2016 Energy Report
1Revision0 September2016
Table of Contents ExecutiveSummary..................................................................2
UtilitiesOverview......................................................................3
AvoidedCost................................................................................4
CarbonFootprint.......................................................................5
BenchmarkingColoradoCollege.........................................6
Benchmarking Educational Facilities.................................9
Benchmarking Residential Facilities...............................10
Benchmarking Support Facilities......................................11
UtilityRates...............................................................................12
2016SustainabilityProjects..............................................13
2017SustainabilityProjects..............................................16
2016 Energy Report
2Revision0 September2016
Executive Summary TheFacilitiesServicesDepartmentatColoradoCollege(CC)iscommittedtotakingactiontomeettheCollege’scarbongoals.ThestewardshipofresourcesandutilitiesmanagementisoneoftheprimarystrategicinitiativesoftheTechnicalServicesDepartment.InFY16,CCexperienceda3.1%decreaseinenergyconsumption.Since2008campusenergyintensitypersquarefoothasdecreased25.8%.Cumulativeavoidedcostsforutilitiesareestimatedtobenearly$4.0Msincethe2008baselineyear.Notableaccomplishmentsfor2016are:
x Cost – The College experience cost reductions in each utility area. A significantportion of the annual utilities budget was returned to support other missionessentialservicesandfunctions.
x RenewableEnergyProduction‐Thisyear7.5%oftheelectricityusedoncampuswasproducedfromsolar.3.5%oftheelectricityconsumedwasproducedfromoncampusrenewableenergyplatforms.
x Recognitions – In 2015, Colorado College achieved a gold rating from theAssociation for the Advancement of Sustainability in Higher Education (ASHEE)SustainabilityTracking,Assessment,andRatingsSystem(STARS).
x 2016SustainabilityProjects–ThisyearCCcompleteda largequantityofprojectswiththepurposeofsupportingcampusenergyefficiencygoals.Completedprojectsinclude the conversion to LED lighting in many facilities on campus, studentinstallation of PV solar at the Baca Campus, and sustainable design for the TuttLibraryProject. Repairsweremadetothepoolandcentralcoolingplantreducingwater consumption by approximately 4.1M gallons for 2016. More detail on thisyear’scompletedprojectsbeginsonpage13ofthisreport.
x 2017SustainabilityProjects–Wehaveanexcitinglistofprojectsonthehorizonforfiscal year 17. Projects include sustainable design for the East Campus HousingProject, continued LED lighting retrofits, and continued energy efficiencyimprovementsattheCentralPlant.Moredetailontheseprojectsbeginsonpage16ofthisreport.
2016 Energy Report
3Revision0 September2016
Utilities Overview
x Forthe2016academicyear,ColoradoCollege’smaincampusenergyrelatedcharacteristicswere:
o Approximately2,034,520squarefeet(SF)ofspaceo Approximately95acresoflando 162Buildings
x Forthe2016academicyear,ColoradoCollege’smaincampusenergyperformance
statisticswere:
o Energyuseaveraged78.1kBtupersquarefoot(SF)� 3.1%decreaseoverpreviousyear� 7.5%ofelectricityfromrenewablesources
o Energycostsaveraged$0.82perSF� 11.9%decreaseoverpreviousyear� $4.0Minavoidedcostssince2008
o MTCO2emissionsfromenergyuseaveraged0.0090MTCO2eperSF� 3.6%increaseoverpreviousyear� 25.8%decreasesince2008
2016 Energy Report
4Revision0 September2016
Avoided Cost Thecumulativecampusutilitycostavoidancecomparedtothecampusbaselineof2008isestimatedat$4.0M. Theavoidedcost for the2016academicyear is estimatedat$706K.Thesenumbersreflectcombinedutilitysavings,which includeavoidedelectricity,naturalgas,water,andwastewatercosts. Belowisagraphicalrepresentationofoverallavoidedutilitycosts(areainblue).
2016 Energy Report
5Revision0 September2016
Carbon Footprint ColoradoCollege’scommitmenttobecomecarbonneutralstemsfromtheCollege’ssigningof the Presidents’ Climate Commitment in early 2009. The College’s carbon footprint, in2008, from energy use is estimated at 24,437metric tons of CO2 (MTCO2). Since 2008,ColoradoCollegehasmadesteadyprogresstowarditscarbonneutralitygoal.For2016,theCollege’scarbonemissionsfromenergyuseareestimatedat18,382MTCO2forareductionof24.8%comparedtothe2008baseline.Thisyearcarbonemissionsincreasedduetotheexpiration of the College’s wind purchasing agreement. These measurements assume aconsistentColoradoSpringsUtilities(CSU)fuelmixandincludeemissionsaschartedbelow:
2016 Energy Report
6Revision0 September2016
Benchmarking Colorado College ColoradoCollege has closelymonitored anddocumentedoverall campus energy and costintensity since 2008. For reference, the Association of Physical Plant Administrators(APPA),whorepresentsthelargestinternationalassociationofeducationalinstitutionsandtheir facilities departments, list the 2014 average energy intensity for higher educationfacilitiesat130kBtu/SF/Yr.APPAliststheaverageutilitiescostpersquarefootat$2.46/SF. The chart illustrates that CC’s performance far exceeds both figureswith an averageenergy intensity of 78kBtu/SF/Yr and energy cost of $0.82/SF. The chart confirmsCC’ssustaineddeclineinbothenergycostandconsumption(use).
One factor that is unclear is what effect CC’s block plan has on our overall energy useintensity. Theblock is thought to requiremore educational spacebecause all spaces areused simultaneously. For comparison, the following annual kBtu/SF/Yr numbers werecalculatedusingthemostrecentASHEESTARSdataatcomparableinstitutions:
x ColbyCollege 144kBtu/SF 12/2014datax ColgateUniversity 161kBtu/SF 07/2013datax MiddleburyCollege 137kBtu/SF 05/2014datax PomonaCollege 114kBtu/SF 10/2015datax UniversityofDenver 104kBtu/SF 02/2016datax UniversityofColoradoBoulder 144kBtu/SF 09/2014datax WilliamsCollege 148kBtu/SF 02/2016data
2016 Energy Report
7Revision0
Thechartabovebreaksdownexpensesbyutilitycommodity.Themostnotableinformationis the continued pressure on water rates and the sustained trend of reduction inconsumptionineachutility.Thechartsbelowgivemoredetailontheserelationships.
2016 Energy Report
8Revision0 September2016
This is the fourth year for energy benchmarking at the building level. In 2011, thermalmetering was installed. Thermal metering has enabled CC to measure the amount ofheating and cooling energy flowing from the central plant to respective buildings. Thefollowingchartsaretheresultofbuildinglevelthermalandelectricalmetering.
2016 Energy Report
12Revision0 September2016
Utility Rates CChasmadesignificantimprovementsinreducingutilityconsumptionsince2008.Becauseof these improvements, total costs are relatively unchanged evenwith increases inmostutilityrates.Thechartsbelowshowthevariationincommodityratesperunitexperiencedby CC since 2008. Electricity and water rate increases have seen larger than expectedupwardpressure.Naturalgascostshavedeclinedduetomarketconditions.
InJulyof2016theETLelectricratewhichaccountsformostofthebuildingssquarefootageatCC increased12%. On January1st,2017weareexpectingColoradoSpringsUtilities tochangeratesasfollows:
x Electric12%increase(ETLrate)x Water6%increasex Wastewater4%increase
2016 Energy Report
13Revision0 September2016
2016 Sustainability Projects
BacaPVSolarProjectStatus:CompleteProjectDescription:TheBacaPVsolarprojectisnearlycomplete.Thisprojectisdesignedtoprovidemorepower than isconsumedat theBacaCampus. Theproject isahandsonopportunityforstudentstolearnaboutrenewableenergy.ThepicturebelowisofstudentswhoparticipatedintheseconddayofinstallationaspartofearlynewstudentorientationAugust2016.ProjectHighlights:
x Studentinstalledx 2–15.5kWPVarrays
2016 Energy Report
14Revision0 September2016
SchlessmanPoolWaterConservationProjectStatus:CompleteProject Description: The Schlessman pool water conservation project reduced waterconsumptionatthepool.Ourbenchmarkingeffortshaverevealedthatthepoolconsumedmore than760,000cubic feet (CF)ofwaterduring the2015academicyear. Evaporationcalculationsestimatedtheannualconsumptionfromevaporationforthepooltobe~57,000CF. FacilitiesServicesperformedextensivetestingandmaderepairstothepoolpipingtocorrect the problem. For the 2016 academic yearwater consumption on themeter thatserves the pool and central cooling plant water consumption has been reduced byapproximately4.1Mgallons.
TuttLibraryDesignReview
ProjectStatus:CompleteProject Description: The Tutt Library design review project was a continuous effort toensure the owners project requirements are accurately captured in the building’s designdocuments.ThenewTuttLibraryistobeabuildingwhosedesignteachescriticallessonsabouthowtocreateandsustainhealthy,productive,andflexiblestudent,staff,andfacultyspaces.ThepurposeofthisprojectistomakesurethatthedesignmeetsColoradoCollege’sinnovative high performance standards. High performance at Colorado College meansachieving the optimal balance between maximizing building performance and occupantcomfort while minimizing operational life cycle cost, energy consumption and carbonemissions. Achieving high performance design requires collaboration and integratedsolutionsfromeachdisciplineofthedesignteamandownercollaborationthroughoutthedesignprocess.ProjectHighlights:TheTuttLibraryProjecthighperformancedesigngoalistoachievethefollowinglevelsofsustainablebuildingperformanceinthenewlibrary.
x NetBuildingEnergyUse=0kBtu/SF/Yrorlessx NetCarbonEmission=0MTCO2e/Yrorlessx AnnualEnergyCost=$0.50/SF/Yrorlessx TotalBuildingEnvelopePerformance(U)=.05orlessx IndoorAirQuality=700PPMCO2orlessduringoccupiedtimesx OccupantComfort=±2°Forlessfromsetpointx ArtificialLighting=.3W/SForlessx BuildingPowerFactor=notlessthan0.95laggingattheutilitymeterx A building that educates occupants about its sustainable features and how to
properlyusethem.x Abuildingthatsupportscampusrecyclingpractices.
EastCampusHousingDesignProjectStatus:CompleteProject Description: The east campus housing design project is the production ofmechanicalandplumbingdesigndocumentsforeastcampushousingprojectconsistingof5separatestructures. Thedesignsarebeingcompletedin‐housebytheFacilitiesTechnical
2016 Energy Report
15Revision0 September2016
ServicesDepartmentandincludeapremiumefficiencygeo‐exchangeheatpumpsystemforbuildingheating.
HonnenFirmNaturalGasTransportation
ProjectStatus:CompleteProjectDescription:TheHonnenfirmnaturalgastransportationprojectisachangeinthewaywebuynaturalgasforourHonnenIceArena.PreviouslywepurchasednaturalgasatHonnen Ice Arena on an interruptible rate meaning Colorado Springs Utilities can stopnatural gas delivery to us at any time. When this happens,Honnen IceArena iswithoutheat.Thisprojectmovesusfrominterruptibleservicetofirmservicemeaningourservicecannotbeinterrupted.ForthisprojecttheCollegeutilizeditsexistingcontracttopurchasenaturalgasfromCenterPointeEnergy.ProjectHighlights:
x Firmnaturalgassupplyx Utilizesexistingcapacity
MonthlyBuildingAutomationReviewProjectStatus:OngoingProjectDescription: Themonthlybuildingautomationreviewprojectisaperiodicreviewwithstakeholderstoreviewbuildingperformancethroughthebuildingautomationsystemandmakeadjustmentsasneeded.Thisperiodicreviewisusedtocommissionnewprojects,troubleshootcontrolsissues,andretro‐commissionbuildingsthatarenotoperatingattheirpeakefficiency.
ElPomarEfficiencyUpgradesProjectStatus:OngoingProjectDescription:TheElPomarenergyefficiencyupgradesprojectincludeslightingandcontrols retrofits to improve building energy efficiency. El Pomar is one of the mostexpensive facilitiesoncampus forelectricityaveragingover$0.15/kWhmaking it agreatopportunityforefficiencyupgrades.SofarwehavecompletedLEDlightingretrofitsintheauxiliary gym, squash, and racket ball courts. These retrofits reduced lighting energyconsumptionbymorethan70%intheseareas.ThisyearwehavecompletedtheadditionofoccupancysensorsthatcontroltheHVACsystemoperationinlargespaces.
CampusLEDLightingUpgradesProjectStatus:OngoingProject Description: The campus LED lighting upgrade project is an ongoing project toreplace lightingoncampuswithmoreefficientLEDlighting. Thisproject leveragesutilityrebatestoassistwiththerestorationandreplacementofcampuslighting.ProjectHighlights:
x Takesadvantageofutilityrebatesx Improveslightinglevelsx Reducesenergyconsumption
2016 Energy Report
16Revision0 September2016
2017 Sustainability Projects
ElPomarElectricalServiceUpgradesProjectStatus:CompleteProjectDescription:TheElPomarelectricalserviceupgradesprojectwillsplitthebuildingselectrical service. Due to demand at El Pomar the building experiences rates as high as$018/kWhwhichismorethandoublethecampusaverageof$0.085/kWh. Thebuildingsuseprofileisuniquebecauseitspeakdemandoccursbetween4pmand10pmduringthewinterwhichisanon‐peakperiod.Duringthistimestudentareutilizingthefitnesscenterandthefieldlights.AddingmetersandmovethefacilityfromtheETLratetotheE2Cratewhich does not charge for demand. The project will yield approximately a 3 to 5 yearpayback.ProjectHighlights:
x Reducesenergycosts
CampusControlsUpgradesPhase2ProjectStatus:ConstructionProject Description: This project is phase 2 of a 3 phase project to replace obsoletecontrols on campus with the latest platform of direct digital controls. The updatedcontrols allow the College to apply more sophisticated logic and manage energyconsumptionmore closely. In addition to updating controls, the project allowsmorespace for archiving data and alarms. This data is essential for benchmarkingcontinuousoperationalimprovements.
CentralPlantControlsUpgradePhase2ProjectStatus:ConstructionProjectDescription: The centralplant controlsupgradephase2projectwill improve theautomation of the central plant heating operation. The controls work includes addingcontrolsandsystemlogictoenableremotestartingandautomatetemperaturemodulationof the high temperature hot water generators and distribution system pumps. Thesecontrolsoptimize centralheatingplant reliability andefficiency. Theprojectwill expandalarms for safety allowing the plant to be controlled remotely and left unmanned forextendedperiodsbeyondjustthesummer.Theextendedperiodsoftimewillallowcentralplant operators time to perform maintenance activities on the distribution system andrespondtoafter‐hoursemergenciesoncampus.ProjectHighlights:
x Improvescentralplantefficiencyx Improvessystemreliabilityx Improvesafterhoursresponsetocampusemergencies
2016 Energy Report
17Revision0 September2016
CutlerHVACSystemReplacementProjectStatus:DesignProject Description: This project will replace the existing heating, ventilation and airconditioning (HVAC) systems at Cutler Hall. Currently Cutler utilizes steam for heatingprovided from Bemis Hall. The system does not have good zone control, so as a resultoccupants are often too hot or too cold. The new system will utilize a new variablerefrigerant flow heat pump system to maximize occupant comfort and efficiency whilemaintainingthehistoriccharacteristicsofthebuilding. Thesystemwillalsohelpsupportrenovationtorepurposethesecondfloorofthefacility.ProjectHighlights:
x Improvedsystemreliability&efficiencyx Improvedoccupantcomfort
BarnesRepair1st&3rdFloorHeatingPiping
ProjectStatus:PlanningProjectDescription:Barnesrepair1st&3rdfloorpipingisthethirdphaseofpipingrepairsin Barnes Science Center. The project includeswork toweld leaky Victaulic fittings andreplacepneumaticcontrolsonthe1st&3rdfloor.Theprojectsavesenergybecausetheoldpiping must be maintained at higher operating temperatures through the summer topreventleaking.Weldingthepipingwillallowheatingsystemtemperaturestobesetbackinthesummer.ProjectHighlights:
x Summerenergysavingsx Improvedsystemreliabilityx Improvedoccupantcomfort
CentralPlantWaterConservation&HeatRecoveryProjectStatus:PlanningProject Description: The central plant water conservations & heat recovery project willwork to optimizewater use and heat recovery at the central plant. Currentlywe utilizedomesticwatertocoolthebearingsonourcentralhightemperaturehotwaterpumps.Thisprojectwouldautomatetheflowofwatertothesepumpsandlookatrecoveringheatfromthiswater.Therecoveredheatcouldbesenttoeitherthelowtemperatureheatinglooporthechilledwater loopduring theheatingseason. Theprojectwillalso lookatrecoveringheatfromtheicerinkcoolingtower.ProjectHighlights:
x Improvescentralplantefficiencyx Reduceswateruseandcost
2016 Energy Report
18Revision0 September2016
CornerstoneRetro‐CommissioningProjectStatus:PlanningProjectDescription: TheCornerstoneretro‐commissioningprojectwillreducetheoverallenergy intensity at Cornerstone Arts Center. The project is to evaluate the operation ofbuilding systems and return them to the intended design parameters. From thereadditional savingsopportunitieswillbe identifiedandpursued tomaximize thebuildingsenergyperformance.Currentlythebuildingutilizeslargequantitiesofoutsideair.Aspartof thisprojectwewill attempt tominimize theamountof conditionedair that leaves thebuildingwhenindoorairqualityisatacceptablelevels.Inmanycasescommissioningworkalsoimprovesoccupantcomfort.
FineArtsCenterEnergyAuditandCommissioningProjectStatus:PlanningProject Description: The Fine Arts Center energy audit and commissioning project willevaluateandproposeprojectsforreducingtheoverallenergyintensity,associatedcarbonemissions, and cost at the Colorado Springs Fine Arts Center at Colorado College. Theevaluation will study both utility supply and demand opportunities. The project willevaluatetheoperationofbuildingsystemsandcompletemakeminorsystemadjustmentsasneeded.