By Todd Boulanger Supporting Materials for Resume / Linkedin

Page 2: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

!  Provide context for unconventional allocation of space or design practice among staff during concept planning;

! Allow lay audience members to visualize how public roadway or right of way space may be changed versus more traditional engineering strip maps or text descriptions; and

! Communicate ‘best practice’ design standards in a local context.

Page 3: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 4: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Convert Main Street back into two way flow without reconstruction costs. [Status: Roadway converted to two way traffic but back-in parking not used here, though used elsewhere.]

Page 5: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 6: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 7: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative drive through design that would not effect pedestrian space on a sidewalk in high capacity transit zone versus conventional Project Developer proposed drive through. [Status: walk up ATM built for bank and drive though not built.]

Page 8: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 9: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Seeking developer and council support of an alternative intersection design, as the first modern roundabout for downtown. Client: Development Review and Public Works [End result: roundabout built]

Page 10: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 11: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative roadway lane layout based on a queuing street to improve bike and pedestrian safety along heritage arterial streets with limited width. [2016 Status: street restriped “as-is”]

Page 12: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 13: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 14: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 15: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of updated parking lot layout and circulation standards to improve pedestrian access and safety. [End result: Staff dialog generated and some pedestrian enhancements adopted.]

Page 16: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 17: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 18: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative roadway lane layout to improve bike safety and property access. [End result: bike lane added.]

Page 19: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative roadway lane layout to improve bike safety and property access. [Status: waiting for Walmart development to install refuge island.]

Page 20: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 21: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative arterial bikeway link and use of new design treatments. [End result: conventional bike lane built but road converted to two way traffic flow.]

Page 22: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative arterial bikeway link and use of new design treatments. [End result: blue conflict bike lane not used here.]

Page 23: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger
Page 24: 2016 Bikeway Project Concept Simulations 2000 to 2013 - Boulanger

Task: Development of an alternative arterial lane layout to provide safer bike access and tourism for rural Oregon town. [Status: not yet built]