2011 trevi towers
TRANSCRIPT
-
8/4/2019 2011 Trevi Towers
1/32
-
8/4/2019 2011 Trevi Towers
2/32
-
8/4/2019 2011 Trevi Towers
3/32
EDSA
ARNAIZ AVENUE (PASAY ROAD)
MRT STATION
(MAGALLANES)
MRT STATION
(AYALA)
-
8/4/2019 2011 Trevi Towers
4/32
5,000 sqm
-
8/4/2019 2011 Trevi Towers
5/32
Masterplanned by the world-renowned design firm,
PROJECT CONCEPT
ISO 9001 AND ISO 14001 Certified
TUV (Germany) Certified
Awardee, BD Magazine Top 200 Architectural Firms in the
World
-
8/4/2019 2011 Trevi Towers
6/32
Three residential towers on top of a five-levelcommercial structure
5-level parking complex 5-level mall and shopping center 5,000 sqm state-of-the art Amenities & Garden
Complex
PROJECT CONCEPT
A mix-use development in Makati with completefeatures and amenities offered at affordable prices
MAIN FEATURES
-
8/4/2019 2011 Trevi Towers
7/32
Tower 1 378 units ( 28 floors )Tower 2 540 units ( 37 floors )Tower 3 306 units ( 24 floors )
Height ofTower 1 96.00mTower 2 125.00mTower 3 83.00m
* From road line
SouthExpress
way
ChinoR
oces(Paso
ngTamo)
-
8/4/2019 2011 Trevi Towers
8/32
What are the amenities that canbe enjoyed?
health club, swimming pool, outdoorfitness center, garden patio, childrens
playground, function areas
> Pool size - 100.00sqm
-
8/4/2019 2011 Trevi Towers
9/32
Amenities & Garden Center
-
8/4/2019 2011 Trevi Towers
10/32
-
8/4/2019 2011 Trevi Towers
11/32
STRUCTURAL MEASUREMENTS
Distance between buildings: 7.50m - 8.50m
Vertical ClearanceGround-4.0m2nd-5th 3.5m
-
8/4/2019 2011 Trevi Towers
12/32
slab soffitbeam soffit
FLOOR-TO-CEILING HEIGHT
Floor to slab - 2.80mFloor to Beam - 2.40m
-
8/4/2019 2011 Trevi Towers
13/32
TOWER 1
378 Units2 passenger elevators
18 units per floor
South
Expressw
ay
-
8/4/2019 2011 Trevi Towers
14/32
TOWER 2
540 Units3 passenger elevators
18 units per level
SouthExpressway
-
8/4/2019 2011 Trevi Towers
15/32
18 units per level
Tower 3
306 Units3 Passenger elevators
ChinoRoc
es(Pasong
Tamo)
-
8/4/2019 2011 Trevi Towers
16/32
Typical20.40sqm (middle unit)
What are the different types andaverage sizes of the units?
-
8/4/2019 2011 Trevi Towers
17/32
Typical21.00sqm (studio unit)
-
8/4/2019 2011 Trevi Towers
18/32
Typical31.23sqm (corner unit)
-
8/4/2019 2011 Trevi Towers
19/32
UNIT DELIVERY
Ceramic Floor Tiles
Unglazed Ceramic floor tiles @ T&B Painted Finish Walls Granite Counter @ Kitchen w/ under counter
built-in cabinet Sliding Flush Door @ Bedroom
ACU Provision only Aluminum Sliding Window Individual electric meter per unit (located at the
electrical room near fire exit)
Individual water meter per unit (located alongthe corridor)
-
8/4/2019 2011 Trevi Towers
20/32
CHB between units,Dry wall w/in unit
What kind of materials is used forthe walls in between rooms and inbetween units?
-
8/4/2019 2011 Trevi Towers
21/32
COMMERCIAL UNITS
TOWER 3
-
8/4/2019 2011 Trevi Towers
22/32
Tower 3Ground FloorTotal Units = 21
( Pasong Tamo Entrance)
Suggested type of store:-fastfood chain,
-banks,-convenient store
-
8/4/2019 2011 Trevi Towers
23/32
Tower 3Second FloorTotal Units = 25
Suggested type of store:-fastfood chain,
-book store
-
8/4/2019 2011 Trevi Towers
24/32
Tower 33rd FloorTotal Units = 25
Suggested type of store:-dry goods,-music store,-internet/computer shop
-
8/4/2019 2011 Trevi Towers
25/32
Tower 34th FloorTotal Units = 25
Suggested type of store:-office space
-
8/4/2019 2011 Trevi Towers
26/32
FREQUENTLY ASKED
QUESTIONS
-
8/4/2019 2011 Trevi Towers
27/32
Does a unit comes with air-conditioningunits?
No, provisions only.
Covered with Ficemboardwindow type
Is there exhaust for kitchen?
-
8/4/2019 2011 Trevi Towers
28/32
Is there exhaust for kitchen?Is it ducted?
Ducted Kitchen exhaustlocated above the
counter
Yes
Granite Color type
Kitchen counter
-
8/4/2019 2011 Trevi Towers
29/32
Is there a power backup?
Yes, generator will be utilized as astandby power source. Common
areas have 100% power while eachresidential unit will provide limitedpower for basic appliances.
Where will be the water tank
located? Located at the roof deck of every
building
What are the safety features of the
building? Fire Detection & Alarm System Fire Escape Stairs Fire Rated Residential Floors Sprinkler System at common areas
-
8/4/2019 2011 Trevi Towers
30/32
When is the completion of theproject?
Dec 2010-Tower 1 Dec 2013-Tower 2 1st Half 2014-Tower 3
How much is the Reservation Fee? Parking 10,000 Below 3M 25,000 3M to 6M 40,000
-
8/4/2019 2011 Trevi Towers
31/32
PAYMENT TERMS
Payment Term - 20% Equity, 80% Balance20% - payable in 36 months, 0% interest80% - payable thru Bank / In-House Financing
TOWER 2
-
8/4/2019 2011 Trevi Towers
32/32
PAYMENT SCHEMES
TOWER 3
Payment Term - 40% Equity, 60% Balance40% - payable in 48 months, 0% interest60% - payable thru Bank / In-House Financing