Mark D. Usherwood Alhambra, California Email: [email protected] Objective: Obtain the position of Construction / Senior Project Superintendent at your company Career Profile Summary: A seasoned professional superintendent in the construction industry with 10 plus years of experience. Diverse experiences and knowledge from projects ranging in heavy construction, retail, commercial, restaurants and high-rise residential. College Graduate holding a variety of construction related certificates. Canadian & USA status for employment. Concrete, Structural Steel, Wood Frame Const. Education Institutes, Seniors Residences High Rise Residential Construction 1,000,000 sqft Warehouses Office Towers & Complexes Parking Structure 12 Floors into solid rock Commercial, Retail, Restaurants Construction Tenant Fit-Up & Demolition Accomplishments: Completed projects with value up to $80 million dollars Career total employer gross revenue over $500 million dollars Safety record with no fatalities or critical injuries on a project Maximizes schedule tasks on a critical paths using Microsoft Project Software Career Summary 15+ years in Supervisors role 15+ years in Superintendents role 15+ years in High Rise Commercial & Residential Construction 10+ years in Commercial, Retail, Restaurant Construction 5 years in Tenant Improvement & Demolition Construction 5 years Non Construction Work Skills & Assets: Problem Solver: analytical, inventive, investigative, adaptable, practical, inventive Communication: respectful, cooperative with diplomatic outlook, open minded, good listener Records Keeping: detail written and computer logs and reports and schedules Site Management: operations supervision, scheduling, cost controls, site performance, and safety Education: Algonquin College, (Ottawa, Ontario, Canada) Construction / Survey Technologist, (Ottawa, Ontario, Canada) Construction / Survey Technician, (Ottawa, Ontario, Canada) M. Usherwood, Alhambra, California Page 1 of 13

Upload: mark-usherwood

Post on 08-Jan-2017

139 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2016 complete Resume USA

Mark D. Usherwood Alhambra, California Email: [email protected]

Objective: Obtain the position of Construction / Senior Project Superintendent at your company

Career Profile Summary: A seasoned professional superintendent in the construction industry with 10 plus years of experience. Diverse experiences and knowledge from projects ranging in heavy construction, retail, commercial, restaurants and high-rise residential. College Graduate holding a variety of construction related certificates. Canadian & USA status for employment.

Concrete, Structural Steel, Wood Frame Const. Education Institutes, Seniors ResidencesHigh Rise Residential Construction 1,000,000 sqft WarehousesOffice Towers & Complexes Parking Structure 12 Floors into solid rockCommercial, Retail, Restaurants Construction Tenant Fit-Up & Demolition

Accomplishments: Completed projects with value up to $80 million dollars Career total employer gross revenue over $500 million dollars Safety record with no fatalities or critical injuries on a project Maximizes schedule tasks on a critical paths using Microsoft Project Software

Career Summary 15+ years in Supervisors role 15+ years in Superintendents role 15+ years in High Rise Commercial & Residential Construction 10+ years in Commercial, Retail, Restaurant Construction 5 years in Tenant Improvement & Demolition Construction 5 years Non Construction Work

Skills & Assets:Problem Solver: analytical, inventive, investigative, adaptable, practical, inventiveCommunication: respectful, cooperative with diplomatic outlook, open minded, good listenerRecords Keeping: detail written and computer logs and reports and schedulesSite Management: operations supervision, scheduling, cost controls, site performance, and safety

Education: Algonquin College, (Ottawa, Ontario, Canada) Construction / Survey Technologist, (Ottawa, Ontario, Canada) Construction / Survey Technician, (Ottawa, Ontario, Canada) Member of Certified Engineering Technicians and Technologists (Canada) Member of Certified Survey Technicians and Technologists (Alberta, Canada) Certified Survey Instrument man (Alberta, Canada) Certified Materials Inspector (Alberta, Canada) Health & Safety Core Training level 2 certifications (Ontario Canada)

Work History:ITC Construction, Calgary, Alberta, Senior Project Superintendent May 2013 to May 2015H&R Block, Oceanside, CA, Customer Service Professional Jan. 2013 to Apr. 2013Resolute Contractors Inc, San Juan Capistrano, CA, Project Superintendent Sept. 2012 to Dec. 2012Labor Ready, Commerce, CA, General Labor / Warehouse Jan. 2012 to Sept. 2012Safeway Canada, Surrey, BC, Canada, Bakers Assistant June 2010 to Dec. 2011AnaCare Kennels, Surrey, BC, Canada, Volunteer Work Aug. 2009 to Jan. 2010Scott Construction, Vancouver, BC Canada, Project Superintendent June 2007 to Feb. 2009Claridge Homes, Ottawa, ONT, Canada, Project Superintendent Nov. 2003 to May 2007Ashcroft Homes, Ottawa, ONT Canada, Project Superintendent Feb. 2001 to Oct. 2003

M. Usherwood, Alhambra, California Page 1 of 11

Page 2: 2016 complete Resume USA

CONSTRUCTION WORK EXPERIENCECONSTRUCTION WORK EXPERIENCE

Project Superintendent Duties & PositionsProject Superintendent Duties & Positions Supervised site construction from start to finish Trained and mentored new staff; coordinated daily activities Ensured projects were done according to plans and specifications Planned, maintained and monitored construction schedule Managed site offices and completed all relevant paperwork Handled daily challenges and emergencies, and resolved issues Ensured construction safety and health plans were implemented Liaised diplomatically with project managers, consultants and owners

Project Superintendent, ITC Group, Calgary, Alberta May 2013 to May 2015, Shortage of Work 1912 Cross / Sobow, Twin Towers 6 Storey Condos

Project Superintendent, Resolute Contractors, San Juan Capistrano, CA Sept. to Dec. 2012, Shortage of Work DXL Menswear Store: Tenant Fit-Up to existing 60 year building

Project Superintendent, Scott Construction Group, Vancouver, BC June 2007 toFeb.2009, Shortage of Work The Villa Parkade Renovation: renovation of existing casino, parkade

expansion and office structure The Vine Residential, Retail and Commercial Complex

Project Superintendent, Claridge Homes, Ottawa, ON Nov. 2003 to May 2007, Career relocation to Vancouver The Pinnacle: 23-floor high-rise condominium 700 Sussex: 10-floor high-end condominium York Street Plaza: 14-floor high-rise with 3 floors of bachelor walkup units

Project Superintendent, Ashcroft Homes, Ottawa, ON Feb. 2002 to Oct. 2003, Shortage of Work The Broadway: 10-floor high-rise condominium

Project Superintendent, Westeinde Construction, Ottawa, ON Sept. 1995 to Jan. 2002, Shortage of Work Denny’s Restaurants (various locations) Algonquin College Saudi Arabia Embassy Michael’s Store Canadian Tire Store Loblaws Super Store Chapter’s Book Store RCMP Forensic Laboratories Ottawa International Airport Services Building

Assistant Superintendent, Zielder & Walker, Ottawa, ON Oct. 1992 to Sept. 1995, Shortage of Work Newbridge Capulum Phase 2 Newbridge Tower Phase 4 Newbridge Building Phase 5 Newbridge Operations Centre River Park Seniors Residence

Assistant Superintendent, Paul Daoust Construction, Ottawa, ON Apr. 1991 to Sept 1992, Shortage of Work Residence Saint Louis St. Peter’s High School

Field Engineer, Zielder & Walker, Ottawa, ON Feb. 1989 to Feb. 1991, Shortage of Work Algonquin College Daycare Newbridge Microsystems Building

M. Usherwood, Alhambra, California Page 2 of 11

Page 3: 2016 complete Resume USA

Mailroom Parking Garage Newbridge Crosskeys Building

Superintendent, H.J. MacFarland Construction, Ottawa, ON Apr. 1987 to Jan. 1989, Career Change to Building Construction Centrepoint Drive Reconstruction Wellington Street Reconstruction

Field Engineer, Dev-Con / Citicom Developments, Ottawa, ON July 1986 to Apr. 1987, Shortage of Work Gallery Court: 6-floor high-end condominium

Field Engineer, H.J. MacFarland Construction, Ottawa, ON June 1985 to July 1986, Career Change Queen Elizabeth Parkway Hunt Club Road Reconstruction Rideau Heights Industrial Development City of Almonte, Road Resurfacing

Survey Technician, Alberta Transportation Department, Leduc Region, AB Feb 1981 to June 1985, Relocated back to Ontario Various provincial and secondary highway construction projects

Survey Technician, Midwest Surveys, Edmonton, AB May 1981 to Jan 1985, Career Position Change Oil leases from Medicine Hat to Fort McMurray / Jasper to Lloyd Minster

M. Usherwood, Alhambra, California Page 3 of 11

Page 4: 2016 complete Resume USA

M. Usherwood, Alhambra, California Page 4 of 11

Page 5: 2016 complete Resume USA

M. Usherwood, Alhambra, California Page 5 of 11

Page 6: 2016 complete Resume USA

Types of Building Projects & Values

ITC Group May 2013 to May 2015 Project Superintendent1912 Cross / Sobow Phase 2, Calgary AB

Upgrade from existing concrete foundation, partial steel structure stop in 2008 Twin Towers 6 Storey connected by a Atrium/Link 120 Units ranging in price from $320,000 to $900,000, 70% Sold Out Concrete Structure Brick, Metal and Window Wall Exterior Design Green Construction Project Management, Lump Sum Price Value $32 million

Resolute Contractors Sept 2012 to Dec 2012 Project SuperintendentDXL Menswear Retail Box Store, Fresno CA

Tenant Fit-Up 11,000 Sq. Ft. Tenant Fit-Up in a 60 year old existing strip mall. Tenant Improvements, Retro Fit to existing structure Project Management, Lump Sum Price Value $3 million

Scott Construction June 2007 to Feb. 2009 Project Superintendent The Villa Casino Parkade Renovation (Burnaby)

Upgrade to existing parkade / Burnaby Casino Tenant Improvements Concrete & Structural Steel Structure Demolition of Casino and upgrading with 3 new elevators Additional 2 levels of parking with seismic upgrades Project Management Value $15 million

The Vine Complex (Vancouver) New 3 Tower Residential, Commercial / Retail Concrete Structure with Brick face Project Management Value $40 million

Claridge Homes Nov. 2003 to May 2007 Project Superintendent The Pinnacle (Ottawa)

M. Usherwood, Alhambra, California Page 6 of 11

Page 7: 2016 complete Resume USA

High Rise Residential Concrete Structure with Curtainwall & Brick 12 levels of underground parking (solid rock) Developer / Project Management Value $35 million

700 Sussex (Ottawa) Luxury High Rise Residential Concrete Structure with Curtainwall & Stone Masonry Developer / Government / Project Management Value $80 million

York Street Plaza (Ottawa) High Rise Residential Concrete Structure with Curtainwall & Brick Developer / Project Management Value $25 million

Ashcroft Homes Feb. 2002 to Oct. 2003 Project Superintendent The Broadway (Ottawa)

High Rise Residential Concrete & Brick Developer / Project Management Value $25million

Westiende Construction Sept. 1995 to Jan. 2002 Project Superintendent Denny’s Restaurant (8 locations)

Commercial Project Wood frame & Brick Construction Project Management / General Contract Value $6 million

Saudi Arabia Embassy (Ottawa) Residential, Commercial “Base Building” Embassy, Consulate, Residence Concrete Structure, Stone Masonry General Contract Value $50 million

Ottawa International Airport (Ottawa) Demolition General Contract

M. Usherwood, Alhambra, California Page 7 of 11

Page 8: 2016 complete Resume USA

Value $4 million

Canadian Tire Store (Ottawa) Box Store, “B” Size, Retail Concrete & Structural Steel General Contract Value $15 million

RCMP Forensic Laboratories (Ottawa) Institutional Concrete & Precast Partnership Management / Project Management / Government Value $30 million

Chapters Book Store (Ottawa) Retail Box Store Concrete & Structural Steel, STO Exterior General Contract Value $14 million

Algonquin College Lan / IT (Ottawa) Institutional Tenant Improvement Demolition, Refit & Upgrade Lan /IT upgrade Design Built Value $10 million

Michaels Store (Ottawa) Retail Box Store “ Base Building” Concrete & Structural Steel General Contract Value $ 10 million

Loblaws Superstore (Ottawa) Retail Box Store Concrete & Structural Steel General Contract

M. Usherwood, Alhambra, California Page 8 of 11

Page 9: 2016 complete Resume USA

Value $ 20 million

Zieldler & Walker Oct. 1992 to Sept. 1995 Project Assistant Superintendent Newbridge Capulum Phase 2 (Ottawa)

Commercial / High Tech Concrete, Structural Steel, Precast Project Management Value $15 million

River Park Seniors Residence (Ottawa) Institutional Concrete & Brick General Contract Value $20 million

Newbridge Phase 5 Building (Ottawa) Commercial / High Tech Concrete Structure & Brick Project Management Value $ 18 million

Newbridge Operations Center (Ottawa) Commercial / High Tech Concrete & Structural Steel Project Management Value $ 15 million

Newbridge Tower Phase 4 (Ottawa) Commercial / High Tech Concrete Structure & Brick Project Management Value $18 million

Paul Daoust Construction Apr. 1991 to Sept. 1992 Assistant Superintendent Residence Saint Louis (Ottawa)

Seniors Residence / Institutional New and Tenant Improvements Concrete & STO, Demolition & Restoration

M. Usherwood, Alhambra, California Page 9 of 11

Page 10: 2016 complete Resume USA

Project Management Value $25 million

St. Peters High School (Ottawa) Institutional Concrete, Structural Steel & Load Bearing Masonry, Brick & Precast Block General Contract / Project Management Value $25 million

Zeilder & Walker Feb. 1989 to Feb. 1991 Field EngineerAlgonquin College Daycare (Ottawa)

Institutional Base Building Shell Concrete & Structural Steel Project Management Value $2.5 million

Newbridge Microsystem Building (Ottawa) Commercial / High Tech Demolition & Restoration Tenant Improvements New facilities upgrade Project Management Value $15 million

Malbron Parking Garage (Ottawa) Parking level addition & upgrade Tenant Improvements Concrete Structure General Contract / Project Management Value $5 million

Newbridge Crosskeys Building (Ottawa) Commercial / High Tech Concrete & Structural Steel, Precast Project Management Value $12 million

M. Usherwood, Alhambra, California Page 10 of 11

Page 11: 2016 complete Resume USA

Dev-Con / Citicom Developments July 1986 to Apr. 1987 Field Engineer Gallery Court (Ottawa)

Luxury High Rise Residential Concrete Structure, Precast, Arch Block, Brick Developer, Project Management Value $50 million

References:

Will Supply Upon Request

M. Usherwood, Alhambra, California Page 11 of 11