2015 capital improvement program ten-year projects for · 2017-05-13 · 2015 capital improvement...
TRANSCRIPT
2015 Capital Improvement Program Ten-Year Projects for:
West Slope Road/Bridge CIP
Airport CIP
1 of 9
15-0279 2H 1 of 9
2 of 9
15-0279 2H 2 of 9
West Slope Road/Bridge CIP Ten-Year Projects
3 of 9
15-0279 2H 3 of 9
4 of 9
15-0279 2H 4 of 9
Index by Project NameProject Number Project Name Page #
Section 8.1 - West Slope Road and Bridge Ten-Year ProjectsGP124 Country Club Drive Extension - Silver Dove Road to Bass Lake Road 3272334 Diamond Springs Parkway - Phase 1B 38GP183 El Dorado Hills Boulevard Widening - Lassen Lane to Park Drive 4277127 Green Valley Road at Indian Creek - Bridge Replacement 5277136 Green Valley Road at Mound Springs Creek - Bridge Replacement 54GP159 Green Valley Road Widening from Salmon Falls Road to Deer Valley Road 66GP154 Latrobe Road Widening (4 to 6 lanes) - White Rock Road to Carson Creek
(Suncast Lane) 92OP005 Metal Beam Guardrail Installation - Various Locations 9477126 Mosquito Road Bridge at South Fork American River 10277129 Mount Murphy Road at South Fork American River - Bridge Replacement 10871324 Saratoga Way Extension - Phase 1 134TIM Prog TIM Fee Program Projects 15671330 U.S. 50/Bass Lake Road Interchange Improvements - Phase 1 16671332 U.S. 50/Cambridge Road Interchange Improvements - Phase 1 17071340 U.S. 50/El Dorado Hills Blvd Interchange - Pedestrian Overcrossing 17871323 U.S. 50/El Dorado Hills Boulevard Interchange Improvements - Phase 2B 18071347 U.S. 50/El Dorado Road Interchange Improvements - Phase 1 18271346 U.S. 50/Missouri Flat Road Interchange Improvements - Phase 1C Riparian
Restoration 18871338 U.S. 50/Ponderosa Rd Interchange - Durock Rd Realignment 19071339 U.S. 50/Ponderosa Rd Interchange - N. Shingle Rd Realignment 192GP137 White Rock Road Widening (2 to 4 lanes) - Manchester Drive to Sacramento 20272374 White Rock Road Widening (2 to 4 lanes) - Monte Verde Drive to US 50/Silva 204
5 of 9
15-0279 2H 5 of 9
Figu
re 6
-1
6 of 9
15-0279 2H 6 of 9
Airport CIP Ten-Year Projects
7 of 9
15-0279 2H 7 of 9
8 of 9
15-0279 2H 8 of 9
Index by Project NameProject Number Project Name Page #
Section 8.3A - Georgetown Airport Ten-Year Projects93535 Crack Seal and Remark Runway, Taxiways, Aprons and Tee Hanger Taxilanes 6
9 of 9
15-0279 2H 9 of 9