2016 road program - volusia county, florida · improvement $2,421,299 8% resurfacing $4,850,000 15%...

18
John Angiulli Public Works Director Gerald Brinton, P.E. County Engineer PUBLIC WORKS DEPARTMENT County Council Meeting August 4, 2016 2016 Road Program 8/16/2016 County of Volusia Public Works Department 1

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

John AngiulliPublic Works Director

Gerald Brinton, P.E.County Engineer

PUBLIC WORKS DEPARTMENT

County Council MeetingAugust 4, 2016

2016 Road Program

8/16/2016 County of Volusia Public Works Department 1

Page 2: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

FY 16/17 Revenue Sources

8/16/2016 County of Volusia Public Works Department 2

Gas Taxes$22,930,617

73%

Utility Tax $4,700,000

15%

Other Reimbursements

$1,368,7874%

Impact Fees$2,460,000

8%

Total Revenues: $31,459,404(without bond program and reserves )

Page 3: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

8/16/2016 County of Volusia Public Works Department 3

County Transportation Assets2,231 lane miles of roads (820 art/col;1411 local)

50 fixed bridges

Two (2) bascule bridges

2,724 acres of road right-of-way

275 miles of sidewalk

13 miles of guardrail

318 signalized intersections

9,172 drainage structures

261 retention ponds

306 miles of roadside ditches

1.0 million linear feet of pipe

40,000 plus signs

Page 4: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

FY 16/17 Expenses

Personal Services$10,068,486

32%

Operational Costs$8,605,104

27%

Debt Service$5,514,515

18%

Capital Improvement

$2,421,2998%

Resurfacing$4,850,000

15%

Bond Debt AllocationImpact Fees $2,922,330LOGT $1,580,061Total $4,502,391

8/16/2016 County of Volusia Public Works Department 4

Total Expenditures: $31,459,404(without bond program and reserves )

Bridge MaintenanceMowingAsphalt RepairDirt Road MaintenanceTree/Vegetation TrimmingSidewalk MaintenanceShoulder/Roadside Ditch MaintenanceSigns and StripingStorm System MaintenanceRetention Area MaintenanceStreet SweepingTrouble Calls/InspectionsSchool Flasher Install/MaintenancePed Flasher Install/MaintenanceSignal Preventative MaintenanceSignal RepairSignal Re-TimingEngineering and DesignConstruction ManagementRight-of-Way AcquisitionSurveyTraffic Studies and Planning

Page 5: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

20.5

21

21.5

22

22.5

23

23.5

04/05 05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17

Gas Tax Collections

8/16/2016 County of Volusia Public Works Department 5

Estimates

$1.89*

$2.12

$2.32$2.63

$2.82 $3.31$2.39

$2.82 $3.58 $3.69$3.58

$2.78 $2.32

* Average annual price per gallon

Page 6: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

$9,000,000

05/06 06/07 07/08 08/09 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17

Road Program Bond Debt

8/16/2016 County of Volusia Public Works Department 6

$65M Bond Debt Service Line

Gas Tax

Bond debt paid by transportation impact fees and gas tax.

Estimates

* Impact fee moratorium July 1, 2011. Fees fully reinstated July 1, 2015.

Impact Fees

Page 7: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

Inflation Impacts

• Over the same twenty year period that fuel efficiency improved 12%, transportation costs grew by 60%!

• So for every $1 fuel efficiency gains drained from gas tax funds, inflation drained $3.50

0

50

100

150

200

250

1 2

00

0

3 2

00

0

1 2

00

1

3 2

00

1

1 2

00

2

3 2

00

2

1 2

00

3

3 2

00

3

1 2

00

4

3 2

00

4

1 2

00

5

3 2

00

5

1 2

00

6

3 2

00

6

1 2

00

7

3 2

00

7

1 2

00

8

3 2

00

8

1 2

00

9

3 2

00

9

1 2

01

0

3 2

01

0

1 2

01

1

3 2

01

1

1 2

01

2

3 2

01

2

1 2

01

3

Quarterly Moving Price Trends Report

Source: Florida Department of Transportation

8/16/2016 County of Volusia Public Works Department 7

Page 8: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

8/16/2016 County of Volusia Public Works Department 8

Gas taxes funding roads

Only the State Fuel Sales Tax and SCETS Tax are indexed for inflation.

County 2017 Legislative Issue

Support indexing of all gas taxes distributed to local governments

Page 9: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

7/29/2016 9

Road Program Capital Investments (1)

FY15/16(Current Year)

FY16/17 FY17/18 FY18/19 FY19/20 FY20/21 6-Yr Total

LOGT $10.48M $11.80M $10.45M $15.75M $8.85M $8.85M = $66.18M

Impact Fees $0.20M $1.05M $7.40M 0 0 0 = $8.65M

Bond (2) 0 $2.10M $7.50M $1.95M 0 0 = $11.55M

Grant Funds $52.53M(3) $2.80M 0 0 0 0 = $55.33M

All Funds $63.21M $17.75M $25.35M $17.70M $8.85M $8.85M = $141.71M

County of Volusia Public Works Department

(1) Capital investments include all non-maintenance type road & bridge improvements including countywide safety projects, new sidewalks & the annual road resurfacing program

(2) Depletes all gax tax revenue bond proceeds

(3) Includes $44.14 M Federal Grant for Veterans Memorial Bridge Replacement

Page 10: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

Capital Projects

7/29/2016 10County of Volusia Public Works Department

Daytona Beach

• Orange Av Reconstruction - Nova Rd to Beach St $1,660,000 (County)

(Construction Underway by Daytona Bch) $4,679,000 (State)

• Veterans Memorial Bridge Replacement $44,142,000 (Federal)

(Construction Underway)

Holly Hill

• LPGA Blvd 4 Laning - Jimmy Ann to Derbyshire $1,500,000 (County)

(Construction Underway) $965,000 (State)

Port Orange

• S Williamson Ext - Airport Rd to Pioneer Trl $9,800,000 (County)

Partnership with Pioneer CDD $5,500,000 (State)(Construction Underway) $500,000 (City)

Page 11: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

Capital ProjectsN Smyrna Beach

• Pioneer Trl at Turnbull Bay Rd $1,053,000 (Federal)

(Construction Completed July 2016) $369,000 (County)

• Turnbull Bay Bridge Replacement $5,426,000 (Federal)

(Construction bids opened July 2016) $477,000 (County)

$3 M shortfall (low bid of $8.4 M)

Edgewater

• Park Ave 3 Laning - Old Mission Rd to Massey Ranch Bl $3,000,000 (County)

(Design Contract Awarded)

Edgewater/N Smyrna Beach

• Tenth St 4 Laning - Myrtle Av to US 1 $5,300,000 (County)

(Design at 90% Complete) $2,800,000 (State)

7/29/2016 11County of Volusia Public Works Department

Page 12: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

Capital Projects

7/29/2016 12County of Volusia Public Works Department

Deltona• Doyle Rd Paved Shldrs – Providence Bl to Saxon Bl $2,000,000 (Federal)

(Advertised for Construction Bids) $320,000 (County)

• Howland Blvd 4 Laning - Courtland Blvd to SR415 $4,236,000 (County)

(Under Construction) $5,879,000 (State)

• Howland Blvd 4 Laning - Providence Bl to Elkcam Bl $13,100,000 (County)

(Preparation of Design Consultant Scope of Services)

Page 13: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

Capital Projects

7/29/2016 13County of Volusia Public Works Department

DeLand• Orange Camp Rd 4 Laning - MLK Blvd to I-4 $9,800,000 (County)

(Preliminary Design/Review of existing SJRWMD Permits Underway)

• Beresford Rd Extension - Blue Lake Ave to Kepler Rd $3,850,000 (County)

(Conceptual Design Underway)

Page 14: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

7/29/2016 14 County of Volusia Public Works Department

Page 15: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

7/29/2016 15County of Volusia Public Works Department

Page 16: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

7/29/2016 16 County of Volusia Public Works Department

Page 17: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

7/29/2016 17County of Volusia Public Works Department

Page 18: 2016 Road Program - Volusia County, Florida · Improvement $2,421,299 8% Resurfacing $4,850,000 15% Bond Debt Allocation Impact Fees $2,922,330 LOGT $1,580,061 Total $4,502,391 8/16/2016

7/29/2016 18County of Volusia Public Works Department