    BEE Laboratory Capacity

    Development Program7th February 2012, New Delhi

    S.P.Garnaik,

    Energy EconomistBureau of Energy Efficiency

    Ministry of Power, Govt. of India

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    2/11

    S & L Program of India :Overview

    Phase-I : Setting-Up of Standards &Norms for Energy Consumption

    Define theAppliance[Section 14(b)]

    Set-up theStandards[Section 14(a)]

    Market SurveyMajor Players

    Envisaged Energy SavingNational Policy

    Technical CommitteeExisting Standards (BIS)

    Development of ScheduleStar Rating Plan

    Notification by Govt. of India

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    3/11

    S & L Program of India :Overview

    Phase-II : Implementation of StarRating Plan

    Manner ofDisplay of Labels[Section 14(d)]

    Enforcement[Section 14(c) andSection 17]

    Participation by Manfrs.Approval to Permittees

    Regulations / Schemes

    VerificationInspection

    Levy of Penalty

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    4/11

    Role of Testing Labs in S&LProgram

    Self Certificationby Mnfrs.

    Review by BEE

    Approval toPermittee

    IAME

    Labeled Product Available in Market

    Check-Verification by

    BEE

    Initiate ActionAgainst

    Defaulters

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    5/11

    Check-Verification in S&L Program

    Procedure mentioned in the BEEs Regulation forMandatory Products

    1st Check Test

    Sou-Motu by BEE / Complainreceived by BEE

    If fails,BEE informs the permittee aboutthe result and go ahead with 2nd check-

    test

    2nd Check Test

    At the cost of the permittee

    If fails, BEE issues direction topermittee with intimation to SDAs

    Asks for Action taken report within atime frame

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    6/11

    Laboratory Capacity Building :An Initiative

    Laboratory Capacity Assessment inPhase-I (2009)

    Identification appliances that needtesting as per S&L program

    Modified SFC proposal submitted toMinistry of Power

    SFC approves allocation of Rs. 26.05crore for Govt. Laboratories

    Scope is limited to purchasing testing

    equipment and cost of commissioning

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    7/11

    Invitation of Proposals

    1. Invitation of proposals was floated on BEEs website on19/10/2011 to invite proposals from Government Laboratorieswilling to participate in the Lab Capacity Building project.

    2. Invites were also sent to the 32 Laboratories with a copy to theirrespective ministries.

    3. Twenty six proposals were received for fifteen products from tendifferent laboratories.

    4. Proposals were graded based on the Parameters finalized by BEE.

    5. Technical Adequacy and Final marks were discussed with theScreening Committee.

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    8/11

    Screening Committee

    1. Screening committee meeting was called on28/12/2011 for technical evaluation of the proposals

    2. Members/invitees are from BIS, NABL, Consumer Voice,

    CLASP, PwC with Energy Economist, BEE in Chair2. Nineteen proposals were recommended by the

    screening committee for the approval of Project ApprovalCommittee (PAC).

    3. Seven proposedwere recommend to be dropped by

    the Screening Committee.4. Clarifications were sought through emails from the

    laboratories

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    9/11

    Evaluation Criteria

    1. Priority Product (10 marks)

    2. Regional Need (10 marks)

    3. Laboratory Credential to Avail the Grant (30marks)

    4. Justification to Avail the Grant (30 marks)

    5. Fund Utilization Plan (20 marks)

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    10/11

    Project Approval Committee

    1. To consider the proposals recommended by the ScreeningCommittee.

    2. DG, BEE in Chair with other members being Secretary,BEE, Chairman of Screening Committee and F&AO, BEE

    3. To review the proposals dropped by the ScreeningCommittee.

    4. Finalization of the Fund Disbursement Guidelines.

    5. Finalization of the draft Agreement to be signed betweenthe BEE and test laboratories.

  • 7/31/2019 2012 02 07 Session1 Lab Capacity Building BEE SPGarnaik

    11/11

    Thanks .For further information, Please Contact

    S.P.Garnaik

    Energy Economist

    Bureau of Energy Efficiency,

    Ministry of Power, GOI

    Ph.: 011-23359736

    Email: [email protected]