2017 sts - irh 2016 hauling jobs of the year
TRANSCRIPT
{ Presents“Two Heavy”Hauling Job of the year entry
Over 160,000 Lbs.
RFQ
Rail siding with an X
Summit rail siding
Colorado River bridge
Sanders
Sanders with an X
Trailer drawing without dollies.
Trailer drawing with dollies.
Thoreau accepted
APPROV
ED
Big trailer pictures
Route map
Throeau bridge
Route map
Pictures of snow
Picture of move with all the truc
Substation Picture
Man hours Prep: 300 Man hours Permitting: 280 Man hours Engineering: 100 Man hours Execution: 8660 Man hours Total: 9340 Safety: no accidents, incidents or damage Obstacles to overcome:
Routing and permitting through 3 states and the BIA, 8% grades, Narrow roads, Night travel, winter conditions with mud and snow at rail siding and substation.
Innovations: Trailking 500 trailer updated 1997, Dolly frame design, engineering and fabrication.
Summary: Project completed, on schedule, and within budget. Profitable job for IRH.