Infrastructure Services Division
Street & Alley Condition Report
-
8/9/2019 2015 CIC Street Alley Condition Report
2/27
Pavement Management Objectives
Preserve and/or improve quality of streets and alleys
Consider immediate and long term needs
Systematic process to rank projects
Publish 2-year program
-
8/9/2019 2015 CIC Street Alley Condition Report
3/27
Pavement Management Plan
Evaluate condition Apply appropriate treatment
Preventative maintenance
Resurface or reconstruct
Get the most out of every dollar
-
8/9/2019 2015 CIC Street Alley Condition Report
4/27
Street Inventory
All Streets
City Maintained
County Highway
State Highway
Freeways
2 %
3 %
3 %
City Maintained
92%71.5 %
17.5 %
5 %
6%
1272.2 miles
32.4 miles
40.6 miles
39.7 miles
-
8/9/2019 2015 CIC Street Alley Condition Report
5/27
How are streets and treatments chosen?
Pavement Quality Index (PQI) rates street segments to narrow the list
Visual inspection
Street Maintenance experience
Pavement core samples
Traffic volume (including transit, freight, pedestrian and bicycle)
Coordinate needed pavement work with needed utility work
Citizen complaints
Allocate appropriate funding levels to maintenance, resurfacing and reco
Leverage grants and other funding opportunities
Developments and TIDs
-
8/9/2019 2015 CIC Street Alley Condition Report
6/27
Pavement Condition Rating
Transportation Aids Distributions: Per State Statute, since 2001 ea
and county shall assess the physical condition of highways under its ja pavement rating system approved by the WISDOT. In 2015, $2,202mileage aid payment shall be available for each mile of road or street
jurisdiction of a municipality.
Stantec Consultant WISDOT approved pavement rating system
2013 2014 last survey Data was delivered in Dec, 2014 will be analyzed to assist with ranking paving
-
8/9/2019 2015 CIC Street Alley Condition Report
7/27
Pavement Condition Ratings
Every seven years DPW obtains a condition rating for every street
segment in the City under the PMS (Pavement Management Systemand rates them on various pavement distresses such as:
Severity of cracking
Potholes
Joint failure Rutting
-
8/9/2019 2015 CIC Street Alley Condition Report
8/27
Pavement Ratings
A PQI (Pavement Quality Index) is identified from the distresses o
scale of 20 to 100 for the new Road Matrix system
100 is the best, brand new street
70-90 is Good
45-70 is Fair20-45 is Poor
-
8/9/2019 2015 CIC Street Alley Condition Report
9/27
Preventative Maintenance Program Benefits
Most cost effective address issues when they first appear
More predictable funding needs
Fewer premature pavement failures
Safer road conditions
Reduces disruption to traffic Require proper pavement restoration when issuing DPW permits
-
8/9/2019 2015 CIC Street Alley Condition Report
10/27
Street Maintenance: Pothole Report
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
2008 2012 2013 2014
Pothole Repair Requests
2014 16,8042013 12,836
2012 8,0172008 16,778
http://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&docid=z62DxcPzkA0elM&tbnid=X9mqr1btnIc-HM:&ved=0CAUQjRw&url=http://nenc-la.org/2012/03/april-pothole-project/&ei=r3DxUrmcHtLE2QWw8IDoCw&bvm=bv.60799247,d.b2I&psig=AFQjCNEhP-gPpWbH3-4jpo-5gzNWfJk90A&ust=1391641083188896 -
8/9/2019 2015 CIC Street Alley Condition Report
11/27
Street Maintenance: Repair Strategies
Slurry & Chip Sealing Crack Filling
Pot Hole Patching
Patching
Joint Repair
Frost Heave Repair
i
-
8/9/2019 2015 CIC Street Alley Condition Report
12/27
Street Maintenance: Supercrews
-
8/9/2019 2015 CIC Street Alley Condition Report
13/27
Street Improvements: Local Street Progr
2013Local Program - $13 m (17.4 miles)
HIP - $1 m (3.6 miles)2014
Local Program - $13.5 m (15.6 miles)HIP - $3.0 m (9 miles)
2015Local Program - $8.0 m (8.0 miles)
HIP - $7 m (21.0 miles)
Based on a 36 foot street
Minus $2m for Capital Maintenance &
Engineering/Administration Costs
-
8/9/2019 2015 CIC Street Alley Condition Report
14/27
Street Improvements: 2-3 yr. Extreme MPaving Strategy
2016
Local Program - $5 (5 miles)HIP - $10.5 m (30.5 miles)
2017Local Program - $5 m (5 miles)HIP - $10 m (30 miles)
Based on a 36 foot street
Minus $2m for Capital Maintenance &
Engineering/Administration Costs
Increase in Miles Pav
2015 32%2016 82%2017 84%
-
8/9/2019 2015 CIC Street Alley Condition Report
15/27
High Impact Paving
Good candidates
Major arterial for traffic movement
Located in a business district Good sub base
No curb and gutter or sidewalk work
No major utility work
Construction Work:
Mill 2 inches existing pavement
Place 2 inches new asphaltic pavement
Construction time 1-5 days (road closure, weather)
Cost $1 mil = 3.6 miles vs $1 mil = 1 mile resurface/reconstruct
-
8/9/2019 2015 CIC Street Alley Condition Report
16/27
1993-2015 Local Street Budget and LRIP fun
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
18000000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
-
8/9/2019 2015 CIC Street Alley Condition Report
17/27
Local Street Miles Constructed
Year Mile
2007 4.2
2008 9.72009 9.5
2010 19.5
2011 15.9
2012 19.3
2013 15.22014 12.7
2015 8 (estimated)
-
8/9/2019 2015 CIC Street Alley Condition Report
18/27
Street Improvements: Major Street Progra
Provide design and construction funding for major and minor arterial streets
Design and construction funding for projects thru Milwaukee Urbanized Surface TraProgram (STP-M), Connecting Highway Program, Highway Safety Improvement PSafe Routes to School (SRTS), Transportation Enhancement (TE), American RecoveReinvestment Act (ARRA), Municipal Streets Improvement Program (MSIP) or ConAir Quality (CMAQ) program.
Coordinate with adjacent outlying communities on arterial paving projects crossingboundaries funded by State and Federal Aid
Coordinate with the WisDOT on State Trunk Highway Projects within the City Limit
Represent City Interests on Milwaukee County Highway Paving and Bridge projects
Coordinate with WisDOT on Mega Projects
-
8/9/2019 2015 CIC Street Alley Condition Report
19/27
2015 Major Street Program ($45,049,435)
State Trunk Highways $11,000,000
Connecting Highways $ 5,075,000
County Trunk Highways $ 80,000 State Transportation Program $ 9,981,000
Other (CH,TE, CMAQ, LRIP, SRTS, etc.) $18,913,435
-
8/9/2019 2015 CIC Street Alley Condition Report
20/27
2002- 2014 Major Street Funding
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
$80,000,000
$90,000,000
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Major Street Fundin
Portion)Major Street Fundin
$7,841,528
$45,049,435
-
8/9/2019 2015 CIC Street Alley Condition Report
21/27
STP (State Transportation Program) Funding to thCity From WISDOT for Paving of Arterial Streets
Funding Year STP Funds
2004-2005 $12,042,850
2006-2007 $11,687,730
2008-2009 $10,965,750
2010-2012 $12,309,509
2013-2014 $11,796,858
2015-2018 $41,830,098
-
8/9/2019 2015 CIC Street Alley Condition Report
22/27
Miles of Major Streets Constructed
0.00
2.00
4.00
6.00
8.00
10.00
12.00
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Miles
-
8/9/2019 2015 CIC Street Alley Condition Report
23/27
Alleys:
Alley in need of repair New alley
4,028 paved alleys with a length of 414 miles
-
8/9/2019 2015 CIC Street Alley Condition Report
24/27
2015 Adopted Alley
Alley
Year
Millions
2015
$2.025
2016
$2.125
2017
$2.125
2018
$2.125
2019
$2.125
2020
$2.125
6 Yr Total $12.650
-
8/9/2019 2015 CIC Street Alley Condition Report
25/27
Alley pavement types
Surface
Asphalt
Concrete
Brick/Block
86%
12%2%
-
8/9/2019 2015 CIC Street Alley Condition Report
26/27
Funding for Alleys1993- 2013
$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
$3,500,000
1993-2015 funding for alleys
1990 68
-
8/9/2019 2015 CIC Street Alley Condition Report
27/27
1991 34
1992 62
1993 65
1994 44
1995 34
1996 41
1997 12
1998 26
1999 37
2000 43
2001 25
2002 20
2003 15
2004 37
2005 25
2006 72007 13
2008 9
2009 6
2010 12
2011 5
2012 41
2013 27
2014 25
0
10
20
30
40
50
60
70
80
Alleys constructed 1990-2014