MATC INTERNSHIPCity of Lincoln, Nebraska
MATC Program
City of Lincoln, Department of Public Works
![Page 2: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/2.jpg)
Job Duties
Prevent the safety of workers, pedestrians, and drivers
![Page 3: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/3.jpg)
Study Plans Mark Pavement
Pink Color. Arrows located inside the square, and pointing to the square limits
Study the project plans (materials, measures, units, and type of job)
![Page 4: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/4.jpg)
Grading and soil compaction
Pavement RemovalCheck the removal amount and construction specifications
![Page 5: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/5.jpg)
Installing Re-bars
ConcreteApplying Concrete
Inspect the size and distance of the bars
Verifying the application methods, volume and concrete type .
![Page 6: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/6.jpg)
Air test
Concrete TestsCylinders test
Measuring the amount of air into the concrete sample. It should range between 6% to 8.5%
Making cylinders to verify the compression resistance according with the time
![Page 7: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/7.jpg)
Concrete Tickets Laboratory
Keeping track the amount and concrete information used on the project
Submit all the cylinders and tickets to the lab. Where they’ll perform the tests
![Page 8: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/8.jpg)
after the specified time
RE-OPEN the StreetConcrete cylinder test (PR or high early concrete)
South B.-70th and Sumner, Normal concrete applied
South B.- 70th and Sumner- West Intersection- PR concrete application.
![Page 9: 2015 MATC Intern Program: Mateus Cortez Lima](https://reader033.vdocument.in/reader033/viewer/2022051706/58f253b21a28ab1b788b4581/html5/thumbnails/9.jpg)
Take notes and PicturesTaking Notes and
Pictures are a good approach to document the jobs done on the project.
Notes