695
CAPITAL IMPROVEMENT PROGRAM 2019-2024 CITY OF KIRKLAND PRELIMINARY PROJECT DETAIL Rendering of Totem Lake Connector - Pedestrian & Bicycle Bridge

Upload: others

Post on 06-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • C A P I T A L I M P R O V E M E N TP R O G R A M

    2 0 1 9 - 2 0 2 4  

    CITY OF KIRKLANDPRELIMINARY PROJECT DETAIL

    Rendering of Totem Lake Connector - Pedestrian & Bicycle Bridge

  • City of Kirkland Preliminary 2019 to 2024

    Capital Improvement Program

    Michael Olson

    Director of Finance and Administration

    Prepared by

    Tom Mikesell

    George Dugdale

    Elijah Panci

    Doug Honma-Crane

    Lori Wile

    Jessica Clem

  • This page intentionally left blank

  • City of Kirkland

    Preliminary 2019 to 2024

    Capital Improvement Program

    The Table of Contents is hyperlinked. To jump to a specific section from the Table of

    Contents, hover the pointer finger on the title or page number and click the mouse.

    Table of Contents

    Transportation ........................................................................................ 1

    Surface Water Management Utility ............................................... 271

    Water and Sewer Utilities ................................................................. 353

    Parks .................................................................................................... 471

    Public Safety ...................................................................................... 563

    General Government ....................................................................... 597

  • This page intentionally left blank

  • Transportation

    Capital Improvement Program

  • Cit

    y o

    f K

    irkl

    and

    2019

    -202

    4 P

    relim

    inar

    y C

    apit

    al Im

    pro

    vem

    ent

    Pro

    gram

    TRA

    NSP

    OR

    TATI

    ON

    PR

    OJE

    CTS

    Fun

    de

    d P

    roje

    cts:

    Cu

    rre

    nt

    Re

    ven

    ue

    S

    tre

    et

    Levy

    Im

    pac

    t Fe

    es

    Wal

    kab

    le

    Kir

    klan

    d

    Re

    serv

    e

    De

    bt

    Ext

    ern

    al/

    Pe

    nd

    ing

    Sou

    rce

    STC

    00

    60

    0A

    nn

    ual

    Str

    eet

    Pre

    serv

    atio

    n P

    rogr

    am1

    ,16

    6,0

    00

    7

    96

    ,00

    0

    1

    ,75

    0,0

    00

    1

    ,75

    0,0

    00

    1

    ,75

    0,0

    00

    1

    ,75

    0,0

    00

    8

    ,96

    2,0

    00

    8

    ,96

    2,0

    00

    STC

    00

    60

    3St

    reet

    Lev

    y St

    reet

    Pre

    serv

    atio

    n1

    ,61

    3,0

    00

    9

    97

    ,00

    0

    2

    ,43

    3,0

    00

    2

    ,46

    0,0

    00

    2

    ,48

    8,0

    00

    2

    ,51

    6,0

    00

    1

    2,5

    07

    ,00

    0

    12

    ,50

    7,0

    00

    STC

    00

    60

    4C

    entr

    al W

    ay S

    tree

    t P

    rese

    rvat

    ion

    21

    4,0

    00

    2

    14

    ,00

    0

    3

    0,0

    00

    18

    4,0

    00

    STC

    00

    60

    5To

    tem

    La

    ke B

    lvd

    Ga

    tew

    ay

    & R

    oa

    dw

    ay

    Rep

    air

    2,1

    20

    ,00

    0

    1,7

    00

    ,00

    0

    1,3

    20

    ,00

    0

    3,0

    20

    ,00

    0

    3,0

    20

    ,00

    0

    STC

    00

    60

    66

    th S

    tre

    et

    Sou

    th S

    tre

    et

    Pre

    serv

    atio

    n1

    ,00

    0,0

    00

    1

    ,20

    0,0

    00

    2

    ,20

    0,0

    00

    8

    32

    ,00

    0

    1

    ,36

    8,0

    00

    STC

    00

    60

    79

    8th

    Ave

    nu

    e N

    E St

    ree

    t P

    rese

    rvat

    ion

    3

    20

    ,00

    0

    1

    ,70

    2,0

    00

    2

    ,02

    2,0

    00

    5

    84

    ,00

    0

    8

    07

    ,00

    0

    6

    31

    ,00

    0

    STC

    05

    91

    21

    24

    th A

    ve N

    E R

    oa

    dw

    ay

    Imp

    rove

    men

    ts (

    No

    rth

    Sec

    tio

    n)

    RO

    W

    1,3

    93

    ,00

    0

    80

    2,0

    00

    2

    ,19

    5,0

    00

    8

    1,0

    00

    31

    4,0

    00

    1

    ,80

    0,0

    00

    STC

    05

    91

    31

    24

    th A

    ve N

    E R

    oa

    dw

    ay

    Imp

    rove

    men

    ts (

    No

    rth

    Sec

    tio

    n)

    Co

    nst

    ruct

    ion

    76

    0,0

    00

    3,4

    55

    ,00

    0

    1,1

    85

    ,00

    0

    5

    ,40

    0,0

    00

    4

    93

    ,00

    0

    1,0

    15

    ,00

    0

    3

    ,89

    2,0

    00

    STC

    08

    00

    0A

    nn

    ual

    Str

    ipin

    g P

    rogr

    am5

    00

    ,00

    0

    5

    00

    ,00

    0

    5

    00

    ,00

    0

    5

    00

    ,00

    0

    5

    00

    ,00

    0

    5

    00

    ,00

    0

    3

    ,00

    0,0

    00

    3

    ,00

    0,0

    00

    STC

    08

    31

    31

    00

    th A

    ven

    ue

    NE

    Ro

    adw

    ay Im

    pro

    vem

    en

    ts (

    No

    rth

    Se

    ctio

    n)

    2,5

    00

    ,00

    0

    1,0

    36

    ,00

    0

    3,5

    36

    ,00

    0

    10

    ,00

    0

    1

    00

    ,00

    0

    10

    0,0

    00

    1,2

    56

    ,00

    0

    2,0

    70

    ,00

    0

    STC

    08

    31

    41

    00

    th A

    ve N

    E R

    oad

    way

    Imp

    s (M

    id-N

    ort

    h S

    ect

    ion

    )3

    ,51

    7,0

    00

    1

    ,76

    2,0

    00

    5

    ,27

    9,0

    00

    1

    29

    ,00

    0

    16

    4,0

    00

    1

    07

    ,00

    0

    2

    ,61

    1,1

    00

    2

    ,26

    7,9

    00

    STC

    08

    90

    0Ju

    an

    ita

    Dri

    ve A

    uto

    Imp

    rove

    men

    ts3

    ,30

    0,0

    00

    2

    ,00

    0,0

    00

    1

    ,30

    0,0

    00

    6,6

    00

    ,00

    0

    82

    4,0

    00

    4

    56

    ,00

    0

    20

    ,00

    0

    5,3

    00

    ,00

    0

    STC

    99

    99

    0R

    egio

    nal

    Inte

    r-A

    gen

    cy C

    oo

    rdin

    atio

    n8

    2,0

    00

    8

    2,0

    00

    8

    2,0

    00

    8

    2,0

    00

    8

    2,0

    00

    8

    2,0

    00

    4

    92

    ,00

    0

    4

    10

    ,00

    0

    82

    ,00

    0

    NM

    C 0

    06

    10

    Stre

    et L

    evy-

    Safe

    Sch

    oo

    l Wal

    k R

    ou

    tes

    15

    0,0

    00

    15

    0,0

    00

    15

    0,0

    00

    15

    0,0

    00

    60

    0,0

    00

    6

    00

    ,00

    0

    NM

    C 0

    06

    20

    Stre

    et L

    evy-

    Ped

    estr

    ian

    Saf

    ety

    15

    0,0

    00

    15

    0,0

    00

    15

    0,0

    00

    15

    0,0

    00

    15

    0,0

    00

    15

    0,0

    00

    90

    0,0

    00

    9

    00

    ,00

    0

    NM

    C 0

    06

    21

    Nei

    ghb

    orh

    oo

    d S

    afet

    y P

    rogr

    am Im

    pro

    vem

    ents

    80

    0,0

    00

    20

    0,0

    00

    20

    0,0

    00

    40

    0,0

    00

    4

    00

    ,00

    0

    NM

    C 0

    12

    04

    Cen

    tral

    Way

    Cro

    ssw

    alk

    Up

    grad

    e5

    0,0

    00

    5

    0,0

    00

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    NM

    C 0

    57

    00

    An

    nu

    al S

    idew

    alk

    Mai

    nte

    nan

    ce P

    rogr

    am2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    1

    ,20

    0,0

    00

    9

    72

    ,00

    0

    22

    8,0

    00

    NM

    C 0

    57

    01

    Gra

    nt

    Fun

    ded

    Sid

    ewal

    k M

    ain

    ten

    ance

    Pro

    gram

    2,0

    00

    ,00

    0

    2

    ,00

    0,0

    00

    2

    ,00

    0,0

    00

    NM

    C 0

    71

    00

    NE

    13

    2n

    d S

    tree

    t Si

    dew

    alk

    Imp

    rove

    men

    t3

    00

    ,00

    0

    2

    50

    ,00

    0

    25

    0,0

    00

    50

    ,00

    0

    2

    00

    ,00

    0

    NM

    C 0

    81

    00

    CK

    C t

    o R

    edm

    on

    d C

    entr

    al C

    on

    nec

    tor

    1,5

    00

    ,00

    0

    1,2

    39

    ,00

    0

    1

    ,23

    9,0

    00

    2

    39

    ,00

    0

    1,0

    00

    ,00

    0

    NM

    C 0

    86

    10

    NE

    12

    4th

    St/

    12

    4th

    Ave

    NE

    Ped

    Bri

    dg

    e D

    esig

    n &

    Co

    nst

    ruct

    ion

    11

    ,81

    0,0

    00

    5,5

    93

    ,10

    0

    5

    ,59

    3,1

    00

    1

    ,05

    0,0

    00

    4

    ,54

    3,1

    00

    NM

    C 0

    87

    00

    Cit

    ywid

    e Sc

    ho

    ol W

    alk

    Ro

    ute

    En

    ha

    nce

    men

    ts3

    ,13

    3,2

    00

    8

    50

    ,00

    0

    4

    00

    ,00

    0

    3

    00

    ,00

    0

    3

    00

    ,00

    0

    3

    00

    ,00

    0

    3

    00

    ,00

    0

    2

    ,45

    0,0

    00

    6

    40

    ,00

    0

    45

    0,0

    00

    13

    0,0

    00

    68

    0,0

    00

    5

    50

    ,00

    0

    NM

    C 0

    87

    10

    No

    rth

    Kir

    kla

    nd

    /JFK

    Sch

    oo

    l Wa

    lk R

    ou

    te E

    nh

    an

    cmen

    ts4

    50

    ,00

    0

    5

    00

    ,00

    0

    9

    50

    ,00

    0

    1

    4,6

    00

    3

    00

    ,00

    0

    10

    0,0

    00

    53

    5,4

    00

    NM

    C 0

    90

    10

    Juan

    ita

    Dri

    ve M

    ult

    i-M

    od

    al (

    On

    -Str

    eet)

    Imp

    rove

    men

    ts

    52

    5,0

    00

    52

    5,0

    00

    10

    0,0

    00

    2

    25

    ,00

    0

    20

    0,0

    00

    NM

    C 0

    98

    00

    Kir

    kla

    nd

    Ave

    Sid

    ewa

    lk Im

    pro

    vem

    ents

    4

    00

    ,00

    0

    2

    00

    ,00

    0

    60

    0,0

    00

    34

    5,0

    00

    2

    55

    ,00

    0

    NM

    C 1

    09

    00

    Cit

    ywid

    e Tr

    ail C

    on

    nec

    tio

    ns

    (No

    n-C

    KC

    )

    27

    5,0

    00

    27

    5,0

    00

    27

    5,0

    00

    NM

    C 1

    09

    02

    Lake

    Fro

    nt

    Pro

    men

    ade

    Des

    ign

    Stu

    dy

    7

    5,0

    00

    7

    5,0

    00

    7

    5,0

    00

    NM

    C 1

    10

    10

    Cit

    ywid

    e A

    cces

    sib

    ility

    Imp

    rove

    men

    ts1

    00

    ,00

    0

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    6

    00

    ,00

    0

    4

    00

    ,00

    0

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    NM

    C 1

    13

    00

    Cit

    ywid

    e G

    reen

    way

    s N

    etw

    ork

    s

    25

    0,0

    00

    25

    0,0

    00

    25

    0,0

    00

    25

    0,0

    00

    25

    0,0

    00

    1,2

    50

    ,00

    0

    35

    0,0

    00

    6

    25

    ,00

    0

    27

    5,0

    00

    NM

    C 1

    13

    02

    Cit

    ywid

    e G

    reen

    way

    s N

    etw

    ork

    Pro

    ject

    -12

    8th

    Ave

    nu

    e N

    E4

    00

    ,00

    0

    4

    00

    ,00

    0

    40

    0,0

    00

    80

    ,00

    0

    70

    ,00

    0

    25

    0,0

    00

    NM

    C 1

    15

    00

    CK

    C E

    mer

    gen

    t P

    roje

    cts

    Op

    po

    rtu

    nit

    y Fu

    nd

    30

    0,0

    00

    10

    0,0

    00

    1

    00

    ,00

    0

    1

    00

    ,00

    0

    NM

    C 1

    24

    00

    Tote

    m L

    ake

    Pu

    blic

    Imp

    rove

    men

    ts P

    has

    e II

    7,5

    00

    ,00

    0

    7

    ,50

    0,0

    00

    1

    ,48

    5,0

    00

    6

    ,01

    5,0

    00

    TRC

    09

    40

    0N

    E 1

    32

    nd

    St/

    10

    8th

    Ave

    nu

    e N

    E In

    ters

    ect'

    n Im

    p5

    00

    ,00

    0

    7

    20

    ,00

    0

    1

    ,22

    0,0

    00

    6

    1,0

    00

    65

    9,0

    00

    50

    0,0

    00

    TRC

    11

    60

    0A

    nn

    ual

    Sig

    nal

    Mai

    nte

    nan

    ce P

    rogr

    am4

    50

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    2

    00

    ,00

    0

    1

    ,20

    0,0

    00

    7

    44

    ,00

    0

    45

    6,0

    00

    TRC

    11

    70

    0C

    ityw

    ide

    Traf

    fic

    Man

    agem

    ent

    Safe

    ty Im

    pro

    vem

    ents

    30

    0,0

    00

    10

    0,0

    00

    10

    0,0

    00

    10

    0,0

    00

    10

    0,0

    00

    10

    0,0

    00

    10

    0,0

    00

    60

    0,0

    00

    30

    0,0

    00

    3

    00

    ,00

    0

    TRC

    11

    70

    2V

    isio

    n Z

    ero

    Saf

    ety

    Imp

    rove

    men

    t2

    00

    ,00

    0

    5

    0,0

    00

    5

    0,0

    00

    5

    0,0

    00

    5

    0,0

    00

    5

    0,0

    00

    5

    0,0

    00

    3

    00

    ,00

    0

    2

    00

    ,00

    0

    10

    0,0

    00

    TRC

    11

    70

    3N

    eigh

    bo

    rho

    od

    Tra

    ffic

    Co

    ntr

    ol

    10

    0,0

    00

    5

    0,0

    00

    50

    ,00

    0

    5

    0,0

    00

    1

    50

    ,00

    0

    8

    4,0

    00

    66

    ,00

    0

    TRC

    11

    70

    5Sc

    ho

    ol Z

    on

    e B

    eaco

    n &

    Sig

    nag

    e Im

    pro

    vem

    ents

    50

    ,00

    0

    5

    0,0

    00

    5

    0,0

    00

    TRC

    12

    00

    0K

    irkl

    and

    Inte

    llige

    nt

    Tran

    spo

    rtat

    ion

    Sys

    tem

    Ph

    ase

    34

    50

    ,00

    0

    4

    00

    ,00

    0

    4

    50

    ,00

    0

    4

    50

    ,00

    0

    4

    50

    ,00

    0

    4

    50

    ,00

    0

    4

    50

    ,00

    0

    2

    ,65

    0,0

    00

    6

    52

    ,40

    0

    79

    6,0

    00

    1

    76

    ,00

    0

    1,0

    25

    ,60

    0

    TRC

    12

    40

    01

    16

    th A

    ven

    ue

    NE/

    NE

    12

    4th

    Str

    eet

    Inte

    rsec

    tio

    n Im

    pro

    vem

    ents

    7

    00

    ,00

    0

    9

    00

    ,00

    0

    1,6

    00

    ,00

    0

    1,6

    00

    ,00

    0

    TRC

    13

    50

    01

    00

    th A

    ven

    ue

    NE/

    Sim

    on

    ds

    Ro

    ad In

    ters

    ect

    ion

    Imp

    s8

    00

    ,00

    0

    3

    89

    ,00

    0

    1

    ,18

    9,0

    00

    3

    35

    ,00

    0

    35

    0,0

    00

    5

    04

    ,00

    0

    TRC

    13

    60

    01

    00

    th A

    ven

    ue

    NE/

    14

    5th

    Str

    ee

    t In

    ters

    ect

    ion

    Imp

    s8

    36

    ,00

    0

    3

    90

    ,00

    0

    1

    ,22

    6,0

    00

    3

    27

    ,00

    0

    38

    6,0

    00

    5

    13

    ,00

    0

    To

    tal F

    un

    de

    d T

    ran

    spo

    rtat

    ion

    Pro

    ject

    s2

    1,9

    63

    ,20

    0

    3

    7,9

    30

    ,10

    0

    1

    8,5

    62

    ,00

    0

    1

    0,4

    77

    ,00

    0

    1

    0,6

    47

    ,00

    0

    8

    ,15

    5,0

    00

    6

    ,84

    8,0

    00

    9

    2,6

    19

    ,10

    0

    2

    2,5

    13

    ,00

    0

    1

    6,4

    82

    ,00

    0

    5

    ,47

    2,0

    00

    8

    00

    ,00

    0

    5

    ,08

    4,0

    00

    2

    0,2

    25

    ,20

    0

    2

    2,0

    42

    ,90

    0

    No

    tes

    Ita

    lics

    = M

    od

    ific

    ati

    on

    in t

    imin

    g a

    nd

    /or

    cost

    (se

    e P

    roje

    ct M

    od

    ific

    ati

    on

    /Del

    etio

    n S

    ched

    ule

    fo

    r m

    ore

    det

    ail)

    Bo

    ld =

    Ne

    w p

    roje

    cts

    + =

    Mo

    ved

    fro

    m u

    nfu

    nd

    ed s

    tatu

    s to

    fu

    nd

    ed s

    tatu

    s

    " =

    Mo

    ved

    fro

    m f

    un

    ded

    sta

    tus

    to u

    nfu

    nd

    ed s

    tatu

    s

    # =

    Pro

    ject

    s to

    be

    fun

    ded

    wit

    h d

    evel

    op

    men

    t-re

    late

    d r

    even

    ues

    Pro

    ject

    Nu

    mb

    er

    20

    19

    -20

    24

    Tota

    l2

    02

    42

    02

    32

    02

    22

    02

    1

    Fun

    din

    g So

    urc

    es

    20

    20

    20

    19

    Pri

    or

    Ye

    ar(s

    ) P

    roje

    ct T

    itle

    1

  • Un

    fun

    de

    d P

    roje

    cts

    in t

    he

    Cap

    ital

    Fac

    ilit

    ies

    Pla

    n Y

    ear

    s 7

    -20

    Un

    fun

    de

    d T

    ran

    spo

    rtat

    ion

    Im

    pro

    vem

    en

    t P

    lan

    /Ext

    ern

    al F

    un

    din

    g C

    and

    idat

    es

    Pro

    ject

    Pro

    ject

    Po

    ten

    tia

    l No

    n-M

    oto

    rize

    d P

    roje

    cts

    Un

    der

    Pla

    ceh

    old

    ers;

    No

    t In

    clu

    ded

    in T

    ota

    ls

    Nu

    mb

    er

    Pro

    ject

    Tit

    leTo

    tal

    Nu

    mb

    er

    Pro

    ject

    Tit

    leTo

    tal

    Pro

    ject

    STC

    06

    30

    01

    20

    th A

    ven

    ue

    NE

    Ro

    adw

    ay Im

    pro

    vem

    ents

    4,5

    00

    ,00

    0

    STC

    05

    60

    01

    32

    nd

    Ave

    nu

    e N

    E R

    oad

    way

    Imp

    rove

    men

    ts2

    5,1

    70

    ,00

    0

    N

    um

    be

    rP

    roje

    ct T

    itle

    Tota

    l

    STC

    07

    20

    0N

    E 1

    20

    th S

    tree

    t R

    oad

    way

    Imp

    rove

    men

    ts (

    Wes

    t Se

    ctio

    n)

    15

    ,78

    0,6

    00

    STC

    06

    10

    01

    19

    th A

    ven

    ue

    NE

    Ro

    adw

    ay E

    xten

    sio

    n5

    ,64

    0,0

    00

    N

    MC

    88

    88

    1 O

    n-S

    tree

    t B

    icyc

    le N

    etw

    ork

    Ca

    nd

    ida

    te P

    roje

    cts:

    STC

    07

    70

    0N

    E 1

    32

    nd

    St

    Rd

    wy

    Imp

    rv.-

    Ph

    ase

    I (W

    est

    Sect

    ion

    )1

    ,73

    9,0

    00

    STC

    06

    20

    0N

    E 1

    30

    th S

    tree

    t R

    oad

    way

    Imp

    rove

    men

    ts1

    0,0

    00

    ,00

    0

    N

    MC

    00

    10

    01

    16

    th A

    ve N

    E (S

    o. S

    ect.

    ) N

    on

    -Mo

    torz

    'd F

    acil-

    Ph

    ase

    II3

    ,37

    8,0

    00

    STC

    07

    80

    0N

    E 1

    32

    nd

    St

    Rd

    wy

    Imp

    rv-P

    ha

    se II

    (M

    id S

    ecti

    on

    )4

    08

    ,00

    0

    ST

    C 0

    64

    00

    12

    4th

    Ave

    nu

    e N

    E R

    oad

    way

    Ext

    ensi

    on

    30

    ,34

    9,0

    00

    NM

    C 0

    36

    00

    NE

    10

    0th

    Str

    eet

    Bik

    e la

    ne

    1,6

    44

    ,30

    0

    STC

    07

    90

    0N

    E 1

    32

    nd

    St

    Rd

    wy

    Imp

    rv-P

    ha

    se II

    I (Ea

    st S

    ecti

    on

    )1

    ,44

    4,0

    00

    STC

    07

    30

    01

    20

    th A

    ven

    ue

    NE

    Ro

    adw

    ay E

    xten

    sio

    n1

    6,3

    92

    ,00

    0

    N

    MC

    99

    99

    1 S

    idew

    alk

    Co

    mp

    leti

    on

    Pro

    gra

    m C

    an

    did

    ate

    Pro

    ject

    s:

    STC

    08

    10

    0To

    tem

    Lak

    e A

    rea

    Dev

    elo

    pm

    ent

    Op

    po

    rtu

    nit

    y P

    rogr

    am5

    00

    ,00

    0

    ST

    C 0

    86

    00

    Fin

    n H

    ill E

    mer

    gen

    cy V

    ehic

    le A

    cces

    s C

    on

    nec

    tio

    n9

    00

    ,00

    0

    N

    MC

    02

    60

    0N

    E 9

    0th

    Str

    eet

    Sid

    ewal

    k (P

    has

    e II

    )7

    06

    ,20

    0

    STC

    08

    31

    51

    00

    th A

    ven

    ue

    NE

    Ro

    adw

    ay Im

    pro

    vem

    en

    ts (

    Mid

    -So

    uth

    Se

    ctio

    n)

    5,5

    30

    ,00

    0

    NM

    C 0

    30

    00

    NE

    90

    th S

    tree

    t/I-

    40

    5 P

    edes

    tria

    n/B

    icyc

    le O

    verp

    ass

    3,7

    40

    ,70

    0

    NM

    C 0

    37

    00

    13

    0th

    Ave

    nu

    e N

    E Si

    dew

    alk

    83

    3,6

    00

    STC

    08

    31

    61

    00

    th A

    ven

    ue

    NE

    Ro

    adw

    ay Im

    pro

    vem

    en

    ts (

    Sou

    th S

    ect

    ion

    )3

    ,61

    9,0

    00

    N

    MC

    03

    10

    0C

    rest

    wo

    od

    s P

    ark/

    CK

    C C

    orr

    ido

    r P

    ed/B

    ike

    Faci

    lity

    2,5

    05

    ,00

    0

    NM

    C 0

    45

    00

    NE

    95

    th S

    tree

    t Si

    dew

    alk

    (Hig

    hla

    nd

    s)5

    71

    ,50

    0

    STC

    09

    40

    0H

    olm

    es

    Po

    int

    Dr

    NE

    Ro

    ad E

    mb

    ankm

    en

    t St

    abil

    izat

    ion

    Lo

    cati

    on

    12

    46

    ,00

    0

    N

    MC

    03

    20

    09

    3rd

    Ave

    nu

    e Si

    dew

    alk

    1,0

    47

    ,90

    0

    NM

    C 0

    47

    00

    11

    6th

    Ave

    nu

    e N

    E Si

    dew

    alk

    (So

    uth

    Ro

    se H

    ill)

    84

    0,0

    00

    STC

    09

    50

    0H

    olm

    es

    Po

    int

    Dr

    NE

    Ro

    ad E

    mb

    ankm

    en

    t St

    abil

    izat

    ion

    Lo

    cati

    on

    24

    12

    ,00

    0

    N

    MC

    04

    30

    0N

    E 1

    26

    th S

    t N

    on

    mo

    tori

    zed

    Fac

    iliti

    es4

    ,27

    7,2

    00

    N

    MC

    04

    80

    0N

    E 6

    0th

    Str

    eet

    Sid

    ewal

    k5

    00

    ,00

    0

    STC

    09

    60

    0H

    olm

    es

    Po

    int

    Dr

    NE

    Ro

    ad E

    mb

    ankm

    en

    t St

    abil

    izat

    ion

    Lo

    cati

    on

    35

    03

    ,00

    0

    N

    MC

    04

    60

    01

    8th

    Ave

    nu

    e SW

    Sid

    ewal

    k2

    ,25

    5,0

    00

    N

    MC

    04

    90

    01

    12

    th A

    ve N

    E Si

    dew

    alk

    52

    7,6

    00

    STC

    09

    70

    0H

    olm

    es

    Po

    int

    Dr

    NE

    Ro

    ad E

    mb

    ankm

    en

    t St

    abil

    izat

    ion

    Lo

    cati

    on

    45

    51

    ,00

    0

    N

    MC

    05

    00

    0N

    E 8

    0th

    Str

    eet

    Sid

    ewal

    k8

    59

    ,70

    0

    N

    MC

    06

    10

    0N

    E 1

    04

    th S

    tree

    t Si

    dew

    alk

    1,0

    85

    ,00

    0

    STC

    09

    80

    0H

    olm

    es

    Po

    int

    Dr

    NE

    Ro

    ad E

    mb

    ankm

    en

    t St

    abil

    izat

    ion

    Lo

    cati

    on

    52

    32

    ,00

    0

    N

    MC

    05

    40

    01

    3th

    Ave

    nu

    e Si

    dew

    alk

    44

    6,7

    00

    NM

    C 0

    63

    00

    Kir

    klan

    d W

    ay S

    idew

    alk

    41

    4,5

    00

    STC

    09

    90

    0C

    ham

    pag

    ne

    Pt

    Ro

    ad N

    E Em

    ban

    kme

    nt

    Stab

    iliz

    atio

    n5

    63

    ,00

    0

    N

    MC

    05

    50

    01

    22

    nd

    Ave

    NE

    Sid

    ewal

    k8

    66

    ,70

    0

    N

    MC

    07

    20

    0N

    E 1

    32

    nd

    Str

    eet

    Sid

    ewal

    k at

    Fin

    n H

    ill M

    idd

    le S

    cho

    ol

    84

    0,0

    00

    STC

    10

    00

    06

    2n

    d A

    ve N

    E R

    oad

    Em

    ban

    kme

    nt

    Stab

    iliz

    aiti

    on

    82

    3,0

    00

    NM

    C 0

    58

    00

    11

    1th

    Ave

    nu

    e N

    on

    -Mo

    tori

    zed

    /Em

    erge

    ncy

    Acc

    ess

    Co

    nn

    ecti

    on

    2

    ,00

    0,0

    00

    N

    MC

    07

    50

    08

    4th

    Ave

    NE

    Sid

    ewal

    k4

    ,05

    2,8

    00

    STC

    10

    10

    01

    14

    th A

    ve N

    E R

    oad

    Re

    con

    stru

    ctio

    n1

    ,90

    0,0

    00

    N

    MC

    06

    20

    01

    9th

    Ave

    nu

    e Si

    dew

    alk

    81

    4,2

    00

    NM

    C 0

    76

    00

    NE

    14

    0th

    St

    Sid

    ewal

    k -

    Mu

    ir E

    lem

    Wal

    k R

    t En

    han

    . Ph

    ase

    11

    ,13

    1,0

    00

    STC

    10

    20

    09

    0th

    Ave

    NE

    Ro

    ad S

    urf

    ace

    Wat

    er

    Dra

    inag

    e R

    ep

    air

    42

    0,0

    00

    NM

    C 0

    74

    00

    90

    th A

    ve N

    E Si

    dew

    alk

    35

    3,4

    00

    NM

    C 0

    77

    00

    NE

    14

    0th

    St

    Sid

    ewal

    k -

    Kel

    ler

    Elem

    Wal

    k R

    t En

    han

    . - N

    1,1

    85

    ,00

    0

    NM

    C 0

    12

    99

    Cro

    ssw

    alk

    Up

    grad

    e P

    rogr

    am4

    ,10

    0,0

    00

    N

    MC

    08

    00

    0Ju

    anit

    a-K

    ings

    gate

    Ped

    estr

    ian

    Bri

    dge

    at

    I40

    54

    ,50

    0,0

    00

    N

    MC

    07

    80

    0N

    E 1

    40

    th S

    t Si

    dew

    alk

    - K

    elle

    r El

    em W

    alk

    Rt

    Enh

    an. -

    S7

    47

    ,00

    0

    NM

    C 0

    86

    30

    CK

    C R

    oad

    way

    Cro

    ssin

    gs3

    ,37

    0,1

    00

    N

    MC

    08

    60

    0C

    ross

    Kir

    klan

    d C

    orr

    ido

    r N

    on

    -mo

    tori

    zed

    Imp

    rove

    men

    ts6

    5,7

    42

    ,00

    0

    N

    MC

    07

    90

    0N

    E 1

    40

    th S

    t Si

    dew

    alk

    - M

    uir

    Ele

    m W

    alk

    Rt

    Enh

    an. P

    has

    e 2

    64

    8,0

    00

    NM

    C 0

    90

    11

    Juan

    ita

    Dri

    ve B

    icyc

    le a

    nd

    Ped

    estr

    ian

    Imp

    rove

    men

    ts1

    0,6

    50

    ,00

    0

    N

    MC

    10

    60

    0C

    ityw

    ide

    CK

    C C

    on

    nec

    tio

    ns

    36

    0,0

    00

    NM

    C 0

    88

    00

    NE

    12

    4th

    Str

    eet

    Sid

    ewal

    k3

    76

    ,00

    0

    NM

    C 1

    11

    00

    10

    8th

    Ave

    nu

    e N

    E B

    icyc

    le L

    anes

    Up

    grad

    e8

    45

    ,00

    0

    N

    MC

    10

    70

    0C

    KC

    to

    Do

    wn

    tow

    n S

    urf

    ace

    Co

    nn

    ecti

    on

    2,0

    00

    ,00

    0

    NM

    C 0

    97

    00

    13

    2n

    d N

    E Si

    dew

    alk

    73

    2,0

    00

    NM

    C 1

    13

    99

    Cit

    ywid

    e G

    reen

    way

    Net

    wo

    rk4

    ,45

    0,0

    00

    TR

    C 0

    67

    00

    Kir

    klan

    d W

    ay/C

    KC

    Bri

    dge

    Ab

    utm

    ent/

    Inte

    rsec

    tio

    n Im

    prv

    6,9

    17

    ,00

    0

    NM

    C 1

    01

    00

    7th

    Ave

    nu

    e Si

    dew

    alk

    20

    8,0

    00

    NM

    C 1

    17

    00

    On

    -Str

    eet

    Bic

    ycle

    Net

    wo

    rk P

    has

    e I

    1,1

    20

    ,00

    0

    TRC

    11

    40

    0Sl

    ater

    Ave

    nu

    e N

    E Tr

    affi

    c C

    alm

    ing

    - P

    has

    e I

    24

    7,0

    00

    NM

    C 1

    02

    00

    NE

    12

    0th

    Str

    eet

    Sid

    ewal

    k5

    48

    ,00

    0

    NM

    C 8

    88

    81

    On

    -str

    eet

    Bic

    ycle

    Net

    wo

    rk3

    ,28

    0,0

    00

    TR

    C 1

    17

    04

    NE

    68

    th S

    tree

    t In

    ters

    ecti

    on

    Imp

    rove

    men

    ts/A

    cces

    s M

    anag

    emen

    t4

    ,37

    5,0

    00

    N

    MC

    10

    30

    01

    20

    th A

    ven

    ue

    NE

    Sid

    ewal

    k 5

    56

    ,00

    0

    NM

    C 9

    99

    91

    Sid

    ewal

    k C

    om

    ple

    tio

    n P

    rogr

    am6

    ,09

    6,8

    00

    TR

    C 1

    23

    00

    Slat

    er A

    ven

    ue

    NE

    (13

    2n

    d A

    ven

    ue

    NE)

    /NE

    12

    4th

    Str

    eet

    2,1

    24

    ,00

    0

    NM

    C 1

    04

    00

    NE

    12

    2n

    d P

    lace

    /NE

    12

    3rd

    Str

    eet

    Sid

    ewal

    k 1

    ,29

    4,0

    00

    PTC

    00

    20

    0P

    ub

    lic T

    ran

    sit

    Spee

    d a

    nd

    Rel

    iab

    ility

    Imp

    rove

    men

    ts5

    00

    ,00

    0

    Su

    bto

    tal U

    nfu

    nd

    ed

    Tra

    nsp

    ort

    atio

    n Im

    pro

    vem

    en

    t P

    lan

    /Ext

    ern

    al F

    un

    din

    g C

    and

    idat

    es

    19

    3,8

    82

    ,50

    0

    N

    MC

    10

    50

    01

    20

    th A

    ven

    ue

    NE

    Sid

    ewal

    k 8

    12

    ,00

    0

    PTC

    00

    30

    0P

    ub

    lic T

    ran

    sit

    Pas

    sen

    ger

    Envi

    ron

    men

    t Im

    pro

    vem

    ents

    50

    0,0

    00

    Gra

    nd

    To

    tal U

    nfu

    nd

    ed T

    ran

    spo

    rtat

    ion

    Pro

    ject

    s3

    85

    ,07

    1,0

    00

    P

    TC 0

    04

    00

    10

    8th

    Ave

    nu

    e N

    E Tr

    ansi

    t Q

    ueu

    e Ju

    mp

    - P

    has

    e I

    4,8

    75

    ,00

    0

    PTC

    00

    50

    01

    08

    th A

    ven

    ue

    NE

    Tran

    sit

    Qu

    eue

    Jum

    p -

    Ph

    ase

    II5

    ,64

    0,0

    00

    No

    tes

    TRC

    09

    50

    0N

    E 1

    32

    nd

    St/

    Fire

    Stn

    Acc

    ess

    Dr

    Inte

    rsec

    t'n

    Imp

    48

    0,0

    00

    Ita

    lics

    = M

    od

    ific

    ati

    on

    in t

    imin

    g a

    nd

    /or

    cost

    TRC

    09

    60

    0N

    E 1

    32

    nd

    St/

    12

    4th

    Ave

    NE

    Inte

    rsec

    t'n

    Imp

    7,4

    00

    ,00

    0

    B

    old

    = N

    ew

    pro

    ject

    s

    TRC

    09

    70

    0N

    E 1

    32

    nd

    St/

    13

    2n

    d A

    ve N

    E In

    ters

    ect'

    n Im

    p1

    ,15

    0,0

    00

    + =

    Mo

    ved

    fro

    m u

    nfu

    nd

    ed s

    tatu

    s to

    fu

    nd

    ed s

    tatu

    s

    TRC

    12

    50

    0K

    irkl

    and

    ITS

    Imp

    lem

    enta

    tio

    n P

    has

    e 4

    2

    ,62

    0,0

    00

    "

    = M

    ove

    d f

    rom

    fu

    nd

    ed s

    tatu

    s to

    un

    fun

    ded

    sta

    tus

    TRC

    12

    80

    06

    th S

    tree

    t S/

    5th

    Pla

    ce/C

    KC

    Tra

    nsi

    t Si

    gnal

    Pri

    ori

    ty2

    ,60

    0,0

    00

    # =

    Pro

    ject

    s to

    be

    fun

    ded

    wit

    h d

    evel

    op

    men

    t-re

    late

    d r

    even

    ues

    TRC

    12

    90

    0N

    E 5

    3rd

    Str

    eet

    Inte

    rsec

    tio

    n Im

    pro

    vem

    ents

    4,3

    45

    ,00

    0^

    = Fu

    ture

    , un

    fun

    ded

    po

    rtio

    n o

    f p

    roje

    cts

    fun

    ded

    in y

    ears

    1-6

    TRC

    13

    00

    0N

    E 1

    45

    th S

    tre

    et/

    Juan

    ita-

    Wo

    od

    invi

    lle

    Way

    Inte

    rse

    ctio

    n Im

    ps

    2,1

    00

    ,00

    0

    ~ =

    An

    nu

    al P

    rogr

    ams

    wit

    h C

    and

    idat

    e p

    roje

    cts

    TRC

    13

    10

    0N

    E 8

    0th

    Str

    ee

    t/1

    20

    th A

    ven

    ue

    NE

    Inte

    rse

    ctio

    n Im

    pro

    vem

    en

    ts1

    ,70

    0,0

    00

    TRC

    13

    20

    01

    00

    th A

    ven

    ue

    NE/

    13

    2n

    d S

    tre

    et

    Inte

    rse

    ctio

    n Im

    pro

    vem

    en

    ts1

    ,64

    7,0

    00

    TRC

    13

    30

    01

    00

    th A

    ven

    ue

    NE/

    Juan

    ita-

    Wo

    od

    invi

    lle

    Way

    Inte

    rse

    ctio

    n Im

    ps

    2,1

    61

    ,00

    0

    TRC

    13

    40

    01

    00

    th A

    ven

    ue

    NE/

    13

    7th

    Str

    ee

    t In

    ters

    ect

    ion

    Imp

    rove

    me

    nts

    1,4

    75

    ,00

    0

    TRC

    13

    70

    0La

    ke S

    tre

    et/

    Kir

    klan

    d A

    ven

    ue

    Inte

    rse

    ctio

    n Im

    pro

    vem

    en

    ts1

    ,55

    3,0

    00

    TRC

    13

    80

    0N

    E 1

    00

    th S

    tre

    et/

    13

    2n

    d A

    ve N

    E In

    ters

    ect

    ion

    Imp

    rove

    me

    nts

    1,7

    43

    ,00

    0

    Cap

    acit

    y P

    roje

    cts

    Sub

    tota

    l1

    15

    ,57

    1,5

    00

    STC

    00

    60

    0 ^

    An

    nu

    al S

    tree

    t P

    rese

    rvat

    ion

    Pro

    gram

    22

    ,75

    0,0

    00

    STC

    00

    60

    3 ^

    Stre

    et L

    evy

    Stre

    et P

    rese

    rvat

    ion

    31

    ,10

    7,0

    00

    STC

    08

    00

    0 ^

    An

    nu

    al S

    trip

    ing

    Pro

    gram

    50

    0,0

    00

    STC

    99

    99

    0 ^

    Reg

    ion

    al In

    ter-

    Age

    ncy

    Co

    ord

    inat

    ion

    82

    0,0

    00

    NM

    C 0

    06

    21

    ^N

    eigh

    bo

    rho

    od

    Saf

    ety

    Pro

    gram

    Imp

    rove

    men

    ts3

    ,00

    0,0

    00

    NM

    C 0

    57

    00

    ^A

    nn

    ual

    Sid

    ewal

    k M

    ain

    ten

    ance

    Pro

    gram

    2,6

    00

    ,00

    0

    TRC

    11

    60

    0 ^

    An

    nu

    al S

    ign

    al M

    ain

    ten

    ance

    Pro

    gram

    2,6

    00

    ,00

    0

    TRC

    11

    70

    0 ^

    Cit

    ywid

    e Tr

    affi

    c M

    anag

    emen

    t Sa

    fety

    Imp

    rove

    men

    ts1

    ,40

    0,0

    00

    TRC

    11

    70

    2V

    isio

    n Z

    ero

    Saf

    ety

    Imp

    rove

    men

    t6

    50

    ,00

    0

    TRC

    11

    70

    3

    Nei

    ghb

    orh

    oo

    d T

    raff

    ic C

    on

    tro

    l3

    25

    ,00

    0

    No

    n-C

    apac

    ity

    Pro

    ject

    s Su

    bto

    tal

    65

    ,75

    2,0

    00

    Tota

    l Tra

    nsp

    ort

    atio

    n M

    aste

    r P

    lan

    Pro

    ject

    s Y

    rs 7

    -20

    18

    1,3

    23

    ,50

    0

    Un

    fun

    de

    d P

    roje

    cts

    in t

    he

    Cap

    ital

    Fac

    ilit

    ies

    Pla

    n Y

    ear

    s 7

    -20

    an

    d T

    ran

    spo

    rtat

    ion

    Im

    pro

    vem

    en

    t P

    lan

    NM

    C 0

    24

    12

    Cro

    ss K

    irkl

    and

    Co

    rrid

    or

    Op

    po

    rtu

    nit

    y Fu

    nd

    50

    0,0

    00

    NM

    C 0

    31

    00

    Cre

    stw

    oo

    ds

    Par

    k/C

    KC

    Co

    rrid

    or

    Ped

    /Bik

    e Fa

    cilit

    y2

    ,50

    5,0

    00

    NM

    C0

    80

    00

    Juan

    ita-

    Kin

    gsga

    te P

    edes

    tria

    n B

    rid

    ge a

    t I-

    40

    54

    ,50

    0,0

    00

    NM

    C 1

    06

    00

    Cit

    ywid

    e C

    KC

    Co

    nn

    ecti

    on

    36

    0,0

    00

    NM

    C1

    07

    00

    CK

    C t

    o D

    ow

    nto

    wn

    Su

    rfac

    e C

    on

    nec

    tio

    n2

    ,00

    0,0

    00

    Cap

    ital

    Fac

    ilit

    ies

    Pro

    ject

    s N

    ot

    in T

    MP

    Su

    bto

    tal

    9,8

    65

    ,00

    0

    Tota

    l Cap

    ital

    Fac

    ilit

    ies

    Pla

    n P

    roje

    cts

    Yrs

    7-2

    01

    91

    ,18

    8,5

    00

    TRA

    NSP

    OR

    TATI

    ON

    PR

    OJE

    CTS

    2

  • Funded Transportation Projects

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060000DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    ANNUAL STREET PRESERVATION PROGRAM

    PROJECTLOCATION

    City‐wide PROJECT STATUSModified Project

    DESCRIPTION/JUSTIFICATIONPreservation of roadway system with various techniques including overlay, slurry seal, crack seal and others.  The Public Works Department is responsible for numerous miles of asphalt streets throughout the City.  The annual program ensures maintenance of this infrastructure and reduces costly repairs resulting from total road failure.  Project includes repair and resurfacing of streets and repair and replacement of adjoining damaged concrete curb, gutters and sidewalks as well as installing accessible curb ramps to meet the requirements of the Americans with Disabilities Act (ADA).  Project complements levy‐funded project STC0060300.

    REASON FOR MODIFICATION (WHERE APPLICABLE)Total Project cost reflects reduced total amounts shown for 2019 and 2020 with funding shifted from this general Street Preservation Project to specific associated Street Preservation Projects, STC0060600 ‐ 6th Street South Street Preservation and STC0060700 ‐ 98th Avenue Street Preservation for funding in those respective years.

    PROJECT STARTOngoing

    METHOD OF FINANCING (%)Current Revenue 100Reserve 0Grants 0Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 92,000 62,000 137,500 137,500 137,500 137,500 0Planning/Design/ Engineering

    704,000 704,000

    0 89,000 60,000 133,500 133,500 133,500 133,500 0In‐House Professional Svcs.

    683,000 683,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 960,000 649,000 1,454,000 1,454,000 1,454,000 1,454,000 0Construction 7,425,000 7,425,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 25,000 25,000 25,000 25,000 25,000 25,000 0Equipment 150,000 150,000

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 1,166,000 796,000 1,750,000 1,750,000 1,750,000 1,750,000 08,962,000 8,962,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Dependable Infrastructure

    3

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060000DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    ANNUAL STREET PRESERVATION PROGRAM

    Amount of public disruption and inconvenience 

    caused

    Minimal, for short periods of time during construction.

    Community economic impacts

    Preventive maintenance through overlay and other repair strategies will prevent costly roadway reconstruction in the future.

    Health and safety, environmental, 

    aesthetic, or social effects

    Improved vehicular traffic safety by improving roadway surface.

    Responds to an urgent need or opportunity

    Responds to the need for safe roadways, and as a preventive measure for the possibility of road failure.

    Feasibility, including public support and 

    project readiness

    There is not a lack of public support or project readiness.

    Conforms to legal or contractual obligations

    Will be designed and constructed per professional and legal guidelines.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Road maintenance program prevents more costly type of repairs.

    Implications of deferring the 

    project

    Possibility of roadway failure with increased maintenance and safety problems.

    Name of Neighborhood(s) in which located:   City‐wideIs there a specific reference to this project or land use in the immediate vicinity?How does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    4

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060300DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    STREET LEVY STREET PRESERVATION PROJECT

    PROJECTLOCATION

    City‐wide PROJECT STATUSModified Project

    DESCRIPTION/JUSTIFICATIONA voter‐approved levy funded annual project to enhance preservation of roadway system as part of an overall preservation program.  Project includes repair and resurfacing of streets and repair and replacement of adjoining damaged concrete curb, gutters and sidewalks as well as installing accessible curb ramps to meet the requirements of the Americans with Disabilities Act (ADA).  Project complements STC0060000.

    REASON FOR MODIFICATION (WHERE APPLICABLE)Total Project cost reflects reduced total amounts shown for 2019 and 2020 with funding shifted from this general Street Levy Street Preservation Project to specific associated Street Preservation Projects, STC0060600 ‐ 6th Street South Street Preservation and STC0060700 ‐ 98th Avenue Street Preservation for funding in those respective years.

    PROJECT STARTOngoing

    METHOD OF FINANCING (%)Current Revenue 100Reserve 0Grants 0Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 128,000 78,000 192,000 194,000 200,000 202,000 0Planning/Design/ Engineering

    994,000 994,000

    0 125,000 76,000 187,000 189,000 194,000 197,000 0In‐House Professional Svcs.

    968,000 968,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 1,325,000 808,000 2,019,000 2,042,000 2,059,000 2,082,000 0Construction 10,335,000 10,335,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 35,000 35,000 35,000 35,000 35,000 35,000 0Equipment 210,000 210,000

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 1,613,000 997,000 2,433,000 2,460,000 2,488,000 2,516,000 012,507,000 12,507,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Dependable Infrastructure

    5

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060300DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    STREET LEVY STREET PRESERVATION PROJECT

    Amount of public disruption and inconvenience 

    caused

    Minimal, for short periods of time during construction.

    Community economic impacts

    Preventive maintenance through overlay and other repair strategies will prevent costly roadway reconstruction in the future.

    Health and safety, environmental, 

    aesthetic, or social effects

    Improved vehicular traffic safety by improving roadway surface.

    Responds to an urgent need or opportunity

    Responds to the need for safe roadways, and as a preventive measure for the possibility of road failure.

    Feasibility, including public support and 

    project readiness

    There is not a lack of public support or project readiness.

    Conforms to legal or contractual obligations

    Will be designed and constructed per professional and legal guidelines.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Road maintenance program prevents more costly type of repairs.

    Implications of deferring the 

    project

    Possibility of roadway failure with increased maintenance and safety problems.

    Name of Neighborhood(s) in which located:   City‐wideIs there a specific reference to this project or land use in the immediate vicinity? NoHow does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    6

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060400DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    STREET PRESERVATION CENTRAL WAY

    PROJECTLOCATION

    Central Way, between Market Street and 114th Avenue NE PROJECT STATUSExisting Project

    DESCRIPTION/JUSTIFICATIONThe design for grinding, patching, modifications of wheelchair ramps and overlay of Central Way.  Funds became available through a federal Street Preservation design‐only grant. Overlay of the project will occur though the Street Preservation Program timed in coordination with adjacent major redevelopment activity.

    REASON FOR MODIFICATION (WHERE APPLICABLE)

    PROJECT START2019

    METHOD OF FINANCING (%)Current Revenue 14Reserve 0Grants 86($184,473) SPP/federal

    Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 143,000 0 0 0 0 0 0Planning/Design/ Engineering

    143,000 143,000

    0 71,000 0 0 0 0 0 0In‐House Professional Svcs.

    71,000 71,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 0 0 0 0 0 0 0Construction 0 0

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 0 0 0 0 0 0Equipment 0 0

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 214,000 0 0 0 0 0 0214,000 214,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Dependable Infrastructure

    Economic Development

    7

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060400DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    STREET PRESERVATION CENTRAL WAY

    Amount of public disruption and inconvenience 

    caused

    Minimal, for short periods of time during construction.

    Community economic impacts

    Preventive maintenance through overlay and other repair strategies will prevent costly roadway reconstruction in the future.

    Health and safety, environmental, 

    aesthetic, or social effects

    Improved vehicular traffic safety by improving roadway surface.

    Responds to an urgent need or opportunity

    Responds to the need for safe roadways, and as a preventive measure for the possibility of road failure.

    Feasibility, including public support and 

    project readiness

    There is not a lack of public support or project readiness.

    Conforms to legal or contractual obligations

    Will be designed and constructed per professional and legal guidelines.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Road maintenance program prevents more costly type of repairs.

    Implications of deferring the 

    project

    Possibility of roadway failure with increased maintenance and safety problems.

    Name of Neighborhood(s) in which located:   Moss Bay, NorkirkIs there a specific reference to this project or land use in the immediate vicinity? NoHow does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    8

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060500DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    TOTEM LAKE BLVD GATEWAY & ROADWAY REPAIR

    PROJECTLOCATION

    Totem Lake Blvd, between NE 124th Street and 120th Avenue NE PROJECT STATUSModified Project

    DESCRIPTION/JUSTIFICATIONThe repair  and rebuild of a portion of Totem Lake Blvd, to include  a combination of standard and geotechnically accepted roadprism  repair  techniques for insuring structural road base and roadway surface integrity. The scope of the project has been expanded to include a new retaining wall at the edge of Totem lake, needed to support and separate the roadway from the lake. The improvements now include a new 10‐foot wide sidewalk along the east side of the Blvd and a new southbound through lane at the intersection of NE 124th Street and Totem Lake Blvd, plus all permit required surface water and environmental improvements. The street is to be re‐channelized with median islands in the southerly segment.  Asphalt pavement to be replaced on all segments throughout the project limits except where already renewed by the developer.  In support of secured grant funding, the project now included sidewalk replacement along 120th Avenue NE and a portion of Totem Lake Way to raise the south and east side sidewalk to be consistent with new sidewalk grades established by the new development along the north and west edge of 120th Avenue NE

    REASON FOR MODIFICATION (WHERE APPLICABLE)Project Description changed/enhanced to include all elements covered by the secured TIB grant.  Total Project costs changed to capture all available City funding and secured TIB grant funding, including City match funds.  Project to be coordinated with associated TIB funded project CNM1220000.  Method of Financing has been updated ‐‐ no new funding has been added.

    PROJECT START2017

    METHOD OF FINANCING (%)Current Revenue 16Reserve 0Grants 84TIB ($4,320,000)

    Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Improvement Plan

    PRIOR YEAR(S)BUDGET TO ACTUALS

    Budget $2,120,000Actual $0

    Balance $2,120,000

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    470,000 209,800 349,000 0 0 0 0 0Planning/Design/ Engineering

    558,800 1,028,800

    71,000 91,200 69,000 0 0 0 0 0In‐House Professional Svcs.

    160,200 231,200

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    1,579,000 1,245,000 881,000 0 0 0 0 0Construction 2,126,000 3,705,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 21,000 0 0 0 0 0Equipment 21,000 21,000

    0 154,000 0 0 0 0 0 0Other Services 154,000 154,000

    Total 2,120,000 1,700,000 1,320,000 0 0 0 0 03,020,000 5,140,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Dependable Infrastructure

    Economic Development

    9

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060500DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    TOTEM LAKE BLVD GATEWAY & ROADWAY REPAIR

    Amount of public disruption and inconvenience 

    caused

    Minimal, for short periods of time during construction.

    Community economic impacts

    Preventive maintenance through overlay and other repair strategies will prevent costly roadway reconstruction in the future.

    Health and safety, environmental, 

    aesthetic, or social effects

    Improved vehicular traffic safety by improving roadway surface.

    Responds to an urgent need or opportunity

    Responds to the need for safe roadways, and as a preventive measure for the possibility of road failure.

    Feasibility, including public support and 

    project readiness

    There is not a lack of public support or project readiness.

    Conforms to legal or contractual obligations

    Will be designed and constructed per professional and legal guidelines.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Road maintenance program prevents more costly type of repairs.

    Implications of deferring the 

    project

    Possibility of roadway failure with increased maintenance and safety problems.

    Name of Neighborhood(s) in which located:   Totem Lake, North Rose HillIs there a specific reference to this project or land use in the immediate vicinity? NoHow does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    10

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060600DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    6TH STREET SOUTH STREET PRESERVATION

    PROJECTLOCATION

    6th Street/6th Street South, between NE 68th Street and Central Way PROJECT STATUSNew Project

    DESCRIPTION/JUSTIFICATIONThe repair and rebuild of 6th Street and 6th Street South, to include  a combination of standard and geotechnically accepted road prism repair techniques for insuring structural road base and roadway surface integrity.  Asphalt pavement to be replaced on all segments throughout the project limits and the replacement of ADA con‐compliant wheelchair ramps.

    REASON FOR MODIFICATION (WHERE APPLICABLE)

    PROJECT START2019

    METHOD OF FINANCING (%)Current Revenue 100Reserve 0Grants 0Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 78,000 98,000 0 0 0 0 0Planning/Design/ Engineering

    176,000 176,000

    0 76,000 95,000 0 0 0 0 0In‐House Professional Svcs.

    171,000 171,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 796,000 1,007,000 0 0 0 0 0Construction 1,803,000 1,803,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 50,000 0 0 0 0 0 0Equipment 50,000 50,000

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 1,000,000 1,200,000 0 0 0 0 02,200,000 2,200,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    11

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060600DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    6TH STREET SOUTH STREET PRESERVATION

    Amount of public disruption and inconvenience 

    caused

    Minor for short periods of time during construction.

    Community economic impacts

    Preventive maintenance through overlay and other repair strategies will prevent costly roadway reconstruction in the future.

    Health and safety, environmental, 

    aesthetic, or social effects

    Improved vehicular traffic safety by improving roadway surface.

    Responds to an urgent need or opportunity

    Responds to the need for safe roadways, and as a preventive measure for the possibility of road failure.

    Feasibility, including public support and 

    project readiness

    There is not a lack of public support or project readiness.

    Conforms to legal or contractual obligations

    Will be designed and constructed per professional and legal guidelines.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    N/A

    Implications of deferring the 

    project

    Possibility of roadway failure with increased maintenance and safety problems.

    Name of Neighborhood(s) in which located:   Everest, Moss BayIs there a specific reference to this project or land use in the immediate vicinity?How does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    12

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060700DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    98TH AVENUE NE STREET PRESERVATION

    PROJECTLOCATION

    98th Avenue NE, Forbes Creek Drive to NE 116th Street PROJECT STATUSNew Project

    DESCRIPTION/JUSTIFICATIONComplete design and construction for resurfacing 98th Avenue NE from Forbes Creek Drive to NE 116th Street.  Repair damaged sections of pavement, broken curb, gutter and sidewalk. Resurface bridge deck and reconstruct bridge joints.  Replace and upgrade curb ramps to meet ADA requirements.  Place traffic loops where needed and restripe pavement markings.

    REASON FOR MODIFICATION (WHERE APPLICABLE)

    PROJECT START2019

    METHOD OF FINANCING (%)Current Revenue 69Reserve 0Grants 31PSRC ($631,000)

    Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 160,000 138,000 0 0 0 0 0Planning/Design/ Engineering

    298,000 298,000

    0 160,000 136,000 0 0 0 0 0In‐House Professional Svcs.

    296,000 296,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 0 1,393,000 0 0 0 0 0Construction 1,393,000 1,393,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 35,000 0 0 0 0 0Equipment 35,000 35,000

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 320,000 1,702,000 0 0 0 0 02,022,000 2,022,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    13

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0060700DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    98TH AVENUE NE STREET PRESERVATION

    Amount of public disruption and inconvenience 

    caused

    Community economic impacts

    Health and safety, environmental, 

    aesthetic, or social effects

    Responds to an urgent need or opportunity

    Feasibility, including public support and 

    project readinessConforms to legal or contractual obligations

    Responds to state and/or federal 

    mandate

    Benefits to other capital projects

    Implications of deferring the 

    project

    Name of Neighborhood(s) in which located:   South Juanita, North JuanitaIs there a specific reference to this project or land use in the immediate vicinity?How does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    14

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0591200DEPARTMENT Public WorksDEPARTMENT CONTACT David Snider

    PROJECTTITLE

    124TH AVENUE NE ROADWAY IMPROVEMENTS (NORTH SECTION) ROW

    PROJECTLOCATION

    NE 116th Street to NE 124th Street PROJECT STATUSModified Project

    DESCRIPTION/JUSTIFICATIONThe purchase of land for the widening of the existing roadway between intersections at NE 116th Street and NE 124th Street from 3 lanes to 5 lanes, include 2‐way center turn lane and improve pedestrian crossing(s).  This project will reconstruct existing sidewalk, transit stops and bicycle lanes which will be impacted by roadway widening.

    REASON FOR MODIFICATION (WHERE APPLICABLE)Project moved from Unfunded upon notice of grant award; Total Project costs increased from $2,050,800 to $2,195,000 based on updated cost estimate and to account for City grant match, including grant unreimbursable project expenses.

    PROJECT START2020

    METHOD OF FINANCING (%)Current Revenue 18Reserve 0Grants 82PSRC ($1,800,000)

    Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 0 100,000 60,000 0 0 0 0Planning/Design/ Engineering

    160,000 160,000

    0 0 55,000 30,000 0 0 0 0In‐House Professional Svcs.

    85,000 85,000

    0 0 1,238,000 712,000 0 0 0 0Land Acquisition 1,950,000 1,950,000

    0 0 0 0 0 0 0 0Construction 0 0

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 0 0 0 0 0 0Equipment 0 0

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 0 1,393,000 802,000 0 0 0 02,195,000 2,195,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Economic Development

    Balanced Transportation

    15

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0591200DEPARTMENT Public WorksDEPARTMENT CONTACT David Snider

    PROJECTTITLE

    124TH AVENUE NE ROADWAY IMPROVEMENTS (NORTH SECTION) ROW

    Amount of public disruption and inconvenience 

    caused

    None ‐‐ right‐of‐way acquisition only

    Community economic impacts

    Added right‐of‐way needed to provide increased congestion mitigation to alleviate congestion in and around the Totem Lake area.

    Health and safety, environmental, 

    aesthetic, or social effects

    Additional pedestrian elements will be added with the project in an attempt to encourage safe pedestrian use of surrounding areas.

    Responds to an urgent need or opportunity

    Significant development and congestion in the Totem Lake area jeopardize the Comp Plan adopted level of service.

    Feasibility, including public support and 

    project readiness

    Commercial driveways and Seattle City Light transmission lines will add significant challenges to the design and construction of the project.

    Conforms to legal or contractual obligations

    Project will be designed and constructed in accordance with professional and legal requirements.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Works in combination with a number of other street improvements to increase capacity in Totem Lake area.

    Implications of deferring the 

    project

    Higher cost of future construction and a continued decline of the area level of service.

    Name of Neighborhood(s) in which located:   Totem Lake, North Rose HillIs there a specific reference to this project or land use in the immediate vicinity? YesHow does the project conform to such references? Project on the 20‐yr list/mapAttachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided: 25%Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    16

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0591300DEPARTMENT Public WorksDEPARTMENT CONTACT David Snider

    PROJECTTITLE

    124TH AVENUE NE ROADWAY IMPROVEMENTS (NORTH SECTION) CONSTRUCTION

    PROJECTLOCATION

    NE 116th Street to NE 124th Street PROJECT STATUSModified Project

    DESCRIPTION/JUSTIFICATIONWiden existing roadway between intersections at NE 116th Street and NE 124th Street from 3 lanes to 5 lanes, include 2‐way center turn lane and improve pedestrian crossing(s).  This project will reconstruct existing sidewalk, transit stops and bicycle lanes, which will be impacted by roadway widening.

    REASON FOR MODIFICATION (WHERE APPLICABLE)Project moved from Unfunded upon notice of grant award; Total Project costs changed from $6,753,800 to $5,400,000 based on updated cost estimate and to account for grant, City grant match and grant unreimbursable project expenses.

    PROJECT START2021

    METHOD OF FINANCING (%)Current Revenue 28Reserve 0Grants 72PSRC ($3,892,000)

    Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 0 0 130,000 725,000 249,000 0 0Planning/Design/ Engineering

    1,104,000 1,104,000

    0 0 0 50,000 138,000 47,000 0 0In‐House Professional Svcs.

    235,000 235,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 0 0 555,000 2,567,000 889,000 0 0Construction 4,011,000 4,011,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 0 25,000 25,000 0 0 0Equipment 50,000 50,000

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 0 0 760,000 3,455,000 1,185,000 0 05,400,000 5,400,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Economic Development

    Balanced Transportation

    17

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0591300DEPARTMENT Public WorksDEPARTMENT CONTACT David Snider

    PROJECTTITLE

    124TH AVENUE NE ROADWAY IMPROVEMENTS (NORTH SECTION) CONSTRUCTION

    Amount of public disruption and inconvenience 

    caused

    During the anticipated multi‐month construction period, all businesses along the project will experience driveway closures, dust, and noise associated with construction.

    Community economic impacts

    Increased congestion in and around the Totem Lake area has the potential to impact local business patronage.

    Health and safety, environmental, 

    aesthetic, or social effects

    Additional pedestrian elements will be added with the project in an attempt to encourage safe pedestrian use of surrounding areas.

    Responds to an urgent need or opportunity

    Significant development and congestion in the Totem Lake area jeopardize the Comp Plan adopted level of service.

    Feasibility, including public support and 

    project readiness

    Commercial driveways and Seattle City Light transmission lines will add significant challenges to the design and construction of the project.

    Conforms to legal or contractual obligations

    Project will be designed and constructed in accordance with professional and legal requirements.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Works in combination with a number of other street improvements to increase capacity in Totem Lake area.

    Implications of deferring the 

    project

    Higher cost of future construction and a continued decline of the area level of service.

    Name of Neighborhood(s) in which located:   Totem Lake, North Rose HillIs there a specific reference to this project or land use in the immediate vicinity? YesHow does the project conform to such references? Project on the 20‐yr list/mapAttachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided: 25%Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    18

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0800000DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    ANNUAL STRIPING PROGRAM

    PROJECTLOCATION

    City‐wide PROJECT STATUSExisting Project

    DESCRIPTION/JUSTIFICATIONAnnual program to maintain markings that identify travel lanes, crosswalks, and other guidance markings for auto, pedestrian, bicycle, transit and other forms of transportation.  The program will result in the restriping of more than 40 miles of collector and arterial streets throughout the City.

    REASON FOR MODIFICATION (WHERE APPLICABLE)

    PROJECT STARTOngoing

    METHOD OF FINANCING (%)Current Revenue 100Reserve 0Grants 0Other Sources 0Debt 0Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 74,000 74,000 74,000 74,000 74,000 74,000 0Planning/Design/ Engineering

    444,000 444,000

    0 35,000 35,000 35,000 35,000 35,000 35,000 0In‐House Professional Svcs.

    210,000 210,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 391,000 391,000 391,000 391,000 391,000 391,000 0Construction 2,346,000 2,346,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 0 0 0 0 0 0Equipment 0 0

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 500,000 500,000 500,000 500,000 500,000 500,000 03,000,000 3,000,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    COUNCIL GOALS

    Dependable Infrastructure

    19

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0800000DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    ANNUAL STRIPING PROGRAM

    Amount of public disruption and inconvenience 

    caused

    During construction traffic control will be required.  Noise and congestion should be anticipated by residents and motorists in the area.

    Community economic impacts

    None anticipated.

    Health and safety, environmental, 

    aesthetic, or social effects

    Improved vehicular traffic safety by improving roadway channelization.

    Responds to an urgent need or opportunity

    Responds to the need for safe roadways, and as a preventive measure for the possibility of insurance claims.

    Feasibility, including public support and 

    project readiness

    There is no lack of public support or project readiness.

    Conforms to legal or contractual obligations

    Will be designed and constructed per professional and legal guidelines.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Road maintenance program prevents more costly type of repairs.

    Implications of deferring the 

    project

    Possibility of  increased maintenance and safety problems.

    Name of Neighborhood(s) in which located:   City‐wideIs there a specific reference to this project or land use in the immediate vicinity? NoHow does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of new capacity provided:Project assists in meeting/maintaining adopted level of service.Project required to meet concurrency standards.

    CRITERIA PROJECT IMPACTS (RESPOND TO ALL SECTIONS WHICH APPLY)

    CONFORMANCE WITH ADOPTED COMPREHENSIVE 

    PLAN

    LEVEL OF SERVICE IMPACT

    20

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0831300DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    100TH AVENUE NE ROADWAY IMPROVEMENTS ‐ NORTH SECTION

    PROJECTLOCATION

    100th Avenue NE, Simonds Road to NE 145th Street PROJECT STATUSNew Project

    DESCRIPTION/JUSTIFICATIONRoadway improvements along 100th Ave NE to address the current 5‐lane to 2‐lane transition to be based on the 2015 Puget Sound Regional Council (PSRC) grant funded design.  This project represents one of four segments for implementing a portion of the 2018 completed design.  This and other elements of the ultimate project will, at a minimum, provide for bicycle lanes, a center turn lane where appropriate, sidewalks, curb and gutter, illumination improvements and storm drainage system upgrades.

    REASON FOR MODIFICATION (WHERE APPLICABLE)

    PROJECT START2019

    METHOD OF FINANCING (%)Current Revenue 2Reserve 3($100,000)

    Grants 59Unsecured ($2,070,000)

    Other Sources 0Debt 361256000

    Unfunded 0

    %%%%%%

    POLICY BASIS

    Transportation Master Plan

    CAPITAL COSTS

    PriorYear(s) 2019 2020 2021 2022 2023 2024

    Future Year(s)

    2019‐2024 TOTAL

    TotalProject

    0 236,000 93,000 0 0 0 0 0Planning/Design/ Engineering

    329,000 329,000

    0 117,000 51,000 0 0 0 0 0In‐House Professional Svcs.

    168,000 168,000

    0 0 0 0 0 0 0 0Land Acquisition 0 0

    0 2,147,000 892,000 0 0 0 0 0Construction 3,039,000 3,039,000

    0 0 0 0 0 0 0 0Comp. Hardware/ Software

    0 0

    0 0 0 0 0 0 0 0Equipment 0 0

    0 0 0 0 0 0 0 0Other Services 0 0

    Total 0 2,500,000 1,036,000 0 0 0 0 03,536,000 3,536,000

    0 0 0 0 0 0 0 00 0NEW MAINT. AND OPER.

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000.00 0.00NEW FTE

    21

  • CITY OF KIRKLANDCAPITAL IMPROVEMENT PROGRAM2019 TO 2024

    PROJECT # STC0831300DEPARTMENT Public WorksDEPARTMENT CONTACT Dave Snider

    PROJECTTITLE

    100TH AVENUE NE ROADWAY IMPROVEMENTS ‐ NORTH SECTION

    Amount of public disruption and inconvenience 

    caused

    Impacts to residential properties and traffic utilizing 100th Ave NE and surrounding streets.

    Community economic impacts

    This project represents a portion of a whole corridor project that is not be feasible using only Kirkland funding and will likely require grant funding participation.

    Health and safety, environmental, 

    aesthetic, or social effects

    Roadway improvements will increase the capacity and safety for the various modes of travel.

    Responds to an urgent need or opportunity

    Responds to a public request tor safe roadways.

    Feasibility, including public support and 

    project readiness

    Project has high level of public support.

    Conforms to legal or contractual obligations

    Project has been designed and constructed to comply with professional and legal requirements.

    Responds to state and/or federal 

    mandate

    N/A

    Benefits to other capital projects

    Is a component of the 100th Ave NE Roadway Improvement Project

    Implications of deferring the 

    project

    The City will not be able to attain the desired level of service for various corridors and surrounding areas.

    Name of Neighborhood(s) in which located:   North Juanita, Finn HillIs there a specific reference to this project or land use in the immediate vicinity?How does the project conform to such references?Attachment (Specify)

    Project provides no new capacity (repair, replacement or renovation).Project provides new capacity. Amount of n