Page 1: 2014 Annual Route Review and Analysis Report

2014 Annual Route Review and Analysis Report

Brown County Planning Commission/ Metropolitan Planning Organization (MPO) for the Green Bay Urbanized Area

March 2014

Page 2: 2014 Annual Route Review and Analysis Report

1

The preparation of this report has been financed in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the Metropolitan Planning Program, Section 104(f) of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. On the Cover: Green Bay Metro buses line up outside Lambeau Field. Photo courtesy of Green Bay Metro.

Page 3: 2014 Annual Route Review and Analysis Report

2

TABLE OF CONTENTS I. INTRODUCTION ..................................................................................................... 4

Overview ................................................................................................................. 4 2014 Operating Budget Estimate Overview ............................................................. 7 II. ROUTE MODIFICATIONS ...................................................................................... 9

III. FULL SERVICE ROUTE SYSTEM PERFORMANCE ........................................... 11

Revenue Per Hour ................................................................................................ 11 Passengers Per Hour ............................................................................................ 13 Operating Ratio ...................................................................................................... 16 Loading Standards ................................................................................................. 18 Schedule Adherence .............................................................................................. 19 Full Service Fixed Route Results and Recommendations ..................................... 20 IV. LIMITED SERVICE ROUTE (LSR) SYSTEM PERFORMANCE ........................... 21 V. PARATRANSIT PROGRAM .................................................................................. 23

Paratransit Contract Rates ..................................................................................... 24 Agency Trips .......................................................................................................... 24 Specialized Transportation Service Demand Uncertainty ...................................... 24

VI. FARE STRUCTURE .............................................................................................. 26 VII. BUS FLEET ............................................................................................................ 27

VIII. SYSTEM ENHANCEMENTS ................................................................................. 29 Paper Transfers Eliminated from Fixed Route System .......................................... 29 Google Translate .................................................................................................... 29 You Tube ............................................................................................................... 30 Green Saturday Program Grows ............................................................................ 30 U-Pass Program ..................................................................................................... 31 Green Bay Packers Game Day Service Expanded to include Residential Areas .. 31 IV. PLANS AND PROGRAMS ..................................................................................... 33

2014-2018 Transit Development Plan (TDP) for the Green Bay Metro System .... 33 Wisconsin Dept. of Transportation (WisDOT) Independent Management Audit .... 35 Green Bay Metro Management Plan ...................................................................... 36

X. SUMMARY OF RECOMMENDATIONS ................................................................ 37

Page 4: 2014 Annual Route Review and Analysis Report

3

LIST OF FIGURES

A. Green Bay Metro Full Service Routes With Paratransit Service Area...................... 6

LIST OF TABLES

1. Revenue per Hour – Weekday .............................................................................. 12 2. Passengers per Hour – Weekday ......................................................................... 14 3. Green Saturday ...................................................................................................... 15 4. Operating Ratio or Percent of Expenses Recovered – Weekday .......................... 17 5. Limited Service Routes – Passengers .................................................................. 22

APPENDICIES

A. Green Bay MPO 2010 Adjusted Urbanized Area Boundary .................................. 38

Page 5: 2014 Annual Route Review and Analysis Report

4

CHAPTER ONE

Introduction

Overview

The Brown County Planning Commission and Green Bay Metro staffs conduct route reviews on a quarterly basis each year in the months of February, May, August, and November. In February of each year, a large-scale review is conducted resulting in the publication of the Green Bay Metro Annual Route Review and Analysis Report, by Brown County Planning Commission. In May, August, and November, a smaller scale route review report is issued.

For each route review, Green Bay Metro’s 14 full service routes are evaluated individually in terms of the performance standards outlined in the Green Bay Metro Policy and Procedures Manual, August 1992, as amended. In February of 2014, the annual Green Bay Metro route review was conducted. Ridership and revenue data were gathered for all full service and limited service routes on weekdays and Saturdays. A special effort was made to separate day and evening data for the full service route system. The passenger and revenue statistics contained in this report are typical of a weekday and Saturday in February. It should be noted that passenger and revenue levels fluctuate throughout the year.

Page 6: 2014 Annual Route Review and Analysis Report

5

From an annual perspective, the number of unlinked passenger trips decreased 2.7% from 1,523,838 in 2012 to 1,482,429 in 2013. The graph below shows the 20-year ridership trend.

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

Un

linke

d T

rip

s

Fixed Route Ridership - Unlinked Trips

Year

Note: New farebox technology implemented in 2009.

Page 7: 2014 Annual Route Review and Analysis Report

VIC

TOR

IA S

T

SH

EA

AV

OLIVIAS WY

LENWOOD AV

BE

RK

EN

CT

8TH ST

SERVAIS ST

COLLETTEAV

3RD ST

JUNIPER DR

OR

RIE

LN

NORTH RD

PADI-WOOD LN

CEDAR ST

APRIL LN

ROCKDALE ST

LOR

RIE

WY

CAROLE LN

GLEN RD

ZAK LN

PINE ST

BERNER ST

MA

LON

EY

RD

HICKORY HILL DR

KENNEY ST

S O

NE

IDA

ST

GLOBE AV

SP

ICA

LN

S L

OC

US

T S

T

BOYD ST

VANDEN BERGH PL

LAV

ER

NE

DR

KURTZ AV

HO

LMG

RE

N W

Y

FERNDALE DR

BLUE RIDGE DR

RO

BIN

ST

CADY LN

SC

OU

T W

Y

RU

TH

ST

CORMIER RD

S B

AIR

D S

T

VANDERBRAAK ST

BY

LSB

Y A

V

AN

GIE

AV

W MARHILL RD

HILLTOP DR

TAL USCI

CYPRESS RD

ST

MA

RY

S S

T

MARINALN

PAULA ST

TOR

DE

UR

LN

N F

ISK

ST

YEAGER DR

LANTERN LN

W PAULSON RD

BOSAR AV

LILYDR

HORSESHOE LN

SHARIE LN

FR

ED

ST

EL

GIN

ST

LAN

E R

D

WALLOUEZAV

8TH ST

MOHICAN CT

TR

ES

TL

E R

D

BOLAND RD

GLORY RD

OREGON ST

ELDORADO DR

VICTORY BL

RE

IME

R S

T

ASHWAUBENON ST

SMITH ST

MORROW ST

RO

Y A

V

ST FRANCIS DR

CREAMERY RD

KILLARNY TR

MC CORMICK ST

HID

DE

N V

ALL

EY

LN

MAIN ST

SCHOOL PL

ELLIS ST

WARREN CT

DOE TR

FIESTA LN

TRU

E L

N

SA

RA

TOG

A S

T

SP

EN

CE

ST

NANCY AV

GWYNN ST

EMILIE ST

AZALEATR

VANDE CT

SU

YD

AM

ST

TOWN HALL RD

ST

JU

DE

ST

JOANNES AV

WESTWAY DR

CHARLES ST

CA

MA

RO

CT

DO

LLA

R L

N

SUNRISE LN

9TH ST

SC

OT

T T

OW

ER

DR

BLUEBILL ST

ELIZA ST

EDISON ST

HOWARD ST

W MAIN AV

RUSK ST

BROADVIEW DR

NE

UF

ELD

ST

VR

OM

AN

ST

FORTUNE AV

GO

OD

ELL

ST10THST

GR

AY S

T

LINDALE LN

CR

ES

TV

IEW

LN

HAVEN PL

SMITH ST

DEBRA LN

SA

N L

UIS

PL

BRYAN ST

LEDGEVIEW RD

BR

IQU

ELE

T S

T

CL

EM

EN

T S

T

7TH ST

RADISSON ST

WAY

NELN

DE

W L

N

MA

RK

ET

ST

COMMANCHE AV

BE

LLE

VU

E S

T

MA

RLE

E L

N

FOX

RIV

ER

DR

THR

US

H S

T

PARTNERSHIP DR

E BRIAR LN

KELLOGG ST

GLE

NV

IEW

RD

FRA

NK

ST

SP

AR

TA

N R

D

MEMORIAL DR

VIEW LN

REBER ST

W BRIAR LN

SUMMER PL

WEDGEWOOD DR

FRO

NTST

CR

ES

TW

OO

D D

R

AVONDALE DR

VIEW LN

WIGGINS WY

FOR

ES

T S

T

TAFT ST

VERLIN RD

HASTINGS ST

BORVAN ST

JOY LN

PORLIER ST

BO

WE

R C

RE

EK

RD

W ROSELAWN BL

OPENGATETR

SP

AR

TA

N R

D

EISENHOWER RD

PE

TE

RS

ST

H

OLLYWY

COUNTRYSIDE DR

RUSTICWY

LARSEN RD

APACHE AV

SANDY SPRINGS RD

EU

RO

LN

TILKENS ST

LOWELL DR

LEA

F S

T

LIDA LN

FREN

CH

RD

SHIRLEY ST

SHAD

OW

CT

N J

AC

KS

ON

ST

6TH ST

SHADOW LN

THORNDALE ST

RICH

CO

RD

AUTOPLAZAWY

ELM ST

PONDEROSA AV

CHRISTIANA ST

GRIGNON ST

LA C

OU

NT

RD

OA

KT

ON

LN

KAREN LN

SAGE DR

DO

UB

LE

Q R

D

SAL ST

DAY ST

TY

RO

LIA

N D

R

S R

IDG

E R

D

AMY ST

RAVINE RD

VE

NU

S D

R

N V

AN

DE

NB

ER

G R

D

CREEKEND LN

10T

H A

V

ECHO LN

GARLAND ST

WESTMEATH AV

GARY LN

THOMAS ST

BA

RB

ER

RY

LN

DONBEA ST

LIS

A L

N

IRE

NE

ST

KLEE ST

DAUPHIN ST

CHAMPEAU RD

FINGER RD

KLAUS ST

GOLF DR

N P

LAT

TE

N S

T

ANDRAYALN

DIVISION ST

JEANST

WILLARD DR

MA

PL

E L

N

SHADY OAK DR

AUGUST ST

E ADAM DR

ORCHID LN

DUQUAINE CT

SHERWOOD DR

S T

AYLO

R S

T

S J

AC

KS

ON

ST

ALT

AIR

ST

12T

H A

V

COFRIN DR

BIEMERET ST

BLUESTONE PL

SANDIA DR

BRUCE LN

ROCKLAND RDS

CH

OE

N S

T

HIL

LTO

P D

R

SPRINGFIELD DR

PRAIRIE AV

SCHOOL PL

BUFFALO ST

LAU

RA

ST

LHOST CT

WH

ISP

ER

LN

CONRAD DR

OA

K S

T

PIO

NE

ER

DR

FLIGHTWAY DR

S Q

UIN

CY

ST

ME

AC

HA

M S

T

WES

TPLA

INDR

ROBINSON AV

N D

AN

Z A

V

SC

HW

AR

TZ S

T

WESTFIELD AV

WEST POINT RD

CONTRACT DR

EL

MV

IEW

RD

CONTINENTAL DR

MO

RR

ISO

N R

D

JUBILEE DR

SO

UT

H P

OIN

T R

D

SKYLARK LN

S MELCORN CI

FAIRVIEW AV

SHAWANO AV

11TH

AV

N G

RA

ND

VIE

W R

D

ER

NS

T D

R

DAISY LN

WIL DCAT TR

MARVELLE LN MORRIS AV

SINCLAIRDR

6TH ST

PIKE LN

BOND ST

ED

GE

WO

OD

DR

SA

ND

AC

RE

S D

R

IRE

NE

ST

MID

VALL

EY DR

LILAC LN

LIM

E K

ILN

RD

AB

RA

MS

ST

HUGUETCT

DOUSMAN ST

N M

ILIT

AR

Y A

V

GO

OD

ELL

ST

VALLEY VIEW RD

VAN DEUREN ST

HUTSON RD

PLYMROCK TE

BALS

AM

WY

VAN RD

N N

OR

TH

VIE

W R

D

FRANZ AV

EMMET ST

CRIMSON WY

E ALLOUEZ AV

ELKAY LN

KE

PL

ER

DR

NPA

CKER

LANDDR

DOLLAR RD

ED

MU

ND

RD

CA

MIL

LA L

N

10T

H A

V

N L

OC

US

T S

T

WEISE ST

RED T

AIL

RA

VIN

E W

Y

MATHER ST

SCRAY HILL RD

BAY BEACH RD

DO

RN

DR

11TH

AV

8TH ST

KLONDIKE RD

CO

UN

TR

Y C

LU

B R

D

S C

LAY

ST

LEMONLN

RANDALL AV

GEMINI RD

ST MARYS BL

HURLBUT ST

HILL DR

SCOTTWOOD DR

CRIMSON CT

LANGLADE AV

CHIP ST

N O

AK

LAN

D A

V

ANTLERTR

COPPER LN

MINTEN WY

S9T

HST

LIST CT

GR

OV

E S

T

MANCEL LN

GR

EEN

LEA

F R

D

SIMONET ST

ENGLEWOOD RD

ROCKDALE ST

O'HARE BL

KENWOOD ST

SILVER LN

PARKVIEW RD

MISTYMOONWY

CAROLINEST

LAWE ST

WOODFIELDDR

VANS LN

KALB AV

JOD

Y D

R

BURNS AV

QU

AR

RY

PA

RK

DR

SHERRY LN

7TH ST

SHA

DY

LN

LIBERTY ST

SM

APLE

AV

WO

OD

LN

E MISSION RD

ZITA ST

CREAMERY R

D

DU

RH

AM

RD

OAKWOOD DR

I43

E MASON ST

PAC

KERLA

ND

DR

ER

IER

D

EATON RD

LAW

REN

CE

DR

LIB

AL

ST

GRANT ST

HERITAGE RD

S H

UR

ON

RD

S W

EB

ST

ER

AV

ON

TA

RI O

RD

STURGEON BAY RD

SAS

HLA

ND

AV

SCHEURING RD

MA

NITO

WO

CR

D

UNIVERSITY AV

S V

AN

DE

NB

ER

G R

D

EA

ST

RIV

ER

DR

SG

RA

ND

VIE

WR

D

AIRPORT DR

BA

YS

ET

TLE

ME

NT

RD

LOMBARDI AV

13T

H A

V

SW

AN

RD

DECKNER AV

EASTMAN AV

AM

ER

ICA

NB

L

AL

PIN

ED

R

WESTERN AV

RIVERVIEW DR

S F

ISK

ST

DUTCHMAN RD

PILGRIM WY

WAUBE LN

N IR

WIN

AV

SITKA ST

ELMORE ST

NEWBERRY AV

HANSEN RD

DOTY ST

EAST SHORE DR

FARLIN AV

S E

RIE

ST

GU

NS

ST

LEBRUN ST

14T

H A

V

PH

ILLI

PS

RD

CROOKS ST

GR

OS

S A

V

HILLSIDE LN

SUS

SE

X R

D

N B

AIR

D S

T

E WALNUT ST

CHERRY ST

REED ST

CIRCLE DR

N Q

UIN

CY

ST

4TH

ST

3RD

ST

PECAN ST

S M

ON

RO

E A

V

S N

OR

TH

VIE

W R

D

SR

IDG

ERD

EL

IZA

BE

TH

ST

CHICAGO ST

JOR

DA

N R

D

HARVEY ST

BA

DE

R S

T

S CIRCLE D R

GREENBRIER RD

TIM

BE

RLN

HA

ZE

NR

D

SU

BU

RB

AN

DR

PREBLE AV

MERRILL ST

W

IETOR

DR

N H

EN

RY

ST

HOFFMAN RD

VAN BEEK RD

GREENE AV

ROSCOE ST

BETH DR

STAGEC

OAC

H R

D

CASS ST

STUART ST

ALL

IED

ST

S6

TH

ST

N T

AYLO

R S

T

5TH ST

S 7

TH

ST

MAYLINE RD

VOYAGER DR

RIDGEWAY DR

BASTEN ST

HAROLD ST

SU

PE

RIO

R R

D

N M

AP

LE A

V

ST

GE

OR

GE

ST

EN

TE

RP

RIS

E D

R

WIL

SO

N A

V

FO

RT

HO

WA

RD

AV

AT

KIN

SO

N D

R

S R

OO

SE

VE

LT S

T

E HOFFMAN RD

EM

ER

AL

D D

R

MESA DR

CO

MM

OD

ITY

LN

ESSEN RD

CLINTON ST

LONGVIEW AV

FLORAL DR

STA

TE

ST

RA

MA

DA

WY

COURIER RD

SH

OR

T R

D

OAK RIDGE CI

S A

DA

MS

ST

ME

LOD

Y D

R

JOH

N S

T

O'KEEFE RD

HE-NIS-RA LN

BAIRD

CREE

KR

D

CR

AR

YST

JAMES ST

NB

RO

ADW

AYST

S M

AD

ISO

N S

T

RO

YAL

BL

DE

LAH

AU

T S

T

MINAHAN ST

N A

SH

LAN

D A

V

SKYVIEWST

CLI

VE

ST

ST

AG

NES

DR

E CIRCLE

DR

BR

UL

E R

D

OLD

PLAN

KR

D

TER

RY

LN

OAK ST

DALY DR

SK

YL

INE

BL

CUR R YLN

FRANKLIN ST

E ST JOSEPH ST

N

CIRC LE DR

KARL ST

PARK DR

ET

HE

L AV

INDIAN

TR

IND

IA

N HILL DR

FULTON ST

NAVAJO TR

WINDLAND DR

FINCH LN

RIDGEWAY BL

SOUTHBRIDGE RD

WIR

TZ

AV

CO

LUM

BIA

AV

N8T

HS

T

COOK ST

S N

OR

WO

OD

AV

EB W MASON FRONTAGE RD

DONALD ST

HE

YR

MA

N S

T

HIN

KL

E S

T

8TH ST

LAKESIDE PL

WESTWOOD DR

BEAUPRE ST

MEADOW VIEW LN

BROOKRIDGE ST

RALEIGH ST

GR

EE

NW

ALD

ST

PARKWOOD DR

HELENA ST

LAK

E L

AR

GO

DR

MILLS ST

WIN

FO

RD

AV

VICKI LN

WIE

SN

ER

ST

RO

LAN

D L

N

BROOK PARK DR

N C

HE

STN

UT

AV

LAU

ST

CO

TT

ON

WO

OD

LN

ALICE DR

OAKDALE AV

BIG CREEK RD

DALLAS LN

AR

GO

NN

ED

R

PLE

AS

AN

TL

N

BLUE SPRUCE DR

ST ANTHONY

DR

WE

SLE

Y A

V

ARBOR LN

15T

H A

V

HO

PF

LN

HO

BA

RT

DR

LE

ON BOND D R

WA

L

L ST

OA

KW

OO

D A

V

BAETEN RD

HA

WTH

ORNE HEIGHTS DR

LORE LN

DEER TR

MT

MA

RY

DR

VANDERPERREN WY

NE

VIL

LE A

V

PION EER

DR

CO

LON

IAL

AV

AP

HR

OD

ITE

RD

WA LK ER

DR

MEMORY AV

BE

AU

MO

NT

ST

RUSSELL ST

SE

MIN

OLE TR

CH

AL

LE

NG

ER

DR

RAVINE DR

LEWIS ST

MAY LN

SS

UP

ER

IOR

ST

MAES DR

ANDERSON DR

MAPLE CT

SUN TE

RO

BE

RT

LN

N C

LAY

ST

ANGELS PATH

MA

RQ

UE

TTE

AV

MA

RS

HA

LL A

V

LOIS ST

AM

BE

RLN

DE

SP

LAIN

ER

D

KENNEDY DR

DREWS DR

CRUSADE LN

CENTURY RD

NL

IBA

LS

T

KA

SS

NE

R D

R

MAYFLOWER RD

BADGER ST

VIK

ING D R

N V

AN

BU

RE

N S

T

LA

MB

EA

US

T

HU

TH

ST

PEONIES DR

JEN RAE RD

AQUARIUS R D

PARK PL

DAVI ES AV

CONESTA DR

SHELLEYL

N

BE

EC

HT

RE

ED

R

MA

DR ID DR

IRONWOOD DR

EDINBURGH RD

ISB

ELL

ST

IVY HILL DR

HO

LZE

RS

T

MA

YW

OO

D A

V

W WALNUT ST

SIL

V

ER ST

HA

RV

ES

T R

D

REMINGTON RD

LANCE ST

RO

TH

E S

T

OT TO CT

DU

CH

AR

ME

LN

LYN

WO

OD

L N

WHITTIER DR

LA

YD

EN

DR

SM

ICH

IGA

NS

T

LAR

UE

LN

TR AILW O OD DR

BIT

TER

SW

EE

T A

V

JAC

OB

ST

GILBERT DR

BOMIER ST

LANDE ST

RA

INB

OW

AV

CR EST LN

K EN DR

N M

AD

ISO

N S

T

NM

ICH

IGA

NS

T

VA

N C

AS

TE

R D

R

S V

AN

BU

RE

N S

T

HA

RT

UN

G S

TEMIR ST

BR

OS

I GS

T

CH

AN

TE

LS

T

AM

BE

RLY

TR

GA

IL

DR

ST ANN DR

FOXFIRE

DR

HAMPTON

AV

SUNRISE CT

WARM SPRIN GS DR

BERKSHIRE DR

CAREFUL DR

TERESA DR

S O

NTA

RIO

ST

MC

KE

NZ

IELN

S B

RO

AD

WA

Y S

T

EGAN LN

MARYJODR

GAR

RE TT

ST

KE

EH

AN

LN

ALLA

RD

ST

CO

MM

ER

CE

DR

NN

OR

WO

OD

AV

ME

NLO

PA

RK

RD

AS

HLA

ND

AVA

CC

ES

SR

D

MA

HO

NC

T

ALDRIN ST

H

ILT

ON

HEAD DR

SLO

CU

ST

ST

COOLIDGE ST

SM

ITS

ST

COLLEGE PARK DR

ECL IPSE DR

S SEDON A CI

ARAPA

HO

ET

R

N SEDONA CI

NE

LSO

NST

ISL

AN

D C

T

CO

PP

EN

SR

D

SA

NTA

BA

RB

AR

AD

R

CR

OC

US

DR

S J

EF

FE

RS

ON

ST

TERRAVIEW DR

DERBY LN

WIN

DW

AR

DR D

NW

EB

ST

ER

AV

BERKLEY RD

BR

ET

CO

ED

R

MIRAMAR DR

ZEISE AV

TWILIGHT DR

COMMERCIAL WY

LON

E O

AK

RD

HIGHVIEW ST

ZE

LA

SD

R

CA

RD

INA

LS

T

LE

EA

V

LOUIS E ST

DA

NC

ING

DU

NE

SD

R

HIL

LC

RE

ST

DR

GENEVA ST

CLA

YT

ON

PL

N M

ON

RO

E A

V

PIN

ET

E

LON

D

ON

RD

WO

OD

LA

ND DR

ST CLAIR ST

WIN

D

SOR DR

R

ADINZ RD

W LAZARRE AV

MO

ON

VA

LL

EY

DR

HI L LSIDE HEIGHT S DR

KA

TH

YD

R

BAYWATCH DR

E VIS

TA C

I

S H

EN

RY

ST

ST PAUL ST

CA

NT

ER

LN

RI V

E

RPINES DR

BAY VIEW DR

KN

OLL

TE

WINDING WATER S W

Y

TO

NY

LN

VALLEY HEIGHTS DR

FR

ON

T S

T

DE

LWIC

HE

RD

CH

IEF

HIL

LD

R

LIN

CK

CT

MC

DO

NA

LD

ST

GOOSER

D

JANICE AV

S P

EA

RL

ST

SAS

HLA

ND

FRO

NTA

GE

RD

MORRIS ST

BINGHAM

DR

NOVA LN

AR

NO

LD

DR

CH

A

RLA MA R DR

KETTLEC

R

E EK DR

JOU

RD

AIN

LN

HU

DS

ON

ST

SOMERSET DR

WH

EA

T W

Y

SIE

RRA CT

NIM

ITZ

DR

TORDEUR CT

STILES RD

DE

LR

AY

DR

PATT

YLN

RED MAPLE RD

TRISSINO WY

S D

AN

Z A

V

FERN LN

CO

LLA

ER

CT

NA

DA

MS

ST

IMPERIAL LN

PALMER DR

WOLVE

RI N

ET

R

WESTMINSTER DR

WILDERS

T

PA

TR

IOT

WY

PIL

GR

IMS

T

CHOCTAWTR

ESTES DR

KAT

ER

SD

R

AUGUSTA ST

RIVERIDGE LN

BLACKWOLF RN

NE

WT

OL

S S

T

C UMBERLAND DR

PROSPER ST

AP P IAN WY

GLEN ABBEY DR

NO

OY

EN

LN

DUTTON AV

WA

UB

EN

OO

RD

R

BA

YH

AR

BOR DR

PR

OFI

T PL

MC

CASTLEN ST

KA

LAH

AR

I DR

MO

RLE

Y R

D

C REEKWO OD CI

VENT

UR

EA

V

SAN JOSE PL

W ST JOSEPH ST

FRE

DR

ICK

CT

WO

OD

RO

W W

Y

RO

SE

WO

OD

ST

SEQUOIA LN

SPYGLASS HILL DR

N R

IVE

RD

ALE

DR

NIER

CT

PE

RS

HIN

G

RD

NE

LLIE

LN

VIRGO RD

TO

MM

AR

KS

T

LOS

TLN

FAGERVILLE WY

DE

WEY

D ECKER DR

WATERFORD DR

MORAINE TE

OAKLAWN AV

COLLEGE AV

DUNBAR LN

AN

NLN

D

OL O MITE DR

RA

INB

OW

CT

GRACE ST

DO

RS

ET

DR

BUFFLEHEA D LN

STEVENS ST

NAUTICAL AV

GRAASS ST

TOM

LIN

ST

VINCENT RD

MU

SEU

MPL

H EMLOCK DR

QU

INT

ON

ST

FIR

ELA

NE

DR

POLO RUN TE

PARKSIDE CT

SYCAMO

RE

DR

SONATA DR

GRIFFITHS LN

MA

ST

ER

SL

N

VE

RC

AU

TE

RE

ND

R

S IDLEWILD CT

ALL

AR

DAV

ALL

EN

AV

HANNAH ST

BLUE MOON DR

DIS

CO

VE

RY

RD

M O

RA

INE

WY

LIN

DE

ND

R

EDGEWOOD LN

MONACO DR

EMMALAN E DR

E

MA

TT

HE

WD

R

RED OAK DR

MAYLINE DR

GU

NS

RD

MT

MA

RY

CI

OLD VAL LEY RD

NR

OO

SE

VE

LTS

T

SORENSON DR

O'H

E

ARN LN

LOR

RA

INE

LN

SURREY TR

PIN

TAIL

ST

YORKSHIRE RD

DETRIE DR

IRIS CT

FAY CT

IRV

ING

TON

ST

OA

KG

RO

VE

AV

FAW

NLN

BLU

EB

IRD

ST

LAREDO LN

MEAD

OW

CI

KIMBALL ST

GLA

CIE

RD

R

HU

BBLED

R

LL

AM

AC

T

BOARDWALK AV

EMINENCES

T

TURNBURY RD

CONCORD WY

R

EGINALD HILL

COTTONWOOD CT

DAFFODIL DR

MAIN ENTRANCEDR

FARMSTEAD RD

WOODMONT WY

HA

RR

ISO

NS

T

BRICK DR

ROSE LN

EVENINGSTAR

DR

PESO PL

SO

AK

LAN

DA

V

CENTENNIAL ST

SE

RV

AN

TW

Y

RITA LN

ORCHARD LN

ST GREGORY DR

GLEN OAKS PS

N MELCORN CI

RO

CK

LED

GE

CT

BA

RT

STA

RR

DR

ELBEN CT

SWAN RIDG

ETR

SCH

AN

OC

K D

R

VIS

TA

RD

VALIANT LN

CA

RS

TE

NS

EN

LN

SW

AN

STO

NE

CI

SUNNYMEDE LN

TIGER CT

OSLO DR

RIDGE HAVENC

T

ALLOUEZ TE

AG

AT

HA

CH

RIS

TIEAV

VA

NE

GE

RE

NL

N

LIM ESTONE TR

MARIAN LN

HE

RIT

AG

EH

EIG

HT

S

STRAWBERRY L N

MANDERLY WY

UTA

HA

V

MIT

CH

ELL

ST

DE

CU

RIA

LN

TOBERMORY DR

EMORY ST

PARISLN

EASTBREEZE LN

AU

TO

PL

AZ

A D

R

NW

AS

HIN

GTO

NS

T

LEONARD ST

MA

RY

HIL

LD

R

VA

L

LEY LN

RIVER

POINT CT

KE

LLY

JOD

R

PETERSONRD

DOVER L N

ROSEMONT DR

HEYDEN LN

COTTAGE HILL DR

TU

RQ

UO

ISE

TR

SC

OTT

DR

MT CAROL DR

FO

XH

EIG

HT

SLN

WG

ILE CI

NOEL D

R

FASCINATION DR

HILLSDALECT

DE

SC

HA

NE

PL

ME

CH

ST

LUK

ELN

PAINT HORSE TR

WILLARD TE

CA

VIL

WY

HIGH LAN D C ENTER DR

OA

K L

EA

F D

R

RIDGEVIEW CT

SW

ISS

ME

AD

OW

LN

REINHARD DR

CE

DA

RR

IDG

EC

T

AE

RTS

LN

S SUNKIST CI

STADIUM DR

CHANTILLY

RU

DE

PR

EY ST

WAYSIDE PL

SILV ER MAPLE DR

HACKBER RY CT

PHOEBE ST

OA

KR

IDG

ED

R

TU

RE

K S

T

RIVERBEND TE

PLATEAU HEIGHTS RD

TO

UC

HS

TO

NE

DR

CABOOSE LN

TENMILE DR

ARMED FORCES DR

YAHARA CI

KENSINGTON LN

SFI

FTH

ST

MILESKI LN

WILD

R OSE DR

WEXFORD LN

ME

AD

OW

WIN

D D

R

WOODRIDGE LN

SHERIDAN DR

ALLEN POND RD

LEDVINA ST

SWAN POINTETE

TRA

EG

ER

ST

LAC

ON

A C

T

WILCO

X

CT

BE

VE

RLY

RD

ED

MU

ND

DR

TAS-SHA CT

WILLOWBROOK

RD

S IR

WIN

AV

BA

CH

EL

OR

DR

MCRAEP

L

CENTRA

LD

R

CRABB CT

REGAL AV

SW

AM

PR

D

RAV

INE C T

HO

LS

CH

UH

LN

CANYONLAND DR

SATELLITE LN

NB

A

DERST

CAMELOT CT

GARDEN PARK TE

WE

BS

TE

RC

T

SHELTER CREEK CT

OLD C OACHRD

RE

DT

AIL

GLE

N

KAYLEE CI

QUINDALEE RD

FAYETTE LN

BR

IAR

WO

OD

CT

RE

DB

IRD

CI

CH

ATEA

U D

R

OAK RIDGE CT

RUSH CT

CORONIS CI

AM

ER

ICA

NC

T

CA

LA

WA

YD

R

BETHANY PL

WEBSTER HEIGHTS DR

APPLE RIDGE CT

SW

AS

HIN

GTO

NS

T

SC

HE

ST

NU

TA

V

BIT

TE

RS

CT

ASH ST

SHADOW LN

ME

AD

OW

LN

5TH ST

SHAWANO AV

JAMES ST

AM Y ST

CHICAGO ST

RIT

ALN

CHURCH RD

S C

LAY

ST

PAR

K S

T

S Q

UIN

CY

ST

S J

AC

KS

ON

ST

7TH ST

LAWE ST

NQ

UIN

CY

ST

MORRIS AV

S C

LAY

ST

HU

TH

ST

CASS ST

ORLANDO DR

CEDAR ST

S M

AP

LE A

V

SU

MA

CD

R

N W

EB

ST

ER

AV

RIV

ER

SID

E D

R

WILLIAM ST

S J

EF

FE

RS

ON

ST

N C

LAY

ST

ELM ST

ORLANDO DR

ALP

INE

DR

NA

DA

MS

ST

MA

NIT

OWOCRD

14T

H A

V

MATHER ST

COTTAGE GROVEAV

VIC

TOR

IAS

T

CASS ST

LAR

RY

LN

WEISE ST

PARK ST

WEISE ST

NC

LAY

ST

RED MAPLERD

SUE

LN

RAV

INE

WY

RE

DW

OO

DD

R 15T

HA

V

SW

EB

ST

ER

AV

CHICAGO ST

WILDWOODD

R

S R

IDG

E R

D

LIN

CO

LN S

T

POTTS AV

VIKING LN

CA

RD

INA

L L

N

MO

NR

OE

RD

ALLOUEZ AV

MAIN AV

7TH ST

N H

UR

ON

RD

S M

ILIT

AR

Y A

V

REID ST

SP

IRIT

WY

GERSHWIN DR

BROOKWOOD DR

LEO ST

N 6TH

ST

AMS

BL

LOMBARDI ACCESSRD

GLENVIEWAV

WO

OD

SID

E R

D

BAD

GERLAND DR

LAN

C

ASTER TE

N 1

0TH

ST

UL

LM

ER

CT

N B

RO

AD

WA

Y

S B

RO

AD

WAY

CORMIER RD

VELPAV

VELPAV

VELPAV

MIN

OR

CT

TR O J AN DR

CO

RN

E

LI U S DR

ALBERT DR

EA

RLYST

HANS

EN

RD

EATONRD

HUMBOLDT RD

ALGOMA RD

LUXEMBURG RD

PINE GROVE RD

KEWAUNEE RD

WILLOW RD

GL

EN

MO

RE

RD

LAR

KS

T

PLEASANT VALLE

YD

R

FINGER RD

E MASON ST

FINGER RD

CH

AR

IT

YLN

WO

O

D HALL DR

NAVI G

ATO

RW

AY

Ê0 0.5 10.25 Miles

1

1

14

14

11

11

5

7

2

7

10

8

6

5

3/4

4

3

17

17

UWGBNWTC

Map created by: Brown County Planning

Commission Staff 2/10/2014

2

5TH ST

7TH ST

N M

AP

LE A

V

9TH ST

STA

TE

ST

HOWARD ST

MC

DO

NA

LD S

T

CLINTON ST

OA

K S

T

N C

HE

STN

UT

AV

ST CLAIR ST

CHRISTIANA ST

ALL

AR

D A

V

HA

RVA

RD

ST

DENIS PL

S O

AK

LAN

D A

V

S M

AP

LE A

V

REED ST

S P

EA

RL

ST

SCHOOL PL

N R

OO

SE

VE

LT S

T

W WALNUT ST

N A

SH

LAN

D A

V

OX

FOR

D A

V

S G

RE

EN

WO

OD

AV

ARNDT ST

HUBBARD ST

JAMES ST

MU

SE

UM

PL

N J

EFF

ER

SO

N S

T

S M

AP

LE A

V

N G

RE

EN

WO

OD

AV

11T

H A

V

SEYMOURCT

SCHOOL PL

S C

HE

STN

UT

AVS

CH

ES

TNU

T AV

4TH ST

N C

HE

STN

UT

AV

S O

AK

LAN

D A

V

N N

OR

WO

OD

AV

JEFFERSON WY

FIN

K S

T

3RD STS M

AP

LE A

VS

OA

KLA

ND

AV

6TH ST

10T

H A

V

10T

H A

V

N O

AK

LAN

D A

V

LAKE ST

8TH ST

15T

H A

V

3RD ST

N C

LAY

ST

CONGRESS ST

S R

OO

SE

VE

LT S

T

N A

DA

MS

ST

S J

EF

FER

SO

N S

TN

AD

AM

S S

T

S J

EF

FER

SO

N S

T

E WALNUT ST

STUART ST

CASS ST

CROOKS ST

N W

AS

HIN

GTO

N S

T

S IR

WIN

AV

CHICAGO ST

N M

AD

ISO

N S

T

S M

AD

ISO

N S

T

CEDAR ST

N W

EB

STE

R A

V

N Q

UIN

CY

ST

UTILITY CT

DOTY ST

BODART ST

N M

ON

RO

E A

V

S Q

UIN

CY

ST

S V

AN

BU

RE

N S

T

S A

DA

MS

ST N

QU

INC

Y S

T

CHERRY ST

HOWE ST

PINE ST

DO

NA

LD D

RIV

ER

WY

VANDERBRAAK ST

ELM ST

S J

AC

KS

ON

ST

N V

AN

BU

RE

N S

T

N C

LAY

ST

S Q

UIN

CY

ST

N J

AC

KS

ON

ST

N B

RO

AD

WAY

S W

AS

HIN

GTO

N S

T

5

8

3/4

111

2

Transit CenterDowntown Inset

Legend

#1 Brown Line

#2 Orange Zippin Line

#3 Silver Line#4 Blue Line

#6 Red Line

#7 Lime Line#8 Green Line

#11 Sky Line

#14 Pink Line

#17 Brick Line

14

18

18

18

#18 Gold Line

Paratransit Service Area

#2 Orange Zippin Line Upon Request

18

6

Transit Center

6#5 Plum Line

#10 Yellow Line

8

8

10

10

3/4

8

8

5

Page 8: 2014 Annual Route Review and Analysis Report

7

2014 Operating Budget Estimate Overview

Green Bay Metro’s 2014 operating budget estimate is projected at $7,847,400. Green Bay Metro receives operating assistance from a variety of sources. These include the Federal Section 5307 program, State 85.20 program, local dollars from entities participating in the system, fares, advertising revenue, and interest revenue.

A summary of the 2014 estimated Green Bay Metro budget by revenue source is below:

2014 Budget Estimate

Source: Amount Percent Federal $2,148,235 27.4% State $2,187,453 27.9% Local $2,041,562 26.0% Fares $1,370,000 17.4% Other $100,150 1.3% Total: $7,847,400 100.0%

Page 9: 2014 Annual Route Review and Analysis Report

8

Local Share

The 2014 budget estimate consists of contributions from participating local entities. The sum of the contribution is projected to be $2,041,562 (26.0%) of the entire operating budget. Local entities contribute to the system based on system mileage and population. The breakdown by participating local entities is as follows:

2014 Budget Estimate – Local Contribution Analysis

Source: Amount Percent of

Local Share Percent of

Overall Budget Green Bay $1,514,044 74.2% 19.3% Ashwaubenon $223,596 11.0% 2.8% De Pere $165,310 8.0% 2.1% Allouez $97,236 4.8% 1.2% Bellevue $41,376 2.0% 0.6% Total: $2,041,562 100.0% 26.0%

Page 10: 2014 Annual Route Review and Analysis Report

9

CHAPTER TWO

Route Modifications

2013 Fixed Route Service Modifications

On December 2, 2013, Green Bay Metro implemented several changes to the fixed route system. Many of the changes were necessitated as a result of the Oneida Tribe of Indians withdrawing financial participation from the system. Prior to this, the tribe contributed the local share for the #16 Shadow route. #4 Blue The #4 Blue route was modified to provide service along Velp Avenue and to allow for improved transfers at Green Bay Plaza. #5 Plum The #5 Plum replaced the #6 Red-South and provides direct service between downtown and Lombardi Middle School with a transfer opportunity at Green Bay Plaza. The #5 Plum only operates on weekdays during the morning and afternoon peaks. #6 Red The #6 Red replaced the #6 Red-North and #100 Downtown X-Press and provides direct service between downtown and NWTC with a transfer opportunity at Green Bay Plaza. Route frequency was reduced to once per hour after 6:00 p.m. on weeknights and on Saturdays. #8 Green The #8 Green (clockwise loop) and the #9 Yellow (counter-clockwise loop), which previously operated as a route pair, now operate in a clockwise direction only. The service retains the #8 Green designation and operates with 30 minute frequency during weekdays and 60 minute frequency on weekday evenings and Saturdays. #10 Yellow The #10 Yellow is a new route that replaced much of the service provided by the #16 Shadow, with the exception of the Oneida Casino (which is no longer served). Additional service is now provided on Broadway south of Cormier Road. #17 Brick The #17 Brick route no longer provides front door service to Humana in De Pere. The desired goals of improved on-time performance and timely transfers were achieved by eliminating this service. #18 Gold The #18 Gold was extended to the south to allow service to be provided to the Costco

Page 11: 2014 Annual Route Review and Analysis Report

10

in Bellevue that opened in August of 2013. 2014 and Beyond Green Bay Metro staff has indicated that changes to the east side route system will be considered in 2014 or 2015.

Page 12: 2014 Annual Route Review and Analysis Report

11

CHAPTER THREE

Full Service Route System Performance

According to the Green Bay Metro Policy and Procedures Manual, "…each existing bus route should be evaluated individually to determine if the service provided is attracting a desired amount of ridership and revenue." The Green Bay Metro system policy for operational evaluation of new bus routes is somewhat different from the evaluation of established bus routes. New routes are to be examined at six-month intervals and must meet minimum ridership and revenue figures or the Transit Commission will give serious consideration to abandoning or making substantial changes to routes that are chronically unproductive. The purpose of the periodic examination is to allow existing and potential riders to become familiar with the new route schedule and service area and to allow time for operational improvements before meeting system-wide standards. The policy manual outlines five performance measures to be used in the evaluation of a bus route. In some cases, the performance of a route is compared to the performance of the entire system. The criteria of revenue per hour, passengers per hour, and operating ratio use minimum measurements based on the system median. After six months of service, a new route must reach 30 percent of the median. After one year, the route should reach 60 percent, and after two years, it should reach 80 percent. The following performance standards are used to review all full service routes: Revenue Per Hour

The revenue per hour standard helps to determine the financial efficiency of a route. The revenue per hour of an established individual route should be at least 80 percent of the system median.

The system standard for weekdays is $11.65 per hour.

The #6 Red route is the strongest route in terms of revenue generated per hour at $18.42.

The lowest performing route is the #17 Brick route ($5.07).

Please see Table 1 for revenue per hour for a weekday, weekday evening, and total. There are no set standards for limited service routes. However, they generally experience much higher passenger and revenue rates than the full service routes. The intent of limited service routes is to operate at or near seated capacity.

Please see Chapter Four for an overview of the Limited Service Route System.

Page 13: 2014 Annual Route Review and Analysis Report

12

RouteDaytime

TripsEvening

Trips

Route Length

(in hours)Total

Revenue

DaytimeRevenueper Hour

EveningRevenueper Hour

TotalRevenueper Hour

# 6 Red 26 3 1.0 $534.17 $18.53 $17.46 $18.42

# 3 Silver 13 0 1.0 230.27 17.71 17.71

# 4 Blue 13 3 1.0 279.44 18.38 13.52 17.47

# 2 Orange 25 7 0.5 250.25 17.81 7.88 15.64

# 5 Plum 8 0 1.0 120.00 15.00 15.00

# 8 Green 26 3 1.0 433.97 14.94 15.16 14.96

#14 Pink 13 3 1.0 233.00 15.75 9.42 14.56

#11 Sky 13 3 1.0 218.66 15.38 6.26 13.67

# 7 Lime 26 3 1.0 392.07 14.03 9.14 13.52

# 1 Brown 26 3 1.0 369.63 12.92 11.28 12.75

SYSTEM STANDARD $11.65

#18 Gold 12 3 1.0 123.24 8.79 5.92 8.22

#10 Yellow 13 3 1.0 121.41 8.58 3.29 7.59

#17 Brick 13 3 1.0 81.04 5.48 3.25 5.07

Total/System Average: $3,387.17 $14.34 $9.30 $13.66

System Median: $14.56

System Standard: $11.65

Notes:

Daytime operations are from 5:15 AM to 6:00 PM

Evening operations are from 6:00 PM to 9:45 PM

Revenue is passenger generated only. Free fare passengers are not included.

#3 Silver and #5 Plum do not operate in the evening.

Table 1Revenue per Hour

Weekday

Page 14: 2014 Annual Route Review and Analysis Report

13

Passengers Per Hour

This standard evaluates the number of revenue passengers per hour. Each route should reach 80 percent of the system median of passengers per hour.

The system standard for weekdays is 15.4 passengers per hour.

On weekdays, the #3 Silver route has the highest passengers per hour rate of 23.8.

The poorest performing route is the #17 Brick carrying only 7.4 passengers per hour.

Please see Table 2 for passengers per hour for a weekday, weekday evening, and total.

Green Saturday (everyone rides free) passengers can be seen in Table 3.

Page 15: 2014 Annual Route Review and Analysis Report

14

Table 2Passengers per Hour

Weekday

RouteDaytime

TripsEvening

Trips

Route Length

(in hours)Total

Passengers

DaytimePassengers

per Hour

EveningPassengers

per Hour

TotalPassengers

per Hour

# 3 Silver 13 0 1.0 309 23.8 23.8

# 4 Blue 13 3 1.0 376 25.0 17.0 23.5

# 6 Red 26 3 1.0 673 23.5 21.0 23.2

# 5 Plum 8 0 1.0 164 20.5 20.5

# 2 Orange 25 7 0.5 327 23.4 10.0 20.4

# 7 Lime 26 3 1.0 561 20.0 13.7 19.3

# 8 Green 26 3 1.0 557 19.3 18.7 19.2

#14 Pink 13 3 1.0 305 20.7 12.0 19.1

#11 Sky 13 3 1.0 299 21.2 7.7 18.7

# 1 Brown 26 3 1.0 469 16.6 12.7 16.2

SYSTEM STANDARD 15.4

#18 Gold 12 3 1.0 158 11.4 7.0 10.5

#10 Yellow 13 3 1.0 156 11.1 4.0 9.8

#17 Brick 13 3 1.0 118 8.0 4.7 7.4

Total/System Average: 4,472 19.0 11.6 18.0

System Median: 19.2

System Standard: 15.4

Notes:

Daytime operations are from 5:15 AM to 6:00 PM

Evening operations are from 6:00 PM to 9:45 PM

Revenue is passenger generated only. Free fare passengers are not included.

#3 Silver and #5 Plum do not operate in the evening.

Page 16: 2014 Annual Route Review and Analysis Report

15

RouteHours of Service

per SaturdayAll Passengers

Ride FreeFree Riders

per Hour

# 1 Brown 11 231 21.0

# 2 Orange 11 245 22.3

# 3 Silver

# 4 Blue 11 418 38.0

# 5 Plum

# 6 Red 11 484 44.0

# 7 Lime 11 249 22.6

# 8 Green 11 418 38.0

#10 Yellow 11 71 6.5

#11 Sky 11 142 12.9

#14 Pink 11 330 30.0

#17 Brick 11 141 12.8

#18 Gold 11 125 11.4

Total/System Average: 121 2,854 23.6

Notes:#3 Silver and #5 Plum do not operate on Saturday.

Table 3Green Saturday

Page 17: 2014 Annual Route Review and Analysis Report

16

Operating Ratio

The operating ratio of a route is determined by dividing a route's passenger revenue by the total operating expense. The standard for the operating ratio is 80 percent of the system median. The operating expense of a route is determined by multiplying the total number of system hours by the cost per hour. The Green Bay Metro System has an estimated expense of $86.95 per hour for 2014 (paratransit costs were removed from this figure starting in 2007 upon recommendation of the state).

Expenses include items such as driver wages and fringe benefits, fuel, bus maintenance, and insurance.

The operating ratio measure illustrates the percentage of revenue recovered. For example, on average the weekday full service system recovers 15.6 percent of all expenses, or 15.6 cents per every dollar spent operating the system (excluding the paratransit system).

The system standard for weekdays is 13.4 percent. The #6 Red route had the highest operating ratio at 21.2 percent. The poorest performing route is the #17 Brick route at 5.8 percent. Please see Table 4 for operating ratio comparison for a weekday, weekday evening, and total.

Page 18: 2014 Annual Route Review and Analysis Report

17

RouteDaytime

TripsEvening

TripsTotalTrips

Route Length

(in hours)TotalHours

Expenseper Hour$86.95

TotalRevenue

DaytimeOperating

Ratio

EveningOperating

Ratio

TotalOperating

Ratio

# 6 Red 26 3 29 1.0 29.0 $2,521.55 $534.17 21.3% 20.1% 21.2%

# 3 Silver 13 0 13 1.0 13.0 1,130.35 230.27 20.4% 20.4%

# 4 Blue 13 3 16 1.0 16.0 1,391.20 279.44 21.1% 15.5% 20.1%

# 2 Orange 25 7 32 0.5 16.0 1,391.20 250.25 20.5% 9.1% 18.0%

# 5 Plum 8 0 8 1.0 8.0 695.60 120.00 17.3% 17.3%

# 8 Green 26 3 29 1.0 29.0 2,521.55 433.97 17.2% 17.4% 17.2%

#14 Pink 13 3 16 1.0 16.0 1,391.20 233.00 18.1% 10.8% 16.7%

#11 Sky 13 3 16 1.0 16.0 1,391.20 218.66 17.7% 7.2% 15.7%

# 7 Lime 26 3 29 1.0 29.0 2,521.55 392.07 16.1% 10.5% 15.5%

# 1 Brown 26 3 29 1.0 29.0 2,521.55 369.63 14.9% 13.0% 14.7%

SYSTEM STANDARD 13.4%

#18 Gold 12 3 15 1.0 15.0 1,304.25 123.24 10.1% 6.8% 9.4%

#10 Yellow 13 3 16 1.0 16.0 1,391.20 121.41 9.9% 3.8% 8.7%

#17 Brick 13 3 16 1.0 16.0 1,391.20 81.04 6.3% 3.7% 5.8%

Total/System Average: 248.0 $21,650.55 $3,387.17 16.4% 10.4% 15.6%

System Median: 16.7%System Standard: 13.4%

Notes:Daytime operations are from 5:15 AM to 6:00 PMEvening operations are from 6:00 PM to 9:45 PMRevenue is passenger generated only. Free fare passengers are not included.#3 Silver and #5 Plum do not operate in the evening.

Table 4Operating Ratio or Percent of Expenses Recovered

Weekday

Page 19: 2014 Annual Route Review and Analysis Report

18

Loading Standards Metro service should provide adequate seating to meet passenger demand. This standard is calculated by dividing the number of passengers at the maximum load point by the number of seats available. Green Bay Metro’s buses have seating capacities of 25 to 45 passengers. Off-Peak Loading Standard The off-peak loading standard is 1.0. Factors of more than 1.0 indicate that some passengers are standing. During the off-peak periods, a seat should be provided to every passenger. Peak Loading Standard The peak loading standard should not exceed 1.25. During the peak periods, some passengers may be standing; however, passengers usually do not have to stand for long distances due to passenger turnover. Peak periods for the Green Bay Metro System are considered to begin before school starts at approximately 6:45 a.m. until 8:45 a.m. and again when school lets out at approximately 2:45 p.m. until 4:45 p.m. The off-peak and peak loading standards are nationally accepted and apply to the Green Bay Metro System. Metro operations staff monitors off-peak and peak loading conditions. When a route displays a large quantity of passengers on a particular run and passengers are forced to stand, strategies for mitigating the occurrences may be implemented, such as assigning a larger capacity bus to the route. However, it should be noted that all but one of the 40’ buses (45 seats) has been removed from service due to age and condition. Metro operations staff reports that standing occurs on a regular basis on select routes, but is not a significant issue for the system.

Page 20: 2014 Annual Route Review and Analysis Report

19

Schedule Adherence The schedule adherence (on-time performance) of each route is monitored by Metro operations staff. Green Bay Metro’s guideline is zero minutes early to five minutes late under normal conditions. The goal of a transit system should be 100 percent on-time operation. However, many factors, such as traffic conditions, rail and bridge crossings, mechanical failures, and inclement weather, cause delays from time to time. Overall, schedule adherence is not a significant issue. Monitoring Schedule Adherence The Automatic Vehicle Locator (AVL) system determines the location of each bus and transmits the information back to Metro’s dispatch office where operations staff can observe on a large CAD screen whether a bus is adhering to the published schedule. Various symbols indicate if a bus is running on time, running ahead of schedule, running behind schedule, or is off its route. Equipment in the buses will also alert the driver if they are deviating from the schedule.

CAD Screen in Dispatch Office with Close-Up

Photos by Brown County Planning Commission.

Page 21: 2014 Annual Route Review and Analysis Report

20

Full Service Fixed Route Results and Recommendations Overall, ridership levels have declined only slightly since the conversion to a multi-hub system in September 2011. This decline can be attributed to a modest decrease in service hours. Based on the performance evaluation and other circumstances, staff has identified the following concerns: #10 Yellow, #17 Brick, and #18 Gold Routes Ridership and revenue statistics for the #10 Yellow (portion of former #16 Shadow), #17 Brick, and #18 Gold routes show that they all fall below system performance standards for established routes. The current route structures of #10, #17, and #18 were introduced in late 2013. Metro policy is to allow new routes to be examined at six-month intervals. The purpose of the periodic examination is to allow existing and potential riders to become familiar with the new route schedule and service area before meeting system-wide standards. However, the areas served by the routes have traditionally performed at a low level. Low ridership can be attributed to low population densities in areas served by the routes and service frequency of only once per hour. National studies show that riders are more likely to ride when frequency of service is every 15 or 30 minutes. Recommendation: Staff should continue to work with the communities and businesses served by the three routes and consider any changes that may lead to increased ridership.

Page 22: 2014 Annual Route Review and Analysis Report

21

CHAPTER FOUR

Limited Service Route (LSR) System Performance

Green Bay Metro operates 10 limited service routes. All limited service routes operate on regularly scheduled school days. All limited service routes are open to the general public. Service #65, #70, #71, #72, #73, #74, #75, #76, and #77 – The routes provide service in the City of Green Bay and Village of Allouez. Green Bay and Allouez share the local cost based on miles within their respective communities. Pass sales to the Green Bay School District help offset the local share. The routes are primarily used by students of the Green Bay School District who either live two or more miles away from school or have to cross a major obstacle to reach school. All routes are available to the general public. #78 – This route operates exclusively in the Village of Ashwaubenon. Local funds are provided by the village. Revenue from pass and cash fares is generated primarily by middle and high school students traveling between home and school. This route is also available to the general public.

Ridership As stated earlier, there are no set standards for limited service routes. However, LSRs generally experience high passenger per trip rates. The intent of this type of service is to operate at or near seated capacity. In February of 2014, an average of 677 one-way trips were made each day. This means that an average of 339 middle and high school students used the limited service system each day. This produced an average of 32 passengers per trip and exceeded the buses’ seating capacity in many cases. All of the routes, with the exception of Route #78, perform at a satisfactory level. Route #78, which operates in the Village of Ashwaubenon, carries an average of only two riders in the morning and 12 riders in the afternoon. The route has performed at a low level for quite some time. Brown County Planning Commission staff recommends that the Transit Commission consider this route for elimination upon completion of the current school year.

Page 23: 2014 Annual Route Review and Analysis Report

22

Limited ServiceRoute Passengers

Limited ServiceRoute Passengers

#65 a.m. 42 #74 a.m. 41

#65 p.m. 47 #74 p.m. 41

#70 a.m. 41 #75 a.m. 45

#70 p.m. 50 #75 p.m. (two loops) 71

#71 a.m. 44 #76 a.m. 14

#71 p.m. 72 #76 p.m. 27

#72 a.m. 27 #77 a.m. 20

#72 p.m. 28 #77 p.m. 13

#73 a.m. 17 #78 a.m. 2

#73 p.m. 23 #78 p.m. 12

Total Passengers: 677

Average Passengers per Route: 32

Notes:

Limited Service routes are open to the general public.

Table 5Limited Service Routes

Passengers

Page 24: 2014 Annual Route Review and Analysis Report

23

CHAPTER FIVE

Paratransit Program

Paratransit is an alternative to the fixed route system. It is intended for people who cannot be served by Metro’s fixed route buses due to disabilities. Service is more flexible in terms of scheduling and routing, is offered on a demand/response basis, and is usually provided by low capacity vehicles, such as vans. Paratransit is meant to be complementary to the fixed route system in terms of service area, service days and hours, and cost.

The Americans with Disabilities Act (ADA) became law on July 26, 1990. The law is intended to provide equal access rights for people with disabilities in the areas of employment, public services, public transportation, private accommodations, and telecommunications. The law requires recipients of Federal Transportation Administration (FTA) funds, such as Green Bay Metro, to prepare a program for providing transportation services to people with disabilities by using both lift-equipped fixed route service and complementary paratransit service. Individuals are eligible to use ADA public transportation service or paratransit if they satisfy disability standards established by the ADA. Metro has contracted with several private companies since 1988 to provide paratransit service. On May 2, 2011, MV Transportation began providing paratransit services. The term of the contract has been set at three years with two one-year options. The table below summarizes the number of trips and trip costs associated with the paratransit program. These data do not include Metro staff time associated with the program.

Paratransit Program 1998-2013

Year Trips Trip Costs* Cost

Increase/ Decrease

Percent Cost Increase/Decrease

1998** 69,621 $602,918 1999 81,571 $908,077 +$305,159 +51% 2000 94,057 $1,081,756 +$173,679 +19% 2001 97,000 $1,161,209 +$79,453 +7% 2002*** 98,320 $1,484,632 +$323,423 +28% 2003 96,509 $1,515,223 +$30,591 +2% 2004 100,601 $1,664,826 +$149,603 +10% 2005 96,039 $1,639,625 -$25,201 -2% 2006**** 72,979 $1,305,135 -$334,490 -20% 2007 69,499 $1,243,337 -$61,798 -5% 2008 69,140 $1,337,548 +$94,211 +8% 2009 68,868 $1,313,787 -$23,761 -2% 2010 67,384 $1,337,797 +$24,010 +2% 2011***** 63,337 $1,330,561 -$7,236 -1% 2012 59,399 $1,393,869 +$63,308 +5% 2013 55,821 $1,543,765 +$149,896 +10%

* Trip cost includes fuel escalator payments from 2006-2011. ** Under contract with Lamers, Inc. *** Start of four and one-half year contract in January with four-month extension with Medi-Vans. **** Start of four and one-half year contract in November with Medi-Vans. Service area reduction implemented. ***** Start of contract in May with MV Transportation.

Page 25: 2014 Annual Route Review and Analysis Report

24

Paratransit Contract Rates The current contract allows MV to receive $23.09 per non-ambulatory passenger (requires a mobility device to board) and $18.71 per ambulatory passenger (does not require a mobility device to board) for each one-way trip in 2014. Green Bay Metro also provides the fuel to operate MV’s revenue vehicles at an average estimated rate of $3.28 per trip. The average rate is tied to service efficiencies (dispatch & trip scheduling) and fuel prices. Agency Trips Agency trip rates were approved by the Transit Commission and introduced on February 2, 2012. An agency is defined as an organization that serves persons who qualify for human service- or transportation-related programs or services due to disabilities, income, or advanced age. Many paratransit clients fall under the umbrella of a local agency. For example, a paratransit client that receives financial support from a program administered by the Brown County Human Services Department and travels to the CP Center for therapy three times per week would be charged the agency rate for the home to CP and CP to home trips. Many transit systems in Wisconsin have implemented an agency rate. Agency rates can vary from $1.50 additional per qualifying trip to the full cost of providing the trip. Green Bay Metro offers advance-purchase convenience tickets for $3.00 (regular rate) or $8.00 (agency rate). Clients may also pay cash upon boarding the paratransit vehicle. Specialized Transportation Service Demand Uncertainty 1. Wisconsin Department of Health Services (DHS)

a) Medicaid Transportation Management

The DHS has implemented a Medicaid Transportation Management Initiative that aims to improve statewide access to transportation services, reduce costs, simplify and improve customer service, and increase accountability. The initiative began on July 1, 2011. Issues such as trip shedding (dumping) onto local programs, reduced service options, and provider performance are major concerns expressed by persons with disabilities and/or their representatives. Green Bay Metro staff has noted that they receive phone calls from Medicaid clients hoping to use paratransit as an alternative. Metro staff appropriately refers the client to the proper entity. In November of 2012, citing significant financial losses, LogistiCare, the broker hired to act as the Medicaid transportation brokerage for qualifying citizens, issued a 90-day notice to terminate the contract. In response, DHS solicited proposals and hired the firm MTM with service beginning on August 1, 2013.

b) Family Care

Family Care is a program that is designed to optimize the health and independence of adults with long-term care needs through the provision of

Page 26: 2014 Annual Route Review and Analysis Report

25

traditional Medicaid services such as nursing homes and non-traditional services such as home- and community-based residential living facilities. Family Care has not been implemented in Brown County. It is anticipated the demand for specialized transportation services will increase if this occurs.

2. Aging Population Increases in the number of people over the age of 65 living in the Green Bay area will result in an increased need for specialized services.

3. Veteran Population With the Milo C. Huempfner Department of Veterans Affairs Health Care Center now open, it is anticipated that specialized services will be used to transport a segment of the veteran population to and from the center. The Brown County Planning Commission staff will continue to monitor these issues.

Page 27: 2014 Annual Route Review and Analysis Report

26

CHAPTER SIX

Fare Structure

Fares

Green Bay Metro’s past and present fare structures are shown below.

Fare Category

1998 2003 2005 2009 2014

Adult Cash $1.00 $1.25 $1.50 $1.50 $1.50 Day Pass* $3.00 Week Pass* $12.00 30-Day Pass $21.50 $23.00 $26.00 $35.00 $35.00

Student (K-12) Cash** $1.00 $1.25 $1.50 $1.50 $1.00 Day Pass $2.00 30-Day Pass $16.00 $16.00 $19.00 $19.00 $19.00 30-Day Pass 7/1/13 $20.00

Reduced (Age 65 or older or qualifying Disability w/ ID Card)

Cash $0.50 $0.60 $0.75 $0.75 $0.75 Day Pass $1.50 30-Day Pass $10.75 $12.25 $15.25 $25.00 $25.00

Disabled Veterans w/ Service-Connected ID Free

Green Saturday*** Free Paratransit

Origin to Destination $2.00 $2.50 $3.00 $3.00 $3.00 Agency Fare- Origin to Destination $8.00

* Day pass and week pass introduced in 2012. Paper transfers were eliminated in 2013. ** Decreased from $1.50 to $1.00 in 2011. *** Green Saturday introduced in 2011.

Page 28: 2014 Annual Route Review and Analysis Report

27

CHAPTER SEVEN

Bus Fleet

Bus Fleet The table below details Green Bay Metro’s 2014 bus fleet and recent activity:

Bus Quantity Year Make Length Age of Vehicles

in Years removed 6 1982 GMC 40 0

removed 6 1986 FLXBLE 35 0

1 1995 Gillig-Phantom 40 20

removed 5 1995 Gillig-Phantom 40 0

removed 6 1998 Gillig-Phantom 40 0

3 1999 DuPont Trolleybus 34 15

9 2003 New Flyer 30 11

3 2004 New Flyer 30 10

9 2009 New Flyer 35 5

10 2011 Gillig Low Floor 35 3

3 approved 2015 TBD 40

Average Age of the active 35 buses: 7.69

Peak Bus Requirements The Green Bay Metro full service route system requires 17 buses during peak operations and an additional nine buses when the limited service routes are in operation. Although Green Bay Metro has the necessary number of buses to provide this level of service at the present time, there is a need for higher capacity buses. Bus Replacement Guidelines The Federal Transit Administration (FTA) has established a standard that each transit vehicle should be either retired and replaced or rehabilitated at the end of its normal service life. Normal service life for transit vehicles is considered to be 500,000 travel miles or 12 years for transit buses greater than or equal to 35 feet in length and 10 years for transit buses that are less than 35 feet. Green Bay Metro staff has done an excellent job maintaining vehicles for use beyond the expected life. By the time the three approved buses are delivered in 2015, it is anticipated that four will be removed from service and nine will not meet the guidelines established by the FTA.

Page 29: 2014 Annual Route Review and Analysis Report

28

Bus Replacement Schedule Green Bay Metro has not been able to replace buses at the same rate of bus retirement. Metro staff will work with WisDOT and FTA staff in an effort to secure funding for additional buses in the future. It is recommended that 40’ buses be purchased as soon as possible to replace the current 40’ Gillig-Phantom and, as they reach the end of service life, the 30’ New Flyer buses. Multiple routes would benefit from the increased seating capacity the 40’ bus can offer as passengers are often required to stand for select trips.

As noted in the bus fleet table, three 40’ buses will be purchased through the Federal Surface Transportation Program – Urban (STP-U) in 2015.

Page 30: 2014 Annual Route Review and Analysis Report

29

CHAPTER EIGHT

System Enhancements

Paper Transfers Eliminated From Fixed Route Bus Service In 2013, Green Bay Metro ended its long standing free-transfer policy. Instead, Metro began selling single all-day passes which allow the passenger unlimited use of the system for a full day. The price of a day pass was set at twice the single ride cash fare. This policy change has resulted in:

1.) a reduction in the misuse of expired transfers 2.) fewer passenger-driver challenges 3.) elimination of used and unused transfer card waste

For those passengers that may only travel one-way using one bus for the entire day, a single ride fare is still available.

Approximately 20 percent of all weekday trips made are with use of a day pass.

What is Google Translate? (information courtesy of Google Translate)

Google Translate is a free translation service that provides instant translations between dozens of different languages. It can translate words, sentences, and web pages between any combination of 80 supported languages.

Green Bay Metro staff has integrated Google Translate with its website at www.greenbaymetro.org. In the example below, adult bus fares have been translated into Chinese.

Page 31: 2014 Annual Route Review and Analysis Report

30

What is YouTube? (information courtesy of YouTube)

YouTube is the largest video sharing site on the Web. YouTube lets anyone upload short videos for public viewing.

Green Bay Metro staff has used this free service to disseminate information about system changes. In the example below, Green Bay Metro Director Tom Wittig discusses fixed route and paratransit fare policy. To view the video go to http://www.youtube.com/watch?v=UROD0WXrZQI.

Green Saturday Program Grows

The Green Bay Transit Commission implemented Green Saturday in 2011. Green Saturday allows everyone to ride the fixed route bus system for free on Saturday. The program was designed to enable non-riders to try Green Bay Metro at no cost with the intention of converting them to fare-paying passengers on weekdays. Reaction to the program has been positive, and Saturday ridership has increased from approximately 2,000 to 2,500-3,000+ unlinked trips per Saturday.

Page 32: 2014 Annual Route Review and Analysis Report

31

U-Pass Program Expanded The U-Pass (or Universal Pass) Program began on July 1, 2008. The program allows participants an unlimited number of rides on any Green Bay Metro bus by scanning an authorized identification card. Students, faculty, and staff of UW-Green Bay, Rasmussen College, and St. Norbert College may participate in the program. 2013 was the first year in which St. Norbert College participated in the program for a full year. A total of 45,501 one-way trips were made with the U-Pass in 2013.

U-Pass Participant 2013 Unlinked Trips

UW-Green Bay 37,932

Rasmussen College 1,396

St. Norbert College 6,173

Total: 45,501

Green Bay is reimbursed for the trips by the participant at an agreed upon rate. Other Opportunities Green Bay Metro is hopeful that similar arrangements can be made with other educational institutions and other local businesses and entities. Green Bay Packers Game Day Service Expands to Include More Residential Areas In 2011, Green Bay Metro began to provide game day service to and from all Packers home games. The service is free and open to the public. Route guides were produced and distributed at businesses along the routes. Area residents and visitors took advantage of the service to get to work, be part of the game day activities at businesses served by the routes, or to attend the game at Lambeau Field. In 2013, service was modified to include additional residential areas. Below are ridership data by season.

2011/2012 2012/2013 2013/2014

One-Way Trips 20,616 25,527 26,953

Eleven games each season including pre- and post-season.

The additional advertising revenue received from wrapped buses partially offset the cost of the program, which costs approximately $16,000 per year to operate.

It is anticipated that the program will continue with the 2014/2015 season.

Page 33: 2014 Annual Route Review and Analysis Report

32

Bike Rack Use

In 2007, Green Bay Metro received a grant and installed bicycle racks on all buses. The addition of bike racks has expanded Metro’s service area as passengers are able to utilize biking on either end of their commute. In the photo below, Green Bay Metro passenger boards bus after loading bicycle onto front rack. The racks are easy to use and allow bicyclists to load and unload their bicycles within seconds. Metro does not charge an additional fee for bike rack use.

Photo: Brown County Planning Commission.

In 2013, with new farebox technology, planning staff requested Metro to begin tracking bike rack use.

Bike Rack Use

Month Use

September 2013 1,378

October 2013 1,607

November 2013 1,157

December 2013 510

January 2014 411

Page 34: 2014 Annual Route Review and Analysis Report

33

CHAPTER NINE

Plans and Programs

2014-2018 Transit Development Plan (TDP) for the Green Bay Metro System

In 2013, the Brown County Planning Commission staff, in conjunction with the Green Bay Metro staff and an advisory committee, prepared the 2014-2018 Transit Development Plan (TDP) for the Green Bay Metro System. A TDP is a 5-year plan designed to evaluate route structure, fares, capital improvement projects, policies and procedures, and general operational functions for a transit system. Long-range issues beyond 2018 were also addressed. The TDP was approved by the Green Bay Transit Commission on November 25, 2013. The recommendations and implementation status are as follows:

2014-2018 TDP Recommendations and Implementation Status

Item Recommendation Status

Bus Fleet Apply for 40-foot buses to replace aging vehicles and vehicles that have been removed from service due to condition.

Three 40-foot buses have been approved through the Federal Surface Transportation Program-Urban (STP-U). Delivery is scheduled for 2015 or 2016.

Additional buses applied for through Section 5339 but not currently funded.

Regional Transportation Authority (RTA)

Establish an RTA in the area to offset the decreases in federal and state operating assistance provided to Green Bay Metro since reaching an urbanized area population of 200,000.

The state enabling legislation that is necessary to create an RTA does not exist.

Full Service Bus Routes

Green Bay Metro staff, with the assistance of the MPO, should continue to explore route restructuring options to maximize effectiveness.

Metro staff is evaluating options for an additional east side hub.

Fixed Route System Fares

Metro should continue to maintain a fare structure that is appealing to existing and potential riders.

Green Bay Metro continues to maintain fares at levels slightly lower than the average of its Wisconsin peers.

Page 35: 2014 Annual Route Review and Analysis Report

34

U-Pass Program

Expand the program to include other post-secondary institutions and others. UW-Green Bay, St. Norbert, and Rasmussen College are participants.

Other entities are encouraged to participate.

Paratransit Program

Continue to study the feasibility of taking over vehicle management, dispatch and scheduling, and/or other aspects of the paratransit program with the goal of reducing the overall cost of the program.

Paratransit vehicles and software are identified in the Transportation Improvement Program (TIP), but are not funded.

MV Transportation was awarded paratransit program contract in 2011. Contract expires in 2016.

Green Bay Metro to issue Request for Proposal (RFP) for existing or reduced level of service in 2015 with service beginning May 1, 2016, if two one-year extensions are not executed.

In 2018, Brown County Planning Commission staff will prepare the 2019-2023 Transit Development Plan (TDP) for the Green Bay Metro System.

Page 36: 2014 Annual Route Review and Analysis Report

35

Wisconsin Department of Transportation (WisDOT) Independent Management Audit In 2012, SRF Consulting Group was hired by WisDOT to perform management audits for several transit properties in Wisconsin, including Green Bay Metro. This review is conducted approximately every five years and addresses 10 functional areas. SRF issued its final report entitled Green Bay Metro – System Management Performance Review, in November 2012. In general, the consultants found Green Bay Metro to be operating very efficiently. Below is a list of the functional areas and SRF’s recommendations:

Functional Area Recommendation Status

1. Accounting, Finance, & Purchasing

No Recommendation

2. Personnel & Labor Relations No Recommendation

3. Transportation Operations No Recommendation

4. ADA Paratransit Service No Recommendation

5. Safety Management & Training No Recommendation

6. Long- & Short-Range Planning No Recommendation

7. Scheduling No Recommendation

8. Marketing

a. Add translation functionality to website or offer multilingual information (such as Google Translate).

a. Implemented in 2013.

9. Vehicle & Facility Maintenance

a. Purchase & install backup generator capable of powering all essential functions for transit operations.

b. Investigate the potential benefits of implementing a more advanced inventory system using barcode or other scanning technology.

a. Programmed. Metro staff to use balance of 2012 capital grant.

b. Investigated. Metro staff does not plan on implementing.

10. Information Technology No Recommendation

Page 37: 2014 Annual Route Review and Analysis Report

36

Green Bay Metro Management Plan The following represents a summary of the 2014 management plan goals submitted to the Wisconsin Department of Transportation (WisDOT) by Metro staff as part of the budget process. Goals for 2014:

Implement new Policy and Procedure Manual for employees.

Continue to improve public image.

Study the feasibility of a “cross-town” route.

Continue to provide safe and convenient transportation.

Create new relationships with area businesses.

Settle union contracts.

Page 38: 2014 Annual Route Review and Analysis Report

37

CHAPTER TEN

Summary of Recommendations

The Brown County Planning Commission staff recommends the following:

1. Staff should continue to closely monitor the performance of all bus routes by conducting ridership analyses on a quarterly basis.

2. The Transit Commission should consider the elimination of the #78 limited service

route due to continuously low ridership.

3. The Brown County Planning Commission staff should continue to monitor the DHS transportation brokerage for Medicaid eligible individuals, Family Care program, and local human-services transportation programs for possible impacts on the paratransit program.

4. The Transit Commission should encourage the City of Green Bay to continue to set

aside the necessary local share for future bus acquisitions and other future capital needs.

5. The Green Bay Transit Commission, Metro staff, City of Green Bay, and Brown

County Planning Commission staff should continue with the following tasks relating to the federal and state funding situation:

Monitor the progress of any legislation or activities relating to future funding for

operating and capital funding. Continue to inform elected officials and interested parties of the need for a

transit funding solution.

6. Continue to implement recommendations in the 2014-2018 TDP. 7. Continue to implement the recommendations outlined by the SFR Consulting Group

and identified in the Green Bay Metro – System Management Performance Review.

8. Implement the Management Plan goals 2014.

Page 39: 2014 Annual Route Review and Analysis Report

38

APPENDIX A