Page 1: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO PublicISO Public

2019 & 23 Draft LCR Study Results

Fresno Area

Vera Hart

Senior Regional Transmission Engineer

Stakeholder Meeting

April 9, 2018

Page 2: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Fresno LCR Area

Kern

Area

Slide 2

Page 3: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Greater Fresno Area

Electrical Boundaries and LCR Sub-Areas

LCR Sub-Areas:

Slide 3

Electrical Boundaries:

● Gates – Mustang #1 230 kV line

● Gates – Mustang #2 230 kV line

● Panoche – Tranquility #1 230 kV line

● Panoche – Tranquility #2 230 kV line

● Warnerville – Wilson 230 kV line

● Melones – Wilson 230 kV line

● Panoche 230/115 kV transformer #1

● Panoche 230/115 kV transformer #2

● Smyrna – Alpaugh – Corcoran 115 kV line

● Los Banos #3 230/70 kV transformer

● Los Banos #4 230/70 kV transformer

● San Miguel – Coalinga #1 70 kV line

● Gates 230/70 kV transformer #1

Melones

Wilson

Warnerville

Gregg

Los Banos

Panoche

Gates

Henrietta

McCall

Helms

Helm

Mcmullin

Kearney

Herndon

Kngsbrg

Corcoran

Alpaugh

Gates 70 kVCoalnga

San Miguel

Wilson Sub Area

Page 4: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Fresno Area Load and Resources (MW)

Gross Load = 3165 3276

AAEE = -33 -114

DG = -158 -35

Net Load = 2974 3127

Transmission Losses = 95 104

Net Load + Losses = 3070 3231

Market Generation = 3215 3215

Muni Generation = 311 311

QF Generation = 28 28

Total Qualifying Capacity = 4357 4492

2019 2023

Slide 4

Page 5: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

New transmission projects modeled:

1. Leemore 701kV Disconnect Switches Replacement (Jun 2018)

2. Los Banos-Livingston Jct-Canal 70kV Switch Replacement (Jun 2018)

3. Gates 500/230 TB#12 addition (Dec 2019)

4. Kearney-Caruthers 70kV reconductoring (2019)

5. Borden 230kV Voltage Support (2019)

6. Kearney-Herndon 230 kV Line Reconductor (2019)

7. Wilson 115kV SVC(2020)

8. Northern Fresno 115kV Reinforcement (Revised scope- 2020)

9. Wilson-Legrand 115 kV Reconductoring (2020)

10. Panoche-Oro Loma 115 kV Reconductoring (2020)

11. Oro Loma 70kV Reinforcement (2020)

12. Reedley 70 kV Reinforcement Projects (2021)

13. Herndon-Bullard Reconductoring Projects (2021)

Slide 5

Page 6: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Hanford

Fresno Area LCR

Hanford Sub-Area

McCall

Gates

Henrietta

Limiting Contingencies:

Category P7:

L-2 Gates-Mustang #1 and Gates-

Mustang #2 230kV Lines

Constraint McCall-Kingsburg #1 115kV

line

Category P1: No LCR need

ContingencyCat. P7.

P15 S-N

2019 LCR 56

2023 LCR 107

LCR Results (MW):

Slide 6

Kingsburg

GWF-Hanford

Small Solar

CorcoranMustang

Page 7: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Fresno Area LCR

Coalinga Sub-Area

Slide 7

Limiting Contingencies:

Category P1-P7:

T-1/L-2: Gates 230/70kV TB #5 and

Panoche-Schindler #1 & #2 115kV

common tower lines

Constraint: Voltage instability

Category P1: No LCR need

ContingencyCat. P1-P7

N-S

2019 LCR 19

2023 LCR 16

LCR Results (MW):

Coalinga

Gates

Calfax

Huron

Schindler DJacalito

Schindler

Coalinga 2

Q633 SS

Plesant

Valley

Penzir Jc

To

Panoche

Coalinga 1

Tornado JCoalinga

Cogen

To Paso

Robles

Q532

Q526

Page 8: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Fresno Area LCR

Borden Sub-Area

Slide 8

Limiting Contingencies:

Category P1: No LCR need

Category P6:

L-1/T-1: Friant - Coppermine 70 kV

and Borden 230/70 kV # 2

Constraint: Borden 230/70 kV # 1

Contingency Cat. P6

2019 LCR 1

2023 LCR 8

LCR Results (MW):Borden

Borden

Glass

Madera

Wishon

Coppermine

Bonita

BiolaFriant

SJ#1

SJ#2

SJ#3

Crane

Valley

To Reedley

Tivy Valley

Solar

Unit

Page 9: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Fresno Area LCR

Reedley Sub-AreaLimiting Contingencies:

Category P6:

L-1-1: McCall-Reedley (McCall-Wahtoke) 115 kV &

Sanger-Reedley (Pomegranate-Pomegranate Jct) 115 kV

Constraint: Kings River-Sanger-Reedley 115 kV

Category P1: No LCR need

Contingency Cat. P6 S-N

2019 LCR 5

2019 Deficiency 1

2023 LCR 12

2023 Deficiency 1

LCR Results (MW):

Slide 9

Reedley

McCall

Sanger

Wahtoke

Parlier

Kings

River

Reedley

Dinuba

Orosi

Sand Creek

Reedley

7MW BESS

in 2021

Page 10: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Limiting Contingency:

Category P3:

G-1/L-1: Herndon-Barton 115kV & Balch 1

Constraint: Herndon-Manchester 115 kV

Category P6:

L-2: Herndon-Woodward 115kV line and

Herndon-Barton 115kV

Constraint: Herndon-Manchester 115kV line

Fresno Area LCR

2019 Herndon Sub-Area

LCR Results (MW):

Slide 10Kings River,

Pine Flats

HelmsGregg

McCall

Herndon

Panoche

Henrietta

Sanger

Haas,

Balch

Rio Bravo

Fresno

KRCD Malaga

GWF

Hanford

Kerckhof

ClovisBullard

Woodward Coppermine

Kingsburg

Wilson

Le Grand

Gates

Manchester

Barton

ContingencyCat. P3

N-S

Cat. P6

N-S

2019 LCR 267 792

Ashlan

Page 11: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Limiting Contingency:

Category P3:

G-1/L-1: Herndon-Barton 115 kV line and Balch 1 unit

Constraint: Herndon-Manchester 115 kV line

Category P6:

L-2: Herndon-Woodward 115kV line and Herndon-

Barton 115kV

Constraint: Herndon-Manchester 115kV line

Fresno Area LCR

2023 Herndon Sub-Area

LCR Results (MW):

Slide 11Kings River,

Pine Flats

Helms

Gregg

McCall

Herndon

Panoche

Henrietta

Sanger

Haas,

Balch

Rio Bravo

Fresno

KRCD Malaga

GWF

Hanford

Kerckhof

ClovisBullard

Woodward Coppermine

Kingsburg

Borden

Gates

Manchester

Barton

Contingency Cat. P3 Cat. P6

2023 LCR 293 821

Ashlan

Page 12: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Fresno Area LCR

2019 Overall (Wilson Sub-Area)

Hanford

Borden

Reedley

Fresno

Haas,

Balch,

Pine Flats

Helms

Gregg

McCall

Herndon

Wilson

Panoche

Gates

KearneyMcMullin

Helm

Borden

Melones Warnerville

Henrietta

Limiting Contingencies:

Category P3:

L-1: Panoche-Mendota 115 kV line & one Helms unit out

Constraint: Panoche-Oro Loma 115 kV- (From Panoche

Jn To Hammonds)

Category P7:

L-2: Borden-Gregg 230kV line #1 and #2 DCTL ( Former

Wilson-Gregg 230kV line and Borden-Gregg)

Constraint: Panoche-Oro Loma 115 kV- (From Panoche

Jn To Hammonds

LCR Results (MW):

Slide 12

Oro Loma

El Nido

Mendota

ContingencyCat. P3

S-N

Cat. P7

S-N

LCR 1406 1670

Dairyland

Le Grand

Exchequer

Page 13: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Hanford

Mendota

Merced

Madera

Fresno

Haas,

Balch,

Pine

Flats

Helms

Gregg

McCall

Herndon

Wilson

Panoche

Gates

Los Banos

McMullin

Helm

Borden

Melones Warnerville

Henrietta

Slide 13

Fresno Area LCR

2023 Overall

Limiting Contingencies:

Category P3:

G-1/L-1: Gates-Mustang 230kV #1 or #2 line and

one Helms unit out

Constraint: Remaining Gates-Mustang 230kV line

Category P6:

L-2: Gates-Mustang 230kV #1 or #2 line and

Helms-Gregg 230kV line

Constraint: Remaining Gates-Mustang 230kV line

LCR Results (MW):

ContingencyCat. P3

S-N

Cat. P6

S-N

LCR 1688 1688 Mustang

Tranquility

Page 14: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Changes

Since last year:

1) Updated NQC

2) 2019 load decreased by 220 MW vs. 2018

3) LCR has decreased by 410 MW due to load decrease and new projects.

4) 2023 load decreased by 121 MW vs 2022

5) LCR has decreased by 171 MW due to load decrease andthe new Gates 500/230kV transformer bank.

Slide 14

Page 15: 2019 & 23 Draft LCR Study Results Fresno Area · 2018-04-04 · 2019 & 23 Draft LCR Study Results Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Meeting April

ISO Public

Stay connected

Page 15

Sign up for the Daily Briefing