2016-2021 capital improvement program for water, sewer ......stormwater - low impact development...
TRANSCRIPT
2016-2021 Capital Improvement Program
For Water, Sewer, Surface Water
July 13, 2015
TABLE OF CONTENTS
Table of Contents _ 1
Letter from the Director _ 2
Water, Sewer, and Surface Water Policies 4
Utility Funding Narrative 6
Project Justification Narrative 7
Water Utility
Recent Financial History 9
CIP Changes Last Year to This Year _ 16
Six Year Improvement Projects 18
20 Year Improvement Projects 77
Sewer Utility
Recent Financial History 80
CIP Changes Last Year to This Year _ 87
Six Year Improvement Projects 88
20 Year Improvement Projects 136
Sewer Connection Incentive Program (SCIP)
CIP Changes Last Year to This Year 140
Six Year Improvement Projects 141
20 Year Improvement Projects 164
Surface Water Utility
Recent Financial History 166
CIP Changes Last Year to This Year _ 173
Six Year Improvement Projects 174
20 Year Improvement Projects 200
1
P.O. Box 1995 • Vancouver, WA 98668-1995 • www.cityofvancouver.us
2016-2021 Water, Sewer and Surface Water Capital Improvement Program (CIP) Letter from the Public Works Director
As shown in this 2016-2021 Water, Sewer and Surface Water Capital Improvement Plan (CIP), the City of Vancouver continues to mark ongoing progress toward ensuring sound, financially sustainable Utilities that will serve the needs of many future generations.
The 2016-2021 CIP looks closely at each Utility’s capital infrastructure needs. These include:
Key Water Projects: Multiple projects at Water Station 1. The Electrical Upgrade, Standby Power, and
Booster Pump Project (WTR-37) is currently under design. SCADA System Upgrade (WTR-A1-5) Fiber optic installation contract portion is out to
bid now Ongoing Transmission Main installation projects – Water Station 14 to Water Station
9 Phase 2 (WTR-77) is the current project Completion of Water System Master Plan Update (complete in 2015)
Key Sewer Projects: Westside treatment plant Ultraviolet (UV) Replacement (SS-66) Interceptor evaluation project (SS-A1-114) SCADA System Upgrade Westside Influent Process Reliability Improvement
Key Sewer Connection Incentive Program (SCIP) Projects: Granada South (SCIP-235) 277 Lots Southridge (SCIP-56) 25 Lots Fircrest (SCIP-64) 39 Lots
Key Surface Water Management Projects: Grant funded projects including 98th Ave phase 2, 109th Ave at Petersen Channel,
18th St at Burnt Bridge Creek. Retrofits focusing on increased water quality at some of our existing drywells Regulatory Compliance – National Pollutant Discharge Elimination System (NPDES)
Stormwater - Low Impact Development (LID) regulations coming in 2016 will mean a significant shift in how stormwater is addressed on new construction projects. Council will see a workshop scheduled this Fall for a more detailed discussion on this topic.
2
While this plan focuses on improvements in each Utility’s infrastructure, equally important is how we operate and maintain these assets in which our customers have invested. Recent key accomplishments in maintenance and operations include:
Successful implementation in January 2015 of a technology upgrade that provides enhanced tracking of maintenance and operations work on water, sewer and stormwater assets. The resulting data also improves decision-making practices for when to repair, rehabilitate or replace Utility assets. Upgrade of the previous Hansen system to the new Infor Public Sector (IPS) software began in 2014.
Continuing achievement of quality water, sewer and stormwater services while offering the lowest rates among comparable cities in our region. The recent technology upgrade, asset management initiatives and work of dedicated Utility employees have provided the advantage needed to continue this strong record.
Extensive review and selection process has been completed for a new sewer treatment plant operations contract. The Utility’s staff has evaluated requested proposals from qualified sewer treatment plant operators to replace the Utility’s current contract, and selected a contractor with which to negotiate a new proposed contract. Contract negotiations have been successfully completed. A new proposal for a long-term operating contract will be offered to Council for approval in July. The sewer/wastewater treatment contract is the greatest portion of the annual sewer operations and maintenance budget. The Utility’s goal is to maintain excellent service and environmental record while significantly reducing yearly costs.
In accordance with City Council policy, Vancouver Public Works strives to take care of our full infrastructure needs with the resources we have, except where it makes significant sense to take on additional debt. This funding approach helps reduce each Utility’s long-term exposure to debt financing and the restrictions it imposes on managing and allocating future resources. With continued support of small incremental rate adjustments, our Water and Sewer utilities will achieve this key goal in the coming years. Our Surface Water utility continues to adapt to changing regulatory requirements, and future rate adjustments will be needed.
In closing, Vancouver’s economic health and livability depends upon safe, sound, effective and efficient community infrastructure. As we navigate the challenges ahead, we will continue to seek out innovations and opportunities that will support our thriving community now and for generations to come.
Brian K. Carlson, P.E. Director of Vancouver Public Works
3
WATER, SEWER, AND SURFACE WATER COMPREHENSIVE PLAN POLICIES (Adopted 11-7-2011)
PFS-1. SERVICE AVAILABILITY (ALL UTILITIES): Consider water, sewer, police, transportation, fire, schools, storm water management and parks as necessary public facilities and services. Ensure that facilities are sufficient to support planned development.
PFS-2. SERVICE STANDARDS (ALL UTILITIES): Establish service standards or planning assumptions for estimating needed public facilities,
based on service capabilities, local land use designations and nationally recognized standards.
PFS-21. WASTEWATER RECLAMATION: Eliminate health hazards from domestic and industrial wastewater and return clean water to the environment.
PFS-22. SEWER SERVICE: Provide sewers and sewer service to every Vancouver home, business, and industry at an affordable and
equitable cost. Discourage development that includes on-site sewage treatment systems. Encourage existing development using septic systems to connect to public sewer as soon as available. Ensure that the infrastructure to support sewer service is in place prior to or at the time of development.
PFS-23. WATER SERVICE: Provide safe, clean, quality drinking water to every Vancouver home, business, and industry. Discourage
development that includes private drinking water wells. Provide water pressures and volumes necessary to support fire suppression hydrants and sprinkler systems. Ensure that the infrastructure to support water service is in place prior to or at the time of development.
PFS-24. SEWER AND WATER SERVICE EXTENSION: Public sewer and water service should not be extended outside the Vancouver urban
growth area except to (a) Remedy a threat to public health or safety. (b) Remedy a threat to water resources, (c) Provide service to uses within the urban reserve district otherwise required to be served (d) Support development envisioned in a jurisdiction's comprehensive plan (e) Water service may be extended if it is consistent with the Clark County Coordinated Water System Plan and does not increase density beyond the adopted Comprehensive Plan. The existence or extension of sewer or water service should not be used to justify changes to the Comprehensive Plan.
PFS-25. SURFACE WATER MANAGEMENT: Manage storm water to safely pass floodwaters, maintain and improve water quality of
receiving streams, lakes, and wetlands, protect and enhance fish and wildlife habitat, promote recreational opportunities, and enhance community aesthetics.
ASSET MANAGEMENT COMPREHENSIVE PLAN POLICY (Adopted 12-16-2013)
PFS-35 City public facility assets shall be systematically managed to balance full life cycle costs, performance, risk, and service levels, using
best management practices and data.
CAPITAL PLANNING AND ASSET MANAGEMENT FINANCIAL POLICIES (Adopted 5-7-2012)
31. Asset management best practice involves managing the performance, risk and expenditures on infrastructure assets in an optimal
and sustainable manner throughout their lifecycle covering planning, design, construction, operation, maintenance, and disposal. The City shall integrate the principles and best practices of Asset Management such as those embodied in the International Infrastructure Management Manual in the management of its assets.
32. Asset Inventory will be maintained with maintenance, repair and deferred maintenance costs identified and updated on an annual
basis. 33. Maintenance of city assets shall be addressed on a current need, rather than deferred into the future.
35. A six-year City-Wide Capital Improvement Program shall be developed annually and shall provide a prioritized list of reasonably
funded projects and those in process of securing funding. Capital Improvement Plans for utility assets shall be updated no less frequently than every two years. The comprehensive plan will identify longer-term capital needs by program area.
36. Funding for capital projects, including major facilities maintenance projects, will be allocated in a manner that balances community
needs with City priorities, the potential for attracting matching funds, and the ability to reduce or limit expenses in future years. 37. The City’s objective is to incorporate a “Pay-As-You-Go” approach (using available cash and current resources) in the Capital
Improvement program. 38. The Capital Budget will be adopted at the same time the City Operating Budget is adopted. The Capital budget will only include
fully funded projects. The Capital Budget will only contain projects identified in the Capital Improvement Program.
4
39. A capital repair appropriation will be maintained for unanticipated major repairs of general operating facilities and for emergency replacement of general fund equipment. Additions to the capital repair contingency reserve will be made based on Council directions.
40. Impacts on net annual operating and maintenance costs will be identified as part of the funding considerations for new capital
projects such as buildings, parks and street enhancements. This includes identifying potential reductions in maintenance costs if improvements are funded. The necessary funds to operate the capital facility will be identified at the time the capital budget is adopted.
41. The City will fund 100% depreciation of the current Utility assets on an annual basis. Goals by a specific utility are outlined below:
Water – effective 2011 Sewer – effective 2023 Surface Water – effective 2017
42. A System Development Reserve will be maintained to fund growth related capital costs. All systems development charge revenue
will be contributed to the fund.
5
415 W. 6th St. • P.O. Box 1995 • Vancouver, WA 98668-1995 • www.cityofvancouver.us
UTILITY FUNDING NARRATIVE Each of the utilities has five components to their funding structure: Revenue, Expenses, Reserves, Debt, and Assets. In broad terms, Revenue is the money brought into the utility, Expenses are the moneys going out of the utility, Reserves are the moneys set aside for emergencies or capital work, Debt is the money owed on loans, and Assets are the value of the infrastructure/facilities and money held by the utility. Below is a general description of each component for the respective utilities. Water -Revenues consist of: Ratepayer revenue, System Development Charges (SDC), Grants, and miscellaneous revenue. -Expenses consist of: Operations and maintenance activities, Taxes and fees, Loans made to other utilities, Debt service, and Capital improvements. -Reserves consist of: Debt service reserve, Capital emergency reserve, Water construction reserve, Sewer Connection Incentive Program (SCIP) reserve. -Debt consists of: Revenue bonds for capital improvements -Assets consist of: Pipes and appurtances, Water stations, Wells, Water rights, Real property/Easements, Distribution pumps, Operations and maintenance equipment, and cash. Sewer -Revenues consist of: Ratepayer revenue, System Development Charges (SDC), Loans, and miscellaneous revenue. -Expenses consist of: Operations and maintenance activities, Taxes and fees, Debt service, and Capital improvements. -Reserves consist of: Debt service reserve, Capital emergency reserve, Sewer construction reserve. -Debt consists of: Revenue bonds for capital improvements, long-term Interfund loan from water. -Assets consist of: Pipes and appurtances, Pump stations, Wastewater treatment facilities, Real property/Easements, Operations and maintenance equipment, and cash. Surface Water -Revenues consist of: Ratepayer revenue, Loans, Grants, and miscellaneous revenue. - Expenses consist of: Operations and maintenance activities, Taxes and fees, and Capital improvements. - Reserves consist of: Surface water construction reserve. - Debt consists of: State Revolving Loan (SRL) for capital improvements. - Assets consist of: Treatment facilities, Conveyance facilities, Flow control facilities, Real property/Easements, Operations and maintenance equipment, and cash.
6
415 W. 6th St. • P.O. Box 1995 • Vancouver, WA 98668-1995 • www.cityofvancouver.us
CAPITAL PROJECT JUSTIFICATIONS Each utility works on capital projects that can be lumped into five broad categories: Regulatory compliance, improved safety, new systems, replace/preserve/rehabilitate systems, or lower operating costs. Regulatory compliance projects include capital work done in order to comply with new State or Federal requirements. Improved safety projects are capital projects undertaken in order to improve the public safety and welfare. New systems capital projects are undertaken in order to increase capacity or facilitate growth. Replace/preserve/rehabilitate system capital projects are undertaken in order to replace old infrastructure or prolong existing infrastructure’s effective life. Lower operating costs projects include capital work done in order to increase efficiencies or to otherwise reduce operating costs. Many projects will overlap categories, but these five categories provide the justification for why most public works capital projects are undertaken. Below are examples of the types of projects that can be found in each category for the respective utilities. Water (1)-Regulatory compliance: State (DOH) and Federal (EPA) projects. (2)-Improved safety: Fire flow improvements, seismic upgrades, and chemical system upgrades. (3)-New systems: Wells, pumps, treatment systems, controls, storage, and mains. (4)-Replace/preserve/rehabilitate systems: Wells, pumps, treatment systems, controls, storage, substandard and leaking mains. (5)-Lower operating costs: Water station upgrades and pump replacement. Sewer (1)-Regulatory compliance: Improve discharge to water bodies and sludge burning (air quality). (2)-Improved safety: Groundwater protection improvements and Sewer Connection Incentive Program (SCIP). (3)-New systems: New trunk/interceptor/service mains and new pump stations. (4)-Replace/preserve/rehabilitate systems: Slip lining projects and pump station replacements. (5)-Lower operating costs: Treatment plant upgrades and pump replacement. Surface Water (1)-Regulatory compliance: NPDES compliance projects and Underground Injection Control (UIC) retrofit. (2)-Improved safety: Flooding mitigation and groundwater protection improvements. (3)-New systems: New treatment, conveyance, or flow control improvements. (4)-Replace/preserve/rehabilitate systems: Swale retrofits and drywell relocation projects. (5)-Lower operating costs: Swale retrofits and flow control retrofits.
7
Water Utility
Capital Improvement Program For Water, Sewer, and Surface Water
8
Water Utility
Recent Financial History
Capital Improvement Program For Water, Sewer, and Surface Water
9
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
RevenueRatepayer Revenue 21,185,527 20,887,185 22,607,560 22,056,022 21,869,406 23,613,734 21,999,301 22,116,629 23,859,970 25,071,155 26,598,003 System Development Charges 3,020,555 3,589,880 2,962,831 2,471,504 1,933,949 1,412,010 1,137,266 967,860 1,373,668 2,589,774 2,060,907 Grants 22,598 49,936 13,454 37,389 - 66,117 85,683 237,151 23,475 74,357 41,385 Other Miscellaneous Revenue* 2,962,592 2,164,562 5,206,516 6,131,701 5,530,813 5,412,160 4,270,805 3,912,580 3,710,699 3,737,647 3,903,125
Total Revenue 27,191,272 26,691,563 30,790,361 30,696,616 29,334,168 30,504,021 27,493,055 27,234,220 28,967,812 31,472,933 32,603,420
ExpensesSalaries & Benefits 6,332,585 6,757,444 7,023,487 7,572,147 8,083,613 8,956,352 8,491,672 9,196,451 9,163,087 9,576,113 9,761,371Supplies and Services 1,949,103 2,519,444 2,457,438 2,305,795 2,286,252 2,053,981 2,273,911 2,703,054 2,841,969 3,132,304 3,864,162Professional Services 1,196,912 992,878 1,240,734 1,382,526 1,331,454 1,050,130 751,575 665,877 921,786 913,658 643,348Electrical 1,646,854 1,458,379 1,704,566 1,713,602 1,719,915 1,873,298 1,651,280 1,583,987 1,705,248 1,624,496 1,570,177Indirects and ER&R 1,809,792 2,017,674 2,083,048 3,993,239 2,843,941 2,326,343 2,354,859 820,766 1,416,381 1,406,584 1,115,950Operations & Maintenance Expenses 12,935,246 13,745,819 14,509,273 16,967,309 16,265,175 16,260,104 15,523,297 14,970,135 16,048,470 16,653,155 16,955,008
Taxes and Fees 4,243,496 4,080,375 4,457,475 4,721,215 4,641,464 5,986,709 5,546,360 5,586,373 6,018,686 6,275,322 6,681,153
Debt Service 1,270,114 1,293,129 1,258,191 1,254,509 1,248,196 1,259,296 1,249,973 1,251,637 1,195,069 1,198,701 645,471 Loans to the Sewer Fund 3,600,000 2,705,000
Capital Construction Expenses 3,913,704 7,851,152 8,082,071 9,728,585 9,040,428 6,307,356 5,001,619 7,529,635 5,466,778 5,700,078 7,653,864
Expenses Subtotal 22,362,560 26,970,474 28,307,010 32,671,618 31,195,262 33,413,466 30,026,250 29,337,780 28,729,003 29,827,256 31,935,496
Depreciation 3,789,312 3,779,389 3,922,732 4,188,798 4,735,182 5,009,562 5,079,245 5,051,790 4,751,066 4,407,994 4,441,149 Total Expenses 26,151,872 30,749,863 32,229,742 36,860,416 35,930,444 38,423,028 35,105,495 34,389,570 33,480,069 34,235,250 36,376,645
*Other Miscellaneous Revenues include items such as: Misc Fines & Penalties Interest Earnings Interfund Rents Service Installations Latecomer Fees Interfund Transfers Proceeds from Refunded Debt
WATER FUND ACTIVITY(2004-2014)
10
Ratepayer Revenue82%
System Development Charges6%
Other Miscellaneous Revenue12%
2014 Water Utility Revenues = $32,603,420
11
Taxes and Fees21%
Debt Service2%
Capital Construction Expenses24%Salaries & Benefits
31%
Supplies and Services12%
Professional Services2%
Electrical5%
Indirects and ER&R3%
2014 Water Utility Expenses = $31,935,496
Operations and Maintenanceexpenses
12
Ratepayer Revenue
System Development
Charges
Other Miscellaneous Revenue (Interest, Rent, Fines, etc)
-
10
20
30
40
50
60
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Dol
lars
(Mill
ions
)
Years
Water Revenues (2004-2021)
ForecastActual
13
Operations and Maintenance
Activities
Taxes and Fees
Capital Improvements
Debt (Interest and Principal)
Loan to SewerWater Total Revenue
-
10
20
30
40
50
60
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Dol
lars
(Mill
ions
)
Years
Water Expenses (2004-2021)
ForecastActual
14
Water Utility Project List
Capital Improvement Program For Water, Sewer, and Surface Water
15
City of Vancouver 6‐Year Capital Improvement Program (2016‐2021)
Water Utility CIP ChangesThis page provides an overview of the changes from the previous 6 year project list (2015‐2020) to this year's 6 year project list (2016‐2021). The changes are segmented by: projects added; projects removed; and other.
Projects Added Project Number
Comments
SCADA System Upgrade (2015‐2018) WTR‐A1‐5 New projects identified by the 2014 project ‐SCADA System Upgrade SC‐01
Pump House Roofing Replacement None ‐ new Project and budget added for 2015 & 2016WS 9 Lead & Copper Pilot Study None ‐new Project budgeted in 2017 for regulatory complianceWater Tower 5,6 & 7 Seismic
Improvements WTR‐A1‐6 New projects for 6 yr CIP
WS 5 Reservoir Seismic Improvements WTR‐A1‐6 New project identified in 2014 study – added to 6 yr CIPWater Station 5 Booster Pumps WTR‐101 New project added to 6 yr CIP
WS 4 water Rights Utilization Study WTR‐102 New project added to 6 yr CIPWS 7 Hypo Gen System WTR‐103 New project added to 6 yr CIPWS 8 Hypo Gen System WTR‐104 New project added to 6 yr CIP
NE 141st ave and 28th St (north) SCIP WTR‐A1‐10 New $200,000 project identified for 2015Wainwright Property None New $1,400,000 project identified for 2015
CRWWD Wooded Acres None $10k CRWWD coordination, City to be reimbursed.County UIC Project None $10k County coordination project.
Columbia View Apartments None $34k to oversize main for development59th Street Oversize None $10k to oversize main for development
Projects Removed Project Number
Comments
Water Production: SCADA System Upgrades (SC‐01) WTR‐A1‐5 Project redefined as SCADA System Upgrade (2015 to 2018)
Land Acquisition for Standpipe in SE WTR‐A1‐13 Changed name to “Reservoir install SE “ and moved outside of 6‐year plan (2026)
45th St east of NE 72nd – repl. water main WTR‐80 Project Completed in 2014NE 53rd Ave & NE 49th St – Repl. water
main Project Completed in 2014
Main St. – Repl. 12th to 15th St WTR‐3 Project Completed in 2014Columbia Terrace (SCIP) WTR‐A1‐10 Project Completed in 2014
Holly Acres (SCIP) none Project Completed in 2014NW 52nd Cul de Sac WTR‐A1‐3 Project Completed in 2014
32nd St – Q St to Fairmont WTR‐25 Project Completed in 2014E. 28th St. – Broadway to F St. WTR‐82 Project Completed in 2014
NE 59th St Cul de Sac WTR‐84 Project Completed in 2014NE 62nd St & NE 72nd Ave – FH Relocate Project Completed in 2014
Chelsea Ave. and SE Evergreen none Project Completed in 201449th St – St. John’s to 40th Ave. none Project Completed in 2014
Other: PRV Flush Valves WTR‐A1‐11 Project Completed in 2014
NE 18th St. Interchange none Coordination project in anticipation of WSDOT interchange project at 18th St & I‐205 project. Completed in 2014
Water Main Evergreen 164th to 192nd Ave
WTR‐2 Project not needed
NE 18th St and Mission Hills Spill none New project to monitor groundwater along 18th St. in vicinity of Mission Hills apartment complex. Completed in 2014.
16
City of Vancouver 6‐Year Capital Improvement Program (2016‐2021)
Other Changes Project Number
Comments
Water Works Park: Standby Power, Booster Station
WTR‐37 Moved part of 2015 budget to 2016
Booster Station Flowmeters WTR‐9 Carry forward partial budgetNE 60th Ave. – NE 70th St WTR‐85 Carry forward partial budget
Seismic Evaluation Towers & Reservoirs WTR‐A1‐6 Carry forward partial budgetWell Level Probes WTR‐A1‐15 Carry forward partial budget
E. 13th St. – V St. to W St.. WTR‐81 Carry forward partial budgetSodium Hypo Gen System/Building WS 1 WTR‐78 Carry forward $450,000 to 2015
Water System Comp Plan None Carried forward partial budget from 2014 Ellsworth Well Rehabilitation WTR‐16 Moved project forward from 2017 to 2015/16
Treatment Regulations Compliance WTR‐A1‐23 2017 budget increased $100,000Port Water System Upgrade WTR‐66 Carried forward from 2014NE 47th Ave – NE 68th St WTR‐76 Carried forward from 2014
Vancouver Mall Dr. Transportation Coordination
WTR‐79 Carried forward from 2014
PRV Flowmeters/SCADA System Connection
WTR‐A1‐12 Carried forward from 2014
Evergreen Lining Sleret None Emergency leak abatement project in 2014. Carry forward partial budget into 2015
18th Street Oil Spill at Mission Hills None Emergency oil spill project in 2014. Carry forward partial budget into 2015
28th St – Grant to Daniels water main WTR‐87 Add’l budget of $50,000 for Leak Abatement projectW. McLoughlin –Lincoln to Kaufman
water main WTR‐88 Add’l budget of $25,000 for Leak Abatement project
Transmission Main‐WS 14 to WS9 Ph 2 (DST‐03)
WTR‐77 Partial budget carried forward from 2014
* These projects were identified after last year’s presentation to Council and will be completed prior to the end of 2015. Therefore, they did not show up in last year’s CIP or this year’s CIP.
17
Note: All costs are in 2015 dolla
Description CIP # 2015 2016 2017 2018 2019 2020 2021 6-yr Total448 Water Construction Fund
Water Production Projects
Ellsworth Greensand Replacement WTR-32 970,579 -
Well Level Probes WTR-A1-15 35,669 -
Water Comp Plan WTR-A1-17 136,000 - Sodium Hypo Gen System WS 14 WTR-62 200,000 - Water Rights Utilization Study WS 6,8,15 WTR-A1-28 200,000 -
Water Station 1 Standby Power Booster Station WTR-37 2,178,006 8,060,000 6,400,000 14,460,000 Sodium Hypo Gen System at WS 1 WTR-78 344,280 450,000 450,000 Ellsworth Well Rehabilitation WTR-16 20,000 250,000 250,000 Scada System Upgrade(2015-2018) WTR-A1-29 3200000 2,200,000 1,400,000 400,000 4,000,000 Pump House Roofing Replacement WTR-99 100,000 100,000 100,000
Water Works Park 3.0 MG Reservoir and Seismic Upgrade WTR-39 - 800,000 2,700,000 6,400,000 9,900,000 Water Works Park New Standpipe WTR-42 - 500,000 2,000,000 2,500,000
Exploration for New Water Source WTR-A1-7 - 50,000 50,000 WS 9 Lead & Copper Pilot Study WTR-100 - 100,000 100,000
Treatment Regulations Compliance WTR-A1-23 - 900,000 900,000 Water Station 6 Internal Coating WTR-47 - 400,000 400,000 Sodium Hypo Gen System Ellsworth WTR-64 - 300,000 300,000 Sodium Hpo Gen System WS 9 WTR-61 - 350,000 350,000 Water Station 6 Well/Treatment Install WTR-69 - 2,000,000 1,000,000 3,000,000 Seismic Evaluation Towers and Reservoirs WTR-A1-6 120,000 Water Tower 5,6,7 Seismic Improvements WTR-A1-6 - 2,700,000 2,700,000
Standpipe in NE WTR-A1-18 - 200,000 2,300,000 2,500,000 Lincoln High Booster Pump Replacment WTR-40 - 800,000 800,000 Water Station 8 Replace Wells 2 & 3 WTR-68 - 1,000,000 1,000,000 2,000,000 WS 5 Reservoir Seismic Improvements WTR-A1-6 - 3,000,000 3,000,000 Water Station 3 Master Plan WTR-38 - 130,000 130,000 Sodium Hypo Gen System WS 15 WTR-63 - 200,000 200,000 Water Station 5 Booster Pumps WTR-101 1,000,000 1,000,000 Water Station 4 Water Rights Utilization Study WTR-102 100,000 100,000 WS 7 Hypo Gen System WTR-103 200,000 200,000 WS 8 Hypo Gen System WTR-104 200,000 200,000
Water Distribtuion Projects
Transmission Main - WS14 to WS9 Ph 2 (DST-03) WTR-77 2,499,860 - Port Water System Upgrade WTR-66 200,000 - NE 47th Ave - 68th to North County WTR-76 132,000 -
Vancouver Mall Drive Transportation Coordination WTR-79 150,000 -
PRV Flowmeters/Scada System Connections WTR-A1-12 124,862 -
E. 13th St. - V St. to W St. WTR-81 555,917
NE 60th Ave. - NE 70th St WTR-85 14,500 K & L St - E 29th to 32nd St Water Main WTR-86 260,000 - NE 54th St - 40th Ave to 45th Ave Water Main WTR-89 200,000 - Booster Station Flowmeters WTR-9 21,530 Claire St Water Main WTR-90 75,000 - Alleys E & W of G St - 19th St to 20th St WTR-91 60,000 - Linde 2" Water Service WTR-97 20,000 - NE 94th Ave - 88th St Trans Main County Coord WTR-94 161,000 - 141st Ave - 28th St North SCIP(Water) WTR-A1-10 200,000 - Wainwright Property 1,400,000 - 18th Street Oil Spill - Mission Hills 17,126 Evergreen Lining at Sleret 34,709
Water Demand Response WTR-A1-27 206,000 300,000 300,000 300,000 300,000 300,000 300,000 1,800,000
CRWWD Wooded Acres 10,000
County UIC Project 10,000
Columbia View Apartment Oversize 34,000
59th St Oversize 10,000
28th St - Grant to Daniels Water Main WTR-87 450,000 450,000
W McGloughlin - Lincoln to Kaufman Water Main WTR-88 - 125,000 125,000 Bunch Plastic - 4th Plain & 103rd Ave WTR-92 - 35,000 35,000 SE Morgan Rd - S of Middle Way WTR-93 - 50,000 50,000 Evergreen Transmission Main Blandford to Sleret WTR-95 - 500,000 2,500,000 3,000,000 Bernie PRV Replacement WTR-55 - 250,000 250,000
Leak Abatement WTR-A1-3 - 700,000 700,000 600,000 600,000 1,000,000 3,600,000
Water SCIP Coordination Projects WTR-A1-10 - 100,000 100,000 100,000 100,000 100,000 500,000 Water Main NE 49th St - NE 15th Ave to NE 40th Ave WTR-36 - 100,000 805,000 905,000
System Surge Evaluation WTR-A1-16 - 50,000 50,000 99th St Transmission Main - 140th Ct to Ward Rd WTR-96 - 2,500,000 2,500,000 WS 5 to WS 9 Transmission Main WTR-51 - 200,000 2,500,000 2,700,000 99th St Transmission Main - 110th to 120th Ave WTR-10 - 875,000 875,000 Transmission Main - Burton Rd (DST-13) WTR-6 - 200,000 2,300,000 2,500,000
Total Water expenditures 13,901,038 13,320,000 16,300,000 10,000,000 10,980,000 12,130,000 6,200,000 68,930,000
6 YEAR CAPITAL IMPROVEMENT PROGRAM FOR WATER(2016-2021)
18
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-10
WTR-77
103RD
108T
H
102ND
118T
H
121S
TCO
RPOR
ATE
120T
HEA
STRI
DGE
109T
H 97TH
123R
D
108T
H
108TH
120T
H
SW-33
117T
H
96TH
95TH
112TH
104TH
93RD
103RD
101ST
115TH
102ND
105TH
116TH
114TH
113TH
122ND
97TH
118TH
108TH
94TH
92ND
109TH
CONIFER
110TH
123RD
121ST
111TH
98TH
100TH
91ST
99TH
111TH
123RD
109TH
100TH
104TH
97TH
102ND
109TH
101ST
98TH
116TH95TH
94TH 111TH
102ND
92ND
108TH
97TH
112TH
92ND
110TH
115TH
115TH111
TH
101ST
95TH
116TH
122ND
104TH
108TH
110TH
105TH
105TH
108TH
116TH
113TH
109TH
103RD
99TH
107T
H
99TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
99TH ST TRANS MAIN - 110TH AVE TO 120TH AVE
Install 20 and 16 inch transmission mains in 99th St from 140th Ave east to 152nd and south toWard Rd. Transmission mains are needed to move the water from the west to the east. Thisproject improves transmission capabilities from WS 14 to WS 9 and to the east.
$2,500,000.00Total Proj. Cost:083256
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
Move water from sources to areas with increasing demand.
WTR-10PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
19
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-100WTR-61WTR-99
40TH (P)
14
3R
D
14
5T
H
43RD
38TH
SOR
REL
42ND
RANCHO
COLUM
BINE
37TH14
6T
H
14
9T
H
WIL
DROSE
14
8T
H
44TH
14
7T
H
14
5T
H
38TH143RD
39TH
41ST (P)
15
0T
H
148T
H Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS 9 LEAD & COPPER PILOT STUDY
Conduct a pilot study for treatment alternatives to increase the pH of the water to meet DOHstandards.
$100,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
1-Requirement to meet pH standards for the site related to lead and copper.
WTR-100PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
20
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-101WTR-99
WTR-51
BLA
ND
FO
RD
(P
)
DE
VIN
E
UTAH
IDAHO
OGDEN
MILL PLAIN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 5 BOOSTER PUMPS
Install additional pumping capacity at Water Station 5 to meet the growing demand anddistribute more water to Heights High.
$1,000,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
3-Provide additional capacity for future growth and improved reliability.
WTR-101PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
21
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-102WTR-99
E 5TH ST
COLUMBIA HOUSE BLVD
S B
LAN
DF
OR
D D
R
SE MARINE PARK WAY
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 4 WATER RIGHTS UTILIZATION STUDY
Study will analyze what needs to be done to utilize all available water rights at water station 4.
$100,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
1 - Ensure sufficient water rights at Water Station 4. All water rights are not currently beingutilized at water station 4.
WTR-102PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
22
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-103**TRANS-719
WTR-99
16TH
15TH
14TH
115
TH
14TH
112
TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS 7 HYPO GEN SYSTEM
Replace the existing Sodium Hypochlorite generation system at WS 7 with a new sodiumhypochlorite generation system.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
Current Sodium Hypochlorite generation sysem is maintenance intensive. This project will helpreduce maintenance costs.
WTR-103PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
23
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-104
WTR-68
WTR-99N
E 1
13
TH
CT
(P
)
NE
11
2T
H A
VE
NE ROSEWOOD AVE
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS 8 HYPO GEN SYSTEM
Replace the existing Sodium Hypochlorite generation system at WS 8 with a new sodiumhypochlorite generation system.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
Current Sodium Hypochlorite generation system is maintenance intensive. This project will helpreduce maintenance costs.
WTR-104PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
24
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-16
WTR-16WTR-16
**TRANS-838
**TRANS-337
**TRANS-740
WTR-32WTR-64
WTR-99
97TH
92ND
21ST
16TH
90TH
99THIMAGE
13TH
RIDGECREST
SR-14 EB
SR-14 WB
12TH
95TH
104TH
FRENCH
BUTTE
99TH
96TH
94TH
15TH
103RD
102ND
14TH
97TH
98TH
SAINT HELENS
13TH
18TH
MT HOOD
11TH
101ST
IMAGE
100TH
PORTER
105TH
COLUMBIA RIDGE BEACON
88TH
MT RAINIER
HILLCREST106
TH
MT LASSEN
16TH
MT ADAMS
MT W
HITNE
Y
MT SH
ASTA
MT MC
KINLE
Y
SHERLEY
105TH
11TH
14TH
13TH
105TH
96TH 97TH
103RD
101ST
98TH
13TH
96TH
15TH
101ST
105TH
10TH
98TH
88TH
EVERGREEN
SAINT HELENS
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ELLSWORTH WELL REHABILITATION
Rehabilitation of all three production wells at Ellsworth
$500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
Project identified by Operations. Site conditions require this well to be rehabilitated every 6-8years. Rehabilitation will improve production, prolong life, and allow us to continue meetingminimum levels of service.
WTR-16PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
25
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-32WTR-64
WTR-16WTR-99
97TH
16TH
SR-14 WBSR-14 EB
12TH
104TH
FRENCH
15TH
14TH
18TH
BUTTE
13TH
11TH
98TH
96TH
99TH
105TH
103RD
102ND
101ST
97TH
16TH
15TH
96TH
14TH
13TH
11TH
105TH
102ND
103RD
97TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ELLSWORTH GREENSAND REPLACEMENT
Replace the existing greensand in all the filters at the Ellsworth Water Treatment Facility
$970,579.00Total Proj. Cost:083343
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
1,2,4 -Greensand requires periodic replacement to maintain operational efficiency.
WTR-32PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
26
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-36
**TRANS-825
WTR-49
WTR-9
WTR-89
SCIP-34
SR-500 WB
SR-500 EB
I-5
54TH
15TH
40TH
ROSS
44TH
39TH
49TH
42ND
FALK
56TH
SAIN
T JOH
NS
SAINT
JAME
S
HIGH
WAY 9
9
MINNEHAHAMINNEHAHA
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER MAIN NE 49TH ST: NE 15TH AVE TO ST. JOHNS
Install 2500 LF of 10 inch and 4300 LF of 8 inch water main to replace substandard and highrisk asbestos cement water main. Funded for design in 2019 for $100,000, and $770,000 forconstruction in 2020
$905,000.00Total Proj. Cost:083440
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
4 - Replace substandard piping and reduce risk.
WTR-36PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
27
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-37
WTR-37
WTR-37
**TRANS-258
**TRANS-835
WTR-78
WTR-99WTR-39
WTR-42WTR-9
18TH (P)
X
(P)
Z
Y
25TH
T
18TH
20TH
X
17TH
RE
SE
RV
E
19TH
W
Z
Z
FOURTH PLAIN
FORT VANCOUVER
17TH (P)
21ST
22ND
WIN
CH
EL
L
RE
SE
RV
E
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 1: STANDBY POWER, BOOSTER STATION
Multi year project to provide an entire site electrical and telemetry upgrade includingemergency power. Project will also replace two existing old booster pump stations with onebooster pump station.
$14,460,000.00Total Proj. Cost:083402
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Multiple improvements identified in 2005 master plan. Water station 1 is the most critical waterstation in the City. Replaces/rehabilitates aging infrastructure for system reliability, efficiency,emergency preparedness, and additional capacity.
WTR-37PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
28
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-38WTR-75WTR-99
NW
WA
SH
ING
TO
N S
T
NW 43RD STE 43RD ST
NW 42ND ST
DIV
ISIO
N A
VE
NW
DIV
ISIO
N A
VE
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 3 MASTER PLAN
Project will produce a site master plan for water station 3
$130,000.00Total Proj. Cost:083W-13-06
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
Expand and upgrade aging water station #3.
WTR-38PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
29
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-39
WTR-39
WTR-39
**TRANS-258
**TRANS-835
WTR-78
WTR-99WTR-37
WTR-42WTR-9
18TH (P)
X
(P)
Z
Y
25TH
T
18TH
20TH
X
17TH
RE
SE
RV
E
19TH
W
Z
Z
FOURTH PLAIN
FORT VANCOUVER
17TH (P)
21ST
22ND
WIN
CH
EL
L
RE
SE
RV
E
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER WORKS PARK: 3.0 MG RESERVOIR AND SEISMIC UPGRADE
One reservoir constructed in 1909 will be removed. One reservoir constructed in the 1930's willget seismic upgrades. This project will also construct one new 3 million gallon reservoir. Designprojected for 2016-2017, with construction in 2018.
$9,900,000.00Total Proj. Cost:083W-15-01
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Multiple improvements identified in 2005 master plan. Water station 1 is the most critical waterstation in the City. Replaces/rehabilitates aging infrastructure for system reliability, efficiency,emergency preparedness, and additional capacity.
WTR-39PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
30
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-40
NW 45TH ST
NW
DA
NIE
LS
ST
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
LINCOLN HIGH: BOOSTER REPLACEMENT
The Lincoln high pressure zone currently only has one old booster pump located in a vault underthe sidewalk. The booster station needs to be upgraded to include multiple correctly sized pumpsand a fire flow pump for added redundancy and improved fire flow. The booster station willlikely be relocated to water station 3.
$800,000.00Total Proj. Cost:083W-15-02
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
Improve pump efficiency and increase capacity for improved fire flow to the Lincoln HighPressure Zone.
WTR-40PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
31
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-42
WTR-42
WTR-42
**TRANS-258
**TRANS-835
WTR-78
WTR-99WTR-37
WTR-39WTR-9
18TH (P)
X
(P)
Z
Y
25TH
T
18TH
20TH
X
17TH
RE
SE
RV
E
19TH
W
Z
Z
FOURTH PLAIN
FORT VANCOUVER
17TH (P)
21ST
22ND
WIN
CH
EL
L
RE
SE
RV
E
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER WORKS PARK: NEW STANDPIPE
The existing elevated 250,000 gallon tower will be replaced with a ground supportedstandpipe. This will add security to the system with this replacement to provide the facilities witha secure elevated structure for the Vancouver High pressure
$2,500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2018*Start of Construction (Year):
Provide secure elevated water storage to serve the Vancouver High Pressure Zone.
WTR-42PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
32
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-47WTR-69WTR-99
53RD (P)
54TH
64
TH
52ND6
3R
D
62
ND
61
ST
(P
)
60
TH
(P
)
59
TH
(P
)
63R
D
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 6 INTERNAL COATING
Coat the inside of the elevated water tower to prevent corrosion.
$400,000.00Total Proj. Cost:5
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
4 - To preserve the existing elevated water tower.
WTR-47PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
33
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-51
SR-14 EB
SR-14 WB
18TH
97TH
87TH
MACARTHUR
86TH
EVERGREEN98
TH
LIESE
R
ANDR
ESEN
STAP
LETO
N
SAINT HELENSSHOREWOOD
BURTON
98TH
MILL PLAIN
BURTON
ANDR
ESEN
FOURTH PLAIN
25TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS 5 TO WS 9 TRANSMISSION MAIN
Install additional water transmission piping to move water from west to east.
$2,700,000.00Total Proj. Cost:11
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
Move water from supply sources to areas with increasing demand.
WTR-51PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
34
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-55
**TRANS-536
**TRANS-816
WH
ITN
EY
DO
GW
OO
D65TH
20TH
CHERRY
69
TH
FRU
IT V
ALLEY
20TH
(P)
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BERNIE PRV REPLACEMENT
Relocate and upgrade the existing PRV (Pressure Reducing Valve) which is in a remote location onrailway property. Connect to SCADA if network availability can be found.
$250,000.00Total Proj. Cost:15
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
4 - Rehab existing PRV to improve access for maintenance and monitoring by operators.
WTR-55PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
35
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-6
**TRANS-348
**TRANS-818
**TRANS-703**TRANS-527**TRANS-281
**TRANS-719
**TRANS-827
**TRANS-826 **TRANS-720
**TRANS-824
WTR-99WTR-103
SCIP-76
SCIP-88
SCIP-103
SCIP-74
SCIP-104
SS-22
SS-8
SW-32
SW-27
SW-4
SW-30
I-205
97TH
98TH
112T
H
18TH
28TH
BURTON
136T
H
FOURTH PLAIN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
TRANSMISSION MAIN-NE BURTON RD (DST-13)
Install a 24 inch transmission main to the east from NE 97th Ave to NE 124th Ave in Burton Rd.Transmission mains are needed to move the water from the southwest to the east. This projectimproves transmission capabilities from WS 1 and Ellsworth to the east.
$2,500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
4 - Move water from supply sources to areas with increasing demand.
WTR-6PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
36
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-61WTR-99
WTR-100
40TH (P)
14
3R
D
14
5T
H
43RD
38TH
SOR
REL
42ND
RANCHO
COLUM
BINE
14
6T
H
14
9T
H
WIL
DROSE
14
8T
H
44TH
14
7T
H
14
5T
H
38TH
143RD
39TH
41ST (P)
15
0T
H
148T
H Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SODIUM HYPO GEN SYSTEM WS 9
Replace the existing chlorine gas system at WS 9 with a sodium hypochlorite generation system.
$350,000.00Total Proj. Cost:21
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
2 - Chlorine gas is becoming more expensive. Sodium hypochlorite costs less and is much safer forthe community and operators.
WTR-61PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
37
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-62WTR-996
6T
H
75TH
76TH
69T
H
67T
H
70
TH
75TH
78TH
AN
DR
ES
EN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SODIUM HYPO GEN SYSTEM WS 14
Replace the existing chlorine gas system at WS 14 with a sodium hypochlorite generation system.
$200,000.00Total Proj. Cost:22
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
2 - Chlorine gas is becoming more expensive. Sodium hypochlorite costs less and is much safer forthe community and operators.
WTR-62PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
38
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-63WTR-46WTR-99
WTR-65
NE
84
TH
AV
E
NE
85
TH
AV
E
NE
83RD
AV
E
NE
86
TH
AV
E
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SODIUM HYPO GEN SYSTEM WS 15
Replace the existing chlorine gas system at WS 15 with a sodium hypochlorite generation system.
$200,000.00Total Proj. Cost:23
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
Gas is becoming more expensive. Sodium hypochlorite costs less and is much safer for thecommunity and operators.
WTR-63PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
39
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-64WTR-32
WTR-16WTR-99
97TH
16TH
SR-14 WBSR-14 EB
12TH
104TH
FRENCH
15TH
14TH
18TH
BUTTE
13TH
98TH
11TH
96TH
99TH
105TH
103RD
102ND
101ST
97TH
16TH
15TH
96TH
11TH
105TH
14TH
13TH
103RD
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SODIUM HYPO GEN SYSTEM ELLSWORTH
Replace the existing chlorine gas system at Ellsworth with a sodium hypochlorite generationsystem.
$300,000.00Total Proj. Cost:24
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
Gas is becoming more expensive. Sodium hypochlorite costs less and is much safer for thecommunity and operators.
WTR-64PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
40
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-66
**TRANS-816
HARBORSIDE32
ND
SS-102
LOWER RIVER
26TH
26TH Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PORT WATER SYSTEM UPGRADE
Install water mains on Port property in order to provide a second feed line to the west parts ofthe Port.
$200,000.00Total Proj. Cost:26
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
3 - New system to provide redundancy to the current one 1 feed line to west end of the Port.Added redundancy needed.
WTR-66PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
41
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-68WTR-99
WTR-104
NE
11
3T
H C
T
(P)
NE
11
2T
H A
VE
NE ROSEWOOD AVE
NE FOURTH PLAIN BLVD
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 8: REPLACE WELLS 2 & 3
Replacement of aging wells based on performance and condition.
$2,000,000.00Total Proj. Cost:29
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020-2021*Start of Construction (Year):
Maintain the existing well field and pumping capacity.
WTR-68PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
42
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-69
WTR-47
WTR-99
53RD (P)
54TH
64
TH
52ND6
3R
D
62
ND
61
ST
(P
)
60
TH
(P
)
59
TH
(P
)
63R
D
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER STATION 6 WELL/TREATMENT INSTALL
Install and additional well at WS 6.
$3,000,000.00Total Proj. Cost:30
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019-2020*Start of Construction (Year):
Increase water production to meet demand.
WTR-69PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
43
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-76
WTR-97
WTR-85
SCIP-127
68TH
47TH ISSLER
51ST
43RD
65TH
70TH56T
H
41ST
64TH
75TH
55TH
40TH
66TH
37TH
80TH
58TH
76TH
69TH
71ST
35TH
50TH
39TH
53RD
72ND
57TH
54TH
74TH
38TH
77TH
67TH
81ST
52ND
46TH
45TH
36TH
81ST
54TH
56TH
67TH
64TH
57TH
47TH
56TH
68TH 68TH68TH
43RD
37TH
76TH
71ST
54TH
56TH
75TH
69TH
55TH
40TH
53RD
65TH
53RD
74TH
58TH
78THPADDEN
SAINT JOHNS
PADDEN
55TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 47TH AVE - 68TH NORTH COUNTY
Install new water main and replace existing main impacted by roadway construction.
$140,000.00Total Proj. Cost:083415
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Replace existing waterline as part of a Roadway coordination project with Clark County's47th Avenue improvement project.
WTR-76PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
44
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-77
WTR-94
WTR-10
SCIP-235
SW-33
117T
H
PADDEN
107T
H
94TH
88TH
99TH
87TH88TH 99TH
PADDEN
94TH
99TH
PADDEN
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
TRANSMISSION MAIN-WS 14 TO WS9 PH 2 (DST-03)
This phase will install 9,400 lineal feet of 24 inch water main from NE 94th Avenue and NE 88thStreet in an east then north direction ending at NE 114th Avenue and NE 99th street.
$2,549,860.00Total Proj. Cost:083223
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
3 - Move water from supply sources to areas with increasing demand.
WTR-77PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
45
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-78
**TRANS-258
**TRANS-835
WTR-99WTR-37
WTR-42WTR-39
WTR-9
18TH (P)
X
(P)
Z
25TH
Y
T
20TH
18TH
X
19TH
17TH
RE
SE
RV
E
Z
Z
FOURTH PLAIN
GR
AN
D
FORT VANCOUVER
17TH (P)
21ST
22ND
W
WIN
CH
EL
L
RE
SE
RV
E
20TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SODIUM HYPO GEN SYSTEM/BUILDING WS 1
Replace the existing chlorine gas system at Water Station #1 with a sodium hypochloritegeneration system.
$902,133.00Total Proj. Cost:083408
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Chlorine gas is becoming more expensive. Sodium hypochlorite costs less and is much safer forthe community and operators. Associated with multiple other projects at water station 1 (seeWTR-37;WTR-39)
WTR-78PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
46
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-79**TRANS-555
48TH (P)
66
TH
AN
DR
ES
EN
VANCOUVER MALL
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
VANCOUVER MALL DRIVE TRANSPORTATION COORDINATION
Install a new water main along Vancouver Mall Drive between 66th Avenue and Andresen inassociation with new roadway being installed the Streets Department.
$150,000.00Total Proj. Cost:083416
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
3 - Water system project as part of a Roadway Coordination project.
WTR-79PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
47
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-81
ZSS-123
V
UT
5TH
S
Z
13TH
Y
6TH
8TH
W
RESE
RVE
X
9TH
R
DAVIS
4TH
GRAN
D
11TH
12TH
WINC
HELL
OFFICERS
GRAC
E
14TH
X
9THZ
RESE
RVE
9TH
6TH
W
X
Z
8TH
R
EVERGREEN
GRAN
D
MILL PLAIN
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
E. 13TH ST -" V" AND "W"
Install 3,600 l.f. of new 8" water main to replace old water mains with a history of emergencyrepair due to leaks.
$578,008.00Total Proj. Cost:083406
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Replace aging waterlines which have exceeded their life expectancy and have a history ofbreakage.
WTR-81PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
48
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-85NE 70TH ST
NE
61
ST
AV
E
NE
60
TH
AV
E
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 60TH AVE AT NE 70TH ST
Install 200 LF of new pipe to replace an existing 2" galvanized water main with a history ofemergency repairs due to leaks.
$27,000.00Total Proj. Cost:083412
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
4 - Replace aging waterlines which have exceeded their life expectancy and have a history ofbreakage.
WTR-85PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
49
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-86
I
L
K
H
O
N
M
29TH
28TH
31ST
30TH
32ND
FR
ON
TA
GE
32ND
31ST
28TH
30TH
FR
ON
TA
GE
33RD
FR
ON
TA
GE
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
K & L ST. - E 29TH TO 32ND ST. WATER MAIN
Install 1600 LF of new pipe to replace existing 2 inch Galvanized, 4 inch Matheson Steel watermains with a history of emergency repairs due to leaks.
$260,000.00Total Proj. Cost:083411
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Replace aging waterlines which have exceeded their life expectantcy and have a history ofbreakage.
WTR-86PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
50
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-87 **TRANS-734
**TRANS-721
25TH (P)
29TH
32ND
31ST
30TH
24TH
25TH
DA
NIE
LS
KA
UF
FM
AN
28TH
27TH
LIN
CO
LN
GR
AN
T
MA
RK
LE
HA
RN
EY
ES
TH
ER
28TH
HA
RN
EY
25TH
27TH
24TH
28TH
27TH
FOURTH PLAIN
FR
AN
KL
IN
FR
AN
KL
IN
WA
SH
ING
TO
N
29TH
30TH
31ST
24TH
GR
AN
T
CO
LU
MB
IA
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
W 28TH ST GRANT & DANIELS WATER MAIN
Install 2400 LF of new pipe to replace existing 2 inch Galvanized and CI, 4 inchOD Steel and 6inch CI water mains with a history of emergency repairs due to leaks.
$450,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Staff utilized a criticality matrix to prioritize pipes with a history of leaks. This is one of thehigher priority projects. Replace aging waterlines which have exceeded their life expectantcyand have a history of breakage.
WTR-87PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
51
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-88
17TH
19TH
MA
RK
LE
LIN
CO
LN
MCLOUGHLINK
AU
FF
MA
N
16TH
MCLOUGHLIN (P)
20TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
W MCLOUGHLIN - LINCOLN TO KAUFFMAN WATER MAIN
Install 600 LF of new pipe to replace existing 6 inch CI water mains with a history of emergencyrepairs due to leaks.
$125,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Staff utilized a criticality matrix to prioritize pipes with a history of leaks. This is one of thehigher priority projects. Replace aging waterlines which have exceeded their life expectantcyand have a history of breakage.
WTR-88PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
52
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-89
57TH (P)
43
RD
(P
)
51ST
54TH
52ND
45
TH
46
TH
56TH
55TH
39
TH
53RD
42
ND
41
ST
55TH
40
TH
56TH
45
TH
38
TH
(P
)
40
TH
(P)
39
TH
(P
)
56TH (P)
45
TH
(P
)
38
TH
38
TH
42N
D
52ND
54TH
41
ST Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 54TH ST - 40TH AVE TO 45TH AVE WATER MAIN
Install 1200 LF of new pipe to replace existing 6 inch OD water mains with a history ofemergency repairs due to leaks.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Replace aging waterlines which have exceeded their life expectantcy and have a history ofbreakage.
WTR-89PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
53
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-9
WTR-9
SR-500 EB
SR-500 WB
15TH MILL PLAIN
I-5
39TH
33RD
18TH
44TH
54TH
FALK
15TH
COLU
MBIA
40TH
ROSS
MCLOUGHLIN
MAIN
FRAN
KLIN
EVERGREEN
58TH
FORT VANCOUVER
49TH
42ND
56TH
20TH
CMA
IN
FOURTH PLAIN
GRAN
D
SAIN
T JOH
NS
SAINT
JAME
S
HIGH
WAY 9
9
MILL PLAIN
33RD
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BOOSTER STATION FLOWMETERS
Install flow meters at 49th Street and St. Johns Booster Pump Houses.
$28,923.00Total Proj. Cost:083232
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Added flow meters will improve modeling capabilities and provide operators additional systemmonitoring.
WTR-9PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
54
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-90
WTR-95
CLAIR ST (P)SE RIVERSIDE WAY (P)
E EVERGREEN BLVD
SE SHOREWOOD DR
SE RIVERSIDE DR
SE
BE
AC
H D
R
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CLAIRE ST WATER MAIN
Install 500 LF of new pipe to replace existing 2 inch Galvanized water mains with a history ofemergency repairs due to leaks.
$75,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Replace aging waterlines which have exceeded their life expectantcy and have a history ofbreakage.
WTR-90PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
55
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-91WTR-91
F
E
G
H
20TH
19TH
RE
SE
RV
E
MCLOUGHLINMCLOUGHLIN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ALLEYS E & W OF G ST - 19TH ST TO 20TH ST
Abandon 840 LF of 1 inch Galvanized water mains and install 420 LF of new pipe. Replacementof existing water mains with a history of emergency repairs due to leaks.
$60,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Replace aging waterlines which have exceeded their life expectantcy and have a history ofbreakage.
WTR-91PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
56
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-92
NE
10
2N
D A
VE
NE FOURTH PLAIN BLVD
NE
10
2N
D A
VE
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BUNCH PLASTIC - 4TH PLAIN & 103RD AVE
Abandon 220 LF of 2 inch PVC water mains and install 220 LF of new pipe.
$35,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Staff utilized a criticality matrix to prioritize pipes with a history of leaks. This is one of thehigher priority projects. Replace aging waterlines which have exceeded their life expectantcyand have a history of breakage.
WTR-92PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
57
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-93
77
TH
(P
)
75
TH
(P
)
MO
RG
AN
MIDDLE
MO
RG
AN
MO
RG
AN Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SE MORGAN RD - S OF MIDDLE WAY
Install 600 LF of new pipe to replace existing 6 inch OD water mains with a history ofemergency repairs due to leaks.
$50,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Staff utilized a criticality matrix to prioritize pipes with a history of leaks. This is one of thehigher priority projects. Replace aging waterlines which have exceeded their life expectantcyand have a history of breakage.
WTR-93PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
58
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-94
WTR-77
WTR-10
I-205
88TH
107T
H
94TH
99TH
87TH
MEADOWS
88TH 99TH
76TH
PADDEN
94TH
78TH
PADDEN
105TH
COVINGTON Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 94TH AVE - 81ST ST NORTH TO 99TH ST COUNTY COORDINATION PROJECT
Replace 6", 8", and 12" mains in NE 94th Avenue to new locations so they do not conflict with theCounty's road improvement project or other utility crossings. Project will also adjust, relocate, andtransfer existing fire hydrants, valves, and water services to coordinate with the County's roadimprovement project.
$161,000.00Total Proj. Cost:083407
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
4 - Relocate water facilities in coordination with a Clark County transportation project.
WTR-94PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
59
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-95
**TRANS-740**TRANS-838
**TRANS-836
WTR-51
WTR-99WTR-102
WTR-90
WTR-93
SCIP-37
SS-32SS-59
SS-121
SS-110
SS-120SR-14 EB
SR-14 WB
EVERGREEN
MACARTHUR
ANDR
ESEN
BLAN
DFORD
RIVERSIDE
MILL PLAIN
ANDR
ESEN
SHOREWOOD
COLUMBIA HOUSE
CHELSEAEVERGREEN
MILL PLAIN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EVERGREEN TRANSMISSION MAIN
Install a new transmission main in Evergreen Hwy from Blandford to Sleret Ave.
$3,000,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Identified in water system master plan. Project needed to move water from supply sources toareas with increasing demand. Helps maintain minimum levels of service, system redundancy, andimproves emergency preparedness.
WTR-95PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
60
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-96
SCIP-235
SCIP-107
SW-33 PADDEN16
2ND
WARD
152N
D
137T
H
130T
H
78TH
99TH
76TH
WARD
137T
H
88THWARD
WARD
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 99TH ST TRANS MAIN - 140TH AVE TO WARD RD
Continuing construction of new transmission main inteded to move water from WS 9 to WS 14
$875,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
4 - Move water from supply sources to areas with increasing demand
WTR-96PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
61
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-97
NE 78TH ST
NE
SA
INT
JO
HN
S R
D
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
LINDE 2" WATER SERVICE
Separate 2 inch water service from fire protection to Linde/Airco. Possible upsize of meter maybe needed.
$20,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Improve safety and water quality
WTR-97PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
62
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-99
WTR-99
WTR-99
WTR-99WTR-99
WTR-99
WTR-99WTR-99
WTR-99
WTR-99
WTR-99
WTR-99
WTR-99
SR-14 EB
SR-14 WB
117T
HSR-500 EB
SR-500 WB
PADDEN
MILL PLAIN
162N
D
58TH
I-5
I-205
119TH
18TH
152N
D
172N
D
39TH
58TH
87TH
20TH
107T
H
68TH
9TH
EVERGREEN
88TH
86TH
83RD
97TH
44TH
25TH
MCGILLIVRAY
10TH
54TH
FALK
MAIN
21ST
DAVIS50
TH
38TH
ROSS 56TH
11TH
13TH
ANDR
ESEN
34TH
PORT
65TH68TH
87TH
88TH78TH
18TH
99TH
MILL PLAIN
76TH
192N
D1ST
28TH
162N
D
63RD
112T
H
164T
H
72ND
WARD
172N
D
137T
H
HAZE
L DEL
L
34TH
50TH
49TH
119TH 117TH
21ST
FRUI
T VAL
LEY
182N
D
119TH
99TH
WARD
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PUMP HOUSE ROOFING REPLACEMENT
Replace several aging roofs at multiple water stations throughout the City
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Project requested by Operations. Replace aging shingle roofs with metal roofs at several pumpstations around the City. Will help prolong asset life and reduce ongoing maintenance costs.
WTR-99PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
63
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-10
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SCIP COORDINATION PROJECTS
Holds money for future scip projects to replace substandard water main, currently funded for$100,000 annually.
$1,280,000.00Total Proj. Cost:083330
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
4 - Replace aging main or substandard pipe materials in the distribution system.
WTR-A1-10PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
64
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-12
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PRV FLOWMETERS/SCADA SYSTEM CONNECTIONS
Provides SCADA system connection for monitoring of flow at all pressure reducing valves
$132,203.00Total Proj. Cost:083332
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Improve system modeling and monitoring capabilities.
WTR-A1-12PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
65
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-15
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WELL LEVEL PROBES
Install level probes on wells to provide continuous monitoring
$47,059.00Total Proj. Cost:083346
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Provides long term trending of well performance.
WTR-A1-15PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
66
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-16
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SYSTEM SURGE EVALUATION
Hire a consultant to model and determine our water system vulnerability to surge damage andprovide a list for potential surge protection projects
$50,000.00Total Proj. Cost:083403
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
4 - Determine risk of surge damage within the system.
WTR-A1-16PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
67
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-17
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER SYSTEM COMP PLAN
Project will generate an updated water system comprehensive plan in order to meet StateDepartment of Health comprehensive plan requirements
$600,000.00Total Proj. Cost:083399
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2013/2014*Start of Construction (Year):
Planning effort to determine overall and in-depth system needs in compliance with DOHrequirements.
WTR-A1-17PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
68
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-18
117T
H
PADDEN
162N
D
FOURTH PLAIN
WARD
152N
D119TH
107T
H 137T
H
130T
H 83RD
99TH
78TH
DAVIS
65TH
99TH
76TH
172N
D
WARD
119TH
182N
D88TH
FOURTH PLAIN
PADDEN
139TH
137T
H
COVINGTON
182N
D
WARD
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STANDPIPE IN NE
Install a standpipe in the northeast to meet development needs in the east.
$2,500,000.00Total Proj. Cost:083W-16-03
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
3 - New standpipe to meet future system demand and provide consistent pressure in the eastportion of the service area.
WTR-A1-18PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
69
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-23
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
TREATMENT REGULATIONS COMPLIANCE
Unforeseen projects as needed to meet additional treatment requirements when regulationsincrease in the future.
$2,000,000.00Total Proj. Cost:33
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
1 - Meet regulatory compliance.
WTR-A1-23PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
70
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-27
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER DEMAND RESPONSE
General Line Item for all Demand Response Projects.
$5,980,002.00Total Proj. Cost:083268
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
This project covers work which is unscheduled roadway coordination, emergency work, oroversized mains associated with developments. Helps maintain minimum level of service.
WTR-A1-27PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
71
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-28
WTR-A1-28
SR-500 EB
SR-500 WB
117T
H
I-205
58TH
18TH
72ND
86TH
66TH
40TH
107T
H
121S
T
44TH47TH
54TH
56TH
102N
D
97TH
MEADOWS
STAP
LETO
N
87TH
82ND
98TH
THURSTON
FALK
65TH
130T
H
122ND
45TH
58TH
76TH
63RD
112T
H
FOURTH
PLAIN
ANDR
ESEN
BURTON
18TH
28TH
49TH
COVINGTON
MINNEHAHA
GHER
MILL PLAIN Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WATER RIGHTS UTILIZATION STUDY WS 6, 8, 15
Hire a hydrologist to conduct wellfield studies to determine if wells can be replaced to increaseproduction.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Water rights at these facilities are not being utilized up to the full amount of the water right
WTR-A1-28PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
72
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-29
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18TH18
2ND
162N
D16
7TH RISTO
119TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SCADA SYSTEM UPGRADE (2015-2018)
Update the SCADA system software to Wonderware and include all associated hardware at allWater Stations.
$7,200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015-2018*Start of Construction (Year):
Existing SCADA system is older technology and is becoming obsolete. Upgrade of the existingSCADA system will improve reliability, increase operational capabilities, and improve systemredundancy.
WTR-A1-29PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
73
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-3
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18THMILL PLAIN18
2ND
162N
D16
7TH RISTO
119TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:DistributionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
LEAK ABATEMENT
Contingency fund for rehabilitation and replacement of substandard leaking water main.
$16,900,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
TBD*Start of Construction (Year):
2,4,5 - Replace leaky mains to lower risk and maintenance costs.
WTR-A1-3PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
74
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-6
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18THMILL PLAIN18
2ND
162N
D16
7TH RISTO
119TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SEISMIC EVALUATION TOWERS AND RESERVOIRS
Several reservoirs and towers within the water system are in need of a seismic evaluation due toage and lack of proper design. Project will evaluate specific towers and propose necessarymodifications for upgrade or replacement.
$250,000.00Total Proj. Cost:083237
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
2 - Seismic evaluation needed due to age and lack of seismic requirements at the time thestructures were constructed. The evaluation will help determine if upgrades or replacement arenecessary.
WTR-A1-6PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
75
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
WTR-A1-7
SR-14 EB
SR-14 WB
117T
H
219TH
LOWER RIVER
10TH
58TH
PADDEN
EVER
ETT
SR-146TH
MILL PLAIN
267T
H
122N
D
242N
D
I-5
I-205
119TH
29TH
152N
D
212T
H
11TH
10TH
50TH
87TH
38TH
172N
D
6TH
39TH58TH
83RD
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
227T
H
94TH
68TH12
1ST
30TH
154TH50
TH72
ND
199TH179TH
18THMILL PLAIN18
2ND
162N
D16
7TH RISTO
119TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
WaterUtility Type:ProductionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EXPLORATION FOR NEW WATER SOURCE
Searching for additional water sources for future use.
$50,000.00Total Proj. Cost:083284
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
Planning is required to meet the future system demand.
WTR-A1-7PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
76
Note: All costs are in 2015 dollars
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Total448 Water Construction Fund
Water Production Projects
Ellsworth Greensand Replacement WTR-32 970,579 970,579
Well Level Probes WTR-A1-15 35,669 35,669
Water Comp Plan WTR-A1-19 26,000 26,000 Sodium Hypo Gen System WS 14 WTR-62 200,000 200,000 Water Rights Utilization Study WS 6,8,15 WTR-A1-28 200,000 200,000
Water Station 1 Standby Power Booster Station WTR-37 2,178,006 8,060,000 6,400,000 16,638,006 Sodium Hypo Gen System at WS 1 WTR-78 344,280 450,000 794,280 Ellsworth Well Rehabilitation WTR-16 20,000 250,000 270,000 Scada System Upgrade(2015-2018) WTR-A1-29 3200000 2,200,000 1,400,000 400,000 7,200,000 Pump House Roofing Replacement WTR-99 100,000 100,000 200,000 Water Works Park 3.0 MG Reservoir and Seismic Upgrade WTR-39 800,000 2,700,000 6,400,000 9,900,000 Water Works Park New Standpipe WTR-42 500,000 2,000,000 2,500,000
Exploration for New Water Source WTR-A1-7 50,000 50,000 WS 9 Lead & Copper Pilot Study WTR-100 100,000 100,000 Treatment Regulations Compliance WTR-A1-23 900,000 900,000 Water Station 6 Internal Coating WTR-47 400,000 400,000 Sodium Hypo Gen System Ellsworth WTR-64 300,000 300,000 Sodium Hpo Gen System WS 9 WTR-61 350,000 350,000 Water Station 6 Well/Treatment Install WTR-69 2,000,000 1,000,000 3,000,000 Seismic Evaluation Towers and Reservoirs WTR-A1-6 120,000 Water Tower 5,6,7 Seismic Improvements WTR-A1-6 2,700,000 2,700,000 Standpipe in NE WTR-A1-18 200,000 2,300,000 2,500,000 Lincoln High Booster Pump Replacment WTR-40 800,000 800,000 Water Station 8 Replace Wells 2 & 3 WTR-68 1,000,000 1,000,000 2,000,000 WS 5 Reservoir Seismic Improvements WTR-A1-6 3,000,000 3,000,000 Water Station 3 Master Plan WTR-38 130,000 130,000 Sodium Hypo Gen System WS 15 WTR-63 200,000 200,000 Water Station 5 Booster Pumps WTR-101 1,000,000 1,000,000 Water Station 4 Water Rights Utilization Study WTR-102 100,000 100,000 WS 7 Hypo Gen System WTR-103 200,000 200,000 WS 8 Hypo Gen System WTR-104 200,000 200,000
Water Works Park: Replace Wells 3, 4, and 5 3,000,000 3,000,000 Water Station 5 Booster Pumps 4,000,000 1,000,000 5,000,000
Water Station 3 Reservoir/Tower Replacement 1,000,000 4,000,000 1,000,000 6,000,000
Sodium Hypo Gen System WS 3 300,000 300,000
Sodium Hypo Gen System WS 4 400,000 400,000
Ellsworth Well Rehabilitation 250,000 250,000
Treatment Regulations Compliance 1,000,000 1,000,000
St. Johns Booster Pump Station - Installation 350,000 350,000 Water Station 4 Replace Well 1 1,000,000 1,000,000
Water Station 3 Replace Wells 1 & 2 with one well 1,000,000 1,000,000
Water Station 15 Wells 1-4 Replacement 4,000,000 4,000,000
Water Station 7 Greensand 200,000 200,000 SCADA Improvements 500,000 500,000 1,000,000
Reservoir Install Southeast 1,000,000 3,000,000 1,500,000 5,500,000 Water Station 4 Well 4 Building Replacement 600,000 600,000
Water Distribution Projects
Transmission Main - WS14 to WS9 Ph 2 (DST-03) WTR-77 2,499,860 2,499,860 Port Water System Upgrade WTR-66 200,000 200,000 NE 47th Ave - 68th to North County WTR-76 132,000 132,000 Vancouver Mall Drive Transportation Coordination WTR-79 150,000 150,000
PRV Flowmeters/Scada System Connections WTR-A1-12 124,862 124,862
E. 13th St. - V St. to W St. WTR-81 555,917 555,917
NE 60th Ave. - NE 70th St WTR-85 14,500 14,500 K & L St - E 29th to 32nd St Water Main WTR-86 260,000 260,000 NE 54th St - 40th Ave to 45th Ave Water Main WTR-89 200,000 200,000 Booster Station Flowmeters WTR-9 21,530 21,530 Claire St Water Main WTR-90 75,000 75,000 Alleys E & W of G St - 19th St to 20th St WTR-91 60,000 60,000 Linde 2" Water Service WTR-97 20,000 20,000 NE 94th Ave - 88th St Trans Main County Coord WTR-94 161,000 161,000 141st Ave - 28th St North SCIP(Water) WTR-A1-10 200,000 200,000 Wainwright Property 1,400,000 1,400,000
20 YEAR CAPITAL IMPROVEMENT PROGRAM FOR WATER
77
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Total18th Street Oil Spill - Mission Hills 17,162 17,162 Evergreen Lining Sleret 34,709
Water Demand Response WTR-A1-27 206,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 400,000 400,000 400,000 5,906,000
CRWWD Wooded Acres 10,000 10,000
County UIC Project 10,000 10,000
Columbia View Apartment Oversize 34,000 34,000
59th St Oversize 10,000 10,000
28th St - Grant to Daniels Water Main WTR-87 450,000 450,000
W McGloughlin - Lincoln to Kaufman Water Main WTR-88 125,000 125,000 Bunch Plastic - 4th Plain & 103rd Ave WTR-92 35,000 35,000 SE Morgan Rd - S of Middle Way WTR-93 50,000 50,000 Evergreen Transmission Main Blandford to Sleret WTR-95 500,000 2,500,000 3,000,000 Bernie PRV Replacement WTR-55 250,000 250,000 Leak Abatement WTR-A1-3 700,000 700,000 600,000 600,000 1,000,000 500,000 1,000,000 600,000 600,000 1,700,000 1,700,000 1,600,000 1,600,000 1,000,000 1,000,000 1,000,000 1,000,000 16,900,000
Water SCIP Coordination Projects WTR-A1-10 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 1,000,000 Water Main NE 49th St - NE 15th Ave to NE 40th Ave WTR-36 100,000 805,000 905,000
System Surge Evaluation WTR-A1-16 50,000 50,000 99th St Transmission Main - 140th Ct to Ward Rd WTR-96 2,500,000 2,500,000 WS 5 to WS 9 Transmission Main WTR-51 200,000 2,500,000 2,700,000 99th St Transmission Main - 110th to 120th Ave WTR-10 875,000 875,000 Transmission Main - Burton Rd (DST-13) WTR-6 200,000 2,300,000 2,500,000 SR 500/I-5 Interchange (move 24")* 550,000 550,000 WS 5 to Ellsworth Transmission Main 400,000 2,500,000 2,900,000 Transmission Improvements (DST 14-18) 3,000,000 3,000,000 3,000,000 3,000,000 12,000,000
Other Water ProjectsWater System Comp Plan 136,000 300,000 300,000 736,000 Central Operations Center Remodel 7,000,000 8,000,000 15,000,000 For SCIP projects see SCIP section of CIP -
Total Water Project 13,927,074 13,320,000 16,300,000 10,000,000 10,980,000 12,130,000 6,200,000 8,850,000 6,600,000 7,900,000 7,300,000 3,800,000 5,500,000 10,400,000 9,900,000 4,300,000 5,000,000 4,400,000 4,400,000 161,207,074
*Project timing is dependent upon the timing of the overriding project.
78
Sewer Utility
Capital Improvement Program
For Water, Sewer, and Surface Water
79
Sewer Utility Recent Financial History
Capital Improvement Program For Water, Sewer, and Surface Water
80
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
RevenueRatepayer Revenue 23,239,761 24,421,378 26,086,118 29,283,140 30,543,545 32,022,225 32,145,884 34,318,896 35,997,525 36,965,444 38,560,932 System Development Charges 3,433,489 3,251,761 3,166,074 3,024,671 2,851,403 2,039,355 1,551,339 1,243,614 1,644,626 3,316,544 2,305,002 Loan from 448 3,600,000 2,705,000 Transfer from 449 156,280 2,000,000 Transfer from 445Grants 2,565 150,398 159,400 13,080 - Other Miscellaneous Revenue* 2,363,872 1,922,398 1,599,914 2,573,975 1,492,777 1,158,756 1,407,160 980,444 1,183,142 1,368,801 1,262,608
Total Revenue 29,037,122 29,595,537 30,852,106 34,884,351 35,044,005 40,820,336 37,959,781 36,702,354 38,838,373 41,650,789 42,128,542
ExpensesSalaries and Benefits 2,332,750 2,616,224 3,002,699 3,153,210 3,548,954 3,086,392 3,029,147 3,089,838 3,057,180 3,163,259 3,282,642Supplies and Services 973,933 927,329 967,674 747,209 767,781 716,545 535,156 723,016 763,959 778,502 597,701Treatment Plant Operations (Veolia) 7,215,797 7,795,740 8,340,678 8,412,297 9,040,669 9,049,841 8,940,872 9,501,069 9,818,967 10,162,439 9,737,910Professional Services 975,413 243,201 269,773 331,411 472,346 426,644 383,673 405,523 312,163 389,635 829,260Indirects and ER&R 2,606,801 2,507,272 2,438,155 1,961,828 2,921,800 2,274,018 2,414,490 2,127,287 2,197,154 2,353,370 2,091,019
Operations & Maintenance Expenses 14,104,694 14,089,766 15,018,980 14,605,955 16,751,550 15,553,439 15,303,338 15,846,733 16,149,422 16,847,205 16,538,532
Taxes and fees 3,810,840 3,986,051 4,316,593 5,061,373 5,383,236 6,897,891 6,991,165 7,522,685 7,922,169 8,122,488 8,438,083
Debt Service 11,982,656 13,137,011 12,764,194 12,721,743 12,679,696 12,773,944 12,806,282 12,811,400 13,270,531 13,271,026 11,281,751
Capital 869,250 747,739 3,744,147 1,104,854 1,865,733 2,000,383 1,825,547 1,015,346 348,328 570,323 412,178
Water Fund (Utilities Administraiton Allocation) 0 0 0 0 0 1,124,470 1,057,455 1,172,252 1,214,512 1,333,913 1,325,340Expenses Subtotal 30,767,441 31,960,567 35,843,914 33,493,926 36,680,214 38,350,127 37,983,787 38,368,416 38,904,963 40,144,955 37,995,884
Depreciation 7,895,357 7,707,581 7,814,799 7,785,638 7,952,543 8,030,699 7,768,413 7,725,731 7,599,485 7,580,918 7,587,492Total Expense 38,662,798 39,668,148 43,658,713 41,279,564 44,632,757 46,380,826 45,752,200 46,094,147 46,504,448 47,725,873 45,583,376
*Other Miscellaneous Revenues include items such as: Septic Tank Receiving Interest Earnings Latecomer Fees
SEWER FUND ACTIVITY(2004-2014)
81
Ratepayer Revenue92%
System Development Charges5%
Other Miscellaneous Revenue*
3%
2014 Sewer Utility Revenues = $42,128,542
82
Taxes and fees22%
Debt Service30%
Capital1%Water Fund (Utilities
Administraiton Allocation)3%
Salaries and Benefits9%
Supplies and Services2%
Treatment Plant Operations (Veolia)26%
Professional Services2%
Indirects and ER&R5%
2014 Sewer Utility Expenses = $37,995,884
Operations and Maintenanceexpenses
83
Ratepayer Revenue
System Development
Charges
Other Miscellaneous Revenue (Interest, Rent, Fines, etc)
-
10
20
30
40
50
60
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Dol
lars
(Mill
ions
)
Years
Sewer Revenues (2004-2021)
ForecastActual
84
Operations and Maintenance
Activities
Taxes and Fees
Debt Service
Capital Improvements
Total Revenue
-
10
20
30
40
50
60
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Dol
lars
(Mill
ions
)
Years
Sewer Expenses (2004-2021)
ForecastActual
Future Capital NeedsBased on Condition Assessment Analysis
85
Sewer Utility Project List
Capital Improvement Program For Water, Sewer, and Surface Water
86
City of Vancouver 6‐Year Capital Improvement Program (2016‐2021)
Sewer Utility CIP ChangesThis page provides an overview of the changes from the previous 6 year project list (2015‐2020) to this year's 6 year project list (2016‐2021). The changes are segmented by: projects added; projects removed; and other.
Projects Added Project Number
Comments
GMA pump station Improvements SS‐122 Project now within the 6‐year horizon.Sludge Force Main Extension SS‐123 Project now within the 6‐year horizon.Evergreen Hwy Force Main SS‐124 Project now within the 6‐year horizon.Section 30 Arterial Expansion SS‐23 Project now within the 6‐year horizon.Mill Plain 102nd to Chaklov SS‐126 Project needed due to Transportation coordination
FBF Mercury Abatement System SS‐125 Project needed to meet new environmental emissions limitsEnergy Sustainability for Multiple
Projects SS‐120 Project added to improve energy efficiency at both treatment
plants
Projects Removed Project Number
Comments
Marine Park Outfall Upgrade SS‐108 Project not needed. Marine Park Outfall Pilings Removal SS‐109 Project not needed. West Side Refractory Replacement SS‐101 Completed by contract operator in 2015.
Roof Replacements SS‐104 Will be completed as part of CP&C (SS‐32).Westside enclosed grit system SS‐105 Project not needed. Major VFD Replacements SS‐111 Will be done as part of CP&C (SS‐32).
Gravity Thickener Rehabilitation SS‐119 See SS‐121 SCADA System Upgrades SS‐96 Will be done as part of CP&C (SS‐32).
H2S Control SS‐A1‐113 Completed. West Side Gravity Thickener
Rehabilitation SS‐121 Completed.
Solids Centrifuge #1 Replacement SS‐94 Completed.
Other Changes Project Number
Comments
Solids Centrifuge #2 Replacement SS‐100 Changed cost to $345,000Lagoon Aeration Upgrade SS‐102 Changed cost to $1,750,000UV System Replacement SS‐66 Changed cost to $2,700,000
Fire Control system Upgrade SS‐99 Changed cost to $100,000Main St. 5th to 15th St SS‐5 Moved from 2016 to 2021
87
Note: All costs are in 2015 dollars
Description # 2015 2016 2017 2018 2019 2020 2021 6-yr Total
Sewer Treatment Projects - WestsideFire Control System Upgrade SS-99 100,000 100,000
Secondary Clarifier Tank Coating SS-92 300,000 300,000
Secondary Clarifier Center Well Upgrade 3, 4, 5 SS-116 125,000 125,000
Solids Centrifuge #2 Replacement SS-100 345,000 -
FBF - Heat Ex Elbow Replacement SS-95 100,000 100,000 200,000
FBF Refractory Replacement SS-101 300,000 300,000
Lagoon Aeration Upgrade SS-102 1,500,000 250,000 1,750,000
WS-Ash Clarifier Corrosion Prevention & Weir Replacement SS-118 45,000 -
WS Wet Process Improvements SS-71 420,000 420,000
Septage Receiving Station Upgrade SS-74 200,000 200,000
Maintenance Building HVAC System Replacement SS-52 40,000 40,000
West 16th Pump Station (Pump Replacement) SS-58 200,000 200,000
Westside Heat Recovery/Bio Solids Dryer SS-97 1,100,000 1,100,000
CEMS Equipment Upgrade and Replacement SS-65 150,000 -
Westside UV System Replacement SS-66 2,700,000 -
FBF Mercury Abatement System SS-125 750,000 -
Sub-Total 3,990,000 440,000 200,000 1,300,000 1,925,000 620,000 250,000 4,735,000
Sewer Treatment Projects -Marine ParkBBC PS Influent Line Repair SS-28 400,000 400,000 Andresen Diversion Gate Valve SS-93 100,000 100,000 MP Wet Process Improvements SS-110 60,000 60,000 Secondary Aeration Basin Effluent Channel Split SS-59 60,000 60,000
Sub-Total - 60,000 500,000 - 60,000 - - 620,000
Sewer Treatment Projects - Both MP & WSAeration Membrane Upgrade SS-31 40,000 35,000 35,000 110,000 Capital Preservation and Compliance (2) SS-32 115,000 145,000 500,000 400,000 400,000 400,000 400,000 2,245,000
CP&C Ash Xfer Conveyor SS-117 60,000 - CP&C WS Influent Pump Motor SS-106 75,000 - CP&C 4 Multi Coating Projects SS-34 35,000 35,000 35,000 105,000 CP&C WS Gravity Thickener #1 Rehabilitation SS-121 120,000
Process Controls Electronics SS-70 500,000 500,000 Energy Sustainability for Multiple Projects SS-120 150,000 250,000 400,000
Sub-Total 250,000 450,000 790,000 435,000 400,000 970,000 435,000 3,480,000
Sewer Collection ProjectsBasin A-20-1 & Force Main Relocation (59th Street) SS-1 160,000 160,000 Mill Plain 102nd to Chaklov* SS-126 60,000 - Fred Meyer Pump Station Grand Central SS-98 150,000 - Flow Monitoring Program - Permanent Meters SS-A1-70 250,000 250,000 Standby Power SS-A1-3 35,000 35,000 Main Street, 5th to 15th* SS-5 520,000 520,000 Substandard Main Repair/Replace SS-A1-6 713,359 500,000 500,000 750,000 750,000 750,000 750,000 4,000,000 Basin B-4 Pump Station Removal SS-8 195,000 195,000 SE 1st St, 164th to 192nd Ave Design* SS-15 54,000 - 2nd and Columbia Pump Station Removal SS-17 70,000 - Basin E5-4 Relief Sewers SS-18 122,000 122,000 NE 28th Street, 142nd to 162nd* SS-19 170,000 170,000 NE 137th Avenue, 49th to Fourth Plain* SS-20 430,000 - NE 18th Street, Four Seasons to 138th* SS-22 395,000 395,000 Interceptor Integrity Evaluation SS-A1-114 120,000 150,000 150,000 Section 30 Arterial Expansion* SS-23 2,000,000 2,000,000 Pinebrook Force Main Reroute SS-112 265,000 265,000 GMA Pump Station Improvements SS-122 1,600,000 1,600,000 Sludge Force Main Extensions SS-123 2,060,000 2,060,000 Evergreen Hwy Force Main* SS-124 1,750,000 1,750,000
Sub-Total 1,597,359 1,250,000 1,227,000 750,000 750,000 2,750,000 6,945,000 13,672,000
Total Sewer Fund Projects 5,837,359 2,200,000 2,717,000 2,485,000 3,135,000 4,340,000 7,630,000 22,507,000
*Project timing is dependent upon the timing of the overriding project.
Shading indicates not included in 6 year plan, but money expected to be spent in 2015.
6 YEAR CAPITAL IMPROVEMENT PROGRAM FOR SEWER (2016-2021)
88
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-1
**TRANS-712
**TRANS-737
**TRANS-275
**TRANS-279
**TRANS-839
WTR-61
SCIP-107
SCIP-102
SS-20
SW-33
162N
D
FOURTH PLAIN
137T
H
162N
D
FOURTH PLAIN
49TH 48TH
WARD
POPLAR
47TH
76TH
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BASIN A-20-1 & FORCE MAIN RELOCATION (59TH STREET)
Funds budgeted are for oversize participation in the form of supplying pipe to the developerdriven project. This project will only move forward if NE 59th Street is constructed. Timing isuncertain and the date is estimated.
$160,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-1PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
89
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-100SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-99SS-97 SS-71SS-92
SS-74SS-125
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SOLIDS CENTRIFUGE #2 REPLACEMENT
Replaced aged and obsolete solids dewatering centrifuge with one that matches our existing one,which is energy efficient and more technologically advanced.
$345,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-100PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
90
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-102
**TRANS-816
**TRANS-819
WTR-66
LOWER RIVER
MILL PLAIN
31ST
WEIGE
L
LAFRAMBOIS
UNAN
DER
XAVIE
R
28TH
27TH
YEOM
AN36TH
39TH
37TH
34TH
VAN ALLMAN
THOM
PSON
SIMPS
ON
FIRESTONE
ROOS
EVELTSAINT FRANCIS TH
OMPS
ON
27TH
THOM
PSON
28TH
THOM
PSON
39TH26
TH
FRUI
T VAL
LEY
FOURTH PLAIN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
LAGOON AERATION UPGRADE
Replace aging blowers and related mechanical equipment with more energy efficient systemsthat also allow for treatment capacity expansion.
$1,750,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
(5) = Lower operating costs
SS-102PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
91
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-106SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-99SS-97 SS-71SS-92
SS-74SS-125
SS-100
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
INFLUENT PUMP MOTOR & VFD REPLACEMENT (RSR#1)
Replace aged influent pumps at the Westside headworks, with those that are more energyefficient, provide better flow control into the plant, and require less maintenance.
$75,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(5) = Lower operating costs
SS-106PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
92
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-110
WTR-95
SS-32SS-59
SS-121SS-120
45
TH
(P
)
SCENIC (
P)
COLUMBIA
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
MP WET PROCESS IMPROVEMENTS
Provides for equipment or updating of existing process changes, that may be needed to meetmore restrictive conventional or other pollutant discharge permit requirements
$60,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
(1) = Compliance with regulations
SS-110PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
93
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-112
9TH
8TH
125TH
12
3R
D
124TH
PINEBROOK
10TH
TIFFANY
12
7T
H
7TH1
28
TH
127TH
12
3R
D
8TH
124T
H
7TH
12
2N
D
126TH
128THÊ
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PINEBROOK FORCE MAIN REROUTE
Construct 700 feet of new forcemain north in NE 125th Avenue to redirect pump stationdischarges and shorten the overall forcemain length by 3550 feet.
$265,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-112PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
94
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-116SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-99SS-97 SS-71SS-92
SS-74SS-125
SS-100
SS-106SS-107SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SECONDARY CLARIFIER CENTER WELL UPGRADE 3, 4, 5
?????
$125,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
(4) - Replace/Preserve/Rehabilitate systems
SS-116PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
95
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-117SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-99SS-97 SS-71SS-92
SS-74SS-125
SS-100
SS-106SS-107SS-116 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ASH XFER CONVEYER REDESIGN
?????
$60,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(4) - Replace/Preserve/Rehabilitate systems
SS-117PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
96
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-118SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-99SS-97 SS-71SS-92
SS-74SS-125
SS-100
SS-106SS-107SS-116 SS-117
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ASH CLARIFIER CORROSION PREVENTION & WEIR REPLACEMENT
?????
$45,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(4) - Replace/Preserve/Rehabilitate systems
SS-118PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
97
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-120
SS-120SR-14 EBSR-14 WB
SR-500 EBSR-500 WB
MILL PLAIN
LOWER RIVER
15TH
I-5
18TH
39TH
EVERGREEN
33RD
COLU
MBIA
44TH 66TH
54TH
FALK
15TH 40
TH
MAIN
MACARTHUR
47TH
MCLOUGHLIN
72ND
8TH
STAP
LETO
N
26TH
RIVERSIDE
BURTON
40TH
54TH
FOURTH PLAIN
MILL PLAIN
MAIN
ANDR
ESEN
SAINT JOHNS
FRUI
T VAL
LEY
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ENERGY SUSTAINABILITY FOR MULTIPLE PROJECTS
Improve energy efficiency of several assets at both Westside and Marine Park Treatment Plants
$400,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016-2017*Start of Construction (Year):
Yearly allocation of money for projects know to improve energy efficiency at treatment plants.Projects may include pump replacements, light replacements, and blower replacements.
SS-120PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
98
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-121
SS-121SR-14 EBSR-14 WB
SR-500 EBSR-500 WB
MILL PLAIN
LOWER RIVER
15TH
I-5
18TH
39TH
EVERGREEN
33RD
COLU
MBIA
44TH 66TH
54TH
FALK
15TH 40
TH
MAIN
MACARTHUR
47TH
MCLOUGHLIN
72ND
8TH
STAP
LETO
N
26TH
RIVERSIDE
BURTON
40TH
54TH
FOURTH PLAIN
MILL PLAIN
MAIN
ANDR
ESEN
SAINT JOHNS
FRUI
T VAL
LEY
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CP&C WESTSIDE GRAVITY THICKENER #1 REHABILITATION
Gravity thickener #1 rehabilitation at Westside treatment plant.
$120,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Funding from CP&C; a yearly allocation of money used to fund extraordinary maintenance ofnew capital and small equipment outside the limits of the O&M Contract and/or unexpectedtreatment plant repairs outside the scope of the O&M contract.
SS-121PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
99
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-122
**TRANS-274
SCIP-102
174T
H
37TH
35TH
EMME
RSON
SS-19
159TH
34TH
166TH
28TH
163RD
169TH
36TH
30TH
42ND
38TH
31ST
176TH
40TH
41ST
164TH
35TH
EDMUNDS
32ND
165TH
43RD
171ST
37TH
173RD
33RD
175TH
29TH
172ND
174TH
161ST
170TH
158TH
STONEY MEADOWS
160TH
STONEY MEADOWS40TH
169TH
37TH
36TH
31ST
174TH
160TH 161
ST
166TH
158TH
32ND
30TH
33RD
29TH
32ND
161ST
30TH
158TH
165TH
175TH
165TH
170TH
34TH
37TH
35TH
160TH
165TH
165TH
31ST
158TH
164TH
35TH
161ST
32ND
35TH
38TH
163RD
165TH
38TH
158TH
40TH41ST
36TH
36TH
43RD
161ST
164TH
35TH
171ST
35TH
174TH
42ND
174TH
158TH
39TH
172N
D
162N
D
28TH Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
GMA PUMP STATION IMPROVEMENTS (BASIN A21)
Construct 3,870 lf of 8-inch forcemain from Maplecrest pump station to 162nd/39th. Alsoredirect Stein Estates Pump station to Maplecrest Pump station.
$1,600,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-122PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
100
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-123
SR-14 EB SR-14 WB
SR-500 EB
SR-500 WB
MILL PLAIN 15TH
LOWER RIVER I-5
39TH
33RDCO
LUMB
IA
EVERGREEN
18TH
FALK
MAIN
MCLOUGHLIN
8TH
FRAN
KLIN26
TH
42ND
20TH
BLAN
DFOR
D
THOM
PSON
8TH
C
GRAN
D
MAIN
MILL PLAIN
SAINT JOHNSFRUI
T VAL
LEY
33RD
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SLUDGE FORCE MAIN EXTENSIONS
Construct force main from Marine Park to along 5th Street to the West Side plant to transfersludge as needed.
$2,060,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
(3) = New Systems
SS-123PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
101
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-124
SR-14 EBSR-14 WB
LEWIS AND CLARK
EVERGREEN
BRADY
34TH PACIFIC RIM34TH
192N
D
164T
H
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EVERGREEN HWY FORCE MAIN
Construct force main along Evergreen Highway from 162nd to 192nd to facilitate future growthin east city
$1,750,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
(3) = New Systems
SS-124PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
102
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-125SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-99SS-97 SS-71SS-92
SS-74SS-121
SS-100
SS-106SS-107SS-116 SS-117
SS-118SS-120
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Construction
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS FBF MERCURY ABATEMENT SYSTEM
Install Mercury abatement equipment at the Westside treatment plant
$750,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(1) = Compliance with regulations
SS-125PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
103
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-126**TRANS-719
**TRANS-826
**TRANS-678
SCIP-69
SCIP-56
SCIP-64I-2
05
5TH117
TH101ST
102ND
103RD
104TH
3RD
120TH
8TH
110TH
2ND
106TH
4TH
7TH
100TH
108TH
SAINT HELENS
118TH
99TH 107
TH6TH
116TH
105TH
MAJOR
119TH
TANGL
EWOO
D
98TH
109TH
CRESTWOOD115TH
1ST
121ST
BOULDER
8TH100TH
4TH
116TH
120TH
6TH
5TH
103RD
102ND
5TH5TH
104TH
4TH
100TH
7TH
98TH
5TH
4TH
4TH
5TH
6TH
2ND
110TH
7TH
117TH
101ST
6TH
3RD
5TH
8TH
5TH
5TH
7TH
6TH
3RD
7TH8TH
2ND
118TH
99TH
105TH
10TH
98TH
97TH
CHKA
LOV
ELLS
WORT
H
10TH
MILL PLAIN11
2TH
2ND
107T
H
MCGILLIVRAY
SAINT HELENS
CHKALOV
Ê
In Design
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
MILL PLAIN 102ND TO CHAKLOV
Upgrade sewer mains in Mill Plain Boulevard between 102nd and Chaklov in association withTransportation improvement project
$60,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(3) = New Systems
SS-126PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
104
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-15
15TH
172N
D13TH
FRIB
ERG-
STRU
NK
BYBEE
1ST
192N
D
164T
H
MILL PLAIN
162N
D
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SE 1ST ST, 164TH TO 192ND AVE DESIGN*
This roadway coordination project will install needed stubs and/or laterals to provide sewer toparcels. Timing is dependant on the Transportation project. The project has funds for design whichis scheduled for 2015. Transportation construction is unfunded.
$54,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-15PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
105
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-17**TRANS-840
**TRANS-715
**TRANS-833
WTR-48
CO
LU
MB
IA S
T
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
2ND AND COLUMBIA PUMP STATION REMOVAL
This pump station program project is to construct the main necessary to take this pump station off-line once the new pump station is constructed for the Waterfront Project. The Waterfront Projectwill construct a new pump station for that project that will be deep enough to take the 2nd andColumbia pump station off-line. The Waterfront Project will extend main to Columbia Street. TheCity project will extend this main further to the site of the station allowing it to bedecommissioned. Timing is dependent on the Waterfront Project.
$70,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-17PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
106
Project Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark CountyBattle GroundCamasW ashougal
SS-18
**TRANS-742
**TRANS-741
**TRANS-838
W TR-2 SS-124
SE
164
TH
AV
E
SE 166TH CT
SE EVERGREEN HWY
SE 164TH AVE
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BASIN E5-4 RELIEF SEWERS
This relief sewer p rogram p roject will p rovid e ad d ed cap acity in the E5 Trunk Sewer and the E5-4 Trunk Sewer if flows from SEH exceed 2.8 M GD. SEH has inquired ab out the City’s ab ility tohand le flows of 2.8 M GD to 4.2 M GD. Flows ab ove 2.8 M GD will trigger relief sewers. Timing ofa p roject will d ep end on the timing of the flows. The p roject b ud get is b ased on installation of 85feet of p arallel 15-inch p ip e und er the railroad tracks at SE 164th Avenue (Basin E5) andp aralleling 2,300 feet of 15-inch main in Basin E5-4.
$122,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(4) = Rep lace/p reserve/rehab ilitate systems
SS-18PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All p roject timing will b e d ep end ent on coord ination with other d ep artments includ ing streets, p avement management, sewer, water and surface water.**Transp ortation p rojects (TRANS-X X X ) can b e found in the 6 Year Transp ortation Imp rovement Plan (TIP) d ocument.
107
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-19**TRANS-274
**TRANS-444
**TRANS-720
**TRANS-349
**TRANS-818
**TRANS-703
WTR-61WTR-99
WTR-100
SCIP-89
SCIP-77
SCIP-102
SS-122
SS-22SW-28
39TH
18TH
28TH
162N
D
138T
H13
7TH
136T
H Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 28TH STREET, 142ND TO 162ND*
This roadway coordination project will install approximately 900 feet of 8-inch main to providesewer to unsewered parcels. Timing is dependant on the Transportation project which is unfunded.
$170,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
(3) = New systems
SS-19PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
108
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-20
117T
HSR
-500 E
B
121S
T
65TH
116T
H
122ND
76TH
137T
H
FOURTH PLAIN
49TH
WARD
48THPOPLAR
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 137TH AVENUE, 49TH TO FOURTH PLAIN*
This roadway coordination project will install approximately 2,600 feet of 8-inch main to providesewer to unsewered parcels. Timing is dependent on the Transportation project. Transportationproject has funds for design which is scheduled to start mid-2014. Transportation construction isunfunded.
$430,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
This project will take advantage of the proposed road improvements to install new main to serveunsewered parcels. By combining with a road improvement project, construction costs are reducedsignificantly.
SS-20PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
109
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-22**TRANS-348
**TRANS-818
**TRANS-720
**TRANS-703
**TRANS-719
**TRANS-274
**TRANS-444
**TRANS-824
WTR-6
WTR-99WTR-103
SCIP-76
SCIP-88
SCIP-74
SCIP-77
SCIP-89
SCIP-103
SS-19
SS-8
SS-112
SW-27
I-205
18TH
28TH
112T
H
138T
H
136T
H
BURTON
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 18TH STREET, FROM FOUR SEASONS TO NE 138TH AVE *
This roadway coordination project will install approximately 1,700 feet of 8-inch and 10-inchmain to provide sewer to unsewered parcels. Timing is dependant on the Transportation project.This project has been designed, but Transportation construction is unfunded.
$395,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
This project will take advantage of the proposed road improvements to install new main to serveunsewered parcels. By combining with a road improvement project, construction costs are reducedsignificantly.
SS-22PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
110
Proje ct Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vanc ouve r City LimitsSe we r Se rvic e Are aWate r Se rvic e Are aCla rk CountyBattle GroundCamasWashougal
SS-23
**TRAN S-349
**TRAN S-268
**TRAN S-607**TRAN S-716
**TRAN S-729
**TRAN S-717**TRAN S-718
**TRAN S-444
SS-15
SW-28
172N
D
13TH
FRIB
ERG-
STRU
NK
GOODWIN
1ST
18TH
192N
D
162N
D16
4TH
MILL PLAIN
LAKE
MILL PLAIN Ê
Futur e
Date : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanita ry Se we rUtility Type:Colle ctionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SECTION 30 ARTERIAL EXPANSION*
This roa dway c oor d ination proje ct provid e s fund s to install se we r mains with Transportation’sSe ction 30 Arte rial Expansion Proje ct id e ntifie d in the Transportation Improve m e nt Program.Timing is d e pe nd ant on the Transportation proje ct whic h is unfund e d . The bud ge t is base d on ane stimate of 17,000 fe e t of 12-inc h main.
$2,000,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
(3) = N e w syste ms
SS-23PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will be d e pe nd e nt on c oor d ination with othe r d e pa rtme nts inc lud ing str e e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.**Transportation proje cts (TRAN S-X X X ) c an be found in the 6 Y e a r Transportation Improve m e nt Plan (TIP) d oc ume nt.
111
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-28
N D
EV
INE
RD
MONTANA LNÊ
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BBC PS UPGRADE
Repair the pipe leading from BBC intercepter into the pump station wetwell.
$400,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-28PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
112
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-31SS-32SS-97SS-34
SS-52SS-58SS-65
SS-66SS-70
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
AERATION MEMBRANE UPGRADE
Replace aeration membranes to retain optimum treatment capability
$110,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014-2017-2020*Start of Construction (Year):
(4) = Replace/Preserve/Rehabilitate systems
SS-31PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
113
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-32
SS-32SR-14 EBSR-14 WB
SR-500 EBSR-500 WB
MILL PLAIN
LOWER RIVER
15TH
I-5
18TH
39TH
EVERGREEN
33RD
COLU
MBIA
44TH 66TH
54TH
FALK
15TH 40
TH
MAIN
MACARTHUR
47TH
MCLOUGHLIN
72ND
8TH
STAP
LETO
N
26TH
RIVERSIDE
BURTON
40TH
54TH
FOURTH PLAIN
MILL PLAIN
MAIN
ANDR
ESEN
SAINT JOHNS
FRUI
T VAL
LEY
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CAPITAL PRESERVATION AND COMPLIANCE (2)
This project will fund extraordinary maintenance of new capital and small equipment outside thelimits of the O&M Contract. Total list of identified projects currently totals $7,168,807.00, withfollowing projected construction schedule: 2014 - $250K; 2015 - $250K; 2016 - $250K; 2017 -$400K; 2018 - $400K; 2019 -$400K.
$1,950,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Yearly allocation of moneyto fund extraordinary maintenance of new capital and smallequipment outside the limits of the O&M Contract and/or unexpected treatment plant repairsoutside the scope of the O&M contract.
SS-32PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
114
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-34SS-31SS-97SS-32
SS-52SS-58SS-65
SS-66SS-70
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CP&C 4 MULTI COATING PROJECTS
Replace coatings on various basins and units at the wastewater treatment plant facilities toprotect and prolong life of facilities.
$105,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Funding from CP&C; a yearly allocation of money used to fund extraordinary maintenance ofnew capital and small equipment outside the limits of the O&M Contract and/or unexpectedtreatment plant repairs outside the scope of the O&M contract.
SS-34PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
115
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-5
**TRANS-452
**TRANS-840**TRANS-833
**TRANS-495
**TRANS-734**TRANS-721
**TRANS-531
**TRANS-831
**TRANS-715
**TRANS-834
**TRANS-835
WTR-48
WTR-88
WTR-91
SS-123
SS-17
15THMILL PLAIN
SR-14 WB
I-5F
E
D13TH
11TH
G
5TH
C
12TH
17TH
16TH
9TH
19TH H
ESTH
ER
7TH
20TH
LINCO
LN
GRAN
T
KAUF
FMAN
DANIE
LS
HARN
EY
6TH
OFFICERS
MCLOUGHLIN
KING
15TH14TH
FORT
VANC
OUVE
R
MARK
LEJEF
FERS
ON
4TH
HILL
3RD
FRAN
KLIN
WASH
INGTO
N
RESE
RVE
INGAL
LS
20TH
RESE
RVE
12THKING
ESTH
ER
7TH
E
20TH
MCLOUGHLIN
17TH
GRAN
T
GRANT
DANIE
LS
6TH
19TH
14TH
ESTH
ER
5TH
HARN
EY
20TH
LINCO
LN
D
16TH
MCLOUGHLIN
MARK
LE
8TH
MAIN
COLU
MBIA BR
OADW
AY
FRAN
KLIN
6TH
MCLOUGHLIN
FORT VANCOUVER
EVERGREEN7TH
GRAN
T
EVERGREEN
8TH
C
WASH
INGT
ON
MAIN
MILL PLAIN
JEFFERSON
JEFF
ERSO
N FORT VANCOUVER
6TH
BROA
DWAY
MCLOUGHLIN
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
MAIN STREET, 5TH TO 15TH*
This roadway coordination project will replace old clay mains installed in 1890 as part of thefirst sanitary sewer project in the City of Vancouver with approximately 1,900 feet of new mainsin coordination with the planned roadway improvements in Main Street. Construction will betriggered when funds are obtained for the roadway project and it is constructed. Sewerconstruction will be included in the roadway plans.
$520,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2021*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-5PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
116
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-52SS-31SS-97SS-32
SS-34SS-58SS-65
SS-66SS-70
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
MAINTENANCE BUILDING HVAC SYSTEM REPLACEMENT
Maintenance of the HVAC system, to replace components due to age, deterioration and requiredrepairs.
$40,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Planned for 2016 due to age, deterioration and required repairs, but further conditionassessment will be in 2015. If condition assessment shows work is not needed, repairs may bepushed further into the future.
SS-52PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
117
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-58SS-31SS-97SS-32
SS-34SS-52SS-65
SS-66SS-70
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WEST 16TH PUMP STATION
The West 16th pump station serves the Fruit Valley neighborhood. The pump station must berepaired or replaced as needed to provide uninterupted service to the community.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-58PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
118
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-59
WTR-95
SS-32SS-121SS-120SS-110
45
TH
(P
)
SCENIC (
P)
COLUMBIA
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SECONDARY AERATION BASIN EFFLUENT CHANNEL SPLIT
The effluent channel of the Marine Park aeration basins needs a gate valve placed betweenPhase 1 and Phase 2. This will prevent solids from settling out in the off-line portion of thechannel, creating odor issues and an inaccurate solids inventory.
$60,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Project has been deferred for approximately 5 years due to insufficient funds and higherpriorities. Money will be available in 2016 to perform work. Project will improve operationalefficiency and reduce odors.
SS-59PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
119
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-65SS-31SS-97SS-32
SS-34SS-52SS-58
SS-66SS-70
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CONTINUOUS EMISSIONS MONITORING SYSTEM (CEMS) SYSTEM UPGRADE AND REPLACEMENT
Upgrades and replaces current CEMS, which is outdated and no longer supported by vendor.Westside Air Discharge Permit requires continuous monitoring of emissions from the fluidized bedfurnace.
$150,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(1) = Compliance with regulations
SS-65PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
120
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-66SS-31SS-97SS-32
SS-34SS-52SS-58
SS-65SS-70
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WESTSIDE UV SYSTEM REPLACEMENT
We are required by our NPDES permit to disinfect our treated wastewater effluent. TheUltraviolet disinfection system serves this purpose and must be repaired or replaced to providecontinuous service.
$2,700,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(4) = Replace/Preserve/Rehabilitate systems; (1) = Compliance with regulations
SS-66PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
121
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-70SS-31SS-97SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-71SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PROCESS CONTROLS ELECTRONICS
Electronics needed to run the process need to be replaced as they age.
$500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-70PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
122
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-71SS-31SS-97SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-74SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS WET PROCESS IMPROVEMENTS
Potential process upgrade based on potential need and regulatory changes, such as nutrientremoval.
$420,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
(1) = Compliance with regulations
SS-71PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
123
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-74SS-31SS-97SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-71SS-99 SS-92SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SEPTAGE RECEIVING STATION UPGRADE
Replace septage station to provide service of septage receiving for Clark County whileprotecting the facility.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-74PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
124
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-8
NE
12
5T
H A
VE
NE 16TH ST
NE
12
1S
T A
VE
NE 15TH ST
NE
12
3R
D A
VE
NE 14TH CIR
NE 15TH ST
NE 14TH ST
NE 16TH ST
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
BASIN B-4 PUMP STATION REMOVAL
This collection system project will allow for the decommissioning of the Sandcastle Pump Stationwhich was built in 1980 as a temporary facility. Only one undeveloped property lies betweenthe existing gravity sewer and the pump station. Staff not successful in obtaining an easementfrom the property owner to allow the City to extend the gravity sewer to the pump station andtake it off-line. The project is being delayed until the property develops. Once a developerextends a main across the property a smaller project will enable the City to decommission thestation.
$195,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-8PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
125
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-92SS-31SS-97SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-71SS-99 SS-74SS-95
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SECONDARY CLARIFIER TANK COATING
Based on condition assessments - repair and replace existing worn and peeling coatings for ourClarifiers #1 and #2
$300,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015 & 2017*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-92PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
126
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-93
SS-93**TRANS-281
14TH (P)
65
TH
18TH
AN
DR
ES
EN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ANDRESEN DIVERSION GATE VALVE
Replace existing influent channel with a diversion control structure to improve flow control into thelift station
$100,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-93PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
127
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-95SS-31SS-97SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-71SS-99 SS-74SS-92
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WS FBF HEAT EXCHANGER ELBOW REPLACEMENT
Replace elbow component of furnace while furnace is shut down in 2016.
$200,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016 & 2018*Start of Construction (Year):
Extended life of asset approximately 2 additional years by utilizing infrared technology. Thefurnace is shut down once per year. This project will take advantage of the shut down to replacean asset at the end of it's useful life.
SS-95PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
128
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-97SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-71SS-99 SS-74SS-92
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WESTSIDE HEAT RECOVER/BIO SOLIDS DRYER
Cyclone separator at fluidized bed furnace exhaust to remove fly ash in dry form.
$1,100,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
(5) = Lower operating costs
SS-97PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
129
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-98
1ST
Y
GR
AN
D
COLUMBIA HOUSE
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
FIRST AND "Y" PUMP STATION
Repair and upgrade pump station, and replace existing pumps which are now obsolete.
$150,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-98PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
130
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-99SS-31SS-95SS-32
SS-34SS-52SS-58
SS-65SS-66
SS-70SS-71SS-97 SS-74SS-92
SS-125SS-100
SS-106
SS-107SS-116SS-117 SS-118
SS-120SS-121
SS-123
HARBORSIDE (P)
KO
TO
BU
KI
(P
)
SIM
PS
ON
(P
)
20TH
22ND
SIM
PS
ON
TH
OM
PS
ON
16TH
TH
OM
PS
ON
RO
OS
EV
ELT
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:TreatmentProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
FIRE CONTROL SYSTEM UPGRADE
Replace aged and increasingly unsupported fire alarm system at Westside, with technicallyadvanced wireless or fiber optic system with "Smart" alarms
$100,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019*Start of Construction (Year):
(4) = Replace/preserve/rehabilitate systems
SS-99PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
131
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-A1-114
SR-14 EB
SR-14 WB
117T
H
SR-500 EB
LOWE
R RI
VER
10TH
58TH
EVER
ETT
6TH
MILL PLAIN
267T
H
162N
D
242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
172N
D
6TH
39TH58TH
83RD
50TH
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
RAWSON
53RD
92ND
INGLE
169TH25
TH
27TH
30TH
98TH
237T
H
154TH50
TH
88TH
10TH
50TH
199TH179TH
72ND
18TH
76TH
182N
D
C
167T
H RISTO
49TH
36TH
29TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
INTERCEPTOR INTEGRITY EVALUATION
To idenfy needed projects on our major interceptors and trunk lines
$270,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
This project will help identify and prioritize repairs to major interceptors and trunk lines. Thisinformation will then be used by the Substandard Main Repair/Replacement project (SS-A1-6) tospend the money as efficiently as possible.
SS-A1-114PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
132
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-A1-3
SR-14 EB
SR-14 WB
117T
H
SR-500 EB
LOWE
R RI
VER
10TH
58TH
EVER
ETT
6TH
MILL PLAIN
267T
H
162N
D
242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
18TH
10TH
38TH
172N
D
6TH
39TH58TH
83RD
50TH
20TH 15TH
107T
H
209TH9T
H
GRAC
E
88TH
292N
D
RAWSON
53RD
92ND
INGLE
169TH
68TH
27TH
30TH
98TH
237T
H
154TH
10TH
50TH
50TH
199TH179TH
72ND
78TH
18TH
76TH
182N
D
C
167T
H RISTO36
TH
29TH
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STANDBY POWER
Initial project is scheduled for $35,000 in 2016. Multi year program for installation ofemergency power standby generators at selected sewer pump stations.
$35,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Multi year program for installation of permanent emergency power standby generators atselected sewer pump stations. Increase reliability of sewer service, reduce risks of backups,reduces overtime, and frees up staff time in emergencies.
SS-A1-3PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
133
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-A1-6
SR-14 EB
SR-14 WB
117T
H
SR-500 EB
LOWE
R RI
VER
10TH
58TH
EVER
ETT
6TH
MILL PLAIN
267T
H
162N
D
242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
18TH
10TH
38TH
172N
D
6TH
39TH58TH
83RD
50TH
20TH 15TH
107T
H
209TH9T
H
GRAC
E
88TH
292N
D
RAWSON
53RD
92ND
INGLE
169TH
68TH
27TH
30TH
98TH
237T
H
154TH
10TH
50TH
50TH
199TH179TH
72ND
78TH
18TH
76TH
182N
D
C
167T
H RISTO36
TH
29TH
Ê
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SUBSTANDARD MAIN REPAIR/REPLACE
Multi year program to replace sewer mains where our ongoing TV inspection condition assesmentprogram has shown that they are in deteriorated condition and in need of restoration. Estimatedat $750,000 per year.
$4,000,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015 and beyond*Start of Construction (Year):
Many sewer main repairs have been deferred while debt was being paid off. This project is amulti year program to rehab sewer mains where our condition assessment program has shownthat pipes are deteriorated and in need of repair.
SS-A1-6PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
134
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SS-A1-70SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
98TH
237T
H
154TH
50TH10
TH
50TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Sanitary SewerUtility Type:CollectionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
FLOW MONITORING PROGRAM - PERMANENT METERS
To install permanent flow meters at multiple locations, in order to monitor system flows, collectoperational data, and calibrate our system hydrualic model.
$250,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
(3) = New Systems
SS-A1-70PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
135
Note: All costs are in 2015 dollars
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Total
Sewer Treatment Projects - WestsideWS Wet Process Improvements SS-71 420000
Fire Control System Upgrade SS-99 100,000 100,000
Secondary Clarifier Tank Coating 1&2 SS-92 300,000 300,000
Secondary Clarifier Center Well Upgrade 3, 4, 5 SS-116 125,000 125,000
Solids Centrifuge #2 Replacement SS-100 345,000 345,000
FBF - Heat Ex Elbow Replacement SS-95 100,000 100,000 100,000 100,000 100,000 500,000
Lagoon Aeration Upgrade SS-102 1,500,000 250,000 250,000 2,000,000
Septage Receiving Station Upgrade SS-74 200,000 200,000
WS Concrete Tank Coatings 500,000 500,000
FBF Heat Exchanger Equipment Replacement 500,000 500,000
WS/MP Chemical Tanks Replacements 500,000 500,000 WS UV System Upgrade 500,000 500,000 Main Industrial Pumstation Upgrade 500,000 500,000 Fluidized Bed Furnace Replacement 20,000,000 20,000,000 WS Schwing Pump Replacements 600,000 600,000 WS Replace Odorous Air Treatment Scrubber 500,000 500,000 WS Grit Removal System Replacement 500,000 500,000 Lagoon Blower Upgrade 300,000 300,000 WS Centrifuge Replacement 800,000 800,000 WS Gravity Thickeners Overhaul 1,000,000 1,000,000 Frito Lay Pump Station Repair and Upgrade 1,000,000 1,000,000 WS Headworks Improvements 3,000,000 3,000,000 WS Effluent Pump and line Upgrade 2,000,000 2,000,000
Ash Clarifier Corrosion Prevention & Weir Replacement SS-118 45,000 45,000
Gravity Thickner #1 Rehabilitation SS-121 120,000 120,000
Maintenance Building HVAC System Replacement SS-52 40,000 40,000
West 16th Pump Station (Pump Replacement) SS-58 200,000 200,000
Westside Heat Recovery/Bio Solids Dryer SS-97 1,100,000 1,100,000
CEMS Equipment Upgrade and Replacement SS-65 150,000 150,000
Westside UV System Replacement SS-66 2,700,000 2,700,000
UV Design Consultant (B&C) -
FBF Mercury Abatement System SS-125 750,000 Enclosed Grit System SS-105 80,000 80,000 Influent Pump Motor & VFD Replacement SS-106 75,000 75,000 Primary Power Panel Bus 4A & 4B (Emergency Replacement) -
Sub-Total 4,145,000 260,000 200,000 1,300,000 1,925,000 200,000 1,250,000 21,350,000 1,900,000 800,000 2,000,000 5,100,000 - - - 600,000 41,030,000
Sewer Treatment Projects -Marine Park - BBC PS Repair Upgrade SS-28 400,000 400,000 Andresen Diversion Gate Valve SS-93 100,000 100,000 MP Wet Process Improvements SS-110 60,000 1,000,000 1,060,000 MP Replace Odorous Air Treatment Scrubbers 1,000,000 1,000,000 Secondary Aeration Basin Effluent Channel Split SS-99 60,000 60,000
Sub-Total - 60,000 500,000 - 60,000 - - - - 2,000,000 - - - - - - 2,620,000
Sewer Treatment Projects - Both MP & WSAeration Membrane Upgrade SS-31 40,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000 285,000 Capital Preservation and Compliance (2) SS-32 115,000 145,000 500,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 5,960,000
CP&C Ash Xfer Conveyor SS-117 60,000 CP&C WS Influent Pump Motor SS-106 75,000 CP&C 4 Multi Coating Projects SS-34 35,000 35,000 35,000 35,000 35,000 35,000 35,000 35,000 280,000 CP&C WS Gravity Thickener #1 Rehabilitation SS-121 120,000
Mutliple Coating Projects 250,000 250,000 500,000 Energy Sustainability for Multiple Projects SS-120 150,000 250,000
Sub-Total 250,000 450,000 790,000 435,000 400,000 470,000 685,000 685,000 400,000 470,000 435,000 470,000 400,000 435,000 435,000 470,000 7,680,000
Sewer Collection ProjectsMain Street, 5th to 15th* SS-5 520,000 Interceptor Integrity Evaluation SS-A1-114 120,000 150,000 Pinebrook Force Main Reroute SS-112 265,000
20 YEAR CAPITAL IMPROVEMENT PROGRAM FOR SEWER
136
Note: All costs are in 2015 dollars
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Total
20 YEAR CAPITAL IMPROVEMENT PROGRAM FOR SEWER
Basin A-20-1 & Force Main Relocation (59th Street) SS-1 160,000 160,000 Fred Meyer Pump Station Grand Central SS-98 150,000 150,000 Flow Monitoring Program - Permanent Meters SS-A1-70 250,000 250,000 Standby Power SS-A1-3 35,000 35,000 Substandard Main Repair/Replace SS-A1-6 713,264 500,000 500,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 750,000 11,463,264 Basin B-4 Pump Station Removal SS-8 195,000 195,000 SE 1st St, 164th to 192nd Ave Design* SS-15 54,000 54,000 2nd and Columbia Pump Station Removal SS-17 70,000 70,000 Basin E5-4 Relief Sewers SS-18 122,000 122,000 NE 28th Street, 142nd to 162nd* SS-19 170,000 170,000 NE 137th Avenue, 49th to Fourth Plain* SS-20 430,000 430,000 NE 18th Street, Four Seasons to 138th* SS-22 395,000 395,000 Mill Plain 102nd to Chaklov SS-126 60,000 GMA Pump Station Improvements SS-122 1,600,000 1,600,000 Basin A12-3 Sewer 715,000 715,000 Sludge Force Main Extensions SS-123 2,060,000 2,060,000 Evergreen Hwy Force Main* SS-124 1,750,000 1,750,000 Section 30 Arterail Expansion* SS-23 2,000,000 2,000,000
Sub-Total 1,477,264 1,100,000 1,227,000 750,000 750,000 2,750,000 6,160,000 750,000 750,000 750,000 1,465,000 750,000 750,000 750,000 750,000 750,000 21,679,264
Total Sewer Fund Projects 5,872,264 1,870,000 2,717,000 2,485,000 3,135,000 3,420,000 8,095,000 22,785,000 3,050,000 4,020,000 3,900,000 6,320,000 1,150,000 1,185,000 1,185,000 1,820,000 73,009,264
*Project timing is dependent upon the timing of the overriding project.
137
SCIP
Capital Improvement Program For Water, Sewer, and Surface Water
138
SCIP Project List
Capital Improvement Program For Water, Sewer, and Surface Water
139
City of Vancouver 6‐Year Capital Improvement Program (2016‐2021)
Sewer Connection Incentive Program (SCIP) CIP ChangesThis page provides an overview of the changes from the previous 6 year project list (2015‐2020) to this year's 6 year project list (2016‐2021). The changes are segmented by: projects added; projects removed; and other.
Projects Added Project Number
Comments
NE 47th Ave SCIP SCIP‐127 $220,000 budgeted for 2015
Projects Removed Project Number
Comments
Holly Acres (153 lots) SCIP‐172 Completed Holly Acres – Laterals only (36 lots) SCIP‐172A Completed
Columbia Terrace (46 lots) SCIP‐42 Completed
Other Changes Project Number
Comments
Evergreen Meadows (64 lots) SCIP‐74 Budget carried forward from 2014Fircrest (39 lots) SCIP‐64 Construction moved to 2016 to coordinate with street project
NE 136th/141st Ave (40 lots) SCIP‐89 Construction moved to 2016 to coordinate with street project
Note 1. “Completed” indicates already completed as of the date of this document or anticipated completion prior to January 1, 2016.
140
Note: All costs are in 2015 dollars
Description CIP/TIP ID # 2015 2016 2017 2018 2019 2020 2021 6-yr Total
SCIP ProjectsDemand Response SCIP-A1-0 250,000 250,000 250,000 250,000 250,000 250,000 250,000 1,500,000
Evergreen Meadows (64 homes) SCIP-74 620,000 -
Village Green (72 homes) SCIP-88 695,000 -
Fircrest (39 homes) SCIP-64 430,000 -
NE 136th/141st Ave (40 homes) SCIP-89 430,000 -
Granada South (282 homes) SCIP-235 2,400,000 -
NE Drexel (14 homes) SCIP-34 250,000 -
Evergreen Airpark North (30 homes) SCIP-77 300,000 50,000 50,000
Southridge (24 homes) SCIP-56 40,000 215,000 215,000
Premier Acres (70 homes) SCIP-103 50,000 650,000 650,000
Lieser Homesites (58 homes) SCIP-63 500,000 500,000
Wil Har Terrace (15 homes) SCIP-69 250,000 250,000
Allum Acres (17 homes) SCIP-104 250,000 250,000
Fruit Lawn (22 homes) SCIP-106 400,000 400,000
Alpine View (44 homes) SCIP-107 500,000 500,000
Evergreen Highlands (12 homes) SCIP-37 150,000 150,000
Evergreen Estates (99 homes) SCIP-76 500,000 540,000 1,040,000
West Vancouver (216 parcels) SCIP-W-238 800,000 1,200,000 2,000,000
Central Vancouver - South (369 parcels) SCIP-CS-243 1,500,000 1,600,000 3,100,000
East Vancouver - Central (577 Parcels) SCIP-EC-242 3,000,000 1,800,000 4,800,000 Central Vancouver - North (462 parcels) SCIP-CN-239 1,000,000 3,000,000 4,000,000 NE 47th Ave SCIP SCIP-127 220,000
Total SCIP Projects 5,465,000 3,065,000 3,200,000 3,590,000 3,250,000 2,050,000 250,000 15,405,000
*All project timing will be dependent on coordination with other departments including pavement management, water, and surface water**Water utility to fund SCIP through 2016. Sewer utility will fund SCIP starting in 2017. Shading indicates not in 6-year plan, but money expected to be spent in 2015.
6 YEAR CAPITAL IMPROVEMENT PROGRAM FOR SCIP(2016-2021)
141
Proje c t Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vanc ouve r City LimitsSe we r Se rvic e Are aWate r Se rvic e Are aCla rk CountyBattle GroundCamasWashougal
SCIP-103
SCIP-88
122ND
32ND
37TH
33RD
124TH
39TH
35TH
41ST
121ST
126TH
119TH
32ND
40TH 122ND
123RD
36TH
125TH
120TH
118TH
122ND
124TH
125TH
40TH
123RD
35TH
119TH
122ND
35TH
126TH
36TH
125TH
Ê
Future
Date : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PREMIER ACRES
Sanitary se we r will be e xte nd e d as part of the City’s ongoing proa c tive e fforts to make re liablepublic se we r available within our se rvic e a re a prior to failure of the e xisting se ptic syste ms.
$700,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015-2016*Start of Construction (Year):
A prioritization c rite ria was originally e stablishe d by the City Engine e r at the be ginning of theprogram base d on he alth and safe ty (viability of e xisting se ptic syste ms), proximity to groundwate r supply and surfa c e wate r, d e nsity and hom e owne r re q ue sts. Proje c ts are be ingc omple te d base d on the ove rall prioritization rating. The proje c ts with the highe r priority ratingswe re c omple te d by 2010 and the re maining proje c ts are prioritize d and c omple te d base dprimarily on he alth and safe ty, bud ge t and hom e owne r re q ue sts. (2) = Improve Safe ty; (3) =N e w Syste ms
SCIP-103PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje c t timing will be d e pe nd e nt on c oord ination with othe r d e partme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.
70 LotsOther Info.:
**Transportation proje c ts (TRAN S-X X X ) c an be found in the 6 Y e a r Transportation Improve m e nt Plan (TIP) d ocume nt.142
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
SCIP-104
SW-27
41ST (P)
42ND
MORROW
41ST
110TH
43RD
108T
H
10
9T
H
42ND
108T
H
112
TH
44TH
Ê
Future
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ALLUM ACRES
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke r e lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing septic syste ms.
$250,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing septic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r eque sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r reque sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-104PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d epe nd e nt on coor d ina tion with othe r d epa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
17 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.143
P roje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSe we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SCIP-106 108TH
(P)
10
5T
H 10
7T
H
59TH
58TH
10
9T
H
10
6T
H
110
TH
CO
XLE
Y
GH
ER
FOURTH PLAIN
CO
VIN
GT
ON
ROSEWOOD
ROSEWOOD
10
8T
H
104T
H
103R
D
Ê
Future
Da te : 6/24/2015
PROJECT AREA MAP
P ROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
FRUIT LAWN
Sa nita ry se we r will b e e xte nde d a s pa rt of the City’s ong oing proa ctive e fforts to ma ke re lia b lepub lic s e we r a va ila b le within our se rvice a re a prior to fa ilure of the e xis ting s e ptic sys te m s.
$400,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
A prioritiza tion crite ria wa s orig ina lly e s ta b lishe d by the City Eng ine e r a t the b e g inning of theprog ra m b a s e d on he a lth a nd sa fe ty (via b ility of e xisting s e ptic sys te m s), proximity to g roundwa te r supply a nd surfa ce wa te r, de nsity a nd hom e owne r re que s ts. Proje cts a re b e ingcomple te d b a s e d on the ove ra ll prioritiza tion ra ting . The proje cts with the hig he r priority ra ting swe re comple te d by 2010 a nd the re ma ining proje cts a re prioritize d a nd comple te d b a s e dprima rily on he a lth a nd sa fe ty, b udg e t a nd hom e owne r re que s ts. (2) = Improve Sa fe ty; (3) =Ne w Syste m s
SCIP-106P ROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including s tre e ts, pa ve m e nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.
22 LotsOther Info.:
**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt P la n (TIP) docume nt.144
Project Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark CountyBattle GroundCamasW ashougal
**TRANS-839
SCIP-10773RD
73RDSW -33
73RD
144TH
147TH
148TH
70TH
71ST
76TH
74TH
141ST
143RD 69TH
151ST
152ND
145TH
AQUIL
A
140TH
142ND
68TH
77TH
149TH
75TH
150TH
146TH
143RD
149TH
71ST
142ND
141ST
141ST
147TH
143RD
140TH 149
TH
151ST 152
ND
152ND
145TH 74TH
142ND
74TH
71ST
145TH
143RD
69TH
70TH
74TH
140TH
76TH
WARD
FOURTH PLAIN
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ALPINE VIEW
Sanitary sewer will b e extend ed as p art of the City’s ongoing p roactive efforts to make reliab lep ub lic sewer availab le within our service area p rior to failure of the existing sep tic systems.
$500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
A p rioritization criteria was originally estab lished b y the City Engineer at the b eginning of thep rogram b ased on health and safety (viab ility of existing sep tic systems), p roximity to groundwater sup p ly and surface water, d ensity and home owner req uests. Projects are b eingcomp leted b ased on the overall p rioritization rating. The p rojects with the higher p riority ratingswere com p leted b y 2010 and the remaining p rojects are p rioritized and com p leted b asedp rimarily on health and safety, b ud get and home owner req uests. (2) = Imp rove Safety; (3) =New Systems
SCIP-107PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All p roject timing will b e d ep end ent on coord ination with other d ep artments includ ing streets, p avement management, sewer, water and surface water.
44 LotsOther Info.:
**Transp ortation p rojects (TRANS-X X X ) can b e found in the 6 Year Transp ortation Imp rovement Plan (TIP) d ocument.145
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
WTR-76
WTR-97
SCIP-127
39TH
53RD
52ND
54TH
69TH
77TH
74TH
70TH
72ND
47TH
68TH
51ST
43RD
ISSLER
70TH
55TH
40TH
56TH66TH
71ST
75TH
65TH
76TH
50TH
39TH
53RD
72ND
69TH
41ST
57TH
54TH
67TH
52ND
46TH
45TH
69TH
68TH
67TH
47TH
56TH
54TH
71ST
75TH
76TH
56TH
68TH
55TH
57TH
40TH
55TH
53RD
56TH
66TH
68TH
43RD
53RD
54TH
78TH
SAINT JOHNS
PADDEN
PADDEN
55THÊ
Active
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 47TH AV
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke r e lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing septic syste ms.
$220,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
This projec tis be ing complete d in coor d ina tion with a Cla rk County Roa d Improve me nt project. Aprioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing septic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r e que sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r re que sts. (2) = Improve Sa f ety; (3) =
SCIP-127PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d epe nd e nt on coor d ina tion with othe r d epa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
32 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.146
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
SCIP-235SW-33
117T
H
PADDEN PADDEN
79TH
86TH
83RD
71ST
120TH
131ST
126TH
127TH
80TH
72ND
133RD
73RD 129TH
124TH122
ND
128TH
75TH74TH
121ST
125TH
123RD
77TH
85TH
78TH
130TH
76TH
119TH
81ST81ST
72ND
81ST
123RD
129TH
77TH
73RD
71ST
71ST
86TH
131ST
128TH
128TH
128TH
125TH
126TH
77TH
126TH
129TH
125TH
124TH
122ND
83RD
126TH
123RD
78TH
130T
H
76TH
PADDENPADDEN
Ê
Active
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
GRANADA - SOUTH
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke r e lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing se ptic syste ms.
$2,400,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016-2017*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing se ptic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r eque sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r reque sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-235PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d e pe nd e nt on coor d ina tion with othe r d e pa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
282 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.147
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
**TRANS-825
SCIP-34
53RD (P)
24
TH
(P
)57TH
53RD
23
RD
DR
EX
EL
24
TH
25
TH
24
TH
54TH
Ê
Future
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE DREXEL
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke re lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing se ptic syste ms.
$250,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing se ptic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r eque sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r reque sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-34PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d e pe nd e nt on coord ina tion with othe r d e pa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
14 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.148
Proje c t Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouve r City LimitsSe we r Se rvic e Are aWate r Se rvic e Are aCla rk CountyBattle GroundCamasWashougal
WTR-95
SCIP-37
HIGHLAND
BUENA VISTA
AD
AM
S
DE
VIN
E
TEXAS
DA
LLA
S
SA
NTA
FE
EVERGREEN
SHO
REW
OO
D Ê
Future
Date : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EVERGREEN HIGHLANDS
Sanitary se we r will be e xte nd e d as part of the City’s ongoing proa c tive e fforts to make re liablepublic se we r available within our se rvic e a re a prior to failure of the e xisting se ptic syste ms.
$150,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
A prioritization c rite ria was originally e stablishe d by the City Engine e r at the be ginning of theprogram base d on he alth and safe ty (viability of e xisting se ptic syste ms), proximity to groundwate r supply and surfa c e wate r, d e nsity and home owne r re q ue sts. Proje c ts are be ingcomple te d base d on the ove rall prioritization rating. The proje c ts with the highe r priority ratingswe re comple te d by 2010 and the re maining proje c ts are prioritize d and comple te d base dprimarily on he alth and safe ty, bud ge t and home owne r re q ue sts. (2) = Improve Safe ty; (3) =N e w Syste ms
SCIP-37PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje c t timing will be d e pe nd e nt on coord ination with othe r d e pa rtme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.
12 LotsOther Info.:
**Transportation proje c ts (TRAN S-X X X ) c an be found in the 6 Y e a r Transportation Improve m e nt Plan (TIP) docume nt.149
Project Bou ndaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark Cou ntyBattle Grou ndCamasW ash ou g al
SCIP-56
5TH
110
TH
4TH
11TH
10
7T
H
10
5T
H
NA
NC
Y
5TH
10TH
EL
LS
WO
RT
H
CH
KA
LO
V
CA
SC
AD
ES
(P
)
SAINT HELENS (P)
10
5T
H
SAINT HELENSSAINT HELENS
7TH
10
5T
H
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SOUTHRIDGE
Sanitary sewer will b e extended as part of th e City’s ong oing proactive efforts to make reliab lepu b lic sewer availab le with in our service area prior to failure of th e existing septic systems.
$255,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
A prioritization criteria was orig inally estab lish ed by th e City Eng ineer at th e b eg inning of th eprogram b ased on health and safety (viab ility of existing septic systems), proximity to grou ndwater supply and surface water, density and h ome owner requests. Projec ts are b eingcompleted b ased on th e overall prioritization rating. The projec ts with th e h ig h er priority ratingswere completed by 2010 and th e remaining projec ts are prioritized and completed b asedprimarily on health and safety, b u d get and h ome owner requests. (2) = Improve Safety; (3) =New Systems
SCIP-56PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All projec t timing will b e dependent on coordination with oth er departments inclu ding streets, pavement management, sewer, water and surface water.
24 LotsOther Info.:
**Transportation projec ts (TRANS-XXX) can b e fou nd in th e 6 Year Transportation Improvement Plan (TIP) doc u ment.150
Proje c t Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vanc ouve r City LimitsSe we r Se rvic e Are aWate r Se rvic e Are aCla rk CountyBattle GroundCamasWashougal
**TRAN S-583
**TRAN S-837
WTR-51
SCIP-63
SCIP-63
SCIP-63
8TH
10TH
MOTHER JOSEPH 92ND
9TH
GARR
ISON
MORR
ISON
DELAWARE
5TH
89TH
90TH88T
H 91ST
CAROLINA
7THINDIANA
6TH
FRED
RICKS
BURG
MICHIGAN
MIAMI
VIRGINIA
BOULDER
NORTHGATE
82ND
MILL PLAIN
BALTI
MORE
TENNESSEE
8TH
PIETZ
AKRO
N
DAYTO
N
LIESER
CHAR
LOTT
E
DETR
OIT
POTOMAC
CAPITOL
DURH
AM
SILVER STAR
8TH
90TH
5TH
6TH
9TH
7TH
5TH
GARR
ISON
91ST
9TH
DELAWARE
7TH
82ND
87TH
LIESE
R
MILL PLAIN
MACARTHUR Ê
Future
Date : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
LIESER HOMESITES
Sanitary se we r will be e xte nd e d as part of the City’s ongoing proa c tive e fforts to make re liablepublic se we r available within our se rvic e a re a prior to failure of the e xisting se ptic syste ms.
$500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
A prioritization c rite ria was originally e stablishe d by the City Engine e r at the be ginning of theprogram base d on he alth and safe ty (viability of e xisting se ptic syste ms), proximity to groundwate r supply and surfa c e wate r, d e nsity and hom e owne r re q ue sts. Proje c ts are be ingc omple te d base d on the ove rall prioritization rating. The proje c ts with the highe r priority ratingswe re c omple te d by 2010 and the re maining proje c ts are prioritize d and c omple te d base dprimarily on he alth and safe ty, bud ge t and hom e owne r re q ue sts. (2) = Improve Safe ty; (3) =N e w Syste ms
SCIP-63PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje c t timing will be d e pe nd e nt on c oord ination with othe r d e partme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.
58 LotsOther Info.:
**Transportation proje c ts (TRAN S-X X X ) c an be found in the 6 Y e a r Transportation Improve m e nt Plan (TIP) d ocume nt.151
P roje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSe we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SCIP-64
96
TH
(P
)
5TH
92
ND
94
TH
93
RD
4TH
2ND
3RD
95TH
98
TH
TANGLEW
OO
D100T
H
95
TH
4TH
3RD
5TH
97
TH
MILL PLAIN
98TH
6TH 6TH
98
TH
Ê
Active
Da te : 6/24/2015
PROJECT AREA MAP
P ROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
FIRCREST
Sa nita ry se we r will b e e xte nde d a s pa rt of the City’s ong oing proa ctive e fforts to ma ke re lia b lepub lic s e we r a va ila b le within our se rvice a re a prior to fa ilure of the e xis ting s e ptic sys te m s.Comple ting improve m e nts prior to P a ve m e nt Ma na g e m e nt work.
$430,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015-2016*Start of Construction (Year):
A prioritiza tion crite ria wa s orig ina lly e s ta b lishe d by the City Eng ine e r a t the b e g inning of theprog ra m b a s e d on he a lth a nd sa fe ty (via b ility of e xisting s e ptic sys te m s), proximity to g roundwa te r supply a nd surfa ce wa te r, de nsity a nd hom e owne r re que s ts. Proje cts a re b e ingcomple te d b a s e d on the ove ra ll prioritiza tion ra ting . The proje cts with the hig he r priority ra ting swe re comple te d by 2010 a nd the re ma ining proje cts a re prioritize d a nd comple te d b a s e dprima rily on he a lth a nd sa fe ty, b udg e t a nd hom e owne r re que s ts. (2) = Improve Sa fe ty; (3) =Ne w Syste m s
SCIP-64P ROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including s tre e ts, pa ve m e nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.
41 LotsOther Info.:
**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt P la n (TIP) docume nt.152
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
SCIP-697TH
10
0T
H
10
2N
D
6TH
8TH
101S
T
8TH
7TH
10
1S
T
9TH
Ê
Future
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WIL HAR TERRACE
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke re lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing septic syste ms.
$250,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing septic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r e que sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r re que sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-69PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d epe nd e nt on coord ina tion with othe r d epa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
15 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.153
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
**TRANS-703
SCIP-74
SS-22
SS-8
16TH
15TH
14TH
118
TH
119
TH
12
1S
T
115
TH
13TH
12
2N
D
18TH
12
1S
T
(P)
119
TH
(P
)
FO
UR
SE
AS
ON
S
Ê
Active
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EVERGREEN MEADOWS
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke r e lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing se ptic syste ms.Requir e s a n e a se me nt f rom Bonneville Powe r Ad ministra tion for extension to prope rtie s on thenorth e d ge of the project bound a ry. Project could be d e la ye d if e a se m e nt is not obta ine d .
$620,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing se ptic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r eque sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r reque sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-74PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d e pe nd e nt on coor d ina tion with othe r d e pa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
64 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.154
Project Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark CountyBattle GroundCamasW ashougal
**TRANS-703
**TRANS-720
SCIP-76
SS-22
SS-8
SS-112
132N
D
13TH
12TH
125T
H12
6TH
16TH
12TH
127TH
125TH124
TH
17TH
129TH
130TH
128TH
14TH
126TH
13TH
10TH
123RD
11TH
131ST
15TH
19TH
134TH
LEROY HAAGEN MEMORIAL
VILLA
GE GR
EEN
127TH
130TH
129TH
126TH
123RD
17TH
11TH
129TH
129TH
13TH
14TH
126TH
125TH
17TH
123RD
15TH
18TH
136T
H
138TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EVERGREEN ESTATES
Sanitary sewer will b e extend ed as p art of the City’s ongoing p roactive efforts to make reliab lep ub lic sewer availab le within our service area p rior to failure of the existing sep tic systems.
$1,040,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017-2018*Start of Construction (Year):
A p rioritization criteria was originally estab lished b y the City Engineer at the b eginning of thep rogram b ased on health and safety (viab ility of existing sep tic systems), p roximity to groundwater sup p ly and surface water, d ensity and home owner req uests. Projects are b eingcomp leted b ased on the overall p rioritization rating. The p rojects with the higher p riority ratingswere com p leted b y 2010 and the remaining p rojects are p rioritized and com p leted b asedp rimarily on health and safety, b ud get and home owner req uests. (2) = Imp rove Safety; (3) =New Systems
SCIP-76PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All p roject timing will b e d ep end ent on coord ination with other d ep artments includ ing streets, p avement management, sewer, water and surface water.
99 LotsOther Info.:
**Transp ortation p rojects (TRANS-X X X ) can b e found in the 6 Year Transp ortation Imp rovement Plan (TIP) d ocument.155
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
**TRANS-444**TRANS-703
**TRANS-720
SCIP-77
SCIP-76
SS-22
132N
D 17TH
9TH
139TH
10TH
13TH
143RD
16TH
7TH
8TH
11TH
147TH
15TH
140TH
141ST
132ND
146TH
145TH
142ND
148TH
138TH
KEYE
S
131ST
14TH
HEAR
THWO
OD
TAMARACK
LEROY HAAGEN MEMORIAL
147TH
9TH
14TH
146TH
11TH145
TH
15TH
148TH
16TH
14TH
16TH
8TH
142ND
15TH
141ST
13TH
8TH
148TH
14TH
18TH
136T
H
138TH
Ê
Future
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EVERGREEN AIRPARK NORTH
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke r e lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing septic syste ms.
$350,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015-2016*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing septic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r eque sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r reque sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-77PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d epe nd e nt on coor d ina tion with othe r d epa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
30 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.156
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
**TRANS-818
**TRANS-824
WTR-6
SCIP-88SCIP-88
SCIP-103
30TH
34TH12
5TH
126T
H
30TH
132ND
31ST
129TH
124TH
33RD
35TH
127TH
34TH
120TH
121ST
130TH
36TH
26TH
131ST
30TH
122ND
27TH126TH
125TH
32ND
123RD
28TH
128TH
119TH
125TH
31ST
27TH
130TH
36TH
130TH
126TH
26TH
131ST
33RD127
TH
33RD
30TH
27TH
127TH
35TH
30TH
36TH
36TH124
TH
35TH
122ND
126TH
28TH
Ê
Active
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
VILLAGE GREEN
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke re lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing se ptic syste ms.
$695,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing se ptic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r e que sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r re que sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-88PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d e pe nd e nt on coord ina tion with othe r d e pa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
81 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.157
Proje c t Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vanc ouve r City LimitsSe we r Se rvic e Are aWate r Se rvic e Are aCla rk CountyBattle GroundCamasWashougal
**TRAN S-818**TRAN S-274
**TRAN S-720
WTR-61WTR-99
WTR-100
SCIP-89
SCIP-89
SCIP-89SCIP-89
SS-19
142N
D
136T
H
38TH37TH
34TH
30TH
33RD
144T
H
35TH
131S
T
37TH
33RD
132ND
141ST
135TH
143RD
39TH
31ST
145TH
136TH
134TH
34TH
130TH
36TH140
TH
30TH
37TH
26TH
38TH
131ST
137TH
27TH
32ND
146TH
POWERS
133RD
35TH
139TH
28TH
33RD
EDELW
EISS
SPRING
WOOD
133RD
146TH
130TH
133RD
36TH
32ND
31ST
36TH
30TH
143RD
146TH
26TH
145TH
38TH38TH
131ST
34TH
146TH
34TH
36TH
131ST
30TH
37TH
145TH
32ND
39TH
28TH
138T
H
137T
H
Ê
Active
Date : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 136TH/141ST AV
Sanitary se we r will be e xte nd e d as part of the City’s ongoing proa c tive e fforts to make re liablepublic se we r available within our se rvic e a re a prior to failure of the e xisting se ptic syste ms.
$450,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
A prioritization c rite ria was originally e stablishe d by the City Engine e r at the be ginning of theprogram base d on he alth and safe ty (viability of e xisting se ptic syste ms), proximity to groundwate r supply and surfa c e wate r, d e nsity and hom e owne r re q ue sts. Proje c ts are be ingc omple te d base d on the ove rall prioritization rating. The proje c ts with the highe r priority ratingswe re c omple te d by 2010 and the re maining proje c ts are prioritize d and c omple te d base dprimarily on he alth and safe ty, bud ge t and hom e owne r re q ue sts. (2) = Improve Safe ty; (3) =N e w Syste ms
SCIP-89PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje c t timing will be d e pe nd e nt on c oord ination with othe r d e pa rtme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.
40 LotsOther Info.:
**Transportation proje c ts (TRAN S-X X X ) c an be found in the 6 Y e a r Transportation Improve m e nt Plan (TIP) d ocume nt.158
P roje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Va ncouve r City Limits
Se we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SCIP-A1-0
SR-14 EB
SR-14 WB
117T
H
SR-500 EB
LOWE
R RI
VER
10TH
58TH
EVER
ETT
6TH
MILL PLAIN
267T
H
162N
D
242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
172N
D
6TH
39TH58TH
83RD
50TH
20TH 15TH
209TH9T
H
GRAC
E
88TH
292N
D
RAWSON
53RD
92ND
INGLE
169TH25
TH
27TH
30TH
98TH
237T
H
154TH50
TH
88TH
10TH
50TH
199TH179TH
72ND
18TH
76TH
182N
D
C
167T
H RISTO
49TH
36TH
29TH
Ê
Future
Da te : 6/24/2015
PROJECT AREA MAP
P ROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
DEMAND RESPONSE
Sa nita ry se we r will b e e xte nde d a s pa rt of the City’s ong oing proa ctive e fforts to ma ke re lia b lepub lic s e we r a va ila b le within our se rvice a re a prior to fa ilure of the e xis ting s e ptic sys te m s.
$1,500,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015-2023*Start of Construction (Year):
A prioritiza tion crite ria wa s orig ina lly e s ta b lishe d by the City Eng ine e r a t the b e g inning of theprog ra m b a s e d on he a lth a nd sa fe ty (via b ility of e xisting s e ptic sys te m s), proximity to g roundwa te r supply a nd surfa ce wa te r, de nsity a nd hom e owne r re que s ts. Proje cts a re b e ingcomple te d b a s e d on the ove ra ll prioritiza tion ra ting . The proje cts with the hig he r priority ra ting swe re comple te d by 2010 a nd the re ma ining proje cts a re prioritize d a nd comple te d b a s e dprima rily on he a lth a nd sa fe ty, b udg e t a nd hom e owne r re que s ts. (2) = Improve Sa fe ty; (3) =Ne w Syste m s
SCIP-A1-0P ROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including s tre e ts, pa ve m e nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.
LotsOther Info.:
**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt P la n (TIP) docume nt.159
Project Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
SCIP-CN-239SR-500 EB
SR-14 EB
SR-500 WB
SR-14 WB
117T
HMILL PLAIN
PADDEN
I-5
I-205
18TH
39TH
58TH72
ND
107T
H
68TH
9TH
EVERGREEN
88TH
33RD
COLU
MBIA
86TH
97TH
44TH
25TH
10TH
130T
H94TH
54TH
FALK
MACARTHUR
40TH
MAIN
121S
T
21ST
87TH
LIESE
RROSS 10
2ND
11TH
13TH
MCLOUGHLIN
136T
H98TH
8TH
MEADOWS
STAP
LETO
N
82ND
99TH
COLUMBIA HOUSE
SLUMAN
CHKALOV
16TH
2ND
94TH
98TH
58TH
88TH
68TH
87TH
78TH
99TH
MILL PLAIN
FOURTH PLAIN
76TH
63RD
112T
H
SAINT JOHNS
MAIN
HIGHW
AY 99
18TH
28TH
GRAN
D
49TH
72ND
MINNEHAHA
50TH
136T
H
FRUI
T VAL
LEY
21ST
94TH
137T
H
Ê
Future
Da te: 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CENTRAL VANCOUVER - NORTH
Sa nita ry sewe r will be extend e d a s pa rt of the City’s ongoing proa ctive e f forts to ma ke re lia blepublic sewe r a va ila ble within our se rvice a re a prior to fa ilur e of the existing septic syste ms.
$4,000,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2020-2021*Start of Construction (Year):
A prioritiza tion crite ria wa s origina lly e sta blishe d by the City Engine e r a t the be ginning of theprogr a m ba se d on he a lth a nd sa f ety (via bility of existing septic syste ms), proximity to groundwa te r supply a nd sur f a ce wa te r, d e nsity a nd home owne r r e que sts. Projects a re be ingcomplete d b a se d on the ove r a ll prioritiza tion ra ting. The projects with the highe r priority ra tingswe r e complete d by 2010 a nd the re ma ining projects a r e prioritize d a nd complete d ba se dprim a rily on he a lth a nd sa f ety, bud get a nd home owne r re que sts. (2) = Improve Sa f ety; (3) =New Syste m s
SCIP-CN-239PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d epe nd e nt on coord ina tion with othe r d epa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd sur f a ce wa te r.
462 LotsOther Info.:
**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt Pla n (TIP) d ocume nt.160
Project Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark CountyBattle GroundCamasW ashougal
SCIP-CS-243
SR-14 EBSR-14 WB
SR-500 EB SR-500 WB
117T
H PADDEN
MILL PLAIN 15TH
I-5
I-205
18TH
39TH
58TH
72ND68TH
107T
HEVERGREEN
88TH
33RD
COLUMBIA
86TH
97TH
44TH
9TH
66TH
10TH MCGILLIVRAY
25TH
87TH
54TH
FALK
152N
D
MAIN
121S
T
LIESE
R
56TH
102N
D
13TH
98TH
8TH
82ND
26TH
RIVERSIDE
58TH68TH
EVERGREEN
88TH
78TH
MILL PLAIN
76TH
FOURTH PLAIN
18TH
28TH
63RD
112T
H
162N
D
PADDEN
164T
H
MAIN
137T
H
GRAN
D
49TH
136TH
FRUI
T VAL
LEY
48TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
CENTRAL VANCOUVER - SOUTH
Sanitary sewer will b e extend ed as p art of the City’s ongoing p roactive efforts to make reliab lep ub lic sewer availab le within our service area p rior to failure of the existing sep tic systems.
$3,100,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017 - 2018*Start of Construction (Year):
A p rioritization criteria was originally estab lished b y the City Engineer at the b eginning of thep rogram b ased on health and safety (viab ility of existing sep tic systems), p roximity to groundwater sup p ly and surface water, d ensity and home owner req uests. Projects are b eingcomp leted b ased on the overall p rioritization rating. The p rojects with the higher p riority ratingswere com p leted b y 2010 and the remaining p rojects are p rioritized and com p leted b asedp rimarily on health and safety, b ud get and home owner req uests. (2) = Imp rove Safety; (3) =New Systems
SCIP-CS-243PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All p roject timing will b e d ep end ent on coord ination with other d ep artments includ ing streets, p avement management, sewer, water and surface water.
369 LotsOther Info.:
**Transp ortation p rojects (TRANS-X X X ) can b e found in the 6 Year Transp ortation Imp rovement Plan (TIP) d ocument.161
Project Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark CountyBattle GroundCamasW ashougal
SCIP-EC-242
SR-14 EB
SR-14 WB
58TH
SR-500 EB
117T
H PADDEN
162N
D
242N
D
237TH
238T
H
232ND
I-205
EVERGREEN38TH
172N
D39TH
83RD
20TH15TH
72ND
28TH
107T
H
88TH
86TH
INGLE
97TH
PARK
ER
MCGILLIVRAY
66TH
10TH23
2ND
87TH
68TH
18TH
121S
T
152N
D
217T
H
LIESE
R
212T
H
102N
D
13TH19
9TH
BRAD
Y
98TH
MEADOWS
ANDR
ESEN
23RD
82ND
34TH
BYBEE 43RD
88TH
98TH 18TH
76TH
MILL PLAIN 192N
D1ST
28TH
162N
D
112T
H
LAKE
63RD
164T
H
FOURTH PLAIN
137T
H
34TH
49TH
78TH
182N
D
88TH13
6TH
WARD
48TH
Ê
Future
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
EAST VANCOUVER - CENTRAL
Sanitary sewer will b e extend ed as p art of the City’s ongoing p roactive efforts to make reliab lep ub lic sewer availab le within our service area p rior to failure of the existing sep tic systems.
$4,800,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2019-2020*Start of Construction (Year):
A p rioritization criteria was originally estab lished b y the City Engineer at the b eginning of thep rogram b ased on health and safety (viab ility of existing sep tic systems), p roximity to groundwater sup p ly and surface water, d ensity and home owner req uests. Projects are b eingcomp leted b ased on the overall p rioritization rating. The p rojects with the higher p riority ratingswere com p leted b y 2010 and the remaining p rojects are p rioritized and com p leted b asedp rimarily on health and safety, b ud get and home owner req uests. (2) = Imp rove Safety; (3) =New Systems
SCIP-EC-242PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All p roject timing will b e d ep end ent on coord ination with other d ep artments includ ing streets, p avement management, sewer, water and surface water.
577 LotsOther Info.:
**Transp ortation p rojects (TRANS-X X X ) can b e found in the 6 Year Transp ortation Imp rovement Plan (TIP) d ocument.162
Proje c t Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vanc ouve r City LimitsSe we r Se rvic e Are aWate r Se rvic e Are aCla rk CountyBattle GroundCamasWashougal
SCIP-W-238
LOWE
R RI
VER
SR-14 EB SR-14 WB
SR-500 EBMILL PLAIN 15TH
I-5
I-205
18TH
94TH
72ND
68TH9T
H
50TH
EVERGREEN
33RD
44TH
25TH
66TH
119TH
139TH
58TH
54TH
FALK
15TH
MAIN
56TH
13TH
8TH
88TH
109TH
68TH78TH
99TH
72ND
ANDR
ESENMA
INHA
ZEL D
ELL
50TH
117TH
36TH
119TH119TH
Ê
Future
Date : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
SCIPUtility Type:Project Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WEST VANCOUVER
Sanitary se we r will be e xte nd e d as part of the City’s ongoing proa c tive e fforts to make re liablepublic se we r available within our se rvic e a re a prior to failure of the e xisting se ptic syste ms.
$2,000,000.00Total Proj. Cost:
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017-2018*Start of Construction (Year):
A prioritization c rite ria was originally e stablishe d by the City Engine e r at the be ginning of theprogram base d on he alth and safe ty (viability of e xisting se ptic syste ms), proximity to groundwate r supply and surfa c e wate r, d e nsity and hom e owne r re q ue sts. Proje c ts are be ingc omple te d base d on the ove rall prioritization rating. The proje c ts with the highe r priority ratingswe re c omple te d by 2010 and the re maining proje c ts are prioritize d and c omple te d base dprimarily on he alth and safe ty, bud ge t and hom e owne r re q ue sts. (2) = Improve Safe ty; (3) =N e w Syste ms
SCIP-W-238PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje c t timing will be d e pe nd e nt on c oord ination with othe r d e partme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.
216 LotsOther Info.:
**Transportation proje c ts (TRAN S-X X X ) c an be found in the 6 Y e a r Transportation Improve m e nt Plan (TIP) d ocume nt.163
Note: All costs are in 2015 dollars
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Total
SCIP ProjectsDemand Response SCIP-A1-0 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 250,000 2,500,000
Evergreen Meadows (64 homes) SCIP-74 620,000 620,000
Village Green (72 homes) SCIP-88 695,000 695,000
Fircrest (39 homes) SCIP-64 430,000 430,000
NE 136th/141st Ave (40 homes) SCIP-89 430,000 430,000
Granada South (282 homes) SCIP-235 2,400,000 2,400,000
NE Drexel (14 homes) SCIP-34 250,000 250,000
Evergreen Airpark North (30 homes) SCIP-77 300,000 50,000 350,000
Southridge (24 homes) SCIP-56 40,000 215,000 255,000
Premier Acres (70 homes) SCIP-103 50,000 650,000 700,000
Lieser Homesites (58 homes) SCIP-63 500,000 500,000
Wil Har Terrace (15 homes) SCIP-69 250,000 250,000
Allum Acres (17 homes) SCIP-104 250,000 250,000
Fruit Lawn (22 homes) SCIP-106 400,000 400,000
Alpine View (44 homes) SCIP-107 500,000 500,000
Evergreen Highlands (12 homes) SCIP-37 150,000 150,000
Evergreen Estates (99 homes) SCIP-76 500,000 540,000 1,040,000
West Vancouver (216 parcels) SCIP-W-238 800,000 1,200,000 2,000,000
Central Vancouver - South (369 parcels) SCIP-CS-243 1,500,000 1,600,000 3,100,000
East Vancouver - Central (577 Parcels) SCIP-EC-242 3,000,000 1,800,000 4,800,000
Central Vancouver - North (462 parcels) SCIP-CN-239 1,000,000 3,000,000 4,000,000
NE 47th Ave SCIP SCIP-127 220,000 220,000 East Vancouver - North (442 Parcels) SCIP-EN-240 3,000,000 700,000 3,700,000 East Vancouver - South (152 parcels) SCIP-ES-241 1,500,000 1,500,000
Total SCIP Projects 5,685,000 3,065,000 3,200,000 3,590,000 3,250,000 3,050,000 3,250,000 3,250,000 2,450,000 250,000 - - - - - - 31,040,000
*All project timing will be dependent on coordination with other departments including pavement management, water, and surface water**Water utility to fund SCIP through 2016. Sewer utility will fund SCIP starting in 2017.***It is anticipated that the SCIP Program will be completed by 2024.
20 YEAR CAPITAL IMPROVEMENT PROGRAM FOR SCIP
164
Surface Water Utility
Capital Improvement Program For Water, Sewer, and Surface Water
165
Surface Water Utility
Recent Financial History
Capital Improvement Program For Water, Sewer, and Surface Water
166
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
RevenueRatepayer Revenue 4,823,355 6,988,558 8,520,967 8,655,843 8,845,260 9,660,900 9,890,603 9,989,162 10,202,474 10,971,328 11,661,445 SRF Loan (included in Misc. Rev.) 331,007 Grants 146,274 1,085,059 48,812 264,198 88,919 18,500 48,629 564,825 396,540 295,500 523,679 Other Miscellaneous Revenue* 322,737 472,023 376,403 454,817 305,636 240,584 237,557 231,594 113,034 621,132 503,531
Total Revenue 5,292,366 8,545,640 8,946,182 9,374,858 9,239,815 9,919,984 10,507,796 10,785,581 10,712,048 11,887,960 12,688,655
ExpensesSalaries & Benefits 1,553,310 1,712,683 2,021,222 2,669,838 3,361,529 3,178,006 3,340,639 3,847,323 3,570,717 3,758,869 3,784,125Supplies and Services 245,822 432,014 604,715 812,497 810,175 878,455 734,708 1,007,404 807,314 831,991 934,475Professional Services 100,853 431,247 282,302 325,817 403,513 297,440 309,931 435,625 356,200 324,489 388,733Indirects and ER&R 1,482,948 1,838,414 1,898,841 1,614,949 2,429,149 1,683,394 1,833,386 2,155,426 2,245,720 2,437,780 2,216,433
Operations & Maintenance Expenses 3,382,933 4,414,358 4,807,079 5,423,101 7,004,366 6,037,294 6,218,664 7,445,778 6,979,952 7,353,129 7,323,766
Taxes and fees 60,536 1,114,469 1,337,128 1,460,163 1,523,354 2,054,616 2,121,600 2,132,527 2,173,263 2,338,834 2,471,031
Debt Service 44,173 86,231
Capital Construction Expenses 598,872 7,304,210 2,353,192 902,810 346,797 529,379 854,527 494,504 795,769 319,656 912,996
General Fund 130,711 345,296 333,265 329,995 350,000 0 144,121 0 0 0
Water Fund (Uitilities Administration Allocation) 0 0 0 0 0 983,642 925,273 1,025,721 1,062,698 1,091,383 1,111,723
Street Maintenance Fund 0 0 0 0 176,151 204,753 823,526 0 0 0 0Expenses Subtotal 4,173,052 13,178,333 8,830,665 8,116,068 9,400,668 9,809,684 11,087,710 11,098,530 11,011,682 11,147,175 11,905,747
Depreciaition 155,859 175,310 188,841 220,606 267,224 298,894 303,838 326,126 348,825 361,816 377,653Total Expense 4,328,911 13,353,643 9,019,506 8,336,674 9,667,892 10,108,578 11,391,548 11,424,656 11,360,507 11,508,991 12,283,400
* Other Miscellaneous Revenues include items such as:Site Plan ReviewSubdivision FeesInterestWDOT RevenueTransfer from General Fund
SURFACE WATER FUND ACTIVITY(2004-2014)
167
Ratepayer Revenue92%
Grants4%
Other Miscellaneous Revenue
4%
2014 Surface Water Utility Revenues = $12,688,655
168
Capital Construction Expenses
8%
Taxes and fees21%
Water Fund (Utilities Administration Allocation)
9%Salaries & Benefits
32%
Supplies and Services8%
Professional Services3%
Indirects and ER&R19%
2014 Surface Water Utility Expenses = $11,905,747
Operations and Maintenanceexpenses
169
Ratepayer Revenue
Other Miscellaneous
RevenueGrants
-
5
10
15
20
25
30
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Dol
lars
(Mill
ions
)
Years
Surface Water Revenues (2004-2021)
ForecastActual
170
Operations and Maintenance
Taxes and Fees
Capital Improvements Surface Water Total
Revenue
-
5
10
15
20
25
30
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
Dol
lars
(Mill
ions
)
Years
Surface Water Expenses (2004-2021)
ForecastActual
Local Match for Future Grants
171
Surface Water Utility
Project List
Capital Improvement Program For Water, Sewer, and Surface Water
172
City of Vancouver 6‐Year Capital Improvement Program (2016‐2021)
Surface Water Management CIP Changes This page provides an overview of the changes from the previous 6 year project list (2015‐2020) to this year's 6 year project list (2016‐2021). The changes are segmented by: projects added; projects removed; and other.
Projects Added Project Number
Comments
Stormwater Retrofit LID Grant – Oakbrook
SW‐32
New grant funded project
East Orchards UIC Retrofit Study and Design – 4th Plain
SW‐33 New WSDOT Fee funded project
Greenway Restoration Program SW‐A1‐34 Program is on hold due to lack of funding. Needs new funding in order to be in compliance with regulations
Stormwater Quality Improvement Program
SW‐A1‐35 Program is on hold due to lack of funding. Needs new funding in order to be in compliance with regulations
Facility Retrofit Program SW‐A1‐36 Program is on hold due to lack of funding. Needs new funding in order to be in compliance with regulations
Sub‐Standard Systems Program SW‐A1‐37 Program is on hold due to lack of funding. Needs new funding in order to be in compliance with regulations
Pump Station Retrofit Program SW‐A1‐38 Program is on hold due to lack of funding. Needs new funding in order to be in compliance with regulations
Comprehensive Surface & Groundwater Management Plan
SW‐A1‐39 Program is on hold due to lack of funding. Needs new funding in order to be in compliance with regulations
Projects Removed Project Number
Comments
None
Other Changes Project Number
Comments
Stormwater Retrofit LID Grant ‐98th Ave. SW‐4 $100,000 budget carried forward from 2014 Stormwater Retrofit LID Grant – 18th St. SW‐25 Budgeted $160,000 for construction in 2016 Stormwater Retrofit LID Grant – 109th Av.
SW‐27 Budgeted $300,000 for construction in 2016
Arterial Safety Projects – 18th St and 162nd Ave Grant
SW‐28
Received grant funding for construction phase
Brookside Operations Center Grant – Stormwater Retrofit
SW‐29 Received grant funding for construction phase
NE 32nd Street Grant – UIC Retrofit SW‐31 Received grant funding for construction phase WSDOT Fee Funded Projects SW‐A1‐5 Several projects completed and several projects added in 2015Country Club Village Phase 1 LID Grant – UIC Retrofit
SW‐A1‐11 Received grant funding for construction phase
Arterial Safety Projects – Mill Plain and 184th Ave
SW‐A1‐24 Budget carried forward from 2014
Stormwater Retrofit LID Grant – WQ for Drywells
SW‐A1‐26 Budgeted $400,000 for construction in 2016
173
Note: All costs are in 2015 dollars
Description CIP# 2015 2016 2017 2018 2019 2020 2021 6-yr Total443 Surfacewater Construction Fund
FUNDED PROJECTS
Regulatory Compliance Projects-NPDES/TMDL
Stormwater Retrofit LID Grant - 98th Ave SW-4 100,000 0
Stormwater Retrofit LID Grant - 18th St SW-25 83,750 160,000 160,000
Stormwater Retrofit LID Grant - 109th Ave SW-27 83,000 300,000 300,000
Brookside Operations Center Construction (Grant Funded) SW-29 30,000 42,000 470,430 512,430
Stormwater Retrofit LID Grant - Oarkbrook SW-32 12,000 52,000 170,900 222,900
Regulatory Compliance-UIC Retrofits
Stormwater Retrofit LID Grant - WQ for Drywells SW-A1-26 349,470 400,000 400,000
Country Club Village Construction (Grant Funded Phase I) SW-30 5,000 35,000 107,000 600,180 742,180
NE 32nd Street Construction (Grant Funded) SW-31 17,280 150,000 150,000
Arterial Safety Projects
18th St & 162nd Ave Construction (Grant Funded) SW-28 5,000 12,000 130,600 142,600
Mill Plain & 184th Ave - CTC SW-A1-24 35,000 0
WSDOT Fee Funded Projects SW-A1-5 219,518 230,000 230,000 240,000 240,000 240,000 1,180,000
Administration (00) SW-A1-5 3,817 0
Thurston Way (04) SW-A1-5 15,410 0
I-205 Burton Detention Study (05) SW-A1-5 37,879 0
WSDOT Culvert and Outfall Inspection (06) SW-A1-5 31,394 0
Ellsworth Vegetation Enhance (11) SW-A1-5 17,850 0 Ellsworth Runoof Study (12) SW-A1-5 50,000 0 I-5/Leverich East Slope (13) SW-A1-5 46,420 0 SR500/Andresen Islands (14) SW-A1-5 39,883 0 I-205 Peterson Runoff (15) SW-A1-5 55,000 0 SR500/Fourth Plain (16) SW-A1-5 91,635 0 SR500/St Johns (17) SW-A1-5 5,939 SR14/164th Ave (18) SW-A1-5 149,000 East Orchards UIC Retrofit Study & Design - 4th Plain (19) SW-33 220,000 220,000
SCIP Coordination Projects* Village Green (88) - UIC Grant Coord. SW-A1-21 12,000 0
Funded Subtotal 1,496,245 1,371,000 1,108,930 830,180 240,000 240,000 240,000 4,030,110
UNFUNDED PROJECTSRegulatory Compliance Projects-NPDES/TMDL SW-A1-23 100,000 100,000 Greenway Restoration - Royal Oaks SW-A1-34 0 Greenway Restoration - Peterson Channel SW-A1-34 100,000 500,000 600,000 Greenway Restoration - 15th Ave East SW-A1-34 100,000 100,000 Greenway Restoration - 18th Str to 87th Ave SW-A1-34 0 Stormwater Quality Pond - Arnold Park/St Johns SW-A1-35 0 Stormwater Quality Vault - Linda Lane/4th Plain SW-A1-35 50,000 50,000
Regulatory Compliance-UIC Retrofits Country Club Village Construction - Phase 2 SW-A1-11 35,000 750,000 785,000 Fourth Plain SR500-131st Ave SW-A1-11 750,000 750,000 Fourth Plain 131st Ave-162nd Ave SW-A1-11 1,250,000 1,250,000 UIC Retrofit Ph 1 - Water Quality Treatment SW-A1-11 100,000 250,000 100,000 450,000 UIC Retrofit Ph 2 - Decommission & WQ Treatment SW-A1-11 200,000 400,000 600,000 UIC Retrofit Ph 3 - Decommission, WQ & Detain SW-A1-11 0
Arterial Safety Projects Mill Plain & 184th Ave - CTC SW-A1-24 100,000 520,000 620,000 Fruit Valley Rd SW-A1-24 250,000 250,000 Mill Plain & 164th Ave SW-A1-24 250,000 250,000 Mill Plain & Hearthwood SW-A1-24 200,000 200,000 Mill Plain & 155th Ave SW-A1-24 350,000 350,000 164th Ave Median Swale Retrofit SW-A1-24 35,000 50,000 85,000
SCIP Coordination Projects* SW-A1-21 60,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
Property Acquisitions-Flood Plain,Habitat,Wetlands SW-A1-20 250,000 250,000 51st St Sump Basin (2.5 Ac =$170,000) SW-A1-20 170,000 170,000 15th Ave Wetlands (11 AC =$405,000) SW-A1-20 ` 405,000 405,000 BBC Headwaters Basin ($750,000) SW-A1-20 0 BBC Greenway (23 Ac =$250,000) SW-A1-20 0 Alki Basin ($150,000) SW-A1-20 0
Facility Retrofits Program Primrose Court DS#105 SW-A1-36 23,000 23,000 Brickhaven (NE 146th Ave & 42nd Str) SW-A1-36 0 Tiffany Meadows (SE 169th & 17th Str) SW-A1-36 31,000 31,000 Creekside Meadows III (NE 124th Crt & 47th Str) SW-A1-36 27,000 27,000 Kristi Lane (NE 35th Cir & 119th Ave) SW-A1-36 45,000 45,000 Oak Run (NE 4th Pln & Plains Way) SW-A1-36 65,000 65,000
6 YEAR CAPITAL IMPROVEMENT PROGRAM FORSURFACE WATER MANAGEMENT (2015-2020)6 YEAR CAPITAL IMPROVEMENT PROGRAM FOR
SURFACE WATER MANAGEMENT (2016-2021)
174
Description CIP# 2015 2016 2017 2018 2019 2020 2021 6-yr TotalSub-Standard Systems 100,000 100,000 Lower Grand Area Green Street SW-A1-37 50,000 250,000 300,000 Columbia Slope Culvert - Mill Creek SW-A1-37 75,000 75,000 Columbia Slope Culvert - Chelsea SW-A1-37 35,000 35,000 Columbia Slope Culvert - Fisher's Creek SW-A1-37 35,000 125,000 160,000 Columbia Slope Culvert - SE 17th Street SW-A1-37 125,000 125,000 Waterfront Outfall Capacity Study SW-A1-37 35,000 35,000
Pump Station Optimization and Retrofit 51st Street PS Basin Study & Design SW-A!-38 85,000 85,000 Existing Stormwater PS Retrofits - FV, LaH, 162, CR SW-A!-38 140,000 140,000
Comprehensive Surface & Ground Water Management Plan SW-A1-39 300,000 300,000
Stormwater Retrofits-Demand Response SW-A1-12 50,000 50,000 50,000 50,000 60,000 60,000 60,000 330,000
Transportation/Pavement Coord.-LID Depave SW-A1-22 40,000 40,000 40,000 40,000 50,000 50,000 50,000 270,000
Unfunded Subtotal 820,000 1,283,000 1,716,000 2,032,000 2,135,000 1,725,000 9,711,000
Funded and Unfunded Total 1,646,245 2,191,000 2,391,930 2,546,180 2,272,000 2,375,000 1,965,000 13,741,110
*Project timing is dependent upon the timing of the coordinating project Shading indicates not included in 6-year plan, but money expected to be spent in 2015
175
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-25
BRYANT (P)
BR
YA
NT
WINTLER
16TH
17TH
MURRAY
GE
NE
RA
L A
ND
ER
SO
N
BE
RG
ER
ON
WA
HC
LE
LL
AH
WINTLER
18TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Ecology Retrofit GrantProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STORMWATER RETROFIT LID GRANT - 18TH STREET (BBC TO GENERAL ANDERSON)
Install Rain Gardens (Bio Retention) for treatment of stormwater runoff prior to discharging toBurnt Bridge Creek
$160,000.00Total Proj. Cost:300 Grants - State
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Water quality and quantity treatment along 18th Street between Burnt Bridge Creek andGeneral Anderson
SW-25PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
176
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-27
SCIP-104 41ST
SEH-KANAGAWA
SW-32
I-205
109TH
41ST
103RD
39TH
37TH
42ND
32ND
34TH
104TH
MORROW
115TH
31ST
106TH
108TH
BURTONWOOD
35TH
32ND
34TH
103RD
108TH
112T
H
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Ecology Retrofit GrantProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STORMWATER RETROFIT LID GRANT - 109TH AVENUE (INDUSTRIAL)
Install Raingardens (Bio-Retention) for treatment of stormwater runoff prior to discharging toPeterson Channel.
$300,000.00Total Proj. Cost:300 Grants - State
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2016*Start of Construction (Year):
Water quality and quantity treatment along N.E. 109th Avenue between N.E. 35th Street andN.E. 39th Street and along 39th Street between N.E. 109th Avenue and N.E. 112th Avenue
SW-27PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
177
P roje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSe we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SW-28
**TRANS-444**TRANS-349
NE 18TH ST
NE
16
2N
D A
VE
Ê
Active
Da te : 6/24/2015
PROJECT AREA MAP
P ROJECT:PROJECT SUMMARY
Project Status:
Surfa ce Wa te rUtility Type:Ecolog y Re trofit Gra ntProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
NE 162ND AVENUE & 18TH STREET ARTERIAL SAFETY PROJECT (ECOLOGY GRANT PROJECT)
Insta ll la rg e r tre a tme nt fa cility for wa te r qua ntity a nd qua lity. The proje ct wa s funde d unde r a nEcolog y g ra nt ($27,000) for de sig n only in 2014. Construction will b e funde d by a 2015 g ra nt($147,600) for comple tion by 2017. The syste m is unde r size d. The construction of the proje ctwould doub le the syste m to a lle via te flooding a nd a dd wa te r qua lity tre a tme nt for re g ula torycomplia nce .
$142,600.00Total Proj. Cost:300 Gra nts - Sta te
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
This is a “Sub sta nda rd Syste ms – Arte ria l Sa fe ty” P roje ct. The re is fre que nt a nd sig nifica ntflooding in le ft turn a nd le ft northb ound tra ve l la ne s of hig h spe e d stre e t.
SW-28P ROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including stre e ts, pa ve me nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt P la n (TIP) docume nt.
178
P roject Bound a ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSewe r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa m a sWa shouga l
SW-29
**TRANS-258
CA
RL
SO
N
GE
NE
RA
L A
ND
ER
SO
N
SHERIDAN
ST
AP
LE
TO
N
FOURTH PLAIN
WA
HC
LE
LL
AH
SHE
RID
AN Ê
Active
Da te: 6/24/2015
PROJECT AREA MAP
P ROJECT:PROJECT SUMMARY
Project Status:
Surf a ce Wa te rUtility Type:Ecology Retrofit Gra ntProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
EST IMAT ED PROJECT COST S FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINIT Y MAPLEGEND
BROOKSIDE OPERATIONS CENTER – STORMWATER RETROFIT (ECOLOGY GRANT PROJECT)
The project wa s fund e d und e r a n Ecology gra nt ($31,000) for d esign only in 2014. Constructionwill be fund e d by a 2015 gr a nt ($542,430). This project will upgr a d e a nd expa nd existingsystems includ ing insta lla tion of Sta te a pprove d tre a tme nt technologies a nd best ma na ge me ntpra ctices to tre a t stormwa te r runof f.
$512,430.00T otal Proj. Cost:300 Gra nts - Sta te
Project Description / Com m e nts
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
This is a “Re gula tory Complia nce P roject” for the City’s Stormwa te r NPDES pe rmit a nd UICre gula tions. Stormwa te r infiltra tion systems a r e a ging. The cur re nt infiltra tion syste ms la ck wa te rqua lity tre a tme nt a nd structura l spill preve ntion.
SW-29P ROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be d e pe nd e nt on coor d ina tion with othe r d e pa rtme nts includ ing stre ets, pa ve me nt ma na ge m e nt, sewe r, wa te r a nd surf a ce wa te r.**Tra nsporta tion projects (TRANS-XXX) ca n be found in the 6 Y e a r Tra nsporta tion Improveme nt P la n (TIP) d ocume nt.
179
Proje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSe we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SW-30
**TRANS-726
83RD
34TH
OAK VIEW
79TH
ROYAL OAKS
OAKS
LOOWIT
ROYA
L OAK
SSR-500 EB
SR-500 WB
LEWIS
BENTON
77TH
PIERCE
36TH
PARKWAY
MASON
PACIF
IC
VANCOUVER MALL
41ST
94TH
87TH
37TH
DOUGLAS
ROYAL VIEW
PLAINS
34TH
78TH
88TH
39TH
GREE
NWOO
D SPOKANE
37TH
MASON
86TH
THURSTON
VANCOUVER PLAZA
FOURTH PLAIN
Ê
Active
Da te : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surfa ce Wa te rUtility Type:Ecolog y R e trofit Gra ntProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
EST IMAT ED PROJECT COST S FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINIT Y MAPLEGEND
COUNTRY CLUB VILLAGE LID – UIC RETROFIT (ECOLOGY GRANT PROJECT)
The proje ct wa s funde d unde r a n Ecolog y g ra nt ($47,000) for de sig n only in 2014. Constructionfor Pha s e I will b e funde d b y a 2015 g ra nt ($747,180). This proje ct will provide wa te r qua litytre a tme nt with the insta lla tion of b io-re te ntion (ra in g a rde ns), which is a Low Impa ct De ve lopm e ntme thodolog y. Approxima te ly 7.5 a cre s of impe rvious city roa d surfa ce s will b e tre a te d.
$742,180.00T otal Proj. Cost:300 Gra nts - Sta te
Project Description / Com m e nts
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
This is a n “Unde rg round Inje ction Control R e trofit” proje ct. Stormwa te r runoff is curre ntlydischa rg e d untre a te d into drywe lls loca te d throug hout the sub division. The sha llow g roundwa te rcontrib ute s b a s e flow to Burnt Bridg e Cre e k.
SW-30PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including stre e ts, pa ve me nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt Pla n (TIP) docume nt.
180
Proje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Ta xlots
Va ncouve r City LimitsSe we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SW-31
**TRANS-258
NE 32ND ST
NE
62
ND
AV
E
Ê
Active
Da te : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surfa ce Wa te rUtility Type:Ecolog y R e trofit Gra ntProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
EST IMAT ED PROJECT COST S FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINIT Y MAPLEGEND
NE 32ND STREET – UIC RETROFIT
The proje ct wa s funde d unde r a n Ecolog y g ra nt ($15,000) for de sig n only in 2014. Constructionwill b e funde d by a 2015 g ra nt ($167,280). This proje ct will re move the drywe ll a nd providewa te r qua lity tre a tme nt prior to discha rg e to surfa ce wa te r a long NE 32nd Stre e t ne a r NE 62ndAve nue .
$150,000.00T otal Proj. Cost:300 Gra nts - Sta te
Project Description / Com m e nts
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
This is a n “Unde rg round Inje ction Control R e trofit” proje ct. The drywe ll is structura lly de ficie nt.Curre ntly, the stormwa te r runoff ove rflows from the de ficie nt drywe ll a nd discha rg e s untre a te dinto Burnt Bridg e Cre e k.
SW-31PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including stre e ts, pa ve me nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt Pla n (TIP) docume nt.
181
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaW ater Service AreaClark CountyBattle GroundCamasW ash ougal
SW -32
SCIP-104
SW -27
SW -4
SW -30
I-205
98TH
109TH
97TH
103RD
41ST
35TH
44TH
45TH
106TH
29TH
37TH
99TH
39TH
104TH
102ND
93RD
MORROW
OAKHURST
42ND
31ST
96TH
43RD
30TH
101ST
34TH
110TH
108TH
BENTON
BURTONWOOD
32ND
105TH
39TH
30TH
102ND
34TH
44TH
109TH
102ND
99TH
101ST
42ND 43RD
97TH
37TH
34TH
110TH
FOURTH PLA
IN
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface W aterUtility Type:Ecology Retrofit GrantProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PETERSON CHANNEL RESIDENTIAL PH III LID GRANT (OAKBROOK)
Th is projec t is in th e residential neig h b orh ood area of Oakb rook and will install “green” streetrain gardens in where stormwater currently runs of f directly into Peterson Channel.
$222,900.00Total Proj. Cost:300 Grants - State
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
Storm water quality and quantity treatment of residential streets.
SW-32PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All projec t timing will b e dependent on coordination with oth er departments including streets, pavement management, sewer, water and surface water.**Transportation projec ts (TRANS-XXX) can b e found in th e 6 Year Transportation Improvement Plan (TIP) document.
182
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-33
117T
H
PADDEN
SR-500 EB
SR-500 WB
162N
D
FOURTH PLAIN 58TH
WARD
I-205
39TH
152N
D
107T
H 137T
H
130T
H
83RD
87TH
94TH
121S
T
DAVIS
88TH
102N
D
78TH
199T
H
172N
D
MEADOWS
99TH
76TH
99TH
28TH
162N
D
WARD
FOURTH PLAIN
137T
H
49TH
112T
H
PADDEN
172N
D
182N
D
88TH
COVINGTON
48TH
BURTON
138TH
POPLAR
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:WSDOT FundedProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
ORCHARDS UIC RETROFIT STUDY & DESIGN
This project will result in a design for improvements in the Orchards area drainage basin to treatand control the stormwater flow reaching Fourth Plain and design retrofits for the stormwatersystems for Fourth Plain storm runoff as needed.
$220,000.00Total Proj. Cost:443 Surface Water Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2017*Start of Construction (Year):
Orchards drainage basins north of Fourth Plain provide no water quality treatment, areinaccessible, and, in some areas, undersized for the stormwater flow they receive.
SW-33PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
183
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Taxlots
Vancouver City LimitsSewer Service AreaWater Service AreaClark CountyBattle GroundCamasWash ougal
SW-4
**TRANS-818
WTR-6
SW-32 SW-27I-205
98TH
21ST
109TH
99TH
93RD
96TH
92ND
103RD
28TH
22ND
35TH
90TH
23RD
97TH
29TH
88TH
102ND
105TH
95TH
25TH
OAKHURST
31ST
24TH
27TH
26TH
101ST
CRANBROOK
36TH
33RD
37TH
30TH
HERON
34TH
106TH
104TH
32ND
HOLLY
97TH
96TH
21ST
22ND 22ND
101ST 34TH
102ND
95TH
93RD
25TH
27TH
22ND
36TH
28TH
88TH
27TH
102ND
102ND
99TH
28TH
101ST
30TH
98TH
BURTON
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Ecology Retrofit GrantProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PETERSON CHANNEL RESIDENTIAL PH I & II RETROFIT LID GRANT
Phase I (2014) of th is projec t in th e residential neig h b orh ood area of Oakb rook installed 15“g reen” street rain gardens and a quarter mile of tree lined median in NE 98th Avenue north ofBurton R oad. Phase II (2015) is for construc tion of two additional rain gardens (b ioretentionfacilities).
Total Proj. Cost:300 Grants - State
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2014*Start of Construction (Year):
Water quality and quantity treatment of NE 98th Ave prior to disc h arg ing to Peterson Channel
SW-4PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All projec t timing will b e dependent on coordination with oth er departments including streets, pavement management, sewer, water and surface water.**Transportation projec ts (TRANS-XXX) can b e found in th e 6 Year Transportation Improvement Plan (TIP) document.
184
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-11SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Regulatory ComplianceProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
UNDERGROUND INJECTION CONTROL RETROFITS
Retrofit projects include: reconstructing systems, raising systems, adding water quality treatment,replacing systems to detain, treat and discharge to surface water. Country Club Village Ph I,Fourth Plain-SR500 to 131st Ave, Fourth Plain-131st Ave to 162nd Ave, UIC Retrofits Ph 1-3.
$3,835,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
State regulations require new and existing UICs (i.e. stormwater infiltration systems) meet specificrequirements to protect groundwater quality
SW-A1-11PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
185
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-12SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Emergency or Critical DemandProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STORMWATER RETROFITS - DEMAND RESPONSE
Coordination Projects
$330,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Ongoing fund for unanticipated projects which include: Roadway Coordination, TrafficHazard/Property Threatening High Water, Slope Stability/Erosion Prevention, Tree Plantings,NPDES Permitting, and Surface Water Monitoring for Quality and Quantity of Fl
SW-A1-12PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
186
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-20SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:AcquisitionProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PROPERTY ACQUISITIONS - FLOODPLAIN, HABITAT & WETLANDS
Coordination Projects
$825,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Acquisition of flood plain and habitat properties, as identified in the property acquisition priorityarea plan and as properties become available.
SW-A1-20PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
187
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-21SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Stormwater Retrofit CoordinatiProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SCIP COORDINATION PROJECTS*
Coordination Projects
$300,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Upgrade and standardize quantity and quality treatment facilities within the project limits of theassociated SCIP project.
SW-A1-21PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
188
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-22SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Stormwater Retrofit CoordinatiProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
TRANSPORTATION AND PAVEMENT COORDINATION
Coordination Projects.
$270,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Ongoing funding to upgrade and standardize quantity and quality treatment facilities within theproject limits of the associated City of Vancouver Transportation or Pavement managementproject.
SW-A1-22PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
189
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-23SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Regulatory ComplianceProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
REGULATORY COMPLIANCE PROJECTS - NPDES/TDML
$100,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Ongoing funding to comply with NPDES permit requirements associated with quantity and qualitytreatment facilities affecting Burnt Bridge Creek.
SW-A1-23PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
190
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-24SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:SafetyProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SUBSTANDARD SYSTEMS - ARTERIAL SAFETY PROJECTS
Program to address multiple flooding safety issues in arterial streets, throughout the city: MillPlain & 184th Ave, Fruit Valley Rd, Mill Plain & 164th Ave, Mill Plain & Hearthwood, Mill Plain &155th Ave, 164th Ave Median Swale Retrofit
$1,755,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Ongoing funding to address safety concerns associated with drainage along arterial streets.
SW-A1-24PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
191
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-26SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Ecology Retrofit GrantProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STORMWATER RETROFIT LID GRANT - WQ FOR DRYWELLS - REGULATORY COMPLIANCE UIC RETROFITS
Install pre-sedimentation manholes and/or water quality vaults to treat stormwater runoff priorto infiltrating.
$400,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
2015*Start of Construction (Year):
Water quality for approximately 50 drywells in various locations throughout the city.
SW-A1-26PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
192
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-34SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Regulatory ComplianceProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
GREENWAY RESTORATION PROJECTS
The current list of specific projects includes; Royal Oaks is at the confluence of Burnt Bridge Creekand Petersen Channel, Peterson Channel just north of Oakbrook Park, 15th Avenue at ahorseshoe bend in Burnt Bridge Creek, the completion of the Burnt Bridge Creek GreenwayMaster Plan, and Arnold Park at St. Johns.
$700,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
The primary goals for the Burnt Bridge Creek Greenway are to; improve water quality, enhancefish & wildlife habitat, control flooding, treat stormwater runoff, increase tree canopy.
SW-A1-34PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
193
Proje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Va ncouve r City Limits
Se we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SW-A1-35SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunde d
Da te : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surfa ce Wa te rUtility Type:R e g ula tory Complia nceProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
STORMWATER QUALITY VAULT AT LINDA LANE & FOURTH PLAIN
The e xisting va ult a t Linda La ne wa s constructe d in the 80’s for the purpos e s of colle ctings e dime nt from runoff coming from the 60” storm s e we r ma in in 4th Pla in e a st of Fa lk R oa d. Thevolume of se dime nt e xce e ds the orig ina l de sig n e ffe cting the ca pa city within the 60” pipe . Thisproje ct will a na lyze a lte rna tive s for re trofitting the va ult a nd construct ne w s e dim e nt controls,upstre a m wa te r qua lity a nd qua ntity controls, or b a sin-wide g re e n stre e t infra structure .
$50,000.00Total Proj. Cost:443 Surfa ce wa te r Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
R e store conve ya nce ca pa city a nd provide a dditiona l wa te r qua lity tre a tme nt to stormwa te rrunoff from 4th Pla in.
SW-A1-35PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtme nts including stre e ts, pa ve me nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt Pla n (TIP) docume nt.
194
Proje ct Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouve r City Limits
Se we r Se rvic e Are aWate r Se rvic e Are aClark CountyBattle GroundCamasWashougal
SW-A1-36SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfund e d
Date : 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
Surfac e Wate rUtility Type:Stormwate r Re trofit Coord inatiProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
FACILITY RETROFIT PROGRAM
This program with re trofit swale s provid ing ne w fac ilitie s that me e ting the c ity’s curre nt stand ard sfor wate r q uality and mainte nanc e . Eac h swale proje ct will inc lud e a cost be ne fit analysis forproje cte d savings re turn on mainte nanc e costs.
$191,000.00Total Proj. Cost:443 Surfac e wate r Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Asse ssme nt of the c ity’s swale fac ility asse ts re sulte d in a priority list of swale re q uiring re trofits.The top six swale s inc lud e Primrose Court, Bric khave n, Tiffany Me ad ows, Cre e ksid e Me a d ows III,Kristi Lane , and O ak Run.
SW-A1-36PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will be d e pe nd e nt on coord ination with othe r d e partme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.**Transportation proje cts (TRANS-X X X ) c an be found in the 6 Y e ar Transportation Improve m e nt Plan (TIP) docume nt.
195
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-37SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunded
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:Stormwater Retrofit CoordinatiProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
SUBSTANDARD SYSTEMS PROGRAM
Typically, this is for culverts and pipes that have reached the end of their life cycle in need ofrepair or drywells that continue to overflow even with repeated maintenance and cleaning.Projects are prioritized based upon severity criteria such as traffic safety, potential propertydamage, nuisance flooding, etc.
$830,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
This management program identifies and retrofits or replaces sub-standard stormwater systems.
SW-A1-37PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
196
Proje ct Bounda ryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Va ncouve r City Limits
Se we r Se rvice Are aWa te r Se rvice Are aCla rk CountyBa ttle GroundCa ma sWa shoug a l
SW-A1-38SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfunde d
Da te : 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surfa ce Wa te rUtility Type:Stormwa te r R e trofit Coordia ntiProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
PUMP STATION RETROFIT PROGRAM
The city curre ntly ha s four e xisting stormwa te r pump sta tions a nd one propose d with thede ve lopme nt of the 51st Stre e t Sump a re a . This proje ct will de ve lop a long te rm ma na g e m e ntpla n for the e limina tion, mitig a tion or re pla ce m e nt of e a ch pump sta tion.
$225,000.00Total Proj. Cost:443 Surfa ce wa te r Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
The contrib uting dra ina g e a re a s for e a ch of the se pump sta tions could b e mitig a te d le sse ning thecity’s costs for ma inte na nce a nd powe r for ope ra tion of the pump sta tions.
SW-A1-38PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will b e de pe nde nt on coordina tion with othe r de pa rtm e nts including stre e ts, pa ve me nt ma na g e m e nt, se we r, wa te r a nd surfa ce wa te r.**Tra nsporta tion proje cts (TRANS-XXX) ca n b e found in the 6 Ye a r Tra nsporta tion Improve m e nt Pla n (TIP) docume nt.
197
Proje ct Bound aryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouve r City Limits
Se we r Se rvic e Are aWate r Se rvic e Are aClark CountyBattle GroundCamasWashougal
SW-A1-39SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
237T
H
154TH
50TH
50TH10
TH
10TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Unfund e d
Date : 6/24/2015
PROJECT AREA MAP
PRO JECT:PROJECT SUMMARY
Project Status:
Surfac e Wate rUtility Type:Re gulatory Complianc eProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
COMPREHENSIVE SURFACE & GROUNDWATER MANAGEMENT PLAN
This Compre he nsive Manage m e nt Plan will use groundwate r monitoring we ll d ata curre ntly be ingcolle cte d , to d e te rmine re q uire d re trofits, the re by optimizing the numbe r, type and costs for theUIC re trofit program.
$300,000.00Total Proj. Cost:443 Surfac e wate r Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
The De partme nt of Ecology Und e rground Inje ction Control (UIC) Rule s we re imple m e nte d in 2007.The c ity has me e t the se re gulations, the ne xt phase re q uire s re trofit of UIC’s, othe rwise known asdrywe lls, in are as c lose to groundwate r.
SW-A1-39PRO JECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All proje ct timing will be d e pe nd e nt on coord ination with othe r d e partme nts inc lud ing stre e ts, pave me nt manage m e nt, se we r, wate r and surfa c e wate r.**Transportation proje cts (TRANS-X X X ) c an be found in the 6 Y e ar Transportation Improve m e nt Plan (TIP) docume nt.
198
Project BoundaryTransportation
Sanitary Sewer
Surface Water
Water
SCIP
Vancouver City Limits
Sewer Service AreaWater Service AreaClark CountyBattle GroundCamasWashougal
SW-A1-5SR-14 EB
SR-14 WB
117T
H58TH
10TH
PADDEN
EVER
ETT
MILL PLAIN 242N
D
I-5
I-205
119TH
C
29TH
152N
D
212T
H
11TH
10TH
38TH
6TH
39TH
58TH
83RD
20TH
15TH
50TH
107T
H
209TH
9TH
GRAC
E
88TH
292N
D
COLUMBIA
RAWSON
53RD
92ND
INGLE
169TH
23RD
68TH
98TH
237T
H
154TH
50TH10
TH
50TH
199TH179TH
72ND
78TH
18TH18
2ND
172N
D16
7TH
3RD
RISTO36
TH
29TH
Ê
Active
Date: 6/24/2015
PROJECT AREA MAP
PROJECT:PROJECT SUMMARY
Project Status:
Surface WaterUtility Type:State Fee ProjectsProject Type:
PROJECT DESCRIPTIONProject Justification / Priority
ESTIMATED PROJECT COSTS FUNDING STRATEGY
SR-14 EB
SR-14 WB
117T
H
SR-500 EBSR-500 WB
LOW
ER R
IVER
58TH
PADDEN
MILL PLAIN
162N
D
I-5
I-205
119TH
EVERGREEN
152N
D
212T
H
18TH
87TH
38TH
172N
D
39TH
58TH
83RD
20TH
15TH
107T
H
6TH
50TH
68TH
9TH 88TH
COLUMBIA
86TH
INGLE
97TH
44TH
25TH
MCGILLIVRAY
139TH
13TH
ANDR
ESEN
34TH
99TH
26TH
16TH
39TH
88TH
18TH
99TH
MILL PLAIN
76TH
72ND
112T
H
172N
D
WARD
137T
H
LAKE
139TH
50TH
GRAN
D
117TH
182N
D
36TH
134TH
VICINITY MAPLEGEND
WSDOT FEE PROJECTS
Annual fee project for Washington State Department of Transportation. State code providesimposition of charges with respect to highway right of ways.
$1,180,000.00Total Proj. Cost:443 Surfacewater Construction Fund
Project Description / Comments
Budget / Proj. #:
Budget / Proj. Task #:
*Start of Construction (Year):
Projects include piping and drainage ways, water quality, and property acquisition.
SW-A1-5PROJECT ID:
2016 - 2021 PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM
*All project timing will be dependent on coordination with other departments including streets, pavement management, sewer, water and surface water.**Transportation projects (TRANS-XXX) can be found in the 6 Year Transportation Improvement Plan (TIP) document.
199
Note: All costs are in 2015 dollars
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Total443 Surfacewater Construction Fund
FUNDED PROJECTSRegulatory Compliance Projects-NPDES/TMDL
Stormwater Retrofit LID Grant - 98th Ave SW-4 100,000 100,000
Stormwater Retrofit LID Grant - 18th St SW-25 83,750 160,000 243,750
Stormwater Retrofit LID Grant - 109th Ave SW-27 83,000 300,000 383,000
Brookside Operations Center Construction (Grant Funded) SW-29 30,000 42,000 470,430 542,430
Stormwater Retrofit LID Grant - Oarkbrook SW-32 12,000 52,000 170,900 234,900
Regulatory Compliance-UIC Retrofits
Stormwater Retrofit LID Grant - WQ for Drywells SW-A1-26 349,470 400,000 749,470
Country Club Village Construction (Grant Funded Phase I) SW-30 5,000 35,000 107,000 600,180 747,180
NE 32nd Street Design Construction (Grant Funded) SW-31 17,280 150,000 ` ` 167,280
Arterial Safety Projects 18th St & 162nd Ave Construction (Grant Funded) SW-28 5,000 12,000 130,600 147,600 Mill Plain & 184th Ave - CTC (Funding for Study & Design) SW-A1-24 35,000 35,000 WSDOT Fee Funded Projects SW-A1-5 219,518 230,000 230,000 240,000 240,000 240,000 240,000 250,000 250,000 250,000 250,000 260,000 260,000 260,000 260,000 3,679,518 Administration (00) SW-A1-5 3,817 3,817 Thurston Way (04) SW-A1-5 15,410 I-205 Burton Detention Study (05) SW-A1-5 37,879 37,879 WSDOT Culvert and Outfall Inspection (06) SW-A1-5 31,394 Ellsworth Vegetation Enhance (11) SW-A1-5 17,850 Ellsworth Runoof Study (12) SW-A1-5 50,000 I-5/Leverich East Slope (13) SW-A1-5 46,420 SR500/Andresen Islands (14) SW-A1-5 39,883 39,883 I-205 Peterson Runoff (15) SW-A1-5 55,000 55,000 SR500/Fourth Plain (16) SW-A1-5 91,635 SR500/St Johns (17) SW-A1-5 5,939 SR14/164th Ave (18) SW-A1-5 149,000 149,000 East Orchards UIC Retrofit Study & Design - 4th Plain (19) SW-33 220,000 220,000
SCIP Coordination Projects*
Village Green (88) - UIC Grant Coord. SW-A1-21 12,000 12,000
Funded Subtotal 1,496,245 1,371,000 1,108,930 830,180 240,000 240,000 240,000 240,000 250,000 250,000 250,000 250,000 260,000 260,000 260,000 260,000 7,806,355
UNFUNDED PROJECTSRegulatory Compliance Projects-NPDES/TMDL SW-A1-23 100,000 250,000 250,000 250,000 250,000 1,100,000 Greenway Restoration - Royal Oaks SW-A1-34 100,000 750,000 850,000 Greenway Restoration - Peterson Channel SW-A1-34 100,000 500,000 600,000 Greenway Restoration - 15th Ave East SW-A1-34 100,000 500,000 600,000 Greenway Restoration - 18th Str to 87th Ave SW-A1-34 100,000 1,000,000 1,100,000 Stormwater Quality Pond - Arnold Park/St Johns SW-A1-35 200,000 750,000 950,000 Stormwater Quality Vault - Linda Lane/4th Plain SW-A1-35 50,000 75,000 450,000 575,000
Regulatory Compliance-UIC Retrofits
Country Club Village Construction - Phase 2 SW-A1-11 35,000 750,000 785,000
Fourth Plain SR500-131st Ave SW-A1-11 750,000 750,000
Fourth Plain 131st Ave-162nd Ave SW-A1-11 1,250,000 1,250,000
UIC Retrofit Ph 1 - Water Quality Treatment SW-A1-11 100,000 250,000 100,000 450,000
UIC Retrofit Ph 2 - Decommission & WQ Treatment SW-A1-11 200,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000 3,400,000
UIC Retrofit Ph 3 - Decommission, WQ & Detain SW-A1-11 1,000,000 1,000,000 1,000,000 1,000,000 4,000,000
20 YEAR CAPITAL IMPROVEMENT PROGRAM FOR
200
Description CIP # 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Total
Arterial Safety Projects Mill Plain & 184th Ave - CTC SW-A1-24 100,000 520,000 620,000 Fruit Valley Rd SW-A1-24 250,000 250,000 Mill Plain & 164th Ave SW-A1-24 250,000 250,000 Mill Plain & Hearthwood SW-A1-24 200,000 200,000 Mill Plain & 155th Ave SW-A1-24 350,000 350,000 164th Ave Median Swale Retrofit SW-A1-24 35,000 50,000 85,000
SCIP Coordination Projects* SW-A1-21 60,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 410,000
Property Acquisitions-Flood Plain,Habitat,Wetlands SW-A1-20 250,000 250,000 400,000 400,000 400,000 400,000 2,100,000 51st St Sump Basin (2.5 Ac =$170,000) SW-A1-20 170,000 170,000 15th Ave Wetlands (11 AC =$405,000) SW-A1-20 ` 405,000 405,000 BBC Headwaters Basin ($750,000) SW-A1-20 750,000 750,000 BBC Greenway (23 Ac =$250,000) SW-A1-20 250,000 250,000 Alki Basin ($150,000) SW-A1-20 150,000 150,000
Facility Retrofits Program 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 400,000 Primrose Court DS#105 SW-A1-36 23,000 23,000 Brickhaven (NE 146th Ave & 42nd Str) SW-A1-36 125,000 ` 125,000 Tiffany Meadows (SE 169th & 17th Str) SW-A1-36 31,000 31,000 Creekside Meadows III (NE 124th Crt & 47th Str) SW-A1-36 27,000 27,000 Kristi Lane (NE 35th Cir & 119th Ave) SW-A1-36 45,000 45,000 Oak Run (NE 4th Pln & Plains Way) SW-A1-36 65,000 65,000
Sub-Standard Systems 100,000 100,000 100,000 100,000 100,000 200,000 200,000 200,000 200,000 200,000 1,500,000 Lower Grand Area Green Street SW-A1-37 50,000 250,000 300,000 Columbia Slope Culvert - Mill Creek SW-A1-37 75,000 75,000 Columbia Slope Culvert - Chelsea SW-A1-37 35,000 35,000 Columbia Slope Culvert - Fisher's Creek SW-A1-37 35,000 125,000 160,000 Columbia Slope Culvert - SE 17th Street SW-A1-37 125,000 125,000 Waterfront Outfall Capacity Study SW-A1-37 35,000 35,000
Pump Station Optimization and Retrofit 51st Street PS Basin Study & Design SW-A!-38 85,000 Existing Stormwater PS Retrofits - FV, LaH, 162, CR SW-A!-38 140,000
Comprehensive Surface & Ground Water Management Plan SW-A!-39 300,000
Stormwater Retrofits-Demand Response SW-A1-12 50,000 50,000 50,000 50,000 60,000 60,000 60,000 70,000 70,000 70,000 80,000 80,000 80,000 80,000 80,000 80,000 1,070,000
Transportation/Pavement Coord. - LID and Depave SW-A1-22 40,000 40,000 40,000 40,000 50,000 50,000 50,000 60,000 60,000 60,000 70,000 70,000 70,000 80,000 80,000 80,000 940,000
Unfunded Subtotal 150,000 820,000 1,283,000 1,716,000 2,032,000 2,135,000 1,725,000 1,780,000 1,980,000 1,530,000 2,150,000 1,550,000 2,450,000 2,460,000 2,060,000 2,060,000 27,881,000
Funded and Unfunded Total 1,646,245 2,191,000 2,391,930 2,546,180 2,272,000 2,375,000 1,965,000 2,020,000 2,230,000 1,780,000 2,400,000 1,800,000 2,710,000 2,720,000 2,320,000 2,320,000 35,687,355
*Project timing is dependent upon the timing of the coordinating project
Shading indicates not included in 6-year plan, but money expected to be spent in 2015
201