· 2018-06-28 · one has already been completed with the asphalting of main street. roland is...

3

Upload: others

Post on 25-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · 2018-06-28 · One has already been completed with the asphalting of Main Street. Roland is still waiting for an additional bid ... Propane $844.13/propane; ... A bid for patching
Page 2:  · 2018-06-28 · One has already been completed with the asphalting of Main Street. Roland is still waiting for an additional bid ... Propane $844.13/propane; ... A bid for patching
Page 3:  · 2018-06-28 · One has already been completed with the asphalting of Main Street. Roland is still waiting for an additional bid ... Propane $844.13/propane; ... A bid for patching