20160428 201518 mp02 d redlynch draft masterplan · 25 50 100 150m st andrew’s goomboora park...
TRANSCRIPT
N
PO Box 8187 Wynnum North QLD [email protected] 273 283
Placemaking I Landscape Architecture I Urban Design
Rounsefell DesignRounseABN: 20 164 429 056
DRAFTClient: Cairns Regional Council DRAFT MASTERPLAN
SCALE 1:2500 @ A1/ 1:5000 @ A3DWG NO. 201518-MP02REVISION DDATE: 28 APRIL 2016
Redlynch Masterplan
25 50 100 150M
GOOMBOORA PARKST ANDREW’S CATHOLIC COLLEGE
POWERLINK SITE
REDLYNCH CENTRAL SHOPPING CENTRE
MCDONALDS
PETROL STATION
INDOOR STADIUM(FUTSAL)
FRESHWATER CHRISTIAN COLLEGE
STATE GOVERNMENT LAND
8 26
GLENOMA PARK
“BIG ISLAND”
DRAINAGE CHANNEL
fi eld 1 fi eld 2
fi eld 3 fi eld 4
existing parking
40
existing parking
22
existing shared pathway
existing footbridge
possible future substation site
substation buffer zone
substation buffer zone
exist
ing
cane
rail a
nd m
ajor
wat
er a
nd se
wer
alig
nmen
t
exist
ing
cane
rail a
nd m
ajor
wat
er a
nd se
wer
alig
nmen
t
possible future substation site
future powerline easement
possible future
powerline easement
possible future
powerline easement
existing parking
existing child care
possible future pool by SACC
Fres
hwat
erC
reek
4
7
5
Freshwater
REDL
YNC
H C
ON
NEC
TION
RD
REDL
YNC
H IN
TAKE
RD
LARSEN RD
HERIT
AGE CEN
TRAL S
T
HERI
TAG
E S
ST
CYP
RUS
DR
LOM
ATIA
CL
SATIN
ASH
CL
NORFOLK CIRCUIT
PORT
ELLI
RO
AD
BYRON TCE
MICHELANGELO DR
BASALT ST
VIEW ST
LORIDAN DR
WIN
DSO
R C
L
BANN
ING
AVE
OPA
LIN
E C
L
BRINSMEAD-KAMERUNGA RD
WESTERN
ARTERIALRD
CAIRNS
OBERSKY CL
VILLAGE TCE
Creek
1
21
21
21
21
21
21
2121
21
22
proposed new site entry road with avenue tree planting - road level within dashed area designed above Q5 fl ood level, including AFL parking area B
shared clubhouse elevated above Q100 fl ood levels - ramp access from fi eld and Portelli Road level
AFL clubhouse/ community hub elevated above Q100 fl ood levels - ramp access from Q5 road/parking level; drop off area east side
senior AFL fi eld with lighting - 135m x 165m with 5m runoff
AFL fi eld 110m x155m with 5m runoff
rectangle fi eld with lighting - 80mx120m with 5 m runoff
rectangle fi eld 80mx120m with 5m runoff - junior cricket between fi elds 6 and 7
on-street 90 degree parking with manoeuvre space direct access from Portelli Road (elevated above fi elds)
new internal site access road and 90 degree parking at gradefuture clubhouse location
future sporting use
existing Powerlink electricity pylons on centreline of 20m wide easement; long term constraint - maximum extent (total 120m width shown) of potential future 60m wide power easement subject to fi nal Powerlink design and alignment
future parking area for rectangle fi elds
nature play area combined with open kickabout/ event space and shady picnic facilities
environment and outdoor education centre above Q100 fl ood level with ramp access - small cafe facility and minimal toilets - pole construction required due to proximity to creek
future sporting use once cane rail operations cease to south and rail no longer required
2
18
3
19
20
21
22
23
23
23
24
24
24
24
20
20
20
20
20
18
18
25
19
19
19
19
4
5
6
7
8
9
9
9
9
1025
26
27
27
28
29
29
29
29
30
30
31
32
33
32
31
31
31
31
10
11
11
33
12
13
14
15
16
16
15
14
13
1 17
17
12
12
12
LORIDAN DRIVE PARK (BMX JUMPS)
UNDERPASS
32
68
100
125
125
A
B
C
G
G
F
E
D
H
I8
6
18
37
(100)
100
24
overfl ow parking area
connected paths throughout site
footbridges/ culverts across watercourses - widths and design as required in each location; small build-out viewing deck in centre of Glenoma Park bridge
main 3.5m shared pathway runs length of west side of creek and connects to Goomboora Park to south, Glenoma Park to east, and to wider community path network - alignment to be verifi ed on site to minimise earthworks and avoid existing signifi cant trees
new rehabilitation planting along Freshwater Creek - minimum 30m wide west from existing edge of cane fi eld
continue existing Treeforce rehabilitation planting area to ‘Big Island’
existing Goomboora Park pathway
existing cane rail - 1.8m high fence both sides required for where it passes through the site; long term after can rail no longer required due to development to south, potential rail trail opportunity
future link road and parking
existing multi-use courts developed into 3 court indoor facility in future
new 3.5m connection between footbridge and existing shared path on Cairns Western Arterial Road
picnic areas in key locations
informal 2m wide deco pathways through forest
existing maintenance track along edge of cane fi eld re-used in path network
open pockets/ themed planting in rainforest e.g. palm grove to provide different path journey experiences; potential for educational/ botanical learning experiences
large existing Leichhardt tree - retain as feature and build paths/road around
State Government land - future strategic drainage corridor
site boundary
minor watercourses/drainage lines
Freshwater Creek channel
existing extent of 1:100 year fl ood level through site
existing shared path network
new parking areas - identifying letter and number of bays
NOTE: ALL ROAD AND PARKING LAYOUTS SUBJECT TO TRAFFIC ENGINEER’S DETAIL DESIGN CONFIRMATION
ALL INFRASTRUCTURE AND PLANTING WITHIN POWERLINE EASEMENT SUBJECT TO POWERLINK REQUIREMENTS
PARKING REQUIREMENTS BASED ON 50 BAYS PER FIELD PLUS 1 ACCESSIBLE PARK PER 50 SPACES; COMMUNITY USE BUILDINGS 1 SPACE PER 15M2 GFA
LEGEND
28
28
28
3
RICE’S GULLY
OVERFLO
W CHANNEL
26
existing amenities
28