37'-7"
33'-1"64"
64"56"48"
TRANSFER STATIONW/SAFETY RAILS
200202562
DBL WIDEPLASTIC SLIDE
200006976
WINDOWPANEL
200007115
SAFETY PANEL200007049
SNAKEPOLE
200006999
DBL WIDEPLASTIC SLIDE
200006977
SPIRALSLIDE
200200264
LEG LIFTBAR
200079019
POSTWHEEL PLASTIC
907718P
INVERTED ARCHCLIMBER
200007012
CURLYCLIMBER
20020026811.3 11.3 12.3
12.3
12.3
11.3 11.3
12.3
12.3
168
This playground design meets thefinal Access Board Regulations.Compliance:
Playground LayoutPlayground Safety
CPSC Handbook for Public
ASTM F1487 - PlaygroundEquipment for Public Use.
to the requirements of ASTM F1487.layout of these components conformplan are IPEMA certified.The use and The play components identified in this
Drawn by:Date:DWG Name:
LTCPS - Farmington878 East Highway 60Monett, Missouri 65708Voice: 1-800-325-8828Fax: 417-354-2273
Project:
LTCPS rep:
LEED points forthis structure
Ground Space:Protective Area:
lengths, i.e. 96 represents a 96 inch post.All post lengths are identified by text showing the post
tripping or collision hazards (i.e. roots, rocks, borderplaystructure is shown. This zone is to be free of allThe minimum recommended fall zone around the entirearound all play equipment.Fall absorbing ground cover is required under andAll deck heights are measured from top of ground cover.existing play components.playground may be in compliance when consideringappropriate number of ground level events, the actualthe proposed Access Board Regulations in regards to theAlthough a particular playground design may not meetaccessible surfacing must be utilized in applicable areas.For playground equipment to be considered accessible,counsel to determine if the ADA applies to you.when viewed in its entirety. Please consult your legalthat you make your park and/or playground accessibleThe Americans with Disabilities Act (ADA) may require
Supervision is required.Not all equipment may be appropriate for all children.8.
7.
6. 5.
material, etc.).
4.
3. 2.
1.
Age GroupGeneral Notes:
2-5yrs 2-12yrs5-12 yrs 13+ yrs
26'-6" x 22'-6"38'-0" x 33'-6"
DONNA FRIEDMAN
573-915-7740Playpower
MONETT, MOKB19-071318
0000_42639470006
Donna Friedman11/8/2018
2
ELEVATED PLAY ACTIVITIES - TOTAL:ELEVATED PLAY ACTIVITIES ACCESIBLE BY TRANSFER:ELEVATED PLAY ACTIVITIES ACCESIBLE BY RAMP:GROUND LEVEL ACTIVITY TYPE:GROUND LEVEL QUANTITY:
REQ'DREQ'DREQ'DREQ'D
AGE GROUP: 2-5
22
30
6
2206
59'-1"
41'-0 1/2"
DRIVINGPANEL
200200250
DUAL STEELSEAT PANEL
BELOW DECK200200695
TELESCOPEPANEL
200200663
STEEL TIC-TAC-TOEPANEL
BELOW DECK200110097
HANGOUT
200202304
POSTWHEEL PLASTIC
200200424
1-STEPDECK
200006950
SAFETYLOOP
200013924TREEHOUSE
SAFETY PANEL200202397
TREEHOUSESAFETY PANEL
200202397
GEARREACH PANEL
200200506
1-STEPDECK
200006950
VEHICLEREACH PANEL
200200503
9 BARSAFETY RAIL200109865
SAFETYLOOP
200013924
NU-EDGE X TOWER F/KB W/MORPHOUS200203432
PLANKBRIDGE
200202961
CATWALK BRIDGE200098030
96",96"
MATCHINGGAME PANEL200200725
SILOCLIMBER
200202420
DECK TO DECKSTEPS
200200402
64"
56" 48"
64"
TRANSFER STATIONW/SAFETY RAILS
200202562
QUANTUM II SLIDE200203303
QUANTUM IIENTRY00ENT
QUANTUM IIENTRY00ENT
QUANTUM IIRIGHT00RGT
QUANTUM IIEXIT
001QEXT
QUANTUM IILEFT
00LEFTQUANTUM II
EXIT001QEXT
X-CLIMBER200202802
NU-EDGEROCKWALL
200202820
TALKTUBE
200058823
TALKTUBE
200202025Z
POSTWHEEL PLASTIC
200200424
ROOF200202810
ROOF200202810
ROOF200202750
24/96/168 12.3
180
180
5
15.5 12.3
15.5 12.315.5
15.5
188
188
16
8
This playground design meets thefinal Access Board Regulations.Compliance:
Playground LayoutPlayground Safety
CPSC Handbook for Public
ASTM F1487 - PlaygroundEquipment for Public Use.
to the requirements of ASTM F1487.layout of these components conformplan are IPEMA certified.The use and The play components identified in this
Drawn by:Date:DWG Name:
LTCPS - Farmington878 East Highway 60Monett, Missouri 65708Voice: 1-800-325-8828Fax: 417-354-2273
Project:
LTCPS rep:
LEED points forthis structure
Ground Space:Protective Area:
lengths, i.e. 96 represents a 96 inch post.All post lengths are identified by text showing the post
tripping or collision hazards (i.e. roots, rocks, borderplaystructure is shown. This zone is to be free of allThe minimum recommended fall zone around the entirearound all play equipment.Fall absorbing ground cover is required under andAll deck heights are measured from top of ground cover.existing play components.playground may be in compliance when consideringappropriate number of ground level events, the actualthe proposed Access Board Regulations in regards to theAlthough a particular playground design may not meetaccessible surfacing must be utilized in applicable areas.For playground equipment to be considered accessible,counsel to determine if the ADA applies to you.when viewed in its entirety. Please consult your legalthat you make your park and/or playground accessibleThe Americans with Disabilities Act (ADA) may require
Supervision is required.Not all equipment may be appropriate for all children.8.
7.
6. 5.
material, etc.).
4.
3. 2.
1.
Age GroupGeneral Notes:
2-5yrs 2-12yrs5-12 yrs 13+ yrs
45'-6" x 29'-6"59'-0" x 41'-6"
DONNA FRIEDMAN
573-915-7740PPLT
MONETT, MONE19-071030 2019 CATALOG
0000_42975342641
Donna Friedman8/28/2017
0
ELEVATED PLAY ACTIVITIES - TOTAL:ELEVATED PLAY ACTIVITIES ACCESIBLE BY TRANSFER:ELEVATED PLAY ACTIVITIES ACCESIBLE BY RAMP:GROUND LEVEL ACTIVITY TYPE:GROUND LEVEL QUANTITY:
REQ'DREQ'DREQ'DREQ'D
AGE GROUP: 5-12
63
90
17
9609
Conceptual X Project Number: 2075140800Preliminary Prepared By: JELFinal (As Bid) Checked By:
Date: April 17, 2019
QUANT. UNIT UNITCOST
TOTALCOST
1 1 LSUM $10,000.00 $10,000
2 1 LSUM $7,500.00 $7,500
3 Import subbase soil, 21" turf and pollinator area , 5 mile haul, no compaction 2,264 Cyd $40.00 $90,560
4 323 Cyd $30.00 $9,690
5 Place topsoil, fine grade, 323 Cyd $20.00 $6,460
6 Remove existing sod layer, turf and pollinator area only 35 MSF $30.00 $1,050
7 862 Cyd $45.00 $38,790
8 Geotextile, Separator - under turf and pollinator areas 4,000 Syd $1.00 $4,000
9 3,262 Syd $2.50 $8,155
10 618 Syd $5.00 $3,090
11 240 EA $25.00 $6,000
12 1 EA $5,000.00 $5,000
13
14 879 Ft $1.50 $1,319
15 Mudmat Access Road 1 LSUM $5,000.00 $5,000
16 254 TON $25.00 $6,350
17 515 Cyd $50.00 $25,750
18 Contaminated Soil Disposal Allowance 1 LSUM $10,000.00 $10,000
19 1 EA $96,700.00 $96,700
20 1 Ea $20,000.00 $20,000
21 1 Ea $21,400.00 $21,400
22 1 Ea $10,000.00 $10,000
23 1 EA $4,200.00 $4,200
24 2 EA $500.00 $1,000
25 Playground: SuperScoop 2 EA $1,000.00 $2,000
26 4,614 SF $30.00 $138,420
27 Playground: play sand for SuperScoop, 24" deep x 50 sf 4 Cyd $50.00 $200
28 Playground: concrete edge adjacent path, 8" wide, 42" deep, poured 109 Ft $25.00 $2,725
29 150 Ft $25.00 $3,750
30 434 SF $50.00 $21,700
31 3 EA $500.00 $1,500
32 3 EA $300.00 $900
33 1 Ea $1,000.00 $1,000
34 20 EA $500.00 $10,000
35 284 LF $18.00 $5,112
$579,000
20% $116,000
$695,000
$260,000
$30,000
$985,000NOTE: The ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor's method of determining prices, or over
competitive bidding or market conditions. Opinions of probable project costs and construction costs provided herin are made on the basis of the ENGINEER'S professionaljudgement and experience. The ENGINEER cannot and does not guarantee that proposals, bids or actual project or construction costs will not vary from the prepared opinionof probable cost.
TOTAL ESTIMATED FINAL CONSTRUCTION COST
CONSTRUCTION CONTINGENCIES
SUBTOTAL ESTIMATE
TOTAL ESTIMATED FINAL CONSTRUCTION COST NORTH
TOTAL ESTIMATED FINAL CONSTRUCTION COST MIDDLE
TOTAL ESTIMATED FINAL CONSTRUCTION COST SOUTH
Sculpture benches
4" Underdrain in rubber surface play area
Playground: swings (3-bay, 2 swings, 1 wheelchair swing) Bluegrass or equal
Pollinator seed bed prep, weed seed eradication, invasive removals
Erosion Control, Silt Fence, project perimeter
Playground: 2-5 yrs product
Limestone screens for gravel path, 6876 sf, 6" depth, 127 cy
Playground: 5-12 yrs product
Bench
Bike Rack
Trash Can
Playground: 5-12 yrs labor, 15 holes
Playground: swings labor
Playground: poured rubber surface, 4" thick black, 2" thick topping with colors
Playground: concrete wall adjacent turf, 8" wide, 217' long, 2' tall
DESCRIPTION
Construction Staking
Remove existing soil, $30 + $15 for contaminants
Seed, straw, fertilize - turf areas
Pollinator plants, 2 gallon, random placement throughout pollinator area, 5'x5' spacing rate
Import topsoil, 3" turf and pollinator areas, 5 mile haul, fine grade
Seed pollinator areas,
STANTEC CONSULTING MICHIGAN - ENGINEER'S OPINION OF CONSTRUCTION COST
Pittsfield Charter Township
Waters / Oak Valley Park north of streamNorth 1/3 of site (north of stream)
Playground: concrete edge adjacent turf, 8" wide, 42" deep, poured
Playground: 2-5 yrs labor, 10 holes
Work By Contractor
Mobilization: signage, staging, bonds, etc.
Import subbase soil under path, compact to 95% density, 6953 sf, 24" deep
north V:\2075\active\2075140800\Water oak valey park MI\cost\2019 4 15 water park EOC.xlsx
Conceptual X Project Number: 2075140800Preliminary Prepared By: JELFinal (As Bid) Checked By:
Date: April 15, 2019
QUANT. UNIT UNITCOST
TOTALCOST
1 1 LSUM $10,000.00 $10,000
2 1 LSUM $7,500.00 $5,000
3 Import subbase soil, 21" turf area , 5 mile haul, no compaction 2,594 Cyd $40.00 $103,760
4 370 Cyd $30.00 $11,100
5 Place topsoil, fine grade, 370 Cyd $20.00 $7,400
6 Remove existing sod layer, turf area only 40 MSF $30.00 $1,200
7 521 Cyd $30.00 $15,630
8 Contaminated Soil Disposal Allowance 1 LSUM $10,000.00 $10,000
9 Geotextile, Separator - under turf 4,448 Syd $1.00 $4,448
10 4,448 Syd $2.50 $11,120
11
12 882 Ft $1.50 $1,323
13 Mudmat Access Road 1 LSUM $5,000.00 $5,000
14 186 TON $25.00 $4,650
15 372 Cyd $50.00 $18,600
16 186 Cyd $30.00 $5,580
17 3 EA $500.00 $1,500
18 3 EA $300.00 $900
19
$217,000
20% $43,000
$260,000
NOTE: The ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor's method of determining prices, or overcompetitive bidding or market conditions. Opinions of probable project costs and construction costs provided herin are made on the basis of the ENGINEER'S professionaljudgement and experience. The ENGINEER cannot and does not guarantee that proposals, bids or actual project or construction costs will not vary from the prepared opinionof probable cost.
Trash Can
SUBTOTAL ESTIMATE
CONSTRUCTION CONTINGENCIES
TOTAL ESTIMATED FINAL CONSTRUCTION COST
Bench
Work By Contractor
Mobilization: signage, staging, bonds, etc.
Construction Staking
Import topsoil, 3" turf areas, 5 mile haul, fine grade
Remove existing soil under turf areas adjacent path and woods
Seed, straw, fertilize - turf areas
Erosion Control, Silt Fence, project perimeter
Limestone screens for gravel path, 5024 sf, 6" depth, 92cy
Import subbase soil under path, compact to 95% density, 5024sf, 24" deep
Remove toposil under path, 5024, 12" dep
DESCRIPTION
STANTEC CONSULTING MICHIGAN - ENGINEER'S OPINION OF CONSTRUCTION COST
Pittsfield Charter Township
Waters / Oak Valley ParkMiddle 1/3 of site (south of stream, north of woods)
middle V:\2075\active\2075140800\Water oak valey park MI\cost\2019 4 15 water park EOC.xlsx
Conceptual X Project Number: 2075140800Preliminary Prepared By: JELFinal (As Bid) Checked By:
Date: April 15, 2019
QUANT. UNIT UNITCOST
TOTALCOST
1 1 LSUM $10,000.00 $2,000
2 1 LSUM $7,500.00 $3,000
3 125 Cyd $30.00 $3,750
4 Contaminated Soil Disposal Allowance 1 LSUM $5,000.00 $5,000
5
6 Mudmat Access Road 1 LSUM $5,000.00 $5,000
7 124 TON $25.00 $3,100
8 124 Cyd $15.00 $1,860
9 1 EA $500.00 $500
10 1 EA $300.00 $300
11
$25,000
20% $5,000
$30,000
NOTE: The ENGINEER has no control over the cost of labor, materials, equipment, or services furnished by others, or over the Contractor's method of determining prices, or overcompetitive bidding or market conditions. Opinions of probable project costs and construction costs provided herin are made on the basis of the ENGINEER'S professionaljudgement and experience. The ENGINEER cannot and does not guarantee that proposals, bids or actual project or construction costs will not vary from the prepared opinionof probable cost.
TOTAL ESTIMATED FINAL CONSTRUCTION COST
Trash Can
SUBTOTAL ESTIMATE
Bench
compact to 95% density, import not needed in south section
Limestone screens for gravel path, 3373 sf, 6" depth, 62cy
CONSTRUCTION CONTINGENCIES
Work By Contractor
Mobilization: signage, staging, bonds, etc.
Construction Staking
Remove existing soil under path
STANTEC CONSULTING MICHIGAN - ENGINEER'S OPINION OF CONSTRUCTION COST
Pittsfield Charter Township
Waters / Oak Valley ParkSouth 1/3 of site (south of woods)
DESCRIPTION
south V:\2075\active\2075140800\Water oak valey park MI\cost\2019 4 15 water park EOC.xlsx