salutationyjanchor.com/pdf_download/youngjin.pdf · 2016. 12. 14. · salutation young jin industry...

36

Upload: others

Post on 27-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • SALUTATIONYoung Jin Industry Since its inception in 1988, 24 years of domestic anchor bolts at theforefront of the industry had been led the domestic industry and had contributed to the ar-chitectural culture.

    Our company developed our business, so we expanded and improved the most cutting-edge facilities required for the production of the new products, and the automated systemhas been introduced in the entire production process line.

    Especially, we introduced into cold forming forging parts formers and bolt formers, so wereduce the cost and we produce precision parts and high-carbon steel bolts, fastener prod-ucts used in the industry as a whole.

    Thanks to your continued support and interest in our company has been the steady growthand development and also by pursuing customer-satisfaction ahead of changing globaltrends is recognized the value of the business at home and abroad.

    We will produce products through ceaseless research and development and strict qualitycontrol, to supply perfect quality products. So we promise to repay your support.

    We ask for your continuing interest and your help and encouragement.

    I wish you tremendous success in everything you do.

    sincerely yours,Jong Sik. Kim

  • ACHIEVEMENT AND GLORYOnly by never-ending innovation and improvement to manufacture high quality but low costproducts can enterprises overtake others in the competitive maketplace.We have been granted registration of EN ISO 9002, ISO 9002, KSA ISO 9002 Quality As-surance system by the SMICC, KAB of korea which not only upgrade our company’s imageand customer satisfaction but also post our products on par with international standards.Having committed ourselves to R&D and obtained more than ten government patents, weown unique experience in reducing costs and promoting quality.

  • BRIEF HISTORYSeptember. 12. 1989 : Established in 786-7 Deokpo-Dong Sasang-Gu Busan CityApril. 1992 : Moving and Expansion to 396-11 Samlak-Dong Sasang-Gu Busan CityDecember. 31.1993 : Selected as the excellent technology company by the Korea Technology Credit Guarantee FundAugust. 31.1996 : Selected as the excellent company in the nation by Kookmin BankAugust. 21.1998 : Selected as the venture enterprise by SMBA(Small & Medium Business Administration)January. 25. 1999 : Selected as the target company for support of export by the SMBA (Small & Medium Business

    Administration)July. 20.1999 : Acquired EM mark (No.1999-047) - Certification of technology andquality by the Ministry of Com-

    merce,Industry and Energy (MOCIE)of the Republic of KoreaOctober. 28. 1999 : Won the official commendation for the development of new technology and goods from the Min-

    ister of Commerce, Industry and Energy (MOCIE)of the Republic of KoreaFebruary. 1. 2000 : Selected as the excellent company off technological competitiveness by the SMBA (Small &

    Medium Business Administration)May. 4.2000 : Selected as the promising small & medium company of export competitiveness by the Small Busi-

    ness Corporation (SBC)July. 19.2000 : Selected as the venture enterprise of development of new technology by the SMBA (Small &

    Medium Business Administration)July. 24.2000 : Selected as the promising small & medium exporter by Busan and Ulsan Branch of the Small &

    Medium Business Export Aid CenterSeptember. 20. 2000 : Achieved success in technical innovationDecember. 15.2000 : Acquired KSA/IOS 9002December. 30.2000 : Won the official commendation for the promotion of export from the head of the Busan and Ulsan

    Branch of the Small & Medium Business AdministrationNovember. 26.2001 : Selected as the INNO-BIZ enterprise by the SMBA (Small & Medium Business Administration)November. 1. 2002 : Won the official commendation for the development of new technology and goods from the Min-

    ister of Commerce, Industry and Energy (MOCIE)of the Republic of KoreaNovember. 15. 2002 : SMBA Venture Company Confirmation (Expiration November. 14. 2004)November. 15. 2004 : Expiration of SME Venture Company (November. 15. 2006)November. 26. 2004 : INNO company (INNO-BIZ) Certification (Expiration November. 25. 2007)June. 3. 2005 : Chairman Card (Anchor Landfill)September. 20. 2006 : Young Jin industry established the second factory - 5742, daejeodong, Gangseo, Busan, KoreaNovember. 23. 2006 : Utility Model Registration (Anchor Construction)December. 26. 2006 : Mechanical Components and Materials Industry CertificateNovember. 26. 2007 : INNO company (INNO-BIZ) Certification (Expiration November. 25. 2010)November. 26. 2010 : INNO company (INNO-BIZ) Certification (Expiration November. 25. 2013)November. 10. 2011 : Certificate of Venture Company (Expiration November. 14. 2013)February. 20. 2012 : Busan Mayor Hu Nam-sik Award (machine parts and materials industry)January. 2013 : Young Jin industry Established a new head office in 5-ro 28 hwajeon-dong Gangsoegu, Busan.March. 24.2015 : ICR ISO9001

  • CONTENTS

    11 STUD BOLTS & NUTS12 CARRIAGE BOLT / ADJUST BOLTS13 FLANGE BOLT14 AR CHEMICAL SETTER15 INJECTION CHEMICAL & INJECTION GUN

    COLD FORMING

    9 COLD FORMING

    SPECIAL BOLTS

  • ANCHOR & SLEEVE

    OTHER PRODUCTS

    17 WEDGE ANCHOR18 SET ANCHOR19 ALL ANCHOR20 DROPIN ANCHOR & DROPIN PVC21 STRONG ANCHOR22 FRAME & SLEEVE ANCHOR23 NEW POWER ANCHOR / HIT ANCHOR24 STONE FIXING & WELDING25 ALL PLUG BOLTS26 EXPENSION CAP / STEEL INSIDE ANCHOR27 STEEL ANCHOR

    28 C-TYPE BRACKET & CEILING BRACKET29 CONNECTING NUT30 CONTROL PIPE FOR TURNBUCKL31 DECK INSERT & FUZZY INSERT /

    CEILING BRACKET

    32 RAIL BOLTS / HOOK BOLTS33 FOUNDATION BOLTS

    34 MEASUREMENT OF ANCHOR’S INTENSITY35 EQUIPMENT

  • COLD FORMING

    9

    Forging cold forging at room temperature in the molding of Materials Processing. Cold heading is the main cold forging process from cold forged

    bolts, the head of the rivet forming process.This processing the excellent manufacturing methods that can produce a lot of

    used parts such as automotive, electronics, electrical bolts, rivets, nuts.

    · Saving in material - scrap reduction- No scale loss due to heating- High product recovery· Excellent dimensional accuracy - Reduction of processing airborne· Excellent surface quality of cold extruded parts· Improvement of mechanical properties of extruded parts· Energy saving· Deformation resistance reduction· Lay out of the factory concise· High productivity

    | BENEFITS OF COLD FORMING |

    · High strength Bolts, Nuts- Cylinder head bolts, Con rod bolts, Bearing cap bolts,Crank pully bolts, Tie rod pins, Ball studs,Plug bolts, Fly wheel bolts, Hub bolts and nuts, Hexagon socket head bolts, Special bolts etc.· Screw- Self-piercing screw, Stator bolts, Self-drilling screwsCompressor bolts, Machine· Tapping- Taptite screws, Sems etc.· Special Fasteners- Drill point Screws, Blind rivets, Hose bend screws, Self clinching screws etc.

    | COLD FORMING PRODUCTS |

    COLD FORMING

  • SPECIAL BOLTS

    Nominal Size or Diameter of

    Stud-bold D

    1/2 ” (M12) up to 1 ” (M27) incl Over 1 ” (M27)

    Thread

    InchSeries

    Unified Coarse Thread Series. Class 2A and

    2B ANSI B1. 1. 1960

    Shall conform to Shall conform toISO R68JIS B0209[

    ISO R68JIS B0209[

    Unified 8-thread(3-pitch)Series. Class 2A and

    2B ANSI B1. 1. 1960

    METRIC Series

    D=1/2”(M12)up to 6”(M150) incl STUD BOL T Length

    L Equal to 12”(300mm) and underL Over 12”(300mm) to 18”(458mm) inclL Over 18”(458mm)

    ± 1/16”± 1/8”± 1/4”

    (2mm )(3mm )(6mm )

    ToleranceASTM A193/A193M ASTM A320/A320M ASTM A307/A307M JIS S4107 DIN 9768 BS4882DIN 9768 BS4882B7, B7M, L7, L7M, B16, B8 , B8M, B8 CL2, B8M CL2

    40 years knowhow of cold-forming process involved a number of domestic projects, and even today continues toparticipate in the final product of the petrochemical plant reliability and durability of moving parts to ensure thatother companies and differentiated processes and high quality through inspection the products are supplied to cus-tomers.

    1. L is the length of first thread to first thread,not including point length of both ends.

    2. Points shall be flat and chamfered.

    | NOTES |

    STUD BOLT FOR PRESSURE-TEMPERATURE PIPING / ANSI B16.5

    | SPECIFICATION |

    M12 ~ M64 (3/8 ~ 2” 1/2)

    | RANGE |

    Petrochemical plant, Flanges, Valves, Heat exchange,etc. High temperatures and pressures used to.

    | USAGE |

    11

    STUD BOLTS & NUTS

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    12

    d p d1 H B C k S lrD H1

    1 type l 302 typeM5x0.8

    M5x0.9

    M6

    M8

    M10

    M12

    0.8

    0.9

    1

    1.25

    1.5

    1.75

    5

    5

    6

    8

    10

    12

    11.5

    11.5

    14

    18

    22

    26

    17

    17

    20

    26

    32

    38

    2.5

    2.5

    3

    4

    5

    6

    0.6

    0.6

    0.7

    0.9

    1

    1

    2.5

    2.5

    3

    4

    5

    6

    5.5

    5.5

    6

    7

    8

    9

    5

    5

    6

    8

    10

    12

    7.1

    7

    8.5

    11.3

    14.1

    17

    0.8

    0.8

    1

    1.2

    1.5

    2

    12

    12

    16

    18

    20

    22

    10~50

    10~50

    17~25

    14~100

    16~100

    20~130

    l 30

    Material (Differant shape’s steel)SIZE LIST

    A bolt having a round head with a square,ribbed, or fluted boss underneath it. The function of the boss being to bite intotimber to prevent the bolt turning while the nutis being tightend.

    Head SizeLarge(24)Large(24)Large(24)Small(15)

    Length(mm)20356030

    Body Diameter(ø)3/83/83/83/8

    SIZE LIST

    Adjusting bolt is also called height controlscrew. It serves as a stand item for householdfurnitures like refirgerator, and other electricalappliances. This can be controlled by movingthe screw from the floor, for loosening andtightening up the bolt. The advantage of thisproduct is that it can really be easily controlled,and can really be fixed for keeping the balance.

    | CONSTRUCTION’S CASE |

    CARRIAGE BOLT

    ADJUST BOLTS

  • SPECIAL BOLTS

    Appellation of screw(d) ds s e de dw k k1 c r1 r da z k1

    A-BA1-B1 b

    The maximum

    length of full threadUsually

    Basic size

    Dimen-sions allow

    Basic size

    Dimen-sions allow Min Max Min Max Min Min Max Min Max About Min Max Min

    M5 5 0-0.1

    6 0-0.2

    8.67 12 9 5.35 3 1.05 0.7 0.2 5.7 0.9 2.0 0.3 16 30

    M6 6 10 11.05 14 11 5.75 3.2 1.3 0.8 0.25 6.8 1 2.3 0.3 18 40

    M8 8 0-0.15

    13 0-0.25

    14.38 17.5 14.5 7.3 4.2 1.6 1.1 0.4 9.2 1.2 3.1 0.4 22 40

    M10 10 17 18.90 22 18 9.2 9.2 1.8 1.4 0.4 11.2 1.5 3.9 0.5 26 45

    M12 0-0.2

    19 0-0.35

    21.10 25 22 10.7 10.7 2.25 1.6 0.5 14.2 2 4.7 0.7 30 45

    M16 24 27.14 32 29 13.2 13.2 2.7 2.0 0.5 18.2 2 6.2 0.8 38 50

    SIZE LIST

    Flange bolt is not easily come loose because itis grooved at the flange face in the opposite direction to the fastened direction on the bolt.This bolt are mainly used flange nuts.

    Zinc galvanizing, Hot dip galvanize, Dachrotizing

    | MATERIAL |

    | PLANTING |

    • Automobile• Components of the piping inconstruction facilities

    | USE |

    SS400, S45C, SCM440, STS 304,STS 316, STS 316L

    FLANGE BOLT

    13

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    14

    Capsule

    8

    10.5

    13

    17

    20

    24

    28

    34

    40

    70

    90

    95

    120

    190

    230

    280

    300

    350

    2.7

    6.0

    9.5

    21

    50

    87

    148

    258

    414

    70

    90

    100

    130

    200

    250

    300

    350

    400

    2,540

    3,910

    5,840

    9,810

    16,750

    26,640

    31,770

    42,500

    52,700

    9

    1213

    14.516

    1920

    242226

    2830

    3234

    4042

    4850

    M 8. W5/16D 6

    M 10. W3/8D 10

    M 12. W1/2D 13

    M 16. W5/8D 16M 20

    W 3/4D 19

    M 22. W7/8D 22

    M 24. W1D 25

    M 30. W11/4D 32

    M 36. W11/2D 38

    Basic laying

    Outerdia

    (mm )

    Layingdegree(mm )

    Layinglength(mm )

    Totallength(mm )

    Weight(mm )

    Using boltDiffer shape of

    steel patch

    Tensil strengthweight

    (Fc=210kg/cm 2)(kg)

    SIZE LIST

    General Anchor-Open in the concrete by theprinciple of screw.-It’ll occur a changed position asa result of the fome side of a fix-ing surface

    1. A basic purpose of machine2. A basic purpose of steel3. Purpose of steel4. Lock bolt purpose5. Conveyor purpose6. Signalboard, advertisting tower purpose7. Sound-proof wall, tunnel purpose8. Crane rail purpose9. Ceiling, wall, supporter purpose10. Resistance material purpose11. Cable, pipe supporter12. Tank, a funnel’s basic purpose13. Bridge, prevent net of a falling-rock14. The other of engineering works and buildings,

    purpose.

    ·General bolt purpose : (SS41, Material of bolt purpose,Different type of steel purpose)

    Ar Chemical setter-It’ll fix with non-burden shape bythe principle of sticking concrete.-A fixing surface can happen a pullingpart on the whole body so veryhard and ever changed position at all.

    | COMPARISON OF FIXING SURFACE |

    | WIDE USAGE |

    1. Dig a hole to the mainbody and put a cap suless.

    2. Hammer or Drill, and put abolt with giving a rotationand a shock

    3. Fastened with turn.

    | CONSTRUCTION’S METHOD |

    AR CHEMICAL SETTER

    Concrete, and air bladder concrete, the world wide of AnchorSystem which stick to a remarkable intensity such as a rock floor etc.

    Capsule SS400 Chemical Assembly Chemical SS400 Stud

  • SPECIAL BOLTS

    15

    The injection chemical improves the difficultpoint of construction projects of glass capsule type and set the bolt and steelframe in prompt and convenient fashionwithout the need of rotating that it has fineadhesiveness on the concrete surface tomaintain heavy weights.It is strong against the humidity and has waterproofing effect as well.

    * Hardening time following the temperature

    Temperature Time

    0 °c

    5 °c

    20 °c

    30 °c

    60 minutes

    30 minutes

    6 minutes

    4 minutes

    Construction dimension M 10 M 12 M 16 M 20 M 24

    Diameter of the hole

    Minimum insertion depth

    12

    90

    14

    110

    18

    130

    25

    180

    28

    210

    The hardening time can be adjusted depending on the requirement of user.

    | CONSTRUCTION’S METHOD |

    | SPECIFICATION |

    INJECTION CHEMICAL

    & INJECTION GUN

  • 17

    ANCHOR & SLEEVE

    | CONSTRUCTION’S METHOD |

    SIZE LISTBoltsize

    Material SWRCH(Normal steel) / STS 304(Stainless)

    Boltlength (mm)

    Threadlength (mm)

    Large booledepth (mm)

    Small faetenablethickness (mm)

    Tensilstrength (mm)

    suitabledrill (mm)

    7595

    115

    8090

    110120140

    7090

    110120140

    120145160220

    150170220270

    252525

    3030353535

    3030353535

    40404040

    45454545

    656565

    707070

    100100

    6070909595

    110115115170

    115130150240

    253045

    7085

    100150180

    2306075

    100150

    180230

    5070

    90140180230

    2,500

    3,500

    4,250

    7,000

    12,250

    8

    10

    12

    16

    20

    M 8

    M 10

    M 12

    M 16

    M 20

    Processed by Cold-Formingand it's very flexible.

    Expantion wage of 3 pieces.

    Speedy, trustful, which attached an ANCHOR is based on a pass through.rocessed by Cold-Forming, its material is strong and flexible. In case of attaching a pass through, it has no problemsat all it the real situation is not accord with between a hole of base plate and anchor's hole. Also, a HSA is easily toput into an anchor's hole, after putted into, and it will be completed of setting once a nut was circulated by about3 times and a widen wage of 3 pieces can showing enough its power.A red string to the above of screw of which appeared to the existence of the proper depth of setting. A HSA alsohaving an additional expansion ability in compliance with its load's increased.

    -reduction of construction time -curtailment of expenditure-curtailment of expense on components-Expected Uses : nuclear power plant, oilrefineries & chemical facilities, heavy industrial facilities, highway railings, roadguards. Fixing rail, bridge railing. Attachment of marble materials etc.

    | The Cold-Forming Processed Products |

    It has no problem at all bysetting even though a posi-tion is a little bit differ.

    WEDGE ANCHOR

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    18

    Material SS41 (Normal steel) *SUS 304 (Stainless)

    Bolt SizeBolt Size (A)M6 (W1 / 4)

    M8 (W5 / 16)

    Total length ( I )506075

    100125150200250300100125150200250300100125150200250300150200250300200250200200250300

    Screw length (S)2530457085

    100150180230

    6075

    100150180230

    507090

    140180230

    80130180230130180230130180230

    Degree (A”)10.012.0

    14.0

    17.0

    21.0

    25.0

    28.0

    32.0

    Pipe length (B)3035

    40

    50

    65

    75

    95

    110

    740 kgf2,120

    2,930

    4,710

    4,740

    5,200

    7,6906,500

    16,880

    19,750

    27,600

    11.012.5

    14.5

    18.0

    22.0

    26.5

    29.0

    33.0

    M10 (W3 / 8)

    (mm) (mm) (mm) (mm) (mm)

    M12 (W1 / 2)

    M16 (W5 / 8)

    M20 (W3 / 4)

    M20 (W7 / 8)

    M24 (W1”)

    Plate Size Tensil strength Suitable drill

    SIZE LIST

    | CONSTRUCTION’S METHOD |

    1. Make a hole with a suitable drill to the total length.2. Put into an one set which made a plate and bolt.3. Hitting with hammer by using of attachment.4. Put the screw to nuts.

    SET ANCHORIt’ll be a safe construction by reason of using a bolt, pipeboth because it is fastened more strongly, so a set anchorwill be a fatastic anchor in order to finish up a speedy, safeand clear working. Construction working, electric working,hygiene working, cool & heating working, accompany’sworking, signalboard working, machines’s equipment work-ing and this set anchor can do any purpose of working.

  • 1. Dig a hole by drill from the upper side of equipment.2. Put into an anchor with a nut washer.3. With a hammer and put into by knock.4. An anchor is glued to after opened.

    | CONSTRUCTION’S METHOD |

    1. Set up a machine2. Attached to a hygiene equipment3. Fixed a electric line4. Attached to a signboard and advertising tower5. Attached working of elevator and achair6. Attached to a cool & heating works7. Light ceiling which attached to bolts8. Attached to a lighting equipment9. Attached to a fence and guard rail10. The other of concrete, stone, block,

    concrete block’s attached.

    | SPECIAL FEATURE |

    SIZE LISTBolt size

    M 10

    M 12

    M 16

    M 20

    Total length60708090

    1007090

    100120150100120130150180130150190

    Thread length60708090

    1007090

    100120150100120130150180130150190

    Tensil strength

    1,500kgf

    2,500

    3,000

    5,000

    Suitable drill

    10.0

    12.0

    16.0

    20.0

    Material SS41 (Normal steel) *SUS 304 (Stainless)

    1. It’s use of the same diameter’s hole like bolt so workingis very easy.

    2. Once hitting a bolt on the center pin and can attachedto concrete.

    3. After setting a nut’s positioned and can use widely regardless of hole’s depth.

    |WIDE USAGE |

    The all anchor is a superior anchor bolt in order tomeet a modern requirement. It’s also did a goodwork by using of anchor bolt such as concrete, light-concrete, block as an economically for fasten con-struction.

    ANCHOR & SLEEVE

    ALL ANCHOR

    19

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    20

    SIZE LISTSize(mm)

    M10 (3/8”)

    M12 (1/2”)M16 (5/8”)M20 (3/4”)

    Slate Dia(mm)

    Length(mm)

    Depth of punching (mm)

    Tensil sterngth(mm)

    Suitable drill(mm)

    1212162025

    3040506580

    3343536985

    4804808501,1501,600

    12.512.516.521.525.5

    FSSSS

    1. Dig a hole by suitable drill.2. Get rid of a rubbish.3. Inserted an anchor and hit a punch byhammer and put in.

    4. An anchor is expanded and then fixed.

    S type

    Ceiling type

    | CONSTRUCTION’S METHOD |

    F type

    DROPIN ANCHOR

    & DROPIN PVC

  • ANCHOR & SLEEVE

    21

    After laying, any of bolt can use and attached to any kind of equipment, it’s the best anchor.

    Construction working, electric working, hygiene working,cool & heating working, accompany’s working,signboard working, curtain working, ceiling working,machine’s equitment working etc.This Strong anchor can use of variety working.

    | WIDE USAGE |

    1. Make a hole with a suitable strong anchor to the total length.2. Put into an anchor plug to the hole.3. hitting with hammer by using of attachment.4. put the screw to bolts.

    | CONSTRUCTION’S METHOD |

    SIZE LISTBolt Size

    ASlate Dia

    B (mm)Screw Length

    S (mm)Tensil sterngth

    (kgf)Total Length

    B (mm) E (mm) F (mm) G (mm) (mm)Plate Size Suitable drill

    M6 (W1/4)M8 (W5/6)

    M10 (W3/8)

    M12 (W1/2)M16 (W5/8)M20 (W3/4)M22 (W7/8)

    M24 (1”)

    1112121214

    17.521.525.528.531.8

    10131315172225354050

    303530354050608090110

    5.05.57.87.87.59.512.516.019.020.0

    7.08.010.010.010.014.016.520.525.530.0

    14.016.018.018.019.023.530.032.040.045.0

    9001,8482,2002,2002,2003,7855,1805,5006,2008,000

    11.512.512.512.514.518.022.026.529.533.0

    STRONG ANCHOR

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    22

    Anchor’sDiameter

    (mm)

    Totallength(mm)

    The minimun Insertion’s

    length (mm)

    Tensillength(mm)

    SuitableDrill (mm)

    7292

    112132152

    3838383838

    170170170170170

    10M 10

    SIZE LIST

    1. After a selected an items such as a window, doors andits frame and put it on a using position and started a drillworking after check up a using FRAME ANCHOR.

    2. Inserted a FRAM ANCHOR to the hole and hit a hammerslightly to the appeared hole.

    3. Turn by screwdriver and fixed a perfectly after inserted aFRAME ANCHOR.

    | CONSTRUCTION’S METHOD |

    SIZE LISTSize Length Depth of punching Suitable DrillM6M6M8M8M10M10M10M12M12M16

    467658886585

    11072

    112131

    (mm) (mm) (mm)40404747565656727285

    88

    1010121212161620

    1. Dlg a hole by suitable drill.2. Get rid of a rubbish.3. Inserted a sleeve anchor.4. After 3 or 5 times, and put the screws a nut by spanner and it'll be fixed an anchor after expansion.

    | CONSTRUCTION’S METHOD |

    Having a part of projecting, and no need offailed go round in the hole, also easy for an expansion of the sleeve and displayed itspower. A general construction, engineeringworks site, machine and an equipment of elec-tricity, concrete, as using of possible for blockas well as a simple and easy way ofits execu-tion of an efficient working.

    | SPECIAL FEATURE |

    Concrete, Sleeve Anchor with Sticking a Strengthen Brick

    | USAGE |

    FRAME & SLEEVE ANCHOR

  • ANCHOR & SLEEVE

    | CONSTRUCTION’S METHOD |

    This products are good for an easy construction for the useof floo's rail at present working and the new method with anew material for the reduce time of working and this is thenew product developed an epochmaking discovery byYOUNG JIN INDUSTRY CO., Also it's brought into a specialdiacasting method and produced, Can be preserved asleeve's corrosion and give full scope to strong pulling powerwith attached and guarantee for a long life its endurance.

    | SPECIAL FEATURE |

    Exclusive Anchor of Handrail(For Floor's Rail) Ralcony.

    | USAGE |

    1. By using of suitable drill and made a hole.2. Get rid of a rubbish.3. By using of hammer and put into after hitting a head.4. The anchor is enlarged and then and fixed.

    SIZE LISTSize Suitable Drill Depth of Punching

    10 x 3212 x 36

    1012

    3040

    (mm) (mm)

    |WEIGHT LIST OF INCH SCREW’S SIZE(g) |

    It's added a special effects to SET ANCHOR and STRONG ANCHOR whichwere now used for now and planned a new products and easy for an execu-tion at any made use of bolts such as a six angles bolt, all screw bolt, andRound Head and superior other than the former items of SET ANCHOR andSTRONG ANCHOR because of its endurance and attached a strongly againsta fixed material. In addition to, by reason of two pieces of wings are just outforth, therefore it's arranged an easy structure in order to pervent a wronglycirculation from an execution and this is the most epoch-marking discoveryas well as planned handy which produced by YOUNG JIN INDUSTRY CO.,

    All Using structure which make use of at presentagainst a SET ANCHOR and STRONG ANCHOR.

    | USAGE |

    SIZE LISTSize Suitable Drill Depth Using Bolt

    10 x 3512 x 4516 x 5018 x 6016 x 50

    M6 x 50M8 x 60M10 x 70M12 x 80W 3/8

    1012161816

    (mm) 4555658065

    (mm)

    NEW POWER ANCHOR

    HIT ANCHOR

    | SPECIAL FEATURE |

    23

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    24

    SIZE LISTOuter Dia

    (mm)Total

    length (mm)Suitableanchor

    Drilldegree (mm)

    Layingdegree (mm)

    Shearing’s Resist intensity(kgf) Tensil strength(kgf)(Fc=240kgf/cm2)

    Female screwlength (mm)

    131316161919202225.4

    150150180180270210250250280

    151520202025253035

    D 10D 10D 10D 13D 10D 13D 13D 16D 19

    13.513.516.716.716.720.020.023.026.7

    65658080809595

    110140

    4,200 ~ 4,5004,200 ~ 4,5005,800 ~ 6,5005,800 ~ 6,5005,800 ~ 6,5007,400 ~ 8,1007,400 ~ 8,100

    9,200 ~ 10,00014,140 ~ 15,300

    3,200 ~ 3,6003,200 ~ 3,6004,800 ~ 5,8004,800 ~ 5,8004,800 ~ 5,8005,200 ~ 6,1005,200 ~ 6,1008,400 ~ 8,70010,500 ~ 11,600

    Material Swrch (Normal Steel)

    An anchor which made a hole through a wire string.

    According to the guide to an earthquake-proof's reapairplan and it's developed for concrete construction as toinceasing buildings of an earthquake-proof or jointed withan existing builidings increased.

    | Using of construction |

    It's fixed a screw line between an existing buildings andan increasing parts so can do for the purpose of anearthquakeproof.

    | Strong for shearing steel |

    By reason of it's marked a depth of laying at the middleof this item and easy for a sitable laying.

    | Suitable laying |

    SIZE LISTOuterdia (mm)

    Totallength (mm)

    Degree(mm)

    Drill’sdegree (mm)

    Tensilstrength (mm)

    10.010.012.014.0

    45555563

    44610

    10.510.512.514.5

    1,4001,4002,0002,000

    STONE FIXING & WELDING

  • 25

    ANCHOR & SLEEVE

    Main material is a superior quality of lead.-Light weight, small size's equipment attached.-Plug for a steel made.

    | Concrete, block, brick purpose/Steel made |

    -Simple construction because of this screw canbe fastened more tight.-using for a widely.

    | Special description |

    | USAGE |

    Assemble a bolts from a steel made plug.-It's possible re-works its plug by using of bolts.

    | Concrete, block, brick purpose/Steel made |

    -Perfect work of bolts fasten.-It's free of its bolts using.

    | Special description |

    -Controller plate/notice plate/signal etc.

    | USAGE |

    SIZE LISTPlug size Drill degreeUsing screw to wood

    6 x 2025

    8 x 202532

    10 x 20253238

    12 x 253238

    14 x 323845

    16 x 3850

    18 x 3850

    3.1 ~ 3.53.1 ~ 3.53.8 ~ 4.13.8 ~ 4.13.8 ~ 4.14.5 ~ 4.84.5 ~ 4.84.5 ~ 4.84.5 ~ 4.85.1 ~ 5.55.1 ~ 5.55.1 ~ 5.55.8 ~ 6.25.8 ~ 6.25.8 ~ 6.26.5 ~ 6.96.5 ~ 6.97.2 ~ 7.57.2 ~ 7.5

    (mm) 4.54.54.84.84.86.46.46.46.47.57.57.58.08.08.09.09.0

    10.010.0

    (mm)

    SIZE LISTBolt size

    dOuter dia

    DTotal length

    L

    3.0 Dish head4.0 Round head5.0 Round head6.0 Round head8.0 Six angles head10.0 Six angles head12.0 Six angles head

    6.07.08.0

    10.513.517.519.2

    (mm) 15.017.520.027.032.038.043.0

    (mm)

    Drill degree

    6.57.58.5

    11.014.018.020.0

    (mm)

    -Lighting equipment/washbowl and hygiene pot-tery/indoor decoration etc.

    CONSTRUCTION’S METHOD

    1. Made a hole and release abolts after put a bolts of plug.

    2. Attached completely.

    CONSTRUCTION’S METHOD

    1. Made a hole andfasten a screwwood after set byplug.

    2. Attached completely.

    ALL PLUG BOLTS

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    26

    - Steel plate was been developed by spring type inside. It’s the best when a plate is under 1 mm.- Pressed a shock after constructed and it’ll return to normal shape because of it’s restored to the former state of spring.- Easy to construction . Just put into a drill’s hole and can be fixed.- It is a metal washer and has an earth efficiency from bolt.

    | SPRING TYPE |

    By using of block, and was built a construction, and itcan be made use of a difficulty of a fixed material byreason of its hole of block.

    | USAGE |

    HEX WOOD SCREW

    | USED BOLT |

    - It’s fixed to light ceiling by steel’s inside more economically.- Just punching only 1 or 2 times and constructed by pressing type.- For steel plate inside.- It’s suitable construction such as electric, line, hygiene, mutual assistance.

    - From the bottom of the slate and possible to color’s confirmation.- It’s down widely at the below of slate in order to prevent frome a rolling.

    | PRESSING TYPE |

    SIZE LIST

    Size Wood Screw deep Suitable drill

    1/41/41/4

    (M6) W1/4(M10) W3/8(M10) W1/2

    406065

    (mm) (mm)1820

    26.5

    SIZE LIST

    Bolt dia Laying (mm) Tensil strengh(kgf)Drill degree

    (kgf)

    W 3/8W 3/8W 1/2

    405050

    1,5002,0002,000

    15.015.021.0

    EXPENSION CAP

    STEEL INSIDE ANCHOR

  • ANCHOR & SLEEVE

    It’s used for a high fiexible PLASTIC ANCHORand easy for put into an insert. (No damagewillhappen at the part of PLASTIC ANCHOR in thewinter season and at the place of cold). It’spossible for a confirmation of color at the topand bottom of slate.It has an abundant supply of color. It’s provided for an item of stainless.

    By reason of having a possibility of trip over byworker in case of the type of deep laying (40mm). So recommended it’s using of springtype(SDA) for fall’s protection.

    | SPECIAL CHARACTER |

    | TESTING OF TAKE-OUT ||CONSTRUCTION’S METHOD |

    ThicknessD1 (mm)

    DepthH1 (mm)

    Valid screwH3 (mm)

    Body DiameterD2 (mm)

    Head thicknessH2 (mm)

    21.521.521.5

    121212

    203040

    6.06.06.0

    6.06.06.0

    SIZE LIST

    SIZE LISTScrew

    DiameterDrill

    Diameter Max Min Ave Compress Strength

    Concree DepthDepth

    (mm) (mm) (mm) (mm) (mm) (kgf/cm2)W3/8W3/8W3/8

    203040

    151515

    84011901970

    40010801490

    60711371753

    268268268

    BoltLot Shell

    Oil Jockey

    Knife Plate

    Beam

    Steel Stay

    Concrete

    Insert Singk900

    27

    STEEL ANCHOR

  • C-type bracket is designed to install the facili-ties by conveniently attached to the C-steel barthat is assembled in new engineering methodin accordancewith the design usage of building improve-ments.

    SINGLE EDGE 3/8 (UNC)

    C-TYPE BRACKET 3/8 (UNC)

    | SPECIAL FEATURE |

    After brackets are secured on the ceiling withthe nails, and they are connected with the boltsto install and secure the pipe lines for heatersor air-conditioned rooms or the water lines andsewage lines.

    | SPECIAL FEATURE |

    DOUBLE EDGE 3/8 (UNC)

    C-TYPE BRACKET

    & CEILING BRACKET

    YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    28

  • Material SUM, SWCH, SUSWEIGHT LIST OF METRIC SCREW’S SIZE

    Size

    width(mm)

    M8 M10 M12 (M14) M16 M(18) M20 M24(M22)M6

    10 12

    20

    25

    30

    40

    50

    60

    70

    80

    38 68 136

    163

    191

    212

    254

    296

    39 58 82 92

    111

    169

    202

    236

    280

    336

    392

    448

    29

    34

    46

    41

    49

    66 85 135

    9

    12

    14

    19

    70 110 194

    233

    272

    188

    225

    263

    301

    41 158

    190

    107

    129

    128

    153

    127 169

    15

    19

    23

    31

    41

    54 109 150

    16

    20

    25

    33

    66

    88 155 224

    15

    19

    23

    31

    55

    74

    28

    35

    42

    56

    76

    102

    14 17 19 22 24 27 323013 17 19 22 24 27 30 3632

    Height

    Size

    width(mm)

    Height

    w1/4

    10 12 14 19 2314 17 21 26

    w5/16 w3/8 w1/2 w5/8

    20253035

    9121416

    13161923

    19242934

    17212530

    28354249

    30384653

    41516171

    556677

    7894110

    40506070

    19 2632

    3949

    3443

    5670

    6075

    82102

    88110132154

    125156188221

    Material SUVI, SWCH, SUSWEIGHT LIST OF INCH SCREW’S SIZE(g)

    | USAGE | For screw’s Connection, also using of control purpose.

    CONNECTING NUT

    OTHER PRODUCTS

    29

    Straight type

    Stop type

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    30

    - Deducted a resistance of pulling.- No harm at all of wall side at the time of pulling.- As a treat of steel sheet and concrete and itspossibile for an attached plywood.

    - It’s a definite strength.

    | SPECIAL CHARACTER |

    | WARNING POINTS OF WORKING |

    | FIXING NAIL |

    | H BEAR FRENCH BOARD |

    - Spare parts of board fixing K(F)

    | SUPPORTER OF BOARD PIERCE |

    WORKING EXAMPLE

    Welding fix

    Steel pulling plywood

    Pcone

    Plywood

    Steel supporters

    Panel

    Ultraring

    Control pipe Panel

    - Spare parts of board fixing H-150, No. 119-3

    - Spare parts of board fixing N-100, 150 No. 119-2

    - Observe a permission strength and made aplan of shape trame.

    - Fixing a steel and steel supporter’s.

    CONTROL PIPE

    FOR TURNBUCKL

  • OTHER PRODUCTS

    31

    | SPECIAL FEATURE |

    Fuzzy anchor is a multi-purpose insert that can conveniently attachand install for the purpose of attaching the C-type steel bars to thebuilding improvements assembled.The bolt is assembled to the fuzzy anchor in advance to place onthe upper groove and start to tighen, and then the upper partspreads out and opens up to secure tightly.

    | SPECIAL FEATURE |

    This product is used in the construction ofhigh rise buildings with the H-beam byusing the contemporary new constructionmethod.After place the beams on the proper place,install the pipelines on all heating and cool-ing spaces by using the bolts to secure theinsert on the deck plate.

    CEILING BRACKET

    DECK INSERT

    & FUZZY INSERT

    SIZE(UNC & W) : 3/8

    SIZE(UNC & W) : 3/8

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    32

    Size5/8 x 4”5/8 x 5”5/8 x 6”5/8 x 7”5/8 x 8”

    d5/85/85/85/85/8

    L175202225250275

    S5065808080

    SIZE LIST

    Hook bolt is used to make walls aroundconstruction sites easily and simply. Thewalls protect pedestrians or cars fromthe construction site for their safety.when set up all kind of fence (sound-proofing, falling rocks, boundary etc.) itis conveniently used.

    SIZE(UNC & W) : 5/16″, 3/8″

    | CONSTRUCTION’S CASE |

    HOOK BOLTS

    RAIL BOLTS

  • OTHER PRODUCTS

    33

    Foundation anchor bolts (L-type anchor)Foundation anchor bolts (L-type anchor) (buried in the concrete at the bottom of the product screw thread afterI install the structure on the floor and firmly that when you want to use mainly barrier, street lighting and guardrail installation, and should be used in production depending on the shape of the L-type, LA type, J type, JA typeare separated.)

    d

    M8

    M10

    (METRIC & UNC)

    M12

    M16

    M20

    M24

    M30

    M36

    M42

    M48

    8

    10

    12

    16

    20

    24

    30

    36

    42

    48

    -

    25

    32

    40

    50

    63

    80

    90

    112

    125

    20

    30

    35

    40

    50

    80

    90

    110

    125

    150

    1.2

    1.5

    2

    2

    2.5

    3

    3.5

    4

    4.5

    5

    -

    40

    50

    63

    80

    -

    -

    -

    -

    -

    -

    20

    25

    32

    40

    -

    -

    -

    -

    -

    -

    45

    56

    71

    90

    112

    140

    160

    200

    224

    -

    20

    25

    32

    40

    50

    63

    71

    90

    100

    32

    40

    50

    63

    80

    100

    125

    140

    180

    200

    41

    51

    64

    81

    102

    127

    158

    181

    226

    252

    8

    10

    12

    16

    20

    24

    30

    36

    42

    48

    -

    35

    40

    55

    70

    80

    100

    120

    140

    160

    -

    50

    65

    85

    105

    125

    155

    190

    220

    250

    +6.30

    +12.5 0

    +8 0

    +10 0

    ±0.4

    ±0.5

    ±0.6

    ±0.7

    ±0.8

    ±0.9

    Bas

    ic Basic

    L/Jl 1 R R a abRl 1 l 1

    LA/JATole

    -ra

    nce

    Tole

    -ra

    nce

    d1 S K Ltype Jtype JA typeLAtype

    about about about about about about about about about about

    SIZE LIST

    FOUNDATION BOLTS

    LA type L type J type

  • YOUNGJIN

    INDUSTR

    Yhttp://w

    ww.yjanchor.com

    34MEASUREMENT OF ANCHOR’S INTENSITY

    * Upper side (celling) construction, side part (wall) construction. a ratio maximum intensity X 0.8~0.9

    * Down position construction a ratio maximum intensity X 0.7~0.8

    PL : Long-term permitted weight.Py : a ratio maximum intensity.

    k : amended figure (1/2 : safety rate)

    Ps : Short-term permitted weight.

    I shape it’s very high about a ratio’s maximum in-tensity. The greatest intensity is a little bit higherthan a ratio’s maximum intensity. This part is showna curve of mountain style and it’s special featurewhich is a big and lower changed position.

    | INTENSITY OF ANCHOR |An intensity of anchor see an its special feature ac-

    cording to a weight changed curve, The weight changedcurve stand for a pulling weight about an anchor which shown

    is a changed position time.This anchor’s curve is,1. It has a part of ratio directly against a weight.2. Now, the changed part against a weight has increasing morebigger and a weight has also much number which increased, inaddition, it’s also staying at the fixed shape or decreases as well.a part of which ratio directly and expressed a close figureagainst an anchor bolt’s materials more mechanical as above.

    1. Also come out as a result of anchor’s resistance and display asimilar figure, Generally, as a mechanical for an anchor and hasa safety as to construction and has a planned to a low figure lessthan resist itself. Compare with this ratio and it’s limited point ishas no left at all after eliminated a weight. Thus, it has reach toa resist of materials as below called a ratio limits. In case of an-chor’s shape, it’ll be increasing a weight than a ratio’s maximum,this time we just called a weight, it’s a greatest intensity.

    | REATION TO A RATIO’S MAXIMUM INTENSITYAND A GREATEST INTENSITY |

    It’ll divided into 5 type between anchor’s actual weight and achanged position

    II shape In case if a ratio’s maximum intensity is not higher than Ishape. if the same situation like a greatest intensity is a ratio’s max-imum intensity or it’ll be changed position and go up a greatest in-tensity.III shape The ratio’s maximum intensity is not higher than I shape.The greatest is a double than a ratio’s maximum intensity. Thecurve stand for a plain mountain type.IV shape It’s very lower in case of a ratio maximum intensity.The greatest intensity appeared on a big charged position.V shape It has no point of a ratio maximum intensity which holdfrom I~IV shape but only for a type of intensity of rubbing resist-ance.

    From the type of I shape to a type of V, you can see a chart whichcompared with a ratio’s maximum and a greatest intensity and it’llshow a difference in compliance with an anchor’s type. conse-

    quently, a ratio’s maximum intensity is YX, a greatest intensity isLX if we take it for granted, in case of curve I shape YA, LA.Also II shape is YB, LB, also a shape of III is YC, LC, IV type is YD,Ld, V shape LE only, which means it’ll be means it’ll be the sameshape of anchor by technically and has a fixed relation. This pictureappeared on the kind of anchor and differ from the type and could-n’t checkup an anchor’s intensity.

    | ANCHOR’S PERMITTED PLAN WEIGHT |As in the past time, it’s hard to calculate a way of a permitted planweight and mostly its calculation for an anchor is only for a madedouble from the anchor’s greatest intensity but as expressed afore-said, it is more reasonable method of showing on a ratio’s maxi-mum intensity than a greatest intensity. In case of a permitted planweight is more confident from a ratio’s maximum intensity after ex-amined it. For example, compared with II shape and IV shape,maybe, it’s the same degree both, but it is a higher by IV for agreatest intensity, on the contrary, a ratio’s maximum intensity hashigher figure for II shape side. If, in case of IV shape, when usingof anchor, added a double a safety percentage it’s cause by aproblem of construction against a standard deviation. In case ofconcrete, it is very important matter especially in a homogeneity.As to anchor, a from of concrete is irregular which cause by a stan-dard deviation. Upper side (celling)·side part (wall), in case of con-struction period, it’ll do as schedule and having a safety point buta construction of floor, will appear on a problem of bridge, sinkinga sand etc.Therefore, we think that it must be need of amend of a standarddeviation. It’ll made a double from an amended figure and comeout a permitted plan weight according to a condition of construc-tion.

    In case of an amended figure is shown on a situation of concrete,weather concrete, a long-term’s stored concrete,and then fixed a little bit lower figure than as above figure (0.7~0.9).A permitted plan weight is amended as above a standard deviationfrom a ratio maximum intensity.(1) Long-term permitted weight.Generally, a long-time permitted weight made 1/2 as an amendedfigure from a ratio’s maximum intensity’s standard deviation.

    (2) short-term permitted weight.Generally, a short-term permitted weight is an amended figure froma ratio’s maximum intensity’s standard deviation.

    (3) Active weight.it’ll necessary for a fix according to a situation of a safety rateagainst active weight.

  • 35

    EQUIPMENT

    AUTOMATION, LABOR SAVING.MASS PRODUCTIONA CONSISTENT INTEGRATEDOPERATION PROCESS

    1. 2Head Tapping M/C2. Cold Double Heading M/c3. Heading M/C4. Thread Rolling M/C5. Full Automatic Tapping M/C6. Full Automatic Cross Cutting M/C7. Multi-Station Former

    FORMING

    PLATING

    TAPPING

    SLOTTING

    ASSEMBLING

    FINISHED PRODUCTPACKING

    PRODUCTION FLOW

    MATERIAL

  • Head office & Factory

    5-Ro 28 Hwajeon-dong, Gangseo-gu. Busan, Korea

    Tel. +82-51-832-8002 | Fax. +82-51-832-2077

    E-mail : [email protected]

    Gangseo Factory

    #5742, Daejeo-dong, Gangseo-gu, Busan, Korea

    Tel. +82-51-305-8001 | Fax. +82-51-303-2077

    http://www.yjanchor.com