White paper

Page 2: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 2 of 20

INTRODUCTION

OWB v.10.2 premier support ended on July 2010.

OWB v.11.1 premier support will end on August 2012.

OWB v.11.2 (available from September 2009) premier support will end on January 2015.

No major enhancements are planned for OWB beyond the OWB 11.2 release.

Earlier versions (9.2 and 10.1) of OWB will no longer be supported.

In the latest Statement of Direction, Oracle announced following:

“No major enhancements are planned for Oracle Warehouse Builder beyond the OWB

11.2 release. OWB 11.2 continues to be available and supported by Oracle, and patches

and bug fixes will continue to be offered at regular intervals. Oracle will continue to

support OWB 11.2 for the full lifetime of Database 11g and the full lifetime of the next

major database release (“Database 12”) in accordance with Oracle’s Lifetime Support

Policies for Database releases. Future database releases beyond Database 12 would

not be certified with OWB 11.2.”

In other words, OWB will not be supported anymore beyond the release 12 of the Oracle database.

Which means that you will have to migrate before 2017. Oracle Data Integrator (ODI) is now Oracle’s

Strategic Product for Data Integration. This means that customers will have to migrate from OWB to

ODI, and needs to plan a manual or automated transfer of the OWB components to equivalent ODI

components.

Product overview

OWB2ODI Converter acquires OWB repository’s metadata and it generates corresponding ODI

repository metadata.

Algorithms in OWB are transferred in ODI, and OWB operators are transformed in corresponding ODI

operators when present or are substituted by a custom solution.

Supplied service

Conversion service of an Oracle Warehouse Builder project to a corresponding Oracle Data Integrator

project.

Additional services

Performance tuning, ODI, DBA consulting, Oracle GoldenGate and Life Cycle Management for ODI

Supported product versions

OWB v. 9.2 or higher

ODI v. 10g or higher (up to v12C).

Page 3: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 3 of 20

Conversion process

After the initial assessment phase with the client, a specific Converter’s component extracts metadata

from the OWB .mdl file.

D&T uses the OWB2ODI Converter in its laboratories to automatically generate a corresponding ODI

project from the original OWB project.

The generated ODI project will be sent to the client for acceptance test and rollout to production.

The conversion process consists of several tasks, which are divided into 5 phases:

1. Assessment

2. Conversion

3. Test

4. Parallel

5. Production

PHASE 1: ASSESSMENT

Page 4: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 4 of 20

The assessment phase has following objectives:

- To define the project framework,

- To evaluate OWB project consistency (component number and type),

- To define the conversion criteria.

The Assessment phase is composed of the following tasks:

- Task 1: conversion assessment and statistics report generation,

- Task 2: handling exceptions,

- Task 3: topology definition,

- Task 4: conversion mode explanation,

- Task 5: KMs definition,

- Task 6: configuration management definition.

Task 1 needs an OWB .mdl file export, which the client has to send to the D&T services centre.

The .mdl file export must:

- Contain all project Locations,

- Contain the Configuration, if it is different from default,

- Contain all mappings and all process flows in validated state,

- Contain all dependences.

After the generation of the report, the client and D&T organize a meeting to execute tasks 2 to 6.

This meeting and relative decisions are a basilar rock upon which the entire conversion project will be

built.

Page 5: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 5 of 20

Task 1 - Conversion assessment and statistics report generation

The .mdl file supplied by the client has to be validated and must include location and configuration

parameters.

It represents the necessary input for converter analyzer.

Converter Analyzer can perform a multitude of operations.

It analyses whether any special operators exist, for which essential changes are required.

For example, consider the case of the splitter operator that allows the flow to direct itself towards

several targets in the same mapping. This operator has to be carefully managed because the Oracle Data

Integrator does not allow a mapping flow to end in multiple targets. In this case, it generates as many

interfaces as the Oracle Warehouse Builder operator targets.

Then it deals with the analysis of each mapping. It starts from the target operator and ends on the

leftmost operator, ensuring the entire mapping structure and its related operators remain unchanged.

Page 6: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 6 of 20

The Converter analyzer generates the following report on the OWB process flows and mappings:

PROCESS FLOWS

ACTIVITY_TYPE AMOUNTFIRST

_FOLDER_NAMESECONDARY

_FOLDER_NAMEPF_NAME

ACTIVITY_PER_PF

PF_STATE

OR 7.942 Folder_A Folder_1 Process flow A1.1 10 LOWTRANSFORMATION 5.995 Folder_A Folder_1 Process flow A1.2 6 LOWMAPPING 2.199 Folder_A Folder_1 Process flow A1.3 35 LOWSET_STATUS 1.930 Folder_A Folder_1 Process flow A1.4 24 LOWSUBPROCESS 1.505 Folder_A Folder_1 Process flow A1.5 13 LOWAND 1.217 Folder_A Folder_1 Process flow A1.6 42 LOWASSIGN 332 Folder_A Folder_1 Process flow A1.7 14 LOWFORK 252 Folder_A Folder_1 Process flow A1.8 46 LOWFILE_EXISTS 92 Folder_A Folder_1 Process flow A1.9 18 LOWUSER_DEFINED 49 Folder_A Folder_1 Process flow A1.10 21 LOWWAIT 21 Folder_A Folder_1 Process flow A1.11 19 LOWEND_LOOP 21 Folder_A Folder_1 Process flow A1.12 12 LOWFOR_LOOP 20 Folder_A Folder_1 Process flow A1.13 15 LOWROUTE 14 Folder_A Folder_1 Process flow A1.14 52 LOWWHILE_LOOP 1 Folder_A Folder_1 Process flow A1.15 13 LOW

Folder_A Folder_1 Process flow A1.16 16 LOWTOTAL 21.590 Folder_A Folder_1 Process flow A1.17 16 LOW

Folder_A Folder_1 Process flow A1.18 7 LOWFolder_A Folder_1 Process flow A1.19 9 LOW

NUM_PROCESS_FLOWS 1.000 Folder_A Folder_1 Process flow A1.20 75 MEDIUMFolder_A Folder_1 Process flow A1.21 80 MEDIUM

MAX_NUM_ACTIVITY_IN_PF 200 Folder_A Folder_1 Process flow A1.22 12 LOWFolder_A Folder_1 Process flow A1.23 9 LOW

NUM_PROCESS_FLOWS_LOW 720 Folder_A Folder_1 Process flow A1.24 7 LOWNUM_PROCESS_FLOWS_MEDIUM 180 Folder_A Folder_1 Process flow A1.25 47 LOWNUM_PROCESS_FLOWS_HIGH 100 etc. etc. etc.

MAPPINGS

OPERATOR_TYPE AMOUNTMODULE_NAME

MAPPING_NAME

OPERATOR_PER_MAPPING

MAPPING_STATE

TABLE 7.011 Module 1 Mapping 1.1 3 LOWEXPRESSION 2.928 Module 1 Mapping 1.2 12 LOWFILTER 1.590 Module 1 Mapping 1.3 7 LOWJOINER 1.336 Module 1 Mapping 1.4 21 LOWCONSTANT 687 Module 1 Mapping 1.5 13 LOWINPUT_PARAMETER 630 Module 1 Mapping 1.6 8 LOWAGGREGATOR 603 Module 2 Mapping 2.0 19 LOWSET_OPERATION 447 Module 2 Mapping 2.1 21 LOWSPLITTER 346 Module 2 Mapping 2.2 25 MEDIUMPREMAPPING_PROCESS 323 Module 2 Mapping 2.3 32 MEDIUMPOSTMAPPING_PROCESS 183 Module 2 Mapping 2.4 14 LOWSEQUENCE 151 Module 2 Mapping 2.5 6 LOWFLAT_FILE 128 Module 2 Mapping 2.6 9 LOWVIEW 89 Module 2 Mapping 2.7 12 LOWDEDUPLICATOR 52 Module 2 Mapping 2.8 18 LOWTRANSFORMATION 51 Module 3 Mapping 3.1 23 MEDIUMSORTER 4 Module 3 Mapping 3.2 34 MEDIUM

Module 3 Mapping 3.3 2 LOWTOTAL 16.559 Module 3 Mapping 3.4 6 LOW

Module 3 Mapping 3.5 7 LOWModule 3 Mapping 3.6 10 LOW

NUM_MAPPINGS 1.000 Module 3 Mapping 3.7 27 MEDIUMModule 3 Mapping 3.8 16 LOW

MAX_NUM_OPERATORS_IN_MAPPING 50 Module 4 Mapping 4.1 11 LOWModule 4 Mapping 4.2 4 LOW

NUM_MAPPINGS_LOW 400 Module 4 Mapping 4.3 4 LOWNUM_MAPPINGS_MEDIUM 300 Module 4 Mapping 4.4 30 MEDIUMNUM_MAPPINGS_HIGH 300 etc. etc.

Page 7: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 7 of 20

D&T and the client discuss the conversion assessment & statistics report in a specific meeting organized

to execute tasks 2 to 6.

During the meeting, the client and D&T will compile the “Roles and responsibilities matrix”.

This matrix assigns roles and responsibilities to the client and D&T for every task within the conversion

process.

Page 8: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 8 of 20

Task 2 – Exceptions handling

This task is dedicated to deciding how to manage (work-around or manual conversion) any eventual

case that cannot be automatically converted to ODI.

A case can be represented by:

• A particular OWB operator in a mapping,

• A particular OWB activity or a particular transition condition in a process flow,

• An external workflow layer (not in OWB) used to execute the OWB project’s components.

These are extremely rare contingencies: most used OWB components are automatically converted.

Task 3 – Topology Definition

In ODI, the definition of the topology, logical architecture, and physical architecture are necessary to

indicate where the data are physically located.

To correctly collect these informations, the OWB2ODI Converter analyzes the OWB Repository Metadata

to obtain:

• Technology

• Machine where the data is located

• Database schema and/or file metadata

ODI was developed to operate with any database technologies available (Oracle, DB2, Teradata, SQL

Server, and many others). ODI provides the ability to refer to a database schema/user by its logical form.

The logical user or logical schema is an abstract reference to a physical schema, which is defined within

ODI as a real user in a specific database technology.

Logical schemas and physical schemas are related through contexts. For example, the BUDGET logical

schema may be associated with the BUDGET physical schema in the ORCL database through the

CTX_BUDGET_ORCL context, etc.

Everything is configured in ODI’s topology section, which contains all the information needed to switch

between the logical and physical side.

The OWB2ODI Converter only works on logical schemas because the pointers to physical schemas are

configured in the topology, and the context is assigned either at runtime or when “conversions” are

executed.

The result of that process shows how easy it is to generate a technology-independent code. As long as

the right context is set up, everything will work properly.

Please note: the logical schema is always associated with its own technology, although it can be easily

moved to another by deleting it from the old platform and building it in the new one.

Page 9: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 9 of 20

Task 4 – Conversion mode explanation

This task is dedicated to give a detailed explanation of the conversion mode of every OWB component

to the client‘s project team.

The OWB2ODI Converter can convert:

• OWB mappings into ODI interfaces and ODI packages,

• OWB process flows logic into ODI native tools, ODI packages, ODI procedures and ODI load plans

(available since ODI v.11.1.1.5).

Task 5 – KMs definition

ODI’s capabilities to handle any RDBMSs are represented by its KMs (Knowledge modules).

The OWB2ODI Converter has a specific console to set parameters and options related to the use of the

KMs.

The present task will affect ODI project’s performances.

The following is an example of how it is possible to customize the OWB2ODI Converter to choose the

KMs better suited to the client’s technology and needs.

KMs customizable choosing grid

KNOWLEDGE MODULE SOURCE

TECH

TARGET

TECH

TYPE OF

LOADING

DEFAULT

OPERATING

MODE

Oracle SQLLDR ORACLE ORACLE INSERT SET BASED

Oracle Incremental Update ORACLE ORACLE UPDATE SET BASED

D&T Custom KM ORACLE ORACLE INSERT/UPDATE SET_BASED

DSNTIAUL DB2 DB2 TRUNCATE/INSERT SET BASED

Client Custom KM DB2 DB2 INSERT/UPDATE SET BASED FAIL

OVER ROW BASED

… … … … …

D&T customized KMs can also manage other aspects such as:

• Management of ANALYZE on target table,

• Management of the maximum number of allowable errors on target table,

• Management of loading HINT,

• Management of selecting HINT,

• Etc…

Page 10: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 1 - ASSESSMENT Page 10 of 20

Task 6 – Configuration management definition

The last, but not the least important task.

To obtain best results, it would be opportune to freeze any maintenance activity about OWB project to

convert. The ideal scenario would be:

- To rollout every OWB project undergoing modification into the client’s production environment,

- To align each of the client’s environment (development, test and production),

- To freeze any maintenance activity.

The client has to decide if freezing is possible or not.

If not, how does the client intend to execute configuration management of the OWB project to be

converted.

In this case, the client and D&T have to define a detailed operative protocol to be applied during the

conversion period.

During this task, the “fixing protocol”, which is the management process (roles, responsibilities, actions,

etc.) needed to fix any bugs identified during the acceptance test task, has to be defined.

Page 11: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 2 - CONVERSION Page 11 of 20

PHASE 2: CONVERSION

Page 12: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 2 - CONVERSION Page 12 of 20

The Conversion phase has the following objectives:

- To convert an original OWB project into a new ODI project,

- To generate the new ODI project’s metadata for the future import into the client ODI repository.

The Conversion phase is composed of the following tasks:

- Task 7: conversion of OWB Mapping and OWB Process Flow,

- Task 8: formal test,

- Task 9: ODI project metadata generation.

Task 7 is the core of the entire conversion process and it is executed by the D&T services centre.

Before starting the task, the following should be carried out:

- To supply a .mdl file aligned with the latest OWB project version,

- To supply a DB schema export aligned with the latest OWB project version,

- To freeze any maintenance activity related to the OWB project to convert.

Task 8 is executed by the D&T services centre and only concerns formal correctness of the new ODI

project, because data are not available for a real test run.

Task 9 is dedicated to the transmission of the new ODI project metadata generated by the Converter.

Task 7 – Conversion of OWB Mapping and OWB Process Flow

According to task 3 “Topology definition” results, the D&T services centre carries out the ODI topology

setting for its internal conversion environment.

Then, all mappings are analyzed and a first transformation is applied whenever specific operators are

found. This requires an onerous process in order to guarantee the proper functioning of the new Oracle

Data Integrator flow, while keeping the semantic flow unchanged.

This task, performed automatically by the OWB2ODI Converter, shows how costly and time-consuming it

would be to carry out an entire manual conversion, not to mention the risk of introducing new mistakes

due to haste or technical misunderstandings.

Once additional mappings are “normalized”, recursive techniques are used to generate the operators

tree of each mapping.

The tree is retraced and each operator involved is transformed according to the new Oracle Data

Integrator semantic.

The correct topological information is maintained, considering the possible overruling of the location

using a database of links or different schemas.

The following tables indicate which OWB components the OWB2ODI Converter automatically converts

and which components have to be converted via manual activity.

Page 13: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 2 - CONVERSION Page 13 of 20

From a conceptual point of view, OWB and ODI are similar, but they do not have equivalent features

and have deep and significant differences.

Thus, the OWB2ODI Converter does not handle some of the OWB components because they are rarely

used or do not have a corresponding ODI function or because conversion would be too complex or

ineffective or inefficient.

OWB mapping: converted operators

Aggregator Joiner Sorter

Constant Mapping input/output parm

Mapping

Splitter

Deduplicator (Distinct) Match-Merge Table

Expression Materialized View Transformation

External Table Pivot/Unpivot View

Filter Pre/Post mapping process Anydata Cast (since 11.1)

Flat File (File multirecord) Sequence

Key Lookup Set Operation

OWB mapping: not handled operators

Dimension Expand object Pluggable mapping

Cube Varray iterator Queue (11.2)

Construct Name and address Subquery filter (11.2)

Data generator Table function LCR cast/splitter (11.2)

OWB process flow: converted activities

Data auditor FTP And / Or

Mapping Manual End

Subprocess Notification End Loop

Transform Set status For Loop

Assign Sqlplus While Loop

Email User Defined Fork

File Exists Wait Route

Page 14: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 2 - CONVERSION Page 14 of 20

OWB process flow: converted transition conditions

Success Error Complex

OWB process flow: not handled activities

Web services (11.2) EJB / Java class (11.2) OMB plus (11.2)

OWB process flow: not handled transition conditions

Warning* Extended

∗ Since ODI does not have a “warning status”, the OWB “warning transition condition” is handled

depending on each client’s specific needs. This is a possible topic to be covered in the assessment

meeting.

The OWB “Fork activity” is converted by using the ODI “Load plan” feature that is only available from

ODI v.11.1.1.5 onwards. Therefore, in order to manage and convert all of the most used and useful

activities in the Process Flow, we need an ODI version that is equal or greater than ODI v.11.1.1.5.

Task 8 – Formal test

This is the first formal non-regression test executed on empty data structures, without data.

This is carried out by the D&T services centre.

Task 9 – ODI project metadata generation

The last task of the conversion process is dedicated to the ODI project metadata generation.

These metadata are included in the .xml files that are delivered to the client.

Page 15: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 3 - TEST Page 15 of 20

PHASE 3: TEST

The test phase has following objectives:

- To compare new ODI project results with old OWB project results (acceptance test),

- To tune new ODI project performances.

Page 16: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 3 - TEST Page 16 of 20

The test phase is composed of the following tasks:

- Task 10: test environment arrangement,

- Task 11: acceptance test,

- Task 12: performance tuning.

Task 10 – Test environment arrangement

During this task, each test environment’s element has to be arranged. In detail it is necessary:

- To install OWB product,

- To install ODI product,

- To copy OWB project’s components,

- To import the two .xml files supplied from D&T services centre into ODI repository,

- To copy the production DB twice: one copy for OWB project and another copy for ODI project.

Task 11 – Acceptance test

The ODI project is tested to ensure that regression issues are not present.

In detail, a complete parallel run of the two projects is executed and then respective results are

compared to verify their matching.

Each incorrect result is investigated to determine relative causes.

The fixing protocol established during the client/D&T initial meeting (Phase 1 – Assessment) is applied

for each bug detected.

Task 12 – Performance tuning

The last step of the Test phase is related to performances.

During this task, the ODI Project’s performances are tuned with data base administrator support.

Page 17: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 4 - PARALLEL Page 17 of 20

PHASE 4: PARALLEL

The parallel phase has following objectives:

- To assure new ODI project correctness in Production environment such as the Test environment,

- To compare and eventually tune new ODI project performances compared to the original OWB

project in Production environment.

Page 18: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 4 - PARALLEL Page 18 of 20

The test phase is composed of the following tasks:

- Task 13: parallel environment arrangement,

- Task 14: verification test,

- Task 15: performance verification.

Task 13 – Parallel environment arrangement

During this task, each parallel environment’s element has to be prepared in order to:

- Deploy ODI project,

- Copy production DB.

Obviously, the DB copy has to be executed just before the parallel run is started.

Task 14 – Verification test

Theoretically, this is a redundant and unnecessary task, but experience teaches us that a parallel

production period must be carried out in order to locate any possible problems that may affect the

production environment (configuration, privileges, missing patches, etc.).

The comparison of results of two projects (just executed during the Test phase) is executed again.

Task 15 – Performance verification

Theoretically, this is also a redundant and unnecessary task, but experience teaches us that a parallel

comparison must be carried out between the original OWB project and new ODI project performances

in the production environment.

Page 19: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

Phase 5 - PRODUCTION Page 19 of 20

PHASE 5: PRODUCTION

The production phase has following objectives:

- To remove the original OWB project and its pertinences (OWB installation, DB schema, etc.) from

production environment,

- To switch the scheduling tool from the original OWB project to the new ODI project.

The test phase is composed of the following tasks:

- Task 16: production environment cleaning,

- Task 17: switching from OWB to ODI.

Task 16 – Production environment cleaning

The cleaning consists of:

- OWB uninstallation,

- DB schema deletion,

- Removal of any other software components that are not necessary to the new ODI project running.

Task 17 – Switching from OWB to ODI

This consists of physical switching from the old OWB project to the new ODI project.

Page 20: 2015 owb2 odi converter - white paper_owb_to_odi_migration_service_d&t

CONTACTS Page 20 of 20

CONTACTS

For more information about OWB2ODI Converter, please visit www.owb2odiconverter.com

or visit www.databtech.com

or send an email to [email protected]

or call +39 02 8950 0080 to speak to a D&T representative.

Database & Technology s.r.l.

Largo Promessi Sposi, 4

20142 – Milano, Italy