2011 - may - 20ivo polák, fzu, prague1 led notched fibre distributing system calibration system for...

9
2011 - May - 20 Ivo Polák, FZU, Prague 1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group [email protected] 1. QMB1 performance 2. QMB1 with Toroidal inductor at PCB 3. Trigger distribution 4. Notched fibre light distribution systems 3x24 5. Resume

Upload: winfred-elliott

Post on 17-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 1

LED notched fibre distributing system Calibration system for SiPM

Ivo Polák, on behalf prague’s [email protected]

1. QMB1 performance2. QMB1 with Toroidal inductor at PCB 3. Trigger distribution4. Notched fibre light distribution systems 3x245. Resume

Page 2: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 2

QMB1

• Quasi resonant Main Board– Modular system, 1 LED per board – DAQ + CANbus control, or stand-alone mode– LVDS Trigger distribution system– Variable amplitude, zero to maximum smooth– Pulse width fixed to abt. 5ns (UV or blue LED)– Voltages and temperature monitor– Width of PCB 30mm, depth TBD {100 to 150mm}

Page 3: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 3

Principal schema

Larger inductor than the older QMB6

Page 4: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 4

Signal distribution

at

30 x D mm

D { 100 to 150 mm } TBDTwo flat cables, Twisted pair for Trigger

Page 5: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 5

TRIGGER (T-calib) LVDS distribution to QMB1

Trigger from DAQ

masterslaveslave slave slave

Terminated 120ohm

Terminated 120ohm

RX

TX

LVDSUp to 6 + 6 slaves modules

Page 6: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 6

work at 2011• QMB1 (1-chanel LED driver):

– Fixed• Topology• Communicating bus (CAN)• CPU (Atmel AVR)• Trigger distribution (LVDS)• Trigger delay canbe tuned by C trimmer

(~10ns)– Free to adjust: will be discussed at DESY in

July calib meeting• Mounting holes (fixation to support/HBU• Fibre(LED) position

• Set of notched fibers, semiautomat machine under development

– Set: 3*fibre with 24 notches, creating a line of 72 notches.

– 3 sets will be delivered

2010 Idea

Page 7: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 7

Notches at one long fibre (24notches total)

Notch # 4 Notch # 24 last one, biggest

Light coupled from tap

LED side

Taken on microscope with zoom ~50

Page 8: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 8

Notched fibre illuminated by green laser pointer

Page 9: 2011 - May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group polaki@fzu.cz

2011 - May - 20 Ivo Polák, FZU, Prague 9

Resume

• QMB1 is in PCB design stage– Exact position of PCB holes to be defined– Exact UV-LED position, coupling to fibre to be defined

• QMB1 in hand with fw - expected in autumn

• Notched fibres sets can be expected in autumn• semiautomat machine is under development