Page 1: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Heavy Oil: Developments, Challenges,

Opportunities & Technologies

GTPP : Grupo de Trabajo sobreGTPP : Grupo de Trabajo sobreGTPP : Grupo de Trabajo sobreGTPP : Grupo de Trabajo sobre

Petróleos PesadosPetróleos PesadosPetróleos PesadosPetróleos Pesados

José Luis Bashbush

19 – April - 2012

Page 2: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

© Schlumberger 2012

An asterisk is used throughout this presentation to denote a mark of Schlumberger. Other company, product, and service names may betrademarks, registered trademarks, or service marks of others..

JLBB 1

trademarks, registered trademarks, or service marks of others..

Page 3: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Outline

■Heavy Oil What is it

■Heavy Oil in Canada

■ Value Chain - Integrated Approach - Environmental

■ Schlumberger’s Solutions for Heavy Oil

2

■ Schlumberger’s Solutions for Heavy Oil

■Conclusions

Page 4: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

What is Heavy Oil?

3

Source: Oil and Gas Journal/Apr. 17, 2006, Canada NEB, SBC Team Analysis

* Bubble size indicates production rates

Page 5: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Heavy Oil Resources

in The Americas

Page 6: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Variance in Rock Type, H.O. Reservoir Properties & Temperature

0

10

20

30

40

Indonesia Unconsolidated Sand

North Sea Unconsolidated …

USA Unconsolidated Sand/Sandstone

Canada Unconsolidated Sand/Sandstone

Venezuela Sandstone

China Sandstone/Dolomites

Kuwait Fractured Carbonate

Mexico Fractured Vuggy Dolomite

Porosity (pu)

min

max

Permeability (Darcy)

GeologyHeterogeneity

Diagenesis

JLBB 5

0

25

50

75

100

Indonesia Unconsolidated Sand

North Sea Unconsolidated Sand/Sandstone

USA Unconsolidated Sand/Sandstone

Canada Unconsolidated Sand/Sandstone

Venezuela Sandstone

China Sandstone/Dolomites

Kuwait Fractured Carbonate

Mexico Fractured Vuggy Dolomite

min

max

Venezuela Sandstone

0.001

0.01

0.1

1

10

Indonesia Unconsolidated Sand

North Sea Unconsolidated Sand/Sandstone

USA Unconsolidated Sand/Sandstone

Canada Unconsolidated Sand/Sandstone

Venezuela Sandstone

China Sandstone/Dolomites

Kuwait Fractured Carbonate

Mexico Fractured Vuggy Dolomite

Permeability (Darcy)

Res. Temperature (oC)

Page 7: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Canadian Heavy Oil Segmentation

Thermal Recovery Methods:

− Gravity <15o API & Viscosity >25,000 cp

− SAGD, CSS, Steam floods

Non Thermal Recovery Methods:

Annual Investments:

Grew from 4 Billion in 2000 to

almost 20 Billion in 2008

Total Well Count:

6

− Gravity of 14o –22o API, Viscosity 10 to 25,000 cp

− Cold primary, CHOPS, Waterflood

Mining:

− Oil sands <10 API & Viscosity > 1 million cp

Grew from 25,000 to almost 40,000

in the same period

Page 8: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Canadian Heavy Oil Regions

Alberta

Peace River Oil Sands

Athabasca Oil Sands

Wabasca deposits

Cold Lake Oil Sands

Saskatchewan

SAGD

SAGD

Mining

CHOPS

CHOPSCSS, CP

CPCSS

7 AP

Wabasca deposits

Edmonton

Calgary

Saskatoon

Regina

Lloydminster

Heavy Oil

SAGD

Prize!2.2 – 2.5 Trillion bbls

Current technology ~200 Billion Recoverable bbls

CHOPS

Page 9: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Heavy Oil Value Chain – Technologies to Optimize Asset Value

Evaluation, Selection

& Pilot Design

Pilot & Full Field

Development Design

Construction (wells,

surface facilities, pipelines

& Upgrader)

Operations -

Control and

Optimization

EVALUATION

EVALUATION

ESO

Data

Acquisition

& Analysis

8

EVALUATION

EVALUATION

ESO

Monitoring/History

Matching/Optimizing

Risk Mitigation

Smart Fast Pilots – Fully

instrumented

Reservoir Evaluation, Target

Selection based on Technical

and Economic Evaluation –

Pilots Designs

Flow assurance,

Diluent placement,

Multiphase pumping?

Page 10: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Reduce Environmental Footprint

The environment: Central importance

■ New techniques required:

■ To use less net water

■ To produce less waste water

■ To improve energy yield

■ To reduce local (wellsite) footprint

■ Reduce GHG

9

■ Reduce GHG

■ CCS technology continues to improve:

■ Storage reservoir characterization and simulation technology

■ Improve special cements—preserve CO2 injection well integrity

■ Improve technologies to monitor CO2 in reservoir and on surface

■ Capture technology needs to become routine

Page 11: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Proof that the Planet is warming-up

10

Page 12: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Making the Unconventional, Conventional

Value

Development PlanPreliminary Evaluation ConstructionTarget Selection Operational Optimization

Page 13: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Geology and Fluids are the Foundation

Seismic

Structure

Stratigraphy

Petrophysics

Sedimentology

Facies Recognition

Gather Data – Early is more valuable

High Quality Seismic

Complete suites of Logs: Dielectric

Scanner, NMR Scanner & ECS

Cores

Cap Rock Strength & Thickness

JLBB 12

Facies Recognition

Environments of Deposition

Fluid Migration - Recharges

Biodegradation – Fresh water circulation

Cap Rock Strength & Thickness

Inter-bedded Shale integrity w/Steam

Stratigraphic & Cased observation wells

Bottom-hole Fluid Samples

INDISPENSABLE PREAMBLE for MEANINGFUL OPTIMIZED DEVELOPMENT!INDISPENSABLE PREAMBLE for MEANINGFUL OPTIMIZED DEVELOPMENT!INDISPENSABLE PREAMBLE for MEANINGFUL OPTIMIZED DEVELOPMENT!INDISPENSABLE PREAMBLE for MEANINGFUL OPTIMIZED DEVELOPMENT!

Page 14: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Viscosity Mapping

• Viscosity changes with Depth & areally within

same reservoir

• Viscosity influences:

� Recovery technique selection

� Well Spacing & Length

VISCOSITYVISCOSITYVISCOSITYVISCOSITY

MAPMAPMAPMAP

50,00050,00050,00050,000++++

µo Range

NMR Logs

� Well Spacing & Length

� Water breakthrough

� Recovery Factor

• Fluid sampling is required

20 cp20 cp20 cp20 cp @ Tr@ Tr@ Tr@ Tr

Page 15: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Steam Injection Pressure is an added challenge

At higher Injection Pressures

Less Energy in the Steam

Less Efficiency in the Process

14

Page 16: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Schlumberger Solutions for Heavy OilSchlumberger Solutions for Heavy OilSchlumberger Solutions for Heavy OilSchlumberger Solutions for Heavy Oil

� 2005 Created a Heavy Oil ThemeHeavy Oil ThemeHeavy Oil ThemeHeavy Oil Theme

� 2011: Invested > $2.5 MM/day in R&E

JLBB 15

� 2011: Invested > $2.5 MM/day in R&E

Page 17: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Drilling and Drilling and Drilling and Drilling and Drilling and Drilling and Drilling and Drilling and MeasurementsMeasurementsMeasurementsMeasurementsMeasurementsMeasurementsMeasurementsMeasurements

SoftwareSoftwareSoftwareSoftwareSoftwareSoftwareSoftwareSoftware

Artificial Lift Artificial Lift Artificial Lift Artificial Lift Artificial Lift Artificial Lift Artificial Lift Artificial Lift CompletionsCompletionsCompletionsCompletionsCompletionsCompletionsCompletionsCompletions

Well testWell testWell testWell testWell testWell testWell testWell test

Data and ConsultingData and ConsultingData and ConsultingData and ConsultingData and ConsultingData and ConsultingData and ConsultingData and Consulting

EcoscopePeriscope 15Stethoscope

Hotline 550 ESPsSand Control

PipesimEclipse ThermalPetrelVisage

Field Development OptimizationGeomechanics

HEAVY OIL THEME

STARTED 2005

R & DR & DR & DR & DR & DR & DR & DR & D

Characterization, SimulationWell Placement, Production,Monitor & Management

Well ServicesWell ServicesWell ServicesWell ServicesWell ServicesWell ServicesWell ServicesWell Services WirelineWirelineWirelineWirelineWirelineWirelineWirelineWireline

StethoscopePowerdriveMultilaterales

MDTADT /Dielectric ScannerNMR

FlexStone HT Cement[250 oC] & CO2 resistant

Sand ControlMeshRiteSensa-Fiber OpticsVx Multiphase MetersSampling

STARTED 2005

16

Page 18: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Heavy Oil Network

Calgary

3 Research Centers

3 Manufacturing Centers

4 Technology Centers

Page 19: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Improve Well Productivity: Controlling sand production & reducing Skin Damage

Traditional completion with slotted linersMeshRite

Page 20: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Enhanced Productivity by increasing area open to flow

Page 21: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Fishbone type well: Only Main Branch “supported”

STARS Screen Technology for Sand and Flow Control [ICD’s] along the entire well length

JLBB 20

Page 22: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Dielectric Scanner

Tool measuring dielectric formation properties

� In use in Venezuela since Jan.2008

� Quantifies Sw independently of its Salinity

� Determines Water Salinity

� Precise information on Crude Mobility

� High Vertical Resolution : 1”

� Depth of investigation: 1” to 4”

� Ideal for reservoirs with < 20,000 ppm [90%]

Page 23: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Producción Monitoring

Temperature Distributed Sensors - Fiber Optics[ DTS ]

Multiphase Flow Meters [ MPFM ]

– Measure up to 4-phases [ O, W, G + D ]– Measure up to 4-phases [ O, W, G + D ]

– Measures Gas Production even if is trapped as part of Foamy Oil

Page 24: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

DTS – Fiber Optics: Temperature Measurement

� Detect: Water entrance

� Flow rate changes

� Leaks

� Multiple-point injection

� Steam stimulation efficiency distribution

Page 25: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Integrating Data from DTSinto simulation models

Better Calibrated models enhancing optimization

New approach for reservoir optimization incorporating DTS

JLBB 24

enhancing optimization capabilities

Page 26: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Field Development Plan Optimization

Pro

du

cció

n A

cum

ula

da

de

Pe

tró

leo

(M

BN

)

Pro

du

cció

n A

cum

ula

da

de

Ag

ua

(M

BN

)

Pro

du

cció

n A

cum

ula

da

de

Pe

tró

leo

(M

BN

)

Pro

du

cció

n A

cum

ula

da

de

Ag

ua

(M

BN

)

Tiempo (Años)

Page 27: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

EOR/Thermal Challenges

Goal:Goal:Goal:Goal: Profitably Increase Recovery Factor

Can the thermal recovery methods applied in Canada be successfully adapted to the Latin American reservoir

conditions?

JLBB 26

High High High High

Recovery FactorRecovery FactorRecovery FactorRecovery Factor

Cold ProductionCold ProductionCold ProductionCold Production

Low Low Low Low

Recovery FactorRecovery FactorRecovery FactorRecovery Factor

ThermalThermalThermalThermal

What are the applicable thermal recovery methods for my Reservoir?

Page 28: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

HEAVY OIL BURNING ISSUES

ComplexityBlendingMeasurementTransportationFlow Assurance

27

Flow AssuranceSurface FacilitiesChemical TreatmentEnergy ManagementSteam + In-situ CombustionIntegration: Downstrem – UpstreamCO2 & Environmental Considerations

Page 29: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

The Heavy Oil initiative is alive and Vibrant!

Page 30: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

has been preparing for years to help obtain the right information

to reduce the uncertainty of the decisions, to study and select the viable

alternatives to optimize through properly planned pilots the development of

JLBB 29

Heavy Oil Reservoirs !

Page 31: 20120419 JLB for GTPP Mexico dis - · PDF fileMatching/Optimizing Risk Mitigation Smart Fast Pilots –Fully instrumented Reservoir Evaluation, Target Selection based on Technical

Heavy Oil

Can not be taken lightly!