Page 1: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

14

Load Side Pump

Buffer Tank

Aqua-stat

W2W Unit

Flow Center

Zone Pumps

Manifolds

Tubing

115F

T1 T2

24V AQUASTAT WITH N/O DRY CONTACTS

THAT WILL CLOSE ON FALL IN TEMP!

HEATING ONLY CONTROLS!

Sensor in tank

Page 2: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

15

Page 3: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

16

Load Side Pump

Buffer Tank

Aqua-stat

W2W Unit

Flow Center

Page 4: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

17

� Combo Heat Pump◦ Thermostat (Forced Air)◦ Electric auxiliary heater (Optional)◦ Air Pad◦ Buffer Tank (Pressurized or HSS)◦ Load Side Pump◦ Aquastat (hydronic control)◦ Flow Center� Pressurized

� Non-Pressurized

� Hose kit

� Tubing◦ Fasteners

◦ Manifolds

◦ Fittings

� Zone pumps/Zone Valves◦ Flanges (w/ pumps)

� Hydronic Accessories◦ Air Eliminator

◦ Expansion Tank

� Controls◦ Zone Control

◦ Pump Relay

◦ Thermostats

Load Side Pump

Buffer Tank

Aqua-stat

GT Unit

PT Ports

Page 5: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

18

On Demand Control Strategy!

Page 6: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

19

• Water-Water Unit Applications• Pressurized piping systems• HSS non-pressurized piping systems• Controls (heating & cooling)

• HSS System (on demand)• HBX Controls (either or, plus Outdoor Reset)• Geo-Tech (Don Schuster) (Set point)• Terra-Therm Hydronic Controller (Set point)• Do it yourself (who knows)

• Controls (Heating only)• HSS• HBX• Tekmar• Johnson Controls• Honeywell• Ranco

� W2W units have lower EER’s than Water-Air heat pumps

� Be careful of sensible cooling capacities of the air handler or water coils – do not size strictly based on tonnage

� All piping with chilled water needs to be insulated including pumps

� Buffer tank must be insulated and have an air seal to prevent condensation

� Advantage – one unit vs. two units

Page 7: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

20

Page 8: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

21

HBX ECOHBX ECO--1000 Wiring Diagram (2stg)1000 Wiring Diagram (2stg)

Page 9: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

22

Page 10: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

23

� What is the boiler’s primary function:◦ Back up source only

◦ Supplemental heat – same output temp

◦ Increase supply temp to provide additional btu’s to high load areas

◦ What source of energy is the backup boiler

� Gas

� Electric

� Wood

Page 11: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

24

Page 12: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

25

� Pool & spa heating

� Domestic water heating

� Snow melt

� Process water chilling

� Ice storage or Ice arena’s

� Waste heat recovery

� Simultaneously heating & cooling

� Design the system properly, not using Btu’s per sqft, but rather good design practices.

� Insulation is a huge factor along with thermal breaks, if you aren’t doing it, verify it is done right!

� Select the proper control strategy for the application, buy off the shelf vs. build your own so anyone can service and troubleshoot!

� Size your piping and pumps for proper flow.

� Select your piping strategy for the application as well as the supplemental heat source.

Page 13: 2012 Geo Hydronics Training - REC Info Center · 2013-02-28 · Pool & spa heating Domestic water heating Snow melt Process water chilling Ice storage or Ice arena’s Waste heat

26