Secure Collaborative BIM in the Cloud
© Asite Solutions 2001-2014
Asite was launched in June 2001 with a mission to deliver collaborative solutions and implement the recommendations of the 1998 Egan Report in UK industry. cBIM was launched in November 2005 at the BuildingSMART International conference in Washington D.C.
Adoddle by Asite provides online information management services to the world's most demanding businesses and government organisations to help their teams work together more efficiently and effectively.
Online collaboration allows organisations to share and manage information in one secure central location that helps to grow any business by applying common data environment (CDE) principles.
What is a Common Data Environment (CDE)?
A single source of information for any given project, used to collect, manage and disseminate all relevant approved project documents for multi-disciplinary teams.
A term defined in BS1192 and an integral enabler for implementing the UK Government’s Building Information Modelling and Asset Information Modelling agenda for 2016.
© Asite Solutions 2001-2014
Information Volumes
Projects today are generating information into the Terabytes
According to a Fiatech Industry Survey (2012) 62% of industry participants think that disparate data volumes impact their efficiency in managing projects
They saw their greatest challenges as:o Finding the right information when it is needed – 40%
o Collecting the information needed from multiple parties – 38%
o Managing the distribution of information to other parties – 18%
Their Answer?o Multiparty Collaboration
© Asite Solutions 2001-2014
Even when it becomes Big Data
Our users upload 394 megabytes of new
data every minute of the day into Adoddle
© Asite Solutions 2001-2014
…paper, emails, voicemails… information chaos?
Engineer
Architect
Materials Supplier
Client
Maintenance
General Contractor
Sub Contractor
I.T. Dept.
What do you see everyday?
© Asite Solutions 2001-2014
cBIM – What can it do?
Support standardised
collaborative working (PAS1192)
as project and client CDE
Federated Model Server &
Browser-based viewer
Cloud Storage
Publish and Subscribe model –
work offline then synchronise
Integrate with existing software
Provide Multi-Level Versioning
and Audit Trail
Connect to commercial data
Work on any device
© Asite Solutions 2001-2014
BIM Maturity Model – Towards Level 3
cBIM is
designed to
support Level 3
BIM
As part of the
Adoddle
platform it
supports Level 0
and up
Engineer
Architect
Materials Supplier
Client
Maintenance
General Contractor
Sub Contractor
I.T. Dept.
You re-use data across the capital project portfolio and improve communication!
Facilities Management
Pre-Construction
Construction
Design
With a Common Data Environment…
Handover
© Asite Solutions 2001-2014
• Publically Available Specification for Information Management for the capital/delivery phase of construction projects using Building Information Modelling.
• Support the UK objective to achieve BIM maturity Level 2 and support the move to Level 3.
• Builds on the existing code of practice for the collaborative production of architectural, engineering and construction information, defined within BS 1192:2007
• Shared use of individually authored models in a Common Data Environment (CDE).
• A single source of information for any given project.
PAS1192What is it?
Adoddle CDE – PAS1192
© Asite Solutions Ltd 2001-2015
Architect
Structure
M & E
Others
Work In Progress – Private Folder in Adoddle CDE
Adoddle CDE – PAS1192
© Asite Solutions Ltd 2001-2015
Shared – Verified Design shared with the Project Team
Architect
M & E
Structure
Others
Project Team
Review
Approval
A-Issued for Construction
Or
S4-Issued for construction approval
Adoddle CDE – PAS1192
A-Issued for Construction
Architect
M & E
Structure
Others
Verify
Published – Co-ordinated and validated Design shared with the all Project Team
Check Design
© Asite Solutions 2001-2014
PAS1192 - Status
© Asite Solutions 2001-2015
Project Teams can clearly identify Document Statuses using our Colour coded Status functionality
Adoddle CDE – PAS1192
Architect Structure M & E Others
WIP
Shared
Published
Archive
© Asite Solutions 2001-2015
Adoddle CDE – Delivery PlansAn example of a typical delivery plan.
Deliverables
Stages/Gates
© Asite Solutions 2001-2015
Adoddle CDE – Project & ClientWhat are your Responsibilities? Do you represent the Client or are you part of the Delivery Team?
Project CDE Client CDE
Project Specific Information
All Asset Information
Task Team Information Delivery Plan (TIDP)
Master Information Delivery Plan (MIDP)
COBieInput/Output
Folders defined as per requirement
© Asite Solutions 2001-2015
Collaborative BIM is for the whole AECO supply chain
Their job is to deliver to the Asset owners and operators.
Our job is to support them and enable their systems to connect
cBIM – A Single View
© Asite Solutions 2001-2015
UK Environment Agency adopts Asite Platform as CDE for Collaborative BIM
Asite's Adoddle platform enables the Environment Agency's internal and external project team members to work together more effectively by:
• Storing and controlling all project documents.• Helping users through key project processes such as business
case submission.• Automating key contract administration tasks such as fee note
processing.• Replacing the Extranet as an electronic store for templates and
guidance.• Making it easier to share best practice and examples.• The ability to report across the breadth of the service.
© Asite Solutions 2001-2014
Thames Water awards Tideway Tunnel CDE contract to Asite
The contract covers the provision of a CDE Common Data Environment (CDE) which Thames Tideway Tunnel is required to provide in compliance with PAS1192 guidelines, notably for the exchange, coordination, compliance and storage of data.
The CDE will be used to exchange a variety of data entities (including drawings, BIM models, setting-out data, correspondence (including NEC3 communications), reports, financial cost data, risk register data, images, and programmes) initially between the Project Managers and Contractors.
© Asite Solutions 2001-2014
Wembley Regeneration Project
Quintain implemented Adoddle cBIM to support collaborative building information modelling (BIM) on its major regeneration project underway at Wembley. The Wembley site comprises the 85 acres surrounding the national football stadium located in North West London and is one of the UK’s leading mixed-use regeneration schemes. The Masterplan for the regeneration encompasses the entire site, in a series of phases, for which Quintain has secured planning permission for 8.7m sq ft of accommodation consisting of more than 5,500 new homes as well as 3.5m sq ft of commercial, leisure and supporting uses.
Asite is delivering real-time visibility of their 3D designs connected to their commercial project data for the project team.
© Asite Solutions 2001-2014
Telephone +44 (0)20 7749 7880
Website www.asite.com
© Asite Solutions 2001-2014