20160518 austin shines deck for doe kickoff final...key project locations community solar 2 mw...

19
SHINES Kickoff Meeting 2016 energy.gov/sunshot energy.gov/sunshot energy.gov/sunshot SHINES Kickoff Meeting 2016 Austin SHINES Project Lisa Martin, SHINES Project Manager Program Mgr, Smart Grid & System Operations, Austin Energy

Upload: others

Post on 27-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016

energy.gov/sunshotenergy.gov/sunshotenergy.gov/sunshot

SHINES Kickoff Meeting 2016

Austin SHINES Project

Lisa Martin, SHINES Project Manager Program Mgr, Smart Grid & System Operations, Austin Energy

Page 2: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 2SHINES Kickoff Meeting 2016

A bit about Austin Energy

2

Page 3: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 3

Austin Energy 2025 Goals

900 95055% MW + MW +55% renewable energy

900 MW of savings from energy efficiency and demand response

200 MW local solar,100 MW customer-sited, 10 MW local storage

All City of Austin facilities, operations and fleet carbon neutral

Subject to Affordability Goals

Page 4: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 4SHINES Kickoff Meeting 2016

Customer-Sited & Community Solar

Key Project Locations

Community Solar 2 MW (est.)

4

May 2015 solar: shown belowMay 2016 solar: ~34 MW

Page 5: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016

The Austin SHINES Solution

• Open standards based Distributed Energy Resource (DER) management platform

• Includes the integration and optimization of DERs at the utility distribution level

• Enables diverse strategies/business models for both utility and customer owned resources; to include direct, third‐party, and autonomous resource management of DERs 

• Integrates more than 3 MW of distributed PV and energy storagewith 31 smart inverters and includes more than 700 PV customers 

5

Page 6: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016energy.gov/sunshotSHINES Kickoff Meeting 2016 6

Austin SHINES Conceptual Overview

Utility Scale Energy Storage + PV

Commercial Energy Storage + PV

Residential Energy Storage + PV

Illustrative

DER Management Platform

Page 7: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016energy.gov/sunshotSHINES Kickoff Meeting 2016 77

Austin SHINES Project Org Chart

Page 8: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 8

Austin SHINES Partnerships

Page 9: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 9

Project Structure and Timeline

SHINES

39‐month project with phases

(State funding)

Page 10: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 10

System Boundary Definition

ESS

Energy and services imported to system

Energy and services exported from system

Load

Load

Load

System boundary

ILLUSTRATIVE

Page 11: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016

System Levelized Cost of Energy (LCOE)

Economic modeling centers around the System LCOE to Serve Load metric

Creating additional value for utility and customers by deploying and managing DERs in an optimal manner

11

Page 12: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016

System Controls

Innovation - SHINES includes multiple levels of control to achieve DER optimization

12

DER Optimizer

1Energy Intelligent Controller

Page 13: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 13

Comparison of System LCOEs

Load served by local solar (% kWh)

System LCOE to

serve load ($/kWh)

Baseline- No new SHINES

assets installed

Baseline + All Assets + Holistic Controls

Baseline + All Assets- No controls

Baseline + All Assets- Autonomous controls

SHINES Solution

ILLUSTRATIVE

Page 14: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016energy.gov/sunshotSHINES Kickoff Meeting 2016 14

Conceptual Network Architecture

ILLUSTRATIVE

Page 15: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 15

Residential Components

*Market transactions in the SHINES project will be simulated only and included in LCOE analysis.

1E‐DERO Pecan Street 

(Aggregator)

Pecan Street Aggregator Sites x6

PV and ESS

Direct Utility Control Sites x12PV only

ERCOTSimulated*

Autonomous Sites x6PV only

Auto Auto

LegendElectricityInformationValue

Page 16: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 16

Commercial Components

API or DNP3

*Market transactions in Austin SHINES will be simulated only and included in LCOE analysis.

LegendElectricityInformationValue

DERO (1Energy)

Aggregator (Vendor)

3rd Party Aggregator Sites – 400kW 5x – 30kW

2x – 125kW

Dispatch Priority: Customer value propositions

Direct Utility Control Sites –155kW1x – 30kW

1x – 125kWDispatch Priority: Utility reliability needs

ERCOTSimulated*

Page 17: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016energy.gov/sunshotSHINES Kickoff Meeting 2016 17

Grid-Scale Components

Page 18: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 18

Key Benefits

• Advance utility’s local storage and solar goals

• Discover best way to maximize DER value for AE and the customer

• Strategic approach leverages AE work and state funds to obtain external funding• Ultimately reducing the overall cost for the customer

• Project designed to engage customers to develop new programs and consumer options

• Modular approach allows utilities across the country to adopt the scale and use-cases right for them

Page 19: 20160518 Austin SHINES Deck for DOE Kickoff Final...Key Project Locations Community Solar 2 MW (est.) 4 May 2015 solar: shown below May 2016 solar: ~34 MW SHINESenergy.gov/sunshot

energy.gov/sunshotenergy.gov/sunshotSHINES Kickoff Meeting 2016 19

Thank You

Lisa MartinSHINES Project Manager