2016 PORT TRANSPORTATION IMPROVEMENT PLAN

DRAFT 1/13/2016

Page 2: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Acknowledgments

Port Transportation Team

Steve Bloomquist Emerald Bogue Tom Bouillion Mike Coleman

Sebastian Degens Rick Finn

Phil Healy Susie Lahsene Sean Loughran

Kathryn Williams Mark Witsoe

Port GIS Team

Ryan Campbell Chad Dettlaff

Paul Ferro Sim Ogle

Page 3: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 1

TABLE OF CONTENTS

Introduction ............................................................................................. 2

Goal and Objectives ................................................................................ 3

Assumptions ............................................................................................ 4

Project Funding ...................................................................................... 4

Port Priority Projects ............................................................................... 4

Cost Estimate Rating .............................................................................. 9

Project List ............................................................................................. 10

Priority Project Map .................................................................... 25

Priority Project Reports ........................................................................ 26

PDX/PIC Area Map ...................................................................... 46

PDX/PIC Project Reports ..................................................................... 47

Hillsboro Area Map ..................................................................... 57

Hillsboro Project Reports ..................................................................... 58

Marine Terminal and Rivergate Area Map................................. 60

Marine Terminal and Rivergate Area Project Reports ........................ 61

T2/Swan Island Area Map ........................................................... 75

T2/Swan Island Area Project Reports .................................................. 76

East County Area Map ................................................................ 79

East County Area Project Reports ....................................................... 80

Page 4: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 2

INTRODUCTION

The Port of Portland's mission is to provide competitive cargo and passenger access to regional, national and international markets while enhancing the region's quality of life. For the most part, the Port does not own or control the surrounding transportation system that provides access to its facilities.1 Good access to Port properties and marine and aviation facilities is a competitive advantage for the region’s businesses and residents. The region’s economy depends on efficient movement to and through the marine and aviation gateways. Therefore, improvements to the road, rail, water and transit systems that provide access to Port facilities are of vital interest to the Port and to the region’s and state’s businesses. Freight movement has historically played a large role in the development of the Portland area economy. Due to its location at the confluence of the Willamette and Columbia Rivers with access to the Pacific Ocean, Portland has long served as a major shipment point in the Pacific Northwest. In addition to the navigable waterways, Portland is also served by two Class 1 rail lines, two interstate highways and a network of other major roads. All of these factors contribute to Portland’s development as a major distribution center for freight. Several recent studies have substantiated the importance of investing in the transportation system and linked those investments to the region’s and state’s economic health. The Cost of Congestion to the Economy of the Portland Region (updated 2014), sponsored by a consortium of public agencies and private businesses, confirms the transportation dependency of the region’s economy and affirms that the region’s competitiveness is largely dependent upon its role as a gateway and distribution center. The study determined that improvements in the transportation system produce a 2:1 return for the economy.

The Commodity Flow Forecast Update (2006) produced by DRI/WEFA predicts a doubling of freight volume moving throughout the region in 30 years. This kind of growth will dramatically impact Port facilities and will require significant investments to ensure access to them. The magnitude of regional transportation access investments and their financing are addressed through Metro’s Regional Transportation Plan (RTP), 1 Roads owned and maintained by the Port of Portland include: NE Airport Way (between I-205 and the Airport terminal), 82nd Ave. (north of NE Alderwood Rd.), NE Frontage Rd., NE Mt. Hood Ave. (north of Airport Way), NE AirTrans Way, part of N Time Oil Rd., T-5 access road, T-6 access roads, old Marine Dr. (west of N Portland Rd.), Ramsey St. (west of Rivergate Blvd.) and other misc. access roads.

Page 5: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 3

Metro’s Transportation Improvement Program (MTIP) and the State Transportation Improvement Plan (STIP). Access needs critical to Port facilities are reflected in the Port Transportation Improvement Plan (PTIP).

GOAL AND OBJECTIVES

The Port Transportation Improvement Plan is a multimodal compilation of marine terminal, airport, road, rail, waterway, transit, bicycle, and pedestrian projects, normally identified through transportation and other studies managed by or in coordination with the Port. The plan also identifies a transportation demand management program to be implemented. The plan is designed to organize transportation and transportation-related improvement needs. The goal and objectives of the Port's Transportation Improvement Plan are as follows: Goal:

Maintain the strategic advantage provided by the transportation system in this region by addressing the surface access needs of businesses and passengers trying to reach national and international markets via Port facilities. Objectives:

• Identify 5, 10, and 20-year surface transportation system investments

that provide and maintain access to Port facilities and property developments.

• Develop a long-range vision for the financial implications of

transportation system investments, and integrate this long-range planning with the Port’s 5-year capital program.

• Increase public awareness of Port access needs on the city, state and

private rail carrier systems.

• Facilitate coordination between the Port and appropriate public and private transportation system stakeholders to make improvements and investments that enhance access to national and international markets for the region’s businesses and residents.

Page 6: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 4

ASSUMPTIONS

Contained within this document are projects generally developed from transportation studies based on the region’s assumptions about population and employment growth. These assumptions, developed by Metro in cooperation with all the jurisdictions in the region, are allocated to the land use designations of locally adopted comprehensive plans. As population and employment assumptions are updated, the needs of the transportation system are updated. The Port and other local governments participate in transportation systems studies to determine what parts of the surface transportation system (road/transit/rail/bicycle/pedestrian) are insufficient to meet the regional assumptions about passenger and freight movement. This document represents the Port’s assessment of the transportation system and the infrastructure necessary in order to achieve its mission. The PTIP helps the Port focus its transportation priorities and lets the public and the Port’s partner jurisdictions know which projects will need cooperative efforts.

PROJECT FUNDING

In recent years, the overall demand for transportation improvements at the local, state and federal levels has vastly exceeded available resources. The PTIP defines Port transportation needs over a 20-year time frame. Some of the transportation improvements are on Port properties, and some are on systems that are the legal responsibility of others but serve Port facilities. Funding for projects in the PTIP is expected from a number of sources, including the jurisdictions that have legal responsibility for the system and private interests that may benefit from the improvements. The project detail sheets identify the funding sources anticipated to implement these projects. Funds attributed to specific jurisdictions reflect specific funding commitments. Funds designated as “Committed Port Share” are in the Port’s approved budget. “Forecasted Port Share” indicates funds which the Port will obtain, whether from its own revenues or with funding from other sources. Where funds are listed as ‘Unfunded’, either a funding strategy has not yet been defined for the improvement, or changes in the project scope have impacted the existing funding strategy.

PORT PRIORITY PROJECTS

Port facilities support an array of transportation modes and present a wide range of project needs: marine and aviation terminal, road, rail, waterway, transit, bicycle and pedestrian improvements. The PTIP maps include surface transportation projects that improve or provide access to marine and aviation terminals. However, the ability of the marine and aviation terminals to provide the region’s businesses with access to markets also depends on the transportation system within the terminal facilities themselves.

Page 7: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 5

Many of the Port’s priority transportation projects will involve funding from other agencies and/or the private sector. A significant portion of these projects are off Port property on facilities owned and maintained by other jurisdictions and in areas that are significant transportation bottlenecks for access to national and international markets via Port facilities. Due to size, type and use of the facility, a cooperative funding arrangement among the affected parties will be necessary to adequately fund and implement these projects. A subgroup of high priority projects deemed to be of strategic value for the Port has been identified to warrant focused attention for obtaining cooperative funding this year.

High Priority Projects Involving Other Funding Sources1

Project Cost2

Map ID #

PDX Northside Redevelopment $5,800,000 3 PIC Ped/Bike Network $1,163,835 4 Cornfoot Road Multimodal Safety Improvements $3,626,000 6 T6 Crane Drives for Cranes 6380 and 6381 $2,000,000 12 Auto Import/Export Expansion $6,700,000 17 Rivergate Boulevard Overcrossing $18,000,000 25 Dredge Oregon Pipe, Scows, and Pontoons $10,200,000 29 New Dredge Tender $7,600,000 30

Notes: 1. Projects are not listed in order of priority.

2. Refer to Priority Reports for funding break-out For surface transportation projects, the following criteria determine which projects have been considered for cooperative funding:

1. The project improves access to Port terminals or properties and is critical to Port strategic development in either a) the next ten years, or b) the next twenty years, with aspects of the project required to begin within the next ten years.

2. The project also serves other city, regional, state or national transportation and/or economic functions.

3. The project is included or, prior to construction, will be included in the Regional Transportation Plan (RTP).

4. The project meets the eligibility criteria for federal funding.

Page 8: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 6

Priority Surface Transportation Projects

Involving Other Funding Sources1 Project Cost2

Map ID #

Alderwood Intersection @ Columbia Blvd. $5,527,534 1 Cully Intersection @ Columbia Blvd. $6,575,000 2 82nd Avenue/Airport Way Grade Separation $50,000,000 5 Time Oil Road Reconstruction $9,000,000 24 Swigert Way Extension $2,500,000 33 Graham Road $10,000,000 34 40 Mile Loop Trail: Blue Lake Park to Sundial Rd. $3,424,073 37 Sundial Road Improvements $3,200,000 38 Intelligent Transportation System (ITS) Improvements $680,000 15, 19, 27

Notes: 1. Projects are not listed in order of priority and generally do not include aviation or non-rail marine terminal capital projects. 2. Refer to Priority Reports for funding break-out.

For priority marine terminal and aviation capital projects, the following criteria determine which projects have been considered for cooperative funding:

1. The project improves operation of Port terminals or airports and is

critical to Port strategic development in the next ten years.

2. The project provides significant economic benefit to the region and state by a) improving market access for all terminal or airport users, or b) improving the operation of port tenant facilities that provide a significant number of jobs.

These projects are consistent with the Port’s adopted budget and long term capital forecast. Priority Marine Terminal Projects Involving

Other Funding Sources1 Project Cost2

Map ID#

Terminal 6 Container Crane Modernization $3,634,260 10 Terminal 6 Crane Drive Electronics $2,000,000 11 Terminal 6 Stormwater Improvements $5,000,000 16 Terminal 4 Pier 1 Site Preparation $34,000,000 18 Terminal 6 Wharf Optimization $1,500,000 22 Columbia River Jetty Refurbishment $75,000,000 23 Notes: 1. Projects are not listed in order of priority. 2. Refer to Priority Reports for funding break-out.

Page 9: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 7

Priority Aviation Projects Involving Other Funding Sources1

Project Cost2

Map ID#

HIO Relocate Charlie Pattern Landing Site $1,433,100 7 HIO Construct East Access Road $1,886,560 8 HIO Relocate Taxiway AA $4,700,000 9 TTD Reconstruct Runway 7-25 $12,534,000 35 TTD Rehabilitate Taxiway A $5,000,000 36 Notes: 1. Projects are not listed in order of priority. 2. Refer to Priority Reports for funding break-out.

PROJECT REPORTS AND MAPS

The following pages contain a list of all projects, followed by maps of project locations and individual project reports. The first map and group of reports are for priority projects in all locations. Following the priority projects are the other projects by area, along with area maps. It should be noted that the area maps include both priority and non-priority projects. The project reports include such details as a brief description, purpose, funding information, cost estimate rating, time frame, and strategic alignment. Acronym Key:

PIC Portland International Center PDX Portland International Airport WHI West Hayden Island TRIP Troutdale Reynolds Industrial Park TTD Troutdale Airport HIO Hillsboro Airport GVBP Gresham Vista Business Park

Time Frame: Projects identified in the PTIP are shown as occurring in the 5, 10, or 20-year time frames. Projects within the 5-year time frame are expected to occur within the next five years. Projects within the 10-year time frame are expected to occur between five and ten years from the time of PTIP adoption. Similarly, projects within the 20-year time frame are expected to occur between 10 and 20 years from the time of PTIP adoption. The time frames shown are estimates. The listing of a project in a given period does not ensure that it will be constructed in that time frame. Rather, projects will be constructed when transportation/business needs support them and when funding becomes available. For many projects, this need has already been identified. However, others depend on a variety of factors, including development at Port facilities and the changing challenges of the region’s transportation system.

Page 10: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 8

Port Strategic Plan Alignment The mission of the Port is to enhance the region’s economy and quality of life by providing efficient cargo and air passenger access to national and global markets. Critical to the Port’s effectiveness in implementing its mission are the following strategic areas of focus.

• Provide leadership around regional transportation infrastructure • Retain and grow key services (Aviation and Marine) • Be a regional leader in industrial land acquisition and development • Implement a Portwide environmental strategy that supports the Port’s

requirements, generates savings and maintains/builds regional credibility as an environmental steward

• Build a sustainable financial model • Strengthen the Port’s culture as a strategic asset

The project reports identify which of the strategic areas of focus the projects most closely align with. The first four areas of focus identified above are the primary categories of alignment. The following abbreviations of the above strategies are included in the project reports.

• Regional Leadership in Transportation • Retain and Grow Key Services • Regional Leadership in Industrial Lands • Portwide Environmental Strategy

Page 11: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Port of Portland 2016 Port Transportation Improvement Plan

Page 9

Cost Estimate Rating When applicable, the project reports shown in the PTIP contain cost estimate ratings. The purpose of the rating is to provide those using the estimates with a qualitative measure of its precision for a project. Since the precision of an estimate is a function of the clarity of project scope (scope accuracy) and the level of effort expended to produce the desired estimate (engineering effort), the rating scale is designed to reflect both of these factors. Below are the definitions of each of these categories.

Scope Accuracy Level 1 Project scope is defined.

Level 2 Project scope is conceptual. Scope lacks

detail due to potential permit requirements; unknown project conditions; limited knowledge of external impacts.

Level 3 Project scope has limited detail. Engineering Effort Level A Preliminary engineering has been

performed. Technical information is available, engineering calculations have been performed; clear understanding of the materials size and quantity needed to execute the job. Schedule is understood; staff and permitting is fairly clear. Contingency generally ranges between 15% and 20%.

Level B Conceptual engineering has been performed. Technical information is available, rough engineering calculations may have been performed, or similar information from previous similar work is compared and used. Contingency generally ranges between 20% and 30%.

Level C No engineering has been performed. Limited technical information is available and/or limited analysis has been performed. Contingency generally ranges between 40% and 50%.

Note: Projects that are the responsibility of a private entity or are the responsibility of another agency generally are not given cost estimate ratings. The costs listed are for the year the estimate was done. Due to cost escalation and other factors the projected costs will vary over time.

Page 12: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

PTIP MASTER PROJECT LIST

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

1 PDX/PICAlderwood and Columbia Blvd. Intersection

Widen and signalize intersection on Columbia Boulevard at Alderwood Rd.

Provide transportation link to the cargo area located within the south airport area and to support Columbia Corridor freight movement.

$5,527,5345

2 PDX/PICCully Blvd. and Columbia Blvd. Intersection

Widen and signalize intersection on Columbia Boulevard at Cully Blvd.

Provide transportation link to the cargo area located within the south airport area and to support Columbia Corridor freight movement.

$6,575,0005

3 PDX/PICPDX Northside Redevelopment

Redevelop the landside and airside properties north of Airport Way for commercial aviation, business aviation and PDX ancillary and support services.

Align these properties with current market conditions.

$5,800,0005

4 PDX/PICPIC Ped/Bike Network Construct bike and pedestrian facilities as shown in the CS/PIC Plan District.

Improve bike/ped circulation in PIC.

$1,163,83510

5 PDX/PIC82nd Ave./Airport Way Grade Separation

Construct grade-separated overcrossing. Provide efficient movement of traffic to PDX properties.

$75,000,00010

6 PDX/PICCornfoot Road Multimodal Safety Improvements

Provide a separated multi-use path on the north side of NE Cornfoot Road.

Increase safety and provide improved bicycle and pedestrian access along NE Cornfoot Road.

$3,626,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 10

Page 13: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

7 HillsboroHIO Relocate Charlie Pattern Landing Site

Construct a new landing site for helicopters that use the Charlie flight pattern at HIO.

Serve helicopter training operations, and avoid operations over noise sensitive residential zones.

$391,0005

8 HillsboroHIO Construct East Access Road

Construct a new public access point and tenant utilities on the east side of runway 12L/30R at HIO.

Future tenant development will require landside infrastructure to support its operation.

$1,886,5605

9 HillsboroHIO Relocate Taxiway AA Relocate a new taxiway AA. Replace existing taxiway AA with a new taxiway with the appropriate design separation from taxiway A. Construct a perimeter road extension between taxiway AA and existing tenant ramps.

$4,700,00010

10 RivergateTerminal 6 Container Crane Modernizations

The project will increase operating efficiencies and improve safety on Cranes 6373, 6374, 6375, and 6379.

The project will increase the reliability of cargo handling equipment, and provide more reliable service to customers.

$3,634,2605

11 RivergateTerminal 6 Crane Drive Electronics

Crane management system upgrades for Cranes 6373 and 6374.

Improve operational efficiencies for the container cranes.

$2,000,0005

12 RivergateT6 Crane Drives for Cranes 6380 and 6381

Crane management system upgrades for Cranes 6380 and 6381.

Improve operational efficiencies for the container cranes.

$2,000,0005

13 RivergateBarnes to Terminal 4 Rail Provide a new track from Barnes Yard to Terminal 4.

Improve rail access to Terminal 4.

$4,543,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 11

Page 14: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

14 RivergateKenton Rail Line Upgrade Upgrade existing track to second main track with new double track from Peninsula Junction to I-205 and increase track speeds between North Portland, Peninsula Junction, to Reynolds on UP's Kenton Line.

Expand rail capacity and reduce delays for greater efficiency.

$25,382,00010

15 RivergateRivergate ITS Intelligent Transportation System in Rivergate.

Improve traffic efficiency in Rivergate by connecting information about the roadway system to ODOT’s Highway information systems.

$480,0005

16 RivergateTerminal 6 Stormwater System

Design and construct a stormwater system. The project will modernize the storm drainage system in the container yard.

$5,000,0005

17 RivergateAuto Import /Export Expansion

The project will construct site improvements to expand the storage and processing capacity for auto imports and exports through Berth 601 at Terminal 6. By increasing the storage and processing capacity, throughput will be increased.

Increase the storage and processing capacity for auto imports and exports through Berth 601, thereby allowing for an increase of volumes, leading to increased employment.

$6,700,0005

18 RivergateTerminal 4 Pier 1 Site Preparation

Remove Berths 405 and 408, the grain leg platform and tower, and the grain elevator in the Pier 1 area of Terminal 4.

This project will facilitate the redevelopment of approximately 30 acres of vital marine industrial property in the Portland Harbor.

$34,000,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 12

Page 15: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

19 RivergateMarine Drive ITS Improvement

Install a CCTV at Portland Road and changeable message signs at N. Portland Road, North Vancouver Way and NE 185th Drive.

Improve traffic efficiency in the Columbia Corridor.

$200,00010

20 RivergateT5 Berth 503 Terminal Expansion

Construct a rail dumper pit, storage building, shiploader and berth improvements at Terminal 5 potash export facility.

The project will increase the throughput capacity of the facility.

$150,000,0005

21 RivergateTerminal 5 Entrance Road Provide improvements on the south side of the roadway as well as rail crossing improvements.

The project will address increased traffic needs.

$2,000,0005

22 RivergateTerminal 6 Wharf Optimization

Crane management system upgrades for Crane 6375. Crane travel improvements for Cranes 6380 and 6381.

Improve operational efficiencies for the container cranes.

$1,500,0005

23 RivergateColumbia River Mouth Jetty Refurbishment

Refurbish and repair the north and south jetties at the mouth of the Columbia River.

This is a critical repair of the jetties at the Columbia River Bar.

$75,000,0005

24 RivergateTime Oil Road Reconstruction

Reconstruct Time Oil Road. Provide improved access to South Rivergate industrial area.

$9,000,00010

25 RivergateRivergate Boulevard Overcrossing

Grade separate the South Rivergate Lead at Rivergate Blvd.

Improve rail and vehicle traffic flow in Rivergate Industrial District.

$18,000,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 13

Page 16: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

26 T2/Swan Island

Terminal 2 Crane Upgrades The project will modify and upgrade Cranes 2371 and 2372, located at Terminal 2. The improvements will increase the suitability and efficiency of the crane to handle bulk cargoes.

The improvements will increase the suitability and efficiency of the cranes to handle bulk cargoes.

$2,750,0005

27 T2/Swan Island

PSU ITS Expansion Expand PSU's existing web based ITS "count sensor" program beyond the freeway to some key arterials throughout the region and create a repository of regional freight data.

To secure truck flow and congestion data.

5

28 T2/Swan Island

Terminal 2 Rail Improvement

Add approximately 600 feet to the inner track (Track 10) and connect it with the outer loop (Track 15). A third track may also be constructed and a rail scaling station added in addition to stormwater improvements to the dock.

Increase rail capacity and operating efficiencies at Terminal 2.

$2,250,0005

29 T2/Swan Island

Dredge Oregon Pipe, Scows and Pontoons

Acquire 2,000 feet of dredge pipe, pontoons, anchor scows and anchors.

Allow Dredge Oregon to make full use of recent repower and pump material 14,000 feet.

$10,200,0005

30 T2/Swan Island

New Dredge Tender Replace the existing vintage tugboat W.L. Williams with a newly constructed modern work-boat vessel. Repower tugboat Clackamas.

Improve operational support for Dredge Oregon dredging operations and improve environmental performance

$7,600,0005

31 T2/Swan Island

T2 Crane Drives and Cabs for Cranes 2371 and 2372

Crane management system and cab upgrades for Cranes 2371 and 2372.

Improve operational efficiencies for the cargo handling cranes.

$2,600,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 14

Page 17: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

32 T2/Swan Island

Dredge Oregon Support Equipment

Repower or replace navigation equipment including support vessels and landside equipment such as bulldozers.

Improve productivity and environmental performance.

$2,000,0005

33 East CountySwigert Way Extension Extend Swigert Way from it existing terminus to Graham Road.

Improve access to Troutdale Reynolds Industrial Park.

$2,500,0005

34 East CountyGraham Road Reconstruct and/or widen Graham Road along and nearTroutdale Reynolds Industrial Park frontage.

Improve access to Troutdale Reynolds Industrial Park Phase 2.

$10,000,0005

35 East CountyTTD Reconstruct runway 7-25

Reconstruct existing 150' x 5400' runway; narrow to 75' wide, relocated/reconstruct edge lighting, construct required drainage improvements.

Project identified in 2004 TTD Master Plan.

$12,534,0005

36 East CountyTTD Rehabilitate Taxiway A Rehabilitation of full-length parallel taxiway A including lighting and markings.

Project recommended in 2004 Master Plan and verified by Port assessment of pavement condition and expected remaining life.

$10,100,0005

37 East County40 Mile Loop Trail: Blue Lake Park to Sundial Rd.

Construct a mixed use off road trail connecting Blue Lake Park and Sundial Road.

Combined with the Port's Reynolds levee trail it will complete gaps in the 40 Mile Loop Trail.

$3,424,0735

38 East CountySundial Road Improvements

Widen Sundial Road north of Swigert Way. Accommodate Troutdale Reynolds Industrial Park and other traffic.

$3,200,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 15

Page 18: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

39 East CountyReynolds Site Road Access Phase 3

Road improvements to serve Phase 3 industrial development. Actual project will be developed in coordination with stakeholders.

Address off-site transportation impacts.

10

40 PDX/PICColumbia Blvd. Improvements at MLK

Construct right turn lane on Columbia at MLK.

Improve connectivity for freight traffic between Columbia Blvd. and Rivergate.

$3,359,2595

41 PDX/PICI-5/Columbia Blvd. Improvement

Construct a full interchange at Columbia Blvd. or the functional equivalent. Includes three projects Delta Park Phase II and III and Argyle on the Hill.

Improve connections between Columbia Blvd. and I-5 for trucks.

$51,773,03210

42 PDX/PIC11th/13th (at Columbia Blvd.): Crossing Elimination

If feasible, eliminate the at-grade crossing and improve alternate roadway access.

Improve Kenton Mainline operation and eliminate a modal conflict.

$1,000,0005

43 PDX/PICColumbia Blvd. Widening (82nd Ave. - 60th Ave.)

Widen Columbia Blvd. to five lanes. Address system bottleneck along Columbia Blvd.

$15,000,00020

44 PDX/PICPDX Transportation Demand Management (TDM)

Implement strategies at PDX and PIC properties that reduce auto trips in the airport area. Programs to be undertaken with other area businesses/developers to maximize effectiveness; possible administration through a transportation management association.

Fulfill TDM requirements of PDX Master Plan. Implement TDM projects and programs recommended in the PDX Alternative Modes Study.

5

45 PDX/PICI-205 Auxiliary Lane NB New auxiliary lane from I-84 to I-205 NB before Columbia Blvd.

Provide additional capacity for anticipated growth in area traffic.

$6,700,00020

Port of Portland 2016 Port Transportation Improvement Plan

Page 16

Page 19: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID Priority Area MapProject Name Project Description Purpose Total CostTime Frame

(Years)

46 PDX/PICSW Quad Access Provide street access from 33rd Ave. into SW Quad.

Provide efficient movement of traffic to developing PDX properties.

$5,917,50010

47 PDX/PICAirport Way Braided Ramps

Construct braided ramps between the I-205 interchange and Cascade Interchange.

Maintain safety and capacity of Airport Way and interchanges.

$59,000,00020

48 PDX/PICAlternative Fuels Station Construct a PDX alternative fuels station. Provide refueling capabilities for CNG vehicles. Encourage airport businesses to convert fleets to CNG to improve air quality.

$1,000,0005

49 PDX/PICSW Quad Drainage Improvements

Drainage improvements in SW Quad through modifications to the existing drainage channels and increasing the capacity of the Broadmoor Pump Station.

Provide additional capacity for anticipated growth in airport traffic.

$1,250,0005

50 PDX/PICWiden APW Outbound East of 82nd

Add New Lane. Provide additional capacity for anticipated growth in passenger traffic.

$3,335,00010

51 PDX/PICDeplaning Curbside Roadway Lanes

Add New Lane. Provide additional capacity for anticipated growth in passenger traffic.

$2,976,00010

52 PDX/PICDeplaning Curbside Roadway Loading

Add New Lane. Provide additional capacity for anticipated growth in passenger traffic.

$324,00010

Port of Portland 2016 Port Transportation Improvement Plan

Page 17

Page 20: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

53 PDX/PICAirport Way Westbound Approaching Return Road

Add New Lane. Provide additional capacity for anticipated growth in passenger traffic.

$1,080,00010

54 PDX/PICTerminal Exit Roadway at P. O. Curves

Add New Lane. Provide additional capacity for anticipated growth in passenger traffic.

$1,500,00010

55 PDX/PICTerminal Exit Roadway at Parking Plaza

Add New Lane. Provide additional capacity for anticipated growth in passenger traffic.

$1,104,00010

56 PDX/PICMitigation Land Bank Plan for, purchase, and develop a site for use as a mitigation bank.

Provide a site for environmental mitigation for Port transportation and other development projects.

5

57 PDX/PIC33rd Avenue/Marine Drive Intersection Improvements

Signalize the intersection of NE 33rd Avenue and Marine Drive.

Improve safety and access for 33rd Avenue. May incorporate bike and ped facilities as well.

$5,760,6435

58 PDX/PICAlderwood Street Bikeway Provide bike lanes on Alderwood Road between Columbia Blvd. and the Alderwood Trail

Improve safety and provide better separation from motor vehicle traffic.

$561,2005

59 HillsboroBrookwood Parkway/Hwy 26 Interchange Improvements

Construct a new westbound to southbound loop ramp at the interchange to serve Brookwood Parkway. Realign and relocate nearby local roads.

Improve access to HIO and area industry.

$45,000,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 18

Page 21: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

60 HillsboroHIO Wash Racks Construct new wash racks for tenant and itinerant aircraft washing with pollution control system to keep wash water out of storm system.

Improve environmental performance at the airport.

$620,1005

61 HillsboroHIO Taxiway to NW Corporate Center

Construct a taxiway to serve new tenant leasehold development.

New tenant development in the area behind the HIO ATCT will require airside infrastructure.

$1,050,0005

62 RivergateCathedral Park Quiet Zone Address rail switching noise by improving multiple public rail crossings in the St. Johns Cathedral Park area.

To allow auto import operations to continue to grow in N. Portland and improve neighborhood livability.

$8,200,0005

63 RivergateNorth Portland Junction Upgrade railroad with revised crossovers, centralized traffic control tie-in and increased turning radius.

Accommodate higher rail speeds at the junction which provides greater capacity.

$9,160,00010

64 RivergateI-5 Columbia River Crossing

Increase the number of lanes and add transit capacity across the river.

Increase multi-modal capacity across the Columbia River and relieve congestion.

$2,982,000,00010

65 RivergateN. Hayden Island Drive Reconstruct N. Hayden Island Drive. Provide improved access to West Hayden Island.

$12,000,00010

66 RivergateWest Hayden Island Rail Access

Rail access from the mainline to support West Hayden Island development.

Advance rail-dependent development.

$3,000,00010

67 RivergateWest Hayden Island Rail Yard

Construct rail yard connected to facility trackage.

Advance rail development on West Hayden Island.

$9,500,00010

Port of Portland 2016 Port Transportation Improvement Plan

Page 19

Page 22: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

68 RivergateWest Hayden Island Interior Access Road

Construct interior roadway including rail overpass and berth access.

Provide roadway for new West Hayden Island terminal.

$13,600,00010

69 RivergateSt. Johns Pedestrian District

Improvements could include restriping, curb extensions and other pedestrian and bicycle amenities on Lombard St. that do not impede truck movement, as well as intersection improvements and signalization.

Maintain truck movement and minimize conflicts with bicycles and pedestrians between Philadelphia Ave. and Lombard St. at Pier Park.

$3,346,0005

70 RivergateLombard Bridge Replacement

Replace the bridge over the St. Johns Lead. Replace with a modern bridge that will also allow for an additional rail lead to Terminal 4.

$6,000,0005

71 RivergateColumbia Blvd./Portland Rd. Intersection Improvements

Redesign could include realignment of travel lanes, channelization, signalization, signing or new sidewalks and curbs.

Reinforce through truck movements on minor and major truck streets (Portland Rd. and Columbia Blvd. respectively), minimizing neighborhood cut-through traffic.

$1,214,0005

72 RivergateNorth Burgard/Lombard Street Improvements

Widen Burgard to 3 Lanes with bike lanes and sidewalks from UPRR bridge to Columbia.

Improve freight mobility, safety and industrial site access.

$14,588,0005

73 RivergateMarine Dr. Improvement Phase 2

Construct rail overcrossing on Marine Dr. Avoid road/rail conflict. $13,644,20020

74 RivergateWillamette River Channel Deepening

Deepen the portions of the Willamette River with deep draft infrastructure to -43' where appropriate.

To allow Willamette River terminals to also benefit from the Columbia River's new controlling depth.

$200,000,00010

Port of Portland 2016 Port Transportation Improvement Plan

Page 20

Page 23: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID Priority Area MapProject Name Project Description Purpose Total CostTime Frame

(Years)

75 RivergateTerminal 6 Honda Rail Extension

Extend current rail yard in order to provide more capacity for current tenants.

Capacity improvements for current tenants.

$1,000,00010

76 RivergateColumbia River Anchorage Improvements

Placement of up to seven stern buoys at different anchorages up and down the Columbia River.

Allow for the anchorage of ships in the river rather than at terminals that could otherwise be loading/unloading cargo.

$2,342,0005

77 RivergateTerminal 6 Internal Overcrossing

Construct a rail overcrossing at Terminal 6. Increase efficient movement for rail and Terminal 6 tenants.

$3,649,0845

78 RivergateT6 Suttle Road Entrance Construct access road from terminus of Suttle Road.

To support development of east end of T6.

$3,000,00020

79 RivergateT6 Development Project This program includes Additional Scour Protection, T6 Entrance Overcrossing, Two New PPMX Cranes, Terminal Electrical Upgrades, Yard Gantry Cranes and 6,800’ Arrival and 8,500' Departure Tracks.

This program is needed to upgrade the terminal to expand the capacity of the container terminal to 1 Million TEUs.

$80,000,00010

80 RivergateT4 B416 Lay Berth Improvements

This project will design, permit and install electrical equipment upgrades necessary to allow vessels to lay berth at B416.

The project is needed to allow vessels to lay berth at B416. This will help the Port retain and grow key services and to be a leader in transportation infrastructure.

$1,000,0005

81 RivergateT4 Stormwater Improvements

Install stormwater improvements. Implement capital projects identified during stormwater master planning process.

$4,100,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 21

Page 24: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

82 RivergateTerminal 4 Automobile Yard Expansion

Design and construct six acres of porous pavement parking for the storage of imported automobiles.

The project will provide additional land to meet auto storage capacity needs of Toyota, supporting the Port's automobile import business line.

$3,000,00010

83 RivergateBNSF Fallbridge Double Tracking

Double-track the Fallbridge line to Washougal.

Increases capacity of the BNSF east-west mainline serving Port of Portland.

$72,000,00010

84 RivergateT4 Berth 410, 411 Rail Yard Improvements

Construct additional rail track in the Berth 410 and 411 Rail Yard.

Improve the efficiency of the rail yard by creating additional rail capacity.

$6,000,0005

85 RivergateBerth Deepening at T2 and T4

Deepen berths at Terminals 2 and 4 to allow deeper draft vessels to transit the planned 43 foot channel.

Allow better utilization of Panamax-class bulk vessels.

$2,000,00010

86 RivergateBonneville Rail Yard Build Out

Construct two interior yard tracks and complete the double track lead from the wye at the east end of the yard to Barnes Yard.

Add rail staging capacity for South Rivergate.

$3,600,00010

87 RivergateRamsey Yard Utilization Connect existing set out track with industrial lead.

Improve unit train staging capabilities at Ramsey Rail Yard.

$1,700,00010

88 RivergateColumbia River Underkeel Clearance Study

Underkeel clearance study for ships moving between the Columbia Bar and Portland, including Loadmax gauge augmentation project.

Understand vessel underclearance in Columbia River to optimize safety and payload.

$1,319,00010

Port of Portland 2016 Port Transportation Improvement Plan

Page 22

Page 25: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

89 T2/Swan Island

North Willamette Greenway Trail

Pedestrian and bicycle trail from Kelly Point Park to the Steel Bridge along the Willamette River. The money associated for this project is for a study only.

Improve pedestrian and bicycle connectivity in North Portland. Coordinate implementation with the City of Portland.

$500,00020

90 T2/Swan Island

Graham Line Connection This project will create a new track connection between the Graham Line, which runs parallel with I-84 through Sullivan's Gulch and the Brooklyn Sub, UP's north-south line through Portland.

This connection will allow UP rail traffic entering Portland from the east to turn south onto the Brooklyn Sub from the Graham Line. This project will eliminate delay and increase system capacity.

$15,000,0005

91 T2/Swan Island

Terminal 2 Stormwater Improvements

Stormwater improvements. Enhance marketability, service and environmental performance for cargo opportunities at T-2.

$1,500,0005

92 T2/Swan Island

T2 Storage Building Improvements

This project upgrades the existing warehouse buildings.

This project is needed to upgrade the existing terminal.

$1,000,0005

93 T2/Swan Island

Portland Terminal Railroad Power Switches

Install Dispatcher Controlled Power Switches between Lake Yard and Terminal 2.

Will reduce time it takes for trains to travel from Lake Yard to Terminal 2, reducing blockage of mainline.

$10,805,0005

94 T2/Swan Island

T2 Track Reconfiguration and Siding

Construct rail loop and support siding. Increase rail capacity at Terminal 2.

$8,900,00010

95 East CountySandy Blvd. Widening to 4 lanes

Sandy Blvd. widen to 4 lanes and center turn lane (181st-202nd) with sidewalks and bike lanes.

Improve east west capacity and serve developing industrial property.

$10,000,00010

Port of Portland 2016 Port Transportation Improvement Plan

Page 23

Page 26: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

Map ID

Priority

Area Map

Project Name

Project Description

Purpose

Total Cost

Time Frame (Years)

96 East CountyRiverside Drive Extension Riverside Dr. Extension (Riverside Parkway to Portal Way).

Serve developing industrial parcels.

$10,975,1105

97 East CountySandy Blvd. Widening to 3 lanes

Sandy Blvd. widen to 3 lanes (207th to 238th), add sidewalks and bike lanes.

Improve east west capacity and serve adjacent developing industrial property.

$7,438,00010

98 East CountyNE Hogan at NE Stark Street

Add right turn lanes on all approaches and second northbound and southbound left turn lanes.

Address intersection capacity affecting access to Gresham Vista Business Park.

$1,908,4315

99 East CountyNE 223rd at Stark Add eastbound and northbound right turn lanes and southbound left turn lanes.

Address intersection capacity affecting access to Gresham Vista Business Park.

$1,196,7565

100 East CountyNE 238th Drive: Halsey to Glisan

Construct improvements for freight by modifying road curvature. Also adds improvements for bikes and pedestrians.

Will improve freight access to Gresham Vista Business Park.

$9,769,3405

101 East County223rd Avenue Widening Widen to three lanes between Halsey St and Marine Drive.

Upgrade the facility to major collector urban street standards.

$3,667,0005

Port of Portland 2016 Port Transportation Improvement Plan

Page 24

Page 27: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

P DXP DX

M A P : G I S P R O G R A M O F F I C E

W H IW H I

T R I PT R I P

T T DT T D

R I V E R G AT ER I V E R G AT E

T 4T 4

T 6T 6T 5T 5

T 2T 2

S WA N I S L A N DS WA N I S L A N D

GV B PGV B P

NAVIGATION CHANNEL

P I CP I C

5

205

84

405

ITS

ITS

ITS

2323

10, 11, 12, 16, 17, 2210, 11, 12, 16, 17, 2215152121

2020

2424

14141313

33

1, 21, 2

55

3737

35, 3635, 3633, 34, 3933, 34, 39

3838

29, 30, 3229, 30, 32

26, 31 26, 31 28 28

2727

2525

6644

1818

1919

P R I O R I T Y

M A P I D #1010ITS

R A I LM A R I N E

P E D / B I K E I N T E L L I G E N TT R A N S . S Y S T E M

P R I O R I T Y P R O J E C T S2 0 1 6 P O R T T R A N S P O R TAT I O N I M P R O V E M E N T P L A N

R O A D

AV I AT I O N

88

H I OH I O

7, 97, 9

Port of Portland 2016 Port Transportation Improvement Plan

Page 25

Page 28: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

1

Provide transportation link to the cargo area located within

the south airport area and to support Columbia Corridor

freight movement.

$5,527,534

2b

$4,959,856

$567,678

10336

Airport Futures Transportation Impact Study (2010)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

810020JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Alderwood and Columbia Blvd. IntersectionProject Name:

2013

Year of Cost

Estimate:

Widen and signalize intersection on Columbia Boulevard at

Alderwood Rd.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

2

Provide transportation link to the cargo area located within

the south airport area and to support Columbia Corridor

freight movement.

$6,575,000

2b

$6,575,000

10336

Airport Futures Transportation Impact Study (2010)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Cully Blvd. and Columbia Blvd. IntersectionProject Name:

2013

Year of Cost

Estimate:

Widen and signalize intersection on Columbia Boulevard at

Cully Blvd.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 26

Page 29: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

3

Align these properties with current market conditions.

$5,800,000

$5,800,000

11650

Airport Futures

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101460JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area PDX/PIC

PDX Northside RedevelopmentProject Name:

2013

Year of Cost

Estimate:

Redevelop the landside and airside properties north of

Airport Way for commercial aviation, business aviation and

PDX ancillary and support services.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

4

Improve bike/ped circulation in PIC.

$1,163,835

3c

$1,163,835

10368

2014 Airport Bike and Pedestrian Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Bike/Ped

Operation Area PDX/PIC

PIC Ped/Bike NetworkProject Name:

2007

Year of Cost

Estimate:

Construct bike and pedestrian facilities as shown in the

CS/PIC Plan District.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Land

Port of Portland 2016 Port Transportation Improvement Plan

Page 27

Page 30: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

5

Provide efficient movement of traffic to PDX properties.

$75,000,000

3c

$50,000,000

$25,000,000

10362

Airport Futures Transportation Impact Study (2010)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101474JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

82nd Ave./Airport Way Grade SeparationProject Name:

2007

Year of Cost

Estimate:

Construct grade-separated overcrossing.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

6

Increase safety and provide improved bicycle and

pedestrian access along NE Cornfoot Road.

$3,626,000

$3,626,000

10340

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Bike/Ped

Operation Area PDX/PIC

Cornfoot Road Multimodal Safety ImprovementsProject Name:

2013

Year of Cost

Estimate:

Provide a separated multi-use path on the north side of NE

Cornfoot Road.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 28

Page 31: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

7

Serve helicopter training operations, and avoid operations

over noise sensitive residential zones.

$391,000

$391,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101032JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area Hillsboro

HIO Relocate Charlie Pattern Landing SiteProject Name:

2014

Year of Cost

Estimate:

Construct a new landing site for helicopters that use the

Charlie flight pattern at HIO.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

8

Future tenant development will require landside

infrastructure to support its operation.

$1,886,560

$1,886,560

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101235JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area Hillsboro

HIO Construct East Access RoadProject Name:

2008

Year of Cost

Estimate:

Construct a new public access point and tenant utilities on

the east side of runway 12L/30R at HIO.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 29

Page 32: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

9

Replace existing taxiway AA with a new taxiway with the

appropriate design separation from taxiway A. Construct a

perimeter road extension between taxiway AA and existing

tenant ramps.

$4,700,000

$4,700,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101030JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Aviation

Operation Area Hillsboro

HIO Relocate Taxiway AAProject Name:

2009

Year of Cost

Estimate:

Relocate a new taxiway AA.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

10

The project will increase the reliability of cargo handling

equipment, and provide more reliable service to customers.

$3,634,260

$2,907,408

$726,852

11207

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

700111JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 6 Container Crane ModernizationsProject Name:

2012

Year of Cost

Estimate:

The project will increase operating efficiencies and improve

safety on Cranes 6373, 6374, 6375, and 6379.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 30

Page 33: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

11

Improve operational efficiencies for the container cranes.

$2,000,000

$2,000,000

11207

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101740JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 6 Crane Drive ElectronicsProject Name:

2011

Year of Cost

Estimate:

Crane management system upgrades for Cranes 6373 and

6374.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

12

Improve operational efficiencies for the container cranes.

$2,000,000

$2,000,000

11207

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

T6 Crane Drives for Cranes 6380 and 6381Project Name:

2014

Year of Cost

Estimate:

Crane management system upgrades for Cranes 6380 and

6381.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 31

Page 34: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

13

Improve rail access to Terminal 4.

$4,543,000

2b

$4,543,000

11355

Marine Terminal Master Plan 2020 (2003)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100658JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

Barnes to Terminal 4 RailProject Name:

2005

Year of Cost

Estimate:

Provide a new track from Barnes Yard to Terminal 4.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Lands

14

Expand rail capacity and reduce delays for greater efficiency.

$25,382,000

$25,382,000

11356

I-5 Rail Capacity Study (HDR, 2003)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

Kenton Rail Line UpgradeProject Name:

2003

Year of Cost

Estimate:

Upgrade existing track to second main track with new

double track from Peninsula Junction to I-205 and increase

track speeds between North Portland, Peninsula Junction,

to Reynolds on UP's Kenton Line.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 32

Page 35: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

15

Improve traffic efficiency in Rivergate by connecting

information about the roadway system to ODOT’s Highway

information systems.

$480,000

3c

$480,000

10373

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: ITS

Operation Area Rivergate

Rivergate ITSProject Name:

2007

Year of Cost

Estimate:

Intelligent Transportation System in Rivergate.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

16

The project will modernize the storm drainage system in the

container yard.

$5,000,000

$5,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101653JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 6 Stormwater SystemProject Name:

2012

Year of Cost

Estimate:

Design and construct a stormwater system.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Portwide Environmental Strategy

Port of Portland 2016 Port Transportation Improvement Plan

Page 33

Page 36: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

17

Increase the storage and processing capacity for auto

imports and exports through Berth 601, thereby allowing for

an increase of volumes, leading to increased employment.

$6,700,000

2b

$6,700,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101764JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Auto Import /Export ExpansionProject Name:

2015

Year of Cost

Estimate:

The project will construct site improvements to expand the

storage and processing capacity for auto imports and

exports through Berth 601 at Terminal 6. By increasing the

storage and processing capacity, throughput will be

increased.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

18

This project will facilitate the redevelopment of

approximately 30 acres of vital marine industrial property in

the Portland Harbor.

$34,000,000

$34,000,000

11208

Terminal 4 Pier 1 Facility Plan (TEC Inc.)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101739JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 4 Pier 1 Site PreparationProject Name:

2012

Year of Cost

Estimate:

Remove Berths 405 and 408, the grain leg platform and

tower, and the grain elevator in the Pier 1 area of Terminal 4.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Lands

Port of Portland 2016 Port Transportation Improvement Plan

Page 34

Page 37: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

19

Improve traffic efficiency in the Columbia Corridor.

$200,000

$200,000

10346

Columbia Multimodal Corridor Study 2012

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: ITS

Operation Area Rivergate

Marine Drive ITS ImprovementProject Name:

2007

Year of Cost

Estimate:

Install a CCTV at Portland Road and changeable message

signs at N. Portland Road, North Vancouver Way and NE

185th Drive.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

20

The project will increase the throughput capacity of the

facility.

$150,000,000

3c

$150,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101763JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

T5 Berth 503 Terminal ExpansionProject Name:

Year of Cost

Estimate:

Construct a rail dumper pit, storage building, shiploader

and berth improvements at Terminal 5 potash export facility.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 35

Page 38: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

21

The project will address increased traffic needs.

$2,000,000

3c

$2,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101716JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Terminal 5 Entrance RoadProject Name:

2015

Year of Cost

Estimate:

Provide improvements on the south side of the roadway as

well as rail crossing improvements.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

22

Improve operational efficiencies for the container cranes.

$1,500,000

$1,200,000

$300,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101740JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 6 Wharf OptimizationProject Name:

2011

Year of Cost

Estimate:

Crane management system upgrades for Crane 6375.

Crane travel improvements for Cranes 6380 and 6381.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 36

Page 39: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

23

This is a critical repair of the jetties at the Columbia River Bar.

$75,000,000

$75,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Columbia River Mouth Jetty RefurbishmentProject Name:

2012

Year of Cost

Estimate:

Refurbish and repair the north and south jetties at the

mouth of the Columbia River.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

24

Provide improved access to South Rivergate industrial area.

$9,000,000

$9,000,000

11654

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Time Oil Road ReconstructionProject Name:

2013

Year of Cost

Estimate:

Reconstruct Time Oil Road.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 37

Page 40: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

25

Improve rail and vehicle traffic flow in Rivergate Industrial

District.

$18,000,000

2b

$3,200,000

$5,000,000

$4,000,000

$5,800,000

11659

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Rivergate Boulevard OvercrossingProject Name:

2015Year of Cost

Estimate:

Grade separate the South Rivergate Lead at Rivergate Blvd.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

26

The improvements will increase the suitability and efficiency

of the cranes to handle bulk cargoes.

$2,750,000

2b

$2,750,000

11649

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101496JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

Terminal 2 Crane UpgradesProject Name:

2015

Year of Cost

Estimate:

The project will modify and upgrade Cranes 2371 and 2372,

located at Terminal 2. The improvements will increase the

suitability and efficiency of the crane to handle bulk cargoes.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 38

Page 41: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

27

To secure truck flow and congestion data.

10377

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: ITS

Operation Area T2/Swan Island

PSU ITS ExpansionProject Name:

Year of Cost

Estimate:

Expand PSU's existing web based ITS "count sensor"

program beyond the freeway to some key arterials

throughout the region and create a repository of regional

freight data.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

28

Increase rail capacity and operating efficiencies at Terminal

2.

$2,250,000

3c

$2,250,000

11649

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101046JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area T2/Swan Island

Terminal 2 Rail ImprovementProject Name:

2015

Year of Cost

Estimate:

Add approximately 600 feet to the inner track (Track 10) and

connect it with the outer loop (Track 15). A third track may

also be constructed and a rail scaling station added in

addition to stormwater improvements to the dock.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 39

Page 42: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

29

Allow Dredge Oregon to make full use of recent repower and

pump material 14,000 feet.

$10,200,000

3c

$10,200,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

102271JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

Dredge Oregon Pipe, Scows and PontoonsProject Name:

2014

Year of Cost

Estimate:

Acquire 2,000 feet of dredge pipe, pontoons, anchor scows

and anchors.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

30

Improve operational support for Dredge Oregon dredging

operations and improve environmental performance

$7,600,000

3c

$7,600,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101349, 102077JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

New Dredge TenderProject Name:

2014

Year of Cost

Estimate:

Replace the existing vintage tugboat W.L. Williams with a

newly constructed modern work-boat vessel. Repower

tugboat Clackamas.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 40

Page 43: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

31

Improve operational efficiencies for the cargo handling

cranes.

$2,600,000

$2,600,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101496JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

T2 Crane Drives and Cabs for Cranes 2371 and 2372Project Name:

2015

Year of Cost

Estimate:

Crane management system and cab upgrades for Cranes

2371 and 2372.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

32

Improve productivity and environmental performance.

$2,000,000

$2,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

Dredge Oregon Support EquipmentProject Name:

2015

Year of Cost

Estimate:

Repower or replace navigation equipment including support

vessels and landside equipment such as bulldozers.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Portwide Environmental Strategy

Port of Portland 2016 Port Transportation Improvement Plan

Page 41

Page 44: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

33

Improve access to Troutdale Reynolds Industrial Park.

$2,500,000

1a

$2,220,000

$280,000

11231

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101633JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

Swigert Way ExtensionProject Name:

2013Year of Cost

Estimate:

Extend Swigert Way from it existing terminus to Graham

Road.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Lands

34

Improve access to Troutdale Reynolds Industrial Park Phase

2.

$10,000,000

1a

$7,780,000

$1,120,000

11232, 11130

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101633JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

Graham RoadProject Name:

2013Year of Cost

Estimate:

Reconstruct and/or widen Graham Road along and

nearTroutdale Reynolds Industrial Park frontage.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Lands

Port of Portland 2016 Port Transportation Improvement Plan

Page 42

$1,100,000

Page 45: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

35

Project identified in 2004 TTD Master Plan.

$12,534,000

$12,534,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101039JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area East County

TTD Reconstruct runway 7-25Project Name:

2010

Year of Cost

Estimate:

Reconstruct existing 150' x 5400' runway; narrow to 75' wide,

relocated/reconstruct edge lighting, construct required

drainage improvements.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

36

Project recommended in 2004 Master Plan and verified by

Port assessment of pavement condition and expected

remaining life.

$10,100,000

$10,100,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101038JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area East County

TTD Rehabilitate Taxiway AProject Name:

2010

Year of Cost

Estimate:

Rehabilitation of full-length parallel taxiway A including

lighting and markings.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 43

Page 46: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

37

Combined with the Port's Reynolds levee trail it will

complete gaps in the 40 Mile Loop Trail.

$3,424,073

$3,072,421

$117,217

$234,43510408

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

102069JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Bike/Ped

Operation Area East County

40 Mile Loop Trail: Blue Lake Park to Sundial Rd.Project Name:

2014

Year of Cost

Estimate:

Construct a mixed use off road trail connecting Blue Lake

Park and Sundial Road.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Transportation

38

Accommodate Troutdale Reynolds Industrial Park and other

traffic.

$3,200,000

1a

$2,900,000

$300,000

11190

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101659JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

Sundial Road ImprovementsProject Name:

2013Year of Cost

Estimate:

Widen Sundial Road north of Swigert Way.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Lands

Port of Portland 2016 Port Transportation Improvement Plan

Page 44

Page 47: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

39

Address off-site transportation impacts.

11231, 11232

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100909JDE NUM:

Conditioned Project

Identified in STIP

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area East County

Reynolds Site Road Access Phase 3Project Name:

Year of Cost

Estimate:

Road improvements to serve Phase 3 industrial

development. Actual project will be developed in

coordination with stakeholders.

RTP 2040 Constrained

RTP 2040 Illustrative

Port Strategic Area: Regional Leadership in Industrial Lands

Port of Portland 2016 Port Transportation Improvement Plan

Page 45

Page 48: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

M A P : G I S P R O G R A M O F F I C E

P O RT L A N D

P DXP DX

VA N CO U V E R

CO LU M B I A R I V E R N AV I G AT I O N C H A N N E L

N E CO LU M B I A B LV D

N E CO LU M B I A B LV DN E LO M B A R D S T

N E LO M B A R D S T

N E M A R I N E D RN E M A R I N E D R

NE

82N

D A

VE

NE

82N

D A

VE

NE

33R

D A

VE

NE

33R

D A

VE

P I CP I C

NE AIRPORT WAY

NE AIRPORT WAY

NE

MLK

BLV

DN

E M

LK B

LVD

205

5

4646

42424040

4949

4343

1, 21, 2

4545

474744

5050

554848

33

44, 5644, 56

51, 5251, 52

5757

53, 54, 5553, 54, 55

5858

66

4141

P R I O R I T Y

N O N - P R I O R I T Y

M A P I D #1010 R A I LAV I AT I O N

P E D / B I K E

P DX / P I C A R E A P R O J E C T S2 0 1 6 P O R T T R A N S P O R TAT I O N I M P R O V E M E N T P L A N

R O A D

O T H E RO

Port of Portland 2016 Port Transportation Improvement Plan

Page 46

Page 49: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

40

Construct right turn lane on Columbia at MLK.

Improve connectivity for freight traffic between Columbia

Blvd. and Rivergate.

$3,359,259

$3,014,263

$230,541

$114,455

10208

Columbia Corridor Transportation Study (1999)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

810030JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Columbia Blvd. Improvements at MLKProject Name:

2011

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

41

Construct a full interchange at Columbia Blvd. or the

functional equivalent. Includes three projects Delta Park

Phase II and III and Argyle on the Hill.

Improve connections between Columbia Blvd. and I-5 for

trucks.

$51,773,032

$51,773,032

10219, 10874

I-5 Delta Park Environmental Assessment (2006)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

I-5/Columbia Blvd. ImprovementProject Name:

2006

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 47

Page 50: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

42

If feasible, eliminate the at-grade crossing and improve

alternate roadway access.

Improve Kenton Mainline operation and eliminate a modal

conflict.

$1,000,000

$1,000,000

10334

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area PDX/PIC

11th/13th (at Columbia Blvd.): Crossing EliminationProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

43

Widen Columbia Blvd. to five lanes.

Address system bottleneck along Columbia Blvd.

$15,000,000

$15,000,000

10376

East Columbia-Lombard Connector Study

Transportation Analysis (2000)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

20Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Columbia Blvd. Widening (82nd Ave. - 60th Ave.)Project Name:

2003

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 48

Page 51: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

44

Implement strategies at PDX and PIC properties that

reduce auto trips in the airport area. Programs to be

undertaken with other area businesses/developers to

maximize effectiveness; possible administration through a

transportation management association.

Fulfill TDM requirements of PDX Master Plan. Implement

TDM projects and programs recommended in the PDX

Alternative Modes Study.

10380

PDX Employee TDM Program Study (2002)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Other

Operation Area PDX/PIC

PDX Transportation Demand Management (TDM)Project Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

45

New auxiliary lane from I-84 to I-205 NB before Columbia

Blvd.

Provide additional capacity for anticipated growth in area

traffic.

$6,700,000

$6,700,000

11398

ODOT Bottleneck Study (2013)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

810022JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

20Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

I-205 Auxiliary Lane NBProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 49

Page 52: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

46

Provide street access from 33rd Ave. into SW Quad.

Provide efficient movement of traffic to developing PDX

properties.

$5,917,500

3c

$5,917,500

10363

PDX Conditional Use Master Plan (2003)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100757JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

SW Quad AccessProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Industrial Land

47

Construct braided ramps between the I-205 interchange

and Cascade Interchange.

Maintain safety and capacity of Airport Way and

interchanges.

$59,000,000

3c

$59,000,000

10371

PDX Airport Way ROW Concept (1999)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101227JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

20Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Airport Way Braided RampsProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 50

Page 53: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

48

Construct a PDX alternative fuels station.

Provide refueling capabilities for both landside (public)

CNG vehicles. Encourage airport businesses to convert

fleets to CNG to improve air quality.

$1,000,000

3c

$1,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Other

Operation Area PDX/PIC

Alternative Fuels StationProject Name:

2001

Year of Cost

Estimate:

Port Strategic Area: Portwide Environmental Strategy

49

Drainage improvements in SW Quad through

modifications to the existing drainage channels and

increasing the capacity of the Broadmoor Pump Station.

Provide additional capacity for anticipated growth in

airport traffic.

$1,250,000

3c

$1,250,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101625JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Other

Operation Area PDX/PIC

SW Quad Drainage ImprovementsProject Name:

2008

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Industrial Land

Port of Portland 2016 Port Transportation Improvement Plan

Page 51

Page 54: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

50

Add New Lane.

Provide additional capacity for anticipated growth in

passenger traffic.

$3,335,000

3c

$3,335,000

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101228JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Widen APW Outbound East of 82ndProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

51

Add New Lane.

Provide additional capacity for anticipated growth in

passenger traffic.

$2,976,000

$2,976,000

11657

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101466JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Deplaning Curbside Roadway LanesProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 52

Page 55: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

52

Add New Lane.

Provide additional capacity for anticipated growth in

passenger traffic.

$324,000

$324,000

11657

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101467JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Deplaning Curbside Roadway LoadingProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

53

Add New Lane.

Provide additional capacity for anticipated growth in

passenger traffic.

$1,080,000

$1,080,000

11656

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101471JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Airport Way Westbound Approaching Return RoadProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 53

Page 56: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

54

Add New Lane.

Provide additional capacity for anticipated growth in

passenger traffic.

$1,500,000

$1,500,000

11655

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101472JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Terminal Exit Roadway at P. O. CurvesProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

55

Add New Lane.

Provide additional capacity for anticipated growth in

passenger traffic.

$1,104,000

$1,104,000

11655

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101473JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

Terminal Exit Roadway at Parking PlazaProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 54

Page 57: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

56

Plan for, purchase, and develop a site for use as a

mitigation bank.

Provide a site for environmental mitigation for Port

transportation and other development projects.

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Other

Operation Area PDX/PIC

Mitigation Land BankProject Name:

Year of Cost

Estimate:

Port Strategic Area: Portwide Environmental Strategy

57

Signalize the intersection of NE 33rd Avenue and Marine

Drive.

Improve safety and access for 33rd Avenue. May

incorporate bike and ped facilities as well.

$5,760,643

$5,760,643

10337

PDX Airport Futures 2010 Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area PDX/PIC

33rd Avenue/Marine Drive Intersection ImprovementsProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 55

Page 58: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

58

Provide bike lanes on Alderwood Road between Columbia

Blvd. and the Alderwood Trail

Improve safety and provide better separation from motor

vehicle traffic.

$561,200

$561,200

10338

2014 Airport Bike and Pedestrian Master Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Bike/Ped

Operation Area PDX/PIC

Alderwood Street BikewayProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 56

Page 59: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

88

5959

60, 6160, 61

7, 97, 9

H I L L S B O R O

H I OH I O

M A P : G I S P R O G R A M O F F I C E

N W CO R N E L L R DN W CO R N E L L R D

N W E V E R G R E E N PA R K WAYN W E V E R G R E E N PA R K WAY

US 26US 26

P R I O R I T Y

N O N - P R I O R I T Y

M A P I D #1010

H I O A R E A P R O J E C T S2 0 1 6 P O R T T R A N S P O R TAT I O N I M P R O V E M E N T P L A N

R O A D

AV I AT I O N

Port of Portland 2016 Port Transportation Improvement Plan

Page 57

Page 60: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

59

Construct a new westbound to southbound loop ramp at

the interchange to serve Brookwood Parkway. Realign and

relocate nearby local roads.

Improve access to HIO and area industry.

$45,000,000

$45,000,000

11178

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Hillsboro

Brookwood Parkway/Hwy 26 Interchange ImprovementsProject Name:

2009

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

60

Construct new wash racks for tenant and itinerant aircraft

washing with pollution control system to keep wash water

out of storm system.

Improve environmental performance at the airport.

$620,100

$620,100

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100646JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area Hillsboro

HIO Wash RacksProject Name:

2010

Year of Cost

Estimate:

Port Strategic Area: Portwide Environmental Strategy

Port of Portland 2016 Port Transportation Improvement Plan

Page 58

Page 61: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

61

Construct a taxiway to serve new tenant leasehold

development.

New tenant development in the area behind the HIO ATCT

will require airside infrastructure.

$1,050,000

$1,050,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100657JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Aviation

Operation Area Hillsboro

HIO Taxiway to NW Corporate CenterProject Name:

2009

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 59

Page 62: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

ITS

8383

ITS

1515

23 COLUMBIA RIVER MOUTH23 COLUMBIA RIVER MOUTH

88887676

2020

2525

75, 7975, 79

10, 11, 12, 16, 17, 2210, 11, 12, 16, 17, 222121

8787

8686

242470, 7270, 72

868674, 81, 84, 8574, 81, 84, 85

1818

80, 8280, 82

6969

6262

1313

1414

7171

6464

6767

666665, 6865, 68

6363

77, 7977, 79

73, 7873, 78

19

P O RT L A N D

R I V E R G AT ER I V E R G AT E

M A P : G I S P R O G R A M O F F I C E

VA N CO U V E R

W H IW H I

T 6T 6

T 5T 5

T 4T 4

NAVIGATION CHANNEL

N M A R I N E D R

N M A R I N E D R

N L

OM

BA

RD

ST

N L

OM

BA

RD

ST

N CO LU M B I A B LV D

N CO LU M B I A B LV D

5

P R I O R I T Y

N O N - P R I O R I T Y

M A P I D #1010

ITS

R A I LM A R I N E

P E D / B I K E I N T E L L I G E N TT R A N S . S Y S T E M

M A R I N E T E R M I N A L A N D R I V E R G AT E A R E A2 0 1 6 P O R T T R A N S P O R TAT I O N I M P R O V E M E N T P L A N

R O A D

Port of Portland 2016 Port Transportation Improvement Plan

Page 60

Page 63: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

62

Address rail switching noise by improving multiple public

rail crossings in the St. Johns Cathedral Park area.

To allow auto import operations to continue to grow in N.

Portland and improve neighborhood livability.

$8,200,000

$8,200,000

10375

Cathedral Park Whistle Free Zone Strategic Options,

Parametrix (2007)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

810051JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

Cathedral Park Quiet ZoneProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

63

Upgrade railroad with revised crossovers, centralized

traffic control tie-in and increased turning radius.

Accommodate higher rail speeds at the junction which

provides greater capacity.

$9,160,000

$9,160,000

I-5 Rail Capacity Study (HDR, 2003)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

North Portland JunctionProject Name:

2003

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 61

Page 64: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

64

Increase the number of lanes and add transit capacity

across the river.

Increase multi-modal capacity across the Columbia River

and relieve congestion.

$2,982,000,000

$2,982,000,000

10893

I-5 Transportation and Trade Partnership Final

Strategic Plan (2002)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

I-5 Columbia River CrossingProject Name:

2002

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

65

Reconstruct N. Hayden Island Drive.

Provide improved access to West Hayden Island.

$12,000,000

$12,000,000

11632

West Hayden Island Concept Plan 2012

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

102151JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type:

Operation Area Rivergate

N. Hayden Island DriveProject Name:

2012

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 62

Page 65: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

66

Rail access from the mainline to support West Hayden

Island development.

Advance rail-dependent development.

$3,000,000

$3,000,000

11353

West Hayden Island Concept Plan 2012

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100348JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

West Hayden Island Rail AccessProject Name:

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

67

Construct rail yard connected to facility trackage.

Advance rail development on West Hayden Island.

$9,500,000

$9,500,000

11354

West Hayden Island Concept Plan 2012

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100348JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

West Hayden Island Rail YardProject Name:

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 63

Page 66: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

68

Construct interior roadway including rail overpass and

berth access.

Provide roadway for new West Hayden Island terminal.

$13,600,000

$13,600,000

West Hayden Island Concept Plan 2012

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type:

Operation Area Rivergate

West Hayden Island Interior Access RoadProject Name:

2012

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

69

Improvements could include restriping, curb extensions

and other pedestrian and bicycle amenities on Lombard

St. that do not impede truck movement, as well as

intersection improvements and signalization.

Maintain truck movement and minimize conflicts with

bicycles and pedestrians between Philadelphia Ave. and

Lombard St. at Pier Park.

$3,346,000

$3,002,365

$343,635

10182

St. Johns Truck Strategy Report & Recommendation

(2001)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

St. Johns Pedestrian DistrictProject Name:

2005

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 64

Page 67: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

70

Replace the bridge over the St. Johns Lead.

Replace with a modern bridge that will also allow for an

additional rail lead to Terminal 4.

$6,000,000

$6,000,000

Terminal 4 Modernization Study (2006)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Lombard Bridge ReplacementProject Name:

2006

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

71

Redesign could include realignment of travel lanes,

channelization, signalization, signing or new sidewalks

and curbs.

Reinforce through truck movements on minor and major

truck streets (Portland Rd. and Columbia Blvd.

respectively), minimizing neighborhood cut-through traffic.

$1,214,000

$538,380

$675,620

10229

St. Johns Truck Strategy Report & Recommendation

(2001)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Columbia Blvd./Portland Rd. Intersection ImprovementsProject Name:

2006

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 65

Page 68: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

72

Widen Burgard to 3 Lanes with bike lanes and sidewalks

from UPRR bridge to Columbia.

Improve freight mobility, safety and industrial site access.

$14,588,000

$14,588,000

10214

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

North Burgard/Lombard Street ImprovementsProject Name:

2009

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

73

Construct rail overcrossing on Marine Dr.

Avoid road/rail conflict.

$13,644,200

3c

$13,644,200

10379

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

20Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Marine Dr. Improvement Phase 2Project Name:

2003

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 66

Page 69: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

74

Deepen the portions of the Willamette River with deep draft

infrastructure to -43' where appropriate.

To allow Willamette River terminals to also benefit from the

Columbia River's new controlling depth.

$200,000,000

$200,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Willamette River Channel DeepeningProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

75

Extend current rail yard in order to provide more capacity

for current tenants.

Capacity improvements for current tenants.

$1,000,000

3c

$1,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100323JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 6 Honda Rail ExtensionProject Name:

2009

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 67

Page 70: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

76

Placement of up to seven stern buoys at different

anchorages up and down the Columbia River.

Allow for the anchorage of ships in the river rather than at

terminals that could otherwise be loading/unloading cargo.

$2,342,000

3c

$1,728,500

$153,400

$460,100Feasibility Study

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Columbia River Anchorage ImprovementsProject Name:

2009

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

77

Construct a rail overcrossing at Terminal 6.

Increase efficient movement for rail and Terminal 6 tenants.

$3,649,084

2b

$3,649,084

10378

Marine Terminal Master Plan 2020 (2003)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100324JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

Terminal 6 Internal OvercrossingProject Name:

2006

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 68

Page 71: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

78

Construct access road from terminus of Suttle Road.

To support development of east end of T6.

$3,000,000

3c

$3,000,000

11307

Suttle Road Improvement Options (2008)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

20Time Frame (Years): years

Project Type: Road

Operation Area Rivergate

T6 Suttle Road EntranceProject Name:

2008

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

79

This program includes Additional Scour Protection, T6

Entrance Overcrossing, Two New PPMX Cranes, Terminal

Electrical Upgrades, Yard Gantry Cranes and 6,800’

Arrival and 8,500' Departure Tracks.

This program is needed to upgrade the terminal to expand

the capacity of the container terminal to 1 Million TEUs.

$80,000,000

$80,000,000

11357, 11207

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

T6 Development ProjectProject Name:

2015

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 69

Page 72: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

80

This project will design, permit and install electrical

equipment upgrades necessary to allow vessels to lay

berth at B416

The project is needed to allow vessels to lay berth at B416.

This will help the Port retain and grow key services and to

be a leader in transportation infrastructure.

$1,000,000

$1,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

T4 B416 Lay Berth ImprovementsProject Name:

2015

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

81

Install stormwater improvements.

Implement capital projects identified during stormwater

master planning process.

$4,100,000

$4,100,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101668JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

T4 Stormwater ImprovementsProject Name:

2012

Year of Cost

Estimate:

Port Strategic Area: Portwide Environmental Strategy

Port of Portland 2016 Port Transportation Improvement Plan

Page 70

Page 73: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

82

Design and construct six acres of porous pavement

parking for the storage of imported automobiles.

The project will provide additional land to meet auto

storage capacity needs of Toyota, supporting the Port's

automobile import business line.

$3,000,000

$3,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100769JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Terminal 4 Automobile Yard ExpansionProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Industrial Lands

83

Double-track the Fallbridge line to Washougal.

Increases capacity of the BNSF east-west mainline serving

Port of Portland.

$72,000,000

$72,000,000

Port Rail Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

BNSF Fallbridge Double TrackingProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 71

Page 74: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

84

Construct additional rail track in the Berth 410 and 411 Rail

Yard.

Improve the efficiency of the rail yard by creating

additional rail capacity.

$6,000,000

3c

$6,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

102052JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

T4 Berth 410, 411 Rail Yard ImprovementsProject Name:

2015

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

85

Deepen berths at Terminals 2 and 4 to allow deeper draft

vessels to transit the planned 43 foot channel.

Allow better utilization of Panamax-class bulk vessels.

$2,000,000

$2,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

100863JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Berth Deepening at T2 and T4Project Name:

2012

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 72

Page 75: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

86

Construct two interior yard tracks and complete the double

track lead from the wye at the east end of the yard to

Barnes Yard.

Add rail staging capacity for South Rivergate.

$3,600,000

3c

$3,600,000

11652

Port Rail Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

Bonneville Rail Yard Build OutProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

87

Connect existing set out track with industrial lead.

Improve unit train staging capabilities at Ramsey Rail Yard.

$1,700,000

3c

$1,700,000

11653

Port Rail Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area Rivergate

Ramsey Yard UtilizationProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 73

Page 76: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

88

Underkeel clearance study for ships moving between the

Columbia Bar and Portland, including Loadmax gauge

augmentation project.

Understand vessel underclearance in Columbia River to

optimize safety and payload.

$1,319,000

$949,608

$65,000

$304,392

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Marine

Operation Area Rivergate

Columbia River Underkeel Clearance StudyProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 74

Page 77: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

ITS 90902727

28289494

939326, 3126, 3191, 9291, 92

29, 30, 3229, 30, 32

8989

P R I O R I T Y

N O N - P R I O R I T Y

M A P I D #1010

ITS

R A I LM A R I N E

P E D / B I K E I N T E L L I G E N TT R A N S . S Y S T E M

P O RT L A N D

S WA NI S L A N DS WA NI S L A N D

T 2T 2

WI L L A M

E T E N AV I G AT I O N C H A N N E L

T 2 / S WA N I S L A N D A R E A P R O J E C T S2 0 1 6 P O R T T R A N S P O R TAT I O N I M P R O V E M E N T P L A N

M A P : G I S P R O G R A M O F F I C E

84

405

5

Port of Portland 2016 Port Transportation Improvement Plan

Page 75

Page 78: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

89

Pedestrian and bicycle trail from Kelly Point Park to the

Steel Bridge along the Willamette River. The money

associated for this project is for a study only.

Improve pedestrian and bicycle connectivity in North

Portland. Coordinate implementation with the City of

Portland.

$500,000

$500,000

10355

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

20Time Frame (Years): years

Project Type: Bike/Ped

Operation Area T2/Swan Island

North Willamette Greenway TrailProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

90

This project will create a new track connection between the

Graham Line, which runs parallel with I-84 through

Sullivan's Gulch and the Brooklyn Sub, UP's north-south

line through Portland.

This connection will allow UP rail traffic entering Portland

from the east to turn south onto the Brooklyn Sub from the

Graham Line. This project will eliminate delay and increase

system capacity.

$15,000,000

$15,000,000

I-5 Rail Capacity Study (HDR, 2003)

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area T2/Swan Island

Graham Line ConnectionProject Name:

2006

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 76

Page 79: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

91

Stormwater improvements.

Enhance marketability, service and environmental

performance for cargo opportunities at T-2.

$1,500,000

$1,500,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

101667JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

Terminal 2 Stormwater ImprovementsProject Name:

2011

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

92

This project upgrades the existing warehouse buildings.

This project is needed to upgrade the existing terminal.

$1,000,000

$1,000,000

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Marine

Operation Area T2/Swan Island

T2 Storage Building ImprovementsProject Name:

2012

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 77

Page 80: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

93

Install Dispatcher Controlled Power Switches between

Lake Yard and Terminal 2.

Will reduce time it takes for trains to travel from Lake Yard

to Terminal 2, reducing blockage of mainline.

$10,805,000

3c

$10,805,000

Port Rail Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Rail

Operation Area T2/Swan Island

Portland Terminal Railroad Power SwitchesProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

94

Construct rail loop and support siding.

Increase rail capacity at Terminal 2.

$8,900,000

3c

$8,900,000

11651

Port Rail Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Rail

Operation Area T2/Swan Island

T2 Track Reconfiguration and SidingProject Name:

2013

Year of Cost

Estimate:

Port Strategic Area: Retain and Grow Key Services

Port of Portland 2016 Port Transportation Improvement Plan

Page 78

Page 81: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

P R I O R I T Y

N O N - P R I O R I T Y

M A P I D #1010

P E D / B I K E

E A S T CO U N T Y P R O J E C T A R E A S2 0 1 6 P O R T T R A N S P O R TAT I O N I M P R O V E M E N T P L A N

R O A D AV I AT I O N

M A P : G I S P R O G R A M O F F I C E

9797

3737

101101

3838

9696

3939

35, 3635, 36

33, 3433, 34

9999 9898

9595

100100T R O U T DA L E

T R I PT R I P

G R E S H A M

FA I R V I E W V I L L AG EW O O D

T T DT T D

COLUMBIA RIVER NAVIGATION CHANNEL

N E H A L S E Y S TN E H A L S E Y S T

N E S A N DY B LV DN E S A N DY B LV D

SW 2

57TH

AV

ESW

257

TH A

VE

N E M A R I N E D R

N E M A R I N E D R

GV B PGV B P

84

Port of Portland 2016 Port Transportation Improvement Plan

Page 79

Page 82: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

95

Sandy Blvd. widen to 4 lanes and center turn lane (181st-

202nd) with sidewalks and bike lanes.

Improve east west capacity and serve developing

industrial property.

$10,000,000

$10,000,000

10443

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area East County

Sandy Blvd. Widening to 4 lanesProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

96

Riverside Dr. Extension (Riverside Parkway to Portal Way).

Serve developing industrial parcels.

$10,975,110

$10,975,110

10515

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

Riverside Drive ExtensionProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 80

Page 83: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

97

Sandy Blvd. widen to 3 lanes (207th to 238th), add

sidewalks and bike lanes.

Improve east west capacity and serve adjacent developing

industrial property.

$7,438,000

$7,438,000

10399

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

10Time Frame (Years): years

Project Type: Road

Operation Area East County

Sandy Blvd. Widening to 3 lanesProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

98

Add right turn lanes on all approaches and second

northbound and southbound left turn lanes.

Address intersection capacity affecting access to

Gresham Vista Business Park.

$1,908,431

$1,908,431

10511

East Metro Connections Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

NE Hogan at NE Stark StreetProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 81

Page 84: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

99

Add eastbound and northbound right turn lanes and

southbound left turn lanes.

Address intersection capacity affecting access to

Gresham Vista Business Park.

$1,196,756

$1,196,756

10473

East Metro Connections Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

NE 223rd at StarkProject Name:

2007

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

100

Construct improvements for freight by modifying road

curvature. Also adds improvements for bikes and

pedestrians.

Will improve freight access to Gresham Vista Business

Park.

$9,769,340

$9,769,340

East Metro Connections Plan

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

NE 238th Drive: Halsey to GlisanProject Name:

2012

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 82

Page 85: 2016 PORT TRANSPORTATION I LANcdn.portofportland.com/pdfs/Trade_Trans_Studies_PTIP...Phil Healy Susie Lahsene Sean Loughran Kathryn Williams Mark Witsoe Port GIS Team Ryan Campbell

101

Widen to three lanes between Halsey St and Marine Drive.

Upgrade the facility to major collector urban street

standards.

$3,667,000

N/A

$3,667,000

10388, 10389

Map ID:

Project Description:

Purpose:

Total Cost:

Estimate Rating:

Federal:

State:

City:

SDC:

Port Share

Committed:

Port Share

Forecasted:

Private:

Other:

Unfunded:

JDE NUM:

Conditioned Project

Identified in STIPRTP 2040 Constrained

RTP 2040 Illustrative

RTP Related:

Recent Study:

5Time Frame (Years): years

Project Type: Road

Operation Area East County

223rd Avenue WideningProject Name:

Year of Cost

Estimate:

Port Strategic Area: Regional Leadership in Transportation

Port of Portland 2016 Port Transportation Improvement Plan

Page 83