“Road safety at road work sites”

Phillip Jordan

IndII Consultant

Mataram 30th and 31st January 2012

Page 2: 20120302152555.phillip jordan on  road safety at roadworks mataram

Objectives of this presentation:

1. To introduce you to road safety engineering.

2. To introduce you to safer ways of managing your road work sites.

3. To explain traffic management plans (TMP’s)

Page 3: 20120302152555.phillip jordan on  road safety at roadworks mataram

The world has a large road safety problem.

o 1.3 million deaths each year on roads of the world

o More than 15 million people injured

o Expected to increase rapidly, unless action is taken urgently

o A “Decade of Action in Road Safety” has started

Page 4: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 5: 20120302152555.phillip jordan on  road safety at roadworks mataram

Indonesia has a massive road safety problem

32,000+ deaths each year on the roads of Indonesia (2010)

Over 250,000 are injured (700 per day) - 2.5% of GDP

61% of deaths are motorcyclists

15% of deaths are pedestrians

Page 6: 20120302152555.phillip jordan on  road safety at roadworks mataram

Road safety engineering is one profession that has an important role to play in road safety. Police, teachers, researchers, doctors and others also have important roles in road safety.

Page 7: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 8: 20120302152555.phillip jordan on  road safety at roadworks mataram

Manual 3 – Road Safety at Work Sites Manual and accompanying DVD (Bahasa and English versions)

A manual and audio visual aid that offers simple diagrams and information

about how to sign and make various common types of road works (i.e., long-term on divided roads, short-term on busy undivided roads, work where a lane is closed, detours, etc)

Page 9: 20120302152555.phillip jordan on  road safety at roadworks mataram

GLOBAL ROAD SAFETY – A CHALLENGE FOR US ALL

A typical scene in many rapidly motorising nations

Page 10: 20120302152555.phillip jordan on  road safety at roadworks mataram

Serious crashes at road work sites are three times more common than on other sections of road.

Page 11: 20120302152555.phillip jordan on  road safety at roadworks mataram

A fatal bus crash outside Palembang – in a road work site

Page 12: 20120302152555.phillip jordan on  road safety at roadworks mataram

ARE YOUR ROAD WORKS UNSAFE?

What do we look for?

What more can we do?

Do not blame drivers/riders for all crashes.

Our roads are not perfect – we must improve them.

Page 13: 20120302152555.phillip jordan on  road safety at roadworks mataram

What is unsafe with this side track?

Page 14: 20120302152555.phillip jordan on  road safety at roadworks mataram

What is unsafe with this side track?

Page 15: 20120302152555.phillip jordan on  road safety at roadworks mataram

What is unsafe here?

Page 16: 20120302152555.phillip jordan on  road safety at roadworks mataram

Unsafe work practices No safety vests Few warning signs No protective barriers

What is unsafe with this long term work site?

Page 17: 20120302152555.phillip jordan on  road safety at roadworks mataram

WE SHOULD NEVER BLAME ONLY THE

DRIVERS/RIDERS?

There is more that we (engineers ) can do to contribute to road safety for all!!

Page 18: 20120302152555.phillip jordan on  road safety at roadworks mataram

There should be no surprises on Indonesian roads!

Page 19: 20120302152555.phillip jordan on  road safety at roadworks mataram

WHAT IS A ROAD CRASH?

“a rare, random, multi-factorial event in which one or more road users has failed to cope with their environment.”

Page 20: 20120302152555.phillip jordan on  road safety at roadworks mataram

AN UNNECESSARY TRAGEDY DUE TO ROAD WORKS!

This man was one of five killed in a head-on crash with a truck in India. The Highway was a divided highway (2 carriageways). The contractor had closed one

carriageway for maintenance – sending all traffic two way along the other carriageway. He did not inform the on-coming traffic to expect two way traffic –

hence this tragedy.

Remember this when you inspect the Airport Road later.

Page 21: 20120302152555.phillip jordan on  road safety at roadworks mataram

Accident implies that :

the cause was unpredictable

no human could have done anything to prevent it

it is outside of our “control”

It was in the “hands of the gods”

These are crashes –

they are not “accidents”

We should use the word “CRASH”

Page 22: 20120302152555.phillip jordan on  road safety at roadworks mataram

A road crash:

• Can have “things” done to prevent it

• Is within our “control”

• Can be prevented

• Is related closely to risk, and is predictable

We should use the word “CRASH”

Page 23: 20120302152555.phillip jordan on  road safety at roadworks mataram

To break that chain, where do we start??

Lets look at a “typical” chain of events……

A road crash is the end result of a chain of events…

Page 24: 20120302152555.phillip jordan on  road safety at roadworks mataram

A 36 year old male is the driver of this truck. He is also the mechanic. His boss allows him to drive it home some weekends.

The chain of events……

Page 25: 20120302152555.phillip jordan on  road safety at roadworks mataram

One weekend, he spends the whole (frustrating)

weekend repairing it (especially the brakes which were

worn)

He finishes late Sunday – it took much more time than

he had expected

Friends drop around – just as he finishes the repair work

Relaxing - they drink and talk until very late

He does not get much sleep

The chain of events……

Page 26: 20120302152555.phillip jordan on  road safety at roadworks mataram

Monday morning – he must start early loading sand at the river near

the city.

Little sleep, no breakfast, late for work.

Drives the truck along a National Highway towards work.

The chain of events……

Page 27: 20120302152555.phillip jordan on  road safety at roadworks mataram

Traffic is heavy.

The highway has unsealed shoulders.

The chain of events……

Page 28: 20120302152555.phillip jordan on  road safety at roadworks mataram

He travels fast.

Many motorcyclists – plus some pedestrians and bicyclists.

Light rain is falling.

The chain of events……

Page 29: 20120302152555.phillip jordan on  road safety at roadworks mataram

He drives very close to the truck ahead of him – impatient to overtake.

He tries several times. The truck ahead has dirty/broken brake lights.

There is a bus in front of that truck.

The chain of events……

Page 30: 20120302152555.phillip jordan on  road safety at roadworks mataram

The road is very “slick” - it has little skid resistance. Wet.

There are no sealed shoulders. Many big “drop-offs” from the pavement.

The chain of events……

Page 31: 20120302152555.phillip jordan on  road safety at roadworks mataram

He knows there is an overtaking lane ahead – he accelerates to overtake the slow bus and truck.

The chain of events……

Page 32: 20120302152555.phillip jordan on  road safety at roadworks mataram

Suddenly........roadworks!

The slow lane is blocked; no advanced warning signs.

The bus and the other truck swerve to the right - without warning.

The chain of events……

Page 33: 20120302152555.phillip jordan on  road safety at roadworks mataram

The chain of events……

Suddenly........roadworks!

The slow lane is blocked; no advanced warning signs.

The bus and the other truck swerve to the right - without warning.

Page 34: 20120302152555.phillip jordan on  road safety at roadworks mataram

The chain of events……

Our 36 year old driver has no time to react – to avoid a “side swipe”

collision he swings his truck to the right hoping to miss the other truck

– hardly slowing. At that instant a motorcycle with 3 girls on it is

travelling past in the other direction. They are not wearing helmets!

Page 35: 20120302152555.phillip jordan on  road safety at roadworks mataram

Our truck driver brakes late and hard – but the new brakes “grab”.

The truck strikes the motorcyclists.

It then side swipes the bus – tipping it over.

The chain of events……

Page 36: 20120302152555.phillip jordan on  road safety at roadworks mataram

One passenger dead

Page 37: 20120302152555.phillip jordan on  road safety at roadworks mataram

What - in this chain of events - „caused‟ the crash ?

• Two motorcyclists killed (head injuries), one very seriously

injured. One bus passenger also dies.

• Police and legal action follows

Page 38: 20120302152555.phillip jordan on  road safety at roadworks mataram

Possible causes………

• His frustrating weekend?

• His drinking?

• His lack of sleep?

• Excessive speed?

• His impatience and inattention?

• The girls on the motorcycle – not wearing helmets?

• The new brakes of his truck?

• The dirty/broken brake lights of the other truck?

• The rain?

• The bus and truck swerving road because of the roadworks?

• Materials being stored on the road?

• The “slick” road conditions?

• The lack of sealed shoulders?

• The big “drop-off” from the pavement?

• No advanced warning of the roadworks?

Page 39: 20120302152555.phillip jordan on  road safety at roadworks mataram

Engineers could have broken this chain of events by:

Sealing the shoulders (create an “escape” route)

Eliminating the big drop offs from pavements

Store materials off the road

Much better advanced warning of the road works

Improving the roads – and especially roadworks sites – is one of the best things an

engineer can do to improve road safety in Indonesia.

YOU CAN SAVE LIVES!

Page 40: 20120302152555.phillip jordan on  road safety at roadworks mataram

HOW CAN WE SAVE LIVES AT ROADWORKS? BY ENSURING – AT ALL OUR ROADWORKS – THAT WE:

Warn

Inform

Guide

Control

Forgive

Page 41: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Warning plus regulatory traffic signs

Page 42: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

SPECIFIC INFORMATION

Page 43: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

SPECIFIC INFORMATION

Page 44: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Plastic bollards, hazard markers

Page 45: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Traffic controllers

Page 46: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Speed limits

Page 47: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Temporary barriers

Page 48: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Very unsafe barriers

Jelek!

Page 49: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Very unsafe location

Jelek!

Page 50: 20120302152555.phillip jordan on  road safety at roadworks mataram

o warn

o inform

o guide

o control

o forgive

Road engineers should....

Very unforgiving location

Jelek!

Page 51: 20120302152555.phillip jordan on  road safety at roadworks mataram

Traffic control at road works is a major problem in most developing countries

Page 52: 20120302152555.phillip jordan on  road safety at roadworks mataram

EVERYONE HAS A ROLE IN ROAD SAFETY

AT WORK SITES

Supervising engineers :

Be aware of their responsibility to manage the site safely

Appoint a Safety Engineer

Provide safety training for all staff

Monitor the site for safety

Workers:

Take responsibility for their own safety

Follow all safety directions

Wear safety vests at all times on the road

Road users:

Comply with all road rules, including speed limits

Page 53: 20120302152555.phillip jordan on  road safety at roadworks mataram

Recurring unsafe practices observed in Indonesia at roadworks Insufficient visibility to first advance warning signs

In the urban area, signs hidden by parked vehicles.

In rural areas, no advanced signs – or sometimes hidden by grass, trees

Use of illegal (unofficial) signs

Use of concrete blocks as delineators

Signs blown over

Little/no use of speed restriction signs

Lack of signing of side roads

Lack of flashing lights on construction plant

14

At road works

Page 54: 20120302152555.phillip jordan on  road safety at roadworks mataram

Recurring unsafe practices observed in Indonesia at

roadworks

Lack of cones, and often no tapers.

Tapers too short.

Use of painted 44 gallon drums filled with concrete.

Excavations not separated enough from the traffic.

Little or no delineation of excavations.

No barrier protection for worker safety.

No barrier protection for pedestrians.

Workers not wearing high visibility clothing.

15

At road works

Page 55: 20120302152555.phillip jordan on  road safety at roadworks mataram

NO TRAFFIC MANAGEMENT OR CONTROL

Page 56: 20120302152555.phillip jordan on  road safety at roadworks mataram

TOO MANY SIGNS TOGETHER, CONFUSING

Page 57: 20120302152555.phillip jordan on  road safety at roadworks mataram

NO SIGNS TO WARN OF SUDDEN CHANGE IN PAVEMENT

Page 58: 20120302152555.phillip jordan on  road safety at roadworks mataram

UNSAFE “BARRIERS”, NO TRAFFIC MANAGEMENT OF

ONE LANE, TWO WAY TRAFFIC

Page 59: 20120302152555.phillip jordan on  road safety at roadworks mataram

NO WARNING OF STOCKPILE AHEAD ON THIS

NATIONAL HIGHWAY

Page 60: 20120302152555.phillip jordan on  road safety at roadworks mataram

IndII and DGH has developed a manual to assist you, Contractors and Consultants to plan and implement safer road works sites.

Please follow the manual to make your road works safer – for all.

Page 61: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 62: 20120302152555.phillip jordan on  road safety at roadworks mataram

LONG TERM WORKS - LONGER THAN ONE DAY

SHORT TERM WORKS - MOBILE

- STATIONARY

ZONE CONCEPT - ADVANCE WARNING ZONE

- TRANSITION ZONE

- WORK ZONE

- TERMINATION ZONE

ENCOURAGES YOU TO PLAN YOUR WORKS

ENCOURAGES YOU TO DEVELOP A TRAFFIC MANAGEMENT PLAN

GIVES YOU SOME DRAWINGS TO GUIDE YOU

Manual 3 explains...........

Page 63: 20120302152555.phillip jordan on  road safety at roadworks mataram

PART A – AN INTRODUCTION TO

ROAD WORK SAFETY

Page 64: 20120302152555.phillip jordan on  road safety at roadworks mataram

Five phases of managing a work site

Page 65: 20120302152555.phillip jordan on  road safety at roadworks mataram

FIRSTLY, YOUR ROAD WORKS NEEDS A TRAFFIC

MANAGEMENT PLAN

What is a Traffic Management Plan (TMP)?

Page 66: 20120302152555.phillip jordan on  road safety at roadworks mataram

TRAFFIC MANAGEMENT PLANS (TMP’S)

A TMP is a plan that shows the signs, barriers and devices to be used at your work site for the duration of your work.

A TMP should be prepared by an experienced and qualified engineer.

It should then be checked for accuracy and safety.

It is then implemented

Page 67: 20120302152555.phillip jordan on  road safety at roadworks mataram

An example of a TMP

Page 68: 20120302152555.phillip jordan on  road safety at roadworks mataram

Steps in preparing your Traffic Management Plan

Page 69: 20120302152555.phillip jordan on  road safety at roadworks mataram

LONG TERM WORKS

Page 70: 20120302152555.phillip jordan on  road safety at roadworks mataram

SHORT TERM (MOBILE) WORKS

Page 71: 20120302152555.phillip jordan on  road safety at roadworks mataram

Steps in preparing your Traffic Management Plan

Page 72: 20120302152555.phillip jordan on  road safety at roadworks mataram

PLANNING YOUR ROAD WORKS IS IMPORTANT

Minimise the number of “starts” and “stops”

along your road work.

Have plenty of “good” signs available for use.

Reflective. Clean. Correct.

Make sure staff are trained and aware. It is their

safety too! Safety vests for all.

Page 73: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 74: 20120302152555.phillip jordan on  road safety at roadworks mataram

Steps in preparing your Traffic Management Plan

Page 75: 20120302152555.phillip jordan on  road safety at roadworks mataram

Steps in preparing your Traffic Management Plan

Page 76: 20120302152555.phillip jordan on  road safety at roadworks mataram

Through work area – most common.

Page 77: 20120302152555.phillip jordan on  road safety at roadworks mataram

Past work area – also common.

Page 78: 20120302152555.phillip jordan on  road safety at roadworks mataram

A side track ( by-pass) – less common.

Page 79: 20120302152555.phillip jordan on  road safety at roadworks mataram

A detour – mainly in urban areas.

Page 80: 20120302152555.phillip jordan on  road safety at roadworks mataram

Planning

Page 81: 20120302152555.phillip jordan on  road safety at roadworks mataram

Safety vests are essential for all workers

Page 82: 20120302152555.phillip jordan on  road safety at roadworks mataram

Think also of managing speeds and managing clearance distance between your workers and the vehicles

Page 83: 20120302152555.phillip jordan on  road safety at roadworks mataram

Steps in preparing your Traffic Management Plan

Page 84: 20120302152555.phillip jordan on  road safety at roadworks mataram

REMEMBER

Page 85: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 86: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 87: 20120302152555.phillip jordan on  road safety at roadworks mataram

Five phases of managing a work site

Page 88: 20120302152555.phillip jordan on  road safety at roadworks mataram

PART B – THE ZONE CONCEPT

Page 89: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 90: 20120302152555.phillip jordan on  road safety at roadworks mataram

Typical work zones

Page 91: 20120302152555.phillip jordan on  road safety at roadworks mataram

Typical work zones

Page 92: 20120302152555.phillip jordan on  road safety at roadworks mataram

Advance warning zone

Page 93: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 94: 20120302152555.phillip jordan on  road safety at roadworks mataram

Transition guidance zone

Page 95: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 96: 20120302152555.phillip jordan on  road safety at roadworks mataram

Work zone

Page 97: 20120302152555.phillip jordan on  road safety at roadworks mataram

Termination zone

Page 98: 20120302152555.phillip jordan on  road safety at roadworks mataram

Five phases of managing a work site

Page 99: 20120302152555.phillip jordan on  road safety at roadworks mataram

PART C - TRAFFIC CONTROL DEVICES

FOR USE AT ROAD WORK SITES

Page 100: 20120302152555.phillip jordan on  road safety at roadworks mataram

MANUAL 3 PART C TRAFFIC CONTROL DEVICES FOR USE AT ROAD WORK SITES

Signs

What these are?

Where they can be safely used?

What design features to note?

Speed restrictions

What these are?

What design features to note?

Barriers

What these are?

Where they can be safely used -

offsets, behind kerbing, deflections?

What design features to note?

Other devices

Details of a variety of other devices

such as lights, flags, flagmen, truck

mounted attenuators, temporary

signals.

Page 101: 20120302152555.phillip jordan on  road safety at roadworks mataram

Signs – the most common device used at road works.

Page 102: 20120302152555.phillip jordan on  road safety at roadworks mataram

Multi message signs are useful for road works

Page 103: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 104: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 105: 20120302152555.phillip jordan on  road safety at roadworks mataram

THREE COMMON PROBLEMS WITH SIGNS

AT INDONESIAN ROAD WORKS

No signs, or not enough signs Dirty, non-reflective signs (often incorrect ) Too many signs, wrongly placed too close together

Page 106: 20120302152555.phillip jordan on  road safety at roadworks mataram

No signs entering road works

Page 107: 20120302152555.phillip jordan on  road safety at roadworks mataram

No signs departing road works

Page 108: 20120302152555.phillip jordan on  road safety at roadworks mataram

Not enough signs to alert drivers/riders

Page 109: 20120302152555.phillip jordan on  road safety at roadworks mataram

Wrong sign – no workers here

Page 110: 20120302152555.phillip jordan on  road safety at roadworks mataram

Wrong sign – no workers here after hours

Page 111: 20120302152555.phillip jordan on  road safety at roadworks mataram

No signs to direct drivers/riders

Page 112: 20120302152555.phillip jordan on  road safety at roadworks mataram

Placing signs

Page 113: 20120302152555.phillip jordan on  road safety at roadworks mataram

SPEED MANAGEMENT

Engineers must install correct signs

Police must then enforce the new limit

Page 114: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 115: 20120302152555.phillip jordan on  road safety at roadworks mataram

THINK ABOUT - AND ACT ON – ROADWORKS SPEED LIMITS

Page 116: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 117: 20120302152555.phillip jordan on  road safety at roadworks mataram

Use a lower speed limit at your worksite if: - Workers will be closer than 3m to the traffic - Machinery will have to share the road with moving traffic - The H or V geometry will be effected by the road works so that sight lines may be reduced. - There is loose material on the road. - Pedestrians and/or bicyclists may be present

Page 118: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 119: 20120302152555.phillip jordan on  road safety at roadworks mataram

Remember line marking

Page 120: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 121: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 122: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 123: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 124: 20120302152555.phillip jordan on  road safety at roadworks mataram

Give Way sign Temporary traffic signals Traffic controllers – each end with radios Do nothing – let traffic sort itself out!

Two way traffic in a single traffic lane

Page 125: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 126: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 127: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 128: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 129: 20120302152555.phillip jordan on  road safety at roadworks mataram

Do nothing – high risk, especially at night

Page 130: 20120302152555.phillip jordan on  road safety at roadworks mataram

Five phases of managing a work site

Page 131: 20120302152555.phillip jordan on  road safety at roadworks mataram

FOLLOW UP INSPECTION TO REPORT

IMPROVEMENTS

Approximately one month after this workshop, IndII consultants will again visit your EINRIP work site and will audit your signs/devices.

IndII wants to see that our workshops are effective.

We want you to help us but (most of all) help the road users.

Page 132: 20120302152555.phillip jordan on  road safety at roadworks mataram

PART D – INDONESIAN CASE STUDIES

Page 133: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 1

Page 134: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 2

Page 135: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 3

Page 136: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 4

Page 137: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 5

Page 138: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 139: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 6

Page 140: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 7

Page 141: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 8

Page 142: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 10

Page 143: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 11

Page 144: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 12

Page 145: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 13

Page 146: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 14

Page 147: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 15

Page 148: 20120302152555.phillip jordan on  road safety at roadworks mataram

Case study 16

Page 149: 20120302152555.phillip jordan on  road safety at roadworks mataram

PART E – SETTING OUT DIAGRAMS

Page 150: 20120302152555.phillip jordan on  road safety at roadworks mataram

Two lane, two way road

Work site on the road, but still space for two lanes

Provide advanced warning

Manage the speeds

Inform drivers of where to go

Guide them there

Manage them past the work site

Tell them when they are out of the zone

For Indonesian roads

Page 151: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 152: 20120302152555.phillip jordan on  road safety at roadworks mataram

Two lane, two way road

Work site on the road, but only space for one lane

Provide advanced warning

Manage the speeds

Inform drivers of where to go

Guide them there

Manage them past the work site – give way signs

or traffic controllers

Tell them when they are out of the zone

For Indonesian roads

Page 153: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 154: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 155: 20120302152555.phillip jordan on  road safety at roadworks mataram

For Indonesian roads

Two lane, one way road

Work site on the road, but only space for one lane

Provide advanced warning

Manage the speeds

Inform drivers of where to go

Guide them into one lane – warning signs for lane

drop

Manage them past the work site – give strong tapers

with plastic bollards

Tell them when they are out of the zone

Page 156: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 157: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 158: 20120302152555.phillip jordan on  road safety at roadworks mataram

Two lane, two way road

Work site on the road, traffic drives through work site

Provide advanced warning

Manage the speeds

Separate the two directions with delineators

Tell them when they are out of the zone

For Indonesian roads

Page 159: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 160: 20120302152555.phillip jordan on  road safety at roadworks mataram

For Indonesian roads

Two lane, two way road – being duplicated

Work site closing one carriageway, all traffic to be

detoured

Provide advanced warning

Manage the speeds

Inform drivers of where to go

Build an all weather detour track (fit for motorcycles too!)

Guide them there

Separate the two directions with strong delineation with

bollards

Tell them when they are out of the zone

Page 161: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 162: 20120302152555.phillip jordan on  road safety at roadworks mataram

For Indonesian roads

Two lane, two way road

Work site closing one direction, all traffic to be detoured

via one way side track

Provide advanced warning

Manage the speeds

Inform drivers of where to go

Build an all weather detour track (fit for motorcycles too!)

Guide them there

Provide strong delineation with bollards

Tell them when they are out of the zone

Page 163: 20120302152555.phillip jordan on  road safety at roadworks mataram
Page 164: 20120302152555.phillip jordan on  road safety at roadworks mataram

REMEMBER

Page 165: 20120302152555.phillip jordan on  road safety at roadworks mataram

As the engineer responsible for a road work site, ensure that you act on the following key points: • Always prepare a traffic management plan. • Use the Zone Concept. • Make sure the zones are long enough to perform correctly. • For larger projects, have the TMP audited by an independent team. • Work with local Traffic Police to keep speeds low through the work site. • Ensure the Contractor has sufficient signs/cones to fully comply with your TMP. • Maintain a Safety (Buffer) Zone around the Work Area to protect your workers.

Page 166: 20120302152555.phillip jordan on  road safety at roadworks mataram

As the engineer responsible for a road work site, ensure that you act on the following key points: • Never allow concrete blocks/branches/rocks to be used for delineation. • Inspect your work site every day – repair or replace any missing or damaged sign or device. • Keep equipment and materials out of the clear zone. • Sweep the road regularly. • Put yourself into “the shoes of the road user” – what will they make of your work? • Finally – record all/any crashes in your work site. Learn from these – can improvements be made.