Q1 – in the received drawings, the length between 120Af and 120Ag shows no other grids and columns and the area between them has the symbol of a bridge (An “X” like sign inside the length). Does the bridge still need to be deleted (as instructed on Page 1)? Q2 – In the latest received drawings, the grid to grid distance for the bridge ‘WE’VE MEASURED’ is 10500mm, same to that of the STAAD file. Is this correct or not? Please provide the updated length of the bridge.

Upload: jordan-rodriguez

Post on 14-Sep-2015

212 views

Category:

Documents


0 download

DESCRIPTION

wuery

TRANSCRIPT

Q1 in the received drawings, the length between 120Af and 120Ag shows no other grids and columns and the area between them has the symbol of a bridge (An X like sign inside the length). Does the bridge still need to be deleted (as instructed on Page 1)?

Q2 In the latest received drawings, the grid to grid distance for the bridge WEVE MEASURED is 10500mm, same to that of the STAAD file. Is this correct or not?Please provide the updated length of the bridge. Q3 Do you mean sub beam or intermediate beams? OPTION 1: Beams will be added but as hangers since there will be too many longitudinal beams in that part of the piperack. See image 1OPTION 2: Longitudinal and sub-beams will be added on the concerned level. However, there will be problems due to limited distance (300~400mm remaining clear distance). See image 2Which option do you prefer?

Image 1

Image 2