Page 1: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

BUDGET 2016–17

BUDGET PAPER NO. 2 INFRASTRUCTURE STATEMENT

Page 2: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Infrastructure Statement 2016-17

Budget Paper No. 2

Circulated by The Hon. Gladys Berejiklian MP, Treasurer, and Minister for Industrial Relations

Page 3: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread
Page 4: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

TABLE OF CONTENTS

Chart and Table List

About this Budget Paper .............................................................................................. i

Chapter 1: Investment Program 1.1 Introduction .......................................................................................................... 1 - 1

1.2 Four year capital program ..................................................................................... 1 - 4

1.3 Capital investment by sector ................................................................................. 1 - 4

1.4 Capital programs by agency ................................................................................. 1 - 7

1.5 Funding of the capital program ............................................................................. 1 - 8

1.6 Existing assets and maintenance program ............................................................ 1 - 11

Chapter 2: Restart NSW 2.1 Introduction .......................................................................................................... 2 - 1

2.2 Restart NSW governance and project selection framework ................................... 2 - 2

2.3 Overview of Restart NSW commitments ............................................................... 2 - 3

2.4 Restart NSW reservations .................................................................................... 2 - 4

2.5 Investing in regional New South Wales ................................................................. 2 - 6

2.6 Restart NSW funding sources ............................................................................... 2 - 8

2.7 Restart NSW reconciliation ................................................................................... 2 - 9

Chapter 3: Rebuilding NSW 3.1 Introduction .......................................................................................................... 3 - 1

3.2 Rebuilding NSW plan ............................................................................................ 3 - 1

3.3 Delivering Rebuilding NSW ................................................................................... 3 - 2

3.4 Investing in regional New South Wales ................................................................... 3 - 6

Infrastructure Statement 2016-17

Page 5: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Chapter 4: State Infrastructure Plan 4.1 Introduction .......................................................................................................... 4 - 1

4.2 Governance and assurance .................................................................................. 4 - 1

4.3 The role of this State Infrastructure Plan ............................................................... 4 - 2

4.4 Priorities for New South Wales ............................................................................. 4 - 2

4.5 Passenger trains .................................................................................................. 4 - 3

4.6 Urban roads ......................................................................................................... 4 - 4

4.7 Buses and light rail ............................................................................................... 4 - 5

4.8 Ferries .................................................................................................................. 4 - 6

4.9 Regional and interstate transport .......................................................................... 4 - 6

4.10 International gateways .......................................................................................... 4 - 9

4.11 Energy .................................................................................................................. 4 - 10

4.12 Water ................................................................................................................... 4 - 11

4.13 Health .................................................................................................................. 4 - 13

4.14 Other significant projects ...................................................................................... 4 - 16

Chapter 5: General Government Sector Projects .................................................... 5 - 1

Chapter 6: Public Non-financial Corporations Projects .......................................... 6 - 1

Appendices A. Capital Strategies and Policies ............................................................................. A - 1

B. Selected Restart NSW Projects ............................................................................ B - 1

Infrastructure Statement 2016-17

Page 6: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

CHART AND TABLE LIST Page

Chapter 1: Investment Program 1 Summary of capital expenditure and funding sources - 2016-17 to 2019-20 Chart 1.1 1-2 Capital spend to GSP Chart 1.2 1-3 State capital spending by functional sector Table 1.1 1-4 Distribution of capital investment by agency Chart 1.3 1-7 State-funded capital expenditure program Chart 1.4 1-9 Australian Government contribution to State capital expenditure program Chart 1.5 1-10 PNFC own funded capital investment program Chart 1.6 1-11 State owned physical assets: value by sector Table 1.2 1-12 State owned physical assets: value by type, as at 30 June 2015 Chart 1.7 1-12 Distribution of physical assets by agency as at 30 June 2015 Chart 1.8 1-13 Maintenance expenses Table 1.3 1-13

Chapter 2: Restart NSW 2 Restart NSW Fund (estimated as at 30 June 2016) Table 2.1 2-1 Restart NSW Fund commitments Chart 2.1 2-3 Restart NSW Fund commitments as at the 2016-17 Budget Table 2.2 2-4 Restart NSW Fund reservations as at the 2016-17 Budget Table 2.3 2-5 Programs in regional New South Wales Table 2.4 2-6 Resources for Regions program as at the 2016-17 Budget Chart 2.2 2-7 Airport infrastructure projects funded since the 2015-16 Budget Chart 2.3 2-8 Restart NSW funding sources (expected position at 30 June 2016) Table 2.5 2-9 Restart NSW Fund commitments reconciliation as at the 2016-17 Budget Table 2.6 2-10 Restart NSW Fund reservations reconciliation as at the 2016-17 Budget Table 2.7 2-11

Chapter 3: Rebuilding NSW 3 Rebuilding NSW plan Table 3.1 3-2 Programs in regional New South Wales Table 3.2 3-7 Fixing Country Roads projects as at the 2016-17 Budget Chart 3.1 3-8

Chapter 4: State Infrastructure Plan 4 The NSW Government’s planning framework for infrastructure Figure 1 4-2 Major projects and programs for passenger trains Table 4.1 4-3 Major projects for urban roads Table 4.2 4-5 Major projects for buses and light rail Table 4.3 4-6 Major projects for ferries Table 4.4 4-6 Major projects for regional and interstate transport Table 4.5 4-7 Major projects for international gateways Table 4.6 4-10 Major projects for water Table 4.7 4-12 Major projects for health Table 4.8 4-13 Major projects for education Table 4.9 4-17 Major projects for training Table 4.10 4-18 Major projects for justice Table 4.11 4-19 Major projects for arts, culture and the visitor economy Table 4.12 4-20 Major projects for sporting facilities Table 4.13 4-21 Major projects for social housing Table 4.14 4-21

Infrastructure Statement 2016-17

Page 7: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Chapter 5: General Government Sector Projects 5 Capital investment by general government sector Table 5.1 5-4

Chapter 6: Public Non-financial Corporations Projects 6 Capital investment by public non-financial corporations projects Table 6.1 6-2

Appendix B: Selected Restart NSW Programs B Resources for Regions projects Table B.1 B-1 Illawarra Infrastructure Fund projects Table B.2 B-2 Fixing Country Roads projects Table B.3 B-2 Water Security for Regions projects Table B.4 B-5 Regional Tourism Infrastructure projects Table B.5 B-6 Housing Acceleration Fund projects Table B.6 B-7

Infrastructure Statement 2016-17

Page 8: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

ABOUT THIS BUDGET PAPER

Purpose and scope

Budget Paper No. 2 Infrastructure Statement provides information on the Government’s infrastructure investment program. The objectives of this budget paper are to:

• support transparency and accountability by reporting on planned capital expenditure covering new works and works-in-progress

• explain how resources have been allocated in the current budget and the forward estimates for both the general government and public non-financial corporations sectors

• explain how infrastructure investment supports the Government’s priorities and service delivery objectives, including the underlying policies and strategies

• make publicly available the State Infrastructure Plan adopted by the Government as required by the Infrastructure NSW Act 2011.

This budget paper includes the infrastructure investment of agencies that are material to the general government and public non-financial corporations sectors. Budget Paper No. 1 Budget Statement, includes an overview of agency classifications by sector and a glossary.

The capital projects listed in this Infrastructure Statement can be accessed online at myinfrastructure.planning.nsw.gov.au with sorting functionality, including a geospatial presentation available.

Structure of Budget Paper No. 2 Chapter Description

1. Investment Program Chapter 1 categorises the State’s capital investment in the Budget and the forward estimates and explains funding arrangements. It reports the value of the State’s physical assets at an aggregate level and maintenance expenditure by government sector.

2. Restart NSW Chapter 2 presents the expenditure commitments and reservations made for infrastructure projects from the Restart NSW Fund. It lists Restart NSW funding sources, along with descriptions of investment themes and governance arrangements.

3. Rebuilding NSW Chapter 3 presents Rebuilding NSW, the Government’s plan to invest $20 billion in new infrastructure projects from the proceeds of the 49 per cent lease of the NSW electricity network. Priority investment areas funded by Rebuilding NSW are categorised and described, along with a list of detailed project and program reservations. Additional details on many of these projects are included in Chapter 4.

4. State Infrastructure Plan Chapter 4 presents the five-year State Infrastructure Plan. The plan outlines the Government’s funded infrastructure priorities over the next five years. The State Infrastructure Plan incorporates priority projects from the 20-year NSW Government State Infrastructure Strategy 2012 and subsequent relevant updates, projects currently underway and projects to begin within the next five years.

Infrastructure Statement 2016-17 i

Page 9: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

About this Budget Paper

Chapter Description

5. General Government Sector Projects

Chapter 5 lists major capital projects and minor works for each general government agency, grouped by cluster. Project level information is treated as commercial-in-confidence for some parts of the sector and is not reported in detail.

6. Public Non-financial Corporations Projects

Chapter 6 lists major capital projects and minor works for each public non-financial corporation, grouped by industry sector. Project level information is treated as commercial-in-confidence for some parts of the sector and is not reported in detail.

Appendix Description

A. Capital Strategies and Policies

Appendix A outlines the Government’s strategy and policies for planning, funding, delivering and managing infrastructure investment and the existing asset base. It highlights new and ongoing initiatives to support infrastructure investment and improve asset management.

B. Selected Restart NSW Projects

Appendix B lists specific projects approved for funding in the 2016-17 Budget for the Resources for Regions program, the Illawarra Infrastructure Fund, the Fixing Country Roads program, the Water Security for Regions program and the Regional Tourism Infrastructure program.

Agency disclosures

Capital program definitions

Program Definition

Major Works This refers to projects with an estimated total cost of $250,000 or above, subdivided into new projects (approved to begin in 2016-17) and works in progress (begun before 2016-17 but not yet completed).

Minor Works This refers to projects with an estimated total cost below $250,000, such as minor plant and equipment or annual provisions for replacements.

Project level information

Item Description

Project description This is a brief outline of the capital project.

Location This is the location where the infrastructure/project/asset will be built. ‘Various’ is noted for projects occurring across multiple locations.

Start This is the calendar year when construction began or will begin. For planning works, it is the year that planning appraisals and related activities began or will begin.

Complete This is the project’s expected calendar year of completion.

Estimated total cost (ETC) This represents the current cost estimate of planning, procuring and delivering the infrastructure/project/asset. The ETC may change as more detailed planning is undertaken and further information on market conditions becomes available. Large infrastructure acquisitions may be split into several projects, including planning, land acquisition and stages of construction. Due to commercial sensitivities, the ETC for some major works is not included.

Estimated expenditure to 30-June-16

This is the projected total project expenditure to 30 June 2016.

Allocation 2016-17 This is the amount of project expenditure approved in the 2016-17 Budget.

ii Infrastructure Statement 2016-17

Page 10: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

About this Budget Paper

Notes

• The Budget year refers to 2016-17, while the forward estimates period refers to 2017-18, 2018-19 and 2019-20.

• Figures in tables, charts and text have been rounded. Discrepancies between totals and the sum of components reflect rounding:

– estimates under $100,000 are rounded to the nearest thousand

– estimates midway between rounding points are rounded up

– percentages are based on the underlying unrounded values.

• For the budget balance, a negative sign indicates a deficit while no sign indicates a surplus.

• One billion equals one thousand million.

• The following notations are used:

– n.a. means data is not available or is not disclosed for commercial reasons

– N/A means not applicable

– no. means number

– 0 means not zero, but rounded to zero

– … means zero

– thous means thousand

– $m means millions of dollars

– $b means billions of dollars.

• Unless otherwise indicated, the data source for tables and charts is Treasury.

Infrastructure Statement 2016-17 iii

Page 11: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

1. INVESTMENT PROGRAM

1.1 Introduction

The purpose of this chapter is to detail government capital spending and to explain how it will be funded.

The 2016-17 Budget provides for a record capital spend of $73.3 billion in the four years to 2019-20. The investments are spread across the general government and public non-financial corporation (PNFC) sectors. The PNFC sector comprises both commercial entities, such as Sydney Water, Hunter Water and Essential Energy, and non-commercial entities (businesses that rely on budget support), such as Sydney Trains, Sydney Ferries and the State Transit Authority of New South Wales.

The investment program is designed to provide a strong foundation for economic growth and to maintain and improve the standard of public services provided to New South Wales residents. Adding to infrastructure allows New South Wales to better manage the increase in population and economic activity over the coming decades. The investment also supports jobs and delivers productivity enhancements over the longer term (see Box 1.1).

The record expenditure is enabled by the State’s strong and sustainable fiscal position. Successive increases in capital expenditure have been enabled by ongoing control of recurrent expenditure and asset recycling rather than just additional borrowing. These measures, combined with a capital investment framework which integrates planning, project selection, funding and delivery, ensure that the right projects are built, at lowest cost, and delivered on time and on budget. This framework is detailed in Appendix A.

The Government’s infrastructure priorities are set out in the State Infrastructure Plan in Chapter 4 of this Infrastructure Statement. The program includes major road and rail projects designed to alleviate congestion for motorists and improve public transport. There are also major hospital redevelopments, the construction of new schools and significant funding for new correctional centres.

Box 1.1: Infrastructure investment and jobs Infrastructure is critical to driving productivity and economic growth. Transport infrastructure allows access to markets and enables workers to travel to where they are most productive. Schools and hospitals provide direct benefits to individuals and indirect economy-wide benefits in the form of increased workforce participation and worker productivity.

Infrastructure construction phase and jobs growth

Infrastructure investment offers an economic benefit from employing people to construct the infrastructure. Over 10,000 jobs are expected to be created during the total construction period of WestConnex.1 The CBD and South East Light Rail will deliver over $4 billion worth of economic benefits and create 10,000 jobs for NSW.2 As the resources boom winds down, infrastructure investment offsets decreasing investment and employment in the mining industry.

In a global environment of slower growth, infrastructure spending provides a boost to aggregate demand. This has flow-on effects for employment in other sectors of the economy.

1 Sydney Motorway Corporation, M4 East Project Overview, WestConnex, Sydney, 2015. 2 Transport for NSW, CBD and South East Light Rail, Project update no. 5, Sydney, 2014.

Infrastructure Statement 2016-17 1 - 1

Page 12: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Long-term productivity growth

A larger infrastructure stock increases the productive capacity of the economy over the long term by removing bottlenecks and supply constraints. This provides ongoing benefits for firms and individuals that use these infrastructure assets. The International Monetary Fund found that a permanent increase of 1 per cent of GDP in public infrastructure investment increases output by 2½ per cent over the long term for advanced economies.3 Infrastructure also creates larger integrated markets, stimulating higher levels of innovation and specialisation.

Better transport networks enable businesses to access more customers, workers to travel for higher paying jobs and supply chains to work more efficiently through lower transport costs. Education infrastructure has long-term implications for labour productivity. Investment in health infrastructure can improve workforce participation. Utility investments ensure reliable supplies of electricity, gas and water for businesses. Improvements in infrastructure therefore lead to jobs.

The NSW Government focuses on projects that have a net benefit to society. Infrastructure NSW (INSW) provides independent expert advice to ensure that investment expenditure is directed to high quality projects.

The State’s capital program is funded from a number of sources including:

• taxation, other own-source State revenues and borrowings

• Restart NSW (which includes the Rebuilding NSW plan), via such sources as asset recycling, windfall tax revenues and the issuing of Waratah Bonds

• Australian Government grants

• public non-financial corporation (PNFC) own-source funding (including from equity, retained earnings and borrowings).

Chart 1.1 summarises the total capital spending program and the sources of funding over the four-year period to 2019-20.

Chart 1.1: Summary of capital expenditure and funding sources - 2016-17 to 2019-20

General Gov ernment

44.6

Public Non-Financial Corporations

28.7

State Sources (excluding

Restart NSW)38.9 (a)

Australian Gov ernment

9.9 (a)

PNFCOwn-sources

15.0

0

10

20

30

40

50

60

70

80

Expenditure Funding

$ bi

llion

s

Restart NSW9.5 (a)

(a) Total committed funding for Rebuilding NSW projects is $10.2 billion of which $9.1 billion will be spent in the four years to 2019-20.

This expenditure will be funded by Restart NSW ($7.3 billion), Australian Government Asset Recycling Initiative payments ($994.0 million) and advances from the Consolidated Fund ($761.0 million).

State funding, including from Restart NSW, is expected to be the largest funding source for capital expenditure and will total $48.5 billion over the four years to 2019-20.

3 International Monetary Fund, World Economic Outlook: Legacies, Clouds, Uncertainties, Washington, 2014.

1 - 2 Infrastructure Statement 2016-17

Page 13: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Australian Government funding includes both infrastructure grants for specific projects as well as Asset Recycling Initiative payments of $994.0 million in 2016-17, which will be deposited into Restart NSW and applied towards approved Rebuilding NSW projects. Australian Government Asset Recycling Initiative incentive payments are expected to total $2.2 billion with $994.0 million recognised in the Budget following the successful lease of TransGrid.

Rebuilding NSW is the Government’s plan to invest $20 billion in new productive infrastructure across the State. This will be funded by the proceeds from the long-term lease of 49 per cent of the State’s electricity network assets, and incentive payments from the Australian Government under the Asset Recycling Initiative. The Government has committed $10.2 billion for Rebuilding NSW projects, including $9.1 billion over the four years to 2019-20, funded by Restart NSW ($7.3 billion), Asset Recycling Initiative payments ($994.0 million) and advances from the Consolidated Fund ($761.0 million).

In accordance with convention, the Budget only includes Restart NSW projects where a formal commitment has been made to the projects. This Budget includes Restart NSW commitments for several Rebuilding NSW transport projects, notably for Sydney Metro City and Southwest (Box 3.1). When fully implemented, the Rebuilding NSW plan will significantly increase capital spending over an extended period, including beyond the Budget and forward estimates period.

A further $1.8 billion has been reserved against funds held in Restart NSW to be committed in future budgets for both Government capital spending and grants to other infrastructure owners, including Local Government. These reservations are not included in the Budget, but when committed will impact capital spending in future years, including beyond the Budget and forward estimates period.

Chapters 2 and 3 of this Infrastructure Statement provide further detail on the Restart NSW Fund and the Rebuilding NSW plan.

Box 1.2: Infrastructure spend across states

Historically, capital spending as a proportion of Gross State Product (GSP) in New South Wales trailed other states. However, spending has picked up in recent years as a result of the Government’s significant infrastructure program, overtaking other states and remaining elevated over the forward estimates. New South Wales’ purchases of new non-financial assets as a percentage of GSP in the non-financial public sector is expected to be 3.5 per cent in 2016-17, the highest of all the major states. This compares to an average of 2.4 per cent across all other states.

Chart 1.2: Capital spend to GSP (a)

0.00

1.00

2.00

3.00

4.00

5.00

Per

cen

t

NSW Other States

(a) Non-financial public sector – purchases of new non-financial assets, percentage of GSP Source: ABS cat no. 5520.0 & 5512.0 for years 1999-00 to 2014-15. State Budget papers and NSW Treasury calculations for 2015-16 and 2016-17.

Infrastructure Statement 2016-17 1 - 3

Page 14: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

1.2 Four year capital program

The Government’s investment program to 2019-20 is forecast to be $73.3 billion. More than half of the program is dedicated to transport and roads spending. Over the four years to 2019-20, transport comprises 56.6 per cent of the total infrastructure spend. This compares to 33.9 per cent over the four years to 2011-12 and 52.9 per cent over the four years to 2015-16. The increase in the share flowing to transport reflects Government priorities and funding of major strategic projects in the sector. The breakdown of capital expenditure by functional sector is shown in Table 1.1 below.

Table 1.1: State capital spending by functional sector (a)

2016-17 2017-18 2018-19 2019-20Budget

$m $m $m $m $m %

Transport 11,881 11,557 11,245 6,819 41,502 56.6

Health (b) 1,457 1,117 1,052 883 4,509 6.1

Education 653 851 788 657 2,948 4.0

Justice 1,626 1,736 925 432 4,719 6.4

Housing 658 624 586 571 2,439 3.3

Electricity (c) 1,457 1,556 1,495 1,475 5,983 8.2

Water 942 1,028 972 765 3,708 5.1

Venues, Arts and Culture 1,902 443 329 110 2,785 3.8

Other 1,260 1,109 1,326 1,062 4,757 6.5

Total (d) (e) 21,833 20,017 18,715 12,772 73,337 100

Forward EstimatesFour year total

(a) Expenditure only includes Rebuilding NSW projects where a formal commitment has been made. When fully implemented, capital spending is expected to increase in later years.

(b) Does not include $128.0 million in 2016-17 and $117.1 million per annum from 2017-18 in capital expensing relating to certain expenditure associated with the construction of health capital projects, which fall below the capitalisation threshold and is therefore expensed annually.

(c) Includes capital expenditure by Ausgrid and Endeavour Energy. Following the partial lease of these businesses, this expenditure will no longer form part of the NSW Government’s capital investment program.

(d) Functional sectors are based on grouping of similar agencies and do not align with the Government Finance Statistics (GFS) classifications published in Budget Paper No.1. “Other” includes investment in family and community services, and general public services.

(e) Total spending may not equal the total of general government and PNFC expenditure due to intra-sector purchases. Spending excludes capital expenditure by public financial corporations.

Chapters 5 and 6 of this Infrastructure Statement list major capital projects and minor works for general government and PNFC sector agencies. The capital projects listed in Chapters 5 and 6 can be viewed by location or region at myinfrastructure.planning.nsw.gov.au.

1.3 Capital investment by sector

Increased focus on transport and roads

According to the Bureau of Infrastructure, Transport and Regional Economics, avoidable congestion costs in Sydney were $6.1 billion in 2015 and will rise to between $9.5 billion (lower baseline estimate) and $12.6 billion (upper baseline estimate) by 2030.4 The following key projects in Sydney such as Sydney Metro, WestConnex and B-Line will help tackle congestion, increase productivity and enhance the quality of life:

• The fully automated, state-of-the-art Sydney Metro network will have the capacity to operate 30 trains an hour through the CBD in each direction – a train every two minutes each way – with trains required to run on time 98 per cent of the time. This means the railway network across greater Sydney will have room for an extra 100,000 train customers an hour in the peak.

4 Bureau of Infrastructure, Transport and Regional Economics, Traffic and congestion cost trends for Australia capital cities, Canberra, 2015. The estimate of $6.1 billion in 2015 is comparable with the Australian Infrastructure Audit estimate included in the 2015-16 Budget Papers of $5.6 billion in 2011.

1 - 4 Infrastructure Statement 2016-17

Page 15: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

• WestConnex will help alleviate Sydney’s congestion problem. WestConnex will deliver more than $20 billion in economic benefits to New South Wales and is estimated to help drivers bypass up to 52 sets of traffic lights. By 2031, WestConnex is projected to be carrying over 200,000 vehicles across the M4 and new M5 on an average weekday.

• B-Line will deliver better bus services for customers travelling between the Northern Beaches and Sydney CBD. The program will provide several improvements for residents and motorists, including more frequent and reliable bus services, reduced congestion and shorter travelling times and a simpler bus network with fewer vehicles on the bus route, improving safety and local air quality and reducing traffic noise.

The State is continuing its focus on transport to meet the needs of a growing population and to support future economic growth. Over the next 15 years, transport infrastructure will need to support 40 per cent more train trips and 30 per cent more car trips.5 The Government is aiming to meet these needs through the provision and funding of major transport projects.

The Australian Infrastructure Plan, developed by Infrastructure Australia, lists several major projects contained in this Budget as high priority to address urban congestion including Sydney Metro, WestConnex, and B-Line.6 High priority projects address major opportunities of national significance.

Over the next four years the Government is undertaking $41.5 billion7 of major capital works in the transport sector including:

• major upgrades for vital link roads, including Princes Highway ($313.4 million), Western Sydney Growth Roads ($315.3 million), Great Western Highway and Bells Line of Road ($150.7 million) and completion of the duplication of Pacific Highway8

• the WestConnex Motorway project9, commencing planning for Western Harbour Tunnel and Beaches Link, and planning funding for WestConnex Stage 3

• Western Sydney roads to support Sydney’s second airport at Badgerys Creek ($1.8 billion)

• the Fixing Country Roads Program ($50.0 million allocated in this Budget) to fund road and bridge upgrades in rural and regional areas10

• rail projects including the fully funded Sydney Metro City and Southwest ($6.2 billion over the Budget and forward estimates period), the Sydney Metro Northwest ($5.8 billion), Next Generation Rail Fleet ($518.4 million), Fixing the Trains ($154.2 million), the Northern Sydney Freight Corridor and growth trains for the suburban rail network (more than $1 billion over the next four years)

• the Transport Access Program of $280.3 million in 2016-17 to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure

• the CBD and South East Light Rail ($1.9 billion), planning for the Parramatta Light Rail ($64.0 million), new buses ($509.0 million) and funding for Newcastle Light Rail

• B-Line ($210.1 million in 2016-17) to deliver faster, more reliable bus journeys.

In addition, the State Government will contribute approximately $560 million to the $3.0 billion NorthConnex project.

5 New South Wales Government, 2016, State Priorities, NSW Making It Happen, Building Infrastructure, Sydney, viewed 1 June 2016, https://www.nsw.gov.au/making-it-happen.

6 Infrastructure Australia, Australian Infrastructure Plan, Sydney, 2016. 7 Excludes government funding reservations from Restart NSW and Rebuilding NSW . 8 The Australian Government will contribute up to $5.64 billion from 2013-14. The New South Wales government is contributing

$201.6 million in 2016-17. 9 The total estimated project cost is $16.8 billion in outturn dollars. Government contributions to WestConnex includes State

funding of $1.8 billion from Restart NSW and $1.8 billion from the Consolidated Fund, and Australian Government funding of $1.5 billion and $2 billion through a concessional loan.

10 Represents grants to local councils, which are classified as recurrent not capital spending.

Infrastructure Statement 2016-17 1 - 5

Page 16: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Boosting investment in health

This Budget approves almost $5 billion (including capital expensing of $479.2 million) in capital works over the four years to 2019-20 for hospital upgrades, redevelopments and expansions, new and upgraded ambulance stations and Multipurpose Services including:

• new major works including Tweed, Port Macquarie and Singleton Hospitals and new stages of redevelopments at Dubbo Hospital and John Hunter Neonatal Intensive Care Unit

• ongoing major works including at Westmead, Blacktown, Gosford, Lismore, St George, Bowral, Armidale and Northern Beaches Hospitals

• a range of new and ongoing technology projects including Digital Patient Records and the Electronic Medications Management System.

Protecting the vulnerable

Investment in family and community services, and social housing in the four years to 2019-20 includes:

• $2.4 billion for social housing projects including $1.4 billion towards capital works supporting the Communities Plus social housing program

• $262.0 million in the remainder of the Family and Community Services cluster.

Investment in skills and education

Around $2.9 billion has been allocated for capital works to 2019-20 for education and training projects, including:

• $2.4 billion for new schools and upgrades at existing schools to meet the growth in student numbers and to improve facilities such as the new Inner Sydney High School, and new schools at Parramatta Public School and Arthur Phillip High School

• $257.1 million for school information technology works

• $334.2 million for TAFE construction and information technology projects.

Increasing prison capacity

Investment in public order and safety in the four years to 2019-20 includes:

• $2.2 billion of capital expenditure for the Prison Bed Capacity program

• the expansion of the Parklea Correctional Centre with an estimated total cost of $185.1 million

• capital funding11 over four years for the construction of a new 1,700 bed correctional facility in Grafton.

Electricity and utilities investment

Capital investment for water and electricity totals $9.7 billion in the four years to 2019-20. The program includes:

• $6.0 billion12 for energy projects to ensure a reliable electricity supply, meet forecast demand, maintain and replace assets as required, and deliver essential distribution networks upgrades

• $3.7 billion13 for water and wastewater projects including growth works to service urban development across Sydney, the Illawarra, the Hunter and the Blue Mountains and upgrades for dams, fishways and reservoirs.

11 Funding amount is commercial-in-confidence. 12 This amount excludes capitalised interest. 13 This amount is inclusive of finance leases, but excludes capitalised interest.

1 - 6 Infrastructure Statement 2016-17

Page 17: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

The State’s energy investment program currently includes capital works for Ausgrid and Endeavour Energy. As with the successful long-term lease of TransGrid, subsequent to the partial long-term leases of Ausgrid and Endeavour Energy, their future capital programs will no longer be included in the State Budget.

As Essential Energy will remain in full government ownership, its expenditure will continue to form part of the State capital program.

Investing in culture and sport

The Budget includes additional spending on culture and sports including:

• funding for the Western Sydney Stadium14

• $128.6 million over four years for the construction of new and upgraded production, studio, rehearsal and performance venues at the Walsh Bay Arts Precinct

• $12.0 million in 2016-17 for the Sydney Opera House to design upgrades to entry points and foyers, new creative learning and function centres, and improvements to the Concert Hall as part of Stage 1 of the Opera House’s Decade of Renewal.

Further details on the major projects listed above are included in the State Infrastructure Plan in Chapter 4 of this Infrastructure Statement.

1.4 Capital programs by agency

The ten largest agencies by level of capital investment account for $58.6 billion, or 79.9 per cent, of the total budgeted investment program over the four years to 2019-20 as shown in Chart 1.3 below.

Chart 1.3: Distribution of capital investment by agency (a) (b)

0 5 10 15

New South Wales Land and Housing Corporation

Department o f Education

Sydney Water Corporation

Ausgrid

Department o f Justice

Ministry of Health

Sydney Motorway Corporation and its subsidiaries

Rail Corporation NSW (Transport Asset Holding Entity)

Transport for NSW

Roads and Maritime Services

$ billions2016-17 2017-18 2018-19 2019-20

(c)

(a) This Budget does not include the full impact of the Rebuilding NSW plan as formal funding commitments on specific projects have not yet occurred. The Government has committed $10.2 billion of funding to Rebuilding NSW of which $9.1 billion will be spent over the four years to 2019-20.

(b) Ausgrid and Endeavour Energy’s capital program will not form part of the Government’s total program after the conclusion of the lease transactions.

(c) Sydney Motorway Corporation is delivering the WestConnex project. The capital investment shown in the chart above is funded by a combination of State Government investment, Australian Government investment and private sector investment (refer to Box A.3 in Appendix A).

14 Funding amount is commercial-in-confidence.

Infrastructure Statement 2016-17 1 - 7

Page 18: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

1.5 Funding of the capital program

The capital program can be divided into three broad categories based on funding source. The three categories are:

• the State-funded program, including expenditure in the general government sector, public transport PNFCs, social housing, Darling Harbour Live and the State-funded contribution to WestConnex. This also includes funding provided from Restart NSW to agencies for capital works as well as finance lease arrangements underwritten by the State

• the Australian Government-funded program sourced from grants to New South Wales, for major road projects and through the Asset Recycling Initiative

• the commercial PNFC program funded by its own sources including borrowings and retained revenues.

State funding remains strong

The State-funded program, including funding from Restart NSW, is $48.5 billion over the four years to 2019-20. Chart 1.4 shows the growth in the State-funded capital investment program since 2008-09. The program increases to an average of $12.1 billion over the four years to 2019-20, 33.3 per cent higher than the four years to 2015-16 and 97.8 per cent higher than the four years to 2011-12.

Capital expenditure is expected to be higher over the four years to 2019-20, driven by spending on Sydney Metro City and Southwest. The allocation to this project is expected to reach $2.4 billion in 2017-18, making up a significant portion of spending in that year. The reduction in expenditure in 2019-20 compared to the previous three years reflects the completion and delivery of two key projects in 2018-19 – Sydney Metro Northwest, and the CBD and South East Light Rail – as well as the winding down of spending on the Pacific Highway upgrade.

Capital expenditure for the Budget and forward estimates period does not include a portion of Transport for NSW’s contribution to the Sydney Metro Northwest project ($1.7 billion) and to the CBD and South East Light Rail project ($332.9 million) which are the subject of public-private partnership (PPP) arrangements. The finished projects will, however, be recorded as an infrastructure asset.

The estimates for 2016-17 to 2019-20 do not as yet include all spending associated with the Rebuilding NSW plan. The 2016-17 Budget allocates $9.1 billion to Rebuilding NSW projects over the four years to 2019-20, including funds allocated from the Consolidated Fund. The recognition of remaining projects within the Government’s $20 billion program is contingent upon the completion of the partial lease of Ausgrid and Endeavour Energy and formal funding commitments being made. Once funding commitments are made, these will increase the capital expenditure program in the latter period of the forward estimates.

Restart NSW reservations of $1.8 billion are also not included in the capital program but will be recognised when formal commitments to fund projects are made.

1 - 8 Infrastructure Statement 2016-17

Page 19: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Chart 1.4: State-funded capital expenditure program (a)

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

Actual2008-09

Actual2009-10

Actual2010-11

Actual2011-12

Actual2012-13

Actual 2013-14

Actual2014-15

Revised2015-16

Budget2016-17

Estimate2017-18

Estimate2018-19

Estimate2019-20

$ m

illio

ns

Other State Funded Infrastructure Program State Funded PPP Projects

Average: $12.1 billion

Average: $9.1 billion

Average: $6.1 billion

(b)

(a) The State-funded capital program includes expenditure in the general government sector, public transport PNFCs, social housing,

Darling Harbour Live and the State-funded contribution to WestConnex. (b) Does not include capital commitments funded from transactions that are yet to be concluded, including Ausgrid and Endeavour

Energy.

Australian Government funding

The Australian Government will contribute close to $9.9 billion to the New South Wales capital investment program over the four years to 2019-20. Chart 1.5 shows the Australian Government contribution to the capital program over years 2010-11 to 2019-20, including Australian Government stimulus funding due to the Global Financial Crisis. Australian Government funded expenditure will account for around 13.4 per cent of the State’s infrastructure program in the four years to 2019-20.

Australian Government funding for the Pacific Highway upgrades is expected to peak in 2016-17, contributing to the large increase in that year. The WestConnex project is also partly funded by an Australian Government contribution with significant funding in 2016-17 and 2017-18.

The 2016-17 Budget year also includes $994.0 million to be received as an Asset Recycling Initiative payment linked mainly to the lease of electricity assets and subsequent investment in capital projects through Rebuilding NSW. The Australian Government Asset Recycling Initiative payments are expected to total $2.2 billion, with the remaining amount expected to be received following the partial lease of Ausgrid and Endeavour Energy and Rebuilding NSW milestones being met. As the long-term lease of the electricity network businesses is not fully reflected in the Budget estimates, a portion of the associated future incentive payments is also excluded from Australian Government contributions. Further incentive payments will be recognised in the Budget following the finalisation of the remaining transactions and as the Rebuilding NSW investment plan is implemented.

Infrastructure Statement 2016-17 1 - 9

Page 20: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Chart 1.5: Australian Government contribution to State capital expenditure program

0

1,000

2,000

3,000

4,000

5,000

Actual2010-11

Actual2011-12

Actual2012-13

Actual2013-14

Actual2014-15

Revised2015-16

Budget2016-17

Estimate2017-18

Estimate2018-19

Estimate2019-20

$ m

illio

ns

Australian Government Other Funded Australian Government Stimulus Funded

PNFC capital investment funding is increasing

PNFC capital investment expenditure (excluding public transport, Darling Harbour Live, Government funding for WestConnex and for social housing, which are budget funded) will total $15.0 billion over the four years to 2019-20. This includes $4.0 billion in capital spending by Ausgrid and Endeavour Energy, which will be managed by the relevant businesses once leased and no longer included in the NSW Government’s capital investment program. Capital expenditure is not included for TransGrid from 2016-17 onwards following the successful lease transaction.

Chart 1.6 shows that the PNFC funded capital program between 2010-11 and 2015-16 moderated. This is in part due to the divestment of Government businesses, principally ports and electricity generation. Also contributing to the decline is the Government’s strategy, announced in the 2012-13 Budget, to reduce electricity sector investment at a time of reduced demand, relieving pressure on consumer electricity prices.

From 2015-16 onwards, expenditure in the non-electricity sector is expected to increase, reflecting spending on the delivery of Stages 1 and 2 of WestConnex. Further details on this project can be found in Box A.3 of Appendix A.

1 - 10 Infrastructure Statement 2016-17

Page 21: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Chart 1.6: PNFC own funded capital investment program (a) (b)

0

1,000

2,000

3,000

4,000

5,000

6,000

Actual2010-11

Actual2011-12

Actual2012-13

Actual2013-14

Actual2014-15

Revised2015-16

Budget2016-17

Estimate2017-18

Estimate2018-19

Estimate2019-20

$ m

illio

ns

Capital expenditure profile of WestConnex project del ivered by Sydney Motorway Corp. Pty L td and principally funded by privateborrowingsCapital expenditure profile of Ausgrid, Endeavour Energy and TransGrid (prior to 2016-17)

Capital expenditure profile of a ll commercially funded PNFCs (excluding WestConnex, Ausgrid , Endeavour Energy andTransGrid)

(a) The PNFC funded capital program excludes general government funded capital expenditure, public transport, State contributions to social housing, Darling Harbour Live and WestConnex capital expenditure funded through the Budget.

(b) The chart splits out the capital investment program of Ausgrid and Endeavour Energy, which are subject to the proposed long-term lease of the electricity networks as well as TransGrid, which was part of the PNFC capital expenditure program until 2016-17. Post-lease, these investments will not form part of the Government’s capital expenditure.

1.6 Existing assets and maintenance program

Existing assets

The State’s physical assets comprise land and buildings, plant and equipment and infrastructure systems. Examples include hospitals, public schools, transport networks, police and court facilities, TAFE facilities, public housing and recreational facilities, as well as water storage and supply networks, electricity transmission and distribution networks and roads. Physical assets exclude inventories, intangibles and assets held for sale.

Table 1.2 shows that the State’s physical assets across both the general government and PNFC sectors had a value of $293.0 billion in June 2015. The State’s physical assets are estimated to have a value of around $306.1 billion in June 2016.

The value of physical assets, net of depreciation, is expected to increase during 2016-17 by $9.9 billion in the general government sector and by $7.8 billion in the PNFC sector to a total of $323.8 billion.

Infrastructure Statement 2016-17 1 - 11

Page 22: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Table 1.2: State owned physical assets: value by sector (a) (b)

As at 30 June2013

Actual2014

Actual2015

Actual2016

Revised 2017

Budget$m $m $m $m $m

General Government Sector 141,612 148,010 158,340 166,353 176,226

Public Non-Financial Corporations (c) 123,748 126,994 134,629 139,760 147,595

Total (c) 265,359 275,005 292,969 306,113 323,821

(a) Net of depreciation. (b) Includes investment properties. (c) Includes assets of businesses prior to their sale or lease to the private sector.

State physical assets are recorded at fair value in line with accounting policies and standards. Where practicable, fair value is measured assuming an asset’s highest and most optimal use. An asset with no feasible alternative use may be recorded at fair value for its existing use.

Chart 1.7 shows the components of the State’s physical assets. The largest component of these assets in June 2015 was infrastructure systems ($148.3 billion) which included railways, roads, ports, dams and pipelines. The remaining components comprised buildings ($68.7 billion), land ($58.6 billion) and plant and equipment ($17.4 billion). The land component value of physical assets has been separated from buildings, providing a clear distinction between built and non-built infrastructure.

Chart 1.7: State owned physical assets: value by type, as at 30 June 2015

Land20%

Buildings23%

Plant and Equipment

6%

Inf rastructureSy stems

51%

Chart 1.8 shows the agency distribution of the State’s physical assets. The chart demonstrates that assets are concentrated in transport, housing, education, electricity, water and health, comprising 86 per cent of the State’s physical assets.

1 - 12 Infrastructure Statement 2016-17

Page 23: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Investment Program

Chart 1.8: Distribution of physical assets by agency as at 30 June 2015 (a)

10.6%1.1%1.2%1.3%1.4%1.4%1.6%2.0%2.3%2.6%2.6%

4.7%5.2%5.3%

7.2%9.9%

13.4%26.3%

0% 5% 10% 15% 20% 25% 30%

OtherSydney Trains

State Library of New South WalesOffice of Environment and Heritage

Department of JusticeTransport for NSWTAFE Commission

TransGridEndeavour Energy

Department of Industry, Skills and Regional DevelopmentEssential EnergyMinistry of Health

AusgridSydney Water Corporation

Department of EducationRail Corporation New South Wales

New South Wales Land and Housing CorporationRoads and Maritime Services

Percentage of Total State Owned Physical Assets of $293 billion

(a) Where applicable, agency names in the chart have been adjusted to take into account changes to reporting entities as a result of the Administrative Arrangements (Administrative Changes - Public Service Agencies) Order 2015 effective 1 July 2015.

Infrastructure maintenance

Agencies must ensure their infrastructure continues to support the planned delivery of services and therefore is adequately maintained.

Treasury guidelines require direct employee, contractor and external costs on infrastructure maintenance activities to be reported as part of an agency’s maintenance expenditure. Table 1.3 shows the maintenance expenditure estimates for the general government and PNFC sectors. Maintenance expenses increase over 2016-17 and 2017-18 and then decrease in 2018-19 and 2019-20. The reduction in the last two years of the forward estimates is driven by changes to the maintenance expenditure profile for education and health. To address backlog maintenance in schools, some maintenance expenditure has been accelerated to 2016-17 and 2017-18. Additionally, a greater proportion of health maintenance related items are now being capitalised and investments are being made in new health infrastructure which have a lower maintenance cost.

Table 1.3: Maintenance expenses

2016-17 2017-18 2018-19 (a) 2019-20 (a)

Budget Revised Budget

$m $m $m $m $m $m

General Government Sector 1,864 1,846 1,990 2,170 1,799 1,829Public Non-Financial Corporation Sector 2,285 2,230 2,260 2,441 2,378 2,434

Total 4,148 4,077 4,250 4,611 4,177 4,263

2015-16Forward estimates

(a) The maintenance expenditure profile over the forward estimates reflects the Government’s allocation of $330.0 million over the next two years to address backlog maintenance in schools. The reduction in 2018-19 and 2019-20 also reflects a greater share of health maintenance related items being capitalised, and also the impact of investment in new health infrastructure which has a lower maintenance cost. Maintenance expenditure in 2016-17 excludes TransGrid, following the successful lease transaction.

Infrastructure Statement 2016-17 1 - 13

Page 24: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

2. RESTART NSW

2.1 Introduction

In 2011, the Government established the Restart NSW Fund (Restart NSW) to enable a range of high priority infrastructure projects to be funded and delivered. The strategy has enabled the Government to commit additional funding to invest in new infrastructure while maintaining the State’s triple-A credit rating.

Restart NSW is the vehicle for the delivery of the Rebuilding NSW plan, which is a plan to invest $20 billion in new infrastructure funded by the lease of 49 per cent of the State’s electricity network businesses and Australian Government Asset Recycling Incentive payments. These proceeds are first deposited into Restart NSW before being invested into Rebuilding NSW projects.

Chapter 3 sets out in detail the implementation of the Rebuilding NSW plan, including the nominated projects, and the progress to date in delivering that plan and those projects.

The Government’s strategy for using Restart NSW has two key elements:

• the securing of additional monies for investment. This includes the proceeds of asset recycling, windfall taxation revenues and Waratah Bonds

• the systematic identification of priority projects to improve the economic growth and productivity of the State.

The forecast 30 June 2016 amount deposited into Restart NSW is estimated at $16.5 billion, as summarised in Table 2.5.

A total of $14.6 billion has been committed, and budgeted, to be spent on infrastructure projects from Restart NSW, and includes $9.3 billion for the Rebuilding NSW plan. These commitments are summarised in Table 2.2 and include funding for projects being delivered by State and Local Government, and community organisations.

A further $1.8 billion has been reserved for identified projects and programs, subject to further investigation and review of individual project plans and business cases. These reservations are summarised in Table 2.3.

This chapter summarises the activities of Restart NSW, the governance framework that applies to the selection of all projects and provides detail on the projects (other than Rebuilding NSW projects), which have either been committed to or are the subject of a reservation. Rebuilding NSW projects are detailed in Chapter 3 of this Infrastructure Statement.

Table 2.1: Restart NSW Fund (estimated as at 30 June 2016)

Restart NSW (excl Rebuilding NSW)

Rebuilding NSW projects Total

Total inflows $16.5 billion

Commitments $5.3 billion $9.3 billion $14.6 billion

Reservations $1.7 billion $0.1 billion $1.8 billion

Total Unallocated Balance $0.2 billion - $0.2 billion

Infrastructure Statement 2016-17 2 - 1

Page 25: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

2.2 Restart NSW governance and project selection framework

The Government has developed a robust governance framework to ensure the effective investment of Restart NSW funds.

The Restart NSW Fund Act 2011 (the Restart Act) provides the Government, through the Treasurer, with enhanced oversight of Restart NSW expenditure and sets out the process for the allocation of funds.

The Restart Act accords Infrastructure NSW (INSW) the responsibility of independently assessing projects and making recommendations to the Treasurer.

New infrastructure projects considered for Restart NSW funding are subject to a rigorous selection process. Projects selected for delivery must be supported by a sound business case showing the project is financially and economically justifiable. The key components of the project assessment framework are:

• strategic assessment to ensure the project aligns with the Restart Act criteria, existing government priorities and Restart NSW investment themes

• economic assessment to ensure the project is expected to produce a net economic benefit and improve economic growth and productivity in the State (demonstrated by a benefit-cost ratio greater than 1)

• Gateway assurance which is an independent review process to ensure the project has successfully completed the appropriate business case development processes.

As well as the elements outlined above, the Government remains focused on exploring innovative procurement and financing strategies and ensuring projects funded from Restart NSW are accompanied by sound delivery strategies, for example see Box 2.1.

Box 2.1: NorthConnex (including M7 Monetisation and LCT transaction)

Project: NorthConnex is a nine kilometre tunnel motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills.

Funding allocation: The $3 billion project will be mainly funded through private financing supported by toll charges with additional State Government contributions of $560 million and $405 million from the Australian Government.

In line with its asset recycling strategy, the Government has monetised a stream of annual M7 Motorway concessionaire rental payments and the additional proceeds from the Lane Cove Tunnel concession transaction, and reinvested these proceeds into the Government contribution.

Service delivery objective: The primary objectives of NorthConnex are to reduce the number of heavy vehicles on Pennant Hills Road and ease congestion for Sydney motorists.

Implementation: Major construction work commenced in 2015 and the tunnel is expected to open to traffic in late 2019. The timeline for delivery is consistent with the Premier’s Priority to deliver key infrastructure projects on time and on budget across the state.

Outcomes: The NorthConnex motorway will:

• increase transport reliability for people, businesses and freight on the motorway network

• help ease traffic congestion by avoiding 21 traffic lights on Pennant Hills Road

• move up to 5,000 trucks per day off Pennant Hills Road

• improve local traffic conditions and amenities.

2 - 2 Infrastructure Statement 2016-17

Page 26: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

2.3 Overview of Restart NSW commitments

Table 2.2 sets out the budgeted Restart NSW funding commitments, noting that the Rebuilding NSW programs and projects are set out in more detail in Chapter 3 of this Infrastructure Statement.

There has been a significant increase in Restart NSW commitments since the 2015-16 Budget of approximately $9.7 billion. The principal components of this increase include:

• Rebuilding NSW projects including Sydney Metro City and Southwest ($7.0 billion), Existing Network Enhancements (previously Sydney Rail Futures 2) ($1.0 billion), Bus Priority Infrastructure (including B-Line) ($290.4 million) and the Fixing Country Roads program ($50.0 million)

• Northern Beaches Hospital, Road Connectivity and Network Enhancement ($348.0 million)

• Grafton Bridge ($177.0 million)

• Regional Tourism Infrastructure program ($97.3 million)

• Parramatta Light Rail planning ($64.0 million).

Table 2.6 provides a complete reconciliation of the movement in commitments from the 2015-16 Budget. Further details for Rebuilding NSW projects are provided in Chapter 3 of this Infrastructure Statement.

Chart 2.1: Restart NSW Fund commitments

4,753 5,173 5,251 146

182

9,318(a)

3,000

5,000

7,000

9,000

11,000

13,000

2015-16 Budget 2015-16 Half-Yearly Review 2016-17 Budget

$ m

illio

ns

Other Restart NSW projects Rebuilding NSW projects

4,899 5,355

14,569

4,899 5,355

(a) The total Rebuilding NSW commitments are $10.2 billion which comprises $9.3 billion from the Restart NSW Fund with the balance advanced from the Consolidated Fund.

Note: Chart 2.1 shows the total cumulative Restart NSW Fund funding up to the 2016-17 Budget. Funding is expended on projects over the course of the projects’ capital expenditure profiles.

Infrastructure Statement 2016-17 2 - 3

Page 27: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Table 2.2: Restart NSW Fund commitments as at the 2016-17 Budget

Commitments$m

WestConnex 1,825.0

Pacific Highway upgrade 403.0

Next Generation Rail Fleet (previously New Intercity Fleet) 402.0

Western Sydney Roads to support Sydney’s Second Airport at Badgerys Creek 381.3

Northern Beaches Hospital, Road Connectivity and Network Enhancement 358.0

Water Security for Regions program (see Appendix B) 248.2

Resources for Regions program (see Appendix B) 207.9

Grafton Bridge 177.0

Princes Highway upgrade 170.0

Bridges for the Bush program 135.0

Easing Sydney’s Congestion (Pinch Points) 130.0

Illawarra Infrastructure Fund (see Appendix B) 100.2

Regional Tourism Infrastructure program (see Appendix B) 97.3

WestConnex Enabling Works 87.0

NorthConnex (M1 to M2 connection) 85.1

Regional Freight Pinch Point and Safety Program 85.0

Parramatta Light Rail 64.0

Additional Support for Tourism Infrastructure - Taronga Zoo 57.4

Western NSW Freight Productivity program 44.7

Fixing Country Roads program (see Appendix B) 40.4

Bells Line of Road Corridor Improvement program 28.0

Hunter Infrastructure Fund 25.0

Regional Health Infrastructure program 24.3

Cobbora Transition Fund 20.0

WestConnex Gateway (Planning) 15.4

Sydney Motorway Network Planning 15.0

Newcastle Inner City Bypass Missing Link (Rankin Park to Jesmond) 14.0

Hawkesbury-Nepean Flood Management Review – Stage 2 5.0

Port of Eden Breakwater Wharf (a) 3.0

Royal Flying Doctor Service Multi-Purpose Facility 2.5

5,250.7 9,318.3

14,569.0

Commitments as at the 2016-17 Budget

Total commitments as at the 2016-17 Budget

Restart NSW commitments excluding Rebuilding NSW Rebuilding NSW projects - various (see Table 3.1 in Chapter 3 )

(a) The 2016-17 Budget allocates an additional $27.5m from the Regional Tourism Infrastructure program to the Port of Eden Breakwater Wharf project (see Appendix B).

2.4 Restart NSW reservations

Restart NSW reservations are funds reserved with a view to a future Restart NSW commitment, at which time expenditure on projects will be included in the Budget aggregates. This is following further project development and completion of project assurance processes, including final business case approval. A Restart NSW reservation can only become a commitment, and budgeted for, once the Treasurer has accepted a specific INSW recommendation for each individual project, as required by the Restart Act.

Table 2.3 sets out the current Restart NSW reservations. Table 2.7 sets out the movements in reservations since the 2015-16 Budget. New reservations include $80.0 million for cycling infrastructure and $23.0 million for the Resources for Regions program.

2 - 4 Infrastructure Statement 2016-17

Page 28: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Table 2.3: Restart NSW Fund reservations as at the 2016-17 Budget

Reservations

$m

Housing Acceleration Fund (see Appendix B) 400.0

Parramatta Light Rail 336.0

Western Sydney Roads to support Sydney’s Second Airport at Badgerys Creek 285.8

Newcastle Inner City Bypass Missing Link (Rankin Park to Jesmond) 136.0

Water Security for Regions program 117.6

Regional Freight Pinch Point and Safety program 115.0

South Western Sydney Housing Acceleration Fund 83.0

NSW Cycling Infrastructure Initiative 80.0

Hunter Infrastructure and Investment Fund 75.0

Resources for Regions program – further investments 32.0

Regional Health Infrastructure program 25.7

Regional Tourism Infrastructure program 12.7

Queanbeyan Bypass (Ellerton Drive extension) 12.5

Additional support for tourism infrastructure 11.5

Fixing Country Roads program 2.4

Co-contribution towards regional development priorities 0.7

1,725.9 77.2

1,803.2 Total reservations as at the 2016-17 Budget

Restart NSW reservations excluding Rebuilding NSW Rebuilding NSW projects - Support for the delivery of the State Infrastructure Strategy

Reservations as at the 2016-17 Budget

The Northern Beaches Hospital Road Connectivity and Network Enhancement (Box 2.2) is an example of a project for which funds were reserved pending the detailed development of a business case.

Box 2.2: Northern Beaches Hospital Road Connectivity and Network Enhancement

Project: Northern Beaches Hospital Road Connectivity and Network Enhancement involves upgrading key roads, shared pedestrian and cyclist bridges and pathways around the new Northern Beaches Hospital.

Funding allocation: The Budget allocates $160.0 million to this package of works in 2016-17. The estimated total cost is $500 million, with $358.0 million funded from Restart NSW.

Service delivery objective: The upgrades will improve access to the Northern Beaches Hospital at Frenchs Forest, including for pedestrians and cyclists, and support growing travel demand from the local community. It will also increase the accessibility of the hospital for patients, staff and visitors. The upgrades will also improve traffic flow across the road network through targeted changes to road configuration.

Implementation: Construction is underway, with planning approval obtained for Stage 1 of the Hospital Connectivity Works in June 2015, and for Stage 2 of the Network Enhancement Works in February 2016. The road works will be completed in time for the opening of the Northern Beaches Hospital in 2018.

Outcomes: Northern Beaches Hospital Road Connectivity and Network Enhancement will:

• help ease traffic congestion and improve travel times

• enhance hospital access and support emergency responses

• provide new shared bridges and paths for pedestrians and cyclists.

Infrastructure Statement 2016-17 2 - 5

Page 29: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

2.5 Investing in regional New South Wales

The Government is committed to investing in regional New South Wales to support long term economic growth and strong communities. In aggregate, 30 per cent of Restart NSW’s investment portfolio is targeted at regions outside the metropolitan areas of Newcastle, Sydney and Wollongong, of which ten per cent is targeted at the Resources for Regions program.

Since the 2015-16 Budget there are new expenditure commitments of $377.2 million for projects in regional New South Wales, including:

• $177.0 million for Grafton Bridge

• $97.3 million for the Regional Tourism Infrastructure program

• $83.3 million for the Water Security for Regions program

• $9.0 million for the Regional Health Infrastructure program.

These projects will make significant contributions to supporting tourism infrastructure, improving health infrastructure and services, and addressing water security issues in regional communities.

Investing in regional infrastructure is a key priority of the Government. There are 18 Restart NSW programs that are delivering priority infrastructure to regional areas of the State. There are 11 Restart NSW programs (not including the Rebuilding NSW plan) that will make significant contributions to alleviating congestion, lifting freight productivity and addressing water security issues in regional communities as set out in Box 2.3.

Box 2.3: Restart NSW Fund - regional investment

Regional infrastructure needs are recognised through 11 programs (not including the Rebuilding NSW plan).1

Table 2.4: Programs in regional New South Wales

Program/Project Description

Bridges for the Bush Improves road freight productivity by replacing or upgrading bridges in regional New South Wales.

Cobbora Transition Fund Drives productivity and economic growth in local communities impacted by the land acquisition and other activities associated with the Cobbora Coal Project.

Fixing Country Roads Improves local and regional roads managed by Local Government in country areas, especially roads allowing higher mass vehicles to operate.

Hunter Infrastructure and Investment Fund

Promotes economic growth and enhances the livability of the Hunter region.

Illawarra Infrastructure Fund Supports economic growth in the Illawarra region.

Regional Freight Pinch Point and Safety Program

Improves key road and rail freight corridors in regional areas including the Bells Line of Road, Golden Highway, Kings Highway and Gocup Road.

Regional Health Infrastructure Fast-tracks regional health infrastructure in Coraki, Grafton, Macksville, Manning, Lismore and Armidale.

Regional Tourism Infrastructure (see Box 2.5)

Supports regional airports, cruise terminals and rail trail infrastructure to increase the economic competitiveness of the State.

Resources for Regions (see Box 2.4)

Supports regional and rural mining-impacted communities by addressing infrastructure constraints.

Water Security for Regions Secures water supplies and drought-proofs regional communities including dams and bores.

Western NSW Freight Productivity Program

Supports sealing, widening and other improvement works on the Cobb Highway, Silver City Highway and other freight corridors in western New South Wales.

1 The Illawarra Infrastructure Fund and Hunter Infrastructure and Investment Fund also include a metropolitan component.

2 - 6 Infrastructure Statement 2016-17

Page 30: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

The Rebuilding NSW plan also provides additional funding for programs (in total $6.0 billion) that will make significant contributions to regional New South Wales (see Chapter 3).

Box 2.4: Resources for Regions

Program: The Resources for Regions program supports regional and rural New South Wales communities impacted by mining. By addressing infrastructure constraints, the attractiveness of these communities as vibrant places to live and do business will increase. Both economic and social infrastructure projects are supported by the program.

Projects cover health, water, road, education, and tourism sectors and town renewals, including Muswellbrook Hospital Redevelopment Stage 2, Narrabri Water Supply Augmentation and replacing the Portland waste water treatment plant. Appendix B provides a detailed list of Resources for Regions projects.

The Resources for Regions program aligns with the objectives of Restart NSW by improving infrastructure in regional areas that are impacted by mining operations and therefore improving the economic growth and productivity of the State.

Funding allocation: Since 2012, the Government has set aside $239.9 million to support mining impacted communities. Already $207.9 million has been committed to 32 projects across the State.

Implementation: Expressions of Interest (EOIs) were advertised in 2015-16 for the Resources for Regions program. EOIs have been shortlisted against four program criteria: strategic assessment, economic assessment, affordability and deliverability. Successful projects will be announced later in 2016-17.

Chart 2.2: Resources for Regions program as at the 2016-17 Budget

Infrastructure Statement 2016-17 2 - 7

Page 31: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Box 2.5: Regional Tourism Infrastructure

Program: The Regional Tourism Infrastructure program supports the development and growth of regional tourism by investing in critical visitor economy infrastructure. The visitor economy is an important contributor to many regional New South Wales communities, and improved infrastructure will attract more visitors across the State. This program meets the objectives of Restart NSW by increasing transport opportunities and strengthening the economic competitiveness and diversity of the State.

Currently the program focuses on boosting airport capacity and safety. This will help expand travel opportunities for domestic and international tourists and support domestic businesses.

Funding allocation: In the 2014-15 Budget the Government reserved $110.0 million for the Regional Tourism Infrastructure program. The Government has committed $69.8 million to 27 airport projects across the State and an additional $27.5 million to the Port Eden Breakwater Wharf project. Appendix B provides a detailed list of Regional Tourism Infrastructure projects.

Implementation: The 27 airport projects across the State include passenger terminal upgrades, improving lighting to support airport expansion and expanding runways and aircraft parking to accommodate larger planes.

Chart 2.3: Airport infrastructure projects funded since the 2015-16 Budget

2.6 Restart NSW funding sources

As shown in Table 2.5 total receipts of $16.5 billion are forecast to be deposited into Restart NSW by 30 June 2016, with $6.6 billion relating to proceeds received to date for the TransGrid transaction (including stamp duty) and $10.0 billion from other sources. These include other asset recycling, Waratah Bonds, windfall tax revenues and interest earned.

2 - 8 Infrastructure Statement 2016-17

Page 32: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Table 2.5: Restart NSW funding sources (expected position at 30 June 2016)

Funding source Total inflow ($m)

Asset recycling

TransGrid transaction (proceeds received to date including stamp duty) 6,578.6

Port Botany and Port Kembla (including stamp duty) 4,252.9

Newcastle Port (including stamp duty) 1,575.6

Macquarie Generation (including stamp duty) 713.6

Sydney Desalination Plant 312.0

Government Property NSW (various asset recycling transactions) 200.2

Green State Power 86.9

Eraring Power Station 48.1

Delta Electricity (Vales Point Power Station) 21.3

Waratah Bonds 860.5

Windfall tax revenues 1,528.0

Interest earned 370.8

Total inflows $16.5 billion

2.7 Restart NSW reconciliation

Tables 2.6 and 2.7 provide a reconciliation of Restart NSW budgeted expenditure commitments and reservations between the 2015-16 Budget, 2015-16 Half-Yearly Review and the 2016-17 Budget. Further details of Rebuilding NSW projects are provided in Chapter 3 of this Infrastructure Statement.

Infrastructure Statement 2016-17 2 - 9

Page 33: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Table 2.6: Restart NSW Fund commitments reconciliation as at the 2016-17 Budget

Commitments$m

WestConnex 1,825.0 Pacific Highway upgrade 403.0

Princes Highway upgrade 170.0

Bridges for the Bush program 135.0

Resources for Regions program 207.9

Easing Sydney’s Congestion (Pinch Points) 130.0

Illawarra Infrastructure Fund 100.2

WestConnex Enabling Works 87.0

Bells Line of Road Corridor Improvement Program 28.0

Port of Eden Breakwater Wharf (a) 3.0

NorthConnex Planning 10.0

NorthConnex (M1 to M2 connection) 400.0

Western Sydney Roads to support Sydney’s Second Airport at Badgerys Creek 278.0

Sydney Motorway Network Planning 15.0

Northern Beaches Hospital, Road Connectivity and Network Enhancement Planning 10.0

Hawkesbury-Nepean Flood Management Review – Stage 2 5.0

Cobbora Transition Fund – Initial Council investments 4.0

Cobbora Transition Fund – further investments 16.0

Water Security for Regions program – initial projects (regional NSW) 20.9

Water Security for Regions program – Regional Water Supply 16.7

Newcastle Inner City Bypass Missing Link (Rankin Park to Jesmond) 14.0

Fixing Country Roads program 39.3

Western Sydney Roads to support Sydney's Second Airport at Badgerys Creek - Western Sydney Infrastructure Plan 103.3

Western NSW Freight Productivity program 44.7

Regional Freight Pinch Point and Safety program 85.0

Next Generation Rail Fleet (previously New Intercity Fleet) 402.0

Water Security for Regions program 127.4

Additional Support for Tourism Infrastructure - Taronga Zoo 57.4

Regional Health Infrastructure program 15.3

4,753.0 146.0

4,899.0

Additional commitments from 2015-16 Budget to 2015-16 HYR

NorthConnex (now funded from M7 Monetisation and LCT transaction proceeds) -174.2

Water Security for Regions program 10.6

Northern Beaches Hospital, Road Connectivity and Network Enhancement 348.0

Fixing Country Roads program 1.1

Grafton Bridge 177.0

Hunter Infrastructure and Investment Fund: Singleton Hospital 7.0

Regional Tourism Infrastructure program 35.0

WestConnex 15.4

419.8 36.2

456.0 5,355.0

Commitments as at the 2015-16 Budget

Total commitments as at the 2015-16 Budget

Total commitments as at 2015-16 Half-Yearly Review

Restart NSW commitments excluding Rebuilding NSW Accelerating Rebuilding NSW initiatives - various projects

Restart NSW commitments excluding Rebuilding NSW Rebuilding NSW projects - Gateway to the South

2 - 10 Infrastructure Statement 2016-17

Page 34: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Table 2.6: Restart NSW Fund commitments reconciliation as at the 2016-17 Budget (cont)

Commitments$m

Additional commitments from 2015-16 HYR to 2016-17 BudgetWater Security for Regions program 72.7

Regional Tourism Infrastructure program 62.3

NorthConnex (now funded from M7 Monetisation and LCT transaction proceeds) -150.7

Regional Health Infrastructure program 9.0

Hunter Infrastructure and Investment Fund 18.0

Royal Flying Doctor Service Multi-Purpose Facility 2.5

Parramatta Light Rail 64.0

77.8 Sydney Metro City and Southwest 7,000.0

Existing Network Enhancements 1,000.0

Water Security and Sports Stadia 768.9

Bus Priority Infrastructure (including B-Line) 290.4

Fixing Country Roads program 50.0 Regional Multipurpose Services (MPS) Facilities 26.8

Rebuilding NSW projects 9,136.1

9,214.0 14,569.0 Total commitments as at 2016-17 Budget

Restart NSW commitments excluding Rebuilding NSW

(a) The 2016-17 Budget allocates an additional $27.5 million from the Regional Tourism Infrastructure program to the Port of Eden Breakwater Wharf project (see Appendix B).

Table 2.7: Restart NSW Fund reservations reconciliation as at the 2016-17 Budget

Reservations

$m

Parramatta Light Rail 400.0

Western Sydney Roads to support Sydney’s Second Airport at Badgerys Creek 285.8

Northern Beaches Hospital, Road Connectivity and Network Enhancement 348.0

Grafton Bridge 177.0

Hunter Infrastructure and Investment Fund 100.0

Newcastle Inner City Bypass Missing Link (Rankin Park to Jesmond) 136.0

Queanbeyan Bypass (Ellerton Drive extension) 12.5

South Western Sydney Housing Acceleration Fund 83.0

Regional Freight Pinch Point and Safety program 115.0

Water Security for Regions program 200.9

Resources for Regions program – further investments 9.0

Co-contribution towards regional development priorities 3.2

Regional Health Infrastructure program 34.7

Regional Tourism Infrastructure program 110.0

Additional support for tourism infrastructure 11.5

Fixing Country Roads program 3.5

Housing Acceleration Fund 400.0

2,430.1 1,854.0

4,284.1 Total reservations as at the 2015-16 Budget

Reservations as at the 2015-16 Budget

Restart NSW reservations excluding Rebuilding NSW Rebuilding NSW projects - Support for the delivery of the State Infrastructure Strategy

Infrastructure Statement 2016-17 2 - 11

Page 35: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Restart NSW

Table 2.7: Restart NSW Fund reservations reconciliation as at the 2016-17 Budget (cont)

Reservations

$m

Changes in reservations from 2015-16 Budget to 2015-16 HYR

Water Security for Regions program -10.6

Northern Beaches Hospital, Road Connectivity and Network Enhancement -348.0

Fixing Country Roads program -1.1

Grafton Bridge -177.0

Hunter Infrastructure and Investment Fund: Singleton Hospital -7.0

Regional Tourism Infrastructure program -35.0

Resources for Regions program 23.0

-555.7 Support for the delivery of the State Infrastructure Strategy -36.2

Fixing Country Roads program 50.0

Support for the delivery of the State Infrastructure Strategy -50.0

Support for the delivery of the State Infrastructure Strategy 747.0

Rebuilding NSW projects (consistent with proceeds from TransGrid transaction) 6,140.2

6,851.0

6,295.3

10,579.4

Changes in reservations from 2015-16 HYR to 2016-17 BudgetNSW Cycling Infrastructure Initiative 80.0

Water Security for Regions program -72.7

Regional Tourism Infrastructure program -62.3

Co-contribution towards regional development priorities -2.5

Hunter Infrastructure and Investment Fund -18.0

Regional Health Infrastructure program -9.0

Parramatta Light Rail -64.0

-148.5 Rebuilding NSW projects (consistent with proceeds from TransGrid transaction) 438.4

Support for the delivery of the State Infrastructure Strategy 70.0

Rebuilding NSW projects (consistent with proceeds from TransGrid transaction) -6,578.6

Support for the delivery of the State Infrastructure Strategy -2,480.7

Fixing Country Roads program -50.0 Regional Multipurpose Services (MPS) Facilities -26.8

-8,627.7

-8,776.3

1,803.2

Restart NSW reservations excluding Rebuilding NSW

Rebuilding NSW projects

Restart NSW reservations excluding Rebuilding NSW

Rebuilding NSW projects

Total reservations as at 2015-16 Half-Yearly Review

Total reservations as at 2016-17 Budget

2 - 12 Infrastructure Statement 2016-17

Page 36: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

3. REBUILDING NSW

3.1 Introduction

Rebuilding NSW is the Government’s plan to invest $20 billion in new infrastructure, funded from the lease of 49 per cent of NSW electricity networks and Australian Government Asset Recycling Incentive payments.

A total of $10.2 billion has now been committed to the $20 billion Rebuilding NSW plan (see Table 3.1). This includes $1.0 billion forecast to be spent in 2015-16 and a further $2.3 billion allocated in 2016-17.

The focus of Rebuilding NSW is on investments that increase productivity and improve the State’s overall economic performance. This significant package will drive economic growth and create opportunities across the State, ensuring all members of the community benefit from improvements in transport, education, health, water, sports and arts infrastructure.

To ensure benefits are spread across all of New South Wales, the Government has committed to invest 30 per cent of the Rebuilding NSW Plan (or $6.0 billion) on projects located outside metropolitan Sydney, Newcastle and Wollongong.

The Rebuilding NSW projects and programs were set out in the Rebuilding NSW State Infrastructure Strategy 2014 (SIS 2014) prepared by the Government following advice from INSW.

Because the Rebuilding NSW proceeds will be deposited into the Restart NSW Fund (Restart NSW), INSW will continue to play a critical role in assessing the projects and making specific funding recommendations to the Government. As a result, Rebuilding NSW projects will be governed by the same framework that has been successfully applied to the $5.3 billion of other Restart NSW project commitments.

3.2 Rebuilding NSW plan

In November 2014, the NSW Government articulated the Rebuilding NSW plan based on 30 investment recommendations for the next round of critical infrastructure projects and programs for New South Wales. The Rebuilding NSW plan will reduce congestion, support population growth and stimulate productivity across Sydney and regional New South Wales.

In addition to accelerating a number of Rebuilding NSW initiatives, a number of programs and projects for Rebuilding NSW are now included in the 2016-17 Budget. This follows the successful lease transaction for TransGrid and INSW assessment of the projects considered for funding. As at the 2016-17 Budget, the $20 billion Rebuilding NSW plan is summarised in Table 3.1.

Infrastructure Statement 2016-17 3 - 1

Page 37: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

Table 3.1: Rebuilding NSW plan

Priority areas Project/Program

Rebuilding NSW Plan

Contribution ($m)(a)

Restart NSW Fund

Commitments to date ($m)

Consolidated Fund

Advances ($m)

Urban public transport Sydney Metro City and Southwest(b) 7,000.0 7,000.0 50.0

Existing Network Enhancements (previously Sydney's Rail Future Stage 2 incl. Western Sydney Rail Upgrades)(b)

1,000.0 1,000.0 36.0

Parramatta Light Rail 600.0 19.0

Bus Priority Infrastructure (including B-Line) 300.0 290.4 10.0Urban roads WestConnex northern/southern extensions and Western

Harbour Tunnel1,100.0 6.0 13.0

Pinch Points and Clearways 400.0 3.0 4.0

Smart Motorways 400.0 0.5 36.3

Gateway to the South 300.0 38.7 11.0

Traffic Management Upgrades 200.0 0.5 18.5

Regional transport Regional Road Freight Corridor 2,000.0 66.0 68.7

Regional Growth Roads 1,000.0 67.5 26.0Fixing Country Roads 500.0 50.0

Fixing Country Rail 400.0 11.0Bridges for the Bush 200.0 14.8

Water Security Regional Water Security and Supply Fund 1,000.0 n.a.(c)

Education Future Focused Schools 700.0 n.a.(c)

Regional Schools Renewal program 300.0 n.a.(c)

Education subtotal 323.0

Health Hospitals Growth Program 600.0 Regional Multipurpose Services (MPS) Facilities 300.0 26.8 76.7Primary and Integrated Care Strategy 100.0 48.5

Culture and Sport Culture and Arts 600.0 161.6Sports Stadia 600.0 n.a.(c)

Regional Growth - Environment and Tourism fund 300.0

Other opportunities Corridor Identification and Reservation 100.0 1.0

Total (d) $20,000.0 $9,318.3 $929.1

(a) In some cases the amount included is less than the expected total cost of the project and funding from other sources will be required.

(b) The Restart NSW Fund commitments include the amounts to be repaid for Consolidated Fund advances. (c) Commercial in Confidence. (d) The total Rebuilding NSW commitments are $10.2 billion which comprises $9.3 billion from the Restart NSW Fund with the balance

advanced from the Consolidated Fund.

3.3 Delivering Rebuilding NSW

Rebuilding NSW commitments

A total of $10.2 billion has now been committed to the $20 billion Rebuilding NSW plan (see Table 3.1). This includes $1.0 billion budgeted to be spent in 2015-16 and a further $2.3 billion allocated in 2016-17.

Since the 2015-16 Budget, a further $9.2 billion has been committed from Restart NSW to deliver the $20 billion Rebuilding NSW plan.

3 - 2 Infrastructure Statement 2016-17

Page 38: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

Urban public transport

Public transport is critical to urban productivity, expanding employment opportunities by connecting people to jobs, reducing congestion, and driving urban renewal. The Rebuilding NSW plan includes $8.9 billion for the urban public transport priority area, with $8.3 billion committed since the 2015-16 Budget1 for:

• Sydney Metro City and Southwest ($7.0 billion) (Box 3.1)

• Existing Network Enhancements (previously Sydney's Rail Future Stage 2) ($1.0 billion) (Box 3.2)

• Bus Priority Infrastructure (including B-Line) ($290.4 million) (Box 3.5).

Box 3.1: Sydney Metro City and Southwest

Project: Sydney Metro City and Southwest is a new 30 kilometre metro line linking with Sydney Metro Northwest at Chatswood, through new stations in the lower North Shore, a line under Sydney Harbour and then through the CBD and southwest to Bankstown. Delivery is expected for 2024 with the capacity to deliver metro services every two minutes during peak hour.

Funding allocation: The Government has committed $7.0 billion of proceeds from the Rebuilding NSW plan for the project. This will be combined with funding from within Transport for NSW’s ongoing allocations to fully fund the project. This Budget allocates $1.4 billion in 2016-17 and $6.2 billion over the Budget and forward estimates period.

Service delivery objective: Sydney Metro City and Southwest, together with the Existing Network Enhancements project, will deliver on the strategic vision outlined in Sydney's Rail Future. These projects combined will provide more regular and faster services across the Sydney rail network. These projects will reduce crowding at stations and on services and will improve reliability across the entire network. It is expected to result in around 30 million fewer car trips annually in 2036.

Implementation: Major construction will begin next year, with the first tunnel boring machine to be in the ground before the end of 2018. New twin railway tunnels will be constructed, stretching 15.5 kilometres from Chatswood to Sydenham, including a second rail crossing of more than 40 metres below the Sydney Harbour. A specialised tunnel boring machine combining two types of tunneling technology will be required to deal with the unique conditions.

Outcomes: Sydney Metro City and Southwest will:

• reduce travel times between key centres

• improve reliability across the entire Sydney transport network

• drive economic growth by supporting jobs and business growth along its route

• improve access to jobs and reduce congestion

• create housing and employment opportunities along the line.

1 Some expenditure against these commitments has occurred in 2015-16.

Infrastructure Statement 2016-17 3 - 3

Page 39: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

Box 3.2: Existing Network Enhancements

Project: Existing Network Enhancements will deliver on key commitments made as part of the second stage of Sydney's Rail Future including integrating the South West Rail Link and Sydney Metro Northwest with the rest of the heavy rail network.

Funding allocation: The Government has committed proceeds from the Rebuilding NSW initiative for the project. The 2016-17 Budget has allocated $407 million in 2016-17 to plan, develop and deliver rail infrastructure and improve fleet reliability.

Service delivery objective: The primary objective of the Existing Network Enhancements project is to ease congestion of the rail network and deliver new, more frequent and reliable train services.

Implementation: Work has started on the planning and delivery of the project which is expected to be completed by December 2019.

Outcomes: The Existing Network Enhancements project will:

• provide a modern fully air-conditioned and reliable train fleet

• increase the frequency of available train services across the rail network

• help ease rail congestion and improve travel times, particularly during peak hours

• enhance the operational efficiency of the rail network by improving flow and balancing service loads.

Water security

The Rebuilding NSW plan includes $1.0 billion for the Regional Water Security and Supply Fund to address water challenges faced by regional communities in New South Wales, including Cobar and Broken Hill. This includes addressing deficiencies in drinking water quality, capacity to meet water demand, drought security, dam safety and inadequate wastewater treatment.

New expenditure commitments since the 2015-16 Budget include funding to ensure the long term security of Broken Hill’s water supply (Box 3.3).

Box 3.3: Broken Hill Water Supply

Project: To ensure long term water security for Broken Hill, a 270 kilometre long pipeline will be built that will source water from the Murray River and pump it directly to the existing water treatment plant in Broken Hill.

Funding allocation: The Government has allocated around $500 million from the Restart NSW Fund (including funds allocated in the Rebuilding NSW plan) for Broken Hill’s water supply. The funding is a centrepiece of the broader Water Security for Regions program. The long-term water supply project is the culmination of a range of Broken Hill water development projects funded from Restart NSW in 2014-15 and 2015-16, totalling $54.3 million.

Service delivery objective: Water security, water quality and the long-term cost of water are vital community concerns for all residents in the State. Broken Hill and surrounding communities have suffered from significant water shortages and uncertainty over decades with resulting consequences for community health and well-being, economic development and general household and business confidence.

Implementation: Work has started on planning and scoping the project. The pipeline is due to be completed in late 2018.

Outcomes: The Murray River to Broken Hill pipeline will:

• provide a secure long term water source for Broken Hill and surrounding communities

• improve business confidence and support economic growth in the Broken Hill region

• improve residents’ health and quality of life through the provision of high quality and secure water. The health and well-being benefits result from greater lead dust suppression and operation of evaporative air coolers

• benefit irrigation communities in New South Wales through more effective use of a limited water resource.

3 - 4 Infrastructure Statement 2016-17

Page 40: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

Sports and cultural infrastructure

The Rebuilding NSW plan includes $1.5 billion for the culture and sport priority area. New expenditure commitments since the 2015-16 Budget include funding for Western Sydney Stadium (Box 3.4) and planning for an indoor sports facility.

Box 3.4: Western Sydney Stadium

Project: The Western Sydney Stadium will be a new venue constructed on the existing Pirtek Stadium site at Parramatta.

Funding allocation: The project will be funded from the $600 million Sports Stadia Fund in Rebuilding NSW. A call for expressions of interest was released in June 2016.

Service delivery objective: The investment in the stadium will support the Government’s priorities in building infrastructure and is a key initiative to rebuild and improve the stadia network in New South Wales.

Implementation: The project has been approved and planning is well advanced. The project will be delivered by INSW on behalf of Venues NSW. Construction is expected to begin in the 2016-17 financial year.

Outcomes: The Western Sydney Stadium is the first of a sequence of planned stadia projects which will:

• boost the Government’s capacity to attract premium international and national level events to New South Wales

• consolidate the State’s stadia, particularly in Greater Sydney

• serve to transfer economic activity to New South Wales (including Western Sydney) and drive economic benefits through productivity and participation

• improve liveability of Greater Sydney, particularly through the increase in the prominence of sport, entertainment and community activity at venues and surrounding precincts

• support the growth of Greater Parramatta as Sydney’s second CBD under A Plan for Growing Sydney, the Government’s plan for the future of the Sydney Metropolitan Area over the next 20 years.

Consolidated Fund advances

A total of $929.1 million in Consolidated Fund advances have now been committed (as set out in Table 3.1) to progress planning for Rebuilding NSW projects and to start specific critical works identified in the SIS 2014. The 2016-17 Budget provides $484.5 million in funding to 2019-20, including:

• Future Focused Schools and Regional Schools Renewal program ($163.0 million)

• Culture and Arts ($140.6 million)

• Regional Road Freight Corridor ($52.2 million)

• Primary and Integrated Care Strategy ($48.5 million)

• Regional Growth Roads ($25.0 million)

• Smart Motorways ($21.3 million)

• Fixing Country Rail ($11.0 million)

• Traffic Management Upgrades ($9.5 million)

• Bridges for the Bush ($7.4 million)

• Gateway to the South ($6.0 million).

Infrastructure Statement 2016-17 3 - 5

Page 41: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

The undertaking of early planning achieves the objectives of:

• addressing the requirements of INSW, whose recommendation of individual projects is a precondition to funding from the Rebuilding NSW proceeds

• avoiding delays in the implementation of the programs when the Rebuilding NSW funding is available

• ensuring the projects selected are the best value for money for achieving the program’s objectives.

Funding for these Rebuilding NSW acceleration initiatives follow on from the acceleration initiatives in the 2015-16 Budget.

2015-16 Budget Rebuilding NSW acceleration update

The 2015-16 Budget provided $590.6 million over four years to prepare for the delivery of major projects and programs and to start specific critical works identified in the SIS 2014. Of this, $444.6 million was allocated from the Consolidated Fund and the remaining $146.0 million was a contribution from Restart NSW. New expenditure commitments since the 2015-16 Budget as a result of the acceleration of planning include the Existing Network Enhancements and B-Line projects (Box 3.5).

Box 3.5: B-Line (Northern Beaches)

Project: The B-Line is an integrated package of services and infrastructure to deliver better bus services for customers travelling between the Northern Beaches and Sydney CBD.

Funding allocation: The 2016-17 Budget has allocated $210 million in 2016-17 to the delivery of this project.

Service delivery objective: The primary objective of the B-Line is to deliver a new, more frequent and reliable bus service for Northern Beaches customers.

Implementation: The first B-Line services are expected to be operational in late 2017, while the existing bus service changes and infrastructure enhancements will be delivered in a staged approach starting from early 2016.

Outcomes: The B-Line will provide several improvements for residents and motorists, including:

• more frequent and reliable bus services

• reduced congestion and shorter travel times

• a simpler bus network with fewer vehicles on the bus route between Northern Beaches and Sydney CBD, improving safety and local air quality and reducing traffic noise.

3.4 Investing in regional New South Wales

The Government is committed to investing in regional New South Wales to support long term economic growth and strong communities. In aggregate, $6.0 billion of the Rebuilding NSW plan is directed to regions outside the metropolitan areas of Newcastle, Sydney and Wollongong.

Investing in regional infrastructure is a key priority of the Government. The Rebuilding NSW plan provides additional funding for nine programs that will make significant contributions to improving access to education and health services, lifting freight productivity and addressing water security issues in regional communities.

3 - 6 Infrastructure Statement 2016-17

Page 42: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

Box 3.6: Rebuilding NSW plan - regional investment

The Rebuilding NSW plan provides additional funding for nine programs.

Table 3.2: Programs in regional New South Wales

Program/Project Description

Bridges for the Bush Improves road freight productivity by replacing or upgrading bridges in regional New South Wales.

Fixing Country Roads (see Box 3.7)

Improves local and regional roads managed by local government in country areas, especially roads allowing higher mass vehicles to operate.

Fixing Country Rail Targets regional rail freight improvements to support primary producers and regional jobs.

Regional Growth - Environment and Tourism fund

Supports regional environmental and tourism facilities to support local economies.

Regional Growth Roads

Supports road network improvements in regional centres experiencing strong population growth. This investment will focus on the Central Coast, Lower Hunter works to improve traffic efficiency, southern Illawarra, and the North Coast.

Regional Multipurpose Services (MPS) Facilities

Improves health infrastructure in regional areas.

Regional Road Freight Corridor

Improves key road and rail freight corridors in regional areas.

Regional Schools Renewal program

Improves schools and education facilities in regional areas.

Regional Water Security and Supply Fund

Secures water supplies and drought-proofs regional communities including dams and bores.

The funding provided by the Rebuilding NSW plan for these programs (in total $6.0 billion), is in addition to the funding provided for the other 11 Restart NSW Fund programs (approximately $935 million at 30 June 2016) and will make significant contributions to regional New South Wales (see Chapter 2).

Box 3.7: Fixing Country Roads program

Program: The Government’s Fixing Country Roads program (part of the Restart NSW Fund) is designed to remove network pinch points also known as ‘last mile’ hotspots that constrain the efficient movement of freight. The program funding is for projects on council owned roads and bridges.

Fixing Country Roads targets projects that better connect local roads to state highways and key freight hubs such as silos, saleyards, rail heads, supermarket distribution centres, industrial parks and depots. These connections help freight get from paddock and factory to their customer and port faster thereby reducing costs and enabling New South Wales’ producers and manufacturers to compete nationally and internationally.

Funding allocation: The 2015-16 Budget included a $43 million Restart NSW reservation for Fixing Country Roads projects across New South Wales. In the 2016-17 Budget, the Government budgeted a further $50.0 million in funding for Fixing Country Roads projects. The total value of Round 2 projects, including those with funding through additional contributions from Australian Government programs, local councils and industry, is $130.8 million.

Service delivery objective: To provide funds to councils to upgrade local infrastructure and assist freight operators, agricultural industries and regional communities right across the State.

Implementation: The road and bridge projects were selected by an independent assessment panel for their capacity to boost freight productivity and ease network capacity constraints on key freight roads.

Infrastructure Statement 2016-17 3 - 7

Page 43: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Rebuilding NSW

Box 3.7: Fixing Country Roads program (cont)

Chart 3.1: Fixing Country Roads projects as at the 2016-17 Budget

3 - 8 Infrastructure Statement 2016-17

Page 44: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

4. STATE INFRASTRUCTURE PLAN

4.1 Introduction

This State Infrastructure Plan (SIP) outlines the major projects that have been funded for delivery in the period 2016-17 to 2020-21.

The SIP represents the Government’s program of specific major infrastructure projects identified as priorities for delivery over the next five years.

The 2016-17 SIP reflects the start of the delivery phase for many significant projects. As part of this Budget, Government investment commitments will see new projects get underway, building on the significant progress made in 2015-16, including:

• Sydney Metro City and Southwest, which now has a finalised project scope, including a new Waterloo station, has started its planning approval process, with major construction due to start next year

• WestConnex Stage 2, with the upgrade of the King Georges Interchange half completed and planning approval in place for the new M5

• Pacific Highway duplication, with 62 per cent of the highway now duplicated and a further 145 kilometres currently under construction

• a site selected for a new Grafton correctional facility

• the investment in a new Western Sydney Stadium at Parramatta, with major construction expected to start in early 2017 for completion in 2019

• investment in new rail network enhancements and fleet availability to integrate Sydney Metro Northwest and the South West Rail Link and provide more express services for Western Sydney.

The development of this SIP was informed by independent advice submitted to the Premier by Infrastructure NSW (INSW), pursuant to Section 2 of the Infrastructure NSW Act 2011.

4.2 Governance and assurance

In 2015-16, the Government adopted and implemented an Infrastructure Investment Assurance Framework (IIAF). The purpose of the IIAF is to ensure the State’s capital projects are being effectively developed and delivered efficiently, on time, on budget, and in accordance with the Government’s objectives. The framework includes the creation of the Infrastructure Investment Assurance Committee (IIAC), chaired by INSW and comprising the heads of key agencies. The IIAC’s role is to advise the Government on the development, procurement, delivery, governance and management of infrastructure projects, with a focus on High Profile/High Risk (HPHR) projects.

The IIAF adopts a risk-based approach to investor assurance where more scrutiny is applied to projects with higher risk and higher cost. Projects identified as HPHR are given particular attention and oversight. The IIAC’s role is to support the Premier and the Minister for Transport and Infrastructure with effective tools to monitor the Government’s infrastructure program, receive early warning of any emerging issues, and ensure Government is able to act ahead of time to prevent further issues arising. This, in turn, enables the Government to act as an informed investor, confident that new capital is being used efficiently and effectively to further the Government’s objectives for New South Wales.

Infrastructure Statement 2016-17 4 - 1

Page 45: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

4.3 The role of this State Infrastructure Plan

Good infrastructure is a key foundation of New South Wales’ economic and social prosperity. Sound infrastructure investments can increase economic opportunities available to the people of New South Wales, improve the quality of services and enhance the social connections that communities rely on in day to day life.

In considering and prioritising new investments, the Government carefully considers the opportunities each investment proposal can unlock. Funded projects are then managed to ensure that projects are delivered efficiently, on time and on budget, in a way that ensures the targeted outcomes are realised for the people of New South Wales.

In formulating the SIP, the Government has aligned its investment decisions with its vision for the future of the State and its communities. The section below sets out the central priorities of the Government that have informed this SIP, and how the priority projects connect to a stronger, more prosperous future for New South Wales.

4.4 Priorities for New South Wales

In September 2015, the Premier announced 30 State Priorities for the Government’s vision of a stronger, more prosperous NSW. Within these commitments, the Premier has nominated 12 priorities to provide particular focus on ways of making the State a better place to live and work.

NSW State priorities relating to infrastructure include:

• improving road travel reliability

• ensuring on-time running for public transport

• increasing housing supply across New South Wales by delivering more than 50,000 new approvals every year

• creating sustainable social housing and increasing the number of households successfully transitioning out of social housing by five per cent over three years

• cutting wait times for planned surgeries

• increasing cultural participation.

With these priorities in place, agencies can plan and develop investment proposals more effectively, and position the Government to make more consistent and better integrated investment decisions over time.

Figure 1: The NSW Government’s planning framework for infrastructure

Vision for NSW Premier’s and State Priorities

20-year Infrastructure Pipeline State Infrastructure Strategy

5-year Funded Program State Infrastructure Plan

Integrated metropolitan, district & regional plans

A Plan for Growing Sydney, District Plans

4 - 2 Infrastructure Statement 2016-17

Page 46: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Figure 1 above shows the intended alignment between the priorities, planning and investment decision making.

Each Government priority has helped shape the decisions informing the 2016-17 Budget. However, some priorities are of particular relevance when considering investment proposals.

For example, one of the Premier’s Priorities is building infrastructure on time and on budget in order to alleviate the pressures that population growth can have on existing infrastructure. A number of other priorities also bear a close relationship to infrastructure investment, including:

• creating jobs, with a target of 150,000 jobs in this term of office

• faster housing approvals, with 90 per cent of approvals determined within 40 days

• improving government services, as measured by customer satisfaction.

These objectives are central to the Government’s aspirations for the future. The following sections set out the links between the Government’s vision, and the way in which the projects in this SIP have been identified, developed, and prioritised for New South Wales.

4.5 Passenger trains

The metropolitan rail network not only plays an essential role in ensuring quality of life for those who work or live in Greater Sydney, but also is a key enabler of economic activity across the entire State.

The strategic direction for the rail network was detailed in Sydney’s Rail Future, which included new infrastructure and modes of service delivered in parallel with operational efficiencies and improvements to the customer experience. The Budget allocates more than $1 billion over four years for growth trains on the suburban passenger network. Passenger rail projects include:

• Sydney Metro City and Southwest, a new 30 kilometre metro line linking with Sydney Metro Northwest at Chatswood, with new stations in the lower North Shore, a line under Sydney Harbour and through the CBD, including stations at Barangaroo and Waterloo, and southwest to Bankstown

• Existing Network Enhancements, including station upgrades and accessibility

• Next Generation Rail Fleet to deliver a new fleet of state of the art intercity trains

• Commencement of replacement of the 30 year old XPT fleet.

Delivery of the following major projects and programs continues in this SIP in order to support the strategic direction for rail.

Table 4.1: Major projects and programs for passenger trains

Project Name Estimated Total Cost Description

Sydney Metro Northwest $8.3 billion 23 kilometre network from Epping to beyond Rouse Hill in North West Sydney as part of the new Sydney Metro Network

Transport Access Program $280.3 million (2016-17) Improvements to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure where it is needed most.

Wynyard Walk $306.0 million Pedestrian link between Wynyard Station and the developing CBD western corridor and Barangaroo.

Automatic Train Protection $100.4 million (2016-17) Progressively fit the network and fleet with European Train Control System Level 1: a signaling, control and train protection system in the driver’s cabin that interfaces with the trackside signaling system.

Infrastructure Statement 2016-17 4 - 3

Page 47: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.1: Major projects and programs for passenger trains (cont)

Project Name Estimated Total Cost Description

Next Generation Rail Fleet $130.4 million (2016-17) A new fleet of state of the art intercity trains, including about 440 brand new carriages, which will carry passengers to the Central Coast, Newcastle, the Blue Mountains and the Illawarra. The project includes a new maintenance facility.

Sydney Metro City and Southwest $1.4 billion (2016-17) A second harbour rail crossing and western extension as part of the new Sydney Metro network.

Rail Operational Centre $90.4 million (2016-17) A consolidated rail operations centre to improve operations and incident management.

Existing Network Enhancements $406.6 million (2016-17) Enhancements to infrastructure and fleet to provide increased and improved rail services, including more express services to Western Sydney.

4.6 Urban roads

Roads are a critical class of infrastructure. Private vehicles, bus services, and freight are all served by road infrastructure, with around 80 per cent of Sydney’s passenger and freight movements made by road. Congested roads carry significant costs in terms of higher freight costs and longer commuter journeys. This combination, in turn, has measurable costs in terms of reduced productivity and economic growth.

Road infrastructure investment is not only about delivering new roads, but also about targeting bottlenecks on existing corridors. These investments, in aggregate, boost productivity, grow the economy and create new jobs by reducing congestion across the network.

The following have been identified as strategic priorities for the State’s urban road infrastructure:

• upgrading and improving the efficiency of urban roads

• completing the missing links on Sydney’s motorway network

• identifying new road corridors and improving connections to and within Sydney’s growth centres.

The following major projects (Table 4.2) include those currently underway and those to commence over the five years of this SIP. These will support achieving State Priorities of on time running for peak travel and public transport services.

4 - 4 Infrastructure Statement 2016-17

Page 48: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.2: Major projects for urban roads

Project Name Estimated Total Cost Description

WestConnex $16.8 billion Widening and extending the M4 and M5 and joining them together to form a continuous free flowing motorway, with connections to northern and southern Sydney. The project is being delivered in three stages – Stage 1 from Parramatta to the City West Link, Stage 2 is the New M5 East, including the Enhanced Sydney Gateway, and Stage 3 from the City West Link to St Peters.

WestConnex will help alleviate Sydney’s congestion program. It will deliver more than $20 billion of economic benefits, serve more than 480,000 travelers per day, and is estimated to help drivers bypass up to 52 sets of traffic lights.

Western Sydney Growth Roads Program – Major Projects

• Brandon Road Link, Windsor Road to Richmond Road (planning)

• Memorial Avenue, Old Windsor Road to Windsor Road (planning)

• Camden Valley Way, Bringelly Road to Ingleburn Road

• Jane Street and Mulgoa Road Infrastructure Upgrade Memorial Avenue, Old Windsor Road to Windsor Road (planning)

• Narellan Road, Camden Valley Way to Blaxland Road

• Old Wallgrove Road, Erskine Park Link Road to M7 (Western Sydney Employment Lands)

• Richmond Road (Stages 2 and 3), Townson Road to North of Garfield Road

• Schofields Road (Stage 2), Tallawong Road to Veron Road

• Schofields Road (Stage 3), Veron Road to Richmond Road via South Street

• The Horsley Drive, Ferrers Road to M7 (planning)

$146.7 million (2016-17)

Major road upgrades and expansions to accommodate population and employment growth in Western Sydney, including the North West and South West Growth Centres and Western Sydney Employment Lands. The aim is to link the Greater Sydney workforce and business community with broader employment opportunities and markets, including through national and international gateways.

NorthConnex (M1 to M2) $3.0 billion A nine kilometre tunnel motorway linking the M1 and M2. This project is in part privately financed.

Easing Sydney’s Congestion (Pinch Points & Clearways)

$246.0 million Measures to relieve traffic congestion and improve network efficiency at key hour traffic hotspots.

Northern Beaches Hospital, Road Connectivity and Network Enhancements

$500.0 million Road upgrades to support the Northern Beaches Hospital.

4.7 Buses and light rail

Buses are the primary form of public transport for many people across areas of Greater Sydney. Sydney’s Bus Future sets out a detailed strategic direction for the Sydney bus network to deliver simpler, faster and better bus services for customers. Buses provide flexible services and bus rapid transit infrastructure can deliver high capacity at relatively low cost.

Infrastructure Statement 2016-17 4 - 5

Page 49: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Light rail is set to play a much greater role in moving people around Sydney and Newcastle in the future, with major work on delivery of the CBD and South East Light Rail commenced and Newcastle Light Rail currently in the planning process. Once the CBD and South East Light Rail is complete in 2019, it will add to the current light rail network between Central and Dulwich Hill via Pyrmont and Lilyfield. Planning work for an integrated light rail solution for the Parramatta area, running between Westmead and Homebush via the Parramatta CBD, is also funded in this SIP.

The following major projects in Table 4.3, currently underway or expected to commence within the next five years, will contribute to delivering the Government’s priorities.

Table 4.3: Major projects for buses and light rail

Project Name Estimated Total Cost Description

CBD and South East Light Rail $2.1 billion New light rail line extending from Circular Quay along George Street to Central Station then to Kingsford via Anzac Parade and Randwick via Alison Road.

Bus Priority Infrastructure (including B-Line) $233.8 million (2016-17) Targeted bus priority infrastructure works on strategic corridors to increase timetable reliability and reduce delays, including on the Northern Beaches and in the Sydney CBD.

218 New Buses to Cater for NSW Services $108.4 million (2016-17) Procure bus fleet and accommodate growth in services.

Newcastle Light Rail $142.0 million (2016-17) To revitalise Newcastle through the truncation of the heavy rail line and introduction of light rail services.

Parramatta Light Rail $64.0 million (2016-17) To progress planning and development works for the Parramatta Light Rail project.

4.8 Ferries

Ferry services provide a practical commute to Sydney’s CBD for customers that reside close to Sydney Harbour and the Parramatta River. Ferries play a unique role in supporting Sydney’s transport task and taking pressure off land based infrastructure in Greater Sydney, with benefits in reducing congestion across other modes of transport.

The following major projects in Table 4.4, currently underway or expected to commence within the next five years, will contribute to delivering the Government’s priorities.

Table 4.4: Major projects for ferries

Project Name Estimated Total Cost Description

Growth Services Parramatta River $25.5 million To provide additional ferries for Parramatta River.

Barangaroo Ferry Wharf $17.2 million (2016-17) To construct a new dual berth ferry wharf at Barangaroo precinct.

Ferry Fleet Replacement $51.6 million To replace some of Sydney’s iconic First Fleet Ferries.

4.9 Regional and interstate transport

Safe, efficient and reliable transport connections are vital to regional communities and businesses. Regional and interstate transport infrastructure supports the economy and quality of life of New South Wales by connecting regional communities, allowing people to access employment opportunities, and supporting freight movements.

4 - 6 Infrastructure Statement 2016-17

Page 50: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Key regional and interstate transport infrastructure strategic priorities include:

• upgrading regional road and rail networks, particularly those linking the regions with Sydney and interstate destinations

• supporting improvements on the major freight rail routes

• reserving regional transport corridors and investigating future investment requirements.

The following major projects in Table 4.5, currently underway or expected to commence within the next five years, will contribute to delivering Government’s priorities and growing the economies of regional New South Wales.

Table 4.5: Major projects for regional and interstate transport

Project Name Estimated Total Cost Description

Pacific Highway – Major Projects

• Oxley Highway to Kundabung • Kundabung to Kempsey • Warrell Creek to Nambucca Heads

• Nambucca Heads to Urunga • Woolgoolga to Ballina • Coffs Harbour Bypass (planning)

The Australian Government will contribute up to $5.6 billion from 2013-14 towards upgrading the Pacific Highway. The NSW Government will contribute $201.6 million in 2016-17.

Staged upgrade to increase dual carriageway length as part of the current jointly funded program to improve travel times, road safety, freight efficiency and traffic conditions on the Pacific Highway.

Funding for this program includes Australian Government and Restart NSW contributions.

Princes Highway – Major Projects

• Foxground and Berry Bypass • Albion Park Rail Bypass (planning and

pre-construction)

• Berry to Bomaderry upgrade (pre-construction)

• Princes Motorway improvements, Bulli Tops to Picton Road (planning)

• Princes Motorway, Interchange at Base of Mount Ousley (planning)

• Nowra bridge over the Shoalhaven River (planning)

• Dignams Creek Realignment

• Burrill Lake Bridge Replacement

$197.7 million (2016-17) Upgrades to sections of the Princes Motorway/Highway to improve road safety, reduce travel time and improve local amenity. Some projects include Australian Government and Restart NSW contributions.

Central Coast Roads – Major Projects

• Pacific Highway, Wyong Town Centre (planning)

• Pacific Highway, Ourimbah Street Lisarow to Glen Road, Ourimbah

• Pacific Highway, Parsons Road, Lisarow to Ourimbah Street, Lisarow (planning)

• Pacific Highway and Manns Road, Narara Creek Road, Narara to Parsons Road, Lisarow (planning)

• Pacific Motorway Widening, Kariong Interchange to Somersby Interchange

• Pacific Motorway Widening, Wyong Road to Doyalson Link Pacific Highway, Wyong Road Intersection Upgrade

• Terrigal Drive, Chetwynd Road to Duffys Road Terrigal Widening (planning)

• Wyong Road, Enterprise Drive Intersection Upgrade

• Wyong Road, Mingara Drive to Tumbi Road Upgrade

$149.7 million (2016-17) Upgrade to key sections of the Central Coast road network to support population growth, reduce travel times, improve safety and enhance the critical freeway link between Sydney, the Central Coast and Newcastle.

Some projects include Australian Government funding contributions.

Infrastructure Statement 2016-17 4 - 7

Page 51: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.5: Major projects for regional and interstate transport (cont)

Project Name Estimated Total Cost Description

Bridges for the Bush Program

• Oxley Highway, Gunnedah Bridge over Rail

• Cobb Highway, second bridge over the Murray River (NSW contribution) (planning)

• Program 2: Timber Truss Bridge Upgrades and Replacements

• Program 3: Bridges for the Bush (planning)

• Minor bridge works

$63.8 million (2016-17) Program to replace and upgrade bridges on key freight routes in regional NSW. These works will enable use of high productivity vehicles. Staged construction commenced in 2013-14.

These works include Restart NSW and Australian Government contributions.

Hunter Roads – Major Projects

• Cormorant Road, Industrial Drive to Stockton Bridge

• Newcastle Inner City Bypass, Rankin Park to Jesmond (planning)

• New England Highway, Scone Bypass • New England Highway, Upgrade of

Maitland roundabouts • New England Highway, Belford to

Golden Highway Upgrade (planning) • New England Highway, Gowrie Gates,

Widen Rail Underpass (planning)

• New England Highway, Muswellbrook Bypass (planning)

• New England Highway, Singleton Bypass (planning)

• Pacific Motorway (M1) Extension to Raymond Terrace (planning)

$74.0 million (2016-17) Planning and investment for works to address localised impact of mining related activity and population growth.

Some projects include Australian Government funding contributions.

Great Western Highway – Major Projects

• Forty Bends and Hartley Valley Safety Improvements

• Kelso, Ashworth Drive to Stockland Drive

• Katoomba to Mount Victoria Safety Works

$88.3 million (2016-17) Upgrade projects for the road network between Sydney and Central Western NSW.

Some projects on the Great Western Highway include Australian Government funding contributions.

Bells Line of Road Corridor Improvement Program (Stages 1 and 2)

$8.4 million (2016-17) This program includes enhanced overtaking opportunities, realignments and safety works on Bells Line of Road and Chifley Road between Bell and Lithgow. This is partly funded by Restart NSW.

Newell Highway

• Overtaking lanes program • Upgrade at Parkes (planning)

• Realignment at Grong Grong • Moree Bypass Stage 2 • Realignment at Trewilga • Heavy duty pavement upgrades between

Mungle Back Creek and Boggabilla.

• Improvements through Coonabarabran (planning)

• Improvements through Dubbo and duplication of the L.H. Ford Bridge (planning)

• West Wyalong Heavy Vehicle Bypass

$45.6 million (2016-17) Upgrades to improve safety, increase overtaking opportunities, address impacts of traffic through regional towns, and support improved freight productivity. Part of a $500 million NSW Government commitment.

4 - 8 Infrastructure Statement 2016-17

Page 52: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.5: Major projects for regional and interstate transport (cont)

Project Name Estimated Total Cost Description

Journey Reliability $46.3 million (2016-17) Program of works to support road network reliability across New South Wales. Works under this program include installation of overtaking lanes, flood mitigation and sealing of gravel roads.

Grafton Bridge $36.0 million (2016-17) Funding provided for construction. This project is partly funded by Restart NSW.

4.10 International gateways

Efficient, reliable access to and from the State’s international gateways supports some of the State’s most important journeys and is a critical element in sustaining the future productivity and competitiveness of Sydney and New South Wales.

Significant growth is forecast over the next 20 years in interstate and international travel and movement of freight. Sydney Airport and Port Botany are already the busiest airport and second-busiest container port in the country, respectively. Together they link the people of New South Wales, tourists, and exported goods to other states and international markets.

Meeting this growth presents a challenge. Sydney Airport’s capacity is limited by hourly movements and curfew, which constrains medium term demand growth. While Port Botany and Sydney Airport can absorb some of the task in accommodating freight growth, a second Sydney airport at Badgerys Creek is a critical step in underwriting continued economic growth for both New South Wales and Australia.

The following strategic priorities are accommodated over the life of this SIP:

• planning for a new airport at Badgerys Creek and delivering the supporting road upgrades

• delivering improvements to the Sydney Airport precinct’s road network

• improving public transport to Sydney Airport

• improving utilisation of regional airports

• improving freight rail

• upgrading major motorway connections to the port and airport precinct

• delivering improvements to the precinct’s road network.

The following major projects in Table 4.6, currently underway or expected to commence within the next five years, will deliver on this strategic vision.

Infrastructure Statement 2016-17 4 - 9

Page 53: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.6: Major projects for international gateways

Project Name Estimated Total Cost Description

Western Sydney roads to support Sydney’s second airport at Badgerys Creek

• The Northern Road, Narellan to the M4 Motorway

• New motorway from the M7 Motorway to The Northern Road

• Bringelly Road, Camden Valley Way to The Northern Road

• Werrington Arterial Stage 1

• Local road upgrades

$3.6 billion Major road upgrades and new road infrastructure over ten years to support the development of an airport at Badgerys Creek. These works include a local roads package to be undertaken by councils.

These works include Restart NSW funding and Australian Government contributions.

Moorebank Intermodal Facility n.a. (a) The Government is working with the Australian Government and the private sector to develop the Moorebank intermodal site to increase the proportion of container movements carried by rail. This is to support growth in container freight volumes and reduce the growth rate in truck movements to and from the port precinct.

Sydney Gateway $800 million Sydney Gateway is a link from WestConnex to Sydney Airport and Port Botany, Australia’s largest international gateways. The cost is included within the $16.8 billion estimated total cost for the WestConnex project.

(a) The estimated total cost has not been included due to its commercially sensitive nature.

4.11 Energy

The electricity industry in New South Wales operates as part of the National Electricity Market and comprises generation, transmission, distribution and retail. The ownership structure of the industry has changed significantly over the past few years, with the sale of Government-owned electricity retailers and generation facilities. More recently, the successful long-term lease for the high voltage network TransGrid was finalised. The partial long-term lease of the low voltage distribution network Ausgrid is now underway and the transactions process for Endeavour Energy will proceed in the coming period. Further, the Independent Pricing and Regulatory Tribunal’s 2014-15 review found that electricity market competition is effective in New South Wales.

The market environment in New South Wales is also changing. A number of coal-based generators across the State are proposed for closure. Renewable energy sources continue to increase, with approximately one third of installed capacity in New South Wales in the form of renewable technologies such as solar photovoltaics, wind and hydro generation. Also, total electricity demand per capita in New South Wales has declined each year since 2009, even as gross state product has continued to grow. Finally, the Government has committed to a market-led, voluntary roll-out of advanced meters in New South Wales to facilitate energy market innovation.

The eastern Australian gas market is also facing a period of significant change in both supply and demand over the coming years. New South Wales is heavily dependent on gas supplied from other States. The Government, through the NSW Gas Plan, is creating a framework to secure gas supplies for New South Wales by establishing a safe, secure gas industry in the state.

4 - 10 Infrastructure Statement 2016-17

Page 54: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Combined with rapid advancements in energy generation, storage and efficiency technologies, these trends present a number of challenges and opportunities in ensuring customers have access to secure, competitive and affordable energy. The following actions are strategic priorities for the State’s electricity infrastructure:

• the long-term lease of 49 per cent of the electricity transmission and distribution networks, with the successful long-term lease of TransGrid now finalised and the partial long-term lease of Ausgrid now underway to drive further efficiencies and yield benefits to consumers

• developing the State’s resources responsibly

• exploring opportunities presented by emerging energy generation, storage, and efficiency technologies

• increasing renewable energy generation in New South Wales through the NSW Renewable Energy Action Plan

• implementing 30 actions to drive energy efficiency through the Energy Efficiency Action Plan

• implementing clear and effective standards and policies for water and energy use, and waste management in government operations through the NSW Government Resource Efficiency Policy.

4.12 Water

Record temperatures and extended periods of hot and dry weather have been experienced across New South Wales in recent years.

Water security underpins the economic prosperity of our regional towns and centres. It is fundamental to driving the sustainable growth of our $12 billion primary industries sector. The Government has established a dedicated $1 billion Regional Water Security and Supply Fund as part of the Rebuilding NSW initiative in order to respond to water challenges.

The Government will continue to improve water infrastructure so that regional communities have a secure, sustainable and affordable water supply that meets drinking water quality and effluent guidelines. The Regional Water Security and Supply Fund will ensure regional communities have reliable access to good quality water supplies by replacing aged assets and bringing systems up to modern standards.

Securing Broken Hill’s water supply will be a key priority in 2016-17 (see Box 3.3). The investment supports New South Wales commitments under the Murray Darling Basin Plan and will bring significant catchment-wide benefits for northern and southern irrigation industries. Under the proposal, Broken Hill will no longer rely on Menindee Lakes. This will enable New South Wales to keep more water in productive use within the Murray Darling Basin Plan and realise the full economic value of this precious water resource.

Restart NSW also continues to fund a range of smaller local infrastructure projects in order to improve water security in the regions. At Cobar, the Albert Priest Channel project will save 4,000 mega litres of water per annum, meaning that the frequent and severe water restrictions being imposed in Nyngan and Cobar can be eased. There are another 33 approved drought projects under the Water Security for Regions program. Infrastructure NSW is assessing a further 45 projects for funding under the Regional Water and Wastewater Backlog program. This initiative follows on from over $230 million spent since 2011 on 35 projects under the Country Towns Water Supply and Sewerage Program providing capital funding for water supply and sewerage projects to water utilities.

The Government continues its reform program to ensure that the best functional arrangements are in place to deliver secure and safe drinking water supplies throughout New South Wales. The second stage of the reforms involves the realignment of functions between the NSW Department of Primary Industries (DPI Water) and Water NSW to remove duplication and inefficiencies within current operations and services. DPI Water will continue to produce strategic water policy and planning advice while developing and enhancing a range of water monitoring, regulation and reporting functions to support productive and sustainable management of the State’s water resources.

Infrastructure Statement 2016-17 4 - 11

Page 55: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

The Government has allocated $58.5 million over the next four years (2016-17 to 2019-20) to implement Stage One of the Hawkesbury-Nepean Valley Flood Risk Management Strategy. There has been $30.3 million allocated over four years to undertake detailed concept designs, environmental assessments and preparation of the full business case. The amount of $10.7 million has been allocated to establish a Hawkesbury-Nepean Flood Risk Directorate which will implement the strategy. A further $17.5 million will be used to deliver the non-infrastructure components of the strategy. These include community engagement, evacuation signage, regional planning, and improved flood forecasting.

For other parts of regional New South Wales, work is being undertaken to assess the needs of the Hunter, Macquarie, Gwydir and Lachlan as priority catchments under the State Infrastructure Strategy.

The following major projects in Table 4.7 are currently underway or expected to commence within the next five years and will contribute to delivering the Government’s priorities.

Table 4.7: Major projects for water

Project Name Estimated Total Cost Description

Broken Hill Water Supply Around $500 million Emergency and long-term solutions to the water needs of Broken Hill and surrounding districts, scheduled for completion by 2021.

Hawkesbury-Nepean Flood Mitigation Program

$58.5 million Implementation of Phase One of the Hawkesbury-Nepean Valley Flood Risk Management Strategy and establishment of a Hawkesbury-Nepean Flood Risk Directorate.

Growth Centre Works $543.0 million Water and wastewater system and sewerage treatment plant works over the four years to 2018-19 to service new urban development in Sydney’s North West and South West Growth Centres and a number of other minor greenfield and infill growth areas.

Sydney Water Towards 2020 (T2020) $133.4 million Implementation of an ERP platform and new billing system (T2020), to support business agility, responsiveness to regulatory changes and a more customer-centric approach.

Enterprise Resource Planning (ERP) Program

$91.3 million Implementation of an ERP platform and new billing system (T2020), to support business agility, responsiveness to regulatory changes and a more customer-centric approach.

Regional Water and Waste Water Backlog Program

Up to $110.0 million Up to 47 water and waste water infrastructure projects including new sewerage treatment plants and drinking water supply projects.

Cobar Water Supply $0.1 million Feasibility study for a pipeline to replace the Albert Priest Channel for the Cobar Water Supply system.

Priority Drought Preparedness Projects in Regional NSW

$6.0 million Feasibility studies for a new dam on the Belubula and Lachlan River.

Priority Catchments’ Infrastructure $6.0 million Options analysis to identify the optimal mix investments for the ‘hot spots’ catchments: the Gwydir, Macquarie and the Hunter.

4 - 12 Infrastructure Statement 2016-17

Page 56: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

4.13 Health

The Premier’s commitment to building infrastructure as articulated in the NSW: Making It Happen publication is a key priority for NSW Health. NSW Health is on track in delivering a significant number of Government commitments over the next four years.

Like health systems around the world, the NSW health system is facing considerable challenges to meet growing demand, driven by a growing and ageing population, chronic diseases and new healthcare technologies.

NSW Health is continuing to implement a number of strategies to address these challenges, including alternative models of care, preventative health initiatives, and utilising private and not-for-profit sector provision of services.

NSW Health facilities are valued at approximately $20 billion. This includes over 230 public hospitals and 226 ambulance stations. Public hospitals in the State are governed by either a Local Health District Board or a statutory health organisation. NSW Health is committed to ensuring that it makes the best possible use of the available capital resources to deliver better health outcomes for the people of New South Wales.

NSW Health plans to invest in infrastructure worth over $5 billion in the next four years in order to meet the challenges of a changing health care system. The total capital works program in 2016-17 is approximately $1.6 billion. The total value of capital projects starting in 2016-17 is over $910 million. Table 4.8 below outlines NSW Health’s major projects, including works already commenced and new works commencing in 2016-17. Details of other health infrastructure projects are shown in Chapter 5 of this Infrastructure Statement.

Table 4.8: Major projects for health

Project Name Estimated Total Cost Description

Dubbo Base Hospital Redevelopment Stages 3 and 4

$150.0 million This project will continue the redevelopment of Dubbo Hospital and will service priorities to respond to future demand. The project will include a new emergency department, enhanced medical imaging services, a new medical inpatient unit, a new surgical inpatient unit, new ambulatory care unit, expanded oncology (chemotherapy) unit, a new interventional cardiology unit and co-location of Dubbo Health Service community health services.

Forensic Pathology and Coroners Court (includes $31.8M Attorney General’s contribution)

$91.5 million This project is a joint initiative between NSW Health and The Department of Justice (DoJ) for a new, purpose built NSW Forensic Pathology Service and Coroners' Court at Lidcombe. The new facility will replace the existing facility at Glebe, ensure the continued co-location of the two services and allow for future expansion. NSW Health and DoJ have a responsibility to provide accommodation for the Coroners Courts and Forensic Pathology in accordance with State and Commonwealth legislation.

HealthOne Strategy (Rebuilding NSW S&H Fund)

n.a. (a) 20 HealthOne sites have been announced to be developed under this Strategy. The range of services provided by each HealthOne service will be configured to meet the needs of the local community, and will vary from site to site. Services may include Australian Government-funded general practice and state-funded primary and community health care services, pharmacists, public dental services, private allied health professionals, other government agencies and non-government organisations.

Infrastructure Statement 2016-17 4 - 13

Page 57: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.8: Major projects for health (cont)

Project Name Estimated Total Cost Description

Digital Patient Records n.a. (a) Investment in Digital Patient Records will enable consistent clinical documentation and medication histories to be available to all NSW hospitals, outpatient and community health facilities. This will deliver safer, higher quality patient-centred care across the care continuum for patients in New South Wales.

Whole of System Digital Platform n.a. (a) This project will improve the capability of clinical systems to deliver services with a consistent base functionality (clinical and infrastructure) across the state. This will deliver clinical process improvements, reliable digital infrastructure resulting in safer, and more appropriate and efficient healthcare delivery in hospitals and in community settings. Benefits to rural patients will include enhanced telehealth capabilities and improved access to specialist diagnostic services.

New Hospital Car Parks (Blacktown, Gosford, and Royal Prince Alfred)

$88.2 million This investment will continue the Sustainable Hospital Car Parking Investment Program to deliver improved car parking facilities and services for both staff and the public. This investment in three new major hospital car parks including Blacktown, Gosford and Royal Prince Alfred Hospitals will address the current and projected increase in parking demand driven by population growth and service expansion.

Tweed Hospital Redevelopment Stage 1

n.a. (a) This project will commence the redevelopment at Tweed Hospital incorporating an expansion and redevelopment of perioperative services including additional theatres, ward upgrades and expanded sterilising services. Car parking will be enhanced for the Hospital.

John Hunter Neonatal Intensive Care Unit (Stages 2 and 3)

$18.0 million This project will complete the final stages of the refurbishment of the neonatal intensive care unit (NICU) at John Hunter Hospital. The upgrade of the NICU will increase the number of cots and develop clinical support areas, isolation rooms, dedicated palliative care facilities, family support areas, including parent accommodation and staff support areas.

Multipurpose Services (MPS) Strategy Stage 5

$49.0 million (2016-17) The MPS Stage 5 project continues the investment in the MPS services to deliver integrated health services for rural and remote communities. Construction will commence this financial year on MPS at Coolah, Tocumwal and Holbrook. Further planning to determine the next MPS sites to commence in future years will also be progressed. Stage 5 is estimated to cost $300.0 million which is planned to be funded as part of the Rebuilding NSW plan.

4 - 14 Infrastructure Statement 2016-17

Page 58: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.8: Major projects for health (cont)

Project Name Estimated Total Cost Description

Lismore Hospital Redevelopment Stages 3A and 3B

$260.3 million The redevelopment of Lismore Hospital Stage 3A will deliver a new and expanded emergency department, renal dialysis unit, ambulatory care unit, and relocation of community and primary health services to the main hospital. This Stage includes Australian Government funding contributions. Stage 3B will continue the redevelopment of the Lismore Hospital that has been progressed under Stage 3A which will expand acute services including the operating theatres and enable new maternity services (birthing, special care nursery, and maternity beds), inpatient beds, medical imaging facilities, a paediatric unit, a helipad, and associated clinical and non-clinical services. This will be delivered in new and refurbished spaces.

Rural Ambulance Infrastructure Reconfiguration $122.1 million This project will progress the reconfiguration of rural and regional ambulance infrastructure to respond to service demand. Under this program work will continue on Rural Ambulance Station upgrades at Berry, Harden, Molong and Wagga Wagga. Planning for station upgrades at Coolamon, Griffith and Ardlethan will be progressed. Planning will continue to identify the next tranche of projects to commence within the overall program.

Sydney Ambulance Metropolitan Infrastructure Strategy

$150.0 million This Strategy will reform ambulance station infrastructure with large new Paramedic Response Centres (Superstations) supported by Paramedic Response Points. Construction will continue on Centres at Bankstown, Liverpool, Blacktown, Kogarah and Penrith and commence on a number of other Centres including Northmead, Artarmon, Caringbah, and in Sydney’s Inner West.

Westmead Hospital Redevelopment $750.0 million The redevelopment of the Westmead Hospital will enhance the tertiary role of the facility and will include the development of a new Acute Services building inclusive of intensive care and high dependency services, a cardiac comprehensive care centre, acute imaging, and expansion of ambulatory care services.

Northern Beaches Health Service Redevelopment

$600.0 million The project will involve a partnership with a private hospital operator to design, construct, manage and operate a new Northern Beaches Hospital at Frenchs Forest, treating both public and private patients. The project will also include the redevelopment and service reconfiguration of Mona Vale Hospital and Community Health.

Asset Refurbishment / Replacement Strategy – State-wide

$500.0 million This 10 year strategy which commenced in 2014-15 will augment the maintenance activities undertaken by Local Health Districts for assets such as major plant (e.g. air conditioning, lifts and other engineering infrastructure).

(a) The estimated total cost has not been included due to its commercially sensitive nature.

Infrastructure Statement 2016-17 4 - 15

Page 59: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

4.14 Other significant projects

The focus of the State Infrastructure Plan is on major projects. However, the Government also delivers on a range of other infrastructure in areas that have significant annual capital programs comprising many projects less than $100 million. All of these projects are essential to supporting state-wide service delivery and are referenced below to recognise their part in the overall infrastructure program.

Education

Improving educational outcomes contributes to economic productivity and social opportunity and is an important State Priority. By facilitating access to quality education services, infrastructure provision contributes to achieving this goal. The Government has over $22 billion invested in public school education infrastructure across the State, including 2,210 schools accommodated in over 21,000 buildings.

Ongoing enrolment growth will continue to be a driver for school infrastructure investment. While many new students will be accommodated within current facilities on existing school sites, new and upgraded schools will need to be delivered to cater for population growth.

The Government has developed a School Assets Strategic Plan to manage the projected capital and maintenance expenditure requirements for teaching space supply and maintenance to 2031. This work will build on commitments in the INSW State Infrastructure Strategy Update 2014 to explore a range of options to improve asset utilisation, condition and functionality. In response to this, $400.0 million has been committed over the next four years to implement a Schools Infrastructure Strategy that will focus on delivering school infrastructure in key growth areas. This funding is part of the additional $942 million over four years to support new schools, upgrades and improved facilities. The plan will also involve greater inter-agency planning coordination and partnerships between agencies and sectors.

The Government’s Innovative Education, Successful Students initiative will continue to focus school infrastructure investment on innovative uses of technology and flexible learning spaces. This investment will drive improvements to in-classroom practices and student outcomes. New and redeveloped schools will provide more opportunities for group work and project based learning to better prepare students for jobs.

Box 4.1: Parramatta Public School and Arthur Phillip High School

Project: The construction of a new multi-storey building for Arthur Phillip High School for up to 2,000 students, and a new Parramatta Public School for up to 1,000 students on the existing school sites.

Funding allocation: Funding has been allocated as part of this Budget to undertake the works, building on the initial allocation made in the last Budget.

Service delivery objective: The primary objective of the redevelopment is to expand the capacity of the school network with future focused education facilities to meet projected demand in and around Parramatta.

Implementation: Work will commence in 2017 and the schools are expected to open to students from 2019.

Outcomes: The project will provide several improvements for students and the community, including:

• additional teaching spaces to meet student enrolment demand

• new and improved school facilities, including flexible and well connected teaching and learning spaces with technology-enabled facilities

• an innovative vertical school solution to meet enrolment growth needs

• maintaining the close proximity to transport and other social infrastructure.

The 2016-17 capital program for the Department of Education is $553.6 million, up 37 per cent compared to the expected outcome for 2015-16. The following major projects in Table 4.9 are currently underway or expected to commence within the next five years and will contribute to delivering the Government’s priorities.

4 - 16 Infrastructure Statement 2016-17

Page 60: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Table 4.9: Major projects for education

Project Name Estimated Total Cost Description

Major works starting in 2016-17

• New Schools: Inner Sydney High School, Hurlstone Agricultural High School (planning), and Lindfield Learning Village, Arthur Phillip High School, Parramatta Public School, Ballina High School, and Queanbeyan Regional Education Hub (distance education)

• Existing School Upgrades: Bolwarra Public School, Coolah Central School, Farrer Memorial Agricultural High School, Pottsville Beach Public School, Ajuga School, and planning for Campbell House School, Glenfield Park School, and a High School in Glenfield

$75.3 million (2016-17) New schools and existing school upgrades to meet the growth in student numbers and/or to improve school facilities, including science lab upgrades at various existing schools.

Schools Infrastructure Strategy, including:

• Willoughby Public School Upgrade

• Willoughby Girls High School Upgrade

• Public School in North Kellyville (new school)

• Fort Street Public School Upgrade

• Oran Park Public School Upgrade

• Rosehill Public School Upgrade

• Cammeraygal High School (new senior campus)

• Curl Curl North Public School Upgrade

• Smalls Road , Ryde site Primary School (new school)

The School Infrastructure Strategy will provide new and upgraded schools to respond to the expected growth in government school enrolments.

Continuing 27 Major Schools Projects $188.4 million (2016-17) Upgrades and additions across various schools and locations, continuing the construction of new schools and information technology projects to improve and maintain school facilities and/or meet growth in student numbers.

Training

TAFE NSW is the public provider of vocational education and training services in New South Wales. TAFE NSW delivers training in all regions of New South Wales to support students to get jobs and succeed, and to support employers by providing the skills they need to increase workforce productivity and prosperity. Through its Strategic Asset Management Plan, TAFE NSW intends to increase its access and reach to enable it to grow student training capacity. It will provide greater access to training services when, where, and how the students require. The framework for this plan is the interconnected training network which offers new and innovative ways for students to access training including:

• specialist training facilities, developed in consultation with industry

• campus facilities in areas of high demand and in accessible locations

• connected learning centres, hubs, and access points that provide flexibility in learning across the State

• digital and mobile capabilities that are better integrated with existing teaching models

• mobile training units, skills exchange, and ‘pop-up’ facilities that can co-locate with regional campuses or within workplaces to expand course offerings.

Infrastructure Statement 2016-17 4 - 17

Page 61: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

The TAFE NSW Strategic Asset Management Plan complements the Government’s priorities. The plan reduces unit costs with the divestment of obsolete facilities. Proceeds from the divestment will be re-invested through sound business cases to support modern learning environments that are right sized, industry standard, and enabled. This increases efficiency and supports completion of qualifications.

The 2016-17 capital expenditure program for the TAFE Commission is $97.1million. The following major and minor projects in Table 4.10 are currently underway or expected to commence within the next five years and will contribute to delivering the Government’s priorities.

Table 4.10: Major projects for training

Project Name Estimated Total Cost Description

TAFE - major works starting in 2016-17 $48.0 million New additions and upgrades at TAFE locations to support the learning needs of students and meet industry requirements.

Continuing 22 Major TAFE Projects $64.6 million (2016-17) Upgrades and additions at various TAFE locations and ICT projects.

TAFE minor capital works $17.2 million (2016-17) Maintaining existing TAFE assets around the State to a high standard

Justice

The Government has invested significant new capital in justice infrastructure in recent years, including correctional centres for adults, juvenile detention centres, police and emergency services facilities, and court and tribunal facilities.

This Budget sets out a continuation of this investment, with over $1.3 billion committed in capital funding for the Department of Justice in 2016-17. This capital investment forms part of a wider package of funding by the Government to address increased demand in the criminal justice system.

This wider package includes $2.2 billion over four years to build capacity in the NSW prison system. The prison system is at capacity and additional beds are required to address the demand. Future capital expenditure will deliver modern, safe and secure correctional centres, upgrade existing correctional and court facilities to meet contemporary standards, invest in facilities that support new service delivery models, and roll-out and upgrade information and communication technologies (ICT) infrastructure.

The Government’s Prison Bed Capacity Program will create around 7,000 new prison beds to provide immediate, medium, and long-term prison capacity. The Government is also investing significant additional funding to expand and construct new facilities at Parklea and Grafton.

This builds on the Corrective Services NSW Infrastructure Strategy, which was designed to support long-term sustainability through the reconfiguration of the prison system to deliver better value for money and support effective service delivery, and to improve outcomes and reduce reoffending.

This includes the development of large and geographically-based correctional precincts and smaller specialist facilities, known as a hub-and-spoke model. This will enable inmates to progress through various program and security levels over the course of their sentence to support their reintegration into the community and reduce their chance of reoffending.

The Government is also providing an additional $107 million in capital funding as part of a $570 million justice reform package over four years to support comprehensive reform of the justice system. This package contains immediate measures to reduce demand on courts and prisons and reforms to support the State Priority to reduce reoffending.

4 - 18 Infrastructure Statement 2016-17

Page 62: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

The department is also developing strategies to better align the court system with community expectations. Enhanced use of technology is anticipated and an overarching strategy will be developed to modernise our legal processes and court systems. Some major ICT initiatives have whole-of-sector application, for example, the Justice Audio Visual Link Consolidation Project.

Box 4.2: Increasing Prison Capacity

Context: The Government has developed the Prison Bed Capacity Program to build additional prison capacity that both meets the short-term urgent need and supports longer term goals to create a sustainable and effective prison system. The program will provide opportunity for innovation in service delivery to reduce recidivism and improve prisoner outcomes.

Project: The Prison Bed Capacity Program will reconfigure the New South Wales correctional system to deliver the best value for money and better support service delivery through the development of more sustainable correctional facilities. The program consists of multiple projects, both brownfield and greenfield, including around 7,000 new prison beds as part of the Prison Bed Capacity Program to provide immediate, medium, and long-term prison capacity. Other longer term initiatives include:

• construction of a New Grafton Correctional Centre, a 1,700 bed facility to service Northern New South Wales expected to be completed in 2020

• expansion of the Parklea Correctional Centre by 650 beds to be completed by 2019.

Funding allocation: The 2016-17 Budget includes a spending commitment of $2.2 billion over the four years to 2019-20 for the Prison Bed Capacity Program.

Outcomes: The investment by Government in the Prison Bed Capacity Program will:

• provide safe and secure prison capacity to ensure offender accountability and prisoner safety

• improve outcomes and reduce re-offending to support community safety

• support the long-term sustainability of the prison system.

The following major projects in Table 4.11 are currently underway or expected to commence within the next five years and will contribute to delivering the Government’s priorities.

Table 4.11: Major projects for justice

Project Name Estimated Total Cost Description

Prison Bed Capacity Program: Immediate and medium term capacity

$2.2 billion Support for the Prison Bed Capacity Program which will provide immediate, medium and long-term prison capacity of about 7, 000 additional beds across the system.

Parklea Correctional Centre Expansion Program

$185.1 million Construction of an additional 650 beds at the existing Parklea Correctional Centre in North-Western Sydney.

New Grafton Correctional Centre Project n.a. (a) Establishment of a new 1,700 bed facility at Grafton in Northern NSW (Northern Hub).

(a) The estimated total cost has not been included due to its commercially sensitive nature.

Arts, culture and the visitor economy

Our arts and cultural facilities support a vibrant and creative New South Wales. Cultural institutions attract and retain the people and skills that the State needs to compete in the global economy. New South Wales contains almost 800 galleries, museums, cultural institutions, libraries, venues and conservatoriums in metropolitan and regional centres.

Infrastructure Statement 2016-17 4 - 19

Page 63: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

New South Wales has the strongest arts and cultural sector in Australia and is home to almost 40 per cent of Australia’s creative industries and over a third of Australia’s creative industry employment. The sector accounts for approximately six per cent of the State’s employment, making a vital and growing contribution to the State’s economy.

In the year ending December 2015, New South Wales received over 11.4 million international and domestic cultural and heritage visitors, who spent an estimated $11.2 billion. Sydney has Australia’s largest creative community across fields including music, film, theatre, dance, visual arts, museums, literature, and festival events. Ten of the 28 major performing arts groups in Australia are located within the State.

Our institutions – including the Art Gallery of New South Wales, the State Library of New South Wales, the Australian Museum, the Museum of Applied Arts and Sciences and the Sydney Opera House – provide a focus for Sydney’s cultural life, and in addition support the regions through lending and touring collections, offsite presentations, educational programs and online access to resources and digitised collections.

The following major projects in Table 4.12 are currently underway or expected to commence within the next five years and will contribute to delivering the Government’s priorities.

Table 4.12: Major projects for arts, culture and the visitor economy

Project Name Estimated Total Cost Description

Walsh Bay Arts Precinct $128.6 million Construction of new and upgraded production, studio, rehearsal and performance venues to support the redevelopment of the Walsh Bay Arts Precinct.

Sydney Opera House Stage 1 Renewal $12.0 million (2016-17) Design upgrades to entry points and foyers, new creative learning and function centres, and improvements to the Concert Hall as part of Stage 1 of the Opera House’s Decade of Renewal.

Museum of Applied Arts and Sciences $10.0 million Planning for the relocation of the Powerhouse Museum to Parramatta.

Active transport

The Government is committed to making cycling safer and increasing the numbers of people riding bikes to help reduce the burden of congestion on our roads. Sydney’s Cycling Future outlined a comprehensive cycling strategy for Sydney, while regional transport plans also include cycling. The Government recognises the importance of high quality cycling infrastructure in making cycling safer and driving growth in cyclist numbers.

In this Budget, the Government is making a major commitment to invest in cycling and pedestrian infrastructure, with a total of $284 million in funding to be made available over the next four years. This includes:

• $59 million in 2016-17 for more than 300 projects across the State

• an additional $145 million for active transport projects over the forward estimates

• an $80 million reservation in Restart NSW for cycling infrastructure projects, which the Government will spend over four year period on additional priority cycling projects.

These funds are in addition to, and separate from, cycling infrastructure that is being delivered as a part of other projects and funded in this Budget, including:

• new cycleway infrastructure at Homebush and around St Peters being delivered as part of WestConnex

• new bike spaces at train station and commuter car parks, including Opal-activated bike sheds, which are being delivered as part of the Transport Access Program and B-Line projects.

4 - 20 Infrastructure Statement 2016-17

Page 64: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

State Infrastructure Plan

Investment in major sporting facilities

The value of stadia and the role of Government investment in sporting facilities are endorsed in the NSW Stadia Strategy and the SIS 2014. Investment in sporting assets improves government service delivery, social outcomes and drives economic benefits through its impact on productivity, population and participation.

The Government has identified the strategic priorities for major stadia investment in the next five years. These include a new rectangular stadium at Parramatta and the redevelopment of Stadium Australia and the Sydney Football Stadium.

Commencing in 2016-17, the replacement of the current Pirtek Stadium at Parramatta will be the first project funded from the stadia reservation in Restart NSW. The Office of Sport will also conduct a feasibility study to build an international standard indoor sporting arena close to the Sydney CBD and prepare a business case for the proposed upgrade of Stadium Australia.

The related Premier’s and State priorities are:

• building infrastructure – key infrastructure projects to be delivered on time and on budget across the State

• increase attendance at cultural venues and events by 15 per cent by 2019.

The following major projects in Table 4.13 are currently underway or expected to commence within the next five years and will contribute to delivering the Government’s strategic priorities.

Table 4.13: Major projects for sporting facilities

Project Name Estimated Total Cost Description

Western Sydney Stadium Project n.a. (a) Construction of a new stadium at Parramatta on the site of the existing facility.

(a) The estimated total cost has not been included due to its commercially sensitive nature.

Social Housing

The Government's investment in Future Directions for social housing in New South Wales includes:

• more social housing

• more opportunities, support and incentives to avoid and/or leave social housing

• better social housing experience.

The following major investments in Table 4.14 in 2016-17 contribute to delivering the State’s strategic priorities.

Table 4.14: Major projects for social housing

Project Name Estimated Total Cost Description

Social housing new supply – Communities Plus

$375.6 million (2016-17) Capital works supporting the Communities Plus social housing program.

Upgrading existing public housing $216.3 million (2016-17) Upgrades and improvements to social housing.

Infrastructure Statement 2016-17 4 - 21

Page 65: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

5. GENERAL GOVERNMENT SECTOR PROJECTS

5.1 General government sector projects

The Legislature The Legislature ................................................................................................................ 5 - 6

Education Department of Education .................................................................................................. 5 - 7 Board of Studies, Teaching and Educational Standards .................................................... 5 - 9

Family and Community Services

Department of Family and Community Services ............................................................... 5 - 10 Multicultural NSW ............................................................................................................ 5 - 10 Aboriginal Housing Office ................................................................................................. 5 - 11 Office of the Children's Guardian ...................................................................................... 5 - 11

Finance, Services and Innovation

Department of Finance, Services and Innovation .............................................................. 5 - 12 Service NSW ................................................................................................................... 5 - 13 Government Property NSW .............................................................................................. 5 - 14 New South Wales Government Telecommunications Authority ......................................... 5 - 14 NSW Self Insurance Corporation ...................................................................................... 5 - 15 State Insurance Regulatory Authority ............................................................................... 5 - 15 State Records Authority of New South Wales ................................................................... 5 - 16 Workers' Compensation (Dust Diseases) Authority ........................................................... 5 - 16

Health

Ministry of Health ............................................................................................................. 5 - 17 Health Care Complaints Commission ............................................................................... 5 - 22 Mental Health Commission of New South Wales .............................................................. 5 - 22

Industry, Skills and Regional Development

Department of Industry, Skills and Regional Development ................................................ 5 - 23 TAFE Commission ........................................................................................................... 5 - 24 New South Wales Rural Assistance Authority ................................................................... 5 - 26 Local Land Services ......................................................................................................... 5 - 26 NSW Food Authority ........................................................................................................ 5 - 26

Infrastructure Statement 2016-17 5 - 1

Page 66: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

General Government Sector Projects

Justice

Department of Justice ...................................................................................................... 5 - 27 Crown Solicitor’s Office .................................................................................................... 5 - 28 Fire and Rescue NSW ...................................................................................................... 5 - 28 NSW Police Force ............................................................................................................ 5 - 29 Office of the NSW Rural Fire Service ................................................................................ 5 - 31 Office of the NSW State Emergency Service .................................................................... 5 - 32 Art Gallery of New South Wales ....................................................................................... 5 - 32 Australian Museum .......................................................................................................... 5 - 33 Museum of Applied Arts and Sciences ............................................................................. 5 - 33 NSW Trustee and Guardian ............................................................................................. 5 - 34 State Library of New South Wales .................................................................................... 5 - 34 Independent Liquor and Gaming Authority ........................................................................ 5 - 35 Information and Privacy Commission ................................................................................ 5 - 35 Judicial Commission of New South Wales ........................................................................ 5 - 35 Legal Aid Commission of New South Wales ..................................................................... 5 - 35 New South Wales Crime Commission .............................................................................. 5 - 35 Office of the Director of Public Prosecutions ..................................................................... 5 - 35 Police Integrity Commission ............................................................................................. 5 - 35

Planning and Environment

Department of Planning and Environment ........................................................................ 5 - 36 Environment Protection Authority ..................................................................................... 5 - 36 Office of Environment and Heritage .................................................................................. 5 - 37 Office of Local Government .............................................................................................. 5 - 38 Royal Botanic Gardens and Domain Trust ........................................................................ 5 - 38 Centennial Park and Moore Park Trust ............................................................................. 5 - 39 Historic Houses Trust of New South Wales ...................................................................... 5 - 39 Minister Administering the Environmental Planning and Assessment Act ....................................................................................................... 5 - 40 Western Sydney Parklands Trust ..................................................................................... 5 - 40 UrbanGrowth NSW Development Corporation .................................................................. 5 - 40

Premier and Cabinet Department of Premier and Cabinet ................................................................................. 5 - 41 Infrastructure NSW ........................................................................................................... 5 - 41 Office of Sport .................................................................................................................. 5 - 42 Sydney Olympic Park Authority ........................................................................................ 5 - 42 Barangaroo Delivery Authority .......................................................................................... 5 - 42 Independent Commission Against Corruption ................................................................... 5 - 43 Independent Pricing and Regulatory Tribunal ................................................................... 5 - 43 New South Wales Electoral Commission .......................................................................... 5 - 44 Ombudsman's Office ........................................................................................................ 5 - 44 Public Service Commission .............................................................................................. 5 - 45 Parliamentary Counsel’s Office ........................................................................................ 5 - 45 Destination NSW .............................................................................................................. 5 - 45 Audit Office of New South Wales ...................................................................................... 5 - 45

5 - 2 Infrastructure Statement 2016-17

Page 67: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

General Government Sector Projects

Transport, Roads and Maritime

Transport for NSW ........................................................................................................... 5 - 46 Roads and Maritime Services ........................................................................................... 5 - 47 Independent Transport Safety Regulator .......................................................................... 5 - 55 Office of Transport Safety Investigations .......................................................................... 5 - 55

Treasury

The Treasury ................................................................................................................... 5 - 56 Long Service Corporation ................................................................................................. 5 - 56 Crown Finance Entity ....................................................................................................... 5 - 56

Infrastructure Statement 2016-17 5 - 3

Page 68: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

General Government Sector Projects

Table 5.1: Capital investment by general government sector (a)

Agency

Capital Expenditure

2015-16 Budget(b)

$m

2015-16 Revised(b)

$m

2016-17 Budget

$m

Variation(c) $m

The Legislature The Legislature ............................................................................................... 29.7 25.9 21.3 (4.6)

Education Department of Education (d) ............................................................................. 455.6 404.6 553.6 149.1

Board of Studies, Teaching and Educational Standards ............................... 3.5 1.1 1.9 0.8

Family and Community Services

Department of Family and Community Services ........................................... 209.1 202.4 123.0 (79.4) Multicultural NSW ........................................................................................... 0.3 0.5 1.5 1.0 Aboriginal Housing Office ............................................................................... 46.6 30.7 53.3 22.5 Home Care Service of New South Wales ...................................................... 3.0 … … … Office of the Children's Guardian ................................................................... 0.8 0.6 0.7 0.1

Finance, Service and Innovation

Department of Finance, Services and Innovation ......................................... 306.2 288.4 90.2 (198.2)

Service NSW ................................................................................................... 97.5 123.1 86.4 (36.7) Government Property NSW ............................................................................ 20.6 9.4 175.0 165.6 Motor Accidents Authority of New South Wales ............................................ 3.3 … … … New South Wales Government Telecommunications Authority ................... 25.4 16.9 63.2 46.3 NSW Self Insurance Corporation ................................................................... 7.4 1.1 6.8 5.7 State Insurance Regulatory Authority ............................................................ … 0.2 14.2 13.9 State Records Authority of New South Wales ............................................... 6.6 3.9 6.8 2.9 Workers' Compensation (Dust Diseases) Board ........................................... 0.0 0.0 0.0 … WorkCover Authority ....................................................................................... 15.0 0.1 … (0.1)

Health

Ministry of Health ............................................................................................ 1,281.5 1,247.7 1,457.3 209.5 Health Care Complaints Commission ............................................................ 0.1 0.1 0.1 … Mental Health Commission of New South Wales .......................................... 0.0 0.0 0.0 …

Industry, Skills and Regional Development Department of Industry, Skills and Regional Development ........................... 53.7 46.0 218.2 172.1 TAFE Commission .......................................................................................... 101.1 55.1 97.1 42.0 New South Wales Rural Assistance Authority ............................................... 0.1 0.1 0.1 … Local Land Services ....................................................................................... 5.3 1.2 0.3 (0.9) NSW Food Authority ....................................................................................... 1.1 1.1 1.5 0.4

Justice

Department of Justice ..................................................................................... 232.8 205.9 1,283.3 1,077.4 Crown Solicitor’s Office .................................................................................. 5.3 0.6 5.2 4.6 Fire and Rescue NSW .................................................................................... 62.1 62.1 47.0 (15.1) NSW Police Force ........................................................................................... 178.2 137.1 217.9 80.8 Office of the NSW Rural Fire Service ............................................................ 13.3 11.0 18.3 7.3 Office of the NSW State Emergency Service ................................................ 26.3 17.3 36.8 19.5 Art Gallery of New South Wales ..................................................................... 18.2 21.7 8.7 (13.0) Australian Museum ......................................................................................... 6.0 4.6 14.1 9.5 Museum of Applied Arts and Sciences .......................................................... 30.2 22.3 15.9 (6.3) NSW Trustee and Guardian ........................................................................... 26.6 7.3 27.1 19.8 State Library of New South Wales ................................................................. 23.4 21.4 21.9 0.4 Independent Liquor and Gaming Authority .................................................... 0.1 0.0 0.1 0.0 Information and Privacy Commission ............................................................ 0.2 0.2 0.2 (0.1) Judicial Commission of New South Wales .................................................... 1.9 0.2 1.9 1.8 Legal Aid Commission of New South Wales ................................................. 4.4 4.4 4.4 … New South Wales Crime Commission ........................................................... 1.9 1.6 1.8 0.2 Office of the Director of Public Prosecutions ................................................. 3.1 3.1 3.1 …

Police Integrity Commission ........................................................................... 1.2 0.4 2.0 1.6

5 - 4 Infrastructure Statement 2016-17

Page 69: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

General Government Sector Projects

Table 5.1: Capital investment by general government sector (a) (cont)

Agency

Capital Expenditure

2015-16 Budget(b)

$m

2015-16 Revised(b)

$m

2016-17 Budget

$m

Variation(c) $m

Planning and Environment

Department of Planning and Environment ..................................................... 23.7 12.5 27.1 14.6 Environment Protection Authority ................................................................... 4.3 4.0 5.1 1.1 Office of Environment and Heritage ............................................................... 53.3 50.3 58.9 8.6 Office of Local Government ............................................................................ 0.1 1.1 0.6 (0.5) Royal Botanic Gardens and Domain Trust .................................................... 22.9 21.0 4.7 (16.3) Centennial Park and Moore Park Trust .......................................................... 12.8 10.9 17.3 6.4 Historic Houses Trust of New South Wales ................................................... 4.9 5.2 8.7 3.5 Minister Administering the Environmental Planning

and Assessment Act ..................................................................................... 25.0 25.0 35.0 10.0

Western Sydney Parklands Trust ................................................................... 34.8 18.1 21.7 3.6 UrbanGrowth NSW Development Corporation .............................................. 5.6 1.2 3.0 1.7

Premier and Cabinet

Department of Premier and Cabinet .............................................................. 12.6 8.0 7.6 (0.4) Infrastructure NSW ......................................................................................... … 0.3 1.0 0.7 Natural Resources Commission ..................................................................... 1.0 1.0 … (1.0) Office of Sport ................................................................................................. 5.9 5.9 16.8 10.9 Sydney Olympic Park Authority ...................................................................... 23.9 21.0 25.1 4.1 Barangaroo Delivery Authority ....................................................................... 10.5 27.5 7.3 (20.3) Independent Commission Against Corruption ............................................... 1.2 0.7 0.7 (0.0) Independent Pricing and Regulatory Tribunal ............................................... 0.6 0.2 1.4 1.2 New South Wales Electoral Commission ...................................................... 8.2 3.9 5.8 1.9 Ombudsman's Office ...................................................................................... 1.3 0.3 2.7 2.3 Public Service Commission ............................................................................ 0.4 0.4 0.3 (0.2) Parliamentary Counsel’s Office ...................................................................... 0.1 0.1 0.2 0.2 Destination NSW ............................................................................................. 0.2 0.2 0.2 … Audit Office of New South Wales ................................................................... 2.2 1.2 2.0 0.7

Transport, Roads and Maritime

Transport for NSW .......................................................................................... 1,037.3 1,727.8 2,423.4 695.7 Roads and Maritime Services ........................................................................ 4,709.2 4,624.4 4,938.9 314.5 Independent Transport Safety Regulator ....................................................... 0.5 … 0.1 0.1 Office of Transport Safety Investigations ....................................................... 0.0 0.0 0.0 0.0

Treasury The Treasury ................................................................................................... 46.8 18.0 36.5 18.6

Long Service Corporation ............................................................................... 3.3 0.8 5.5 4.7 Crown Finance Entity ...................................................................................... 0.5 0.5 0.5 … Advance to the Treasurer ............................................................................... 20.0 … 20.0 20.0 Not allocated to an Agency ............................................................................ … … 171.0 171.0

Total 9,381.9 9,572.7 12,530.7 2,958.0

(a) This table only reports infrastructure investment by agencies and does not include capital grants to public and private bodies to fund infrastructure.

(b) General government sector investment published in Table A1.1 of Budget Paper 1 may not sum to the totals of agency programs published in Table 5.1. The difference represents intra-sector eliminations.

(c) The variation is from 2015-16 Revised to the 2016-17 Budget. (d) The Revised Budget for 2015-16 is lower than the original 2015-16 Budget due to re-profiling of land acquisitions and planning

approvals.

Infrastructure Statement 2016-17 5 - 5

Page 70: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

The Legislature

The Legislature Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Emergency Generator for Sydney 2016 2017 4,050 4,050 Business Continuity Folding and Inserting Various 2016 2018 1,876 938 Machines for Electorate Offices Parliament House Ceiling and Sydney 2016 2020 15,000 1,000 Building Services Replacement Parliament House Education Sydney 2016 2018 4,979 996 Centre and Level 6 Modifications Parliament House Emergency Sydney 2016 2018 2,341 819 Ventilation Compliance Parliament House Tower Sydney 2016 2018 4,285 1,500 Block Membrane Replacement Total new works 9,303 Work-In-Progress Disabled Access Toilets Sydney 2015 2017 2,200 200 1,700 Upgrade at Parliament House Historical Building Restoration Sydney 2015 2017 2,340 1,140 1,200 Level 7 Seminar Space Upgrade Sydney 2015 2017 3,202 960 2,242 Lotus Notes/Domino Replacement Sydney 2014 2016 4,884 4,184 700 Managed Print Services Various 2015 2016 1,030 900 130 for Electorate Offices Online Processing of Members' Sydney 2015 2017 1,844 350 1,494 Claims Entitlement Upgrade of the Legislature's Sydney 2015 2017 1,890 490 1,400 Security Systems Total work-in-progress 8,866

Total, Major Works 18,169

Minor Works 3,102

Total, The Legislature 21,271

5 - 6 Infrastructure Statement 2016-17

Page 71: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Education Cluster

Department of Education Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 School Education Services Major Works New Works Ajuga School, Glenfield 2016 2020 n.a. n.a. Campbell House School and Glenfield Park School Upgrades - Planning Arthur Phillip High Parramatta 2016 2019 n.a. n.a. School and Parramatta Public School (new schools) Ballina High School Ballina 2016 2019 n.a. n.a. (new school) Bolwarra Public School Maitland 2016 2019 n.a. n.a. Upgrade Coolah Central School Coolah 2016 2018 n.a. n.a. Upgrade Farrer Memorial Agricultural Tamworth 2016 2018 n.a. n.a. High School Boarding Accommodation Upgrade Hurlstone Agricultural Richmond 2016 2020 n.a. n.a. High School (new school) - Planning Inner Sydney High Surry Hills 2016 2020 n.a. n.a. School (new school) Lindfield Learning Lindfield 2016 2019 n.a. n.a. Village (new school) Pottsville Beach Pottsville 2016 2019 n.a. n.a. Public School Upgrade Queanbeyan Regional Queanbeyan 2016 2018 n.a. n.a. Education Hub (new distance education school) Schools Infrastructure Strategy Various 2016 2020 400,000 n.a. including:

Cammeraygal High School Crows Nest (new senior campus)

Curl Curl North Public North Curl Curl School Upgrade

Fort Street Public School Millers Point Upgrade

New Public School North Kellyville

Oran Park Public School Oran Park Upgrade

Rosehill Public School Rosehill Upgrade

Smalls Road Site Primary Ryde School (new school)

Willoughby Girls High Willoughby School Upgrade

Willoughby Public Willoughby School Upgrade

Infrastructure Statement 2016-17 5 - 7

Page 72: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Education Cluster

Department of Education (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Selective High School Upgrade Glenfield 2016 2020 n.a. n.a. in Glenfield - Planning Science Lab Upgrade Program Various 2016 2018 n.a. n.a. Total new works 75,251 Work-In-Progress Artarmon Public Artarmon 2015 2018 n.a. 900 n.a. School Upgrade Bardia Public School Bardia 2015 2018 n.a. 523 n.a. Upgrade Bella Vista Public Bella Vista 2015 2018 n.a. 471 n.a. School (new school) Bellevue Hill Public Bellevue Hill 2014 2017 n.a. 2,763 n.a. School Upgrade Bourke Street Public Surry Hills 2014 2016 8,700 3,124 5,576 School Upgrade Bowral Public School Bowral 2014 2016 4,351 2,275 2,076 Upgrade Cairnsfoot School Arncliffe 2008 2016 16,776 16,152 624 Relocation Cherrybrook Cherrybrook 2015 2018 n.a. 145 n.a. Technology High School Upgrade Dubbo Networked Dubbo 2015 2019 n.a. 552 n.a. Specialist School (new school) Glenmore Park School Glenmore Park 2014 2017 16,151 6,518 9,633 (new school) Harbord Public Freshwater 2014 2017 10,561 5,872 4,689 School Upgrade Homebush West Public Homebush West 2015 2018 n.a. 577 n.a. School Upgrade Human Resource and Various 2014 2018 n.a. 1,304 n.a. Payroll System for Schools Hunter Sports High Gateshead 2014 2019 n.a. 1,394 n.a. School Upgrade Lucas Gardens School Canada Bay 2014 2017 14,655 10,132 4,523 Upgrade Manly Vale Public Manly Vale 2014 2018 n.a. 1,825 n.a. School Upgrade Moree East Public Moree 2014 2016 15,000 10,217 4,783 School Upgrade Narellan School (new Narellan 2015 2018 n.a. 444 n.a. school) Narrabri Public Narrabri 2014 2016 2,101 1,720 381 School Upgrade Old Kings School Parramatta 2015 2018 n.a. 1,800 n.a. Site Primary School (new school)

5 - 8 Infrastructure Statement 2016-17

Page 73: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Education Cluster

Department of Education (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Point Clare Public Point Clare 2014 2016 9,166 2,177 6,989 School Upgrade Rainbow Street Randwick 2015 2018 n.a. 582 n.a. Public School Upgrade Randwick Public Randwick 2015 2018 n.a. 294 n.a. School Upgrade Rowland Hassall Old Guildford 2015 2017 12,994 2,521 10,473 School Relocation Ultimo Public School Ultimo 2014 2019 n.a. 1,603 n.a. (new school) Walgett Community College Walgett 2014 2017 7,642 5,661 1,981 High School Upgrade Wentworth Point Public Wentworth Point 2013 2018 n.a. 1,270 n.a. School (new school) Total work-in-progress 188,436

Total, Major Works 263,687

Minor Works

School Infrastructure Upgrades 232,339

Technology for Learning and ICT 51,200

Other Minor Works 6,326

Total Minor Works 289,865

Total, School Education Services 553,552

Aboriginal Affairs – Minor Works 94

Total, Department of Education 553,646 Board of Studies, Teaching and Educational Standards Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress ICT Systems Integration Sydney 2015 2017 2,855 700 1,455 Total work-in-progress 1,455

Total, Major Works 1,455

Minor Works 482

Total, Board of Studies, Teaching and Educational Standards 1,937

Infrastructure Statement 2016-17 5 - 9

Page 74: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Family and Community Services Cluster

Department of Family and Community Services Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Accommodation for People with Disability Fire and Building Safety Various 2013 2017 53,897 46,937 6,960 Mitigation Child Protection IT System Improvements Frontline System Support Ashfield 2014 2018 60,130 26,430 26,950 Corporate and Shared Liverpool 2015 2017 48,092 23,000 25,092 Services Projects Stronger Together 2 Accommodation for People with Disability Large Residential Various 2010 2017 134,000 117,259 16,741 Centre Redevelopments - Metro Large Residential Centre Various 2011 2018 87,802 61,282 4,920 Redevelopments - Non-Government Organisation Supported Accommodation Various 2010 2017 202,444 191,700 10,744 Total work-in-progress 91,407

Total, Major Works 91,407

Minor Works 31,632

Total, Department of Family and Community Services 123,039 Multicultural NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Language Services Transformation Parramatta 2016 2017 1,000 1,000 Total new works 1,000

Total, Major Works 1,000

Minor Works 467

Total, Multicultural NSW 1,467

5 - 10 Infrastructure Statement 2016-17

Page 75: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Family and Community Services Cluster

Aboriginal Housing Office Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Aboriginal Housing - New Supply Various 2016 2020 60,371 13,581 National Partnership - Various 2016 2018 37,467 25,704 Remote Indigenous Housing New Supply and Employment Related Accommodation Total new works 39,285 Work-In-Progress Aboriginal Housing - New Supply Various 2013 2019 6,059 701 2,259 National Partnership - Various 2013 2017 5,684 2,588 3,096 Remote Indigenous Housing New Supply and Employment Related Accommodation Total work-in-progress 5,355

Total, Major Works 44,640

Minor Works 8,617

Total, Aboriginal Housing Office 53,257 Office of the Children's Guardian Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Accreditation of Out of Sydney 2013 2017 2,021 1,671 350 Home Care Providers Total work-in-progress 350

Total, Major Works 350

Minor Works 339

Total, Office of the Children's Guardian 689

Infrastructure Statement 2016-17 5 - 11

Page 76: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Finance, Services and Innovation Cluster

Department of Finance, Services and Innovation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Commerce Regulator Various 2016 2018 7,500 5,500 Data Analytics Centre Sydney 2016 2020 1,903 1,014 Staff Relocation Gosford 2016 2019 13,172 4,797 Total new works 11,311 Work-In-Progress Accelerating Digital Alignment Sydney 2014 2017 6,840 4,682 2,158 OneGov Accommodation Strategy Parramatta 2011 2020 36,506 5,191 180 Business Volume Future Sydney 2013 2020 10,244 4,044 1,500 Growth Program Cadastral 2020 Sydney 2013 2017 5,608 3,914 1,694 Data Centre Consolidation Sydney 2013 2020 14,485 9,985 1,125 Acceleration Program Data Conversion and Cleansing Bathurst 2013 2020 17,613 5,113 2,000 Field Based Customer Service Gosford 2015 2017 1,584 384 1,200 Delivery Future Business Development Sydney 2013 2020 5,600 956 250 Program Human Capital Management Sydney 2015 2017 2,700 600 2,100 System Phase 2 ICT Development Program Various 2014 2020 27,786 9,305 4,525 ICT Projects Various 2004 2020 71,070 53,358 4,428 Information System Enhancements Sydney 2001 2020 172,702 149,254 6,687 Office Refurbishment and Various 2005 2020 114,333 72,013 10,580 Rationalisation OneGov Digital Services Sydney 2013 2020 7,310 3,562 937 Gateway Plan of Survey Cadastral Bathurst 2013 2017 5,406 3,706 1,700 Fabric Public Works ICT Sydney 2015 2017 11,200 300 10,900 Replacement of Manual Sydney 2013 2020 8,063 1,863 1,300 Processes Program Spatial data Infrastructure Bathurst 2014 2020 21,881 6,300 4,231 Program Tax Risk Management (OSR) Parramatta 2015 2017 6,600 4,800 1,800

5 - 12 Infrastructure Statement 2016-17

Page 77: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Finance, Services and Innovation Cluster

Department of Finance, Services and Innovation (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Technology Asset Parramatta 2014 2020 14,208 4,736 2,368 Replacement Program Titling Development Program Sydney 2014 2020 16,402 4,602 2,500 Transition to Cloud Based Sydney 2015 2017 4,811 111 4,700 Corporate and Shared Services Whole of Government Data Various 2014 2017 4,354 3,256 1,098 Centre Total work-in-progress 69,961

Total, Major Works 81,272

Minor Works 8,895

Total, Department of Finance, Services and Innovation 90,167 Service NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Building Digital Capability and Various 2016 2017 31,800 31,800 Transition of Agency Transactions Total new works 31,800 Work-In-Progress Customer Service Platforms Various 2014 2017 56,917 53,617 3,300 Digital Channel Enhancements Various 2014 2017 25,205 18,907 6,298 Digital Licence Program Various 2016 2017 23,230 10,890 12,340 Easy To Do Business Program Various 2015 2017 12,350 4,680 7,670 Service Centres and Technology Various 2014 2017 82,502 64,302 18,200 Related Assets Technology Upgrades to Support Various 2014 2020 70,625 29,925 6,800 Increased Scale of Operation Total work-in-progress 54,608

Total, Major Works 86,408

Total, Service NSW 86,408

Infrastructure Statement 2016-17 5 - 13

Page 78: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Finance, Services and Innovation Cluster

Government Property NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Property Development Program St Leonards 2016 2017 155,000 155,000 Total new works 155,000 Work-In-Progress Building Refurbishment Program Various 2001 2020 115,397 73,254 17,510 Business Services Program Sydney 2007 2020 16,310 12,076 2,479 Total work-in-progress 19,989

Total, Major Works 174,989

Total, Government Property NSW 174,989 New South Wales Government Telecommunications Authority Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Critical Communications Various 2016 2017 45,033 45,033 Enhancement Program Total new works 45,033 Work-In-Progress Critical Communications Various 2015 2017 18,317 6,905 11,412 Enhancement Program Planning and Pilot Total work-in-progress 11,412

Total, Major Works 56,445

Minor Works 6,728

Total, New South Wales Government Telecommunications Authority 63,173

5 - 14 Infrastructure Statement 2016-17

Page 79: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Finance, Services and Innovation Cluster

NSW Self Insurance Corporation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Data Warehouse Upgrade Sydney 2016 2017 6,500 6,500 Total new works 6,500

Total, Major Works 6,500

Minor Works 290

Total, NSW Self Insurance Corporation 6,790 State Insurance Regulatory Authority Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Fit-out McKell Office Sydney 2016 2017 6,100 6,100 Accommodation Refurbish Workers Darlinghurst 2016 2017 2,500 2,500 Compensation Commission Accommodation Total new works 8,600

Total, Major Works 8,600

Minor Works 5,555

Total, State Insurance Regulatory Authority 14,155

Infrastructure Statement 2016-17 5 - 15

Page 80: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Finance, Services and Innovation Cluster

State Records Authority of New South Wales Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Critical Engineering Services Kingswood 2015 2017 3,320 310 3,010 Upgrade Digital Records Operation Kingswood 2014 2016 837 184 653 Integrated Collection Kingswood 2014 2017 2,318 271 2,047 Management Total work-in-progress 5,710

Total, Major Works 5,710

Minor Works 1,093

Total, State Records Authority of New South Wales 6,803 The following agencies have a Minor Works Program only.

Workers' Compensation (Dust Diseases) Authority 40

5 - 16 Infrastructure Statement 2016-17

Page 81: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Health Cluster

Ministry of Health Project Description Location Start Complete (a) Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Ambulance Radio Network Rozelle 2016 2018 20,000 10,000 Replacement Blacktown Hospital Car Park Blacktown 2016 2020 18,066 8,540 Dubbo Hospital Redevelopment Dubbo 2016 2020 150,000 25,023 Stage 3 and 4 Forensic Pathology and Lidcombe 2016 2020 91,500 4,097 Coroner's Court Gosford Hospital Car Park Gosford 2016 2018 35,543 15,000 HealthOne / Integrated Primary Health Care Centres HealthOne Strategy Various 2016 2023 n.a. 4,000 (Rebuild NSW Fund) Information and Communication Strategy New Works Digital Patient Records Various 2016 2023 n.a. 6,500 HealtheNet Pathology Various 2016 2018 n.a. 4,160 Results Repository Whole of System Various 2016 2025 n.a. 10,000 Digital Platform John Hunter Children's New Lambton 2016 2018 18,000 10,327 Hospital Neonatal Heights Intensive Care Unit Stage 2 and 3 Local Initiatives Various 2016 2017 150,000 150,000 Program 2016-17 for Locally Funded Projects Planning Future New Various 2016 2017 10,920 10,920 Works (Coffs Harbour, Concord, Inverell, Hornsby, Campbelltown, Mudgee and Nepean) Port Macquarie Hospital Port Macquarie 2016 2019 n.a. 3,163 Mental Health Expansion Royal Prince Alfred Camperdown 2016 2018 34,632 27,000 Hospital Car Park Singleton Hospital Upgrade Singleton 2016 2018 7,000 5,400 Tweed Hospital Tweed Heads 2016 2020 n.a. 12,080 Redevelopment Stage 1 Total new works 306,210

Infrastructure Statement 2016-17 5 - 17

Page 82: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Health Cluster

Ministry of Health (cont) Project Description Location Start Complete (a) Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Work-In-Progress Ambulance Information Rozelle 2012 2019 27,958 12,474 4,561 Communication Technology Ambulance Infrastructure Ambulance Fleet Rozelle 2015 2020 56,735 9,500 9,500 Replacement Program - Next Phase Ambulance Medical Rozelle 2015 2020 17,500 2,700 2,300 Equipment Replacement Program - Next Phase Ambulance Rural Stations Kempsey Ambulance Station Kempsey 2014 2016 3,666 1,746 1,920 Ambulance Service of NSW - Infrastructure Ambulance Radio Various 2012 2018 14,870 9,876 1,477 Network Infrastructure Armidale Hospital Armidale 2015 2019 60,000 5,888 26,220 Redevelopment Asset Refurbishment / Various 2014 2024 500,000 60,000 40,000 Replacement Strategy (State-wide) Ballina District Hospital Upgrade Ballina 2015 2017 6,300 1,232 2,792 Blacktown Mount Druitt Blacktown 2012 2020 659,187 259,508 58,131 Hospitals Redevelopment Stage 1 and 2 Bowral Hospital Redevelopment Bowral 2015 2018 n.a. 2,792 20,000 Broken Hill Hospital and Broken Hill 2015 2018 n.a. 1,207 2,000 Dental Facility Reconfiguration Bulli Hospital Aged Care Bulli 2015 2018 n.a. 2,882 9,112 Centre of Excellence Byron Central Hospital Ewingsdale 2014 2016 88,000 85,530 2,470 Dubbo Hospital – Stage 1 and 2 Dubbo 2011 2018 91,300 80,129 400 Energy Efficient Camperdown 2016 2017 6,993 … 6,993 Government Program (EEGP) Project - Royal Prince Alfred Hospital Energy Efficient New Lambton 2016 2017 7,562 … 7,562 Government Program Heights (EEGP) Project John Hunter Hospital Fluoridation Program Various 2014 2019 7,500 1,736 3,100

5 - 18 Infrastructure Statement 2016-17

Page 83: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Health Cluster

Ministry of Health (cont) Project Description Location Start Complete (a) Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Forensic Pathology and Lidcombe 2014 2016 2,887 2,484 403 Coroner's Court - Planning Gosford Hospital Redevelopment Gosford 2014 2019 348,000 48,580 118,055 Grafton Hospital Ambulatory Grafton 2015 2018 n.a. 129 121 Care HealthOne / Integrated Primary Health Care Centres Coraki HealthOne Coraki 2015 2017 4,000 527 3,473 HealthOne Strategy - Various 2015 2016 2,000 437 1,563 Planning and Development Jindabyne HealthOne Jindabyne 2014 2017 2,250 750 1,500 Hornsby Ku-ring-gai Hospital Hornsby 2012 2017 120,995 100,727 3,838 Redevelopment Stage 1 Illawarra Hospitals Shellharbour 2013 2016 7,060 3,988 3,072 (Shellharbour / Shoalhaven) – Planning Information and Communication Technology Community Health and Chatswood 2009 2017 100,703 95,648 5,055 Outpatients Information System Corporate Systems 2B Chatswood 2011 2017 77,400 54,771 22,629 Electronic Medical Various 2011 2017 85,400 73,785 11,615 Record - Rollout to Clinical Specialties Electronic Medications Chatswood 2011 2018 170,300 102,910 32,469 Management System Incident Information Chatswood 2012 2017 22,218 9,279 12,939 Management System (IIMS) Intensive Care Unit Chatswood 2011 2017 43,130 26,773 16,357 Clinical Information System John Hunter Children's New Lambton 2014 2017 14,000 8,900 5,100 Hospital Paediatric Heights Intensive Care Unit Kempsey District Hospital Kempsey 2013 2017 81,900 73,809 5,900 Redevelopment Stage 1 Lismore Base Hospital Lismore 2013 2019 260,250 103,033 75,189 Redevelopment Stage 3A and 3B Macksville Hospital Redevelopment Macksville 2015 2019 n.a. 1,073 2,500 Manning Hospital Redevelopment Taree 2015 2019 n.a. 1,188 10,039 Stage 1 (Renal and Oncology)

Infrastructure Statement 2016-17 5 - 19

Page 84: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Health Cluster

Ministry of Health (cont) Project Description Location Start Complete (a) Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Medical Research Infrastructure Various 2015 2017 70,000 34,075 35,925 Initiatives (Phase 1) Missenden Mental Health Camperdown 2012 2016 67,000 65,418 1,582 Unit at Royal Prince Alfred Hospital (includes Brain and Mind Institute Research Beds) Multipurpose Services (MPS) Strategy Stage 5 MPS Strategy Stage 5 - Various 2015 2019 n.a. 17,049 41,411 (Total Program is $300m) Future MPS Planning and Works including Barham, Bonalbo, Molong, Walgett, Coolah, Tocumwal, Holbrook MPS Strategy Stage 5 Various 2013 2018 31,294 3,818 7,594 Planning and Development Muswellbrook Hospital Muswellbrook 2015 2019 19,975 1,036 2,284 Redevelopment Stage 2 New Maitland Hospital - Maitland 2013 2017 20,000 13,562 6,200 Planning and Site Preparation Northern Beaches - Mona Frenchs Forest 2013 2019 600,000 122,212 35,439 Vale Hospital and Community Health Parkes and Forbes Hospitals Various 2012 2017 110,726 93,344 10,579 Port Macquarie Base Port Macquarie 2011 2016 104,000 100,795 3,205 Hospital Expansion Public Private Partnerships (PPP) - Cyclical Maintenance Long Bay Forensic Malabar 2010 2026 26,524 2,833 45 Hospital Cyclical Maintenance Newcastle Mater Newcastle 2008 2026 47,077 13,812 5,966 Hospital Cyclical Maintenance Orange Base Hospital Orange 2008 2026 117,966 25,209 6,131 Cyclical Maintenance Royal North Shore St Leonards 2008 2026 191,785 32,989 6,717 Hospital Cyclical Maintenance Rural Ambulance Infrastructure Reconfiguration Rural Ambulance Various 2015 2025 122,120 8,833 14,641 First Tranche includes Berry, Harden, Molong Wagga Wagga; Planning Station Upgrades at Coolamon, Griffith and Ardlethan; and Planning for Future New Works Ryde Hospital Upgrade Ryde 2015 2017 9,000 660 8,340 South East Regional Bega 2012 2017 187,090 180,995 6,095 Hospital Bega

5 - 20 Infrastructure Statement 2016-17

Page 85: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Health Cluster

Ministry of Health (cont) Project Description Location Start Complete (a) Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 St George Hospital Redevelopment - Kogarah 2014 2019 277,000 70,070 166,958 Acute Services Building St Vincent's Hospital Psychiatric Darlinghurst 2015 2018 14,000 1,500 11,000 Alcohol and Non-prescription Drug Assessment (PANDA) Unit and Emergency Department Enhancements State-wide Planning and North Sydney 2011 2017 6,217 3,724 2,493 Asset Maintenance Sutherland Hospital Expansion Caringbah 2014 2017 62,900 25,780 26,279 Sydney Ambulance Metropolitan Various 2014 2019 150,000 45,635 72,746 Infrastructure Strategy Sydney Local Health Various 2014 2017 6,400 1,504 4,896 District Aged Care and Rehabilitation Network Configuration Tamworth Hospital Tamworth 2012 2017 210,825 197,797 5,798 Redevelopment Stage 2 The Bright Alliance comprising Randwick 2011 2017 114,000 91,817 20,733 the Nelune Comprehensive Cancer Centre, Scientia, and The Sydney Children's Hospital Network at Randwick Campus Tweed Hospital Planning Tweed Heads 2015 2016 1,000 253 747 Wagga Wagga Rural Wagga Wagga 2011 2017 270,100 238,188 17,400 Referral Hospital Redevelopment Westmead Hospital Car Park Westmead 2015 2019 72,365 15,219 38,849 Westmead Hospital Westmead 2014 2021 750,000 95,445 60,507 Redevelopment Stage 1 Whole of Government Data Various 2013 2017 31,422 27,672 3,750 Centre Migration Wollongong Hospital Wollongong 2010 2017 106,746 103,350 2,422 Elective Surgery Unit (Emergency Department and Ambulatory Care) Total work-in-progress 1,157,087

Total, Major Works 1,463,297

Minor Works 121,974

Total 1,585,271

Less Capital Expensing (b) (127,993)

Total, Ministry of Health 1,457,278

(a) Represents the calendar year the project is expected to be completed. Construction completion may occur 12 months or more prior depending on the project schedule.

(b) Certain expenditure associated with the construction of projects falls below the capitalisation threshold and is therefore expensed annually.

Infrastructure Statement 2016-17 5 - 21

Page 86: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Health Cluster

Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 The following agencies have a Minor Works Program only.

Health Care Complaints Commission 65 Mental Health Commission of New South Wales 25

5 - 22 Infrastructure Statement 2016-17

Page 87: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Industry, Skills and Regional Development Cluster

Department of Industry, Skills and Regional Development Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Broken Hill Long Term Broken Hill 2016 2019 n.a. 139,700 Water Supply ICT Systems Upgrade - Various 2016 2019 7,000 3,000 Implement New Crown Lands Legislation NSW Shark Management Byron Bay 2016 2018 2,400 1,400 Strategy Total new works 144,100 Work-In-Progress Bethungra Dam Stabilisation Bethungra 2013 2017 3,935 2,335 1,600 Coastal Infrastructure Program Various 2015 2019 41,400 11,090 10,794 Construct Artificial Reefs Various 2015 2017 2,800 800 2,000 Dredging of Priority Waterways Various 2014 2018 9,973 3,973 3,500 on the North Coast Eden Wave Attenuator Project Eden 2015 2017 1,788 488 1,300 Grains Research Development Tamworth 2015 2017 2,000 240 1,760 Corporation (GRDC) Research Port of Eden Breakwater Eden 2015 2018 n.a. 1,074 21,226 Wharf Extension Regional Office Accommodation Various 2014 2018 8,369 3,440 1,967 Strategy Replacement of Fisheries Coffs Harbour 2015 2017 2,507 7 2,500 Offshore Patrol Vessel Water Monitoring Framework Various 2015 2020 22,810 220 7,192 Water Reform in the Various 2014 2019 7,330 1,890 3,110 Murray Darling Basin Total work-in-progress 56,949

Total, Major Works 201,049

Minor Works 17,120

Total, Department of Industry, Skills and Regional Development 218,169

Infrastructure Statement 2016-17 5 - 23

Page 88: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Industry, Skills and Regional Development Cluster

TAFE Commission Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Hunter Institute - Newcastle 2016 2018 n.a. n.a. Hunter Street Campus West Refurbishment and Upgrade Illawarra Institute - Bega 2016 2019 n.a. n.a. Bega Regional Industry Training Centre New England Institute - Gunnedah 2016 2018 n.a. n.a. Gunnedah Campus Trades Refurbishment North Coast Institute - Various 2016 2021 n.a. n.a. Connected Mobile Learning and Self Service North Coast Institute - Kingscliff Kingscliff 2016 2018 n.a. n.a. Campus Connected Health Hub - Stage 2 Northern Sydney Various 2016 2017 n.a. n.a. Institute - Educational Technology Platform Upgrades Northern Sydney Brookvale 2016 2018 n.a. n.a. Institute - Northern Beaches Campus Plumbing Consolidation and Refurbishment Northern Sydney St Leonards 2016 2018 n.a. n.a. Institute - St Leonards Campus Higher Education, International Business and Foundation Services Upgrade South Western Sydney Granville 2016 2019 n.a. n.a. Institute – Granville College Electrotechnology Consolidation South Western Sydney Miller 2016 2019 n.a. n.a. Institute - Miller College Carpentry Construction and Electrical Consolidation Sydney Institute - Petersham Petersham 2016 2018 n.a. n.a. College Upgrade and Consolidation Sydney Institute - Gymea 2016 2018 n.a. n.a. Sutherland College Rigging and Scaffolding Consolidation Total new works 15,377

5 - 24 Infrastructure Statement 2016-17

Page 89: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Industry, Skills and Regional Development Cluster

TAFE Commission (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Work-In-Progress Hunter Institute - Newcastle Tighes Hill 2014 2019 n.a. 2,939 3,816 Campus Block D Refurbishment Hunter Institute Tighes Hill 2015 2018 n.a. 150 3,350 Newcastle Campus - Customer Service and Industry Development Centre Illawarra Institute - Various 2015 2018 n.a. 907 4,700 Growing Flexible Delivery - Information Technology Infrastructure Illawarra Institute - North 2015 2016 2,535 2,435 100 Wollongong Employer Wollongong Services Centre Mudgee TAFE - Consolidation Mudgee 2013 2017 6,116 5,866 250 Nepean College Kingswood Kingswood 2013 2016 15,361 13,861 1,500 TAFE - Stage 5 New England Institute - Various 2014 2018 n.a. 418 3,000 Country NSW Connected Learning - Stage 1 North Coast Institute - Coffs Harbour 2015 2018 n.a. 185 5,000 Coffs Harbour Education Campus, Applied Construction and Plumbing Technologies Hub North Coast Institute - Various 2016 2017 n.a. 580 2,199 Port Macquarie Customer Contact Centre and Kingscliff Student Central Northern Sydney Institute - Brookvale 2016 2017 n.a. 135 2,725 Northern Beaches Campus Electrotechnology Northern Sydney Institute - Ryde 2015 2018 n.a. 211 4,000 Ryde Campus, Hospitality Training Centre Northern Sydney Institute - Ryde 2016 2017 n.a. 130 2,410 Ryde Campus, Hospitality Upgrade Northern Sydney St Leonards 2016 2017 n.a. 135 2,670 Institute - St Leonards Campus, Children's Services South Western Sydney Wetherill Park 2015 2018 n.a. 20 5,156 Institute Wetherill Park College - Engineering Consolidation TAFE Customer Billing Various 2014 2017 n.a. 7,075 5,875 System - Stage 2 TAFE NSW Business Various 2015 2018 n.a. 537 1,000 Systems - Strategic Priority Applications Revivification and Consolidation Taree TAFE - Facilities Upgrade Taree 2012 2016 n.a. 2,484 1,749 Ultimo TAFE - New Fashion Ultimo 2013 2017 n.a. 2,631 1,950 Design Studio

Infrastructure Statement 2016-17 5 - 25

Page 90: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Industry, Skills and Regional Development Cluster

TAFE Commission (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Ultimo TAFE - Relocation Ultimo 2013 2017 n.a. 5,344 1,363 of Building U Western Institute - TAFE Various 2014 2017 n.a. 1,016 1,160 Western Connect - Stage 1 Western Institute - TAFE Various 2015 2020 n.a. 250 3,500 Western Connect - Stage 2 Young TAFE - New Facilities Young 2013 2017 10,251 3,163 7,088 Total work-in-progress 64,561

Total, Major Works 79,938

Minor Works 17,190

Total, TAFE Commission 97,128 The following agencies have a Minor Works Program only.

New South Wales Rural Assistance Authority 50

Local Land Services 299

NSW Food Authority 1,500

5 - 26 Infrastructure Statement 2016-17

Page 91: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

Department of Justice Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Accommodation fit-out - NSW Civil Sydney 2016 2017 9,600 9,600 and Administrative Tribunal Criminal Justice Reform Various 2016 2020 107,272 65,386 New Grafton Correctional Centre Grafton 2016 2020 n.a. n.a. Prison Bed Capacity Various 2016 2019 1,904,000 682,450 Strategy Program Phase 3 Registry of Births Deaths Various 2016 2017 7,300 7,300 and Marriages Relocation Walsh Bay Arts Precinct - Sydney 2016 2020 127,304 12,041 Construction Total new works 860,201 Work-In-Progress Arts NSW Wharf 4/5 Substructure Sydney 2015 2017 1,277 67 1,210 Justice Audio Visual Link Various 2014 2018 36,964 16,964 10,000 Consolidation Justice KidsLink Sydney 2015 2017 2,085 85 2,000 Justice Shared Corporate Services Sydney 2012 2017 47,370 26,227 21,143 NSW Civil and Administrative Various 2014 2017 8,583 7,009 1,574 Tribunal Implementation New Grafton Correctional Grafton 2015 2020 20,000 7,809 8,855 Centre - Planning and Procurement New Sydney Central Children's Sydney 2014 2018 37,835 11,046 18,569 Court Parklea Correctional Centre Parklea 2015 2020 185,071 7,121 20,270 Expansion Prison Bed Capacity Strategy Various 2015 2018 326,980 25,241 271,589 Program Phase 1B and 2 Sydney CBD Decentralisation Various 2014 2018 14,004 10,148 2,042 Wagga Wagga Courthouse Upgrade Wagga Wagga 2012 2017 19,500 18,800 700 Walsh Bay Arts Precinct - Sydney 2015 2017 10,641 1,363 9,278 Planning and Design Total work-in-progress 367,230

Total, Major Works 1,227,431

Minor Works 55,830

Total, Department of Justice 1,283,261

Infrastructure Statement 2016-17 5 - 27

Page 92: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

Crown Solicitor's Office Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Practice Management System Sydney 2016 2017 4,500 4,500 Total new works 4,500

Total, Major Works 4,500

Minor Works 665

Total, Crown Solicitor's Office 5,165 Fire and Rescue NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Alexandria Fire Station Fitout Alexandria 2016 2018 2,000 100 Batlow Land and New Station Batlow 2016 2018 920 200 Eden Land and New Station Eden 2016 2019 1,020 250 Parkes Land and New Station Parkes 2016 2019 1,020 250 Props at New College / Unknown 2016 2017 2,500 2,500 Academy - Phase 1 South West Rocks Land South West 2016 2019 1,500 400 and New Station Rocks Total new works 3,700 Work-In-Progress Abermain New Station Abermain 2015 2017 1,000 350 650 Gulgong Land and New Station Gulgong 2015 2017 920 250 670 Henty Land and New Station Henty 2015 2018 920 150 120 Maryland Land and New Station Maryland 2013 2018 3,600 921 923 Mount Druitt New Station Mount Druitt 2015 2017 3,087 200 900 Murrurundi Land and New Murrurundi 2015 2017 920 258 662 Station New Head Office Various 2013 2017 26,458 17,238 9,220

5 - 28 Infrastructure Statement 2016-17

Page 93: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

Fire and Rescue NSW (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Nyngan Land and New Station Nyngan 2015 2017 920 270 650 Replacement of Fire Appliances (a) Various 2011 2020 132,431 66,631 14,800 Wollongong Fire Station Wollongong 2015 2018 4,950 261 2,100 Refurbishment Total work-in-progress 30,695

Total, Major Works 34,395

Minor Works 12,559

Total, Fire and Rescue NSW 46,954 (a) Represents an ongoing program. NSW Police Force Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Armoured Vehicle Replacement Various 2017 2017 550 550 Fleet – Prisoner Transport Modules Various 2017 2018 5,886 1,500 Greater Metro Area Radio Various 2017 2019 27,500 3,545 Network Refresh Greater Metro Area Radio Various 2017 2018 29,218 13,982 Terminal Refresh Integrated Light Various 2017 2018 19,600 6,000 Armoured Vests (ILAV) Marine Vessel Replacement Various 2017 2021 28,950 5,000 Program Mount Druitt Police Station Mount Druitt 2017 2019 25,000 750 Polair Aircraft Replacement Various 2017 2018 24,781 9,643 Queanbeyan Police Station Queanbeyan 2017 2019 17,000 2,400 Risk Management Compliance Various 2017 2017 1,000 1,000 Tactical Operations Unit Various 2017 2017 505 505 - Weapons Replacement Tactical Telecommunications Various 2017 2017 5,975 5,975 Well Being Program Various 2017 2017 1,395 1,395 Total new works 52,245

Infrastructure Statement 2016-17 5 - 29

Page 94: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

NSW Police Force (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Work-In-Progress Active Armed Offender Various 2016 2017 1,500 1,000 500 Training Sites Air Wing Down Link Various 2014 2017 1,600 912 688 Bail Reform - Phase 2 Various 2016 2017 2,000 695 1,305 Bay and Basin Police Station Nowra 2015 2017 5,000 50 1,240 COPS Phase 3 Technical Parramatta 2013 2018 49,029 23,893 7,783 Migration Coffs Harbour Police Station Coffs Harbour 2009 2017 20,783 19,801 282 Deniliquin Police Station Deniliquin 2010 2017 18,354 5,188 9,400 Dog Unit Command Facilities Sydney 2016 2018 15,000 100 4,100 Enhanced DNA Testing Various 2012 2017 700 219 481 Fighting the Scourge of Ice Various 2015 2016 3,000 1,700 1,300 Firearms Licensing System Various 2015 2017 5,000 683 4,317 Fit-out for Additional Various 2008 2017 8,535 7,452 1,083 Police Officers' Vehicles Forensic Services Group Various 2015 2017 1,500 150 1,350 Equipment Replacement Gunnedah Police Station Gunnedah 2015 2018 5,500 100 1,800 Hazardous Materials Various 2011 2018 83,063 61,014 10,709 Management Program Lake Macquarie Local Various 2011 2017 29,136 24,580 4,556 Area Command Liverpool Police Station Liverpool 2009 2017 22,900 18,806 4,094 Mobile Automatic Number Various 2014 2017 7,000 5,800 1,200 Plate Recognition System (MANPR) Moss Vale Police Station Moss Vale 2007 2017 14,852 1,195 9,200 New Polair Aircraft Various 2016 2017 8,600 5,000 3,600 Policing for Tomorrow (Mobility) Various 2015 2019 55,000 4,656 27,919 Prisoner Transport Vehicles Various 2011 2017 2,041 948 1,093 Riverstone Police Station Riverstone 2008 2017 19,805 15,898 2,905 Security Upgrade of Various 2016 2017 8,500 1,100 7,400 Police Stations Taser Replacement Program Various 2015 2016 6,744 3,230 3,514

5 - 30 Infrastructure Statement 2016-17

Page 95: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

NSW Police Force (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Technology Asset Refresh Various 2014 2018 45,000 23,000 8,000 Program (TARP) 3 Tweed Heads Police Station Tweed Heads 2009 2017 25,223 8,272 12,353 Voice Infrastructure Migration Parramatta 2013 2017 20,502 15,968 4,534 and Data Network Upgrade Walgett Police Station Walgett 2010 2017 16,069 14,853 1,216 Workforce Optimisation Various 2016 2017 1,051 996 55 Total work-in-progress 137,977

Total, Major Works 190,222

Minor Works 27,655

Total, NSW Police Force 217,877 Office of the NSW Rural Fire Service Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Fire Behaviour Analyst - Various 2016 2020 800 200 Enhancement Funding Improved Effectiveness of Hazard Various 2016 2020 9,195 2,214 Reduction Burning Program Improved Situational Awareness Various 2016 2020 3,094 1,564 of Major Bushfires Funding Total new works 3,978 Work-In-Progress Guardian Bush Fire Risk Lidcombe 2015 2017 5,220 760 4,460 Information Management System Total work-in-progress 4,460

Total, Major Works 8,438

Minor Works 9,863

Total, Office of the NSW Rural Fire Service 18,301

Infrastructure Statement 2016-17 5 - 31

Page 96: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

Office of the NSW State Emergency Service Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Centrally Managed Operational Various 2012 2017 24,488 16,325 8,163 Vehicle Fleet Flood Rescue Marine Craft Various 2012 2017 1,400 1,090 310 and Equipment New Headquarters Wollongong 2015 2017 13,634 117 13,517 Replacement of Major Various 2013 2018 31,436 8,101 12,020 Communications Equipment Total work-in-progress 34,010

Total, Major Works 34,010

Minor Works 2,742

Total, Office of the NSW State Emergency Service 36,752 Art Gallery of New South Wales Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Acquisition of Works of Art (a) Sydney 2010 2020 47,353 39,393 1,990 Building Maintenance Program (a) Sydney 2010 2020 25,734 15,254 2,620 Lighting Upgrade and Sydney 2015 2017 1,200 285 915 Air-Conditioning Duct Work Replacement of Chiller Units Sydney 2015 2017 1,650 900 750 Safety Upgrade Sydney 2014 2019 7,437 3,067 2,020 Total work-in-progress 8,295

Total, Major Works 8,295

Minor Works 400

Total, Art Gallery of New South Wales 8,695 (a) Represents an ongoing program.

5 - 32 Infrastructure Statement 2016-17

Page 97: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

Australian Museum Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Long Gallery Works Darlinghurst 2016 2018 8,034 236 6,798 Planning for the New Museum Darlinghurst 2014 2016 4,722 943 3,779 Total work-in-progress 10,577

Total, Major Works 10,577

Minor Works 3,566

Total, Australian Museum 14,143 Museum of Applied Arts and Sciences Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Castle Hill Chillers Castle Hill 2015 2016 900 500 400 Construction of a Shared Castle Hill 2012 2016 33,557 28,569 4,988 Storage Facility Relocation of Powerhouse Parramatta 2015 2016 10,000 2,380 7,620 Museum to Parramatta – Planning Sydney Observatory Sydney 2016 2016 360 20 340 Emergency Egress Sydney Observatory Fire Sydney 2015 2017 300 60 240 Hydrant Total work-in-progress 13,588

Total, Major Works 13,588

Minor Works 2,320

Total, Museum of Applied Arts and Sciences 15,908

Infrastructure Statement 2016-17 5 - 33

Page 98: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

NSW Trustee and Guardian Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Applications Consolidation and Parramatta 2015 2020 2,672 72 1,100 Upgrade Business Intelligence System Sydney 2011 2020 924 524 100 Client Management System Sydney 2010 2020 15,581 5,431 8,250 Corporate Email System Parramatta 2014 2020 609 40 269 Data Network Upgrades Sydney 2013 2020 2,746 1,646 800 Newcastle Fit-out Newcastle 2013 2017 2,029 789 1,240 O'Connell Street Office Upgrade Sydney 2012 2017 9,830 670 9,160 Records Management System Parramatta 2012 2020 1,811 1,211 300 SAP Financial System Parramatta 2015 2020 3,829 1,129 2,400 Total work-in-progress 23,619

Total, Major Works 23,619

Minor Works 3,466

Total, NSW Trustee and Guardian 27,085 State Library of New South Wales Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Building Accessibility and Lift Sydney 2015 2017 4,930 1,000 3,930 Safety Compliance Digitisation for Regional Sydney 2012 2022 62,277 23,571 7,409 Delivery Program Ongoing Collections and Sydney 2015 2020 12,000 4,000 2,000 Refurbishment (a)

Total work-in-progress 13,339

Total, Major Works 13,339

Minor Works 8,521

Total, State Library of New South Wales 21,860 (a) Represents an ongoing program.

5 - 34 Infrastructure Statement 2016-17

Page 99: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Justice Cluster

Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 The following agencies have a Minor Works Program only.

Independent Liquor and Gaming Authority 70

Information and Privacy Commission 150

Judicial Commission of New South Wales 1,900

Legal Aid Commission of New South Wales 4,350

New South Wales Crime Commission 1,782

Office of the Director of Public Prosecutions 3,068

Police Integrity Commission 2,000

Infrastructure Statement 2016-17 5 - 35

Page 100: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Planning and Environment Cluster

Department of Planning and Environment Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress ePlanning Stage 2 Various 2015 2017 21,789 1,743 20,046 Total work-in-progress 20,046

Total, Major Works 20,046

Minor Works 7,062

Total, Department of Planning and Environment 27,108 Environment Protection Authority Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Container Deposit Various 2016 2017 300 300 Registration System Total new works 300 Work-In-Progress Digital Stakeholder Various 2015 2018 2,817 516 2,017 Management Solution Gas Team Regulatory Various 2015 2018 1,712 1,202 325 Compliance - Equipment Regulatory and Communication Various 2013 2017 8,136 5,847 2,289 System Enhancement Total work-in-progress 4,631

Total, Major Works 4,931

Minor Works 150

Total, Environment Protection Authority 5,081

5 - 36 Infrastructure Statement 2016-17

Page 101: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Planning and Environment Cluster

Office of Environment and Heritage Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Coastal Science, Capacity Various 2016 2018 3,382 1,691 Building and Planning Royal Coast Track Improvement Various 2016 2020 9,000 3,660 Saving Our Species-On-Park Various 2016 2020 1,100 500 Threatened Species Infrastructure Total new works 5,851 Work-In-Progress Acquisition of Satellite Imagery (a) Various 2007 2020 31,992 21,692 2,800 Biodiversity Legislation Various 2015 2017 6,510 2,487 4,023 Reforms Implementation Energy Efficiency Action Plan Various 2014 2017 3,545 1,987 1,558 Fire Management in National Various 2008 2022 50,000 30,310 3,609 Parks Heritage Information Various 2015 2018 2,070 850 850 Management System Iconic Walks Program Various 2013 2018 3,000 1,800 600 Land Purchases Various 2002 2019 86,444 77,444 3,000 National Australian Various 2014 2020 1,185 385 200 Built Environment Rating System (NABERS) (a) Newcastle Port Corporation Newcastle 2015 2017 1,978 478 1,500 Land Acquisition Offset Perisher Range Redevelopment Perisher Valley 2005 2026 41,177 29,388 309 Scientific Equipment (a) Various 2012 2020 9,600 4,800 1,200 Scientific Service Various 2011 2020 8,140 4,500 910 Capacity Maintenance (a) Total work-in-progress 20,559

Total, Major Works 26,410

Minor Works 32,503

Total, Office of Environment and Heritage 58,913 (a) Represents an ongoing program.

Infrastructure Statement 2016-17 5 - 37

Page 102: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Planning and Environment Cluster

Office of Local Government Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Companion Animals Various 2016 2017 1,500 1,000 500 Register Rebuild Total work-in-progress 500

Total, Major Works 500

Minor Works 145

Total, Office of Local Government 645 Royal Botanic Gardens and Domain Trust Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Amenities Upgrade at Mount Tomah 2014 2017 2,082 773 1,309 Mount Tomah Mt Tomah Entry and Mount Tomah 2015 2017 1,297 84 1,213 Safety Upgrade Online Booking and Sydney 2015 2017 615 40 575 Customer Relationship Management System Total work-in-progress 3,097

Total, Major Works 3,097

Minor Works 1,629

Total, Royal Botanic Gardens and Domain Trust 4,726

5 - 38 Infrastructure Statement 2016-17

Page 103: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Planning and Environment Cluster

Centennial Park and Moore Park Trust Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Centennial Park Moore Park 2016 2017 1,875 1,875 Equestrian Centre Upgrade Total new works 1,875 Work-In-Progress Childrens Garden Centennial Park 2015 2017 3,750 450 3,300 E.S. Marks Safety Upgrade Moore Park 2015 2017 2,887 178 2,709 Strategic Asset Centennial Park 2013 2017 20,524 13,646 6,878 Management Program Total work-in-progress 12,887

Total, Major Works 14,762

Minor Works 2,500

Total, Centennial Park and Moore Park Trust 17,262 Historic Houses Trust of New South Wales Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress 10-Year Capital Various 2016 2026 28,000 1,379 5,104 Maintenance Program Capital Maintenance Program Various 2014 2017 4,399 3,067 1,332 Total work-in-progress 6,436

Total, Major Works 6,436

Minor Works 2,300

Total, Historic Houses Trust of New South Wales 8,736

Infrastructure Statement 2016-17 5 - 39

Page 104: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Planning and Environment Cluster

Minister Administering the Environmental Planning and Assessment Act Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress General Land Acquisition Various 2007 2020 383,778 213,778 35,000 Total work-in-progress 35,000

Total, Major Works 35,000

Total, Minister Administering the Environmental Planning and Assessment Act 35,000 Western Sydney Parklands Trust Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Bringelly Road Business Hub Leppington 2016 2021 19,643 450 100 Conservation Works Various 2008 2025 13,310 7,867 1,300 Development of Bungarribee Eastern Creek 2008 2019 22,815 13,420 5,000 Park Eastern Creek Business Hub Eastern Creek 2012 2019 14,908 2,930 5,900 Fifteenth Ave Business Hub West Hoxton 2016 2025 4,463 200 100 Horsley Drive Business Hub Horsley Park 2012 2018 11,080 7,301 3,000 Multipurpose Pathway Various 2009 2024 18,426 7,950 800 Signage and Track Improvements Various 2009 2024 7,398 4,853 410 Upgrade and Improve Park Various 2010 2024 47,958 7,622 4,000 Facilities Total work-in-progress 20,610

Total, Major Works 20,610

Minor Works 1,087

Total, Western Sydney Parklands Trust 21,697 The following agencies have a Minor Works Program only.

UrbanGrowth NSW Development Corporation 2,986

5 - 40 Infrastructure Statement 2016-17

Page 105: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Premier and Cabinet Cluster

Department of Premier and Cabinet Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Corporate and Shared Sydney 2016 2018 4,000 2,000 Services Reform Total new works 2,000 Work-In-Progress Counter Terrorism: Sydney 2015 2018 2,700 683 1,477 Martin Place Enhancements Government House Ground Sydney 2015 2017 1,180 540 640 Floor Building Works Government House Sydney 2015 2020 5,273 329 1,879 Maintenance Program Government House Security Sydney 2015 2017 250 20 230 Gates Government Organisational Sydney 2015 2017 595 520 75 View Database (GO View) Update eReporting Tool Sydney 2015 2017 500 210 290 Total work-in-progress 4,591

Total, Major Works 6,591

Minor Works 1,047

Total, Department of Premier and Cabinet 7,638 Infrastructure NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works IT System Improvements Various 2016 2017 1,000 1,000 Total new works 1,000

Total, Major Works 1,000

Total, Infrastructure NSW 1,000

Infrastructure Statement 2016-17 5 - 41

Page 106: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Premier and Cabinet Cluster

Office of Sport Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Lake Ainsworth Water Jump Ramp Lennox Head 2016 2017 n.a. n.a. Total new works n.a.

Total, Major Works n.a.

Minor Works n.a.

Total, Office of Sport 16,843

Sydney Olympic Park Authority

Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Developer Funded Sydney 2006 2020 73,976 42,716 16,710 Precinct Improvements Olympic Park Total work-in-progress 16,710

Total, Major Works 16,710

Minor Works 8,384

Total, Sydney Olympic Park Authority 25,094

Barangaroo Delivery Authority Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Public Domain Sydney 2016 2020 7,400 1,800 Total new works 1,800 Work-In-Progress Hickson Road Upgrade Sydney 2016 2019 40,000 4,000 5,000 Total work-in-progress 5,000

Total, Major Works 6,800

Minor Works 450

Total, Barangaroo Delivery Authority 7,250

5 - 42 Infrastructure Statement 2016-17

Page 107: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Premier and Cabinet Cluster

Independent Commission Against Corruption Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Case Management System Sydney 2016 2017 630 350 280 Replacement Total work-in-progress 280

Total, Major Works 280

Minor Works 400

Total, Independent Commission Against Corruption 680 Independent Pricing and Regulatory Tribunal Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Licencing Database System: Sydney 2017 2017 830 830 Water Industry Competition Amendment (Review) Act 2014 Total new works 830 Work-In-Progress Fit-out of New Accommodation Sydney 2014 2017 3,745 3,365 380 Total work-in-progress 380

Total, Major Works 1,210

Minor Works 180

Total, Independent Pricing and Regulatory Tribunal 1,390

Infrastructure Statement 2016-17 5 - 43

Page 108: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Premier and Cabinet Cluster

New South Wales Electoral Commission Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Count Back System Sydney 2016 2017 883 883 Electronic Mark-Off at Various 2016 2018 1,885 1,405 Polling Places Universal Postal Voting Various 2016 2017 1,543 1,543 System Total new works 3,831 Work-In-Progress Compliance System Various 2015 2017 650 150 500 New South Wales Roll Various 2014 2016 5,703 4,303 1,400 Management System Total work-in-progress 1,900

Total, Major Works 5,731

Minor Works 100

Total, New South Wales Electoral Commission 5,831 Ombudsman's Office Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Fit-out for Office Accommodation Sydney 2014 2017 4,551 2,183 2,368 Total work-in-progress 2,368

Total, Major Works 2,368

Minor Works 300

Total, Ombudsman's Office 2,668

5 - 44 Infrastructure Statement 2016-17

Page 109: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Premier and Cabinet Cluster

Public Service Commission Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Human Capital Management Sydney 2013 2017 2,130 1,975 155 Information System Total work-in-progress 155

Total, Major Works 155

Minor Works 100

Total, Public Service Commission 255 The following agencies have a Minor Works Program only.

Parliamentary Counsel's Office 246

Destination NSW 160

Audit Office of New South Wales 1,970

Infrastructure Statement 2016-17 5 - 45

Page 110: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Transport for NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works 218 New Buses to Cater Various 2016 2017 108,439 108,439 for NSW Services Country Rail Capital Maintenance (a) Various 2016 2017 104,579 104,579 Lower Hunter Freight Corridor Hexham - 2016 n.a. n.a. 14,000 (Planning and Pre-Construction) Fassifern Total new works 227,018 Work-In-Progress B-Line Various n.a. n.a. n.a. 39,570 210,108 Barangaroo Ferry Hub Sydney 2014 2017 n.a. 35,467 17,199 Business System Sydney 2012 2017 n.a. 163,213 22,780 Improvements Bus Priority Various n.a. n.a. n.a. … 12,318 Infrastructure (inc Bus Rapid Transit Planning) (b)

CBD and South East Light Various 2011 2019 2,100,000 359,240 54,135 Rail (c) Cargo Movement Various 2015 n.a. n.a. 6,407 5,000 Coordination Centre Customer Experience - Various 2012 n.a. n.a. 117,261 7,690 Journey Planner Website and Wayfinding Fixing Country Rail Various 2014 2018 n.a. 3,500 10,500 Pilot Program Intelligent Congestion Various 2015 n.a. n.a. 3,657 12,900 Management Program - Stage 2 Main Western Rail Line Lithgow 2015 n.a. n.a. 4,000 7,000 Capacity Enhancements - Stage 1 Newcastle Light Rail Various 2014 n.a. n.a. 133,400 142,017 Next Generation Various 2014 n.a. 336,851 217,419 61,314 Information Systems Opal - Delivery Phase Various 2011 2016 n.a. 411,215 46,180 Parramatta Light Rail Various 2015 n.a. n.a. 12,556 64,000 (Planning) Southern Sydney Freight Sefton 2015 n.a. n.a. 3,000 2,500 Line Amplification (Planning) Sydney Metro City and Southwest Various 2014 2024 n.a. 868,858 1,386,600 Total work-in-progress 2,062,241

5 - 46 Infrastructure Statement 2016-17

Page 111: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Transport for NSW (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000

Total, Major Works 2,289,259

Minor Works 134,057 Total, Major and Minor Works 2,423,316 Project description included in the Non-Financial Public Sector projects (Chapter 6) Sydney Metro Northwest – Public Private Partnership (PPP) component delivered by Transport for NSW 811,374 Total 3,234,690 Less capital contribution to Public Private Partnership (PPP) projects (d) (811,269)

Total, Transport for NSW 2,423,421 (a) Represents an annual program of various maintenance works. (b) Bus Priority Infrastructure is an ongoing $23.7 million program (2016-17 allocation) delivered jointly by Transport for NSW and

Roads and Maritime Services. (c) The 2016-17 allocation for CBD and South East Light Rail excludes the contribution from the City of Sydney. (d) A portion of the capital contribution is not recognised as capital expenditure under accounting standards. Roads and Maritime Services Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Major Works (b)

Established Sydney Roads Alfords Point Road Alfords Point 2018 40,000 11,257 20,000 Widening Brushwood Drive to Georges River Epping Town Centre Epping n.a. n.a. 10,513 5,000 Road Upgrades Mona Vale Road Mona Vale n.a. n.a. 8,671 10,500 Manor Road to Foley Street (Planning and Preconstruction) Mona Vale Road Ingleside n.a. n.a. 7,743 3,000 McCarrs Creek Road to Powder Works Road (Planning) Nepean River Bridge Penrith 2018 49,000 8,084 22,500 Northern Beaches Frenchs Forest 2018 500,000 191,143 160,000 Hospital, Road Connectivity and Network Enhancements Prospect Highway and Prospect n.a. n.a. 9,418 250 Blacktown Road widening, Reservoir Road to St Martins Crescent (Planning) Showground Road, Old Castle Hill 2018 41,000 8,730 28,000 Northern Road to Carrington Road

Infrastructure Statement 2016-17 5 - 47

Page 112: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Windsor Bridge over Windsor n.a. n.a. 15,393 1,000 Hawkesbury River Replacement (Planning) Sydney Airport Area Road Upgrades Sydney Airport East, Mascot 2018 n.a. 30,273 50,000 Wentworth Avenue Extension and Joyce Drive Widening (State and Federal Funded) Sydney Airport Mascot n.a. n.a. 9,451 6,000 North, O'Riordan Street Widening Sydney Airport West Arncliffe 2017 34,000 11,500 22,500 Marsh Street Easing Sydney's Congestion Bus Priority Various n.a. n.a. 74,531 11,380 Infrastructure (including Bus Rapid Transit Planning) (c)

Easing Sydney's Various n.a. 246,000 146,121 66,440 Congestion, Pinch Points and Clearways Package 1 and 2 Easing Sydney's Various n.a. n.a. 3,790 2,210 Congestion, Pinch Points and Clearways Packages 3 Gateway to the South Various n.a. n.a. 3,550 8,950 Pinch Points (Planning) Smart Motorways Various n.a. n.a. 23,851 31,100 (Planning) CBD Light Rail Various n.a. n.a. 31,346 16,630 Enabling Road Works Intelligent Congestion Various n.a. n.a. 44 7,456 Management Program (Stage 1) Sydney Motorways Various n.a. n.a. 3,339 7,000 Real Time Travel Information WestConnex Motorway WestConnex (State Various n.a. n.a. 1,123,597 656,610 and Federal Funded) (d) NorthConnex NorthConnex, M1 to Various 2019 3,000,000 93,213 31,312 M2 Motorway Link (State and Federal Funded) (e) Sydney Motorways M5 Motorway, Belmore Riverwood n.a. n.a. … 1,300 Road Ramps (Planning) Gateway to the South Various n.a. n.a. 14,260 11,635 M1 Extension (Planning) Western Harbour Various n.a. n.a. 18,272 17,631 Tunnel and Beaches Link (Planning)

5 - 48 Infrastructure Statement 2016-17

Page 113: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Western Sydney Roads to Support Sydney's Second Airport at Badgerys Creek Bringelly Road Leppington 2017 220,000 141,021 64,500 Camden Valley Way to King Street (State and Federal Funded) Bringelly Road, King Leppington 2019 n.a. 38,707 10,000 Street to The Northern Road (State and Federal Funded) Mulgoa Road, Andrews Penrith, n.a. n.a. 1,684 1,500 Road to Glenmore Parkway Glenmore Park (Planning) The Northern Road Oran Park 2018 86,000 15,601 42,000 Camden Valley Way to Peter Brock Drive (State and Federal Funded) The Northern Road Penrith n.a. n.a. 6,204 45,000 Glenmore Parkway to Jamison Road (State and Federal Funded) The Northern Road, Luddenham n.a. n.a. 5,838 35,000 Mersey Road to Glenmore Parkway (Planning) (State and Federal Funding) The Northern Road, Bringelly 2019 n.a. 26,052 87,000 Peter Brock Drive to Mersey Road (State and Federal Funded) Werrington Arterial Claremont 2016 55,000 36,937 17,000 Road, M4 Motorway to Meadows Great Western Highway (State and Federal Funded) M12 Motorway, M7 to Badgerys n.a. n.a. 4,702 6,000 The Northern Road Creek (Planning) (State and Federal funding) Western Sydney Growth Roads Bandon Road Link, Vineyard n.a. n.a. 1,023 1,000 Windsor Road to Richmond Road (Planning) Jane Street and Penrith n.a. n.a. 2,262 3,000 Mulgoa Road Infrastructure Upgrade (Planning) (State and Federal Funded) Memorial Avenue, Old Kellyville n.a. n.a. 6,191 800 Windsor Road to Windsor Road (Planning) Narellan Road, Narellan 2018 114,000 52,260 34,000 Camden Valley Way to Campbelltown Blaxland Road (State and Federal Funded) Old Wallgrove Road Eastern Creek 2017 95,000 52,830 32,000 Erskine Park Link Road to M7 (Western Sydney Employment Lands)

Infrastructure Statement 2016-17 5 - 49

Page 114: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Richmond Road Stages Marsden Park 2016 96,000 90,598 5,533 2 and 3, Townson Road to North of Garfield Road Schofields Road Schofields 2017 135,000 121,018 13,800 Stage 2, Tallawong Road to Veron Road Schofields Road Schofields 2018 140,000 38,049 38,000 Stage 3, Veron Road to Richmond Road via South Street The Horsley Drive Horsley Park n.a. n.a. 3,464 1,500 M7 Motorway to Cowpasture Road (Planning) Central Coast Roads Manns Road, Central West Gosford - n.a. n.a. 500 500 Coast Highway to Narara Narara Creek (Planning) Pacific Highway, Lisarow - 2018 70,000 19,635 20,000 Ourimbah Street Ourimbah to Glen Road Pacific Highway Lisarow n.a. n.a. 6,050 7,000 Parsons Road to Ourimbah Street (Planning) Pacific Highway and Narara - n.a. n.a. 15,651 2,000 Manns Road, Narara Creek Lisarow Road to Parsons Road (Planning) Pacific Highway, Tuggerah 2018 84,000 35,038 25,000 Wyong Road Intersection Upgrade Pacific Highway, Wyong n.a. n.a. 12,755 1,500 Wyong Town Centre (Planning) Pacific Motorway (M1) Various n.a. n.a. 43,658 72,500 Productivity Package (State and Federal Funded) Warnervale Link Watanobbi n.a. n.a. 500 1,000 Road, Albert Warner Drive to Pacific Highway (Planning) Wyong Road Chittaway Bay 2016 28,000 15,970 9,000 Enterprise Drive Intersection Upgrade Wyong Road, Mingara Tumbi Umbi 2018 35,000 11,623 12,000 Drive to Tumbi Road Upgrade Great Western Highway and Bells Line of Road Bells Line of Road Various n.a. n.a. 36,244 7,000 Corridor Improvement Program Stage 1

5 - 50 Infrastructure Statement 2016-17

Page 115: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Bells Line of Road Bell - Lithgow n.a. n.a. 2,633 1,366 Stage 2 (Chifley Road) (Planning) Forty Bends and Hartley 2017 130,000 86,116 45,000 Hartley Valley Safety Improvements (State and Federal Funded) Katoomba to Mount Various n.a. n.a. 24,913 18,000 Victoria Safety Works (State and Federal Funded) Kelso, Ashworth Kelso 2017 94,000 73,509 20,000 Drive to Stockland Drive Hunter Roads Cormorant Road Kooragang 2018 n.a. 16,808 35,000 Industrial Drive to Island Stockton Bridge (State and Federal Funded) Hunter Pinch Points Various n.a. n.a. 750 250 (Planning) New England Highway, Muswellbrook n.a. n.a. 2,895 3,100 Muswellbrook Bypass (Planning) New England Highway, Scone n.a. n.a. 5,535 10,000 Scone Bypass (State and Federal Funded) New England Highway, Maitland 2016 51,000 46,387 4,000 Upgrade of Maitland Roundabouts Pacific Motorway Hexham n.a. n.a. 20,847 7,000 (M1), Extension to Raymond Terrace (Planning) New England Highway, Singleton n.a. n.a. 2,559 1,500 Singleton Bypass (Planning) New England Highway Singleton n.a. n.a. 1,033 1,500 Gowrie Gates, Widen Rail Underpass (Preconstruction) New England Highway Belford n.a. n.a. 1,817 4,000 Belford to Golden Highway Upgrade (Planning) Newcastle Inner City Lambton n.a. n.a. 16,994 5,000 Bypass, Rankin Park to Jesmond (Planning) Newell Highway Newell Highway, Heavy Various n.a. n.a. 100 3,300 Vehicle Pavement Upgrades (Planning) Newell Highway, Grong Grong 2017 n.a. 2,841 9,000 Grong Grong Realignment

Infrastructure Statement 2016-17 5 - 51

Page 116: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Newell Highway, Boggabilla n.a. n.a. 2,800 4,000 Mungle Back Creek to Boggabilla Heavy Duty Pavement (State and Federal Funded) Newell Highway Dubbo n.a. n.a. 1,000 1,500 Improvements through Dubbo and Duplication of the L.H. Ford Bridge (Planning) Newell Highway Various n.a. n.a. 18,962 2,500 Overtaking Lanes Newell Highway, Trewilga 2018 33,000 4,287 14,000 Trewilga Realignment Newell Highway Coonabarabran n.a. n.a. … 750 Improvements through Coonabarabran (Planning) Newell Highway, Parkes n.a. n.a. 1,363 6,000 Upgrade at Parkes (Planning) Newell Highway, West West Wyalong n.a. n.a. 6,041 4,500 Wyalong Heavy Vehicle Bypass Pacific Highway Oxley Highway to Port Macquarie, n.a. n.a. 126,225 2,000 Kempsey (Planning and Kempsey Early Works) (State and Federal Funded) Coffs Harbour Bypass Coffs Harbour n.a. n.a. 53,470 5,000 (Planning and Preconstruction) (State and Federal Funded) Oxley Highway to Kundabung, 2017 820,000 360,414 200,000 Kundabung (State and Thrumster Federal Funded) Kundabung to Kempsey Kundabung, 2017 230,000 110,972 75,000 (State and Federal Kempsey Funded) Frederickton to Clybucca 2016 675,000 552,107 25,000 Eungai (State and Federal Funded) Warrell Creek to Macksville n.a. n.a. 91,705 8,300 Urunga (Planning) (State and Federal Funded) Warrell Creek to Macksville 2017 830,000 324,225 200,000 Nambucca Heads (State and Federal Funded) Nambucca to Urunga Urunga 2016 780,000 574,403 65,000 (State and Federal Funded) Woolgoolga to Grafton 2020 4,356,000 834,529 954,200 Ballina (State and Maclean Federal Funded) Princes Highway Burrill Lake Bridge Burrill Lake 2017 58,000 10,711 30,000 Replacement

5 - 52 Infrastructure Statement 2016-17

Page 117: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Albion Park Rail Yallah – Oak Flats n.a. n.a. 12,526 15,000 Bypass (Planning and Preconstruction) Dignams Creek Dignams Creek n.a. n.a. 9,174 15,000 Realignment Foxground and Berry Berry 2018 580,000 366,963 110,000 Bypass, Toolijooa Road to South Berry Berry to Bomaderry Berry - Bombaderry n.a. n.a. 26,800 18,000 Upgrade (Planning and Preconstruction) Nowra Bridge over Nowra n.a. n.a. 5,336 3,000 Shoalhaven River (Planning) (State and Federal Funded) Princes Motorway Cataract n.a. n.a. 1,909 4,000 Improvements, Bulli Tops to Picton Road (Planning) (State and Federal Funded) Princes Motorway Mount Ousley n.a. n.a. 1,594 1,000 Interchange at Base of Mount Ousley (Planning) Regional NSW Major Road Upgrades Gocup Road Upgrade Gundagai - Tumut 2019 70,000 20,599 14,100 Kosciuszko Road Cooma - Jindabyne n.a. n.a. 500 600 Overtaking Lanes and Safety Improvements Hume Highway Heavy Marulan n.a n.a. 1,790 21,500 Duty Pavement (State and Federal Funded) Main Road 54 Tuena n.a n.a. 5,046 2,500 (Goulburn to Bathurst) Initial Sealing Mitchell Highway Molong 2018 40,000 6,681 20,000 Guanna Hill Realignment Monaro Highway Williamsdale - n.a. n.a. 500 600 Overtaking Lanes and Cooma Safety Improvements New England Highway, Aberdeen - n.a. n.a. 1,000 2,000 Heavy Duty Pavement Willow Tree (Preconstruction) New England Highway Bolivia n.a. n.a. 5,441 2,600 Bolivia Hill Upgrade, (Planning) (State and Federal Funded) Oxley Highway Safety Various n.a. n.a. 700 2,300 and Realignment Works (Planning) Queanbeyan Bypass Queanbeyan n.a. n.a. 2,179 6,000 (Ellerton Drive Extension) (State and Federal Funded) Riverina Highway Lake Hume 2018 11,000 5,000 3,000 Safety Upgrade Village

Infrastructure Statement 2016-17 5 - 53

Page 118: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Roads and Maritime Services (cont) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost (a) to 30-06-16 2016-17 $000 $000 $000 Silver City and Cobb Various n.a. n.a. 23,180 11,500 Highway Seal Extension Summerland Way Grafton 2019 n.a. 45,583 36,000 Additional Clarence River Crossing Grafton Golden Highway Various n.a. 133,000 4,060 14,200 Safety and Productivity Works (State and Federal Funded) Kings Highway, River Nelligen 2017 12,270 6,300 5,970 Forest Road Realignment Bridges for the Bush Cobb Highway, New Moama - n.a. n.a. 4,878 1,000 Bridge at Echuca-Moama Echuca (NSW Contribution) (Planning) Oxley Highway Gunnedah n.a. n.a. 9,403 4,000 Gunnedah Bridge over Rail Program 2: Timber Various n.a. n.a. 49,774 49,250 Truss Bridge Replacements and Upgrades Program 3: Bridges Various n.a. n.a. 5,150 9,550 for the Bush (Planning) Other Major Programs Active Transport Various 25,309 Journey Reliability Various 46,293 Rail Interfaces Various 7,300 Road Freight Safety Various 9,461 and Productivity Road Safety Various 114,696 Transport Access Various 32,000 Program - Commuter Wharf Upgrades Total, Major Works 4,167,032

Minor Works

Capital maintenance 586,664

Other Works 185,200

Total, Minor Works 771,864

Total, Roads and Maritime Services 4,938,896

(a) Current approved project cost. (b) Start dates are not shown since each project is an amalgamation of individual works. Estimated total cost and completion dates

are not available (n.a.) at this stage for some projects as they are in the planning phase. Completion date refers to when the project is open to traffic. Further works may be undertaken and costs incurred after the completion date.

(c) Part of a $23.7 million program in 2016-17 delivered jointly by Transport for NSW and Roads and Maritime Services. (d) Represents Roads and Maritime Services’ capital contributions to the WestConnex program delivered by Sydney Motorway

Corporation. This is included within the WestConnex ETC of $16.8 billion. (e) The estimated expenditure to 30 June 2016 and the 2016-17 allocation do not include contributions related to private financing.

5 - 54 Infrastructure Statement 2016-17

Page 119: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport, Roads and Maritime Cluster

Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 The following agencies have a Minor Works Program only.

Independent Transport Safety Regulator 50

Office of Transport Safety Investigations 20

Infrastructure Statement 2016-17 5 - 55

Page 120: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Treasury Cluster

The Treasury Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works NSW Industrial Relations Sydney 2016 2017 2,280 2,280 IT Platform Upgrade Unisys IT Systems Upgrade Sydney 2016 2017 2,000 2,000 Total new works 4,280 Work-In-Progress Financial Management Sydney 2013 2017 54,290 22,590 31,700 Transformation Program Total work-in-progress 31,700

Total, Major Works 35,980

Minor Works 555

Total, The Treasury 36,535 Long Service Corporation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Integrated Leave System Gosford 2016 2018 5,817 250 4,878 Total work-in-progress 4,878

Total, Major Works 4,878

Minor Works 578

Total, Long Service Corporation 5,456 The following agencies have a Minor Works Program only.

Crown Finance Entity 500

5 - 56 Infrastructure Statement 2016-17

Page 121: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

6. PUBLIC NON-FINANCIAL CORPORATIONS PROJECTS

6.1 Public non-financial corporations projects

Transport Rail Corporation New South Wales (Transport Asset Holding Entity) ................................ 6 - 3 Sydney Trains .................................................................................................................. 6 - 4 Sydney Motorway Corporation Pty Ltd and its subsidiaries ................................................ 6 - 4 State Transit Authority of New South Wales ..................................................................... 6 - 4 Sydney Ferries ................................................................................................................. 6 - 5 NSW Trains ..................................................................................................................... 6 - 5

Water Hunter Water Corporation ................................................................................................ 6 - 6 Water NSW ...................................................................................................................... 6 - 7 Sydney Water Corporation ............................................................................................... 6 - 8

Ports

Newcastle Port Corporation (trading as Port Authority of NSW) ........................................ 6 - 9

Housing

New South Wales Land and Housing Corporation ............................................................ 6 - 10 Teacher Housing Authority of New South Wales ............................................................... 6 - 10

Property

Sydney Cricket and Sports Ground Trust .......................................................................... 6 - 11 Sydney Harbour Foreshore Authority ................................................................................ 6 - 12 Sydney Opera House Trust .............................................................................................. 6 - 13 Venues NSW ................................................................................................................... 6 - 13 Forestry Corporation of New South Wales ........................................................................ 6 - 13 Landcom (trading as UrbanGrowth NSW) ......................................................................... 6 - 13

Other

Waste Assets Management Corporation ........................................................................... 6 - 14 Zoological Parks Board of New South Wales (trading as Taronga Conservation Society .... Australia) ....................................................................................................................... 6 - 14

Electricity

Ausgrid ............................................................................................................................ 6 - 15 Endeavour Energy ........................................................................................................... 6 - 15 Essential Energy .............................................................................................................. 6 - 16 Competitive Government Sector ....................................................................................... 6 - 16

Infrastructure Statement 2016-17 6 - 1

Page 122: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Public Non-Financial Corporations Projects

Table 6.1. Capital investment by public non-financial corporations

Agency

Capital Expenditure

2015-16 Budget

$m

2015-16 Revised

$m

2016-17 Budget

$m

Variation(a) $m

Transport

Rail Corporation New South Wales (Transport Asset Holding Entity) 2,377.3 2,310.4 2,230.7 (79.6) Sydney Trains ................................................................................................. 20.9 19.8 12.8 (7.0) Sydney Motorway Corporation Pty Ltd and its subsidiaries .......................... 727.1 1,628.1 2,214.4 586.3 State Transit Authority of New South Wales .................................................. 8.0 5.1 7.0 1.9 Sydney Ferries (b) ............................................................................................ 11.8 9.3 38.0 28.7 NSW Trains ..................................................................................................... 7.9 7.9 5.5 (2.4)

Water Hunter Water Corporation ............................................................................... 113.1 102.3 94.9 (7.4)

Sydney Water Corporation ............................................................................. 929.2 914.3 721.1 (193.1) Water NSW ...................................................................................................... 134.6 56.9 126.4 69.5

Ports Newcastle Port Corporation (trading as Port Authority of NSW) ................... 16.6 9.9 27.0 17.1

Housing City West Housing Pty Ltd .............................................................................. 40.2 … … …

New South Wales Land and Housing Corporation ........................................ 553.8 500.8 593.5 92.7 Teacher Housing Authority of New South Wales ........................................... 6.9 4.6 4.9 0.4

Property Sydney Cricket and Sports Ground Trust ...................................................... 19.7 17.6 14.6 (3.0)

Sydney Harbour Foreshore Authority (c) ......................................................... 31.5 18.2 1,641.7 1,623.5 Sydney Opera House Trust ............................................................................ 22.9 28.6 23.3 (5.3) Venues NSW ................................................................................................... 20.2 4.2 49.2 45.0 Forestry Corporation of New South Wales ..................................................... 9.4 4.8 10.3 5.5 Landcom (trading as UrbanGrowth NSW) ..................................................... 4.9 5.8 3.0 (2.8)

Other Waste Asset Management Corporation ......................................................... 2.4 2.3 1.6 (0.7)

Zoological Parks Board of New South Wales (trading as Taronga Conservation Society Australia) .................................................................... 19.7 20.4 45.7 25.3

Electricity Ausgrid ............................................................................................................. 795.4 510.9 748.3 237.4

Endeavour Energy .......................................................................................... 365.0 277.8 253.5 (24.2) Essential Energy (d) .......................................................................................... 533.0 427.5 454.6 27.2 TransGrid ......................................................................................................... 315.2 161.2 … … Competitive Government Sector .................................................................... 31.9 3.2 0.3 (2.9)

Total 7,118.5 7,051.6 9,322.4 2,270.7

(a) The variation is from 2015-16 Revised to 2016-17 Budget. (b) Capital expenditure on fleet refurbishment delivered by Harbour City Ferries has not been included. (c) The 2016-17 Budget for Sydney Harbour Foreshore Authority includes $1.6 billion allocation for the Sydney International

Convention Exhibition and Entertainment Centre. (d) The difference between total investment in Table 6.1 and the total of agency programs in the project list represents the capitalising

of interest costs.

6 - 2 Infrastructure Statement 2016-17

Page 123: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport

Rail Corporation New South Wales (Transport Asset Holding Entity) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Existing Network Various 2016 2019 n.a. 112,434 406,630 Enhancements Total new works 406,630 Work-In-Progress Automatic Train Various 2008 n.a. n.a. 202,153 100,424 Protection Digital Train Radio Various 2008 2016 402,000 380,081 10,754 System Enterprise Asset Various 2015 2018 n.a. 102,769 86,000 Management (EAM) Program (a)

Fixing the Trains Various 2013 2021 n.a. 195,282 51,051 Investments Lidcombe to Granville - Various 2006 2017 n.a. 308,396 22,501 Corridor Upgrade Next Generation Rail Various 2014 2024 n.a. 37,969 130,432 Fleet Power Supply (b) Various 2004 n.a. n.a. 762,972 135,073 Rail Operations Centre Various 2014 2018 276,000 66,091 90,407 Sydney Metro Northwest Various 2011 2019 8,279,000 3,027,733 1,321,968 (including rollingstock) Transport Access Program (c) Various 2011 n.a. n.a. 722,209 248,301 Wynyard Walk Sydney 2010 2016 306,000 260,056 44,492 Total work-in-progress 2,241,403

Total, Major Works 2,648,033

Minor Works

Rail Capital Maintenance 258,349

Other Minor Works 135,710

Total Minor Works 394,059 Total, Rail Infrastructure Investment 3,042,092

Less Sydney Metro Northwest – Public Private Partnership (PPP) Component delivered by Transport for NSW (811,374)

Total, Rail Corporation New South Wales (Transport Asset Holding Entity) (d) 2,230,718

(a) The project was previously in Transport for NSW. Estimated expenditure to 30 June 2016 includes actual expenditure previously reflected in Transport for NSW.

(b) Represents a portfolio of projects (generally in excess of $100 million) some of which are still in the planning phase or subject to tender. Expenditure on these programs in prior years reflects works in progress only.

(c) Includes a number of projects which commenced prior to 2011-12 and are now included in the larger Transport Access Program. (d) From 1 July 2015, Rail Corporation New South Wales (Transport Asset Holding Entity) was classified as a commercial public

non-financial corporation. Existing capital projects will continue to be managed by Transport for NSW for a fee.

Infrastructure Statement 2016-17 6 - 3

Page 124: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport

Sydney Trains Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Waratah Rollingstock - Various 2004 2016 677,962 648,020 12,795 Enabling and Ancillary Works Total work-in-progress 12,795

Total, Major Works 12,795

Total, Sydney Trains 12,795 Sydney Motorway Corporation Pty Ltd and its subsidiaries Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 (a) $000(a) Major Works Work-In-Progress WestConnex Stage 1 (b) Various 2014 2019 4,299,000 1,018,367 1,050,553 WestConnex Stage 2 (b) Various 2015 2019 5,266,000 763,400 1,098,798 WestConnex Stage 3 - Various 2015 2018 230,000 8,000 65,000 Preliminary Works (c) Total work-in-progress 2,214,351

Total, Major Works 2,214,351

Total, Sydney Motorway Corporation Pty Ltd and its subsidiaries 2,214,351

(a) A combination of State, Australian Government and private funding. (b) Estimated total cost includes works and related costs delivered by Road and Maritime Services. (c) The total estimated cost for WestConnex Stage 3 is $7.2 billion. The estimated total cost of all three stages is $16.8 billion. State Transit Authority of New South Wales Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Depot Facilities Upgrade Various 2009 2017 9,200 7,190 1,097 Total work-in-progress 1,097

Total, Major Works 1,097

Minor Works 5,894

Total, State Transit Authority of New South Wales 6,991 6 - 4 Infrastructure Statement 2016-17

Page 125: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Transport

Sydney Ferries Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Ferry Fleet Replacement Various 2013 2018 51,624 13,722 29,993 Growth Ferries - Various 2015 2018 25,000 1,205 8,000 Parramatta River Total work-in-progress 37,993

Total, Major Works 37,993

Minor Works 11,775

Total, Sydney Ferries 49,768 The following agencies have a Minor Works Program only.

NSW Trains 5,474

Infrastructure Statement 2016-17 6 - 5

Page 126: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Water

Hunter Water Corporation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Enhancement of Various 2016 2025 83,436 1,005 Wastewater Infrastructure Enhancement of Water Various 2016 2021 29,674 138 Infrastructure Total new works 1,143 Work-In-Progress Backlog Sewer Scheme Various 2015 2025 2,244 221 57 Enhancement of Various 2007 2024 208,138 54,385 9,320 Wastewater Infrastructure Enhancement of Water Various 2013 2024 22,107 4,512 5,017 Infrastructure Other Business Projects Housing Acceleration Various 2014 2017 22,550 3,672 8,493 Fund 2 Upgrades Telemetry System Various 2009 2026 14,596 3,923 1,412 Upgrade Total work-in-progress 24,299

Total, Major Works 25,442

Minor Works 69,448

Total, Hunter Water Corporation 94,890

6 - 6 Infrastructure Statement 2016-17

Page 127: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Water

Water NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Blue Mountains System Katoomba 2016 2027 4,985 442 Upgrade Total new works 442 Work-In-Progress Catchments Upgrade Various 1998 2030 21,812 3,767 1,943 Chaffey Augmentation Tamworth 2013 2017 31,373 31,252 121 Chaffey Dam Upgrade Bowling Alley 2012 2018 16,922 16,777 28 Phase 2 Point General Upgrades Various 1999 2030 481,011 14,565 20,864 Integrated Surveillance Various 2010 2024 46,266 13,193 4,159 Monitoring, Automation and Remote Telemetry Keepit Dam Upgrade - Keepit 1994 2024 213,333 82,174 16,938 Phase 1 Metropolitan Dams Upgrade Various 1998 2021 32,464 1,259 13,220 Metropolitan Water Plan Various 2004 2026 856,481 535 2,814 Prospect Reservoir Prospect 1998 2017 22,601 18,483 4,118 Upgrade Shoalhaven System Upgrade Various 1998 2021 22,365 7,125 11,028 State Wide Metering Various 2013 2021 16,651 16,357 230 Upper Canal Upgrade Various 1998 2020 88,983 10,493 7,996 Warragamba Dam General Warragamba 1997 2022 57,816 400 14,728 Upgrade Warragamba Pipelines Various 1998 2022 20,415 668 2,623 Upgrade Water For Rivers - Other Various 2010 2026 22,581 22,155 34 Water Saving Projects Total work-in-progress 100,844

Total, Major Works 101,286

Minor Works 25,088

Total, Water NSW 126,374

Infrastructure Statement 2016-17 6 - 7

Page 128: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Water

Sydney Water Corporation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Critical Watermain Various 1998 2027 750,000 337,098 26,800 Program Enterprise Resource Various 2015 2020 91,300 8,300 42,500 Planning System Green Square Town Centre Alexandria 2013 2018 65,300 41,800 14,900 - Flood Risk Management Growth Works to Service Various 1995 2027 3,400,000 1,169,857 195,700 Urban Development (a) Information Technology Various 2001 2027 1,100,000 548,447 20,700 Projects (a) Maintain Water Various 1995 2027 2,400,000 1,447,871 76,331 Distribution Systems Maintenance Plant Various 2001 2027 90,000 44,687 3,100 Renewals (a) Property Management and Various 2001 2027 550,000 453,999 7,900 Acquisition (a)

Quakers Hill Wastewater Various 2016 2020 173,900 1,000 5,800 Treatment Plant Renewal Recycled Water Projects Various 2014 2024 46,200 1,100 800 Riverstone Wastewater Riverstone 2013 2017 22,300 12,700 9,600 Lead-Ins Riverstone Wastewater Various 2015 2027 125,000 1,800 13,300 Treatment Plant Stage 1 Amplification Sewage Overflow Abatement (a) Various 1995 2027 1,600,000 964,959 41,300 Sewer Network Various 1995 2027 2,200,000 1,179,725 92,800 Reliability Upgrades (a) Stormwater Asset Renewals (a) Various 2008 2027 600,000 56,600 22,800 Towards 2020 Customer Various 2014 2020 184,000 18,100 39,700 Billing and Information System Upgrade Reliability of Various 1995 2027 2,100,000 774,961 98,500 Sewage Treatment Plants (a) Water Meter Replacement Various 1995 2027 240,000 136,414 8,600 Program (a) Total work-in-progress 721,131

Total, Major Works 721,131

Total, Sydney Water Corporation 721,131 (a) Represents an ongoing program.

6 - 8 Infrastructure Statement 2016-17

Page 129: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Ports

Newcastle Port Corporation (trading as Port Authority of NSW) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Fire Fighting Capability Sydney 2016 2018 n.a. 4,404 Platform Glebe Island - Silos Balmain 2017 2018 n.a. 1,000 Rectifications Glebe Island - Wharf 8 Balmain 2016 2025 n.a. 3,262 Augmentation Overseas Passenger Sydney 2017 2018 n.a. 1,000 Terminal Northern Truck Access Total new works 9,666 Work-In-Progress Connection Reliant Sydney 2016 2017 n.a. 240 2,906 Gangway Replacement Total work-in-progress 2,906

Total, Major Works 12,572

Minor Works 14,459

Total, Newcastle Port Corporation (trading as Port Authority of NSW) 27,031

Infrastructure Statement 2016-17 6 - 9

Page 130: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Housing

New South Wales Land and Housing Corporation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Office Accommodation and Various 2016 2020 3,040 1,520 Administrative Assets Social Housing - Asset Various 2016 2020 862,843 215,000 Improvement Social Housing - New Various 2016 2028 1,212,585 230,215 Supply Total new works 446,735 Work-In-Progress Social Housing - New Various 2011 2019 236,782 57,197 140,489 Supply Total work-in-progress 140,489

Total, Major Works 587,224

Minor Works 6,241

Total, New South Wales Land and Housing Corporation 593,465 Teacher Housing Authority of New South Wales Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress New Houses to Meet Various 2013 2020 7,426 5,278 548 Demand Growth Total work-in-progress 548

Total, Major Works 548

Minor Works 4,390

Total, Teacher Housing Authority of New South Wales 4,938

6 - 10 Infrastructure Statement 2016-17

Page 131: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Property

Sydney Cricket and Sports Ground Trust (a)

Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 29-02-16 2016-17 $000 $000 $000 Major Works New Works Allianz Stadium Members Moore Park 2016 2016 350 350 and Goods Lifts Upgrades Corporate Suite Upgrades Moore Park 2016 2017 500 500 Fitness Centre Spa Moore Park 2016 2017 300 300 Upgrade and Pool Plant Room Upgrade Leased Building - Air Moore Park 2016 2017 400 400 Conditioning Website Upgrade Moore Park 2016 2017 300 300 Total new works 1,850 Work-In-Progress Allianz Stadium (b) Moore Park 2012 2016 8,521 4,983 3,538 Redevelopment - Concept Design Beverage System Moore Park 2014 2016 1,005 240 765 Infrastructure Catering Facility Moore Park 2015 2017 4,079 79 4,000 Upgrades Commemorative Sculptures Moore Park 2015 2016 300 80 220 Customer Relationship Moore Park 2015 2016 497 47 450 Management and Records System New Administrative Moore Park 2015 2017 1,159 159 1,000 Building and Training Facilities Total work-in-progress 9,973

Total, Major Works 11,823

Minor Works 2,763

Total, Sydney Cricket and Sports Ground Trust 14,586

(a) The Sydney Cricket and Sports Ground Trust operates on a March to February financial year and the allocation for 2016-17 represents expenditure incurred/to be incurred from March 2016 to February 2017.

(b) The Allianz Stadium Redevelopment Concept Design project has been completed. Expenditure allocated in 2016-17 for this project was incurred prior to June 2016.

Infrastructure Statement 2016-17 6 - 11

Page 132: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Property

Sydney Harbour Foreshore Authority Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Pyrmont Bridge Sydney 2016 2022 22,800 5,000 Restoration Sydney International Sydney 2016 2017 1,590,232 1,570,402 Convention Exhibition and Entertainment Centre Various Land Purchases Sydney 2016 2017 6,514 6,514 Total new works 1,581,916 Work-In-Progress Campbells Cove Public Sydney 2015 2020 17,721 421 3,500 Domain Upgrade Cockle Bay Marine Sydney 2016 2018 15,240 440 8,750 Structure Redevelopment Commercial Properties Sydney 2015 2026 96,832 6,157 18,618 Upgrade Program Darling Harbour Sydney 2016 2017 5,400 400 5,000 Interface Project Darling Harbour Public Sydney 2012 2026 24,327 4,503 6,348 Domain Upgrade Marine Structures Upgrade Sydney 2011 2017 5,372 5,172 200 Sydney International Sydney 2011 2017 38,719 28,466 10,253 Convention Exhibition and Entertainment Project Development Technology Integration Sydney 2016 2018 7,667 1,492 4,537 Program The Rocks Foreshore Sydney 2015 2024 38,831 182 601 Improvement Project The Rocks Public Domain Sydney 2012 2026 49,604 4,755 1,976 Upgrade Total work-in-progress 59,783

Total, Major Works 1,641,699

Total, Sydney Harbour Foreshore Authority 1,641,699

6 - 12 Infrastructure Statement 2016-17

Page 133: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Property

Sydney Opera House Trust Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Theatre Machinery Project Sydney 2015 2018 43,057 6,869 18,219 Total work-in-progress 18,219

Total, Major Works 18,219

Minor Works 5,126

Total, Sydney Opera House Trust 23,345 Venues NSW Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress WIN Stadium Northern Wollongong 2015 2016 792 42 750 Grandstand Western Sydney Stadium Parramatta 2015 2019 n.a. 3,000 48,000 Total work-in-progress 48,750

Total, Major Works 48,750

Minor Works 450

Total, Venues NSW 49,200 The following agencies have a Minor Works Program only. Forestry Corporation of New South Wales 10,324 Landcom (trading as UrbanGrowth NSW) 3,018

Infrastructure Statement 2016-17 6 - 13

Page 134: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Other

Waste Assets Management Corporation Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Environmental Systems Eastern Creek 2012 2019 1,619 1,173 146 Landfill Site Development Eastern Creek 2010 2017 10,938 10,335 603 Plant and Equipment Eastern Creek 2011 2019 5,637 4,668 719 Replacement Total work-in-progress 1,468

Total, Major Works 1,468

Minor Works 125

Total, Waste Assets Management Corporation 1,593 Zoological Parks Board of New South Wales (trading as Taronga Conservation Society Australia) Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Taronga Institute of Mosman 2014 2018 29,188 3,012 12,119 Science and Learning Taronga Wildlife Retreat Mosman 2015 2019 38,500 521 2,000 Taronga Zoo - Mosman 2001 2018 248,599 232,910 15,346 Construction and Restoration Projects Visitor Experience - Dubbo 2014 2025 48,851 3,022 8,418 Taronga Western Plains Zoo Visitor Experience - Mosman 2014 2025 114,769 2,032 5,281 Taronga Zoo Western Plains Zoo - Dubbo 2001 2018 34,971 34,671 50 Construction and Restoration Projects Total work-in-progress 43,214

Total, Major Works 43,214

Minor Works 2,500

Total, Zoological Parks Board of New South Wales (trading as Taronga Conservation Society Australia) 45,714

6 - 14 Infrastructure Statement 2016-17

Page 135: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Electricity

Ausgrid Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Line Works (a) Various - - 746,438 683,529 37,950 Substation (a) Various - - 793,394 616,094 102,171 Total work-in-progress 140,121

Total, Major Works 140,121

Minor Works 608,153

Total, Ausgrid 748,274

(a) Represents a portfolio of projects that have various start and completion dates. Endeavour Energy Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works New Works Substation (a) Penrith - - 8,395 1,858 Total new works 1,858 Work-In-Progress Line Works (a) Various - - 873,283 746,482 30,568 Substation (a) Various - - 495,534 383,553 36,649 Transformers and Equipment (a) Various - - 3,565,363 2,781,606 184,449 Total work-in-progress 251,666

Total, Major Works 253,524

Total, Endeavour Energy 253,524

(a) Represents a portfolio of projects that have various start and completion dates.

Infrastructure Statement 2016-17 6 - 15

Page 136: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Electricity

Essential Energy Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 Major Works Work-In-Progress Line Works (a) Various - - 64,560 47,204 14,818 Substation (a) Various - - 53,839 11,077 23,214 Total work-in-progress 38,032

Total, Major Works 38,032

Minor Works 418,910

Total, Essential Energy 456,942

(a) Represents a portfolio of projects that have various start and completion dates. Competitive Government Sector Project Description Location Start Complete Estimated Est. Expend Allocation Total Cost to 30-06-16 2016-17 $000 $000 $000 This program comprises works undertaken by the electricity generation sector. Given the competitive nature of works undertaken by this sector, individual project details are treated as commercial in confidence and are not disclosed below.

Total, Competitive Government Sector 281

6 - 16 Infrastructure Statement 2016-17

Page 137: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

A. CAPITAL STRATEGIES AND POLICIES

Introduction

The Government is committed to delivering a robust capital program that fosters NSW’s economic, social and financial objectives. The policies set out in this Appendix reflect a thorough approach to capital that includes the acquisition of new capital assets and the recycling of existing assets, along with the effective and efficient use of core assets. In conjunction with service delivery strategies, the capital framework seeks to effectively meet the current and future needs of the people of New South Wales.

The capital strategy has two distinct elements:

• A high level strategic approach which defines the objectives and how to meet them. In 2015 the Premier announced 30 State priorities outlining specific goals and clear ways to track progress. The 20-year State Infrastructure Strategy (SIS) is the central spoke for the capital program and encapsulates many of the State’s priorities. The SIS informs the annually reported five-year funded State Infrastructure Plan (SIP) and other specific plans.

• A project specific approach to provide assurance for individual projects. This approach continually monitors the development of cluster and agency capital plans and the progression of individual projects from initial planning to delivery. Infrastructure NSW (INSW) and NSW Treasury jointly play a significant role in evaluating projects at an individual level, including through business cases, gateway reviews and ensuring consistency with strategic plans.

A cornerstone of the strategy is the capital investment framework which addresses the four major components of successful infrastructure delivery:

• planning - a single comprehensive infrastructure strategy for the State, with supporting plans which are integrated with funding and project delivery

• project selection - ensuring individual projects or programs represent value for money and are economically and socially justifiable

• funding - implementing an innovative approach to funding for infrastructure while maintaining the State’s triple-A credit rating

• delivery - ensuring all committed projects are delivered efficiently, within budget and on time.

INSW plays a vital role in providing independent expert advice to the Government on investment priorities, driving key infrastructure in partnership with the private sector and managing the presentation of projects to the Australian Government for potential funding. Project review and selection for the five year SIP and for projects recommended for Restart NSW funding follow a consistent and objective assessment framework and enhanced assurance gateway process.

Planning

The Government proactively plans for the next generation by mapping future needs and investing in and actively managing strategic capital assets. This helps to ensure service delivery needs are met and expenditure is managed sustainably.

Infrastructure Statement 2016-17 A - 1

Page 138: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

The State priorities announced in 2015 outline the Government’s key objectives and provide an overarching direction for capital investment. The 20-year State Infrastructure Strategy 2012 (SIS 2012), that was subsequently updated in 2014 and 2015 (collectively, the SIS), complements these objectives and provides a detailed infrastructure strategy for New South Wales. The SIS outlines many of the immediate priorities for the State and these are reflected in the annual SIP (Chapter 4 of this Infrastructure Statement). The SIS and the SIP outline overall infrastructure priorities that support integrated metropolitan, district and regional plans and sector specific strategies. These include:

• the NSW Long Term Transport Master Plan released in December 2012

• agency level Total Asset Management (TAM) Plans, which include 10-year capital plans.

A key component of the Government’s prudent approach has been to ensure that its infrastructure plans are sustainable and that five year plans are fully funded within current budget estimates.

Intergenerational Report

The Intergeneration Report (IGR) is published every five years and projects demographics, workforce and housing trends for the next four decades. This analysis assists the Government to lay the foundations today for a strong future. The plans and policies included in this chapter support the Government in implementing strategic capital investment that is crucial to long-term sustainability.

Refer to the NSW Intergenerational Report 2016 for more detail.

Priorities for New South Wales

In September 2015 the Premier announced 30 State priorities for achieving the Government’s vision of a stronger, more prosperous New South Wales. Within these commitments, the Premier has nominated 12 priorities to provide particular focus on ways of making the State a better place to live and work.

Box A.1: Capital investment and the State priorities

Strategic capital planning and delivery is critical to achieving the State priorities, including:

• reducing road fatalities by at least 30 per cent from 2011 levels by 2021

• improving road travel reliability

• increasing housing supply across the State and delivering more than 50,000 approvals every year

• planning for 70 per cent of government transactions to be conducted via digital channels by 2019.

The complete set of State priorities can be found at: https://www.nsw.gov.au/making-it-happen

Refer to Chapter 4 of this Infrastructure Statement for more detail on how infrastructure investment contributes to achieving the State priorities.

State Infrastructure Strategy

The strategic direction provided by the 20-year SIS allows for effective infrastructure investment to support growth of the State’s economy and community living standards.

The SIS 2012 prioritised major projects aimed at improving productivity and contributing to economic growth through the provision of infrastructure across transport, utilities, health and education. Many of the highlighted projects in the SIS 2012 are well underway. Examples include WestConnex, Sydney Metro Northwest, the Northern Beaches Hospital, and the Sydney International Convention, Exhibition and Entertainment Centre.

A - 2 Infrastructure Statement 2016-17

Page 139: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

In November 2014, INSW released the SIS 2014. It contained 30 investment recommendations to the Government on the next round of critical infrastructure projects and programs for New South Wales – priorities that will reduce congestion, support population growth and stimulate productivity across Sydney and regional New South Wales. These recommendations were adopted by the Government to make up the $20 billion Rebuilding NSW plan and released as the Rebuilding NSW State Infrastructure Strategy 2014, with a subsequent update in February 2015.

State Infrastructure Plan

The SIP outlines the Government’s funded infrastructure priorities over the next five years, 2016-17 to 2020-21, and incorporates short term priority projects from the Government’s SIS.

Refer to Chapter 4 of this Infrastructure Statement for more detail.

NSW Long Term Transport Master Plan

In December 2012, the Government released the NSW Long Term Transport Master Plan.

Consistent with the SIS, the master plan identifies both the priority infrastructure and the necessary service delivery changes required over the next 20 years to deliver on the Government’s objectives for the transport system.

More information can be found at: http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/nsw-transport-masterplan-final.pdf

Regional Plans

Regional plans project growth and change by forecasting the State’s future population’s needs for housing, jobs, infrastructure and a healthy environment. Regional plans improve the link between infrastructure provision and population growth, by planning for both to occur in tandem.

Throughout 2016, regional plans are being exhibited for community engagement. The new plans focus on:

• enabling a robust, diversified economy

• facilitating greater housing choice to suit the State’s changing population needs

• developing strong and vibrant communities through improved transport and urban design

• maintaining environmental attributes and building resilience to natural hazards

• growing the competitiveness of towns to provide more jobs, housing and lifestyle opportunities

• supporting the social fabric to maintain strong communities and liveable places.

The Sydney Metropolitan Strategy, A Plan for Growing Sydney, is the plan for the Sydney region. The Government is committed to making Sydney a strong global city and a great place to live by focusing on productivity, sustainability and liveability.

The recently established Greater Sydney Commission is responsible for implementing A Plan for Growing Sydney. A key priority for the Commission are District Plans. The Commission will engage with residents, state agencies, local governments and the Australian Government to actively integrate land use, transport and infrastructure planning.

Infrastructure Statement 2016-17 A - 3

Page 140: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

Property Asset Utilisation Taskforce

As part of the Property Asset Utilisation Taskforce (PAUT) Implementation Phase II reform, the Government identified the need to ensure that agencies are appropriately focused on asset utilisation and recycling prior to seeking new or increased expenditure. New processes are being developed to strengthen oversight of new and increased capital expenditure.

Project selection

Individual projects must be financially, socially and economically justifiable to attract government investment. The project selection process helps to provide assurance to the people of New South Wales that investment is directed only to projects that will support economic growth and improve living standards. Many mechanisms are in place to support strong project selection processes including:

• state priorities and the SIS provide a strong strategic context for project specification and selection

• agency Total Asset Management (TAM) Plans consistent with State priorities and the SIS

• robust business cases and economic evaluations are required for each project

• Gateway reviews using independent external reviewers

• an Infrastructure Investment Assurance Framework enables the Government to act as an informed investor in infrastructure

• a sound process to evaluate unsolicited proposals ensuring value to the State.

Total Asset Management

Total Asset Management allows the Government to make budget decisions on infrastructure that meet current and future needs. TAM strategies and 10-year capital investment pipelines are required for each asset intensive agency and allow the Government to invest in the infrastructure that is needed most.

TAM is the foundation for asset management and planning at an agency level. This includes ensuring only assets needed for service delivery are held and surplus assets are available for divestment. Sound asset management requires appropriate management practices by agencies across the asset lifecycle. This covers planning, procurement, operations, maintenance and disposal.

Box A.2: Continued transformation of ICT policy, governance and investment

Information and Communication Technology is a key enabler of government service delivery. The NSW Government ICT expenditure increased from $2.3 billion in 2013-14 to $2.4 billion in 2014-15 (NSW Government ICT Metrics Report 2014-15). The pipeline of new major ICT projects to be delivered by the government in coming years is estimated to be at least $2.7 billion.

The ICT Strategy, released by the Government in 2012 and updated annually, sets out a plan to build capability across the sector to deliver better, more customer-focused services, and to drive better value for the Government’s investment in ICT. The Government subsequently (in 2014) released the ICT Investment Policy and Guidelines, to support ICT investment through:

• establishing a collaborative approach, enabling clusters and agencies to leverage existing solutions, consolidate investments and identify enablers that could be leveraged for whole of government benefits

• identification of opportunities to deliver more efficient and effective ICT investment through early consideration of different sourcing strategies

• whole-of-government ICT strategic planning which will drive the transition to more consistent, shared and standardised approaches to ICT investment.

A - 4 Infrastructure Statement 2016-17

Page 141: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

Box A.2: Continued transformation of ICT policy, governance and investment (cont)

A strengthened ICT Investment Governance Model has been developed to better ensure ICT investments are delivered on time and on budget while achieving the best value outcomes for the State. This requires:

• agency ICT investments to comply with whole-of-government ICT strategy and investment delivery principles

• establishment of new ICT governance arrangements, including a new Government Chief Information and Digital Officer role in the Department of Finance, Services and Innovation to implement and administer a new risked based ICT Assurance Framework.

The progress achieved over the four year life of the 2012 ICT Strategy has created a strong platform for delivering better services in New South Wales. This includes work in key areas such as customer service, procurement reform, open data, transition to cloud, data centre consolidation, and cyber security. This work will help to frame the new approach to digital innovation across government in 2016. The final update on the NSW Government ICT Strategy (Digital+ 2016) can be accessed at:

https://www.finance.nsw.gov.au/ict/sites/default/files/resources/Digital_Strategy_2016_20151125.pdf

Gateway Review

The Gateway Review system is the Government’s assurance program for major capital projects. Reviews are conducted by discrete teams of experienced independent reviewers. The reviews assess projects against seven criteria: service delivery, affordability and value for money, sustainability, governance, risk management, stakeholder management and change management.

INSW and NSW Treasury managed Gateway Reviews during 2015-16. Cluster agencies participating in Gateway Reviews managed by NSW Treasury in 2015 included, Health, Education, Justice, Innovation and Services and Family and Communities, with 20 reviews undertaken for projects totalling $4.6 billion. The review teams were drawn equally from the public and private sectors and other States including Victoria, Queensland and Tasmania.

A review of the Gateway Policy Framework was carried out in early 2016. NSW Treasury will deliver an updated NSW Gateway Policy later this year with consideration of the recommendations from this review and those made by the Auditor General in reports relating to Gateway.

This policy will refine the framework for delivering Gateway providing independent assurance for government on projects from inception through to delivery and benefit realisation, delivering value to NSW taxpayers.

Infrastructure Investment Assurance Framework

In December 2014, following advice from INSW, the Government endorsed the establishment of an Infrastructure Investment Assurance Framework (IIAF). This strengthens the Government’s ability to ensure that infrastructure projects are:

• the highest priority and scoped for maximum value for money

• delivered in a timely and efficient way

• managed and maintained efficiently over their life.

The IIAF established the Infrastructure Investment Assurance Committee chaired by INSW and comprising heads of key agencies to advise the Government on planning, procurement, governance and management of major infrastructure projects.

The IIAF also includes a gateway review process that aims to ensure agencies follow a sound and rigorous approach to developing, evaluating and delivering infrastructure projects.

Refer to Chapter 4 of this Infrastructure Statement for more detail.

Infrastructure Statement 2016-17 A - 5

Page 142: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

Unsolicited proposals guide

The Government recognises that the private sector can offer innovative ideas, approaches and solutions to the State’s policy goals. The Government seeks to encourage a greater level of private sector investment and participation in projects, with rigorous planning and costing to deliver the highest standards of public value and confidence to investors and the community. The Guide for Submission and Assessment of Unsolicited Proposals, February 2014 (the Guide) gives the private sector the consistency and certainty of a transparent and streamlined framework for the assessment of their proposals.

The Guide is subject to regular reviews with the aim of continuous improvement. Since the Guide’s initial release in January 2012, the Government has sought feedback from industry and reviewed the Guide and its underlying processes to improve the quality of proposals received.

In late 2015 the Department of Premier and Cabinet (DPC) undertook a review into the NSW Unsolicited Proposals Framework. The review found that the framework is sound and has led to successful outcomes following the update to the Guide in February 2014. In March 2016, the NSW Acting Auditor General released a Performance Audit Report Managing Unsolicited Proposals in New South Wales which noted that “overall, the governance arrangements for unsolicited proposals are adequate”. The Guide is expected to be further enhanced by 2017, taking into consideration the findings of the DPC review and the Acting Auditor General’s report.

The Guide outlines seven minimum criteria for assessing proposals:

• unique benefits of the proposal providing justification to negotiate directly

• value to government, encompassing economic benefit, service delivery, whole-of-life costs, risk transfer, timely achievement of objectives and qualitative outcomes

• whole-of-government impact, including opportunity costs arising from deviations from the Government priorities that would require a reallocation of funding

• appropriateness of return on investment obtained by the proponent given project risks

• capability and capacity of the proponent to deliver the proposal

• affordability from the perspective of the Government

• appropriate balance in the allocation of risk.

Since the updated Guide was published in February 2014:

• 52 proposals have been received

• four proposals are in Stage 1

• one proposal passed Stage 2 - ‘Macquarie Square’ for AMP Capital and Macquarie University for a new transport interchange and town centre at Macquarie Park

• two proposals have been completed:

– ‘Crown Sydney Resort’, for the application for a restricted gaming facility licence at Barangaroo South

– ‘Wynyard Place’ a consolidation of four existing buildings to deliver a four-level public concourse, a new transit hall and entrance to Wynyard Station, and a state-of-the-art office tower.

A - 6 Infrastructure Statement 2016-17

Page 143: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

Funding

The Government is better utilising, and increasing the potential pool of funds available for infrastructure projects by:

• continuing to fund infrastructure projects through Restart NSW, a dedicated fund for infrastructure to improve the economic competitiveness of the State (refer to Chapter 2 of this Infrastructure Statement)

• working with the Australian Government to secure support for infrastructure funding including through an overarching Asset Recycling Agreement with incentive payments of up to 15 per cent of the asset sale value recycled into productive investment

• securing funding in the 2016 Australian Government Budget of $9.9 billion over the four years to 2019-20 for infrastructure projects administered by the Government and local government

• applying Capital Planning Limits for major infrastructure portfolios (Health, Education and Transport) to provide longer term security of funding for the portfolios and allow savings to be re-allocated to other approved projects

• delivering options for contestable delivery of new service infrastructure in growth areas which will contribute to faster and lower cost development

• better setting and management of contingency allowances for efficiency gains and savings to free up funding for other projects

• working with local governments to improve productivity by assisting in the reduction of infrastructure backlogs

• working closely with the private sector to fund and deliver productive infrastructure projects.

Restart NSW

The Restart NSW Fund was established in 2011 to promote economic growth and productivity by funding the delivery of major infrastructure projects. By 30 June 2016, $16.5 billion is expected to have been deposited in the Restart NSW Fund. These inflows are from asset recycling initiatives, Waratah Bonds, interest income and windfall tax revenues.

Refer to Chapter 2 of this Infrastructure Statement for more detail.

Rebuilding NSW

The focus of Rebuilding NSW is on investments that increase productivity and improve the State’s overall economic performance. It involves unlocking $20 billion from the proceeds of the lease of 49 per cent of the NSW electricity network businesses for investment in new infrastructure. Areas of priority include public transport, urban and regional roads, water, hospitals, schools and cultural and sporting infrastructure.

Refer to Chapter 3 of this Infrastructure Statement for more detail.

Local government infrastructure

Effective local government infrastructure policy has a significant role to play in improving productivity.

The Government has committed $120.0 million to implement the Local Infrastructure Backlog Policy, consisting of:

• financial assessment and benchmarking of councils by NSW Treasury Corporation (TCorp)

• an audit of councils’ local infrastructure backlog

• a Local Infrastructure Renewal Scheme which offers councils with infrastructure backlogs State interest subsidies to help finance projects.

Infrastructure Statement 2016-17 A - 7

Page 144: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

The three rounds of the Local Infrastructure Renewal Scheme have provided interest subsidies for loans worth $567.0 million. These subsidies support 166 projects that will unlock $823.0 million of infrastructure investment. The projects include buildings, roads and bridges, airports, water and sewerage, waste management, stormwater and drainage, aquatic centres, sports facilities, and enabling infrastructure for housing developments. Councils have completed 79 projects.

While there are no further rounds of the Local Infrastructure Renewal Scheme, investment in local infrastructure remains a key priority for the Government. Eligible councils will now be able to access potential savings of up to $600.0 million through the TCorp facility as part of the reform package for local government.

The Government has also established and committed up to $365.0 million to the Stronger Communities Fund. This provides councils established as part of the Fit for the Future reform with access to funds for infrastructure and services that will grow and support their community. This will enable these councils to invest in the future by delivering new or improved infrastructure projects such as sporting fields, libraries and parks for the community.

Contingency review

Major infrastructure projects are long duration, highly complex undertakings that are often significantly affected by external events. A contingency component is required, covering costs that are difficult to precisely identify, given the risk profile of these projects.

In 2014, NSW Treasury and INSW issued a circular and guidelines to improve the allocation and management of contingencies to materially improve value for money in infrastructure delivery. The guidelines are intended to assist agencies to better plan and manage risks, and reuse surplus contingency for investment in other projects.

Contingencies must be managed throughout the full lifecycle of a capital project, including at the following stages:

• preliminary business case

• final business case

• project development stage

• project delivery stage.

Infrastructure finance / public private partnerships

Infrastructure finance involves a range of tools that facilitate better access to potential funding for infrastructure investments in New South Wales. These include public private partnerships (PPPs), concession agreements, leases, vendor finance and other structured finance arrangements.

The Infrastructure and Structured Finance Unit (ISFU) in NSW Treasury focuses on developing innovative solutions to enable continued partnerships with the private sector. These partnerships support complex service-enabling infrastructure projects and balance sheet and cash flow structuring. ISFU also provides structuring advice to develop alternative sources of capital and leads the restructure, refinancing and renegotiation of existing PPP projects.

PPPs are an approach to procurement and financing infrastructure that enables appropriate risk allocation between the Government and the private sector on a value for money basis. These partnerships are developed using world class standards and expertise and emphasise the role infrastructure projects play as an enabler for the delivery of government services. PPPs include social infrastructure PPPs (such as availability payment PPPs in health, education, transport and roads), economic infrastructure PPPs (such as user fee PPPs in roads and water), joint financing arrangements and concession agreements.

A - 8 Infrastructure Statement 2016-17

Page 145: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

The Government’s NSW Public Private Partnership Guidelines were recently enhanced following a review. The updated Guidelines reflect current best practice in procuring PPPs with the following principal features:

• creating public service-enabling infrastructure assets through public and/or private sector financing

• a contribution by government through land, capital works, availability payments, risk sharing, revenue diversion or other supporting mechanisms

• engaging the private sector for a specified period for the provision of related services.

The Guidelines provide a transparent mechanism to competitively pursue innovative solutions to deliver improved services and better value for money. This is primarily achieved through optimal risk allocation, management synergies, encouraging innovation in operations, design and construction, efficient asset utilisation and integrated whole-of-life asset management.

Reducing bid costs for outcome based procurement in New South Wales

In line with continuous improvement, NSW Treasury sought detailed feedback from industry participants on the State’s procurement processes for major infrastructure projects and how processes could be improved to reduce the cost of bidding. This review resulted in a number of key policy developments including the establishment of the Project Deed Evolution. This is a new standard project deed for availability based PPPs in New South Wales reflecting the most recent market precedent and was developed in collaboration with the private sector.

The last twelve months saw financial close for a number of significant contracts as well as development of key projects in the pipeline as summarised in Box A.3.

Box A.3: Innovative infrastructure procurement and financing in New South Wales

WestConnex

WestConnex is Australia’s largest transport project, linking Sydney’s west and south-west with the CBD, Sydney Airport and Port Botany and generating over $20 billion in economic benefits. The project is being delivered in three stages. Stage 1 is the widening and extension of the M4 motorway to Haberfield. Stage 2 is the new M5 motorway and Stage 3 is the planned link between the new M4 and the new M5. The project is primarily delivered by Sydney Motorway Corporation with capital contributions from Roads and Maritime Services (RMS).

WestConnex is estimated to cost $16.8 billion. The total cost is funded through a combination of NSW Government contributions, Australian Government contributions of $1.5 billion, an Australian Government concessional loan of $2.0 billion and private financing supported by user charges.

The WestConnex 2016-17 allocation is $2.9 billion, with around 40 per cent invested by the State and the remainder from the Australian Government and private investment.

The Government is investing $3.6 billion into WestConnex. The Government’s investment has enabled the delivery of Stage 1, the accelerated delivery of Stage 2 and the delivery of Stage 3 Preliminary Works. As part of the Stage 2 acceleration, a further additional Government equity investment was made to enable a majority ownership stake to be retained to maximise the value of the Government’s investment and asset recycling potential for Stage 3.

The Government is currently considering Stage 3 financing and delivery options to maximise the value for money, which may include asset recycling, Government contributions, private financing and user charges.

Westconnex – Stage 1B: In June 2015, financial close was reached on the design and construction contract with consortia led by CPB Contractors Samsung John Holland Joint Venture to deliver the M4 East Extension via a tunnel from Homebush to Haberfield.

Infrastructure Statement 2016-17 A - 9

Page 146: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

Box A.3: Innovative infrastructure procurement and financing in New South Wales (cont)

Westconnex – Stage 2: In November 2015, financial close was reached on the design and construction contract for WestConnex – Stage 2 – the new M5 Motorway with a CIMIC, Dragados and Samsung C&T joint venture. WestConnex Stage 2 incorporates design, construction, finance, maintenance and operation of a new M5 East tunnel as well as maintenance and operation of the existing M5 East tunnel. WestConnex Stage 2 will widen and extend the eastbound on-ramp and westbound off-ramp between King Georges Road and the M5 East and is the first section of the WestConnex Stage 2 including widening and extending the M5 motorway. The upgrade to the King Georges Road Interchange will cut travel times at the interchange by up to half as well as alleviate delays along the M5 East and King Georges Road.

Monetisation of M7 rental payments

In October 2015, the M7 base rent payable by Westlink M7 to RMS was successfully monetised and recycled into the NorthConnex project. The monetisation was unprecedented in the Australian market and is an innovative way of recycling assets to invest in critical infrastructure.

The monetisation involved a competitive sale process that attracted strong interest from domestic and offshore parties. This resulted in proceeds that were well above the minimum acceptable price, despite significant market volatility. All proceeds will be applied to the NSW Government’s contribution to the NorthConnex project.

Social and Affordable Housing Fund

The Social and Affordable Housing Fund (SAHF) is a dedicated fund that will facilitate new social and affordable homes to support vulnerable households. In partnership with Infrastructure Partnerships Australia and the NSW Council of Social Services, the fund has been set up with $1.1 billion in seed capital from the Government. The first phase will deliver 3,000 additional social and affordable homes, with at least 70 per cent to be social housing dwellings, and associated services.

The project will take the form of a Services Agreement with preferred consortia for the delivery of services including social and affordable homes throughout the State, asset management, tenancy management, tailored support coordination and performance and data reporting. The SAHF model will facilitate innovation to support a sustainable social housing system, deliver services that achieve outcomes, scalable design, and promote partnerships with private and non-government participants. The project is currently in the procurement stage.

Project delivery

Delivering infrastructure projects efficiently, on time and on budget is a key priority for the Government. There are a number of policies in place to help achieve this and measure progress along the way, including:

• using strategic plans to advance preparation by delivery agencies and by private providers who can rely on a project pipeline

• the Infrastructure and Structured Financing Unit in NSW Treasury continuing to actively engage and work with the private sector

• using innovative project delivery models, like the establishment of the Sydney Motorway Corporation Pty Ltd (SMC Group) which is delivering WestConnex, to focus both expertise and accountability

• further enhancement of the Government Procurement Policy

• the continued implementation of a set of business processes for Enterprise Asset Management

• INSW overseeing, monitoring and reporting to government on the progress of all significant projects

• the Projects NSW unit within INSW managing the procurement and delivery of nominated priority infrastructure projects

• instituting structural changes within major agencies, and across government, to drive infrastructure delivery. For example:

– Health Infrastructure, an independent expert organisation responsible for delivering all major health capital projects over $10.0 million on behalf of the Ministry of Health

A - 10 Infrastructure Statement 2016-17

Page 147: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Capital Strategies and Policies

– the Transport Asset Holding Entity, a dedicated asset manager for the State’s public transport sector responsible for procuring and selling assets consistent with Government requirements and negotiating leases and other contracts with operators

– constituting the Major Projects Executive Committee, comprising Chief Executives from central and infrastructure agencies, to supervise all major infrastructure projects and report to the Cabinet Sub-Committee for Infrastructure.

Review and reform of procurement policy

The Government has reformed its system for procurement of goods and services to deliver value for money, quality government services, and alignment with business needs.

The NSW Procurement Board Goods and Services Policy Framework and the Strategic Directions Statement 2014-15 outlines ways agencies can achieve the Government’s objectives of reducing red tape, increasing competition and innovation, and simplifying the procurement process for buyers and suppliers. This policy helps to improve overall procurement and industry engagement that will result in better outcomes.

Enterprise Asset Management

Enterprise Asset Management (EAM) is the efficient and effective management of an organisation’s assets across departments, facilities, business units and geographical locations to deliver the services required by customers. In February 2015 the NSW Government successfully launched a set of end-to-end business processes for EAM that aligns with the International Asset Management Standards (ISO 55000) series. The State’s asset portfolio includes physical assets, such as:

• buildings

• public transport assets

• health and education assets

• utilities

• cultural and recreational service assets

• emergency services and police assets.

The continued implementation of EAM will help to reduce the State’s annual maintenance expenditure. This new whole-of-life approach to managing assets focuses on the planning and renewal stages in addition to the acquisition and maintenance stages. This provides government agencies with the means to reduce waste and improve return on investment.

Guidelines for construction procurement

The Implementation Guidelines to the New South Wales Code of Practice for Procurement: Building and Construction 2013 deals with matters including:

• protecting freedom of association laws

• protecting independent contractors (including sub-contractors) from coercion

• restrictions on over-award payments, unregistered workplace agreements and project agreements

• ensuring that right of entry laws are appropriately applied on construction work sites

• arrangements for Workplace Relations Management Plans on larger projects.

The guidelines apply to contractors, including prospective contractors, who participate in government procurement processes for public building and construction work.

Infrastructure Statement 2016-17 A - 11

Page 148: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

B. SELECTED RESTART NSW PROJECTS

Resources for Regions The Resources for Regions program was established in 2012 and continues to support regional and rural mining-affected communities by addressing infrastructure constraints. The program is open to projects that cater for economic and social infrastructure. Each project helps to create jobs, drive economic growth and improve service delivery across the State.

Table B.1: Resources for Regions projects

Project Description Funding ($million)

Muswellbrook Hospital Redevelopment Stage 2 20.0

Cessnock and Singleton Hermitage and Broke Road upgrade project 16.7

Upgrade to Wollar Bylong Road project 14.0

Narrabri Water Supply Augmentation 12.3

Portland waste water treatment plant 10.1

Maitland renovation of High Street project 9.9

Ulan Road upgrade including over taking lanes and intersection works 9.5

Singleton CBD Renewal 9.0

Cobar Water Treatment plant 7.8

Muswellbrook roads safety and improvements 7.6

Muswellbrook mine affected Roads package 7.2

Cope Road upgrade: safety barriers, visibility improvements, drainage, line marking, signs & pavement works 6.7

Narrabri Airport airfield upgrade 6.0

Singleton Regional Livestock Market upgrade 6.0

Singleton Road and Bridges - three projects 5.9

Shortland Esplanade upgrades 5.6

Timber Bridge replacement project, Narrabri 5.3

Broken Hill Civic Centre project 5.1

Cobar to Nyngan Twin Pipelines 5.0

Cobar to Nyngan Twin Pipelines replacement - Stage 2 5.0

Upgrade of Cordeaux road and bridge, Wollongong 4.5

Muswellbrook mine affected roads rehabilitation and safety package 4.2

Muswellbrook Hospital Stage 1, Emergency Department 4.0

Upper Hunter Tertiary Education Centre 4.0

Redevelopment of Black bridge, Bathurst 3.5

Denman intersection upgrade, Muswellbrook 3.5

Ryan upgrade of pavement and safety, Singleton 2.9

Cobar Airport pavement strengthening works and lighting installation 2.5

New Cobar Sewerage treatment plant upgrade 2.1

Mudgee Airport upgrades 2.0

Total 207.9

Infrastructure Statement 2016-17 B - 1

Page 149: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Selected Restart NSW Projects

Illawarra Infrastructure Fund The Illawarra Infrastructure Fund was established to drive economic growth in the region. A range of infrastructure projects have received funding including aged and healthcare facilities, a technology hub, facilities for people with disabilities, pedestrian and cycle links, road links and tourism infrastructure.

Table B.2: Illawarra Infrastructure Fund projects

Project Description Funding ($million)

West Dapto Access Road Link 22.5

Aged Care Facility at Shellcove, Shellharbour 17.0

iAccelerate University of Wollongong (UOW) 16.5

ISLHD - Centre of Excellence for Aged Care Bulli Hospital 14.5

Kiama Hospital - redevelopments 8.0

Bowral Distributor Bypass road 7.5

Grand Pacific Walk Stage 1,Wollongong 5.0

Care and Community Centre for the aged with intellectual disability, Wollongong 3.0

Bald Hill Improvement Fund 2.9

Noahs Early Intervention and Family Support Centre 1.4

South Nowra Employment Precinct - entrance upgrades 1.1

Assisted Accommodation for the disabled 0.9

Total 100.2

Fixing Country Roads Fixing Country Roads is a program to provide targeted funding to local councils for road projects that will eliminate connectivity constraints on local roads in New South Wales and reduce the cost to market for local businesses. The program is helping fund vital road and bridge upgrades to better connect local and regional roads to state highways and key freight hubs such as silos, saleyards, industrial parks and depots.

Table B.3: Fixing Country Roads projects

Project Description Funding ($million)

Approved

Wagga Wagga High Productivity Freight Route upgrade 4.9

Upgrade of Silo Road Tocumwal, Berrigan 2.5

Purvis Lane upgrades, Dubbo 2.3

South Kempsey Village Heavy Vehicle bypass 2.3

Southern Cadia access route, Blayney 2.0

Romiaka Channel Bridge replacement 1.7

Deniliquin Industrial Area local road upgrade 1.6

Mount Lindesay Road upgrade, Tenterfield 1.5

Gresford Road bridge upgrade, Singleton 1.5

Tara-Betric Road Bridge replacement, Temora 1.5

Federation Street, road upgrade, Gilgandra 1.4

Jerangle Road upgrade Stage 2, Cooma 1.4

Boree Creek Freight Link, Urana 1.3

Tyrone Bridge replacement, Eurobodalla 1.3

Forest Road Rail bridge duplication, Orange 1.3

Cranky Corner Road (South) bridge upgrade, Singleton 1.3

Combaning Road upgrade, Junee 1.2

Tocal Road improvements, Maitland 1.2

Reconstruction and sealing of Gundabloui Road between Collarenebri and Mungindi 1.2

Kolkilbertoo Road, Bland 1.2

B - 2 Infrastructure Statement 2016-17

Page 150: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Selected Restart NSW Projects

Table B.3: Fixing Country Roads projects (cont)

Project Description Funding ($million)

Middlebrook Bridge replacement 1.1

Sealing of Bugilbone Road between Burren Junction and Pilliga 1.1

Milvale Road upgrade, Young 1.1

Bumbaldrey Road upgrade, Weddin 1.1

Forbes Northern Heavy Vehicle Route 1.1

Brookers Bridge (replace timber bridge with a concrete bridge), Singleton 1.1

Burrendong Way upgrade, Wellington 1.1

Gobarralong Bridge, Gundagai 1.0

MR 380 Cunningar Road Pavement Rehabilitation and Widening 1.0

Griffith Southern Heavy Vehicle bypass stage 1 0.9

Beaconsfield and Sewell's Creek Road upgrade, Oberon 0.9

Lower Bendoc Road pavement rehabilitation, Bombala 0.9

Upgrade of Gundabloui Road north of Collarenabri 0.8

Accelerated Timber Bridge replacement program, Wakool 0.8

Safety works, realignment of seal 4km extension Wilga Downs Road (SR26), Cobar 0.8

Bulli Creek Bridge Replacement, Comboyne Road 0.8

Upper Murray Industry access project, Riverina 0.8

Dicks Creek Road Bridge replacement - Nanima (Murrumbateman Creek) 0.7

Gundagai Road and Cowcumbla Street reconstruction, Cootamundra 0.7

Abington Creek Bridge, Uralla 0.7

Whitbarrow Way, Cobar 0.7

Eyre/Comstock and Comstock//Patton Street intersection upgrade, Broken Hill 0.7

Mount Lindesay Road upgrade, Kyogle 0.7

Gumble Road sealing, Cabonne 0.7

Replacement of Abercrombie River Bridge, Upper Lachlan 0.7

The Rock Road upgrade, Lockhart 0.7

Ardlethan Grain Hub Connectivity project, Coolamon 0.7

Box Creek Bridge replacement, Conargo 0.7

Jones Road and Boorga Road intersection, Griffith City 0.7

Gundy Creek Bridge upgrade – Renshaw McGirr Way 0.6

Marrar Croker Grain, Coolamon 0.6

Carrs Creek Bridge replacement, Bathurst 0.6

Rockvale Road upgrade, Armidale 0.6

Widen MR350 between Trundle and Tullamore, Parkes 0.6

Main Canal road upgrade, Murrumbidgee 0.6

Bridge assessments, Greater Taree 0.5

Burrangong Creek Bridge, Young 0.5

Kiamma Creek Bridge upgrade 0.5

Old Cootamundra Road upgrade, Temora 0.5

Tenterden Road Bridge replacement, Guyra 0.5

Bergen Bridge widening, Walcha 0.5

Conargo road at Murrumbidgee 0.5

MR 241 Murringo Road pavement west of Lachlan Valley Way 0.5

Pilliga Road culvert repairs and replacement, Coonamble 0.5

Bridge assessments, Tamworth 0.4

Ardlethan - Coolamon Road project 0.4

Bull Plain Road upgrade, Cowra 0.4

Bulgandramine Timber Bridge replacement. Narromine 0.4

Infrastructure Statement 2016-17 B - 3

Page 151: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Selected Restart NSW Projects

Table B.3: Fixing Country Roads projects (cont)

Project Description Funding ($million)

Cunnigar Road rehabilitation, Harden 0.4

Widening of McHenrys Creek Bridge, Henry Lawson Way, Young 0.4

Rosemeath Road widening and pavement strengthening, Bombala 0.4

Starr's Crossing Bridge replacement 0.4

Sutton's Lane reconstruction, Cootamundra 0.4

Upgrade Middle Trundle Road, Parkes 0.4

Cedar Party Creek Bridge replacement (Stage 1), Taree 0.4 Trangie Showground Road upgrade, Narromine 0.3 Euston Prungle access upgrade, Balranald 0.3 Inspections and load ratings for 42 Bridges (level 3), Narromine 0.3 Acres Billabong Tilpa project, Cobar 0.3 Hanover Bridge, Cabonne 0.3 Replace Tin Tot Bridge, Inverell 0.3 Widen and upgrade MR350, Gunningbland 0.3 Mitchell Highway and Bunglegumbie Road intersection widening, Dubbo 0.3 Structural assessment of Bridge Infrastructure at Young and Boorowa 0.3 Mihi Creek Bridge replacement, Uralla 0.3 Bridge capacity assessments, Wagga Wagga 0.3 Cam Creek Bridge upgrade, Glen Innes 0.3 Parsonage Creek Bridge strengthening and widening, Bombala 0.2 Hopefield Road Bridge widening, Corowa 0.2 Phoenix Street intersection upgrades for B-Triple Access to TRLX, Tamworth 0.2 Timber Bridge Load assessments, Bega 0.2 Regional Bridge assessments’ across multiple locations (REROC project) 0.2 Ardlethan Grain Hub, Coolamon 0.2 Barham road bridge assessment, Deniliquin 0.2 Daysdale Walbundrie Road floodway, Corowa 0.2 Bridge assessment at Monaro 0.2 Rebuilding Taylors Bridge, Coffs Harbour 0.2 Kinghorn Bridge replacement 0.2 Validation of maximum load limits bridges, Coffs Harbour 0.2 Access upgrades at Mugincoble Silos, Parkes 0.2 Bridge assessments, Walcha 0.2 Bridge load assessments, Tamworth 0.2 Reseal Railway Street saleyards access, Coonamble 0.2 Bridge assessment, Narrandera 0.2 Bridge assessment, Wingecarribee 0.2 Tooloom Bridge, Tenterfield 0.2 Flags Niangala Bridge replacement, Walcha 0.2 Mosquito Creek road intersection widening, Moree 0.2 Bridge assessments, Eurobodalla 0.2 Regional Tantawangalo Road upgrade, Bombala 0.2 HMS Bridge assessment, Gunnedah 0.1 Bellingen Timber Bridge capacity assessment 0.1 Bridge assessments, Bombala 0.1 Bridge assessments, Inverell 0.1 Bridge and Culvert assessments for heavy mass vehicle transport, Leeton 0.1 Bridge assessments, Goulburn 0.1 Bridge assessments, Moree Plains 0.1 Cumnock S's project, Cabonne 0.1 Bridge Inspections (Level 3), Armidale 0.1 Bridge size culvert assessments, Temora 0.1 Emerald Grain project, Coolamon 0.1 Timber Bridge assessments, Eurobodalla 0.1

B - 4 Infrastructure Statement 2016-17

Page 152: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Selected Restart NSW Projects

Table B.3: Fixing Country Roads projects (cont)

Project Description Funding ($million)

Bridge assessments, Temora 0.1 Structural investigation Jimmy Scott Bridge, Port Stephens 0.1 Jacks Bridge replacement 0.0 Structural assessment of bridge over Crookhaven River, Culburra Road 0.0 Bridge assessments, Coolamon 0.0 Old Punt Road, Tomago, culvert structural investigation, Port Stephens 0.0 Not Yet Approved (a) Newell Highway to Wirrinya Heavy Vehicle Route upgrade 2.8 Upper Murray - Clarkes Hill 1.6 Appleby Lane upgrade 1.6 Browns Creek Road upgrade 1.5 Federation Way Freight Link 0.8 Realignment of the Devil's Elbow Corner 0.5 Grubben Road Upgrade 0.5 Urana Lockhart Road Causeway upgrade 0.3 Middle Trundle Road upgrade 0.3

Total 90.2

(a) INSW has recommended Restart NSW Fund allocations for these projects subject to the confirmation of Australian Government Round five Heavy Vehicle Safety Productivity Package contributions.

Water Security for Regions The NSW Government’s Water Security for Regions program has been set up to improve water security and help farmers and regional industries deal with drier conditions. Combined these projects will help to safeguard regional communities against future droughts and assist the Government in meeting its targets on access to potable water.

Table B.4: Water Security for Regions projects

Project Description Funding ($million)

Secure water source in Broken Hill (second stage) 72.7 Secure water source in Broken Hill (first stage) 42.3 Pipeline from Orange to Blayney and Carcoar 21.2 Pipeline from Orange to Molong Dam and Molong to Cumnock and Yeoval 16.7 Pipeline from Scone to Murrurundi 11.5 Broken Hill water security emergency works and investigations 12.0 Nyngan Single Storage project 10.0 Feasibility studies for priority catchments’ infrastructure 6.1 Kyogle Water Supply Augmentation project 6.4 Crookwell Water Supply upgrade 6.0 Nimmitabel Lake Wallace project 5.4 Willow Tree Pipeline 4.8 Boggabilla to Toomelah Pipeline project 4.6 Condobolin Bores project 3.9 Walgett - Raise weir with fish hatchery 3.6 Bourke - Bourke Bore Water 2.5 Baan Baa Water Supply Provision project 2.2 Upgrade Lachlan River intake, refurbish bore 2.2 Forbes - Bore Water and Pipeline 2.0 Narromine - additional bores 2.0 Warren, Collie and Nevertire Bores 1.4 Rankin Springs supply upgrade project 1.2 Gilgandra new production bore and 2km pipeline 1.1 Wilcannia, Ivanhoe and White Cliff bores 1.0 Glen Innes - Off Stream Storage 1.0 Angledool bore installation 0.7 Timor Dam - Feasibility Study 0.5

Infrastructure Statement 2016-17 B - 5

Page 153: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Selected Restart NSW Projects

Table B.4: Water Security for Regions projects (cont)

Project Description Funding ($million)

Tumbarumba - Connection of bores 0.5 Bombala Water Treatment plant 0.5 Installation of Bore - Binnaway 0.4 Wallabadah Pipeline between Scone and Murrurundi project 0.4 Installation of Bore - Coolah 0.4 Installation of Bore - Mendooran 0.3 New Bores at Brewarrina and Gongolgon project 0.3 Grawin bore and tanks 0.3 Replacement of No. 1 bore project 0.2 Test drilling of three bore sites 0.1

Total 248.2

Regional Tourism Infrastructure The Regional Tourism Infrastructure program was announced by the NSW Government to support the development and growth of regional tourism by investing in critical visitor economy infrastructure. These projects will make regional New South Wales a more attractive place to live and do business and contribute to the diversification of the economy.

Table B.5: Regional Tourism Infrastructure projects

Project Description Funding ($million)

Port of Eden Breakwater Wharf 27.5

Dubbo City runway and lighting upgrade 7.5

Armidale Dumaresq Terminal upgrade 6.6

Coffs Harbour Airport Airside and Terminal upgrade 5.1

Port Macquarie-Hastings Terminal upgrade 5.0

Airport upgrade 4.6

Ballina Byron Terminal upgrade 4.5

Merimbula Airport Runway extension 4.4

Wagga Wagga Airport upgrade taxiway network 4.0

Tamworth Terminal upgrade 4.0

Albury Airport Terminal upgrade 3.3

Ballina Byron Gateway Airport Airside upgrade 2.2

Tamworth Airport runway upgrades 2.2

Wagga Wagga Terminal upgrade 2.0

Lord Howe Island Airport Terminal upgrade 1.8

Lismore Airport Airside and Lighting upgrade 1.6

Armidale Regional Airport Airside upgrade 1.5

Moree Airport runway and lighting upgrades 1.5

Orange Airport Runway reseal 1.5

Cooma Airport Lighting upgrade 1.4

Bega-Merimbula Regional Airport emergency fire support infrastructure 1.0

Mudgee Airport Airside upgrade 0.9

Newcastle Airport international services upgrade 0.9

Lightning Ridge Airport upgrade 0.7

Griffith Airport airside and lighting upgrade 0.7

Bourke Airport re-seal existing runway 0.6

Taree Airport airside and lighting upgrade 0.4

Narrandera Leeton Airport general aviation parking upgrade 0.1

Total 97.3

B - 6 Infrastructure Statement 2016-17

Page 154: 2016- 17 Budget Paper No. 2 – Infrastructure …...The 2016-17 Budget provides for a record capital spend of $7.33 billion in the four years to 2019-20. The The investments are spread

Selected Restart NSW Projects

Housing Acceleration Fund (Reservations) The South Western Sydney Housing Acceleration Fund and the Housing Acceleration Fund include projects that help facilitate new housing investment, while improving the infrastructure and amenity of existing areas.

Table B.6: Housing Acceleration Fund projects

Project Description Funding ($million)

M4/Hill Road off ramp, Lidcombe 140.0

Housing Acceleration Fund planning 30.0

South Western Sydney Housing Acceleration Fund contingency 30.0

Spring Farm Parkway, Camden (Stage 1) 30.0

Hambledon Road NR2, Alex Avenue, Blacktown 22.0

Appin Road planning, Mt Gilead, Camden 10.0

Total 262.0

Infrastructure Statement 2016-17 B - 7