2014 honeywell users group americas experion pks · –c300 with iec 61850 –profibus dpv1 and...
TRANSCRIPT
Honeywell Proprietary
Honeywell.com
1
Document control number
2014 Honeywell Users Group Americas
Experion PKS
The Next Frontier
What is in the next release of Experion PKS?
Honeywell Proprietary
Honeywell.com
2
Document control number
Agenda • The Orion Series - Objective
– A review of the strategic roadmap
• Experion PKS Orion Enhancement Release
– Experion PKS R431
• Productivity Advancements
– Experion Orion Console
– LEAP Late Binding developments
– Universal Remote Modular Cabinet
– The Universal Barrier
• Industry Standards
– OneWireless
– C300 with IEC 61850
– Profibus DPV1 and DPV2
– FMC 722 Protocol with ACE
• Continuous Evolution
– EHPM advancements
– Experion Hiway Bridge goes on process
– Introducing the Enhanced T-Node
– Optimized OPM with Virtualization
Honeywell Proprietary
Honeywell.com
3
Document control number
The Orion Series Objective
• Establish Experion PKS as “State of the Art”
– Integrated Control and Safety System, ICSS
– Established Technology Leadership
• Universal Channel Technology
• Virtualization and Cloud Engineering
• Human Interface
– Creative Thought Leadership
• Lean Execution of Automation Projects, LEAP
• Experion Orion Console
• Collaboration Station
• The Honeywell User Experience
• Cyber Security Solutions
• The Evolution Continues
– Protecting intellectual investments in Honeywell legacy systems
• The High Performance Process Manager joins Experion controller family
• The Experion Hiway Bridge moves the 40 year old controller to C300
• TPS gets Virtualized
• Optimized On Process Migration with Virtualization
Honeywell Proprietary
Honeywell.com
4
Document control number
2014 Honeywell Users Group Americas
Experion PKS R431
Productivity Enhancements
Honeywell Proprietary
Honeywell.com
5
Document control number
Experion Orion Console
•Design based on human factors analysis of operator needs
•Large 4K ultra-hi def monitors provide contiguous screens supporting flexible display layouts
•Ambient indicator aligned with audible annunciation
Honeywell Proprietary
Honeywell.com
6
Document control number
Experion Orion Console
•Footprint matches existing
consoles
•Fully redundant including
power, screens,
computers and keyboards
no single point of fail
•Re-use of existing
displays – SafeView
change only for large
screen transition
Classic, Z, EZ (4 x Consoles) ICON (2 x Consoles) Orion (1 Console)
3840 x 2160
1920 x 1080
1920 x 1080
4 x 23” Widescreen 1 x 55” Ultra High Definition
1920 x 1080
1920 x 1080
Honeywell Proprietary
Honeywell.com
7
Document control number
Off the
Critical Path
Lean Execution of Automation Projects (LEAP)
Define Design Manuf Config Test Install
Start Finish Physical Functional
Late
Binding
• Cloud Engineering enabled by Controller and IO Simulators in Virtual Machines
• Control Strategy Adaptability when you need it, during project execution
• No IO Module ID required for configuration
• No IO Channel ID required for configuration
• Functional configuration independent of physical design
• Late Binding matches the functional configuration to the physical design
Honeywell Proprietary
Honeywell.com
8
Document control number
Late Binding
Universal Cabinet
Central Control Room
Virtual Engineering Platform
Control
Configuration
Alarm
Configuration
HMI
Configuration
Configuration
FAT
SIMACE SIMC300
No physical channel
assignments required
Honeywell Proprietary
Honeywell.com
9
Document control number
Late Binding - Future
Universal Cabinet
Central Control Room
Control
Configuration
Alarm
Configuration
HMI Configuration
Configuration
FAT
SIMACE SIMC300
Tagname 1
Tagname 2
Tagname 3
Tagname 4
Tagname n
FI101
xxxxxxxxxxFI101xxxxxxxxxxxxxxxxxx
32 character tagname for HART 6/7
No physical channel
assignments required
Detect
Interrogate
Configure
Enable
Document
Virtual Engineering Platform
Honeywell Proprietary
Honeywell.com
10
Document control number
The Universal Remote Modular Cabinet
Field junction box
Junction box
Multi Core Cables
Marshalling Cabinet
LER or RIE
Controller and IO Cabinet
Universal IO Standard Cabinet
Controller Cabinet
Honeywell Proprietary
Honeywell.com
11
Document control number
The Universal Barrier
• Introducing the P&F Universal Barrier
– Compliments Universal Channel Technology
• Works for both process and safety IO
– Universal Barrier with “Adaptive Signal Technology”
• Capable to have 24VDC AI, AO, DI and DO connected IO
– Universal Barrier Cabinets
• 16 Barrier with 16 pair prefabricated cable
• 32 Barrier with two 16 prefabricated system cables.
• 64 Barrier with four 16 pair prefabricated cable
– Environmental Specifications
• -40C to +70C, same as Universal IO
• Marine and HazLoc, same as Universal IO
Honeywell Proprietary
Honeywell.com
12
Document control number
2014 Honeywell Users Group Americas
Experion PKS R431
Industry Standards
Honeywell Proprietary
Honeywell.com
13
Document control number
OneWireless Network R220/R230 Wall-to-wall Redundancy
– Improves overall data availability
– Eliminates single point of failure
• Duo cast from transmitters to access points
• Multiple paths between ISA100 Wireless devices
• Redundant WDM
• FTE for Experion users
System Manager Improvements
– More rugged and reliable network
Tx power of radios can now be changed
from control room
– Certified installer required
Usability Improvements
– Reports
– Improved Maps and Map overlays
Dedicated VLAN for sensor traffic
Honeywell Proprietary
Honeywell.com
14
Document control number
I/O IED
Redundant Experion Control Server
HMI
IED Tools
IEC61850 Topology Diagram
Redundant Experion IEC61850
Client Server
I/O
IEC61850 Network
MMS & RCB
Alarms, Events,
Supervisory
Control, and HMI
MMS, RCB, GCB
Measurement &
Control
FW
DSA
FTE Network
NTP Time
Master
IED IED IED
C300-50ms IIM
Honeywell Proprietary
Honeywell.com
15
Document control number
Profibus Topology
Turck EXCOM
HART Devices
CEAG
STAHL
HART Devices
Siemens PROC Siemens PROV
Simatic S7 400 PLC Danfoss VLT2800
Drive
ABB ACS 800 Drive
HMI
DP: Time-Sync & Time Stamped Alarms and
Events, Read/Write DPV1 data
HART: Device & Dynamic variables, Command
48 Alarms, HART std diagnostic alarms and
other HART variables
FDM
Other Third
party comp.
Redundant Experion Control Server
C300 PGM
Future
Honeywell Proprietary
Honeywell.com
16
Document control number
FMC Kongsberg - Best Practice
• FMC – being most prolific S/S vendor
– Direct FMC 722 TPU Protocol
– Peer control to C300
• Reduced points of failure
• No mapping across OPC or Modbus
• Simplifies operation and maintenance
– Standardized library of shapes and
faceplates
– Optional replacement of FMC Data Collector
Server with ACE to further simplify footprint.
– Also Reduces comms load from C300
ACE-2
C300 C300
FMC
TPU
Experion
Server
FMC
Server
FMC
TPU C300 C300
SEM
001
SEM
nnn
Experion
Server ACE-1
SEM
001
SEM
nnn R431
R410
Subsea
Tofino
Firewall
FMC722 over TCP
OPC DA
FMC722 over TCP
Diagnostic Data
Non process data
Process data
CDA
Quick Builder /
OPC integrator
CDA
CDA
Process data
Tofino
Firewall
Subsea
Topsides
Honeywell Proprietary
Honeywell.com
17
Document control number
FDM R450
• FDM R450 – Compatible with Experion R430
• Also works with R430, R410, and R400
– DE Protocol Support • Support DE Protocol devices on TPS networks
– PVST Planner (HART) • Major customer cost mitigation for compliance and safety
• Automatically schedule and run PVST tests
• Start with support for most popular devices
• Designed so others can be added “release independent”
Honeywell Proprietary
Honeywell.com
18
Document control number
2014 Honeywell Users Group Americas
Experion PKS R431
Continuous Evolution
Honeywell Proprietary
Honeywell.com
19
Document control number
TDC/ TPS Evolution to Experion
History Module
Network Interface Module Hiway Gateway
Application Module
ACE-T / E-APP Experion Server -TPS
HPM
Logic Manager
Basic Controller
C300 C300
Safety Manager
Universal Station
Global User Station
Experion Orion Console
Experion Station –TPS
GUS Application
Level 2 Switch Local Control Network
Fault Tolerant
Ethernet
C300-UHIO
ELMM
EHPM Universal
Control
Network
APP
Experion Station –TPS
GUS Application
Basic
Hiway
ENIM EHB
Control
Firewall
Honeywell Proprietary
Honeywell.com
20
Document control number
TDC/ TPS Evolution to Experion
History Module Application Module
ACE-T / E-APP Experion Server -TPS
C300 C300
Safety Manager
Level 2 Switch Local Control Network
Fault Tolerant
Ethernet
ELMM
EHPM
ENIM EHB
Control
Firewall
Experion Orion Console
Experion Station –TPS
GUS Application
C300-UHIO
Peer to Peer
Below the Firewall
FTE Data Access
Offloads the LCN
Honeywell Proprietary
Honeywell.com
21
Document control number
The Enhanced TPS Node
ACE-T / E-APP
Experion Server -TPS
C300 C300
Safety Manager
Level 2 Switch LCN
Fault Tolerant
Ethernet
ELMM
EHPM Control
Firewall
Experion Orion Console
Experion Station –TPS
GUS Application
C300-UHIO
Experion Station - TPS
Thin Client
HM
LCN Data Access
ETN Gateway
TPS Applications
GUS
Honeywell Proprietary
Honeywell.com
22
Document control number
Optimized On Process Migration
Optimized OPM
with
Virtualization
Experion Virtual Infrastructure
Experion OPM
Process
(hardware refresh)
Experion Support and Maintenance
(ESM)
Experion Backup and Recovery
(EBR)
Honeywell Proprietary
Honeywell.com
23
Document control number
ACE Server B Server A Flex/Console
Experion Support and Maintenance
Optimized OPM Process
Pre-migration
OPM Server B
OPM Server A OPM ACE
OPM Flex/Console
Production Cluster
Virtual Staging Area
• Sample data based on test scenario of single Experion cluster consisting of
• 2 Experion Servers
• 6 Console Stations
• 3 ACEs
• 6 Flex Stations
• Assumes ESM configuration already exists
ACE Replacement Server B
Replacement Server A
Replacement Flex/Console Replacement