2016-2017 - actrec files/tenders/2016/liason architech.pdf · letter inviting offer ... for...
TRANSCRIPT
TATA MEMORIAL CENTER
ACTREC
Plot No. 1 & 2, Sector – 22,
Kharghar, Navi Mumbai 410 210
Pre-qualification Requirements &
Notice Inviting Tender
Tender Notice No: TMC/ACTREC/ENGG./SKB/LA/ET-23/2016 For Appointment of Liaison Architect
2016-2017
2
PRE-QUALIFICATION CUM-NOTICE INVITING TENDER
Tenders in the prescribed formats are hereby invited on behalf ofDirector,
ACTREC/ TMC, from the experienced Liaison Architect firms, who meet the specific
qualification requirements, as mentioned below to undertake the Liaison work
(i) Name of Assignment : Liaison work to obtain development
permissions & Occupancy Certificate
for construction of Dormitory building
at ACTREC, Plot No. 1 & 2, Sector–
22, Kharghar, Navi Mumbai in
coordination with Principal architect.
(ii) Approximate area of construction : About 12100 SqM (1,30,000 sqft)
(iii) Time for completing theAssignment : 36 Months OR Six months after
completion of building, whichever
is later
(iv) Earnest Money Deposit : Rs. 20,000/-
(v) Documents can be seen &
downloaded from website
www.tenderwizard.com :
From 10.00 hrs on 28/05/2016 to
17.00 hrs on 09/06/2016
(vi) Date of pre-bid meeting : 10/06/2016 from 10.00 AM to 4.30PM
(vii) Last date of submission of
Documents on website
www.tenderwizard.com : Up to 15.00 Hrs on 15/06/2016
(viii) Submission of hard copies of
credentials, EMD, Cost of tender
documents & Processing Fee : Up to 15.00 hrs on 17/06/2016
(ix) Opening of Technical Bids : 15.30 hrs on 17/06/2016
(x) Opening of financial bids :
Will be communicated after screening
the Technical Bid.
(xi) Tender Processing fee (To be paid
in the form of DD favouring M/s ITI
Ltd. Payable at Bangalore) :
Rs. 572/- (Rupees Five Hundred
Seventy Two Only)
Pre-qualification Requirements:
A) Organization:
Tenderer should ensure that he qualifies for all the items of the Assignment of his own
or through his affiliate Associate. Offers that seek to be qualified for only some of the
items of the Assignment will be summarily rejected. The details of Organizational set
up of the agency shall be provided along with their bid. The participating Organisation
shall have fully fledged Branch Office in Mumbai / Navi Mumbai if, they are based out
of Mumbai/ Navi Mumbai.
3
B) Experience & Resources:
a) shall have capability to execute the following:
i. Liaison work to obtain development permissions and occupancy certificate for
construction of Dormitory building at Plot No. 1 & 2, Sector–22, Kharghar, Navi
Mumbai in coordination with Principal architect.
ii. Should have qualified & trained personnel.
iii. Liaison Architect to obtain statutory approvals / permissions from various
authorities like, CIDCO, MCGM, municipal council, Horticulture Dept / Tree
Authority, Airport Authority, MOEF, pollution Control Board etc.
C) Financial capability:
a) should have satisfactorily completed three similar assignments, one of these
should be in Central Government/Central Autonomous Bodies/ Central PSUs,
each for an institutional project having built up area not less than 4850 Sqm; or two
similar assignments each for an institutional project having built up areanot less
than 7260 Sqm; or one similar assignments for aninstitutional project having built
up area not less than 9700 Sqm, during the last five years ending March 31, 2016
b) should have average annual turnover of Rs. 10 Lakhs from Architectural,
Engineering consultancy & Liaisoning services contracts during the last three
years ending March 31, 2016, Should not have incurred loss in more than two
years during the last five years and financial net worth of the tenderer should not
be negative.
c) Should have a minimum Bank Solvency of Rs. 4.00 lakhs from Scheduled Banks /
Nationalized bank.
d) should not be under liquidation, court receivership or similar proceedings.
4
LETTER INVITING OFFER
Ref. No.: _____________ Date: __________
To:
M/s____________________
………………………….
…………………………..
Sub: Appointment of Liaison Architect for obtaining development permissions
for Construction of Dormitory by Infosys Ltd.
Proposals are hereby invited in the prescribed form on behalf of Director, TMC /
ACTREC for the following Assignment:
(i) Name of Assignment : Liaison work to obtain
development permissions for
construction of Dormitory building
at Plot No. 1 & 2, Sector–22,
Kharghar, Navi Mumbai in
coordination with Principal
architect.
(iii) Approximate area of construction : About 12100 SqM (1,30,000 sqft)
(iii) Time for completing the Assignment : 36 Months Or Six months after
completion of building, whichever
is later.
(iv) Earnest Money Deposit : Rs. 20,000/-
(v) Tender processing fee : Rs. 572/-(Rupees five hundred
seventy two only)
(vi) Sale of Tender : From 27/05/2016 to 08/06/2016
(vii) Date of pre-bid meeting : 10/06/2016 (10.00 AM to 4.30 PM)
(viii) Date & time of up loading of Technical bids, Credential documents & Financial bid on website.
: 15/06/2016 Up To 3.00 PM
(ix) Last date of submission of hard
copies of Tender Papers (Technical
bid and credentials, cost of tender
documents, processing fee etc. in
sealed covers)
: 17/06/2016 Up To 3.00 PM
(x) Opening of Tender Papers
(Technical bid)
: 17/06/2016 at 15.30 hrs.
(xi) Opening of financial bids : Will be communicated after screening
the Technical Bid.
5
1) Desirous Liaison Architect/ Consultants may view and download the Tender Document from the
website www.tenderwizard.com. between 10:00 hrs on 27/05/2016 & 17:00 Hrs on 08/06/2016
against non-refundable processing fee of Rs. 572/- in favour of M/s ITI Ltd. Payable at
Bangalore (Details of Demand draft for processing fee to be entered on the website before
download can be started)
3) Alternatively the applicants can view the application from the web site www.actrec.gov.in.
Tender cost shall not be accepted in any other form. The DD shall be submitted in a sealed
envelope super scribed as Processing Fee. The application without Processing Fee will not be
considered for short listing. Proposals shall not be used for any other purpose and shall be kept
confidential. It will be obligatory on your part to return these documents and drawings at the
time of opening of the Proposals regardless of your making the bid or not.
4) The Proposals must accompany an Earnest Money Deposit (EMD) for the amount indicated
above, in the form of Demand Draft/ Fixed Deposit Receipts/ Pay Order Receipt, drawn in
favour of Accounts Officer ACTREC. Earnest money and the Proposals shall be kept in
separate sealed corers with name of Assignment and tender notice number clearly
written on top of envelopes. In case the earnest money is not deposited or is not in order,
then the Proposal will not be considered further.
5) In the event of your receiving the Liaison Contract, you will have to deposit Performance Guarantee (P
G) @ 5% of the Contract value. PG can be paid in the form of Demand Draft / Bank Guarantee of the
scheduled bank by the Consultant valid up to 60 days beyond completion period of consultancy. In
addition You will be required to deposit an amount equal to 2.5% of the contract Value as Security
Deposit ( S D) or it can be recovered from the Consultant's running bill @ 2.5% of the bill value till
the full amount of Security Deposit is built up. EMD deposited at the time of submission of proposal
will be refunded on receipt of S.D. Amount kept under PG & SD shall not bear interest and same shall
be returned to Consultant after satisfactory completion of the defect Liability period of the Construction
Contract.
6) Director, ACTREC/ TMC does not bind himself / herself to accept the lowest Proposal and reserves the
right to reject any or all Proposals received without assigning any reason. The Proposals, which are
incomplete and have not addressed or fulfilled the requirements specified in Tender Document, are
liable for rejection.
Thanking you,
Yours Sincerely,
For and on Behalf of Director, ACTREC
Officer-in-Charge, Engineering Services ACTREC
6
INFORMATION AND INSTRUCTIONS TO BIDDERS FOR e-TENDERING
PART A: GUIDELINES FOR e-TENDERING:-
1. The intending bidders must read the terms and conditions of the tender documents. He should only submit bids if he considers himself eligible and he is in possession of all documents required.
2. The information and instruction for bidders along with Technical bid, Financial bids etc. posted on website shall form part of the bid document.
3. The documents as uploaded can be viewed and downloaded free of cost by any one including the intending bidder. However for participating tendering process the intending bidder must download the documents after confirmation of tender processing fees from e-tendering portal only, within time and date of down loading, otherwise it will not be possible for them to upload the documents on the e-tendering portal.
Notes:
i) Downloading the tender documents without confirmation of payment details towards tender processing fees on web site: www.tenderwizard.com/DAE shall not be valid.
ii) The excel sheets accompanied with technical bid and financial bid shall be filled up uploaded within due date of submission.
iii) The PDF document available in website are part of tender document and can‟t be uploaded on the e-tendering portal in its present form. However the bidders may download the specific forms / data sheets etc. filled up, scanned and upload the same as required.
iv) The tender shall be submitted on the website www.tenderwizard.com in electronic form only and hard copy needs to be submitted manually. The tender documents submitted manually and E tender process.
v) The agency must ensure downloading of excel sheets in which the columns meant for filling up data / rates appears in yellow colour and the movement the data / rates are entered , it turns sky blue. The agencies have to fill and upload the filled up form on the website www.tenderwizard.com.
4. It is mandatory for all the applicants to have class-III digital signature certificate from any of the licensed Certifying Agency to participate in e-tendering.
5. In order to participate in online e-tendering process, it is mandatory for the applicants to have user ID & password to get access to the website www.tenderwizard.com/DAE. The applicants have to get registered their firm / company with the service provider, M/s ITI Limited for user ID & password. The registration shall be done by paying an annual registration fees to M/s ITI Limited and completing other formalities as mentioned in website. Validity of online registration is for one year from date of its issuance and be subsequently renewed. For assistance/clarifications, please contact on mobile 09969395522, e-mail : [email protected] / [email protected]
6. The applicants, who have already obtained such valid user ID and password from M/s ITI Limited, for any other project of TMC / DAE, need not obtain fresh user ID and password for the purpose of participation in the present tender.
7. The services for e-tendering in TMC / DAE is provided by M/s ITI Ltd., Tender wizard Help Desk Centre, B-1/5A, 2ndFloor, Main Nazafgarh Road Near Janakpuri Metro Station (East) Janakpuri, New Delhi-110058, Fax No: 91-11-25618721 Ph No : 011-49424365, or Mumbai helpdesk Rudresh.KSC/o Shri Rakesh Ranjan, Room No 7, 3rd floor, V.S.Bhavan, Anushakti Nagar, Mumbai 400094, 022-25487363, 09969395522, 9, 09969313460, 09969313423, e- mail : [email protected]
7
8. The excel sheets comprising of technical bid and financial bid and other documents shall be uploaded online in the prescribed format (Excel for Technical & Financial Bids, JPG or PDF for credentials) before the date and time as mentioned in e-tender portal. No other mode of submission is acceptable.
9. The agency shall download the pre bid clarification if any for the work and upload the same (scanned copy) duly signed and sealed. The revised documents (if any) shall be uploaded in e tender portal.
10. After submission of the bid / document the bidder can re-submit revised bid / document any number of times but before last date and time of submission of bid/document as notified.
11. If the agency found ineligible, after opening of technical bid his tender shall become invalid and processing fees shall not be refunded.
12. Tenderers are advised to upload their documents well in advance, to avoid last minutes rush on the server or complications in uploading. TMC, in any case, shall not be held responsible for any type of difficulties during uploading the documents including server and technical problems whatsoever.
13. Submission of the tender documents after the due date and time (including extended period) shall not be permitted. Time being displayed on e-tendering portal of TMC shall be final and binding on bidders.
14. In case of any problem with the submission of the tender, the tenderers may take the assistance of help desk or use the help manual given on the said website or mobile and e-mail mentioned above.
15. The tenderers are advised to submit the hard copies towards processing fees (if not paid online), EMD and other documents etc. well in advance to the Tender Inviting Authority, so that it should reach on or before the due date and time. Delay in receipt of hard copies due to security restriction, postal delay or delay due to any other reasons etc. shall not be accepted and tender shall be rejected forthwith.
Notes:-
1) If any information furnished by the tenderer is found incorrect at a later stage, he shall be
liable to be debarred from tendering/taking up of work inTMC. TMCreserves the right to
usein-house information to verify the particulars furnished by the tenderer and assess the
capability of the tenderer independently.
3) TMC/ACTRECshall not be responsible for any cost or expenses incurred by the tenderer in
connection with the preparation or delivery of bids, including costs and expenses related
with visits to the work site.
4) Clarifications, if any, can be obtained from the office of Engineering Services, ACTREC
Vide E-mail:[email protected], [email protected]
5) Please note that to enter ACTREC, TMC premises,aphoto-identity (passport, driving
license, voter's I-card, employer's I-card etc.) is a must.
6) The acceptance of a tender will rest with Director ACTREC, who does not bind himself to
accept the lowest tender and reserves to himself the authority to reject any or all the
tenders received without assignment of reason. Also he reserves to himself the right to
accept the whole or any part of the tender and the tenderer shall be bound to perform the
same at the rate quoted.
8
INFORMATION TO CONSULTANTS/ ARCHITECTS
1. INTRODUCTION
1.1 The Client named in the "Data Sheet" will select a Liaison Architect firm among those firms who obtain
the tender documents and submit their bid after fulfilling the qualification criteria and qualifyin
accordance with the method of selection indicated in the Data Sheet.
1.2 Liaison Architect are invited to submit a Technical Proposal & Financial Proposal for consulting
services required for the Assignment named in the Data Sheet. The proposal will form the basis for
future discussions and ultimately, a contract between the Client and the selected firm.
1.3 The liaison Architect liaises between ACTREC/ TMC their Principal architect at Bangalore, and
Government / local bodiesin Navi Mumbaito get periodic development permissions, Environment
Clearance, Fire NOC, Height & Airport Clearance NOC, Horticulture NOC, Commencement Certificate,
full occupancy certificate, permissions for water supply and drainage, Electrical Enhancement including
all other necessary approvals/ permissions etc. and obtain the final occupancy certificate of the
building.
1.4 The Assignment will be implemented in accordance with the phasing indicated in the Data Sheet.
When the Assignment includes several phases, continuation of services for the next phase will be
subject. to satisfactory performance of the previous phase, as determined by the Client.
1.5 Liaison Architect must familiarize themselves with the local conditions and take these into account in
preparing the proposals. To obtain firsthand information on the Assignment and on the local
conditions, Liaison Architect are encouraged to pay a visit to the Client before submitting a Proposal
and attend a pre-proposal conference as specified in the Data Sheet. Consultants should contact the
officials named in the Data Sheet to arrange for their visit or to obtain additional information on pre-
proposal conference. Liaison Architectshould ensure that the Client's officials are informed of the
intended visit in adequate time to allow them for making appropriate arrangements.
1.6 The Client will provide the inputs specified in the Data Sheet and make available relevant project data,
reports, design basis information etc.
1.7 It will be obligatory on your part to sign the Proposals for all components/parts. You shall
enclose the power of attorney for the person signing the bid.
1.8 Consultants may note that the costs incurred in the preparation of the Proposal and subsequent
discussions including a visit to the Client's office or proposed location(s) connected with the
assignment, are not reimbursable, and for which the Client is not bound to accept any claim.
1.9 Financial statements must show the latest available Five years' data certified by duly certifiedby
Charted Accountant.
1.10 Your Proposal shall provide a definitive answer to the following questions:
9
i. Has your firm during the last five years:
a) Default on a contract?
b) Been declared bankrupt?
c) Assigned a contract for the benefit of creditors?
d) been a party to litigation involving the non-payment on account of wages, materials,
equipment or supplies?
ii. If the answer to any of the above questions is 'yes', an explanation of the circumstances and
disposition shall be given. Any incorrect or false information will lead to disqualification or
cancellation of contract forthwith.
iii. You are required to indicate whether within the preceding five years they( the firm) have ever
been debarred, suspended, or otherwise prohibited from contracting with any Central/State, or
other governmental agency or entity. You shall also inform whether within the last ten years they
(including any joint venture partner) have been charged with, or convicted if any serious crime or
felony.
1.11 Information or the replies to the questions should be complete in all respects. In case the information or
the reply is 'Nil' or 'Not Applicable' etc. the same should be invariably mentioned as such.
1.12 Liaison Architecture informed that in order to avoid conflict of interest situations, any firm providing
goods, works or services with which you are affiliated or associated is not eligible to participate in
bidding for any goods, works or services resulting from or associated with the project of which this
Assignment forms part. You should clarify your situation in that respect with the Client before preparing
the Proposal.
2. CLARIFICATION & AMENDMENT OF TENDER DOCUMENT
2.1 Liaison Architect may request a clarification on any of the Documents furnished to them with the
tender up to the number of days indicated in Data Sheet, before the Proposal submission date. Any
request for clarification must be sent in writing by e-mail or speed post to the Client's address indicated in
the Data Sheet. The Client will respond by e-mail or speed post to such requests and copies of the
response (including an explanation of query but without identifying the source of enquiry) will be sent to all
invited Liaison Architect who intend to submit the Proposal.
2.2 At any time before the submission of Proposals, the Client may, for any reason, whether at its own
initiative or in response to a clarification requested by an invited consulting firm, modify the Documents,
furnished with the tender, by amendment. The amendment will be notified in writing bye-mailor speed
post to all invited consulting firms and will be binding on them. The Client may at its discretion extend the
deadline for the submission of Proposals.
3. PREPARATION OF PROPOSAL
3.1 Liaison Architectshall submit, a Technical Proposal and a Financial proposal, written in the language
specified in the Data Sheet.
10
Technical Proposal
3.2 Liaison Architectis expected to examine all terms and instructions included in the Documents furnished
with Tender. Failure to provide requisite information may result in rejection of Proposal.
3.3 While preparing the Technical Proposal, the bidder must give particular attention to the following:
i. Liaison Architectshould have requisite expertise while making the offer. In case, as permitted in Data
Sheet, the firm considers that it does not have all the expertise for the Assignment, it may
obtain such expertise by associating with individual consultant (s) and other associates, as
appropriate. These associations shall be subject to the approval of the Client. Consultant may or
may not associate with other Consultants invited on this Assignment as indicated in Data Sheet.
ii. Sub-contracting, if any, shall be indicted in the proposal, which may subject to the limitations as
mentioned in Data Sheet.
iii. The estimated cost of construction or work for which the Liaison assignmentis sought as well the time
to complete the Assignment is stated in the Data Sheet. Financial Proposal may be in accordance with
this. However, the Liaison Architectto note that financial proposal shall not be linked to the indicated
cost of work or project in any way.
iv. The key professional staff, listed in the offer, shall be available for the entire duration of the
execution of the Assignment. These shall preferably be the permanent employees of the firm or have
an extended and stable working relation with it.
v. Proposed staff must have relevant educational qualification and experience, preferably under
conditions similar to those prevailing at the locations of the Assignment.
vi. No alternative to key professional staff may be proposed and only one curriculum vitae (CV) may be
submitted for each position. The firm‟s personnel shall have a good working knowledge of
English.
3.4 Technical Proposal should provide the following information, but not limited to, using the attached
Standard Formats (Section - 3):
i. A brief description of the Liaison Architect organization and an outline of recent experience on
assignments of a similar nature. For each assignment, the outline should indicate, inter alia, the
profiles and names of the staff provided, duration of assignment, contract amount and firm's
involvement.
ii. Any comments or suggestions on the scope of work & services, documents and details made
available with this tender, as well on the facilities to be provided by the Client.
iii. A description of the methodology (work plan), which the Liaison Architectproposes to employ in
performing the Assignment, duly illustrated with bar charts of activities, Critical Path Method
(CPM) or Project Evaluation and Review Technique (PERT) or any other type of graphics.
iv. The composition of the proposed staff team by specialty, the tasks which would be assigned
to each and their timing;
11
v. Curricula Vitae (CV) recently signed by the proposed key professional staff and
countersigned by an authorized officer of the Consultant. Key information should include:
years with the firm/entity and degree of responsibility held in various assignments during
the last ten years;
vi. Details of specific experience/ expertise/information asked for in the Data Sheet;
vii. Confirmation/ submission on salient technical conditions mentioned in Tender
Document.
viii. List of Engineering & Management software and workstations, office space etc.
available with the firm, which the Consultant proposes to employ on this Assignment:
ix. List of current commitments (staff-months)with any oftheUnits/ Autonomous Institutions/ PSUs of
DAE;
3.5 The technical proposal shall not include any financial information.
Financial Proposal
3.6 In preparing the Financial Proposal, Liaison Architect is expected to take into account, besides technical
requirements, commercial conditions specified in the Tender Document. The Financial proposal
should follow, but not limited to, Standard Formats (Section -4).
3.7 The amount/ rates quoted in the Proposal shall be both in figures and words. Cost shallbe expressed
in Indian Rupees only.
3.8 The Financial Proposal, shall be all inclusive; and should cover, but not be limited to, remuneration for
staff (in the field and at headquarters), gratuity, provident fund, travel assistance, out of pocket
expense (per diem), overheads, profits, accommodation (housing), transportation (for mobilization and
demobilization), communication, equipment (vehicles, office equipment, furniture, consumable etc.),
printing of documents, surveys, training. The Financial Proposal shall also include the tax Liability and
cost of insurance of Consultants' firm and his personnel specified in Data Sheet.
3.9 The Financial Proposal should consider the mode of payment as specified in Data Sheet.
4. SUBMISSION, RECEIPT & OPENING OF PROPOSALS:
4.1. The original copy of the Technical Proposal and Financial Proposal must be prepared in indelible
ink. The proposals contain no inter-lineation or overwriting except as necessary to correct errors
made by the Consultants themselves. Any such corrections must be initialed by the person or
persons signing the Proposals.
4.2. An authorized representative of the firm must initial with stamp &sealon all pages of the
Proposals. The representative's authorization to be confirmed by a written power of attorney
accompanying the Proposals.(Copy of Power of Attorney in favour of the authorized representative to
be enclosed with the bid.)
12
4.3. For each Proposal, the Consultant shall-prepare number of copies indicated in the Data Sheet.
Each Technical Proposal and Financial proposal should be marked 'Original'.
4.4. The original proposal of the Proposals shall be placed in a sealed outer envelope which will bear the
address and information indicated in the Data Sheet. This outer envelope will include two separate
envelopes, one clearly marked "Technical Proposal" and one clearly marked "Financial Proposal".
4.5. The completed Technical Proposal and Financial Proposal must be delivered at the submission
address on or before the time and date stated in the Data Sheet. Any proposal received after
closing time for submission will not be considered.
4.6. The Proposal must be valid for the number of days stated in the Data Sheet from the date of its
submission during which you must maintain the availability of the key professional staff
proposed for the Assignment. The Client will make its best effort to conclude the Proposal
evaluation process within this period. If the Client wishes to extend the validity period of the
Proposals, Consultant has a right to extend or not to extend the validity of their Proposals.
4.7. After the deadline for submission of proposals, the Technical Proposal will be opened by the
Client's evaluation committee in the presence of all attending bidders/their representatives.
Financial Proposal shall remain sealed until the technical evaluation of all the proposals is
complete.
5. EVALUATION OF PROPOSALS
5.1. A two-stage procedure will be adopted in evaluating the proposals: i) technical evaluation, which will
be carried out prior to opening any financial proposal; and ii) financial evaluation. Each firm will be
ranked using a combined technical and financial score.
Technical Proposal
5.2. The evaluation committee or team appointed by the Client will evaluate the proposals on the basis of
their responsiveness to the requirements specified in Tender Document, applying the
evaluation criteria, sub-criteria and point system specified in the Data Sheet. Each responsive
proposal will be attributed a technical score (St.). A proposal shall be rejected at this stage if it does
not respond to important aspects of the tender requirements or if it fails to achieve the minimum
technical score set out in the Data Sheet.
Financial Proposal
5.3. After the evaluation of Technical Proposals, the Client shall notify the date, place and time set for
opening of Financial Proposals. The notification may be sent by e-mail, or speed post.
5.4. The evaluation committee or team will determine if the Financial Proposals are complete i.e.
whether they have costed all items of the corresponding Technical Proposal, if not the Financial bid
will be rejected.
5.5. The lowest Financial Proposal will be given a financial score for 100 points. The Applicants will be
allotted score relative to the score of Applicant with lowest quote, which will be as below:
13
Fs = 100 x FL/F
Where:
Fs = The financial score of the Financial Proposal being evaluated
FL = The price of lowest priced Financial Proposal
F = The price of Financial Proposal under consideration
The score of technical proposals would be given 70% weightage and that of the financial proposals would be given 30% weightage. The weighted total score of both the Technical and Financial proposals shall be used to rank the Applicants.
Total Score = 70% x Ts + 30% x Fs
The first ranked Applicant is eligible for award of the work.
6. DISCUSSIONS PRIOR TO AWARD OF CONTRACT
6.1 Prior to the award of contract, the Client will notify the successful bidder whose proposal
scored the highest combined score (technical+financial) and invite him to discuss the
Contract. Discussions will be held at the address indicated in Data Sheet and the aim is to
reach an agreement on all the points.
6.2 The discussions may include the proposed methodology (work plan), staffing, quality system
and any suggestions made by the firm for expeditious completion of the Assignment.
Agreement must then be reached on the final requirements on terms of reference, the
staffing and bar charts, which will indicate activities, staff periods in the field and in the home
office, communication, logistics, reporting etc. Special attention will be paid to define clearly
the inputs required from the Client to ensure satisfactory completion of the Assignment. The
agreed work plan and other terms of reference will then be incorporated in the 'Description
of Services' and shall form part of the Contract.
6.3 The financial discussions may include clarifications, if any, on taxes, levies and other
such charges considered in the proposal. Some of the special conditions of contract may be
discussed.
6.4 Having selected Liaison Architect, among other things, on the basis of an evaluation of
proposed key professional staff, total staff deployment as well as availability of requisite
facilities/ resources, the Client will require assurances that these shall be actually available.
If this is not the case and if it is established that key staff, facilities and resources which were
offered in the proposal were, not actually available, the firm may get disqualified.
14
7. AWARD OF CONTRACT
7.1 The Contract will be awarded, after obtaining requisite approvals from the Competent Authority,
based on completion of successful discussions.
7.2 On award of the Contract, the Liaison Architectshall commence the Assignment on the date
and at the location specified in the Data Sheet. A co-ordination procedure shall also be
established and name of the accredited representative of the Liaison Architectwho would be
responsible for taking instructions from the Client/Principal architect shall be communicated.
15
DATA SHEET
(Information to Liaison Architect)
1. The name of the Client: ACTREC,Tata Memorial Centre (TMC), Under Administrative Control
of Dept. of Atomic Energy, Government of India.
2. The name of the Assignment: Liaison work to obtain development permissions for Liaison
work to obtain development permissions for construction of Dormitory building at Plot
No. 1 & 2, Sector–22, Kharghar, Navi Mumbai in coordination with Engineer-In-Charge,
ACTREC and Principal Architect.
The objective of the Assignment is: To provide complete Liaising Services pertaining to
obtain development permissions such as Environment Clearance, Fire NOC, Height &
Airport Clearance NOC, Horticulture NOC, Commencement Certificate, full occupancy
certificate, permissions for water supply and drainage, Electrical Enhancement including
all other necessary approvals/ permissions etc. required for the project.
The address for requesting clarification is “Officer-in-charge, Engineering Service,
ACTREC, Plot No. 1 & 2, Sector–22,Kharghar, Navi Mumbai 410 210”.
3. Specific experience/ expertise/ additional information to be provided by the Liaison Architect
are:
The Liaison Architectshall obtain all forms andall documents from Principal architect (who is the
designer for the project of Dormitory building at ACTREC)for getting for registration of Licensed
Structural Engineer, Architect, Licensed Plumber etc.with local bodies.
4. Financial proposal should be on Total Value of Work in Indian Rupees only.
5. Tax liability, insurance description or reference to Documents:
The Liaison Architect and his personnel shall pay the taxes and other impositions levied under
existing, amended or enacted laws during the period of the Assignment.
The Liaison Architect shall cover employer‟s liability compensation insurance for his or his sub-
Consultants‟ personnel in accordance with the provisions of relevant applicablelaws.
6. The payment is proposed to be made on the basis of milestones achieved or deliverables
received during the course of working on the Assignment. The proposed milestones/ deliverables
for this purpose are included herewith.
16
7. The number of copies of the Proposals: Two (One in original Format and one photo copy)
a) The address for obtaining tender documents, pre-bid clarification/informationand
submission of bid:Officer-in-Charge, Engineering Services, ACTREC, Plot No. 1 & 2,
Sector–22, Kharghar, Navi Mumbai-410 210
b) The date and time of Proposal submission are: 21.06.2016
c) Financial Proposal must remain valid for 120 (days) from the date of submission of bid.
8. The points given to evaluation criteria are:
PRE-QUALIFICATION PART-1------------------------------------------------------------------- 100 points.
ATTRIBUTE - A.: ORGANISATION. . . .. . . . . . . . . . . . . . . . . . . . . . . . 30 Points
1 Organization set up & Office Locations Form " E” 5 Points
2 In-House Service for Assignment Form "F” 10 Points
3 Associates related to the Assignment and their Experience Form "G” 5 Points
4
Qualifications and Competence of the Key Technical Personnel
for the Assignment Form "K” Firm shall meet the requirement as per the
table under Form “K”–“minimum required experience of the proposed key
staff and number of staff to be deployed for the project”.
(a) Architects 4 points
(b) Civil & MEP Engineers 6 Points
10 Points
TOTAL : 30 Points
ATTRIBUTE - B. EXPERIENCE.--------------------------------------------------------------------------- 50
Points
B1
Experience in similar nature completed of Work for an institutional project
during last five years Form “B”:
a) one similar assignments for an intuitional project spread not less
than an area of 9700 Sqm,
b) two similar assignments each for an intuitional project
spread not less than an area of 7260 Sqm; or
c) three similar assignments, spread not less than an area of
4850 Sqm
At least one of the above projects shall be for Government/ Semi-
30 Points
17
Government/ Government Undertaking/ Government Autonomous
Bodies, etc.
B2 Performance of Works : Performance of work is evaluated w.r.t.:-
Attribute-1- Quality of work : Total points = 5
1 Excellent 5 Points
2 Very Good 3 Points
3 Good / Satisfactory 2 Points
4 Average 1 Point
Attribute-2- Technical Proficiency.: Total points = 5
1 Excellent 5 Points
2 Very Good 3 Points
3 Good / Satisfactory 2 Points
4 Average 1 Point
Attribute-3- Resourcefulness : Total points = 5
1 Excellent 5 Points
2 Very Good 3 Points
3 Good / Satisfactory 2 Points
4 Average 1 Point
Attribute-4- General Behaviour : Total points = 5
1 Excellent 5 Points
2 Very Good 3 Points
3 Good / Satisfactory 2 Points
4 Average 1 Point
20 Points
5
Points
5
Points
Points
5
Points
TOTAL : 50 Points
ATTRIBUTE - C. FINANCIAL CAPABILITY . . . . . . . . . . . . . . . . . . . 20 Points
1 Average annual turnover (gross) 10 Points
2 Net profit 5 Points
3 Not under liquidation, court receivership or similar proceedings. 5 Points
TOTAL : 20Points
18
Note: -
a) Evaluation Criteria in general (i) 70% marks for meeting minimum eligibility (ii) 100% marks for
twice the minimum eligibility criteria or more (iii) in between (i) & (ii) on pro rata basis.
b) The TMC, however, reserves the right to restrict the short listing of firms to any number
deemed suitable by it.
c) The applicant must secure Sixty percent in each of criteria but min. 70% in aggregate
d) Initially the points will be given based on the documentary evidence as Part-1.
e) The Financial bid of only those Consultants who secures minimum 70% in aggregate of Part-1
will be opened.
f) Assignment is expected to commence: June/ July 2016, Kharghar, Navi Mumbai
19
STANDARD FORMATS FOR PREPARATION OF TECHNICALPROPOSAL
(1) Technical proposal submission form
(2) Firm's references
(3) Team composition & assigned task
(4) Format of Curriculum Vitae of proposed key professional staff
(5) Profession Experience of Key persons
(6) Activity (work) schedule
(7) Particulars of assignment in hand
(8) Particulars of litigation history
(9) Financial Information
(10) Details of all works of similar nature of Assignment completed during the last Five Years.
(11) performance report of works referred to in Form 3 N
(12) Organizational structure.
(13) Details of Proposed Associate service –if any
(14) Certificate of Ethical Purchase
(15) Certificate
20
TECHNICAL PROPOSAL SUBMISSION FORM
(On the letter Head of the bidder) [Location, date]
TO :
(Name & Address of Client)
__________________________
__________________________
________________________
Sir:
Subject: Liaison Architect Service forConstruction of Dormitory building at ACTREC.
We, the undersigned, offer to provide the Liaison Architect services for the above in
accordance with your Letter Inviting Offer (Reference & date). We are hereby submitting our
Proposal which includes this Technical Proposal, and a Financial Proposal sealed under a separate
envelop.
We understand you are not bound to accept any proposal you received.
We remain,
Your „sfaithfully,
Signature_______________
(Authorized Representative)
Full Name_______________
Designation______________
Address_________________
21
1. FIRM‟S REFERENCES
Relevant services carried out in the last five years that best illustrates qualification for the tendered Assignment
The following information should be provided in the format below for each reference assignment
(similar to the tendered work) for which your firm, either individual as a corporate entity or as one of
the major companies within an association, has been primary responsible to render the Services
Assignment Name: Country :
Location within Country No. of Profession staff by your Firm
Name of Client:
Address:
(With Name, Telephone & Fax Nos.
of contract person)
No. of professional staff months
Start Date
(Month/year)
Completion Date :
(Month/ Year)
Name of Associated Firm(s) if any: No. of months of
Professional Staff provided
By Associated
Name of Senior Staff (Project Manager/Coordinator, Team Lead) involved and functions
performed:
Narrative Description of Project:
Description of actual services provided by Professional Staff:
Signature of Liaison Architect
22
2. TEAM COMPOSITION & TASK ASSIGNMENTS
Technical / Managerial Staff
Sr.
No. Name
Years of
experience
Nos. of years
with your firm Position Task
1. _
2. _
3. _
4. –
5. –
..
..
..
Support Staff
Sr.
No.
Name Years of
experience
Nos. of years
with your firm
Position Task
1. _
2. _
3. _
4. –
5. –
..
..
23
Format of Curriculum Vitae (CV) for proposed key staff
Proposed Position: ________________________________________________________
Name of firm: ______________________________________________________________
Name of staff: _____________________________________________________________
Profession: _________________________________________________________________
Date of Birth: _______________________________________________________________
Years with Firm: ____________ Nationality: ________________________
Membership of professional societies:
___________________________________________________
Detailed tasks assigned:
_____________________________________________________________
Key Qualifications:
(Give an outline of staff member's experience and training most pertinent to tasks on assignment.
Describe degree of responsibility held by staff member on relevant previous assignments and give
dates and locations. Use up to half a page).
Education:
(Summarize college/university and other specialised education of staff member, giving names of the
institutes, dates attended and degrees obtained. Use up to a quarter page).
____________________________________________________________________________
Employment Record:
(Starting with present position, list in reversed order, every employment held. List all positions held
by staff member since graduation, giving dates, names of employing organisation, title of positions
held and location of assignments. For experience in last ten years, also give types of activities
performed and TMC references, where appropriate. Use up to three-quarters of a page).
_____________________________________________________________________________
24
Present assignment:
Expected date of completion of present assignment in Hand, if applicable.
Languages:
(Indicate proficiency in speaking, reading and writing of each language by “excellent” “good”, “fair” or
“poor”)
Certification:
I, undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my
qualifications and my experience.-
Date ------------- (Day /Month/Year)
(Signature of the staff member &
Authorised representative of the firm)
25
3. PROFESSIONAL EXPERIENCE OF KEY PERSONNEL
Sl
NO
Parameter Detail
1 Name
2 Date and place of birth:
3 Nationality:
4 Marital status:
5 Address (phone/fax/e-mail):
6
Education:
(i) Institutions:
(ii) From (month/year
(iii) To (month/year)
7 Degree:
8 Mother Tongue:
9 Language known :
10
Language skills : Indicate on a scale of 1 to 5
(1- excellent 5 – basic):
11 Membership of professional bodies:
12 Other skills (e.g. computer literacy, etc.):
13 Present position:
14 Years of professional experience
15 Key qualifications:
26
4. ACTIVITY (WORK) SCHEDULE
(1st, 2nd, 3rd … are month from the start of Assignment)
Month wise programme (in the form of Bar chart) For Entire period of liaisoning
Sl No Item of 1st 2nd 3rd 4th 5th
Activities/ work
27
5. PARTICULARS OF ASSIGNMENT IN HAND
Provide information about all project in progress, including those where the firm has received
a letter of intent, but a formal contract has not yet been awarded. The list shall also include
separately the Assignments in hand for the Units/PSU‟s of DAE.
Sl.No Name &
Brief Detail
of the
Assignment
Value of
Assignment
Name &
Address of
Contact
Person
with
Telephone/
fax no & E-
mail.
Estimated
Man
hours/
months
assigned/
to be
assigned
foe the
work
Completion Period Present
stage of
work
with
reason
for
delay (if
any)
Stipulated Actual
(1 ) ( 2) (3 ) (4) (5a) (5b) (6)
6. PARTICULARS OF LITIGATION HISTORY
Name of the Consultant_________________________
Consultant, including Associate should provide information on any history of litigation or arbitration
resulting from contracts executed in the last ten years or currently under execution, as required in
this pre-Qualification document.
Year Name of
Client
Cause of
litigation
Matter under
dispute
Award FOR
or AGAINST
the Applicant
Disputed
Amount.
28
FORM “A”
7. FINAICIAL INFORMATION
I. Financial Analysis - Details to be furnished duly supported by figures in balance sheet/profit
and loss account for the last five years duly certified by the Chartered Accountant, as
submitted by the applicant to the Income Tax Department (copies to be attached).
Financial Year
Particulars 2010-11 2011-12 2012-13 2013-14 2014-15
Gross Annual turnover on
Liaison Architects work (In
Lakhs)
i) Profit/Loss
iii) Certified by
II. Financial arrangements for carrying out the proposed work.
III. Copy of the PAN card
IV. Copy of TIN / Service Tax No :
V. The following certificates are enclosed:
(a) Current Income Tax clearance Certificate/Profit & Loss account
(b) Solvency Certificate from bankers of Applicant for minimum Rs. 10.00 lakh
Signature of Chartered Accountant with seal Signature of Applicant(s)
29
FORM “B”
8. DETAILS OF ALL WORKS OF SIMILAR NATURE OF ASSIGNMENT COMPLETED DURING THE
LAST FIVE YEARS ENDING LAST DATE OF PREVIOUS MONTH OF NOTICE.
SIMILAR NATURE OF ASSIGNEMENT COMPLETED
Sr.No Description 1 2 ...
1 Name of work /project and
location
2 Name & Address of
Employer/ organisation
3 Cost of work in Rs. Crores
(or built up area in case of
foreign consultants)
4 Date of commencement as
per contract
5 Stipulated date of
completion
6 Actual date of completion
7 Litigation /arbitration
pending /in progress with
details*
8 Name and address/
telephone number of officer
to whom reference may be
made.
9 Remarks / Scope of
consultancy contract.
**Indicate gross amount claimed and amount awarded by the Arbitrator.
Signature of Applicant(s) with date & seal
30
FORM 'C'
PROJECTS UNDER EXECUTION OR AWARDED
Sr.No Description 1 2
1 Name of work /project and
location
2 Name & Address of
Employer/ organization
3 Cost of work in Rs.
4 Date of commencement
as per contract
5 Stipulated date of
completion
6 Up to date percentage
progress of work
7 Name and address/
telephone number of
officer to whom reference
may be made.
8 Remarks / Scope of
consultancy contract.
Signature of Applicant(s) with date & seal
31
FORM “D"
9. PERFORMANCE REPORT OF WORKS REFERRED
Sl
No
DETAIL INFORMATION
1 Name of work/Project & Location.
2 Agreement No
3 Estimated Cost
4 Tendered Cost
5 Date of start
6 Date of Completion (i)Stipulated date of completion
(ii)Actual date of completion
7 Amount of compensation levied for delayed
completion, if any.
8 Overall performance of the Liaison Architect Very Good / Good / Fair/ Poor
Dated: Executive engineer or equivalent
#Note:-Certificate for each work completed/under execution shall be obtained in the above format
32
FORM “E”
10. ORGANISATIONAL STRUCTURE
1 Name & Address of the applicant: Points
Attributed
2 Telephone No./Telex No./Fax No/Email/ Website
3 Legal status of the applicant (attach copies of
original document defining the legal status)
i. An individual
ii. A proprietary firm
iii. A firm in partnership
iv. A limited company or Corporation
2.0
3.0
4.0
5.0
4 Particulars of registration with various
Government bodies (attach attested photocopy)
Organisation
/Place of
registration
.
Registration
No.
5 Names and Titles of Director & Officers with
designation to be concerned with this work:
6 Designation of individuals authorised to act for
the organisation.
7 Was the applicant ever required to suspend
assignment for a period of more than six months
continuously after you commenced the
assignment? If so, give the name of the project
and reasons of suspension of work.
8 Has the applicant or any constituent partner in
case of partnership firm, ever abandoned the
awarded work before its completion? If so, give
name of the project and reasons for
abandonment.
9 Has the applicant, or any constituent partner in
case of partnership firm, ever been debarred /
black listed for tendering in any organisation at
33
any time? If so, give details.
10 Has the applicant or any consultant partner in
case of partnership firm, ever been convicted by
a court of law? If so, give details
11 In which fields of Consultancy assignment the
applicant has specialisation and interest?
12 Details of Association/tie-ups with Indian Partner
[in case of Foreign Consultancy firm]
13 Details of Association/tie-ups with Foreign
Partner [in case of Indian Consultancy firm]
14 Any other information considered necessary but
not included above.
34
FORM 'F'
DETAILS OF AVAILABLE IN-HOUSE SERVICE
Sr.No. IN HOUSE SERVICE AVAILABILITY OF SERVICE
(STRIKE OUT WHICHEVER IS
NOT AVAILABLE)
Points
attributed
Total 10 Points
1 ARCHITECTURAL-CIVIL
YES / NO 2 Point
2 STRUCTURAL ENGG
YES / NO 1.5Point
3 PUBLIC HEALTH ENGINEERING YES / NO 1 Point
4 ELECTRICAL YES / NO 1 Point
5 MECHANICAL YES / NO 1 Point
6 HVAC YES / NO
7 ACOUSTIC & SOUND SYSTEM YES / NO 0.25 Point
8 FIRE FIGHTING YES / NO 0.25 Point
9 LANDSCAPING YES / NO 0.5 Point
10 INTERIORS YES / NO 0.5 Point
11 LAN & NETWORKING YES / NO 1.0 Point
12 IBMS YES / NO
13 INFRASTRUCTURE FOR
OBTAINING
1Point
(a)Statutory Clearances such as
MoEF
YES / NO
(b) Construction YES / NO
(c) Power Connection YES / NO
(d) Water Connection YES / NO
(e) Sewage Connection YES / NO
(f) Other Clearances as applicable. YES / NO
35
FORM'G'
DETAILS OF PROPOSED ASSOCIATE SERVICE IF ANY
Sr.
No
.
PROPOSED
ASSOCIATE FOR
NAME &
ADDRESS OF
ASSOCIATE
PROPOSED
YEARS OF
EXPERIENCE
YEARS OF
ASSOCIATION WITH
THE PRIME
CONSULTANT
Points
attributed
Total 5
Points.
1 ARCHITECTURAL-
CIVIL
1 Point
2 STRUCTURAL
ENGG
1Point
3 PUBLIC HEALTH
ENGINEERING
0.25 Point
4 ELECTRICAL
0.25 Point
5 MECHANICAL -
HVAC
0.25 Point
6 ACOUSTIC
0.25 Point
7 FIREFIGHTING
0.25 Point
9 LANDSCAPING
0.25 Point
10
INTERIORS 0.50 Point
11 LAN &
NETWORKING/IBMS 0.50 Point
13 Statutory clearance. 0.50point
Note : If the firm has In-House services in respective fields/ trades, will get the full points
attributed under Form-G by default.
36
FORM „H‟
DETAILS OF TECHNICAL & ADMINISTRATIVE PERSONNEL TO BE DEPLOYED FOR
THE WORK
Sr.N
o
Designatio
n
Total
Numbe
r
Number
availabl
e for this
work
Nam
e
Qualifications
.
Professiona
l experience
and details
of work
carried out
How
these
would
be
involve
d in this
work
Remark
s
1 2 3 4 5 6 7 8 9
37
FORM „J‟
DETAILS OF CONSULTANCY/OFFICE EQUIPMENT LIKELY TO BE USED IN CARRYING OUT THE WORK
Sr
No
Name of
Equipment
Nos. Capacity
or Type
Age Conditio
n
Ownership status Curre
nt
Locat
ion
Re
ma
rks Presently
owned
Leased To be
purcha
sed 1 2 3 4 5 6 7 8 9 10 11
A CONSULTANC
Y
1. Hardware
i) Compute
ii) Plotters
etc
2.SOFTWARE
(Please mention
the software
proposed to be
used in this
work)
2 Any other
Office
Equipment.
(Please mention
the equipment
proposed to be
used in this
work)
38
FORM „K‟
PROFESSIONAL EXPERIENCE OF KEY PERSONNEL
Sl
NO
Detail
1 Name
2 Date and place of birth:
3 Nationality:
4 Civil status:
5 Address (phone/fax/e-mail):
6 Education:
(iv) Institutions:
(v) From (month/year
(vi) To (month/year)
7 Degree:
8 Mother Tongue:
9 Language known :
10 Language skills : Indicate on a scale
of 1 to 5 (1- excellent 5 – basic):
11 Membership of professional bodies:
12 Other skills (e.g. computer literacy,
etc.):
13 Present position:
14 Years of professional experience
15 Key qualifications:
16 Specific experience in non-
industrialized countries :
(i) Country .
(ii) Date: From – To
(iii) Brief description
** Minimum required experience of the proposed key staff and number of staff to be deployed for the project. Refer Attribute-A SL No 4.
39
ORGATIONAL ESTABLISHMENT
SL No
Position Experience in years
Numbers.
A. Architectural TOTAL Nos.
1 Specialists. > 25
2 Team Leader > 20
3 Sr Architect > 10
4 Jr Architect > 8
5 Support staff/ Draughtsman > 4
B. Structural Engineering TOTAL Nos.
1 Sr Designer > 10
2 Jr Designer > 8
3 Support staff/ Draughtsman > 4
C. Electrical Engineering TOTAL Nos.
1 Sr Designer > 10
2 Jr Designer > 8
3 Support staff/ Draughtsman > 4
D. Mechanical Engineering TOTAL Nos.
1 Sr Designer > 10
2 Jr Designer > 8
3 Support staff/ Draughtsman > 4
E. Public Health Engineering TOTAL Nos.
1 Sr Designer > 10
2 Jr Designer > 8
3 Support staff/ Draughtsman > 4
F. Others :Networking/ Landscape /Acoustic & Sound/ Interiors/Fire fighting
TOTAL Nos.
1 Sr Designer > 10
2 Jr Designer > 8
3 Support staff/ Draughtsman > 4
4 Project co-ordinator for all services. > 15
40
CHECK LIST
S. No
Basic Requirement
Specific Requirements
Documents Required
Document enclosed
1
Legal Entity
The firm should be a
company registered under
Indian Companies Act, 1956
or a partnership firm registered
under Indian Partnership Act,
or a Proprietorship firm
registered under the foreign
act
1. Copy of Certificate(s)
of incorporation-.
2.Copy of Registration
Certificate(s)
YES / NO
2
Turnover
Annual Turnover of the firm
for the last Five financial
years (2008-09, 2009-10, 2010-
11, 2011-12 and 2012-13) as
per the last published
audited balance sheets),
should be at least
Rs.9.00Crores.
CA Certificate with CA‟s
Registration
Number/Seal
YES / NO
3
Technical Capability
The bidder must have
successfully completed similar
nature of consultancy
assignment for any
state/central government
organization/PSU‟s/ Private
firms only in India during the
last Five years ending last date
of previous month of EOI
noticeas mentioned under Para
8 of Section -II.
Note : Foreign firms shall be
evaluated based on the built up
area.
As per project reference
and(Work Completion
Certificates from the
client; OR Work Order +
Self Certificate of
Completion (Certified by
the For scope Auditor);
OR Work Order + Phase
Completion Certificate
from the client)
YES / NO
4
Tax registration
(**)
The bidder should have a
registered number of :
1. VAT/Sales Tax where his
1. Copies of relevant
certificates of
registration.
2. VAT clearance
YES / NO
41
business is located 2. Service Tax. 3. Income Tax /Pan number. 4. WCT- TIN No :
certificate from the
Commercial Taxes
Officer of the Circle
concerned
5
Certifications
The bidder if possess, at thetime
of bidding, a valid ISO
9001:2008 Certification.
Copy of a valid
certificate
YES / NO
6
Blacklisting
A firm is not eligible to
participate in this project while
under sanction by DCSEM.
Similarly, at the time of
submission of PQ document,
the firms black- listed/
debarred in participating in
any procurement activities by
any State or Central
Government or UT in India/
Foreign Government are not
allowed to bid.
A Self Certified letter
YES / NO
7
Manpower Strength
The bidder shall have sufficient
qualified in house staff for
efficiently handling the
consultancy assignment.
A self-declaration (on
Firm‟s Letterhead)
YES / NO
8 Letter of
Transmittal
Format “A” to “K”. Complete information as
per the format.
YES / NO
9 Certificate As per the Performa. Duly signed with rubber
stamp.
YES / NO
**Note: Tax registration for Foreign consultants: On award of the work, Foreign consultants shall
have to register their firm with concerned authorities for VAT-TIN/WCT/Service-Tax/Income-
Tax/Labour cess as per the rules & regulation of Government of India.
42
CERTIFICATE OF ETHICAL PRACTICE
1 . I/We assure the Centre that neither I/We nor any of my/our staff will do any act/s, which
are improper /illegal during the currency of the contract awarded to us.
2. Neither I/WE nor anybody on my/our behalf will indulge in any corrupt
Activities/ practices in my / our dealing with the Centre. I/WE will have no
Conflict of Interest in any of our jobs/contracts at the Centre.
I/We have no conflict of interest in any of our jobs/contracts at the Centre
SIGNATURE
43
CERTIFICATE
I ____________________________, working as ______________________ in this organization
and authorized to issue this certificate and certify that:
1. We have gone through the contents of advertisement and related documents for this EOI and fulfill all
the eligibility criteria as per EOI.
2. All relevant documents are enclosed with our EOI.
3. The details and contents of our EOI are authenticated and based on actual work carried out by
our agency, as per record.
4. We have understood that in case it is found that our agency is not fulfilling any of the laid down
criteria, or relevant details/supporting documents are not found to be enclosed, we will not be
given any opportunity for any clarifications and our EOI will be evaluated based on available
documents in EOI.
Signature of Authorized Signatory.
Name: …………………………… Dated: …………………….
Designation: ……………………………
[Please Affix Rubber Stamp]
44
FINANCIAL PROPOSAL SUBMISSION FORM
FROM (name of Firm) (On the letterhead of the bidder)
TO:
(Name & Address of Client)
_____________________
_____________________
Sir,
Sub: Liaison work to obtain development permissions and occupancy
certificate for construction of Dormitory building at Plot No. 1 & 2,
Sector–22, Kharghar, Navi Mumbai in coordination with principal
architect.
We, the undersigned, offer to provide the consulting services for the above in accordance
with your Letter Inviting Offer Ref No.________________dt________ and out Proposal
(Technical &Financial). Our lump sum financial proposal is for a sum of Rs (in
words____________________). This amount is inclusive of all Taxes, and levies.
We undertake that, in completing for the award made to us in the above contract we shall
strictly observe the Laws “prevention of Corruption Act 1988” against Fraud & Corruption.
We understand you are not bound to accept any proposal you receive.
We remain
Yours faithfully,
Signature________
(Authorized Representative)
Full Name______________
Designation______________
Address_______________________
45
M I L E STONES FOR PAYMENT OF LIAISONING CHARGES
Stage-1
Obtaining Development Permission
(Commencement Certificate) for
establishment dormitory building in
ACTREC campus.
Cumulative 40% of the Total fee payable.
Stage-2
On submission of final report and file
containing all documents such as MOEF
Clearance, NOC from Civil Aviation
Department if required, Fire NOC, Health
NOC, Horticulture NOC, Water Supply
NOC, etc. Forwarding complete file for
obtaining of Occupancy Certificate from
concern local authorities.
Cumulative 55% of the Total fee payable
Stage-3:
On obtaining and submission of
Occupancy Certificate to owner &
Principal Architect.
Cumulative 100% of the Total fee payable
46
GENERAL CONDITIONS OF CONTRACT (GCC)
1. GENERAL PROVISION
1.1 Definitions
Unless the context „otherwise; enquires, the following terms whenever used in this Contract havethe
followingmeanings:
(a) "Client" means the Tata memorial Centre under Administrative control of the Department of Atomic
Energy, Government of India.
(b) "Government " means the Government of India.
(c) "Contract"- meansthe Contract signed by the Parties, to which these Conditions of Contract are
attached together with all the documents listed in Appendices of such signed Contract.
(d) "Applicable Law" means the laws and any other instruments having the force of law in the Client's
country, as they may be issued and in force from time to time.
(e) "Engineer-in-charge" means an engineer so appointedby the Client responsible to direct, supervise and
be in charge of the Services to be performed by the Architectural Consultancy Firms under the
Contract.
(f) "GCC" means General Conditions of Contract.
(g) "SCC" means Special Conditions of Contract by which these General Conditions of Contract may be
amended or supplemented.
(h) "Party" means the Client or the Consultant(s}, as the case may be, and Parties means both of them.
(i) "Services" means the work to be performed by the Consultant pursuant to this Contract, as
described in Appendix -A hereto.
(j) "Contract Price" means the charges to be paid for the performance of Services under this Contract.
(k) "Local currency" means Indian Rupees.
(l) "Foreign currency" means any currency other than Indian Rupees.
(m) "Personnel" means persons hired by the Consultant(s) or by any Sub-consultant(s) as employees
and assigned to the performance of the Services or any part thereof. "Local Personal" means such
persons who at the time of being so hired had their domicile inside the Client's country.
(n) "Member", in case the Liaison Architect consist of one entity.
(o) "Associate" means any other Liaison Architect to which the Consultant sub-let any part of the Services;
(p) "Third Party" means any person or entity other than the TMC, the Liaison Architect or Associate.
(q) "Site" means part or the whole of the property belonging to the Client on which the Services will need
to be performed.
(r) "Month" shall mean a calendar month.
47
1.2 Relation between the Parties
Nothing contained herein shall be construed as establishing a relation of master and servant
or of agent and principal as between the Client and the Consultant.; The Consultant,
subject to this Contract, has complete charge orPersonnel performing the Services and
shall be fully responsible for the Services performed by them oron their behalf hereunder.
1.3 Law Governing the Contract
This Contract, its meaning and interpretation and the relation between the Parties be
governed by the Applicable Law.
1.4 Language
This Contract has been executed in the language specified in the SCC, which shall be
the binding and controlling language for all matters relating to the meaning or interpretation
of this Contract.
1.5 Location
The Services shall be performed at such locations as are specified in Appendix-A hereto
and, where the location of a particular task is not so specified, at such locations in India,
as the Client may approve.
1.6 Notices
(a) Any notice, request or consent required or permitted to be given or made pursuant to this
Contract shall be in writing and shall be deemed to have been given or made when delivered in·
person to an authorized representative of the Party to whom the communication is
addressed, or when sent by registered mail, e mails to such Party at the address specified in
the SCC.
(b) Notice will deem to be effective as specified in the SCC.
1.7 Authority of Member in Charge
In case of Consultants consist of a Associates of more than one entity, the Members hereby
authorize the entity specified in the SCC to act on their behalf in exercising all the
Consultants' right and obligations towards the Client under this Contract, including without
limitation the receiving of instructions and payments from the Client.
1.8 Authorized Representatives
48
Any action required or permitted to be taken, and any document required or permitted to be
executed, under this Contract by the Client or the Consultant may be taken or executed by
the officials specified in the sec.
1.9 Taxes and Duties
Unless otherwise specified in the SCC, the Consultant, Sub-consultants and their
Personnel shall pay such taxes, duties, fees and other impositions as may be levied under
the Applicable Law, the amount of which is deemed to have been included in the Contract
Price.
2. COMMENCEMENTCOMPLETIONMODIFICATION&TERMINATIONOFCONTRACT
2.1. Effectiveness of Contract
This Contract shall come into effect on the date the Contract is signedbyboththe Parties or
such other date-as may be stated in these SECTION.
2.2. Termination of the Contract for Failure to become Effective
Ifthis contracthas notbecome effective withinsuch period oftime .after the date ofthe
Contractsigned by the Partiesas shall bespecifiedinSCC, eitherParty may,butnot
lessthan 4(four) weekswrittennoticetootherParty, declarethisContracttobenull and void,
and in theeventof such declaration by either Party, neitherParty shall have
anyclaimagainstthe otherPartywith respecthereto.
2.3. Commencement of Services
TheConsultantshall begin carryingoutthe Servicesattend ofsuch time period afterthe
Effective Date asmaybespecifiedintheSCC.
2.4. Expiration of Contract
Unless terminated earlier pursuant to Clause GCC 2.8 hereof, this Contract shall
expire when the Services have been completed in all respect at the end of
such time period after the Effective Date as is specified in the SCC.
2.5. Entire Agreement
This Contract contains all covenants, stipulations and provisions agreed by the
Parties. No agent or representative of either Party has authority to make, and
the Parties shall not be bound by or be liable for, any statement, representation,
promise or agreement not set forth herein.
49
2.6. Modification
Modification of the terms and conditions of this Contract, including any
modification of the scope of the Services or Contract Price, may only be made
by written agreement between the Parties.
2.7. Force Majeure
2.7.1. Force Majeure' means and includes any cause which is beyond the control of either
of the parties in the agreement which they could not foresee or with a reasonable
amount of diligence could not have been foreseen and which substantially affects the
performance of the Contract such as:
a) Natural phenomena such as floods, droughts, earthquakes, epidemics etc.;
b) Acts of war - declared or undeclared, priorities and embargoes, quarantine etc.
c) Other phenomena such as riots, civil commotion, state wise/ nation wise (but not
local) bandh etc.
2.7.2. Parties shall not be liable for the delays in performing their part of obligation (s)
resulting from any 'Force Majeure' causes as referred to above. The time for
completion of the contract shall, however, be extended by a reasonable time to cover the
period of delay completely attributable to the Force Majeure events.
2.8. Termination
2.8.1. By the Client
The Client may terminate the Contract, by not less than thirty (30) days' written
notice of termination to the Liaison Architect, to be. given after the occurrence of
any of the events specified in paragraphs (a) through (d) of this Clause GCC
2..8.1 and sixty (60) days in the case of event referred to in (e) below:
a) if the. Liaison Architectfail to remedy a failure in the performance of their
obligations under the Contract within thirty (30) days of receipt after being
notified or within such further period as the Client may have subsequently
approved in writing;
b) if the Liaison Architectbecome insolvent or bankrupt or enter into any
agreements with their creditors for relief of debt or take- advantage of any law
for the benefit of debtors or go into liquidation or receivership whether
compulsory or voluntary;
50
c) If the Liaison Architect submit to the Client a statement which has a material
effect on the rights, obligation or interests of the Client and which the Liaison
Architectknow to be false;
d) If, as the result of Force Majeure, the Liaison Architectare unable to perform a
material portion of the Services for a period of not less than sixty (60) days; or
e) If the Client, in its sole discretion and for any reason whatsoever, decides
to terminate this Contract.
2.8.2. By the Liaison Architect
The Liaison Architect may, by not less than thirty (30) days' written notice to the
Client, such notice to be given after the occurrence of any of the events specified in
paragraphs (a) and (b) of this Clause GCC 2.8.2, terminate this Contract:
a) If the Client fails to pay any money due to the Liaison Architect pursuant to this
Contract and not subject to dispute pursuant to Clause 8 hereof within forty-five
(45) days after receiving written notice from the Liaison Architect that such
payment is overdue.
b) If, as a result of Force Majeure, the Liaison Architectare unable to perform a
material portion of the Services for a period of not less than sixty (60) days.
2.8.3. Payment upon Termination
Upon termination of this Contract pursuant to Clauses GCC 2.8.1 or 2.8.2 hereof, the
Client shall make the following payments to the Liaison Architect (after offsetting against
these payments any amount that may be due from the Liaison Architectto the Client):
a) Remuneration pursuant to Clause GCC 6.1 hereof for Services
satisfactorily performed prior to the effective date of termination; and
b) reimbursable expenditures pursuant to Clause GCC 6.2 hereof for
expenditures actually incurred prior to the effective date of termination.
2.8.4. The Client shall not be liable to pay any bonus, damage or other claims of the Liaison
Architect for the loss of expected profit or interest in uncompleted portions of
the work and services
2.8.5. In the event, the contract is terminated due to reasons of unsatisfactory
performance, negligence or inordinate delays in achieving the targets, the Client
shall be free to encash the Performance Guarantee (BG) or forfeit the Security
Deposit fully or partially as may be decided by the Client.
51
2.8.6. In the event of termination of Contract, the Liaison Architectshall furnish to the Client
all the design, drawings, data, documents and details as are existing with him on that
date.
3. OBLIGATIONS OF THE LIAISON ARCHITECT
3.1 General:
a) Standard of Performance
The Liaison Architectshall perform the Services and carry out their obligations
hereunder with all due diligence, efficiency and economy, in accordance with
generally accepted professional techniques and practices, and shall observe
sound management practices, and employ appropriate advanced technology and
safe and effective equipment machinery, materials and methods.: The Liaison
Architectshall always act, in respect of any matter relating to this Contract or to the
Services, as faithful advisers to the Client, and shall at all times support and
safeguard the Client legitimate interests in any dealings with sub-Consultant or
Third Parties.
3.2 Conflict of interests
3.2.1 Liaison Architect not to benefit from Commissions, Discounts. etc.
a) The remuneration of the Liaison Architectpursuant to Clause GCC 6.1 & 6.2
hereof shall constitute the Liaison Architectsole remuneration in connection
with this Contract or the Services, the Liaison Architectshall not accept for
their own benefit any trade commission, discount or similar payment in
connection with activities pursuant to this Contract or to the Services or in
the discharge of their obligations hereunder, and the Liaison Architectshall use
their best efforts to ensure that any Sub-consultant, as well as the Personnel
and agents of either of them, similarly shall not receive any such additional
remuneration.
b) If the Liaison Architect, as part of the Services, have the responsibility of
advising the Client on the procurement of goods or appointment of
construction contractors, the Liaison Architectshall comply with any
applicable procurement guidelines, work contract procedures etc. of the Client
and shall at all times exercise such responsibility in the best interest of the
Client. Any discounts or commissions obtained by the Liaison Architectin the
exercise of such responsibility shall be for the account of the Client.
52
c) The Liaison Architect shall not have the benefit either directly or indirectly of
any royalty or gratuity or commission in respect of any patented or protected
article or process used unless it is mutually agreed.
3.2.2 Liaison Architect & Affiliates not to be otherwise Interested in Project
The Architect /Consultant agree that during the term of this Contract and after
its termination, the Consultant and his affiliates, as well assub-consultants shall
be disqualified from providing goods, works or services (other than the
Services and continuation thereof) for any project resulting from the Services.
3.2.3 Prohibition of Conflicting Activities
Neither the Consultant nor their sub-Consultant nor the Personnel of either of
them shall engage, either directly or indirectly, in any of the following
activities:
a) During the term of this Contract, any business or professional activities which
would conflict with the activities assigned to the under this Contract; or
b) After the termination of this Contract, such other activities as may be
specified in the sec.
3.3 Confidentiality:
a) The. Consultant, his Sub-contractors and the Personnel of either of them shall
not disclose any Information and data furnished to them by Client to any third
party nor shall disclose any drawings, reports, specification, manuals and
other information developed and prepared for Client by the Consultant and his
Sub-contractors and the Personnel of either of them, without prior written approval
of Client.
b) The Consultant and his Sub-contractors and the Personnel of either of them shall
be subject to the provisions of the Atomic Energy Act, 1962 and Official Secret Act
1923, with amendments as of date, pertaining to such information at all times.
3.4 Insurance to be taken out by the Consultant
The Consultant (i) shall take out and maintain, and shall cause any sub-Consultant to
take out and maintain, at their (or the sub-Consultant', as the case may be) own cost
but on terms and conditions approved by the Client, insurance against the risks, and
for the coverage, as shall be specified in the Special Conditions of Contract (SCC),
53
and (ii) at the Client's request, shall provide evidence to the Client showing that such
insurance has been taken out and maintained and that the current premiums therefore
have been paid.
3.5 Consultant's Actions requiring Client's prior Approval
The Consultant shall obtain the Client's prior approval in writing before taking any
of the following actions:
a) appointing such members of the Personnel as are Listed in Appendix-C merely by title
but not by name.
b) Consultant may avail the services of an associate but the prime responsibility remains
with the Consultant.
c) Any other action that may be specified in the SCC.
3.6 Reporting Obligations
The Consultant shall submit to the Client the reports, documents and other
deliverables specified in Appendix-B hereto, in the form, in the numbers and within the
time periods set forth in the said Appendix.
3.7 Documents prepared by the Consultant to be the Property of the Client
a) All plans, drawings, specifications, designs, reports and other documents prepared by
the Consultant in performing the Services shall become and remain the property of the
Client, and the Consultant shall, not later than upon termination or expiration of this
Contract, deliver all such documents to the Client, together with a detailed inventory
thereof. Client reserves the right of repetitive use of these designs, drawings,
specifications etc. without any financial obligation to the Consultant.
b) The Consultant shall also return, along with the detailed inventory thereof, all plans,
drawings, specification.. reports both in hard copy & soft copy format etc. made
available by the Client for performing the Services, upon termination or expiration of
the Contract.
c) Copyrights and all proprietary rights of all design, drawings, specifications,
software, program, reports, formats, manuals, documents etc. developed and
prepared by the Consultant for this assignment shall vest with the Client and shall
not use these for any other purpose/assignment without the written permission of the
Client. Any deviation to this effect will be dealt with in accordance with law.
54
4. CONSULTANT‟S PERSONNEL
4.1 General
The Consultant shall employ and provide such qualified and experienced
Personnel as are required, and agreed by the Engineer-in-charge, to carry out the
Services. The Consultant shall also bond his Personnel to the confidentiality of the
Services performed by them under this Contract.
4.2 Description of Personnel
The titles, agreed job descriptions, minimum qualification and estimated periods of
engagement in the carrying out of the Services of each of the Consultant's Key Personnel
are described in Appendix-C. If any of the Key Personnel has already been approved by
the Client his/her name is listed as well.
4.3 Removal and/or Replacement of Personnel
a) Except as the Client may otherwise agree no changes shall be made in the Key
Personnel.If, for any reason beyond the reasonable control of the Consultant, it
becomes necessary to replace any of the Personnel, the Consultant shall
forthwith provide as a replacement a person of equivalent or better qualifications.
b) If the Engineer-in-charge (i) finds that any of the Personnel has committed
serious misconduct or has been charged with having committed a criminal
action, or (ii) has reasonable cause to be dissatisfied with the performance of
any of the Personnel, then the Consultant shall, at the Client's written request
specifying the grounds therefore, forthwith provide as a replacement a person
with qualifications and experience acceptable to the Client. Failure to do so
shall be construed to be a default for which the Client could terminate the
Contract.
c) The Consultant shall have no claim for additional costs arising out of or incidental
to any removal and/or replacement of Personnel.
5. OBLIGATIONS OF THE CLIENT
5.1 Assistance and Exemptions
The Client shall use its best efforts to:
a) provide the Liaison Architect, Sub-consultant and Personnel with work permits,
pertinentdata and such other documents as shall be necessary to enable the Liaison
Architect, Sub-consultant or Personnel to perform the Services;
55
b) issue to officials, agents and representatives of the Client all such instructions as may be
necessary or appropriate for the prompt and effective implementation of the Services;
c) give decisions on all matters laid before the Client by the Consultant in such a
reasonable lime as not to delay the work of the Liaison Architect.
5.2 Change in the Applicable Law
lf, after the date of this Contract, there is any change in the Applicable Law with respect
to taxes and duties which increases or decreases the cost or reimbursable
expenses incurred by the Consultant in performing the Services, then the
remuneration and reimbursable expenses otherwise payable to the Consultant
under this Contract shall be increased or decreased accordingly by agreement
between the Parties hereto, and corresponding adjustments shall be made to the
contract price specified in Clause GCC 6.1 (b).
5.3 Services & Facilities -Deleted-
5.4 Payment
In consideration of the Services performed by the Liaison Architectunder this Contract, the
Client shall make to the Consultant such payments and in such manner as is provided by
Clause GCC 6.
6. PAYMENTS TO THE LIAISON ARCHITECT
6.1 Contract Price; Ceiling Amount
The payment to the Liaison Architectwill be made asper theMile Stone Specified in Table
4B.
6.2 Currency of Payment
Payment shall be made in the Indian Rupees
6.3 Mode of Billing & Payment
Billing and payments in respect of the Services shall be made as follows:
a) The payment to the Consultant will be made periodically as per the schedule of
payment terms and conditions. The Client shall cause the payment to the Liaison
Architectto the extent of ninety (90) percent of the amount indicated in the running
bill, received in triplicate along with duly approved supporting documents, within
56
thirty days of receipt of the running bill. Balance ten (10) percent will be paid after due
corrections if any.
b) The final payment under this Contract / Agreement shall be made only after the
obtaining occupancy certificate submitted by the Liaison Architectand approved as
satisfactory by the Engineer-in-charge.
c) Terms & Conditions of Payment:
I) 40% after obtaining Development Permission (Commencement Certificate) for
establishment dormitory building in ACTREC campus.
II) 15% after submission of final report and file containing all documents such as
MOEF Clearance, NOC from Civil Aviation Department if required, Fire NOC,
Health NOC, Horticulture NOC, Water Supply NOC, etc. Forwarding complete file
for obtaining of Occupancy Certificate from concern local authorities.
III) 45% after obtaining and submission of Occupancy Certificate to owner & Principal
Architect.
7. SETTLEMENT OF DISPUTES
a) Amicable Settlement
The Parties shall use their best efforts to settle amicably all disputes arising
out of or in connection with this Contract or the interpretation thereof.
b) Dispute Settlement
Any dispute between the Parties as to matters arising pursuant to this Contract
which cannot be settled amicably within thirty (30) days after receipt by one Party of
the other Party's request for such amicable settlement may be submitted by either
Party for settlement in accordance with the provisions specified in the SCC.
57
SPECIAL CONDITIONS OF CONTRACT (SCC)
Number of GCC Clause: Amendments of, and Supplements to, Clauses in the General
Conditions of Contract
1. The language of this contract shall be: English
2. The Addresses are:
For the Client:
Officer-in-Charge, Engineering Services, ACTREC, Plot No. 1 & 2, Sector–22,
Kharghar, Navi Mumbai. 410 210.Maharashtra.
E-mail:[email protected], [email protected]
For the Consultant(s): _ _ _ _ _ _ _ _ _ _
E-mail:
3. Notice will be deemed to be effective as follows
a) In the case of personal delivery or registered mail, on delivery;
b) In the case of E mail 24 hours following confirmed transmission.
4 The Member in Charge is Director, ACTREC
5 The Authorized Representatives are:
(a) For the Client:-
Officer-in-Charge, Engineering Services, ACTREC, Plot No. 1 & 2, Sector–22,
Kharghar, Navi Mumbai
(b) For the Consultant:_ _ _ _ _ _ _ _ _
6 The Consultant and his personnel shall pay the taxes, duties, fees, levies and other impositions
levied under the existing, amended or enacted laws during Life of this Contract and the Client
shall perform such duties in regard to the deduction of such tax as may be lawfully imposed.
7 The time period shall be 36 Months OR Six months after completion of building,
whichever is laterinclusive of obtaining all approvals/permission/certificates etc.
58
8 The risks and the coverage shall be as follows
a) employer's liability and workers' compensation insurance in respect of the Personnel of
the Consultant and of any Associate, in accordance with the relevant provisions of the
Applicable Law, as well as, with respect to such Personnel. any such life, health,
accident, travel or other insurance as may be appropriate; and
b) Insurance against loss of or damage to (i) equipment purchased in whole or in part with
funds provided under this Contract, (ii) the Consultant's property used in the performance
of the Services, and (iii) any documents prepared by the Consultant in the performance of
the Services
10 The amount payable in Indian Rupees is: Rs. ---------- (Rs. ------- Only).
11 It is to be understood that the amount/rates quoted are all inclusive and payment shall be
made on the basis of the milestones given in table of Milestones (4-B), hereto.
12 The payment schedule envisaged is:
(a) On the basis of milestone achieved during the execution of this Contract, as listed in the
table of Mile stone 4B, hereto.
13 Disputes shall be settled by arbitration in accordance with the following provisions:
Any dispute or difference at any time arising between the Client and the Consultant as to
the construction, meaning or effect of the Contract or as to any clause, matter or
thing herein contained or as to the rights and liabilities of the parties hereto shall be
referred to a Sole Arbitrator to be appointed by the authority (Director, TMC/ACTREC)
who will decide the case in accordance with and subject to the provisions of the Indian
Arbitration & Reconciliation Act, 1996 or any statutory modifications or re-enactment
thereto or thereof for the time being in force and all proceedings in any such Arbitration
shall be held in Mumbai/ Navi Mumbai
14. Equipment and Materials if furnished by the Client
If Equipment and materials made available to the Consultant by Client, or purchased
by the Consultant with funds provided by the Client, shall be the property of the
Client and shall be marked accordingly. Upon termination or expiration of this Contract,
the Liaison Architect shall makeavailable to the Client an inventory of such equipment
and materials and shall dispose of such writing, shall insure them at his own expense
for an amount equal to their full replacement value, equipment and materials in
accordance with the Client's instructions. While in possession of such equipment and
materials, the Consultant, unless otherwise instructed by the Client in
15 Indemnification
a) The Liaison Architectshall indemnify and keep indemnified the Client for and against
any and all claims, actions, demands, costs, charges and expenses arising
from or for infringement of patent rights, copy rights or other protected rights, if
any, in design, plans, diagrams, drawings in respect of any of the equipment, processes
59
or construction methods furnished by the Liaison Architectfor the performance of the
Service, and found to have infringed any such rights.
b) In the event of any claim being made or action being brought against the Client in
respect of any of the matters referred to the above, Liaison Architectshall promptly be
notified and it shall be at its own expenses conduct all negotiations for the settlement of
the same and any litigation that may arise.
c) In the event of any designs, plans, diagrams, drawings in respect of any of the
equipment, processes or construction methods furnished by the Liaison Architectfor the
performance of the Service constitute infringement of patent or any of the protected
rights and use thereof is restrained, the Liaison Architectshall at no extra cost to the
Client procure the right to continue using the same or replace the same at their own
costs with non-infringing work approved by the Client or modify them so that these
become non-infringing, but such modifications shall otherwise be to the entire satisfaction
of the Client.
d) The provisions of (a) to (c) above shall survive the completion, expiration or terminator of
the Contract.
16. Responsibility for Data & Designs
The final responsibility for thecorrectness, adequacyand accuracy of the designs,
drawings, technical specifications, tenders documents, purchase specifications,
installation instructions and commissioning steps etc. furnished by the Consultant, shall
lie with the Liaison Architect.
The Liaison Architectshall ensure that all designs and services rendered by him, under
this Agreement, are in compliance with the existing statutory regulations of bodies
such as MOEF,MCGM/CIDCO, Boiler Inspector, Electrical Inspector, Lift Inspector,
CFO, Directorate of Explosive & Civil Aviation etc. as well as Atomic Energy Regulatory
Board/ Bhabha Atomic Research Centre (BARC) Safety Council/any other Safety
Authority. Inter-institutional coordination in the design & development of codes/software
etc. shall also be the responsibility of the Liaison Architect.
17 Liability of the Liaison Architect
a) Except in case of gross negligence or willful misconduct on the part of the Liaison
Architector on the part of any person or firm acting on behalf of the Liaison Architectin
carrying out the Services, the liability of the Liaison Architectfor all guarantees &
warrantees shall be limited to 100 percent (to be mentioned by the indenter) of the
Contract Price.
b) This limitation of liability shall not affect the Liaison Architectliability, if any, for damage to
Third Parties caused by the Liaison Architector any person or firm acting on behalf
of the Liaison Architectin carrying out the Services.
c) In case of gross negligence or willful misconduct on the part of the Liaison Architector on
the part of any person or firm acting on behalf of the Liaison Architectin carrying out the
Services, the liability of the Liaison Architectshall be 100% of the contract value for
defects in the deliverables/deficiencies in the Services.
60
18 Levies of Liquidated Damages
For any delays, attributable to the Liaison Architectin the scheduled dates I periods of
completion of different activities as per the agreed work schedule, the Liaison
Architectshall pay to the Client compensation as Liquidated Damages (LD), calculated at the
following rates, where the contract value originally sanctioned is more than Rs.____ lakhs:
Period of Contract
(Originally stipulated)
Liquidated Damages Rate
per week (on Liaison fee
amount only)
Maximum amount of
Liquidated Damages.
1) Completion period not
exceeding 6 months. 2 %
10% of fee value paid under
contract
2) Completion period
exceeding 6 months but not
exceeding 12 months.
1% ------ do----
3) Completion period
exceeding 12 months ½% ------ do----
The amount of liquidated damages may be adjusted or set off against any sum payable
to the Liaison Architect under this or any other contract with the Client at one or more of its
units.
19 Foreign Association
No foreign Liaison Architectfirm(s) or individual(s) shall be associated with the Consultant or
his Sub-consultant on this Contract.
20 Working hours, Overtime, Leave, etc
(a) The Liaison Architect, Associate or their Personnel shall not be entitled to any
overtime payment and the same deemed to have been included in the Contract Price.
Taking of leave by Key Personnel shall be subject to the prior approval by the Liaison
Architectwho shall ensure that absence for leave purposes will not delay the
progress and adequate supervision of the Services.
(b) The Liaison Architect personnel working at the Site shall observe the site construction
working hours and holidays.
21. Project Organization
61
The Liaison Architectshall ensure that at all times during the Liaison Architectperformance of
the Services a well-defined project set-up exits at his end. This set-up only will interact with
the Client's personnel in providing the Services.
22. Access to Site
The Client warrants that the Liaison Architectshall have, free of charge, unimpeded access
to the Site in respect of which access is required for the performance of the Services.
23. Security Rules
The Liaison Architectwill follow the rules and regulation for the security framed by the
Client from time to time regarding movement of personnel, materials and equipment to and
from office/site, issue of identity cards, control of entry of personnel and all similar matters.
The Liaison Architectwill also follow all rules and regulations applicable to the area being
declared/pronounced from time to time by the authorities or authority of existing Client
facilities in the vicinity of any other statutory orders. Nothing extra will be payable on account
of stoppage/hindrance of the work due to the enforcement of security measures/ emergency
conditions.
24. Rights of Other Agencies
Other agencies may also be simultaneously working within and around the
locations/areas designated to carry out the Assignment. No extra claim during the tenure of
the work will be entertained by the Client for hindrances on account of such interfaces with
other/allied agencies.
25. Idle Claim
No claims from the Liaison Architectwill be entertained on account of idle work force, non-
use of facilities due to stoppage of work, unprecedented rain, storm or any other
Unforeseen circumstances
26. Fairness & Good Faith
(a) Good Faith
The Parties undertake to act in good faith with respect to each other's rights under this
Contract and to adopt all reasonable measures to ensure the realization of the objectives of
this Contract.
(b) Operation of the Contract
The Parties recognize that it is impractical in this Contract to provide for every
contingency which may arise during the currency of the Contract, and the Parties hereby
agree that it is their intention that this Contract shall operate fairly between them, and
without detriment to the interest of either of them, and that, if during the term of this
Contract either Party believes that this Contract is operating unfairly, the Parties will use
their best efforts to agree on such action as may be necessary to remove the cause or
causes of such unfairness, but no failure to agree on any action pursuant to this Clause
shall give rise to a dispute subject to arbitration in accordance with Clause 7 of GCC.
62
TERMS OF REFERENCE
(Terms of reference normally contain the following items that would be detailed out by the Client;
Additions could be made to this list)
1. Background:
2. A concise statement of objectives
3. An outline of the Assignment to be carried out i.e. Scope of Work & Services
including quality assurance system/ requirements
4. Schedule for completion of the Assignment.
5. Data, Information, Document, Reports, Services & Facilities to be provided by the Client.
6. Deliverables (i.e. Reports, Analysis, Data, Systems, Drawings, Reference Documents,
Source Codes, etc.) that will be required of the Consultant.
7. Procedure for progress review, status etc. of the Assignment.
8. List of key professional positions whose CV and experience would be evaluated.
9. List of facilities that need to be available with the Liaison Architectand would be evaluated.
Notes:
1. TOR shall provide complete details so that the possibilities of extra items arising during the
currency of the contract are minimal.
2. TOR shall not leave possibilities for the Liaison Architectto pass-on his part of work or services or
responsibility to another agency e.g. construction contractor etc.
3. CVC guidelines issued from time to time in regard to appointment of Liaison Architectshallbe
duly considered while framing TOR.
Appendix-A: LOCATION OF SERVICES
The liaison Architect shall liaise between ACTREC/ TMC and Government / local
bodies in Navi Mumbai, Mumbai & Raigad, and shall co-ordinate with Principal Design
Aarchitect who is located at Bangalore,
63
Appendix - B: Description of the Services, Documents and other deliverables
Detailed description of the documents to be prepared by the Liaison Architect for submission to
government bodies in co-ordination with client and Principal architect.
Sr. No.
PARTICULARS OF DOCUMENTS PAGE NO.
1. Application / Forwarding letter From Architect / Licensee / Owner.
2. Prescribed Application Form duly filled.
3. Letter of Appointment of Architects.
4. Acceptance letter of the Architect.
5. Form of Supervision Memo of the Architect
6. Copy of Certificate of Council of the Architect registration validity.
7. Previous Architects registration letter if Architect is changed.
(Sr. No. 3, 4, 5, 6 is required)
8. Letter of appointment of Structural Engineer.
9. Acceptance letter of the Structural Engineer.
10. Form of supervision Memo of the Structural Engineer
11. Certificate of Earthquake stability.
12. Confirmation of column position letter.
13. Copy of Structural Engineer Registration copy with License validity.
14. Previous Structural Engineer Registration letter if Structural Engineer is
changed.(Sr. No. 1, 2, 3 is required)
15. Letter of Appointment of Licensed Plumber
16. Acceptance letter of the Licensed Plumber
17. Form of Supervision Memo of the Licensed Plumber
18. Copy of Licensed Plumber Registration with License validity
19. Previous Licensed Plumber registration letter if Licensed Plumber is changed.
(Sr. No. 15, 16, 17 & 18 is required.)
20. Copy of Agreement (Between CIDCO and Owner/Licensee) with possession
Receipt, Demarcation Plan / Ownership documents of property with TILR Plan,
7/12 Extract, Location Plan etc.
21. Copy of Tripartite Agreement. (AII)
22. Copy of Transfer order from Estate Section CIDCO (AII)
23. Copy of Power of Attorney (POA) if Licensee given a POA if more than two
partners.
24. Delay Condonation NOC from Estate Section CIDCO if lease agreement is more
than 6 months old.
25. Extension of Time Limit from Estate Section CIDCO if lease agreement is more
than 4 years old.
26. Amalgamation application from Licensee/Owner.
27. Amalgamation terms and condition forwarding letter to Licensee/Owner.
28. Forwarding letter for Amalgamation to Estate section.
29. Amalgamation NOC from Estate Section CIDCO.
30. Amalgamation forwarding letter to Licensee/Owner.
31. Amalgamation consent letter fro Licensee/Owner.
64
32. Change of user / Expansion use NOC from Estate Section CIDCO.
33. Additional Area lease Premium NOC for BUA from Estate Section CIDCO.
34. Association / Society NOC.
35. PSIDC NOC for Kharghar Node Sector 1 to 45 from Executive Engineer
(Electrical)
36. Indemnity Bond for ULC on Rs. 100/- stamp paper with notaries.
37. Affidavit for ULC on Rs. 100/- stamp paper with notaries.
38. Undertaking for stilt and Terrace CB / FB on Rs. 100/- stamp paper with notaries.
39. Undertaking for premium for CB / FB on Rs. 100/- stamp paper with notaries.
40. Undertaking for Projected Terrace / staircase on Rs. 100/- stamp paper with
notaries.
41. Undertaking for Machine Room less lift on Rs. 100/- stamp paper with notaries.
42. Undertaking for Stack Parking / Fitness Centre / Society office on Rs. 100/- stamp
paper with notaries.
43. Undertaking for “NO COURT MATTER” on Rs. 100/- stamp paper with notaries if
12.5% Scheme Plot.
44. Undertaking for Drainage connection on Rs. 100/- stamp paper with notaries.
45. Copy of Draft Agreement of sale of Flats.
46. Society Registration Copy / Resolution to sign documents.
47. Charitable Trust / Public Trust with registration copy.
48. NOC from Fire officer CIDCO (Bldg. Height more than 15M or special buildings.)
49. Forwarding letter for MAWEJA NOC to Land Section for 12.5% Scheme Plot.
50. NOC from Land / Estate Section / Undertaking NOC on Rs. 100/- Stamp Paper
with notaries for 12.5/% Scheme Plot
51. Mangroves Clearance letter from Lands & Survey / Horticulture Department
CIDCO if required.
52. Aesthetic approval from Sr. Planner (c) CIDCO if required.
53. NOC from Civil Aviation Department if required
54. NOC from Railway Department if required.
55. Approval / NOC from MSEDCL for size and location of Electrical Sub Station for
plots having Built up Area more than 4000 sqm.
56. Environment Clearance certificate from MOE & F for Gross Built up Area more
than 20000 sqm.
57. One set of Proposal Drawing for Scrutiny.
58. One set of Ground floor plan showing column position signed by Structural
Engineer
59. Necessary charges:- Challan& Receipts Scrutiny Fee, security Deposit, Balcony
Enclosure Premium, Development Charges, Amalgamation Charges, Revalidation
charges, Infrastructure Development charges (IDC).
60. Credit Verification from Account Section CIDCO.
61. Refusal letter to Licensee / Owner.
62. Resubmission Letter from Architects / Licensee / Owner.
63. Other documents (if any).
A) Labour Area Statement.
B) CB / FB / LOBBY / TERRACE Area Statement.
65
Appendix-C: Consultant's Key Personnel
DETAILS OF TECHNICAL & ADMINISTRATIVE PERSONNEL REQUIRED FOR THE
WORK
Sr.
No
Name Designation Profession
al
experience
How these
would be
involved in this
work
.
Number
for this
work
Remarks
1 2 3 4 5 6 7
Bidders Signature
(with seal & date)
66
SECTION –10 (i)–FORM OF PERFORMANCE SECURITY – BANK GUARANTEE BOND (BG)
(To be submitted on Non-judicial stamp paper worth Rs 100/-only)
1. In consideration of the Chief Engineer TMC having agreed under the terms and conditions of Letter of Intent/ Agreement No. ................................................ dated................................ made between Accounts Officer, TMC and ............................... ................. (Hereinafter called" the said Contractor{s}") for the work................... .................................................................................................. (hereinafter called " the said Letter of Intent / Agreement') having agreed to production of a Irrevocable bank Guarantee for Rs................ (Rupees ............................. only), as a security / guarantee from the contractor(s) for compliance of his obligations in accordance with the terms and conditions in the said agreement, we............................................................. (Indicate the name of the Bank) (hereinafter referred to as "the Bank') hereby undertake to pay to the TMC an amount not exceeding Rs. ............ (Rs........................................... only) on demand by the TMC
2. We................................................. (Indicate the name of Bank) do hereby undertake to pay the amounts due and payable under this guarantee without any demur, merely on a demand from the TMC stating that the amount claimed is required to meet the recoveries due or likely to be due from the said Contractor(s). Any such demand made on the bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceeding Rs............(Rupees.................................................. only).
3. We, the said bank, further undertake to pay to the TMC any money so demanded notwithstanding any dispute or disputes raised by the Contractor(s) in any suit or proceeding pending before any court or Tribunal relating thereto, our liability under this present being absolute and unequivocal.
The payment so made by us under this bond shall be a valid discharge of our liability for payment there under and the Contractor(s) shall have no claim against us for making such payment.
4. We............................... (Indicate the name of Bank) further agree that the guarantee herein contained shall remain In full force and effect during the period that would be taken for the performance of the said Agreement and that It shall continue to be enforceable till all the dues of the TMC under or by virtue of the said Agreement have been fully paid and Its claims satisfied or discharged or till Engineer-In-charge on behalf of the TMC certifies that the terms and conditions of the said Agreement have been fully and properly carried out by the said Contractor(s) and accordingly discharges this guarantee.
5. We.............................. (Indicate the name of Bank) further agree with the Director, TMC that the TMC shall have the fullest liberty without our consent and without affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or to extend time of performance by the said Contractor(s) from time to time or to postpone for any time or from time to time any of the powers exercisable by the Director, TMC against the said Contractor(s) and to forbear or enforce any of the terms and conditions relating to the said Agreement and we shall not be relieved from our liability by reason of any such variation, or extension being granted to the said Contractor(s) or for any forbearance, act of omission on the part of the TMC or any indulgence by the TMC to the said Contractor(s) or by any such matter or thing whatsoever which under the law relating to sureties would, but for this provision, have effect of so relieving us.
6. This guarantee will not be discharged due to the change In the constitution of the Bank or the contractors.
67
7. We, ............................... (Indicate the name of Bank) lastly undertake not to revoke this guarantee except with the previous consent of the TMC In writing.
8. This guarantee shall be valid up to ........................, unless extended on, demand. Notwithstanding anything mentioned above, our liability against this guarantee is restricted to Rs...............................Rupees....................................................................... only) and unless a claim in writing is lodged with us within six months of the date of expiry or the extended date of expiry of this guarantee, all our /liabilities under this guarantee shall stand discharged.
Signed and sealed
Dated the ............. day of................. for...................................... (Indicate the name of Bank)
(Note: The Letter of Intent shall form part of the Agreement)
68
(On the letter head of the Bidder)
FORM F-1
PROPOSED ORGANISATION STRUCTURE
Minimum Level of Key Staff proposed to be deployed for the work and their Qualification/
Experience are as follows:
S. No Name of
Representative
Position held in
Organization Post in Team
Experience Level
(Minimum five years
experience in the related
field.).
1.
Team Leader
Experience ______Yrs
2
Environmental
Expert
Experience ______Yrs
3 Environmental
Law Expert
Experience ______Yrs
Authorized Signatory
Signature
Name of the Signatory
Designation
(Name of the agency)
(SEAL)
69
(On the letter head of the Bidder)
FORM F-2
CVS OF KEY STAFF
NAME OF THE STAFF
DESIGNATION
YEARS WITH THE FIRM
PROPOSED POSITION
DETAILS OF TASK ASSIGNED
MAN- MONTHS BUDGETED FOR THE TASK ASSIGNED
KEY QUALIFICATIONS
EDUCATION
EMPLOYMENT RECORD (In chronological order)
NAME OF THE FIRM POSITION HELD YEARS OF EMPLOYMENT
Authorized Signatory
Signature
Name of the Signatory
Designation
(Name of the agency)
(SEAL)