Reliability
Availability
Maintainability
Safety
![Page 4: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/4.jpg)
IEC 61508: Required activities for safety related systems
![Page 5: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/5.jpg)
Risk and the design process
• Each design step includes the refinement of the risk analysis
• Each design solution has to be measured against the risk analysis
• Constant design questions: – Is the design balanced? – Can it be made? – Can it be done simpeler?
![Page 6: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/6.jpg)
Simplicity is prerequisite for reliability
Edsger W. Dijkstra
![Page 7: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/7.jpg)
Risk management process
Slide 7 15 June 2016
![Page 8: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/8.jpg)
Failure definitions
• What can go wrong exactly?
• When do we consider the system to be failed?
![Page 9: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/9.jpg)
An example…
• Not extracting landing gear when commanded without error indication
• Spontaneous irreversible landing gear extraction while travelling overseas
![Page 10: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/10.jpg)
Top-down vs. Bottom-Up analysis
• Bottom-up: structured brainstorm about everything that could happen given a specific scope
• Top-down: think about your biggest fears first, than find out what could cause it.
![Page 11: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/11.jpg)
FME(C)A: bottom-up thinking
• Failure Mode and Effect (Criticality) Analysis
• Reasoning from failure of the components, thinking about the consequences
![Page 12: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/12.jpg)
Risk: System does not perform trick?
![Page 13: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/13.jpg)
Guide words…
Look at every component and investigate what happens if:
– It doesn’t work
– It is very slow
– Does the wrong thing
– Sends messages spontanously
– Loses messages/state
– Leaks information
![Page 14: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/14.jpg)
Structured FMECA approach
Function Failure Mode Causes Local Effects System Effects Criticality
Inwin Wrong output Logical error Unjustified open No closure Catastrophic
Delayed output PLC error delayed closure Closure delayed Limited
No output Application hang No closure No closure Catastrophic
Spontanous output Switching error Unjustified open Onterechtesluit False Positive
Process Wrong output Logical error Unjustified open No closure Catastrophic
Delayed output PLC error delayed closure Closure delayed Limited
No output Application hang No closure No closure Catastrophic
Spontanous output Switching error Power failure No closure Catastrophic
… … … … … …
… … … … …
… … … … …
… … … … …
![Page 15: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/15.jpg)
Certainty…
Rank beliefs not according to their plausibility but by the harm they may cause.
Nassim Nicholas Taleb
Slide 15 15 June 2016
![Page 16: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/16.jpg)
Identifying measures
• Risk = Chance * Impact
• Moments allowing measures: – Preventive
– Detection
– Repression
– Correction
– Ignore
– Accept
Slide 16 15 June 2016
![Page 17: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/17.jpg)
You can’t mitigate everything… • You can’t prevent everything
• You can’t plan for everything
• You can’t predict everything
• You couldn’t do any business
• But, you can’t ignore everything either
![Page 18: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/18.jpg)
Structured FMECA approach
Function Failure Mode Causes Local Effects System Effects Criticality Detection
Mitigating
Measures
Inwin Wrong output Logical error Unjustified open No closure Catastrophic None Multiprogramming
Delayed output PLC error delayed closure Closure delayed Limited None
No output Application hang No closure No closure Catastrophic None Failsafe behaviour Process
Spontanous output Switching error Unjustified open Onterechtesluit False Positive None
Process Wrong output Logical error Unjustified open No closure Catastrophic None Multiprogramming
Delayed output PLC error delayed closure Closure delayed Limited None
No output Application hang No closure No closure Catastrophic None Deadlock detection
Spontanous output Switching error Power failure No closure Catastrophic None Safety relay
… … … … … … … …
… … … … … … …
… … … … … … …
… … … … … … …
New functional and design requirements!
![Page 19: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/19.jpg)
Disadvantages FME(C)A
• It is impossible to calculate an overall risk exposure
• Relation between risks is missing – Common mode failures usually aren’t modelled
• Complex scenario’s are hard to model – Multiple failures aren’t modelled
– Are there root causes that could trigger multiple failures?
• Usually identifies irrelevant risks
![Page 20: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/20.jpg)
Top-Down Risk analysis • Start with a dominant
concern
• Identify potential causes
• Detail further
![Page 21: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/21.jpg)
A small FTA
![Page 22: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/22.jpg)
Typical risks identified
• Components making the wrong decissions
• Power failure
• Hardware failure of PLC’s/Servers
• Software failures
• Network failure
• External factors
• Human maintenance error
22
![Page 23: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/23.jpg)
Breaking a cut-set
Alternate component
Alternate service
![Page 24: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/24.jpg)
Measures and FTA
15/06/2016 24
Before After
![Page 25: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/25.jpg)
Design decisions…
• Every design decision is accompanied by a Risk analysis focussing on RAMS aspects
• In the end the cost, RAMS effects and other trade-off aspects will determine which design option will be used
![Page 26: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/26.jpg)
Option 1
![Page 27: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/27.jpg)
FTA Option 1
![Page 28: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/28.jpg)
Option 2
![Page 29: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/29.jpg)
FTA Option 2
![Page 30: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/30.jpg)
Info
Hoogtebepaling Aansturing
Hoogtemeting
Waterkering
Diesels
Meeta
Meetb
Stuura
Stuurb
Software failure Chance: 1/1.000 year
Measurement error Chance: (1/1.000.000 year)3
Software failure Chance: 1/1.000.000 year
Software failure Chance: 1/1.000 year
Design Option 1
![Page 31: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/31.jpg)
Info
Hoogtebepaling Aansturing
Hoogtemeting
Waterkering
Diesels
Meeta
Meetb
Stuura
Stuurb
Software failure Chance: 1/10.000 year
Measurement error Chance: (1/1.000.000 year)3
Software failure Chance: 1/100 year
Software failure Chance: 1/10.000 year
Design Option 2
![Page 32: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/32.jpg)
IEC 61508: Required activities for safety related systems
![Page 33: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/33.jpg)
Testing
Function Impact wrong/not functioning
Impact spontanous functioning
Function 1 Small Medium
Function 2 Disasterous Huge
Function 3 Serious Huge
Function 3 Serious Small
Function 4 Serious Serious
Function 5 Serious Small
Function 6 Huge Huge
…
![Page 34: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/34.jpg)
Test depth and acceptable risk
• Level A: Thorough endurancetest aiming to prove function reliability with high accuracy.
• Level B: Thorough endurancetest aiming to prove function reliability with medium accuracy.
• Level C: Thorough endurancetest aiming to prove function reliability with low accuracy.
• Level D: Test to verify if the function works once.
• Level E: Function testd alongside other functions, might leave paths untested.
Test effort
Level #Tests Effort
Level A 50.000 120 hours
Level B 10.000 24 hours
Level C 1.000 4 hours
Level D 1 1 hour
Level E - PM
![Page 35: 2016-05-30 risk driven design](https://reader031.vdocument.in/reader031/viewer/2022030214/588b3d1c1a28ab5a5b8b6037/html5/thumbnails/35.jpg)
Test depth…
Functie Not functioning Spont. Function
Function 1 Level E NOT
Function 2 Level A Level A
Function 3 Level A Level A
Function 3 Level B Level B
Function 4 Level A Level A
Function 5 Level E NOT
Function 6 Level A Level A
… … …