OFFICE OF THE COUNTY COMMISSIONERS WILLIAMS COUNTY, OHIO PROJECT MANUAL 2020 FIBER INSTALLATION PROJECT PROJECT #6-2020 COMMISSIONERS: Brian A. Davis Lewis D. Hilkert Terry N. Rummel INFORMATION TECHNOLOGY MANAGER: Jeremy Suffel Date: September 8 th , 2020 MANAGERS ESTIMATE: $160,000.00 CONTRACTOR’S NAME AND ADDRESS: Submitted by: ___________________________________________________________________________________ Address: _______________________________________________________________________________________ City: __________________________________________________________________________________________ State: __________________________________________________ Zip Code: ______________________________ Phone: ___________________________________________________Fax___________________________________ Email: _________________________________________________________________________________________ PURCHASE ORDER NUMBER: ___________________________

Upload: others

Post on 16-Oct-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

OFFICE OF THE COUNTY COMMISSIONERS

WILLIAMS COUNTY, OHIO

PROJECT MANUAL

2020 FIBER INSTALLATION PROJECT

PROJECT #6-2020

COMMISSIONERS: Brian A. Davis

Lewis D. Hilkert Terry N. Rummel

INFORMATION TECHNOLOGY MANAGER:

Jeremy Suffel

Date: September 8th, 2020

MANAGERS ESTIMATE: $160,000.00

CONTRACTOR’S NAME AND ADDRESS:

Submitted by: ___________________________________________________________________________________

Address: _______________________________________________________________________________________

City: __________________________________________________________________________________________

State: __________________________________________________ Zip Code: ______________________________

Phone: ___________________________________________________Fax___________________________________

Email: _________________________________________________________________________________________

PURCHASE ORDER NUMBER: ___________________________

Page 2: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

2020 HCL FIBER SERVICE

PROJECT PROJECT #6-2020

TABLE OF CONTENTS

LEGAL NOTICE .........................................................................................ITEM 00025 INSTRUCTIONS TO BIDDERS ..................................................................ITEM 00100 FEDERAL INSTRUCTIONS AND CONTRACT PROVISIONS...................ITEM 00101 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS .................................ITEM 00120 SUPPLEMENTAL SPECIFICATIONS........................................................ITEM 00130 UTILITIES ..................................................................................................ITEM 00250 BID FORM .................................................................................................ITEM 00300 BID BOND .................................................................................................ITEM 00310 NON-COLLUSION AFFIDAVIT ..................................................................ITEM 00400 AFFIDAVIT OF CONTRACTOR AS TO DELINQUENT PORPERTY TAXES ...........................................................ITEM 00405 NOTICE OF AWARD .................................................................................ITEM 00410 NOTICE TO PROCEED .............................................................................ITEM 00420 SUBCONTRACTOR LIST ..........................................................................ITEM 00430 AGREEMENT BETWEEN OWNER AND CONTRACTOR .........................ITEM 00500 AUDITOR’S CERTIFICATION ...................................................................ITEM 00505 PERFORMANCE BOND ORC 153.57 FORM ............................................ITEM 00600 CERTIFICATE OF SUBSTANTIAL COMPLETION ...................................ITEM 00610 SUPPLEMENTAL GENERAL CONDITIONS .............................................ITEM 00800 CHANGE ORDER PROCEDURE ..............................................................ITEM 01028 DISPUTE RESOLUTION AND ADMINSTRATIVE CLAIM .........................ITEM 01029 ORC 3517.13 COMPLIANCE CERTIFICATION ........................................ITEM 01300 W-9 IRS TAX PAYER ID NUMBER CERTIFICATION ............................ITEM 01031 PREVAILING WAGE RATES (DAVIS BACON) ........................................ITEM 01900

END OF ITEM

Page 3: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00025

LEGAL NOTICE

PROJECT #06-2020 COUNTY OF WILLIAMS SEALED BIDS FOR HCL FIBER SERVICE PROJECT

The Board of Williams County Commissioners will receive sealed bids in their office, One Courthouse Square, 4th Floor, Bryan, Ohio until 10:00 A.M. Local Time Thursday, September 24th, 2020 for: Project #6-2020 HCL FIBER SERVICE PROJECT, Williams County, Ohio.

Complete sets of documents for the Request for Proposals will be available for examination, Monday through Friday from 8:30 a. m. to 4:00 p. m. at the above named office. Copies may be obtained by request from the Williams County Commissioners, One Courthouse Square, 4th Floor, Bryan, Ohio 43506, 419-636-2059 or on the Commissioners’ Web Site at https://www.williamscountyoh.gov/ under the heading COMMISSIONERS, LEGAL NOTICES at no charge. Documents will be mailed upon request for a charge of $10.00.

Bid notice may also be viewed on the Williams County Web Site at https://williamscountyoh.gov/ under the heading COMMISSIONERS, LEGAL NOTICES

Bids must be submitted on the forms found in the Bidding Document; must contain the names of every person or company interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The Owner intends and requires that this project be complete no later than November 30th, 2020

Each bidder shall be required to file with his proposal a Bid Guaranty in accordance with Section 153.54 of the Ohio Revised Code. The guaranty shall be a bond for one hundred percent (100%) of the bid amount. A certified check or cashier’s check for ten percent (10%) of the bid can be submitted in lieu of a bond. The successful Bidder will be required to furnish a satisfactory Performance Bond for one hundred percent (100%) of the bid amount.

Bidders must comply with the prevailing wages rates for Public Improvements for Williams County, Ohio as determined by the Secretary of Labor, under the Federal Labor Standards.

Contractor compliance with the non-discrimination and equal employment opportunity requirements of Title VI of the Civil Rights Act of 1964 (Title VI) and Ohio Administrative Code Chapter 123, the Governor’s Executive Order of 1972, and Governor’s Executive Order 84-9 shall be required.

SPECIAL ATTENTION MUST BE GIVEN to all the requirements contained in the bid packet, particularly to prevailing wages, various insurance requirements, various equal opportunity provisions, and the requirement for a performance bond for 100% of the contract price.

Any bid may be withdrawn prior to the schedule closing time for the receipt of bids, but no bidder shall withdraw his bid within 30 days after the actual opening thereof. The County reserves the right to reject any or all bids, waive irregularities in any bid, and to accept any bid which is deemed most favorable to the County.

WILLIAMS COUNTY COMMISSIONERS By – Anne Retcher, Clerk

Advertise: (Once in paper two weeks prior to bid opening and on web page) Local Paper: September 9, 2020 Local Web Pages: September 4, 2020

Bid Opening: September 24, 2020 @ 10:00 am

Page 4: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00100 Instruction To Bidders

9/1/20 1

1. Defined TermsTerms used in these Instructions to Bidders that are defined in the 100 General Provisions, State of Ohio, Department of Transportation, Construction and Materials Specifications, 2019 (2019 CMS).

Certain additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.

1.1 BIDDER-one who submits a Bid directly to Owner as distinct from a sub-bidder, who submits a bid to a bidder.

1.2 ISSUING OFFICE-the office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.

1.3 SUCCESSFUL BIDDER-the lowest, responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes and award.

2. Copies of BiddingDocuments

2.1 Complete sets of the Bidding Documents in the number and for the non-refundable sum stated in the Advertisement or Invitation to Bid may be obtained from the Issuing Office.

2.2 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.3 Owner and Engineer in making copies of Bidding Documents available on the above terms do so only for the purposed of obtaining Bids for the Work and do not confer a license or grant for any other use.

3. Qualifications of Bidders3.1 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit within five days after Bid opening, upon Owner's request, detailed written evidence such as financial data, previous experience, present commitments, and other such data as may be called for below (or in the Supplementary Instructions or LPA Template).

3.2 Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract.

4. Examination of ContractDocuments and Site

4.1 It is the responsibility of each Bidder before submitting a Bid:

4.1.1 to examine thoroughly the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to below);

4.1.2 To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work;

4.1.3 To consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;

4.1.4 To study and carefully correlate Bidder's knowledge and observations with the Contract Documents and such other related data; and

4.1.5 To promptly notify Engineer of all conflicts, errors, ambiguities or discrepancies, which Bidder has discovered in or between the Contract Documents and such other related documents.

4.2 Information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities or others, and Owner and Engineer do not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions.

4.3 Before submitting a Bid, each Bidder will be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise, which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or

Page 5: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00100 Instruction To Bidders

9/1/20 2

which bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents.

4.4 On request, Owner will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies.

4.5 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the contract Documents, that Bidder has given IT Manager written notice of all conflicts, errors, ambiguities and discrepancies that bidder has discovered in the Contract Documents and the written resolutions thereof by Engineer is acceptable to Bidder, and that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

5. Availability of Lands for Work,etc.

The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents.

6. Interpretations and Addenda6.1 All questions about the meaning or intent of the

Bidding Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

6.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Engineer.

6.3 Addenda, if issued, will be mailed at least three days prior to bid date to each bidder recorded by the Engineer as having received, be available for inspection as listed in "Invitation to Bid".

7. Bid Security7.1 Each Bid shall be accompanied by a Bid Guarantee, in the form of a bid bond, a certified check, a cashier’s check or a letter of credit, in conformity with the requirements of ORC 153.54 and 153.571 (B). If a bid bond is used, the bond shall be in the full amount of the bid and signed by a Surety company authorized to do business in Ohio, and accompanied by the Surety’s sufficient power of attorney affirming said signature. If a certified check, cashier’s check, or letter of credit is used, the instrument shall be drawn on a solvent bank in an amount not less than ten percent (10%) of the Bid.

7.2 The Bid security of Successful bidder will be retained until such Bidder has executed the agreement, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within fifteen days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders Whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of the seventh day after the Effective Date of the Agreement or the thirty-sixth day after the Bid opening, whereupon Bid security furnished by such bidders will be returned. Bid security with Bids which are not competitive will be returned within seven days after the Bid opening.

8. Contract TimesThe number of days within which, or the dates by which,

Page 6: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00100 Instruction To Bidders

9/1/20 3

the Work is to be substantially completed and completed and ready for final payment (or incorporated therein by reference to the attached Bid Form).

9. Liquidated DamagesProvisions for liquidated damages Section 100 General Provisions, Ohio Department of Transportation, Construction and Materials Specifications, 2019

10. Subcontractors, Suppliers andOthers

11.1 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers and other persons and organizations (including those who are to furnish the principal items of material and equipment) to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, apparent Successful Bidder, and any other Bidder so requested, shall within five days after bid opening submit to Owner, a list of all such Subcontractors, Suppliers and other persons and organizations proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, person or organization if requested by Owner. An Owner or Engineer who after due investigation has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, may before the Notice of Award is given request apparent Successful bidder to submit an acceptable substitute, [select one of two alternatives] in which case apparent Successful Bidder shall submit an acceptable substitute, that Bidder's Bid price will be increased (or decreased) by the difference in cost occasioned by such price adjustment in evaluating Bids and making the contract award.

or

without an increase in Bid price.

If apparent Successful Bidder declines to make any such substitution, Owner may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers and other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. Any Subcontractor, Supplier, other person organization listed and to whom Owner or Engineer does not make written objection prior to the

giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.

11.2 In contracts where the Contract Price is on the basis of Cost-of-the-Work Plus a Fee, apparent Successful Bidder, prior to the Notice of Award, shall identify in writing to Owner those portions of the Work that such Bidder proposes to subcontract and after the Notice of Award may only subcontract other portions of the Work with Owner's written consent.

11. Bid Form12.1 The Bid Form is included with the Bidding Documents; additional copies may be obtained from Engineer (or the Issuing Office).

12.2 All blanks on the Bid Form must be completed by printing in ink or by typewriter.

12.3 Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary an assistant secretary. The corporate address and state of incorporation must be shown below the signature.

12.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.

12.5 All names must be typed or printed in black below the signature.

12.6 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).

12.7 The address and telephone number for communications regarding the Bid must be shown.

12.8 Evidence of authority to conduct business as an out-of-state corporation in the state where the Work is to be performed shall be provided in accordance with Paragraph 3 above. State contractor license number, if any, must also be shown.

or

Page 7: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00100 Instruction To Bidders

9/1/20 4

12.9 Bidders may submit a Bid for any of the separate sections described in the Contract Documents or any combination of sections as provided for in the Bid Form.

or

12.10 Bids must be priced on a lump sum basis for the base contract and include a separate price for each alternate described in the Specifications as provided for in the Bid form. The price of the Bid for each alternate will be the amount to be added to or deducted from the price of the base Bid if Owner selects the alternate.

12. Submission of Bids

Bids shall be submitted at the time and place indicated in the Advertisement of Invitation to Bid and shall be enclosed in an opaque sealed envelope, marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted) and name and address of Bidder and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it.

13. Modification and Withdrawal of Bids

13.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.

13.2 If, within twenty-four hours after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bids and the Bid security will be returned. Thereafter, that Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.

14. Opening of BidsBids will be opened publicly and (unless obviously non-responsive) at the place where Bids are to be submitted.

An abstract of the amounts of the base bids and major alternates (if any) will be made available to Bidders after the opening of Bids.

15. Bids to Remain Subject toAcceptance

All Bids will remain subject to acceptance for sixty days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date.

16. Award of Contract

16.1 Owner reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Owner also reserves the right to waive all informalities not involving price, time or changes in the Work and to negotiate contract terms with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

17.1.1 Disqualification of Bidders. Any of the following reasons may be considered as being sufficient for the disqualification of a Bidder and the rejection of his proposal or proposals:

(a) More than one proposal for the same work from an individual, firm, or corporation under the same or different name.

(b) Evidence of collusion among Bidders. Participants in such collusion will receive no recognition as Bidders for any future work of the Owner until any such participant shall have been reinstated as a qualified Bidder.

(c) Bid prices which obviously are materially

Page 8: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00100 Instruction To Bidders

9/1/20 5

unbalanced. Mathematically un-balanced bid prices are those that do not reasonably reflect the cost of the item bid, inclusive of labor, profit, overhead and material costs. Some examples of a mathematically unbalanced are ‘front-end loading’ and ‘covering’ (moving money from one item to another). Bidders must bid at least the cost of the materials for every item bid. Rejection of a bid will result if the Owner or Engineer determines that the bid prices submitted are ‘materially unbalanced’. A bid is materially unbalanced if there is a reasonable doubt that the award to the bidder submitting the mathematically unbalanced bid will result in the lowest ultimate cost to the Owner.

16.2 In evaluating Bids, Owner will consider the qualifications of Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

16.3 Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Supplementary Conditions. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award

16.4 Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.

16.5 If the contract is to be awarded, it will be awarded to lowest Bidder whose evaluation by Owner indicates to Owner that the award will be in the best interests of the Project.

16.6 If the contract is to be awarded. Owner will give Successful Bidder a Notice of Award within sixty (60) days after the day of the Bid opening.

17. Contract Security

The successful bidder shall furnish a performance bond in an amount equal to 100% of their bid.

18. Signing of AgreementWhen Owner gives a Notice of Award to the Successful bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen days thereafter Contractor shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner with the required Bonds. Within ten days thereafter Owner shall deliver one fully signed counterpart to Contractor. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification.

19. Prebid ConferenceOwner reserves the right to call a prebid conference. Plan holders will be notified of the meeting and notice will also be posted on the Williams County Web Page at: www.williamscountyoh.gov

20. Sales and Use TaxesThis project is exempt from sales tax.

21. RetainageProvisions concerning retainage and Contractors' rights to deposit securities in lieu of retainage are set forth in the Agreement.

22. Prevailing WagesIn accordance with Item 01900, the Federal Davis Bacon Wage Rates will be applicable to this project, and all bidders shall ensure that their bids have met the requirements. An addendum may be issued to plan holders and posted on the web page to notify a change of wage rates for the project. Wage Rates for the Contract will be the most recent determination in effect on the bid date, as posted on the Federal Wage Determination Web Page.

A list of prevailing rates of wages, for Federal funded

Page 9: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00100 Instruction To Bidders

9/1/20 6

projects, for mechanics and laborers is included and shall constitute the minimum hourly wage paid to workmen for the duration of the contract. Prior to final payment, the contractor must file an affidavit with the Engineer attesting to the contractor’s compliance of this requirement. The contractor and subcontractors shall provide the prevailing wage coordinator a schedule of the pay dates and a certified copy of all payrolls during the life of the contract.

23. Campaign ContributionCompliance

The successful bidder will be required to complete documentation certifying Compliance with Sections 3517.13 of the Ohio Revised Code.

24. SafetySection 107.01 of the Specifications requires, among other things, compliance with Chapter 4121:1-3 of the Ohio Administrative Code entitled "Specific Safety Requirements of the Industrial Commission of Ohio relating to Construction," effective November 1, 1979, and with the "Federal Occupational Safety and Health Act of 1970 and Code of Federal Regulations, Title 29, Chapter XVII, Part 1926."

END OF ITEM

Page 10: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

1

REQUEST FOR BID

Williams County, Ohio

FALL 2020 HCL Fiber Service Project

DEADLINE: September 24th, 2020 at 10:00 AM

Page 11: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

2

TABLE OF CONTENTS

Title Page 1

Table of Contents 2

Notice to Bidders 3

Purpose and Scope of Work 4

General Instructions 4

Selection Criteria 8

Bid Content 8

Bid Content Details 9

Project Specifications 11

Page 12: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

3

NOTICE TO BIDDERS

Sealed proposals will be received by the Williams County Board of Commissioners (Board) for the following:

Fall 2020 HCL Fiber Service Project

The Williams County Board of Commissioners are seeking bids from qualified vendors to provide dark fiber network connectivity to one or multiple county facilities.

Bid Specifications, Bid Forms, Q&A, and Instructions are being made available online at https://www.williamscountyoh.gov/Bids.aspx or upon request through the Board of Commissioners [email protected].

Bids must be received no later than September 24th, 2020 at 10:00 AM EST at the Williams County Commissioners Office, One Courthouse Square, Bryan, OH 43506. Bids will be opened September 24th at 10:00 AM. The submitted bids shall be clearly marked “FALL 2020 HCL Fiber Service Project” on the front of the envelope or the top of the package that encloses the bid documents.

Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder is required to furnish with their proposal a Bid Guaranty and Contract Bond which complies with Section 153.571 of the Ohio Revised Code. The Bid Specifications document contains the Bid Guaranty and Contract Bond to be completed.

The Williams County Commissioners Office reserves the right to reject any and all bids, or to increase or decrease or omit any items, or to waive any informality in any bid(s), and to award the contract to the lowest and best bidder in accordance with Section 307.86 of the Ohio Revised Code as determined by the Williams County Board of Commissioners.

Williams County Board of Commissioners Lew Hilkert, President

Page 13: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

4

1. PROJECT INFORMATION

1-A. Purpose and Scope of Work

The purpose of this request is to receive competitive bids to provide the requirements described in the following specifications. The Board is not liable for any costs incurred by the respondents in the preparation and submission of this bid. This BID does not constitute a contract for services performed or to be performed.

The Board is seeking to improve connectivity to county facilities for the services below to reduce long-term costs for Internet, video streaming services, and phone service. To that end, the Board is seeking a vendor within a 50-mile radius of Bryan, Ohio.

1.A.1. FiberThe Board is looking for a Dark Fiber Optic connection from a splice point at theintersection of Williams County Road I & Williams County Road 13 to the datacloset within the Hillside County Living Main Distribution Closet. Fiber needs toremain underground where feasible.

1-B. General Instructions

The bid shall be submitted in a sealed envelope to:

Williams County Board of Commissioners Attn: Fall 2020 HCL Fiber Service Project Williams County Commissioner’s Office One Courthouse Square Bryan, OH 43506

The submitted bids shall be clearly marked “FALL 2020 HCL FIBER SERVICE PROJECT” on the front of the envelope or the top of the package that encloses the bids. All submitted bids shall be submitted to the Williams County Board of Commissioners Office where they shall remain sealed and held until the time of the public bid opening. Bids must be received at the above address no later than September 23rd, 2020 at 4:00 PM EST to be considered. All respondents must furnish the Commissioners Office with five (5) complete printed copies of the bid. Bids received after the scheduled receipt date and time will not be accepted and will be marked "Late" and may be returned to the bidder. All bids and materials submitted become the property of the Williams County Board of Commissioners and will not be returned. Williams County is not responsible for any cost incurred by the vendors in seeking this award. Pursuit of this contract shall be borne by the vendor.

Faxed or emailed bids will not be considered. The bid document must be signed with an original ink signature by the person authorized to sign the bid. The Williams County Board of Commissioners reserve the right to accept any bid, to reject any bid or all bids, to waive irregularities and/or informalities in any bid, to increase or decrease or omit any item or items, and to make the award in any manner deemed in the best interest of

Page 14: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

5

Williams County. The selection decision will be based upon the Williams County Board of Commissioners judgment of relevant criteria listed in section 1-C.

1. Schedule: The following schedule is planned (Eastern Time Zone):

DATE EVENT 09/08/2020 09/14/2020 09/18/2020

BID Released Bidder’s Conference 2:00 p.m. Questions and Clarifications Deadline at 4:00 p.m.

09/24/2020 Bid Due by 10:00 a.m. 09/24/2020 Bid Opening at 10:00 a.m. 11/30/2020 Project Completion Deadline

2. Bid Conference: Attendance is optional but recommended.

Bid conference location:

Williams County Commissioners OfficeWilliams County Commissioners Board RoomOne Courthouse SquareBryan, OH 43506

3. Questions and Clarifications Regarding the BID: Vendors shall submit all questionsin writing or via email exclusively to the Williams County Commissioners Office. Allquestions must be received no later than 4:00 p.m. EST on September 18th, 2020.All responses to questions regarding this BID will be made available online athttps://www.williamscountyoh.gov/Bids.aspx within 3 business days of submissiondate.

Questions concerning this BID or the bid procedures should be addressed to:

Williams County Board of Commissioners Attn: Williams County IT Manager – Jeremy Suffel One Courthouse Square Bryan, OH 43506 Email: [email protected]

4. Bid Guaranty and Contract Bond Required: As required by State law, any bidsubmitted in response to this BID shall be accompanied by a bid guaranty in the formof a bond or a certified check, cashier’s check, or a money order made out toWilliams County Board of Commissioners from a solvent bank or savings and loanassociation. The bid guaranty shall conform to R.C. §153.54. The bid guaranty mustbe valid for a minimal period of ninety (90) days after the date of opening or until acontract is signed, whichever is shorter. Once a contract has been signed by boththe Williams County Board of Commissioners and selected vendor, the bid guarantyand contract bond of the vendors who were not selected will be returned to thosevendors upon request.

5. State Taxes: The Williams County Board of Commissioners are exempt from allsales, excise, and transportation taxes, except the State of Ohio gasoline tax. The

Page 15: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

6

price or prices bid shall be exclusive of all such taxes and will be so construed. The Williams County Board of Commissioners will provide documentation of its exemption.

6. Subcontractors: The use of subcontractors will be permitted on this project.

7. Non-Discrimination Practices: The vendor shall agree that it shall not discriminate inany manner based on sex, race, color, age, religion, national origin, or ancestry ofany person.

8. Payment Schedule: The Williams County Board of Commissioners and theselected vendor will determine a payment schedule at the time of contractnegotiations with the selected firm.

9. Project Time Frame: The Williams County Board of Commissioners require that theproject be completed by November 30th, 2020 at the latest.

10. Bid Opening: All bids received will remain sealed until the bid opening. The bids will be opened on September 24th at 10:00 AM EST in the Board of Commissioners Board Room, located at One Courthouse Square, Bryan OH 43506. At that time, Bids will be opened and logged. Bids will not be available for public viewing during the bid review and vendor selection process. Respondents are not required to be present at the bid opening.

11. Insurance & Workers Compensation: The Williams County Commissioners Officewill require the selected firm to maintain liability and workers compensationinsurance throughout the term of the contract. The company shall saveharmless the Williams County Board of Commissioners and its officers or agentsfrom all claims, demands, payments, suits, actions, recoveries, and judgementsof every kind brought against it by reason of act or omission of the company.The selected company will be required to provide proof of insurance at the timeof selection.

12. Valuable Papers Insurance: The selected vendor or shall carry valuable papersinsurance in an amount sufficient to cover all claims on any data and informationwhich belong to the Williams County Board of Commissioners and is in the vendor’spossession, all work products and deliverable items covered in the contract. Theselected vendor will be required to provide proof of insurance at the time ofselection.

13. Licenses, Permits, and Regulations: Permits and licenses necessary for theprosecution of the project shall be secured and paid for as part of the project. Thevendor shall include any licensing, permit, and regulatory costs in the overallproposal. Any reoccurring costs pertaining to Licenses, Permits, and Regulationsmust be revealed as a part of the proposal.

14. Tie Bids: If two or more bids are determined by the Williams County Board ofCommissioners to be equally qualified, the Williams County Board ofCommissioners will invite each equally qualified bidder to make a presentationwhich the Williams County Board of Commissioners will use to determine the bidderto be awarded the project. The bidder shall solely be responsible for all costs

Page 16: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

7

associated with the presentation.

15. Method of Bidding: Bids are solicited for the services requested as described in thespecifications. Bids shall be submitted on a lump sum only bid for the entire project

16. Examination of Sites: Bidders are required to satisfy themselves by personalexamination at the sites of the service, and by examination and study of the contractdocuments as to the conditions existing and difficulties likely to be encountered in theinstallation of services. No plea of ignorance, as a result of failure to make suchexaminations on the part of the Vendor, will be accepted as an excuse for failure tofulfill the provisions of the Contract.

17. Drug Free Work Place: The Vendor must be enrolled and in good standing in theOhio Bureau of Workers’ Compensation Drug-Free Workplace (DFWP) DiscountProgram or a similar program approved by the Bureau of Workers’ Compensationwithin eight (8) days of the bid opening.

18. Notice of Delinquent Taxes: Within ten (10) days after the award of the Contract, thebidder shall submit to the Williams County Board of Commissioners an affidavitstating either that he owes no delinquent taxes or that he does owe delinquenttaxes and the amount. If the bidder owes such taxes, a copy of the statement willbe sent to the Williams County Treasurer within thirty (30) days. A copy of thestatement will be attached to the Contract. No payment will be made on theContract without such a statement.

19. Liability Insurance and Builders Risk Insurance: From the date of thecommencement of the Improvements until the date of final completion of allinstallation of services by Vendor on the site(s), Vendor shall purchase and maintaincommercial general liability insurance. See Article 8 of the proposed Contractdocument for further details.

1-C. Selection Criteria

The Williams County Board of Commissioners will select a firm which they determine to be capable of providing a high-quality service at a reasonable cost, in accordance with Section 307.86 of the Ohio Revised Code.

The following is a partial list of criteria which will be used to evaluate bids: experience and personnel qualifications, compliance with BID instructions, costs, delivery schedules, fee distribution, knowledge and technical expertise, subcontractor details, proposed procedures, and references. The Williams County Board of Commissioners reserves the right to reject any bid and all bids, or to increase or decrease or omit any item or items, or to waive any informality in any bid(s), and to award the contract to the lowest and best bidder in accordance with Section 307.86 of the Ohio Revised Code as determined by the Williams County Board of Commissioners.

1-D. Bid Content

All bids must follow the same format. No exceptions to this format will be accepted, and all sections of the format must be clearly addressed in order for a bid to be accepted for evaluation. The purpose of the required format is to simplify the bid evaluation processes and to ensure that all bids receive the same orderly review.

Page 17: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

8

All bids must include the following sections:

1. Cover Letter2. Project Service Plan/Technical Approach3. Project Schedule4. Proposed Service Maps5. References for Similar Projects and Firm Financial Statement6. Project Cost Bid Form7. Bid Guaranty and Contract Bond8. Optional Information9. Delinquent Taxes Affidavit10. Vendor Corporation Affidavit along with copy of resolution11. Request for Taxpayer Identification Number (W-9)12. Affidavit of Compliance with Campaign Contribution Limitations13. Non-Collusion Affidavit14. Affidavit of Authority of Corporation to Bid15. Proposal for Bidder’s Signature

1-E. Bid Content Details

1. Cover Letter: Provide a cover letter introducing the document as to its contentand purpose. The cover letter should also identify the individual within yourorganization who will respond to questions the Williams CountyCommissioners may have regarding your bid. Include title, phone number,fax number, email address and address where this person may be contacted.Also include specific highlights of your firm in your bid.

2. Project Service Plan/Technical Approach: This section is intended to be theheart of the bid and should reflect the vendor's knowledge and experiencewith the complete methodologies, equipment, hardware, and softwarenecessary to complete the project scope of work.

3. Project Schedule: The vendor must complete the Project Schedule for servicecompletion.

4. Proposed Service Maps: For several of the connections, the vendor is beingasked to provide the route for all portions of the service connection. Thevendor must submit complete fiber route maps in .KMZ format, designatingunderground sections in Blue and aerial sections in Red.

5. References for Similar Projects and Firm Financial Background: Include asummary description of at least 3 prior similar projects that exhibits yourfirm's experience and capabilities. Include the client name, organization, andcontact person (with a current phone number and email address) that theWilliams County Board of Commissioners may contact for referencepurposes. Also, the vendor must provide a current company financialstatement.

6. Cost Bid Form: The vendor must complete the Cost Bid Form included with

Page 18: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

9

this document and return it as part of the Cost Bid. Additional Cost Bid Forms may be submitted for options or alternatives proposed by the Vendor.

7. Bid Guaranty and Contract Bond Form: See pages.

8. Optional Information: This section may contain a variety of informationsuch as an additional or alternative technique not listed in the BID,additional or alternative processes that would enhance the project orreduce costs, or additional project information that the vendor wishes toconvey to the Williams County Board of Commissioners evaluators.

9. Delinquent Taxes Affidavit: See pages.

10. Vendor Corporation Affidavit and Copy of Resolution: See pages.

11. Request for Taxpayer Identification Number (W-9): See pages.

12. Affidavit of Compliance with Campaign Contribution Limitations: See pages.

13. Non-Collusion Affidavit: See pages.

14. Affidavit of Authority of Corporation to Bid: See pages.

15. Prop o sa l f o r Bidd e r’s Sign a tu re : See pages.2. PROJECT SPECIFICATIONS

2-A SPECIFICATIONS

Fiber must meet the following specifications:

Constructions – Dielectric, armored, double armored, dual jacket Count – 144 fibers in color-coded buffer tubes Fiber Type – Single-mode Performance – Tested in accordance with TIA 455 series FOTPs for fiber optic cables. Complies with

ICEA 640, RUS 7 CFR 1755 (PE90 listed), Telcordia GR-20, and IEC 60794-3-11 Registered Supplier – ISO 9001, ISO 14001, TL 9000, and OHSAS 18001

Conduit Must meet the following specifications:

Nominal Diameter in [Imperial] 1.25 Nominal Diameter mm [Metric] 31.75 Average Inside Diameter in [Imperial] 1.338 Outside Diameter in [Imperial] 1.66 Outside Diameter mm [Metric] 42.164 Diameter in [Imperial] 1.25 Bend Radius - Load in [Imperial] 34 Bend Radius - No Load in [Imperial] 17 Working Load Limit lb [Imperial] 1717 Working Load lb [Imperial] 1717 Color Orange

2-B Fiber Route Map

Page 19: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00120Supplementary Instructions To Bidders

9/1/20 1

1. DOCUMENTSCopies of the Contract Documents are on file at:

Williams County IT Managers Office 1425 East High Street Bryan, Ohio 43506

2. BID DUE DATESeptember 24th, 2020 at 10:00 AM Local Time

Deliver to: Williams County Commissioners Fourth Floor One Courthouse Square Bryan, OH 43506

3. PROJECT

2020 HCL Fiber Service Project Local Project #6-2020

4. CONSTRUCTION SCHEDULEConstruction to begin after Notice to Proceed is issued according to General Conditions.

5. COMPLETION DATEFinal Completion: No later than November 30th, 2020

6. SECURING DOCUMENTSA. Drawings and Specifications may be obtained from the Commissioners Office at the below

address, or at the address below or at: www.williamscountyoh.gov/

B. Contact for Documents: Jeremy Suffel Williams County Information Technology Managers Office 1425 East High Street Bryan, Ohio 43506 (419) 633-5069 Email: [email protected]

7. BID FORMIn order to receive consideration, make all bids in strict compliance with Instructions to Bidders, and the following:

A. Submit all bids ON FORMS PROVIDED, properly executed with ALL ITEMS FILLED OUT.

B. Unauthorized conditions, limitations, or provisions will be cause for rejection of bid.

Page 20: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00120Supplementary Instructions To Bidders

9/1/20 2

Complete all bidding information and submit entire bid with the bid.

C. Bid Package includes, but not limited to, the following:

• Bid Form• Bid Bond• If a Corporation, Evidence Authorizing Signatory to Enter Into Contracts• Affidavits: Item 00400, Item 00405• Certificates: Item 01030, Item 01031• Evidence of Liability Insurance• Evidence of Workman’s Compensation Coverage

8. BIDS

A. Bids must be based upon conditions at the site, Drawings, Project Manual, General Provisions, Supplemental General Provisions, Specifications, and all Addenda.

9. PROPOSALS

A. Contract shall be on a UNIT PRICE basis.

10. BIDDERS' QUESTIONSA. Direct all questions concerning project in writing to:

Jeremy Suffel Williams County Information Technology Managers Office 1425 East High Street Bryan, Ohio 43506 (419) 633-5069 Email: [email protected]

11. EXAMINATION OF DRAWINGS, SPECIFICATIONS AND SITEA. Before submitting a bid, each bidder shall carefully examine the Contract Documents, and visit the

Site of Work. Bidder shall fully inform himself of all existing conditions and limitations under which the work is to be performed. Submission of a bid shall be taken as evidence that the bidder has made such an examination.

END OF ITEM

Page 21: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00130 SUPPLEMENTAL SPECIFICATIONS

09/02/20

Section 1: All work shall be performed in accordance with The Ohio Department of Transportation, Construction and Material Specifications, 2019, except as modified in the contract specifications, plans, or project manual.

In matters concerning conflicts between the referenced 2019 CMS and Project Specifications, Plans, or Project Manual, the Specifications, Plans, or Manual shall govern.

Section 2: If permits are required. The contractor is responsible for obtaining any permits prior to work beginning.

END OF ITEM

Page 22: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Item 00250Utilities

9/1/20 1

2020 FIBER SERVICE CONTRACT

Bidders are advised that the following utilities are/may be present and will not be cleared from the construction area at the time of award of the contract. These utilities shall remain in place and active within the construction limits during the time of construction. The Owner anticipates zero conflicts and little or no contact with persons from the utilities.

NORTH WESTERN ELECTRIC COOPERATIVE, - Aerial & Underground Power Distribution.

TOLEDO EDISON COMPANY (FIRST ENERGY), Aerial & Underground Power Distribution.

FRONTIER COMMUNICATIONS, Aerial and Buried Cable

CENTURY LINK COMMUNICATIONS, Aerial and Buried Cable

OHIO GAS COMPANY, Underground Low- & High-Pressure Natural Gas, Gauging and Valve Stations

VARIOUS COMMUNICATION AND CATV FIRMS, Aerial and Buried Cable

GENERAL COMMENTS

The contractor shall exercise caution when working in the proximity to existing utility facilities. Sections 105.06 and 107.17 of the Department of Transportation Construction and Materials Specifications require, among other things, that the contractor cooperate with all utilities located within the limits of this construction project and take responsibility for the protection of utility property and services.

Bidders are advised that there are no plans to relocate any existing utilities.

END OF ITEM

Page 23: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00300Bid Form

9/1/20 1

PROJECT IDENTIFICATION: 2020 HCL Fiber Service

Project Project #6-2020

THIS BID IS SUBMITTED TO: Williams County Commissioners Fourth Floor Courthouse Bryan, OH 43506

1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement withOWNER in the form included in the Contract Documents to perform and furnish all Work as specified orindicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and inaccordance with the other terms and conditions of the Contract Documents.

2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions toBidders, including without limitation those dealing with the disposition of Bid security. This Bid will remainsubject to acceptance for sixty days after the day of Bid opening. BIDDER will sign and deliver the requirednumber of counterparts of the Agreement with the Bonds and other documents required by the BiddingRequirements within fifteen days after the date of OWNER's Notice of Award.

3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:a. BIDDER has examined and carefully studied the Bidding Documents and the following Addenda

receipt of all which is hereby acknowledged: (List Addenda by Addendum Number)

ADDENDA NO(s). ______, _____, _____, _____, _____, _____, _____, _____, _____

b. BIDDER has visited the site and become familiar with and is satisfied as to the general, local andsite conditions that may affect cost, progress, performance and furnishing of the Work.

c. BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations thatmay affect cost, progress, performance and furnishing of the Work.

d. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at orcontiguous to the site and all drawings of physical conditions in or relating to existing surface orsubsurface structures at or contiguous to the site (except Underground Facilities) which have beenidentified in the Supplementary Conditions as provided in paragraph 4.0.2 of the GeneralConditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of theSupplementary Conditions of the extent of the "technical data" contained in such reports anddrawings upon which BIDDER is entitled to rely as provided in paragraph 4.0.2 of the GeneralConditions. BIDDER acknowledges that such reports and drawings are not Contract Documentsand may not be complete for BIDDER's purposes. BIDDER acknowledges that OWNER andENGINEER do not assume responsibility for the accuracy or completeness of information and datashown or indicated in the Bidding Documents with respect to Underground Facilities at orcontiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility forhaving done so) all such additional or supplementary examinations, investigations, explorations,tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) ator contiguous to the site or otherwise which may affect cost progress, performance or furnishing ofthe Work or which relate to any aspect of the means, methods, techniques, sequences andprocedures of construction to be employed by BIDDER and safety precautions and programsincident thereto. BIDDER does not consider that any additional examinations, investigations,explorations, tests, studies or data are necessary for the determination of this Bid for performanceand furnishing of the Work in accordance with the times, price and other terms and conditions ofthe Contract Documents.

Page 24: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00300Bid Form

9/1/20 2

e. BIDDER is aware of the general nature of Work to be performed by Owner and others at the sitethat relates to Work for which this Bid is submitted as indicated in the Contract Documents.

f. BIDDER has correlated the information known to BIDDER, information and observations obtainedfrom visits to the site, reports and drawings identified in the Contract Documents and all additionalexaminations, investigations, explorations, tests, studies and data with the Contract Documents.

g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepanciesthat BIDDER has discovered in the Contract Documents and the written resolution thereof byENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient toindicate and convey understanding of all terms and conditions for performing and furnishing theWork for which this Bid is submitted.

h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm orcorporation and is not submitted in conformity with any agreement or rules of any group,association, organization or corporation; BIDDER has not directly or indirectly induced or solicitedany other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person,firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain foritself any advantage over any other Bidder or over OWNER.

i. (Any other representation required by Laws and Regulations.)

4. a. BIDDER will complete the Work in accordance with the Contract Documents for the followingprice(s):

* See Attached Bid Form

5. BIDDER agrees that the Work

will be substantially completed and completed and ready for final payment on or before the dates or withinthe number of calendar days indicated in the Agreement.

BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure tocomplete the Work within the times specified in the Agreement.

6. The following documents are attached to and made a condition of this Bid:

a. Required Bid Security in the form of ____________________________________________

b. A tabulation of Subcontractors, Suppliers and other persons and organizations required to beidentified in this Bid.

c. Required BIDDER's Qualification Statement with supporting data.

d. If BIDDER is a corporation, corporate resolution authorizing submission of bid.

e. (Add other documents as pertinent.)

Page 25: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00300Bid Form

9/1/20 3

7. Communications concerning this Bid shall be addressed to: _______________________________

The address of BIDDER indicated below.

The following address: ____________________________________________________________

8. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meaningsindicated in the General Conditions or Instructions.

SUBMITTED on __________________________________, 2020.

State Contractor License No. __________________________________.

If BIDDER is:

An Individual

By________________________________________________________________________(SEAL) (Type or Print Individual's Name)

doing business as ________________________________________________________________

_______________________________________________________________________________ Business Address (City, State, Zip Code)

_________________________ ____________________________________________________ Telephone No. Signature

A Partnership

By _______________________________________________________________________(SEAL) (Firm Name)

_______________________________________________________________________________ (Type or Print Name Clearly of General Partner)

_______________________________________________________________________________ Business Address (City, State, Zip Code)

__________________________ ____________________________________________________ Telephone No. Signature

Page 26: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00300Bid Form

9/1/20 4

A Corporation

By _______________________________________________________________________ (SEAL) (Corporation Name)

_______________________________________________________________________________ (State of Incorporation)

By ____________________________________________________________________________ (Type or Print Clearly Name of Person Authorized to Sign) (Title)

Attest _________________________________________________________________________ (Secretary)

______________________________________________________________________________ Business Address (City, State, Zip Code)

__________________________ ___________________________________________________ Telephone No. Signature

Date of Qualification to do business is _______________________________________________

Joint Venture

By _______________________________________________________________________ (SEAL) (Name) (Title)

By _______________________________________________________________________(SEAL)

(Name) (Title)

_______________________________________________________________________________ Business Address (City, State, Zip Code)

__________________________ ____________________________________________________ Telephone No. Signature

Phone Number and Address for receipt of official communications

_______________________________________________________________________________ (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above).

CONTINUED NEXT PAGE

Page 27: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00310 Bid Bond

1

Bid Bond O.R.C. § 153.571 KNOW ALL PERSONS BY THESE PRESENTS,

that we, the undersigned ________________ as principal and _______________ as sureties, are

hereby held and firmly bound unto the Williams County Commissioners and the as obligee in the

penal sum of the dollar amount of the bid submitted by the principal to the obligee on

_________________ to undertake the project known as 2020 HCL Fiber Service Project. The

penal sum referred to herein shall be the dollar amount of the principal's bid to the obligee,

incorporating any additive or deductive alternate bids made by the principal on the date referred

to above to the obligee, which are accepted by the obligee. In no case, shall the penal sum exceed

the amount of _________________________ dollars. (If the foregoing blank is not filled in, the

penal sum will be the full amount of the principal's bid, including alternates. Alternatively, if the

blank is filled in, the amount stated must not be less than the full amount of the bid including

alternates, in dollars and cents. A percentage is not acceptable.) For the payment of the penal

sum well and truly to be made, we hereby jointly and severally bind ourselves, our heirs,

executors, administrators, successors, and assigns.

Signed this _____ day of _____, 2020 THE CONDITION OF THE ABOVE OBLIGATION IS

SUCH, that whereas the above named principal has submitted a bid for 2020 HCL Fiber

Service Project, Project #6-2020.

Now, therefore, if the obligee accepts the bid of the principal and the principal fails to enter into

a proper contract in accordance with the bid, plans, details, specifications, and bills of material;

and in the event the principal pays to the obligee the difference not to exceed ten per cent of the

penalty hereof between the amount specified in the bid and such larger amount for which the

obligee may in good faith contract with the next lowest bidder to perform the work covered by

the bid; or in the event the obligee does not award the contract to the next lowest bidder and

resubmits the project for bidding, the principal pays to the obligee the difference not to exceed

ten per cent of the penalty hereof between the amount specified in the bid, or the costs, in

connection with the resubmission, of printing new contract documents, required advertising, and

printing and mailing notices to prospective bidders, whichever is less, then this obligation shall

Page 28: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00310 Bid Bond

2

be null and void, otherwise to remain in full force and effect; if the obligee accepts the bid of the

principal and the principal within ten days after the awarding of the contract enters into a proper

contract in accordance with the bid, plans, details, specifications, and bills of material, which

said contract is made a part of this bond the same as though set forth herein;

Now also, if the said ______________________ shall well and faithfully do and perform the

things agreed by _______________________ to be done and performed according to the terms

of said contract; and shall pay all lawful claims of subcontractors, materials suppliers, and

laborers, for labor performed and materials furnished in the carrying forward, performing, or

completing of said contract; we agreeing and assenting that this undertaking shall be for the

benefit of any materials supplier or laborer having a just claim, as well as for the obligee herein;

then this obligation shall be void; otherwise the same shall remain in full force and effect; it

being expressly understood and agreed that the liability of the surety for any and all claims

hereunder shall in no event exceed the penal amount of this obligation as herein stated.

The said surety hereby stipulates and agrees that no modifications, omissions, or additions, in or

to the terms of the said contract or in or to the plans or specifications therefore shall in any wise

affect the obligations of said surety on its bond.

IN WITNESS, WHEREOF, the parties have affixed their signatures on the date set forth below to

be effective on the date first written above.

____________________________ ____________________________

By:_________________________ By:_________________________

Its:_________________________ Its:_________________________

Date:_______________________ Date:________________________

END OF ITEM

Page 29: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00400Non-Collusion Affidavit

9/1/20 1

The Owner reserves the right to require the bidder to submit such an affidavit, dated, executed, and contained with the bidding documents, as a condition precedent to its award of the Contract.

AFFIDAVIT OF PRINCIPAL CONTRACTOR

STATE OF ) SS

COUNTY OF )

being duly sworn, deposes and says that is

of (Sole Owner\Partner\President\Sec'y\Other) (Name of Bidder)

who on , 2020 submitted to Williams County Commissioners (Date Bid Submitted)

a bid as set forth in the attached copy; that all statements of fact in such bid are true; that such bid was not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that such bid is genuine and not collusive or sham; that said bidder has not directly or indirectly, by agreement, communication or conference with anyone attempting to induce action prejudicial to the interests of the Owner who is to award the contract, or of any other bidder or anyone else interested in the proposed contract; and further, that prior to the opening and reading of bids, said bidder,

A. did not directly or indirectly, induce or solicit anyone else to submit a false or sham bid;

B. did not directly or indirectly, collude, conspire, connive or agree with anyone else that said bidder or anyone else would submit a false or sham bid, or that anyone should refrain from bidding or withdraw his bid;

C. did not, in any manner, directly or indirectly, seek by agreement, communication or conference with anyone to raise or fix the bid price of said bidder or of anyone else, or to raise or fix any overhead, profit or cost element of his bid price or that of anyone else;

D. did not, directly or indirectly, submit his bid price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any individual or group of individuals, except to the awarding authority or to any person or persons who have a partnership or other financial interest with said bidder in his business; and

E. did not include in his bid price any fees, dues, changes, or assessments because required to do so by reason of his membership in or affiliation with any association, organization, corporation,

Page 30: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00400Non-Collusion Affidavit

9/1/20 2

partnership, company, individual or group of individuals, or because of any agreement or understanding with anyone that he would do so.

Signed: .

Title: .

STATE OF OHIO COUNTY OF , SS:

Sworn to before and subscribed in my presence this day of , 2020

Notary Public

My Commission Expires: ___________________

END OF ITEM

Page 31: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00405 Affidavit of Contractor As To Delinquent Personal Property Taxes

(ORC 5719.042)

9/1/20 1

TO: Williams County

The undersigned Contractor, being first duly sworn, having bid on a contract for:

2020 HCL Fiber Service Project , Project #6-2020

and having been awarded the contract, hereby certifies:

(Mark One)

that at the time the bid was submitted, the undersigned Contractor was not charged with any delinquent personal property tax on the general tax list of personal property of Williams County.

that at the time the bid was submitted, the undersigned Contractor was charged with delinquent personal property taxes on the general tax list of personal property of Williams County and that the amount of such due and unpaid delinquent taxes, including any due and unpaid penalties and interest thereon, was $ .

In consideration of the award of the above contract, this sworn statement is incorporated in said contract as a covenant of the undersigned.

By: . (Print Name and Title)

Signature: .

STATE OF OHIO COUNTY OF , SS:

Sworn to before and subscribed in my presence this day of 2020

Notary Public

My Commission Expires: ____________________

INSTRUCTIONS

A copy of this Affidavit shall be included in the bidding documents and incorporated into the contract.

TO THE TREASURER:

If this Affidavit indicates that taxes are due, a copy of this statement must be submitted to the County Treasurer within thirty (30) days.

END OF ITEM

Page 32: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00410 Notice of Award

9/1/20 1

DATED: _ , 2020__ TO:

ADDRESS: _________________________________________

CONTRACT FOR 2020 HCL Fiber Service Project, Project

#6-2020 You are notified that your Bid dated , 2020, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a contract for paving for Williams County Engineer. (Base Bid Awarded)

The Contract Price of your contract is: _$ ____---

4 copies of each of the proposed Contract Documents will follow this Notice of Award.

4 sets of ITEM 00420 Notice to Proceed and ITEM 00500 Agreement will be delivered separately or otherwise. The Owner is required withhold Item 00420 and Item 00500 until the award package is formally approved by ODOT and/or the FHWA.

You must comply with the following conditions precedent within fifteen days of the date of this Notice, or by the

______ day of ______, 2020, whichever is later.

1. You must deliver to the OWNER 3 fully executed counterparts of the Agreement including all theContract Documents. This includes sets of Drawings. Each of the Contract Documents must bearyour signature on every page.

2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in theInstructions to Bidders

3. (List other conditions precedents).Current Certificate of Liability Insurance – .Certificate of Worker’s Compensation Coverage - .IRS Form W-9 Taxpayer ID Number Certification (Item 01031)

______________________________________________________________________

Failure to comply with these conditions within the time specified will entitle OWNER to consider your bid in default, to annul this Notice of Award and to declare your Bid Security forfeited.

Within ten days after you comply with the above conditions, OWNER will return to you one fully signed counterpart of the Agreement with the Contract Documents attached.

ACCEPTANCE OF AWARD

Williams County Commissioners (OWNER) (CONTRACTOR)

. Lewis Hilkert (AUTHORIZED SIGNATURE)

. Brian Davis (TITLE)

Terry Rummel

END OF ITEM

Page 33: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00420Notice To Proceed

9/1/20 1

TO:_____________ Dated: ______________

PROJECT NAME: 2020 HCL FIBER SERVICE

PROJECT Project #6-2020

You are notified that the Contract Times under the above contract will commence to run on Date of "Notice to Proceed". By that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 3 of the Agreement the date of Final Completion is __________________, 2020.

Before you may start any Work at the site, you and Owner must each deliver to the other (with copies to ENGINEER and other identified additional insureds) certificates of insurance which each is required to purchase and maintain in accordance with the Contract Documents.

Also, before you may start any Work at the site, you must: (Add other requirements)

ATTEND PRE-CONSTRUCTION MEETING & SUBMIT PRECONSTRUCTION DOCUMENTS.

__________________________________________________________________________________________

__________________________________________________________________________________________

__________________________________________________________________________________________

ACCEPTANCE OF AWARD

Williams County Commissioners_ ________________ _____(OWNER) (CONTRACTOR)

___________________________________Lewis Hilkert (AUTHORIZED SIGNATURE)

___________________________________Brian Davis (TITLE)

Terry Rummel END OF ITEM

Page 34: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00430 Subcontractor List

9/1/20 1

PROJECT: 2020 HCL FIBER SERVICE PROJECT Owner: Williams County Commissioners One Courthouse Square

Project #6-2020 Bryan, Ohio 43506

CONTRACTOR: ____________________________________________

DATE: ____________, ___ , 2020

List Subcontractors and others proposed to be employed on the above Project as required by the bidding documents.

(To be filled out by the Contractor and returned to the Engineer.)

Work Firm Address Phone Representative

This Form Does Not Replace or Over-Ride the Requirements for C-92 Forms As Required In Other Items.

END OF ITEM

Page 35: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00500 Agreement Between Owner and Contractor

9/1/20 1

THIS AGREEMENT is dated as of the ___ day of _______, in the year 2020, by and between, Williams County

Commissioners(hereinafter called OWNER), and ___________________________________, (hereinafter

called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:

Article 1. WorkCONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is described as follows:

2020 HCL FIBER SERVICE PROJECT The Project for which the Work under Contract Documents may be the whole or only a part is generally described

as follows: Provide and Install ………………

PROJECT #6-2020 Article 2. Engineer The Project Manager shall be:

The Williams Information Technology Manager

who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents.

Article 3. Contract Times3.1

The Project will reach final completion by: _________________, 2020

3.2 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) see Table 108.07-1 “Schedule of Liquidated Damages” in Ohio Department of Transportation, Construction and Materials Specifications, 2019.

Article 4. Contract Price

OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 4.1 below:

Page 36: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00500 Agreement Between Owner and Contractor

9/1/20 2

4.1 See Item 00300 for Contractors unit price bid price, for a total base bid of $______________________. Estimated quantities are not guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER.

Article 5. Payment ProceduresCONTRACTOR shall submit Applications for Payment on a monthly basis. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.

5.1 Progress Payments; Retainage. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by ENGINEER, on or about the 20th day each month during construction as provided in paragraphs 5.1.1 and 5.1.2 below. All such payments will be subject to Unit Price Work based on the number of units completed.

5.1.1 For Cost of Work: Progress payments on account of the Cost of the Work will be made.

5.1.2 Progress payments will be made in an amount equal to the Units or Percentage completed, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, 8% of ALL work completed up to 50% completion of the contact amount.

5.1.3 OWNER may pay, 75% of ALL stored materials. (2019 CMS – 109.10)

Article 6. Contractor's RepresentationsIn order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

6.1 CONTRACTOR has examined and carefully studied the Contract Documents (including the Addenda listed in paragraph 13) and the other related data identified in Bidding Documents including "technical data."

6.2 CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work.

6.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, performance and furnishing of the Work.

6.4 CONTRACTOR has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site been identified in the Supplementary Conditions. CONTRACTOR acknowledges that such reports and drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all such additional supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents.

Page 37: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00500 Agreement Between Owner and Contractor

9/1/20 3

6.5 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the site that relates to the Work as indicated in the Contract Documents.

6.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.

6.7 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

Article 7. Accounting Records

CONTRACTOR shall check all materials, equipment and labor entering into the Work and shall keep such full and detailed accounts as may be necessary for proper financial management under this Agreement, and the accounting methods shall be satisfactory to OWNER. OWNER shall be afforded access to all CONTRACTOR's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda and similar data relating to the Cost of the Work and CONTRACTOR's fee. CONTRACTOR shall preserve all such documents for a period of three years after the final payment by OWNER.

Article 8. Contract Documents

The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR concerning the Work consist of the following:

8.1 This Agreement (ITEM 00500).

8.2 Legal Notice (ITEM 00025)

8.3 Project Manual , Including prevailing wages

8.4 Drawings (Construction Drawings (Item 00130)

8.5 CONTRACTOR's Bid (ITEM 00300)

8.6 Ohio Department of Transportation, Construction and Material Specifications, 2016.

8.7 The following which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto:

All Written Amendments and other documents amending, modifying or supplementing the Contract Documents

There are no Contract Documents other than those listed above in Article 8. Contract Documents may only be amended, modified or supplemented as provided in the Contract Documents.

Page 38: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00500 Agreement Between Owner and Contractor

9/1/20 4

Article 9. Miscellaneous

9.1 Terms used in this Agreement, which are defined in 100 General Provisions, Ohio Department of Transportation, Construction and Material Specification, 2016.

9.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

9.3 OWNER and CONTRACTOR each binds itself, its partners, successors and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents.

9.4 Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.

IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All portions of the Contract Documents have been signed, initiated or identified by OWNER and CONTRACTOR or identified by ENGINEER on their behalf

Williams County Commissioners ________________ __ (OWNER) (CONTRACTOR)

. Lewis Hilkert (AUTHORIZED SIGNATURE)

. Brian Davis (TITLE)

. Terry Rummel

Agent for service of process: _____________________________________ (If CONTRACTOR is a corporation,

(Attach evidence of authority to sign).

CERTIFICATE OF OWNER'S ATTORNEYI, the undersigned, Williams County Prosecutor, the duly authorized and acting legal representative of Williams County Commissioners do hereby approve this document as to form.

____________________________________ _____________________ Katherine J. Zartman, Williams County Prosecutor Date

END OF ITEM

Page 39: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00505 Auditor’s Certification

9/1/20

INSTRUCTIONS

This Affidavit is to be executed and submitted to the Auditor after the award and prior to the time of executing the contract. A copy of this Affidavit shall be incorporated into the contract.

I, Vickie L. Grimm, Auditor, Williams County, hereby certify that the amount of money required to meet the Williams County Commissioners obligations under this contract has been lawfully appropriated and is in the treasury or in the process of collection to the credit of an appropriate fund free from any previous encumbrances.

Vickie L. Grimm, Williams County Auditor

Dated: , 2020

2020 HCL FIBER SERVICE

PROJECT PROJECT #6-2020

END OF ITEM

Page 40: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Item 00600 Performance Bond

1

Performance Bond O.R.C. § 153.57(A) Form

KNOW ALL PERSONS BY THESE PRESENTS, that we, the undersigned

______________________________________________________________ as principal and

_______________________________________________________________ as sureties, are

hereby held and firmly bound unto The Williams County Commissioners in the penal sum of

______________________________________________ dollars, for the payment of which well

and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors,

administrators, successors, and assigns. Signed this ________ day of __________, 2020

THE CONDITION OF THE ABOVE OBLIGATION IS SUCH, that whereas the above-named principal

did on the _________ day of ____________, 2020 enter into a contract with The Williams

County Commissioners, which said contract is made a part of this bond the same as though set

forth herein;

Now, if the said __________________________________ shall well and faithfully do and

perform the things agreed by:

2020 HCL FIBER SERVICE PROJECT

PROJECT #6-2020

to be done and performed according to the terms of said contract; and shall pay all lawful claims

of subcontractors, material suppliers, and laborers, for labor performed and materials furnished

in the carrying forward, performing, or completing of said contract; we agreeing and assenting

that this undertaking shall be for the benefit of any material supplier or laborer having a just

claim, as well as for the obligee herein; then this obligation shall be void; otherwise the same

shall remain in full force and effect; it being expressly understood and agreed that the liability of

Page 41: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Item 00600 Performance Bond

2

the surety for any and all claims hereunder shall in no event exceed the penal amount of this

obligation as herein stated.

The said surety hereby stipulates and agrees that no modifications, omissions, or additions, in or

to the terms of the said contract or in or to the plans or specifications therefor shall in any wise

affect the obligations of said surety on its bond.

IN WITNESS, WHEREOF, the parties have affixed their signatures on the date set forth below to be

effective on the date first written above.

____________________________ ____________________________

By:_________________________ By:_________________________

Its:_________________________ Its:_________________________

Date:_______________________ Date:_______________________

END OF ITEM

Page 42: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00610 Certificate of Substantial Completion

1 09/01/20

PROJECT: 2020 HCL FIBER SERVICE PROJECT – PROJECT #6-2020

DATE OF ISSUANCE

OWNER: Williams County Commissioners

OWNER's Contract No: Project #6-2020

CONTRACTOR PROJECT MANAGER: Wms Co IT Manager

This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof:

TOWilliams County Commissioners

OWNER

And To ________________________________________________

CONTRACTOR

The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on

DATE OF SUBSTANTIAL COMPLETION

A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within 30 days of the above date of Substantial Completion.

From the date of Substantial Completion, the responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows:

RESPONSIBILITIES:

OWNER: ____________________________________________________________________________

CONTRACTOR: _______________________________________________________________________

Page 43: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00610 Certificate of Substantial Completion

2 09/01/20

The following documents are attached to and made a part of this Certificate:

(For items to be attached see definition of Substantial Completion as supplemented and other specifically noted conditions precedent to achieving Substantial Completion as required by Contract Documents.)

This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents.

Executed by ENGINEER on ___________________________, 2020.

Williams County Project Manager

By_________________________________________ Jeremy Suffel

CONTRACTOR accepts this Certificate of Substantial Completion on ________________________, 2020.

_____________________________________________________ CONTRACTOR

By_____________________________________________

OWNER accepts this Certificate of Substantial Completion on ________________________, 2020

Williams County CommissionersOWNER

By_______________________________________________ Lewis Hilkert

_______________________________________________ Brian Davis

_______________________________________________ Terry Rummel

END OF ITEM

Page 44: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00800 Supplemental Conditions

9/1/20 1

These supplementary conditions amend or supplement the standard General Conditions of the Construction Contract.

Article 1. Bonds & Insurance

CONTRACTOR'S LIABILITY INSURANCE:

The CONTRACTOR shall secure and maintain in effect at all times, at his expense, insurance of the following kinds

and limits, with OWNER to be named as additionally insured thereon, to cover all locations of the CONTRACTOR'S

operations in connection with work on the OWNER's project.

A. The limits of liability for the insurance required shall provide coverage for not less than the following amount

or greater where required by Laws and Regulations:

1. Workmen's Compensation and Employer's Liability covering employees of the CONTRACTOR:

a. Workmen's Compensation with statutory limits of liability, and in States with limited

medical benefits, additional medical payments of at least $500,000.00 per employee;

b. Employer’s Liability with a limit of liability of at least $500,000.00 per accident or disease.

2. Public Liability Insurance covering the CONTRACTOR'S legal liability for bodily injuries, in limits of not less

than $1,000,000.00 per person and $2,000,000.00 per occurrence and for property damage of not less than

$1,000,000.00 per accident and $2,000,000.00 aggregate, and covering at least the following hazards:

a. CONTRACTOR'S Premises and Operations;

b. CONTRACTOR’S Protective for his legal liability in connection with SUB-CONTRACTOR'S

operations;

c. Completed Operations Insurance in effect at all times for at least one year following the final

completion and acceptance of his work by the OWNER.

3. Automobile Liability Insurance for bodily injuries in limits of not less than $1,000,000.00 per person and

$2,000,000.00 per accident for property damage of not less than $1,000,000.00 per accident, providing

coverage for any accident arising out of resulting from the operation, maintenance or use by

CONTRACTOR of any owned, non-owned or hired automobiles, trailers of other equipment required to be

licensed.

Page 45: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 00800 Supplemental Conditions

9/1/20 2

4. Direct Damage Insurance. The CONTRACTOR shall secure and maintain in effect at all times, at his

expense, extended coverage, and vandalism and malicious mischief insurance to cover the work from the

time of insurable exposure until the work is accepted by the OWNER. The amount of insurance shall be

the full insurable value of the work as determined by the OWNER. Such insurance is to be written in

accordance with the standard "Builders' Risk Completed Value Form" of the State in which the work is

located. The policy(s) shall name both the OWNER and the CONTRACTOR as insured as their interests

may appear. The original policy(s) shall be furnished to the OWNER prior to the existence of insurable

exposure as determined by the OWNER.

B. No certificate shall be acceptable to the OWNER unless it provides that any change or termination within

the policy periods of the insurance coverages, as certified, shall not be effective within ten (10) days prior to

written notice to the OWNER. In addition, the OWNER'S Protective Policy shall contain the following

provisions:

1. The presence of the OWNER'S ENGINEERS, ODOT ENGINERS or their agents on the site of the work

shall not invalidate the policy of insurance;

2. The policy shall not be invalidated by reason of any violation by CONTRACTOR of any of the terms of any

policy issued;

3. A breach of warranty by the CONTRACTOR shall not negate any insurance coverage provided to the

OWNER or ODOT as additional insured.

Article 2. TaxesOWNER is exempt from State Sales and Use Taxes on materials and equipment to be incorporated in the work.

Said taxes shall not be included in the contract price.

END OF ITEM

Page 46: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01028 Change Order Procedure

9/1/20 1

PART 1 GENERAL

1.01 Definition - Change Order A. See the General Conditions, CMS 109.

1.02 Reference A. Refer to the General Conditions, - Changes in the Work.

1.03 Submittals A. Submit to Project Manager, the name of the individual authorized to receive change documents

for the Prime Contractor. The same person will be responsible for informing all Subcontractors of changes to the Work.

1.04 Documentation of Change in Contract Sum/Price and Contract TimeA. Maintain detailed records of work done on a time and material basis. Provide full information

required for evaluation of proposed changes, and to substantiate costs of changes in Work.

B. Document each quotation for a change in cost or time with sufficient data to allow evaluation of the quotation.

C. Upon request, provide additional data to support computations: 1. Quantities of products, labor, and equipment.2. Taxes, insurance and bonds.3. Overhead and profit.4. Justification for any change in Contract Time.5. Credit for deletions from Contract, similarly documented.

D. Support each claim for additional costs, and for work done on a time and material basis, with additional information: 1. Origin and date of claim.2. Dates and times work was performed, and by whom.3. Time records and wage rates paid.4. Invoices and receipts for products, equipment, and subcontracts, similarly documented.

1.05 Change Order ProceduresA. The Project Manager will advise Contractor and Owner of minor changes in the Work not

involving an adjustment to Contract Sum/Price or Contract Time by issuing supplemental instructions or field directive.

B. The Project Manager may issue a Proposal Request which includes a detailed description of a proposed change with supplementary or revised Drawings and Specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor shall prepare and submit to Project Manager an estimate within 7 days after receipt of said material.

C. The Contractor may propose a change by submitting a request for change to the Project Manager, describing the proposed change and its full effect on the Work, with a statement describing the reason for the change, and the effect on the Contract Sum/Price and Contract Time with full documentation and a statement describing the effect on Work by separate or other Contractors. The Contractor will not be reimbursed for any costs born by the Contractor, associated with submitting the proposed change (i.e., Drawings, Document Preparation, etc.).

Page 47: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01028 Change Order Procedure

9/1/20 2

1.06 Construction Change AuthorizationA. The Project Manager may issue a directive, signed by the Owner, instructing the Contractor to

proceed with a change in the Work, for subsequent inclusion in a Change Order.

B. The document will describe changes in the Work, and will designate method of determining any changes in Contract sum/Price or Contract Time.

C. Promptly execute the change in Work.

1.07 Stipulated Sum Change OrderA. Based on Proposal Request and Contractor's fixed price quotation or Contractor's request for a

Change Order as approved by the Project Manager.

1.08 Unit Price Change OrderA. For pre-determined unit prices and quantities, the Change Order will be executed on a fixed unit

price basis.

B. For unit costs or quantities of units of work, which are not pre-determined, execute Work under a Construction Change Authorization.

C. Changes in Contract Sum/Price or Contract Time will be computed as specified for Time and Material Change Order.

1.09 Time and Material Change OrderA. Submit itemized account and supporting data after completion of change, within time limits

indicated in the Conditions of the Contract.

B. Engineer will determine the change allowable in Contract Sum/Price and Contract Time as provided in the Contract Documents.

C. Maintain detailed records of work done on Time and Material basis.

D. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work.

1.10 Execution of Change Orders A. Engineer will issue Change Orders for signatures of parties as provided in the General Conditions.

B. No work for which a change in contract sum or contract time is anticipated shall be performed without a directive issued first.

1.11 Correlation of Contractor SubmittalsA. Promptly revise Application for Payment forms to record each authorized Change Order as a

separate line item and adjust the Contract Sum/Price.

B. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedule to adjust time for other items of work affected by the change, and resubmit.

C. Promptly enter changes in Project Record Documents.

END OF ITEM

Page 48: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01029 DISPUTE RESOLUTION AND ADMINSTRATIVE CLAIM PROCESS

Page 1

WILLIAMS COUNTY COMMISSIONERS OFFICE DISPUTE RESOLUTION AND ADMINISTRATIVE CLAIM PROCESS

The Williams County Dispute Resolution and Claim Process is premised on the partnering approach to construction administration and must be adhered to by the Contractor in order to resolve disputes on the project and in order to seek additional compensation or contract time from Williams County in the form of an Administrative Claim.

Disputes and Claims Disputes include disagreements, matters in question, and difference of opinion between Williams County’s personnel and the Contractor. Claims are disputes that are not settled through Steps 1 and 2 of the Dispute Resolution and Administrative Claim Process and for which the Contractor has documented costs or time incurred as a result of such disputes.

Disputes and claims by subcontractors and suppliers may be pursued by the Contractor on behalf of subcontractors or suppliers. Disputes and claims of subcontractors and suppliers against the Contractor will not be reviewed by Williams County. Disputes and claims by subcontractors and suppliers against Williams County but not supported by the Contractor will not be reviewed by Williams County.

Disputes and claims subject to review by Williams County include:

1. Interpretation of specifications, standard drawings, plans, proposal, working drawings, change ordersauthorized by the Williams County Commissioners, and orders by Williams County personnel havingauthority over the project.

2. Differing site conditions as defined in CMS 104.02.B.

3. Cost and time incurred by:a. Suspension of the work pursuant to CMS 104.02.Cb. Significant changes in character of the work pursuant to CMS 104.02.Dc. Utility interference with the work pursuant to CMS 105.07 and Utility notes.d. Extra work ordered pursuant to CMS 104.02.F and Item 01028 Change Orders.e. Acts or inaction of Williams County or other government agencies.

4. Adequacy and constructability of the plan design.

5. Contract time extensions due to weather, shortages of labor, equipment, or materials, or other causesbeyond the Contractor’s control as defined in CMS 108.06 and Item 01028 Change Orders.

6. Other subjects mutually agreed upon by Williams County and the Contractor to be within the scope of theDispute Resolution and Administrative Claim Process.

Process The Contractor must exhaust Williams County’s Dispute Resolution and Administrative Claim Process prior to seeking additional compensation or contract time by filing an action in a Williams County Court. The following procedures do not compromise the Contractor’s right to seek relief in any appropriate Court in Williams County.

All parties in the dispute must adhere to the Dispute Resolution and Administrative Claim process. Williams County personnel involved in second step reviews will not consider a dispute until the previous step has properly reviewed the dispute and issued a decision. The Contractor’s personnel shall not contact Williams County personnel involved in a second step review until a decision has been issued by the previous step.

Failure to meet any of the timeframes outlined below or to request an extension may terminate further review of the dispute and may serve as a waiver of the Contractor’s right to file a claim.

Page 49: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01029 DISPUTE RESOLUTION AND ADMINSTRATIVE CLAIM PROCESS

Page 2

Continuation of Work. The Contractor shall continue with all Work, including that which is in dispute. The Owner will continue to pay for Work.

Step 1 (On-Site Determination). The Field Engineer shall meet with the Contractor’s superintendent within two (2) working days of receipt of the Contractor Written Early Notice set forth in CMS 104.02.G. They shall review all pertinent information and contract provisions and negotiate in an effort to reach a resolution according to the Contract Documents. The Field Engineer or Project Manager will issue a written decision of Step 1 within fourteen (14) calendar days of the meeting. If the dispute is not resolved, the Contractor must either abandon or escalate the dispute to Step 2.

Step 2 (District Dispute Resolution Committee). Within seven (7) calendar days of receipt of the Step 1 decision, the Contractor must submit a written request for a Step 2 meeting to the Field Engineer. The Field Engineer will assign the dispute a dispute number. The dispute number will consist of the Owner’s project number, followed by a hyphen and then the number of disputes on this project that this dispute represents. Within fourteen (14) calendar days of receipt of the request for a Step 2 meeting, the Contractor shall submit the Dispute Documentation as follows:

1. The Contractor shall submit three (3) complete copies of the documentation of the dispute to the WilliamsCounty Commissioners.

2. The Dispute Documentation shall be identified on a cover page by county, project number, Contractorname, subcontractor or supplier if involved in the dispute, and dispute number.

3. The Dispute Documentation shall be an original document that clearly and in detail gives the requiredinformation for each item of additional compensation and time extension requested.

4. A narrative of the disputed work or project circumstance at issue. This section must include the dates ofthe disputed work and the date of early notice.

5. References to the applicable provisions of the plans, specifications, proposal, or other contract documents.Copies of the cited provisions shall be included in the Dispute Documentation.

6. The dollar amount of additional compensation and length of contract time extension being requested.

7. The cost and supporting documents that served as the basis for the requested compensation stated innumber six (6) above.

8. A detailed schedule analysis must be included in the Dispute Documentation for any dispute concerningadditional contract time, actual or constructive acceleration, or delay damages. At a minimum, theschedule analysis must include the Schedule Update immediately preceding the occurrence of thecircumstance alleged to have caused delay and must comply with accepted industry practices. Failure tosubmit the required schedule analysis will result in the denial of that portion of the Contractor’s request.

9. Copies of relevant correspondence and other pertinent documents.

Williams County shall establish a Dispute Resolution Committee (DRC) which shall be responsible for hearing and deciding disputes at the Step 2 level. The DRC shall consist of the Project Manager, the Williams County IT Manager, or designees as determined by the Williams County IT Manager. (Who may include a representative of Owner).

Page 50: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01029 DISPUTE RESOLUTION AND ADMINSTRATIVE CLAIM PROCESS

Page 3

To prepare for the DRC meeting, the IT Manager will create a file on the dispute and assign a person to review and manage the dispute. When submitting the Claim Documentation, the Contractor must certify the claim in writing. Such certification shall attest to the following:

1. The claim is made in good faith.

2. To the best of the Contractor's knowledge, all data offered to support the claim is accurate and complete.

3. The claim amount accurately reflects the Contractor's actual incurred costs and additional time impacts.

4. This claim certification shall also be notarized pursuant to the laws of the State of Ohio.

The following is an example of the correct form for a claim certification: (The Contractor) certifies that this claim is made in good faith, that all supporting data is accurate and complete to the best of (the Contractor's) knowledge and belief, and that the claim amount accurately reflects the contract amendment for which (the Contractor) believes Williams County is liable.

By: ____________________ (The Contractor, Name and Title)

Date of Execution: ________

The DRC shall meet with the Contractor at the office of the Williams County COMMISSIONERS and consider the dispute within fourteen (14) calendar days of receipt of the Contractor’s Dispute Documentation. The DRC will issue a written decision of Step 2 within fourteen (14) calendar days of the meeting. The DRC may disagree with the entire claim, may agree in part to resolution of parts of the claim, or may agree with the claim in its entirety. In the event that the dispute is not resolved, the Contractor must either abandon the claim or unresolved part therein or escalate the dispute to Step 3.

Step 3 (Remedy Through the Courts).

In the event that there is no resolution to the dispute, the Contractor may continue the claim through proper legal proceedings in the appropriate Williams County Court.

END OF ITEM

Page 51: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01030 ORC 3517.13

COMPLIANCE CERTIFICATION

9/1/20 1

The Owner reserves the right to require the successful bidder to submit such an affidavit, dated, executed, and submitted with the bids, as a condition precedent to its award of the Contract.

AFFIDAVIT OF PRINCIPAL CONTRACTOR

STATE OF ) SS

COUNTY OF )

being duly sworn, deposes and says that is

of (Sole Owner\Partner\President\Sec'y\Other) (Name of Bidder)

who on , submitted to (Date Bid Submitted) (Owner)

a bid as set forth in the attached copy; I certify that pursuant to the provisions of Ohio House Bill 694 as passed by the 126th General Assembly, that none of the following have collectively made since January 1, 2007 and that, if you or your company are awarded a public contract for the purchase of services costing more than $500, none of the following collectively will make beginning on the date the contract is awarded and extending until one year following the conclusion of that contract, one or more contributions totaling in excess of $2000 to any individual elected official who participates in decision making for the Owner or the campaign committee for any such individual:

i. Myselfii. Any partner or shareholder of my companyiii. My spouse or the spouse of any partner or shareholder of my companyiv. Any child seven years of age through seventeen years of age of myself, my

spouse or any partner or shareholder of my companyv. Any political action committee affiliated with your company.

I further certify that none of the following has individually made within the previous two calendar years and that, if you or your company are awarded a public contract for the purchase of services costing more than $500, none of the following individually will make, beginning on the date the contract is awarded and extending until one year following the conclusion of that contract, as an individual, one or more contributions totaling in excess of $1,000

Page 52: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01030 ORC 3517.13

COMPLIANCE CERTIFICATION

9/1/20 2

within the two previous calendar years to any individual elected official who participates in decision making for the Owner or the campaign committee for any such individual:

i. Myselfii. Any partner or shareholder of my companyiii. My spouse or a spouse of any partner or of any shareholder of my companyiv. Any child seven years of age through seventeen years of age of myself, my

spouse, any partner or any shareholder of my company (only applicable tocontributions made on or after January 1, 2007).

Signed: .

Title: .

Subscribed and sworn to before me this day of , 2020.

Notary Public

END OF ITEM

Page 53: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Form W-9(Rev. August 2013)Department of the Treasury Internal Revenue Service

Request for Taxpayer Identification Number and Certification

Give Form to the

requester. Do not

send to the IRS.

Pri

nt

or

typ

e

See S

pe

cif

ic I

nstr

uc

tio

ns o

n p

ag

e 2

.

Name (as shown on your income tax return)

Business name/disregarded entity name, if different from above

Check appropriate box for federal tax classification:

Individual/sole proprietor C Corporation S Corporation Partnership Trust/estate

Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=partnership)

Other (see instructions)

Exemptions (see instructions):

Exempt payee code (if any)

Exemption from FATCA reporting

code (if any)

Address (number, street, and apt. or suite no.)

City, state, and ZIP code

Requester’s name and address (optional)

List account number(s) here (optional)

Part I Taxpayer Identification Number (TIN)Enter your TIN in the appropriate box. The TIN provided must match the name given on the “Name” line to avoid backup withholding. For individuals, this is your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the Part I instructions on page 3. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN on page 3.

Note. If the account is in more than one name, see the chart on page 4 for guidelines on whose number to enter.

Social security number

– –

Employer identification number

Part II CertificationUnder penalties of perjury, I certify that:

1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me), and

2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal RevenueService (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I amno longer subject to backup withholding, and

3. I am a U.S. citizen or other U.S. person (defined below), and

4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct.

Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions on page 3.

Sign Here

Signature of

U.S. person Date

General InstructionsSection references are to the Internal Revenue Code unless otherwise noted.

Future developments. The IRS has created a page on IRS.gov for information about Form W-9, at www.irs.gov/w9. Information about any future developments affecting Form W-9 (such as legislation enacted after we release it) will be posted on that page.

Purpose of Form

A person who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) to report, for example, income paid to you, payments made to you in settlement of payment card and third party network transactions, real estate transactions, mortgage interest you paid, acquisition or abandonment of secured property, cancellation of debt, or contributions you made to an IRA.

Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN to the person requesting it (the requester) and, when applicable, to:

1. Certify that the TIN you are giving is correct (or you are waiting for a number to be issued),

2. Certify that you are not subject to backup withholding, or

3. Claim exemption from backup withholding if you are a U.S. exempt payee. If applicable, you are also certifying that as a U.S. person, your allocable share of any partnership income from a U.S. trade or business is not subject to the

withholding tax on foreign partners’ share of effectively connected income, and

4. Certify that FATCA code(s) entered on this form (if any) indicating that you are exempt from the FATCA reporting, is correct.

Note. If you are a U.S. person and a requester gives you a form other than Form W-9 to request your TIN, you must use the requester’s form if it is substantially similar to this Form W-9.

Definition of a U.S. person. For federal tax purposes, you are considered a U.S. person if you are:

• An individual who is a U.S. citizen or U.S. resident alien,

• A partnership, corporation, company, or association created or organized in the United States or under the laws of the United States,

• An estate (other than a foreign estate), or

• A domestic trust (as defined in Regulations section 301.7701-7).

Special rules for partnerships. Partnerships that conduct a trade or business in the United States are generally required to pay a withholding tax under section 1446 on any foreign partners’ share of effectively connected taxable income from such business. Further, in certain cases where a Form W-9 has not been received, the rules under section 1446 require a partnership to presume that a partner is a foreign person, and pay the section 1446 withholding tax. Therefore, if you are a U.S. person that is a partner in a partnership conducting a trade or business in the United States, provide Form W-9 to the partnership to establish your U.S. status and avoid section 1446 withholding on your share of partnership income.

Cat. No. 10231X Form W-9 (Rev. 8-2013)

dan
Typewritten Text
ITEM 01031
dan
Typewritten Text
END OF ITEM
Page 54: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Form W-9 (Rev. 8-2013) Page 2

In the cases below, the following person must give Form W-9 to the partnership for purposes of establishing its U.S. status and avoiding withholding on its allocable share of net income from the partnership conducting a trade or business in the United States:

• In the case of a disregarded entity with a U.S. owner, the U.S. owner of the disregarded entity and not the entity,

• In the case of a grantor trust with a U.S. grantor or other U.S. owner, generally, the U.S. grantor or other U.S. owner of the grantor trust and not the trust, and

• In the case of a U.S. trust (other than a grantor trust), the U.S. trust (other than a grantor trust) and not the beneficiaries of the trust.

Foreign person. If you are a foreign person or the U.S. branch of a foreign bank that has elected to be treated as a U.S. person, do not use Form W-9. Instead, use the appropriate Form W-8 or Form 8233 (see Publication 515, Withholding of Tax on Nonresident Aliens and Foreign Entities).

Nonresident alien who becomes a resident alien. Generally, only a nonresident alien individual may use the terms of a tax treaty to reduce or eliminate U.S. tax on certain types of income. However, most tax treaties contain a provision known as a “saving clause.” Exceptions specified in the saving clause may permit an exemption from tax to continue for certain types of income even after the payee has otherwise become a U.S. resident alien for tax purposes.

If you are a U.S. resident alien who is relying on an exception contained in the saving clause of a tax treaty to claim an exemption from U.S. tax on certain types of income, you must attach a statement to Form W-9 that specifies the following five items:

1. The treaty country. Generally, this must be the same treaty under which you claimed exemption from tax as a nonresident alien.

2. The treaty article addressing the income.

3. The article number (or location) in the tax treaty that contains the saving clause and its exceptions.

4. The type and amount of income that qualifies for the exemption from tax.

5. Sufficient facts to justify the exemption from tax under the terms of the treaty article.

Example. Article 20 of the U.S.-China income tax treaty allows an exemption from tax for scholarship income received by a Chinese student temporarily present in the United States. Under U.S. law, this student will become a resident alien for tax purposes if his or her stay in the United States exceeds 5 calendar years. However, paragraph 2 of the first Protocol to the U.S.-China treaty (dated April 30, 1984) allows the provisions of Article 20 to continue to apply even after the Chinese student becomes a resident alien of the United States. A Chinese student who qualifies for this exception (under paragraph 2 of the first protocol) and is relying on this exception to claim an exemption from tax on his or her scholarship or fellowship income would attach to Form W-9 a statement that includes the information described above to support that exemption.

If you are a nonresident alien or a foreign entity, give the requester the appropriate completed Form W-8 or Form 8233.

What is backup withholding? Persons making certain payments to you must under certain conditions withhold and pay to the IRS a percentage of such payments. This is called “backup withholding.” Payments that may be subject to backup withholding include interest, tax-exempt interest, dividends, broker and barter exchange transactions, rents, royalties, nonemployee pay, payments made in settlement of payment card and third party network transactions, and certain payments from fishing boat operators. Real estate transactions are not subject to backup withholding.

You will not be subject to backup withholding on payments you receive if you give the requester your correct TIN, make the proper certifications, and report all your taxable interest and dividends on your tax return.

Payments you receive will be subject to backup withholding if:

1. You do not furnish your TIN to the requester,

2. You do not certify your TIN when required (see the Part II instructions on page 3 for details),

3. The IRS tells the requester that you furnished an incorrect TIN,

4. The IRS tells you that you are subject to backup withholding because you did not report all your interest and dividends on your tax return (for reportable interest and dividends only), or

5. You do not certify to the requester that you are not subject to backup withholding under 4 above (for reportable interest and dividend accounts opened after 1983 only).

Certain payees and payments are exempt from backup withholding. See Exempt payee code on page 3 and the separate Instructions for the Requester of Form W-9 for more information.

Also see Special rules for partnerships on page 1.

What is FATCA reporting? The Foreign Account Tax Compliance Act (FATCA) requires a participating foreign financial institution to report all United States account holders that are specified United States persons. Certain payees are exempt from FATCA reporting. See Exemption from FATCA reporting code on page 3 and the Instructions for the Requester of Form W-9 for more information.

Updating Your Information

You must provide updated information to any person to whom you claimed to be an exempt payee if you are no longer an exempt payee and anticipate receiving reportable payments in the future from this person. For example, you may need to provide updated information if you are a C corporation that elects to be an S corporation, or if you no longer are tax exempt. In addition, you must furnish a new Form W-9 if the name or TIN changes for the account, for example, if the grantor of a grantor trust dies.

Penalties

Failure to furnish TIN. If you fail to furnish your correct TIN to a requester, you are subject to a penalty of $50 for each such failure unless your failure is due to reasonable cause and not to willful neglect.

Civil penalty for false information with respect to withholding. If you make a false statement with no reasonable basis that results in no backup withholding, you are subject to a $500 penalty.

Criminal penalty for falsifying information. Willfully falsifying certifications or affirmations may subject you to criminal penalties including fines and/or imprisonment.

Misuse of TINs. If the requester discloses or uses TINs in violation of federal law, the requester may be subject to civil and criminal penalties.

Specific Instructions

Name

If you are an individual, you must generally enter the name shown on your income tax return. However, if you have changed your last name, for instance, due to marriage without informing the Social Security Administration of the name change, enter your first name, the last name shown on your social security card, and your new last name.

If the account is in joint names, list first, and then circle, the name of the person or entity whose number you entered in Part I of the form.

Sole proprietor. Enter your individual name as shown on your income tax return on the “Name” line. You may enter your business, trade, or “doing business as (DBA)” name on the “Business name/disregarded entity name” line.

Partnership, C Corporation, or S Corporation. Enter the entity's name on the “Name” line and any business, trade, or “doing business as (DBA) name” on the “Business name/disregarded entity name” line.

Disregarded entity. For U.S. federal tax purposes, an entity that is disregarded as an entity separate from its owner is treated as a “disregarded entity.” See Regulation section 301.7701-2(c)(2)(iii). Enter the owner's name on the “Name” line. The name of the entity entered on the “Name” line should never be a disregarded entity. The name on the “Name” line must be the name shown on the income tax return on which the income should be reported. For example, if a foreign LLC that is treated as a disregarded entity for U.S. federal tax purposes has a single owner that is a U.S. person, the U.S. owner's name is required to be provided on the “Name” line. If the direct owner of the entity is also a disregarded entity, enter the first owner that is not disregarded for federal tax purposes. Enter the disregarded entity's name on the “Business name/disregarded entity name” line. If the owner of the disregarded entity is a foreign person, the owner must complete an appropriate Form W-8 instead of a Form W-9. This is the case even if the foreign person has a U.S. TIN.

Note. Check the appropriate box for the U.S. federal tax classification of the person whose name is entered on the “Name” line (Individual/sole proprietor, Partnership, C Corporation, S Corporation, Trust/estate).

Limited Liability Company (LLC). If the person identified on the “Name” line is an LLC, check the “Limited liability company” box only and enter the appropriate code for the U.S. federal tax classification in the space provided. If you are an LLC that is treated as a partnership for U.S. federal tax purposes, enter “P” for partnership. If you are an LLC that has filed a Form 8832 or a Form 2553 to be taxed as a corporation, enter “C” for C corporation or “S” for S corporation, as appropriate. If you are an LLC that is disregarded as an entity separate from its owner under Regulation section 301.7701-3 (except for employment and excise tax), do not check the LLC box unless the owner of the LLC (required to be identified on the “Name” line) is another LLC that is not disregarded for U.S. federal tax purposes. If the LLC is disregarded as an entity separate from its owner, enter the appropriate tax classification of the owner identified on the “Name” line.

Other entities. Enter your business name as shown on required U.S. federal tax documents on the “Name” line. This name should match the name shown on the charter or other legal document creating the entity. You may enter any business, trade, or DBA name on the “Business name/disregarded entity name” line.

Exemptions

If you are exempt from backup withholding and/or FATCA reporting, enter in the Exemptions box, any code(s) that may apply to you. See Exempt payee code and Exemption from FATCA reporting code on page 3.

dan
Typewritten Text
Instructions (Do Not Need To Be Included in Bidding Documents)
Page 55: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Form W-9 (Rev. 8-2013) Page 3

Exempt payee code. Generally, individuals (including sole proprietors) are not exempt from backup withholding. Corporations are exempt from backup withholding for certain payments, such as interest and dividends. Corporations are not exempt from backup withholding for payments made in settlement of payment card or third party network transactions.

Note. If you are exempt from backup withholding, you should still complete this form to avoid possible erroneous backup withholding.

The following codes identify payees that are exempt from backup withholding:

1—An organization exempt from tax under section 501(a), any IRA, or a custodial account under section 403(b)(7) if the account satisfies the requirements of section 401(f)(2)

2—The United States or any of its agencies or instrumentalities

3—A state, the District of Columbia, a possession of the United States, or any of their political subdivisions or instrumentalities

4—A foreign government or any of its political subdivisions, agencies, or instrumentalities

5—A corporation

6—A dealer in securities or commodities required to register in the United States, the District of Columbia, or a possession of the United States

7—A futures commission merchant registered with the Commodity Futures Trading Commission

8—A real estate investment trust

9—An entity registered at all times during the tax year under the Investment Company Act of 1940

10—A common trust fund operated by a bank under section 584(a)

11—A financial institution

12—A middleman known in the investment community as a nominee or custodian

13—A trust exempt from tax under section 664 or described in section 4947

The following chart shows types of payments that may be exempt from backup withholding. The chart applies to the exempt payees listed above, 1 through 13.

IF the payment is for . . . THEN the payment is exempt for . . .

Interest and dividend payments All exempt payees except for 7

Broker transactions Exempt payees 1 through 4 and 6 through 11 and all C corporations. S corporations must not enter an exempt payee code because they are exempt only for sales of noncovered securities acquired prior to 2012.

Barter exchange transactions and patronage dividends

Exempt payees 1 through 4

Payments over $600 required to be

reported and direct sales over $5,0001

Generally, exempt payees

1 through 52

Payments made in settlement of payment card or third party network transactions

Exempt payees 1 through 4

1 See Form 1099-MISC, Miscellaneous Income, and its instructions.

2 However, the following payments made to a corporation and reportable on Form 1099-MISC are not exempt from backup withholding: medical and health care payments, attorneys' fees, gross proceeds paid to an attorney, and payments for services paid by a federal executive agency.

Exemption from FATCA reporting code. The following codes identify payees that are exempt from reporting under FATCA. These codes apply to persons submitting this form for accounts maintained outside of the United States by certain foreign financial institutions. Therefore, if you are only submitting this form for an account you hold in the United States, you may leave this field blank. Consult with the person requesting this form if you are uncertain if the financial institution is subject to these requirements.

A—An organization exempt from tax under section 501(a) or any individual retirement plan as defined in section 7701(a)(37)

B—The United States or any of its agencies or instrumentalities

C—A state, the District of Columbia, a possession of the United States, or any of their political subdivisions or instrumentalities

D—A corporation the stock of which is regularly traded on one or more established securities markets, as described in Reg. section 1.1472-1(c)(1)(i)

E—A corporation that is a member of the same expanded affiliated group as a corporation described in Reg. section 1.1472-1(c)(1)(i)

F—A dealer in securities, commodities, or derivative financial instruments (including notional principal contracts, futures, forwards, and options) that is registered as such under the laws of the United States or any state

G—A real estate investment trust

H—A regulated investment company as defined in section 851 or an entity registered at all times during the tax year under the Investment Company Act of 1940

I—A common trust fund as defined in section 584(a)

J—A bank as defined in section 581

K—A broker

L—A trust exempt from tax under section 664 or described in section 4947(a)(1)

M—A tax exempt trust under a section 403(b) plan or section 457(g) plan

Part I. Taxpayer Identification Number (TIN)

Enter your TIN in the appropriate box. If you are a resident alien and you do not have and are not eligible to get an SSN, your TIN is your IRS individual taxpayer identification number (ITIN). Enter it in the social security number box. If you do not have an ITIN, see How to get a TIN below.

If you are a sole proprietor and you have an EIN, you may enter either your SSN or EIN. However, the IRS prefers that you use your SSN.

If you are a single-member LLC that is disregarded as an entity separate from its owner (see Limited Liability Company (LLC) on page 2), enter the owner’s SSN (or EIN, if the owner has one). Do not enter the disregarded entity’s EIN. If the LLC is classified as a corporation or partnership, enter the entity’s EIN.

Note. See the chart on page 4 for further clarification of name and TIN combinations.

How to get a TIN. If you do not have a TIN, apply for one immediately. To apply for an SSN, get Form SS-5, Application for a Social Security Card, from your local Social Security Administration office or get this form online at www.ssa.gov. You may also get this form by calling 1-800-772-1213. Use Form W-7, Application for IRS Individual Taxpayer Identification Number, to apply for an ITIN, or Form SS-4, Application for Employer Identification Number, to apply for an EIN. You can apply for an EIN online by accessing the IRS website at www.irs.gov/businesses and clicking on Employer Identification Number (EIN) under Starting a Business. You can get Forms W-7 and SS-4 from the IRS by visiting IRS.gov or by calling 1-800-TAX-FORM (1-800-829-3676).

If you are asked to complete Form W-9 but do not have a TIN, apply for a TIN and write “Applied For” in the space for the TIN, sign and date the form, and give it to the requester. For interest and dividend payments, and certain payments made with respect to readily tradable instruments, generally you will have 60 days to get a TIN and give it to the requester before you are subject to backup withholding on payments. The 60-day rule does not apply to other types of payments. You will be subject to backup withholding on all such payments until you provide your TIN to the requester.

Note. Entering “Applied For” means that you have already applied for a TIN or that you intend to apply for one soon.

Caution: A disregarded U.S. entity that has a foreign owner must use the appropriate Form W-8.

Part II. Certification

To establish to the withholding agent that you are a U.S. person, or resident alien, sign Form W-9. You may be requested to sign by the withholding agent even if items 1, 4, or 5 below indicate otherwise.

For a joint account, only the person whose TIN is shown in Part I should sign (when required). In the case of a disregarded entity, the person identified on the “Name” line must sign. Exempt payees, see Exempt payee code earlier.

Signature requirements. Complete the certification as indicated in items 1 through 5 below.

1. Interest, dividend, and barter exchange accounts opened before 1984 and broker accounts considered active during 1983. You must give your correct TIN, but you do not have to sign the certification.

2. Interest, dividend, broker, and barter exchange accounts opened after 1983 and broker accounts considered inactive during 1983. You must sign the certification or backup withholding will apply. If you are subject to backup withholding and you are merely providing your correct TIN to the requester, you must cross out item 2 in the certification before signing the form.

3. Real estate transactions. You must sign the certification. You may cross out item 2 of the certification.

4. Other payments. You must give your correct TIN, but you do not have to sign the certification unless you have been notified that you have previously given an incorrect TIN. “Other payments” include payments made in the course of the requester’s trade or business for rents, royalties, goods (other than bills for merchandise), medical and health care services (including payments to corporations), payments to a nonemployee for services, payments made in settlement of payment card and third party network transactions, payments to certain fishing boat crew members and fishermen, and gross proceeds paid to attorneys (including payments to corporations).

5. Mortgage interest paid by you, acquisition or abandonment of secured property, cancellation of debt, qualified tuition program payments (under section 529), IRA, Coverdell ESA, Archer MSA or HSA contributions or distributions, and pension distributions. You must give your correct TIN, but you do not have to sign the certification.

Page 56: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Form W-9 (Rev. 8-2013) Page 4

What Name and Number To Give the RequesterFor this type of account: Give name and SSN of:

1. Individual The individual

2. Two or more individuals (jointaccount)

The actual owner of the account or, if combined funds, the first

individual on the account 1

3. Custodian account of a minor (Uniform Gift to Minors Act)

The minor 2

4. a. The usual revocable savings trust (grantor is also trustee) b. So-called trust account that is not a legal or valid trust under state law

The grantor-trustee 1

The actual owner 1

5. Sole proprietorship or disregarded entity owned by an individual

The owner 3

6. Grantor trust filing under Optional Form 1099 Filing Method 1 (see Regulation section 1.671-4(b)(2)(i)(A))

The grantor*

For this type of account: Give name and EIN of:

7. Disregarded entity not owned by an individual

The owner

8. A valid trust, estate, or pension trust Legal entity 4

9. Corporation or LLC electing corporate status on Form 8832 or Form 2553

The corporation

10. Association, club, religious, charitable, educational, or othertax-exempt organization

The organization

11. Partnership or multi-member LLC The partnership

12. A broker or registered nominee The broker or nominee

13. Account with the Department of Agriculture in the name of a public entity (such as a state or local government, school district, or prison) that receives agricultural program payments

The public entity

14. Grantor trust filing under the Form 1041 Filing Method or the Optional Form 1099 Filing Method 2 (see Regulation section 1.671-4(b)(2)(i)(B))

The trust

1List first and circle the name of the person whose number you furnish. If only one person on a joint account has an SSN, that person’s number must be furnished.

2 Circle the minor’s name and furnish the minor’s SSN.

3 You must show your individual name and you may also enter your business or “DBA” name on the “Business name/disregarded entity” name line. You may use either your SSN or EIN (if you have one), but the IRS encourages you to use your SSN.

4 List first and circle the name of the trust, estate, or pension trust. (Do not furnish the TIN of the personal representative or trustee unless the legal entity itself is not designated in the account title.) Also see Special rules for partnerships on page 1.

*Note. Grantor also must provide a Form W-9 to trustee of trust.

Note. If no name is circled when more than one name is listed, the number will be considered to be that of the first name listed.

Secure Your Tax Records from Identity Theft

Identity theft occurs when someone uses your personal information such as your name, social security number (SSN), or other identifying information, without your permission, to commit fraud or other crimes. An identity thief may use your SSN to get a job or may file a tax return using your SSN to receive a refund.

To reduce your risk:

• Protect your SSN,

• Ensure your employer is protecting your SSN, and

• Be careful when choosing a tax preparer.

If your tax records are affected by identity theft and you receive a notice from the IRS, respond right away to the name and phone number printed on the IRS notice or letter.

If your tax records are not currently affected by identity theft but you think you are at risk due to a lost or stolen purse or wallet, questionable credit card activity or credit report, contact the IRS Identity Theft Hotline at 1-800-908-4490 or submit Form 14039.

For more information, see Publication 4535, Identity Theft Prevention and Victim Assistance.

Victims of identity theft who are experiencing economic harm or a system problem, or are seeking help in resolving tax problems that have not been resolved through normal channels, may be eligible for Taxpayer Advocate Service (TAS) assistance. You can reach TAS by calling the TAS toll-free case intake line at 1-877-777-4778 or TTY/TDD 1-800-829-4059.

Protect yourself from suspicious emails or phishing schemes. Phishing is the creation and use of email and websites designed to mimic legitimate business emails and websites. The most common act is sending an email to a user falsely claiming to be an established legitimate enterprise in an attempt to scam the user into surrendering private information that will be used for identity theft.

The IRS does not initiate contacts with taxpayers via emails. Also, the IRS does not request personal detailed information through email or ask taxpayers for the PIN numbers, passwords, or similar secret access information for their credit card, bank, or other financial accounts.

If you receive an unsolicited email claiming to be from the IRS, forward this message to [email protected]. You may also report misuse of the IRS name, logo, or other IRS property to the Treasury Inspector General for Tax Administration at 1-800-366-4484. You can forward suspicious emails to the Federal Trade Commission at: [email protected] or contact them at www.ftc.gov/idtheft or 1-877-IDTHEFT (1-877-438-4338).

Visit IRS.gov to learn more about identity theft and how to reduce your risk.

Privacy Act Notice

Section 6109 of the Internal Revenue Code requires you to provide your correct TIN to persons (including federal agencies) who are required to file information returns with the IRS to report interest, dividends, or certain other income paid to you; mortgage interest you paid; the acquisition or abandonment of secured property; the cancellation of debt; or contributions you made to an IRA, Archer MSA, or HSA. The person collecting this form uses the information on the form to file information returns with the IRS, reporting the above information. Routine uses of this information include giving it to the Department of Justice for civil and criminal litigation and to cities, states, the District of Columbia, and U.S. commonwealths and possessions for use in administering their laws. The information also may be disclosed to other countries under a treaty, to federal and state agencies to enforce civil and criminal laws, or to federal law enforcement and intelligence agencies to combat terrorism. You must provide your TIN whether or not you are required to file a tax return. Under section 3406, payers must generally withhold a percentage of taxable interest, dividend, and certain other payments to a payee who does not give a TIN to the payer. Certain penalties may also apply for providing false or fraudulent information.

dan
Typewritten Text
END OF INSTRUCTIONS
dan
Typewritten Text
Page 57: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01900

1

PREVAILING WAGE REQUIREMENTS

PLEASE NOTE THIS SECTION CONTAINS THE OWNERS STANDARD PREVAILING WAGE CONTRACT PROVISIONS. ADDITIONAL INFORMATION CAN ALSO BE FOUND IN ITEM 00101, ODOT SECTION 15 AND FHWA SECTION IV. IN MATTERS OF CONFLICT ITEM 00101 WILL PREVAIL.

I. Project #6-2020, 2020 HCL Fiber Service Project is subject to Federal Prevailing Wage Laws and Wage Rates (Davis Bacon). The Contractor and Sub-Contractors are responsible for compliance with the Prevailing Wage Statutes and Regulations.

II. Federal Prevailing Wage Law (Davis Bacon) and Ohio Prevailing Wage Laws differ in manyareas and the Contractor for this project is required to comply with Federal Laws. Differencesinclude but are not limited to the areas of record keeping, payroll reporting, constant rates throughoutthe project, and notice of prevailing wage rates to non-union employees.

III. The PROJECT WAGE RATES are included in this section of bid packet (Exhibit A). Changes in thewage rates during the Bidding process MAY be added to posted wage rates. Wage Rates in effecton the bid date will be issued as the Contract Wage Rates. Wage Rates in Federal projects are notsubject to change during the project as is the case with State of Ohio projects.

IV. Item 01900, Prevailing Wage Requirements, contains excerpts from the Codes, ExampleExhibits, and the Prevailing Wage Rates for the Project. The Codes are not reproduced in theirentirety and the Contractor is responsible for his/her compliance and compliance of all Sub-Contractors and applicable Suppliers.

V. Definitions:

Apprentice means any employee who is enrolled or indentured per trade occupation as a member of a bona fide apprenticeship program, or a person in the first ninety days of probationary employment as an apprentice in such an apprenticeship program who has been certified by the Ohio apprenticeship council or registered with the Ohio apprenticeship council through those states with which Ohio holds reciprocal apprenticeship agreements to be eligible for probationary employment as an apprentice.

Bona Fide Apprenticeship Program means a comprehensive training program registered with the Ohio apprenticeship council or certified by those with which Ohio holds reciprocal apprenticeship agreements.

Employee means any person in the employment of an employer who performs labor or work of the type performed by a laborer, workman, or mechanic in the construction, prosecution, completion or repair of a public improvement and includes owners, partners, supervisors, and working foremen who devote more than twenty per cent of their time during a work week to such labor or work for the time so spent. Employee does not include an individual who is a sole proprietor.

Page 58: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01900

2

Fringe Benefits means: Medical or hospital care or insurance to provide such; Pensions on retirement or death or insurance to provide such; Compensation for injuries or illnesses resulting from occupational activities if it is in addition to that coverage required by Chapter 4121 and 4123, of the Revised Code; Supplemental unemployment benefits that are in addition to those required by Chapter 4141. of the Revised Code; Life insurance; Disability and sickness insurance; Accident insurance; Vacation and holiday pay; Defraying of costs for apprenticeship or other similar training programs which are beneficial only to the employees affected; Other bona fide fringe benefits.

Prevailing Wage and/or Total Prevailing Wage Rate means the sum of the following: • The basic hourly rate of pay, paid to the employee before deductions, excluding fringe

benefits.• The rate of contribution irrevocably made by an employer to a trustee or to a third person

pursuant to a fund, plan, or program which is communicated in writing to the employeesaffected prior to completion of any project to which sections 4115.03 to 4115.16 of theRevised Code apply;

• The rate of costs to the employer which may be reasonably anticipated in providing FringeBenefits to employees pursuant to an enforceable commitment to carry out a financiallyresponsible plan or program which is communicated in writing to the employees affected priorto completion of any project to which sections 4115.03 to 4115.16 of the Revised Code apply.

VI. Prevailing Wage Notification to Employee – ORC 4115.05. This Notice is not applicable onFederal projects.

VII. Certified Payroll Reports. The initial Original signed certified payroll reports should be sent tothe Owner’s Prevailing Wage Coordinator within two weeks after the first employee pay. Reportsfor Projects scheduled to last less than four months are to be filed weekly after the initial report.Projects scheduled to last longer than four months may submit reports monthly. Certified Payrollreports must be received prior to the processing of monthly pay estimates by the Owner. ASample report is included in this section. The initial and all supplemental payroll reports shallcontain the required information required on Pay Roll Report (WH-347), and an accuratedescription of the nature of the deductions withheld from each employee's wages. Where fringebenefits are paid into a bona fide plan instead of cash, the Contractor should provide a listing ofeach benefit and the amount per hour paid to the program for each employee. The Owner isobligated to report deficiencies. The Prime Contractor much submit weekly reports after theproject begins until all regular work and punch items are completed even if the prime has noemployees on the site that week. Subs are not required to submit “No Work” reports when off site.

VIII. Affidavit of Compliance ̶ Prevailing Wage. The Affidavit is to be completed by the Contractorand all Sub-Contractors. The completed Original signed document should be forwarded to theOwner’s Prevailing Wage Coordinator, upon completion of the work. The Owner will NOT makefinal payment for the work until all Affidavits have been received.

IX. Wage Rate Posting. The Contractor is required to Post in a prominent and accessible place onthe site of the work a legible statement of the schedule of wage rates specified in the contract forthe various occupations of laborers, workmen, and mechanics employed. (Sub-Contractors mustalso have access to the notice.) The notice must remain posted during the life of the contract andmust be supplemented in its entirety whenever new wage rate schedules are issued by thedepartment. The schedule must also state the name, address, and phone number of the prevailingwage coordinator.

Page 59: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

ITEM 01900

3

X. Penalties for Violation. Contractors may be assessed the wages owed, plus penalties for the wages owed, payable to the employee. The Code also provides for additional penalties as may be imposed by the State of Ohio or the Federal Government.

XI. Public Records. Certified Payrolls, Affidavits, Wage Rates, etc. are public records and aresubject to Public Records Requests. To the extent that the Public Records Law allows, the Ownerwill redact all employee home addresses and all but the last four digits of all employee socialsecurity numbers.

XII. Exhibits:• Exhibit A – Prevailing Wage Rates for Project #6-2020• Exhibit B – Affidavit of Contractor Compliance.• Exhibit C – Sample Certified Payroll Report. (A Fillable Version Is Available From The Owner)• Exhibit D – Davis Bacon Poster WH 1321• Exhibit E – Labor Standard Interview

END OF ITEM

Page 60: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

"General Decision Number: OH20200001 03/20/2020

Superseded General Decision Number: OH20190001

State: Ohio

Construction Types: Heavy and Highway

Counties: Ohio Statewide.

Heavy and Highway Construction Projects

Note: Under Executive Order (EO) 13658, an hourly minimum wageof $10.80 for calendar year 2020 applies to all contractssubject to the Davis-Bacon Act for which the contract isawarded (and any solicitation was issued) on or after January1, 2015. If this contract is covered by the EO, the contractormust pay all workers in any classification listed on this wagedetermination at least $10.80 per hour (or the applicable wagerate listed on this wage determination, if it is higher) forall hours spent performing on the contract in calendar year2020. If this contract is covered by the EO and aclassification considered necessary for performance of work onthe contract does not appear on this wage determination, thecontractor must pay workers in that classification at least thewage rate determined through the conformance process set forthin 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it ishigher than the conformed wage rate). The EO minimum wage ratewill be adjusted annually. Please note that this EO applies tothe above-mentioned types of contracts entered into by thefederal government that are subject to the Davis-Bacon Actitself, but it does not apply to contracts subject only to theDavis-Bacon Related Acts, including those set forth at 29 CFR5.1(a)(2)-(60). Additional information on contractorrequirements and worker protections under the EO is availableat www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/07/2020 3 03/13/2020 4 03/20/2020

BROH0001-001 06/01/2019

DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan CreekTownships), HENRY (Excluding Monroe, Bartlow, Liberty,Washington, Richfield, Marion, Damascus & Townships & that partof Harrison Township outside corporate limits of city ofNapoleon), PAULDING, PUTNAM and WILLIAMS COUNTIES

Dan
Typewritten Text
Dan
Typewritten Text
Dan
Typewritten Text
The Most Recent Decision On The Date Bids Are Opened, Will Be The Project Wage Rates.
Dan
Rectangle
Dan
Typewritten Text
We will need new rates for the 2020 Fiber Service Project
Dan
Typewritten Text
Page 61: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0001-004 06/01/2019

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.34 16.11---------------------------------------------------------------- BROH0003-002 06/01/2019

FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY(Townships of Washington, Damascus, Richfield, Bartlow,Liberty, Harrison, Monroe, & Marion), LUCAS and WOOD (Townshipsof Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster,Center, Portage, Middleton, Plain, Liberty, Henry, Washington,Weston, Milton, Jackson & Grand Rapids) COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0005-003 05/01/2019

CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick,Liverpool, Montville, York, Homer, Harrisville, Chatham,Litchfield & Spencer Townships and the city of Medina)

Rates Fringes

BRICKLAYER BRICKLAYERS; CAULKERS; CLEANERS; POINTERS; & STONEMASONS.................$ 34.85 16.94 SANDBLASTERS................$ 35.10 16.94 SEWER BRICKLAYERS & STACK BUILDERS....................$ 35.35 16.94 SWING SCAFFOLDS.............$ 35.35 16.94---------------------------------------------------------------- BROH0006-005 06/01/2019

CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships),STARK & TUSCARAWAS

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0007-002 06/01/2019

Page 62: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

LAWRENCE

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0007-005 06/01/2019

PORTAGE & SUMMIT

Rates Fringes

BRICKLAYER.......................$ 29.34 16.11---------------------------------------------------------------- BROH0007-010 06/01/2019

PORTAGE & SUMMIT

Rates Fringes

MASON - STONE....................$ 29.34 16.11---------------------------------------------------------------- BROH0008-001 06/01/2019

COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run,Middleton, & Unity Townships and the city of New Waterford),MAHONING & TRUMBULL

Rates Fringes

BRICKLAYER.......................$ 29.34 16.11---------------------------------------------------------------- BROH0009-002 06/01/2019

BELMONT & MONROE COUNTIES and the Townships of Warren & Mt.Pleasant and the Village of Dillonvale in JEFFERSON COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11Refractory.......................$ 31.45 19.01---------------------------------------------------------------- BROH0010-002 06/01/2019

COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington,Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek &Saline Townships)

Rates Fringes

Page 63: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0014-002 06/01/2019

HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek,Saline & Salineville Townships & the Village of Dillonvale)

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0016-002 06/01/2019

ASHTABULA, GEAUGA, and LAKE COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0018-002 06/01/2019

BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon,Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES:

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0022-004 06/01/2019

CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN,MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin,Jefferson & Washington Townships) and SHELBY COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0032-001 06/01/2019

GALLIA & MEIGS

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0035-002 06/01/2019

ALLEN, AUGLAIZE, MERCER and VAN WERT COUNTIES

Rates Fringes

Page 64: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0039-002 06/01/2019

ADAMS & SCIOTO

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0040-003 06/01/2019

ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND,WAYNE and WYANDOT (Except Crawford, Ridge, Richland & TymochteeTownships) COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11

FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate. Free standing stack work ground level to top of stack; Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.""Hot"" work: $2.50 above journeyman rate.

---------------------------------------------------------------- BROH0044-002 06/01/2019

Rates Fringes

Bricklayer, Stonemason COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, KICKING, MORGAN, MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY COUNTIES:...................$ 29.34 16.11---------------------------------------------------------------- BROH0045-002 06/01/2017

FAYETTE, JACKSON, PIKE, ROSS and VINTON COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 28.65 14.55---------------------------------------------------------------- BROH0046-002 06/01/2019

Page 65: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry &Bloom Townships) and WYANDOT (Tymochtee, Crawford, Ridge &Richland Townships) COUNTIES & the Islands of Lake Erie northof Sandusky

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11

FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate. Free standing stack work ground level to top of stack; Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.""Hot"" work: $2.50 above journeyman rate.

---------------------------------------------------------------- BROH0052-001 06/01/2019

ATHENS COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0052-003 06/01/2019

NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock,Jackson, Jefferson & Elk Townships) and WASHINGTON COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.34 16.11---------------------------------------------------------------- BROH0055-003 06/01/2017

DELAWARE, FRANKLIN, MADISON, PICKAWAY and UNION COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 28.65 14.55---------------------------------------------------------------- CARP0003-004 05/01/2017

MAHONING & TRUMBULL

Rates Fringes

CARPENTER........................$ 26.20 17.42---------------------------------------------------------------- CARP0069-003 05/01/2017

Page 66: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

CARROLL, STARK, TUSCARAWAS & WAYNE

Rates Fringes

CARPENTER........................$ 25.98 15.98---------------------------------------------------------------- CARP0069-006 05/01/2017

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

CARPENTER........................$ 24.04 15.29---------------------------------------------------------------- CARP0171-002 05/01/2019

BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE

Rates Fringes

CARPENTER........................$ 27.37 20.02---------------------------------------------------------------- CARP0200-002 05/01/2017

ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA,GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING,MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY,PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON and WASHINGTONCOUNTIES

Rates Fringes

CARPENTER........................$ 29.07 16.22Diver............................$ 39.41 10.40PILEDRIVERMAN....................$ 29.07 16.22---------------------------------------------------------------- CARP0248-005 07/01/2008

LUCAS & WOOD

Rates Fringes

CARPENTER........................$ 27.27 14.58---------------------------------------------------------------- CARP0248-008 07/01/2008

Rates Fringes

CARPENTER DEFIANCE, FULTON, HANCOCK, HENRY, PAULDING & WILLIAMS COUNTIES....................$ 23.71 13.28

Page 67: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

---------------------------------------------------------------- CARP0254-002 05/01/2017

ASHTABULA, CUYAHOGA, GEAUGA & LAKE

Rates Fringes

CARPENTER........................$ 32.40 16.97---------------------------------------------------------------- CARP0372-002 05/01/2016

ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT

Rates Fringes

CARPENTER........................$ 24.54 18.21---------------------------------------------------------------- CARP0639-003 05/01/2017

MEDINA, PORTAGE & SUMMIT

Rates Fringes

CARPENTER........................$ 30.42 16.99---------------------------------------------------------------- CARP0735-002 05/01/2019

ASHLAND, ERIE, HURON, LORAIN & RICHLAND

Rates Fringes

CARPENTER........................$ 26.30 17.91---------------------------------------------------------------- CARP1311-001 05/01/2017

BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE,GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY &WARREN

Rates Fringes

Carpenter & Piledrivermen........$ 29.34 15.95Diver............................$ 40.58 9.69---------------------------------------------------------------- CARP1393-002 07/01/2008

CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA,PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD

Rates Fringes

Piledrivermen & Diver's Tender...$ 27.30 16.05

Page 68: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

DIVERS - $250.00 per day---------------------------------------------------------------- CARP1393-003 07/01/2008

ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT

Rates Fringes

Piledrivermen & Diver's Tender...$ 25.15 15.92

DIVERS - $250.00 per day---------------------------------------------------------------- CARP1871-006 05/01/2017

BELMONT, HARRISON, & MONROE

Rates Fringes

Diver, Wet.......................$ 48.11 17.33Piledrivermen; Diver, Dry........$ 32.07 17.33---------------------------------------------------------------- CARP1871-008 05/01/2017

ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE,LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT

Rates Fringes

Diver, Wet.......................$ 45.80 18.84Piledrivermen; Diver, Dry........$ 30.53 18.84---------------------------------------------------------------- CARP1871-014 05/01/2017

CARROLL, STARK, TUSCARAWAS & WAYNE

Rates Fringes

Diver, Wet.......................$ 38.34 16.95Piledrivermen; Diver, Dry........$ 25.56 16.95---------------------------------------------------------------- CARP1871-015 05/01/2017

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

Diver, Wet.......................$ 37.34 16.07Piledrivermen; Diver, Dry........$ 24.89 16.07---------------------------------------------------------------- CARP1871-017 05/01/2017

MAHONING & TRUMBULL

Page 69: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Rates Fringes

Diver, Wet.......................$ 40.65 17.62Piledrivermen; Diver, Dry........$ 27.10 17.62---------------------------------------------------------------- CARP2235-012 01/01/2014

COLUMBIANA & JEFFERSON

Rates Fringes

PILEDRIVERMAN....................$ 31.74 16.41---------------------------------------------------------------- CARP2239-001 07/01/2008

CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT

Rates Fringes

CARPENTER........................$ 23.71 13.28---------------------------------------------------------------- ELEC0008-002 05/27/2019

DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD

Rates Fringes

CABLE SPLICER....................$ 38.98 18.96ELECTRICIAN......................$ 40.45 1.5%+20.23---------------------------------------------------------------- ELEC0032-003 12/02/2019

ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT &WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland,Ridge & Salem Townships)

Rates Fringes

ELECTRICIAN......................$ 31.37 19.24---------------------------------------------------------------- ELEC0038-002 04/29/2019

CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) &LORAIN (Columbia Township)

Rates Fringes

ELECTRICIAN Excluding Sound &

Page 70: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Communications Work.........$ 39.13 20.69

FOOTNOTES; a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; & Christmas Dayb. 1 week's paid vacation for 1 year's service; 2 weeks' paid

vacation for 2 or more years' service

---------------------------------------------------------------- ELEC0038-008 04/29/2019

CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) &LORAIN (Columbia Township)

Rates Fringes

Sound & Communication Technician Communications Technician...$ 27.55 11.98 Installer Technician........$ 26.30 11.94

FOOTNOTES; a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; & Christmas Dayb. 1 week's paid vacation for 1 year's service; 2 weeks' paid

vacation for 2 or more years' service

---------------------------------------------------------------- ELEC0064-003 11/25/2019

COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships)MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield,Ellsworth, Coitsville, Goshen, Green, Jackson, Poland,Springfield & Youngstown Townships), & TRUMBULL (Hubbard &Liberty Townships)

Rates Fringes

ELECTRICIAN......................$ 34.67 15.83---------------------------------------------------------------- ELEC0071-001 01/01/2019

ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE,FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING,JACKSON (Coal, Jackson, Liberty, Milton, Washington & WellstonTownships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN,MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver,Benton, Jackson, Mifflin, Pebble, Peepee, Perry & SealTownships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay,Jefferson, Oxford, Perry, Salem, Rush, Washington & YorkTownships), UNION, VINTON (Clinton, Eagle, Elk, Harrison,Jackson, Richland & Swan Townships), and WASHINGTON COUNTIES

Page 71: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Rates Fringes

Line Construction Equipment Operators.........$ 33.62 13.40 Groundmen...................$ 24.17 11.32 Linemen & Cable Splicers....$ 38.27 14.42---------------------------------------------------------------- ELEC0071-004 01/01/2019

AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI,MONTGOMERY, PREBLE, and SHELBY COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42---------------------------------------------------------------- ELEC0071-005 12/31/2018

ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN

Rates Fringes

LINE CONSTRUCTION: Equipment Operator DOT/Traffic Signal & Highway Lighting Projects...$ 32.44 14.10 Municipal Power/Transit Projects....................$ 40.10 16.42LINE CONSTRUCTION: Groundman DOT/Traffic Signal & Highway Lighting Projects...$ 25.06 12.26 Municipal Power/Transit Projects....................$ 31.19 14.11LINE CONSTRUCTION: Linemen/Cable Splicer DOT/Traffic Signal & Highway Lighting Projects...$ 36.13 15.03 Municipal Power/Transit Projects....................$ 44.56 17.58---------------------------------------------------------------- ELEC0071-008 01/01/2019

COLUMBIANA, MAHONING, and TRUMBULL COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 33.62 13.40

Page 72: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42---------------------------------------------------------------- ELEC0071-010 01/01/2019

BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE,STARK, SUMMIT, and WAYNE COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42---------------------------------------------------------------- ELEC0071-013 01/01/2019

BROWN, BUTLER, CLERMONT, HAMILTON, and WARREN COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42---------------------------------------------------------------- ELEC0071-014 01/01/2019

ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton,Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS,PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & UnionTownships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton &Wilkesville Townships)

Rates Fringes

Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42---------------------------------------------------------------- ELEC0082-002 12/02/2019

CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN(Wayne, Clear Creek & Franklin Townships)

Rates Fringes

ELECTRICIAN......................$ 31.15 19.96---------------------------------------------------------------- ELEC0082-006 11/26/2018

Page 73: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN(Wayne, Clear Creek & Franklin Townships)

Rates Fringes

Sound & Communication Technician Cable Puller................$ 12.18 3.85 Installer/Technician........$ 24.35 11.29---------------------------------------------------------------- ELEC0129-003 03/25/2019

LORAIN (Except Columbia Township) & MEDINA (Litchfield &Liverpool Townships)

Rates Fringes

ELECTRICIAN......................$ 34.35 17.30---------------------------------------------------------------- ELEC0129-004 03/25/2019

ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman,Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich,Greenfield, Fairfield, Fitchville & New London Townships)

Rates Fringes

ELECTRICIAN......................$ 34.35 17.30---------------------------------------------------------------- ELEC0141-003 09/01/2019

BELMONT COUNTY

Rates Fringes

CABLE SPLICER....................$ 30.63 25.87ELECTRICIAN......................$ 30.38 25.87---------------------------------------------------------------- ELEC0212-003 11/26/2018

BROWN, CLERMONT & HAMILTON

Rates Fringes

Sound & Communication Technician.......................$ 24.35 10.99---------------------------------------------------------------- ELEC0212-005 06/03/2019

BROWN, CLERMONT, and HAMILTON COUNTIES

Page 74: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Rates Fringes

ELECTRICIAN......................$ 30.18 18.89---------------------------------------------------------------- ELEC0245-001 01/01/2020

ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson,Marseilles, Mifflin, Richland, Ridge & Salem Townships)

Rates Fringes

Line Construction Equipment Operator..........$ 32.37 25.9%+6.75 Groundman Truck Driver......$ 17.70 25.9%+6.75 Lineman.....................$ 40.46 25.9%+6.75

FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day

---------------------------------------------------------------- ELEC0245-003 01/01/2020

DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA,PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, and WOOD COUNTIES

Rates Fringes

Line Construction Cable Splicer...............$ 46.53 25.9%+6.75 Groundman/Truck Driver......$ 17.70 25.9%+6.75 Heli-arc Welding............$ 40.76 25.9%+6.75 Lineman.....................$ 40.46 25.9%+6.75 Operator - Class 1..........$ 32.37 25.9%+6.75 Operator - Class 2..........$ 28.32 25.9%+6.75 Traffic Signal & Lighting Technician..................$ 36.41 25.9%+6.75

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

---------------------------------------------------------------- ELEC0245-004 01/01/2020

ERIE COUNTY

Rates Fringes

Line Construction

Page 75: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Cable Splicer...............$ 46.53 25.9%+6.75 Groundman/Truck Driver......$ 17.70 25.9%+6.75 Lineman.....................$ 40.46 25.9%+6.75 Operator - Class 1..........$ 32.37 25.9%+6.75 Operator - Class 2..........$ 28.32 25.9%+6.75

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

---------------------------------------------------------------- ELEC0246-001 10/29/2018

Rates Fringes

ELECTRICIAN......................$ 38.00 84%+a

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.

---------------------------------------------------------------- ELEC0306-005 05/28/2018

MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville,Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer,Wadsworth, Westfield & York Townships), PORTAGE (Atwater,Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph,Ravenna, Rootstown, Shalersville, Streetsboro & SuffieldTownships), SUMMIT & WAYNE (Baughman, Canaan, Chester,Chippewa, Congress, Green, Milton, & Wayne Townships)

Rates Fringes

CABLE SPLICER....................$ 36.87 16.56ELECTRICIAN......................$ 34.54 5%+18.06---------------------------------------------------------------- ELEC0317-002 06/01/2019

GALLIA & LAWRENCE

Rates Fringes

CABLE SPLICER....................$ 32.68 18.13ELECTRICIAN......................$ 34.35 25.70---------------------------------------------------------------- ELEC0540-005 01/01/2020

CARROLL (Northern half, including Fox, Harrison, Rose &Washington Townhships), COLUMBIANA (Knox Township), HOLMES,MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn,Clay, Rush & York Townships), and WAYNE (South of Baughman,

Page 76: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Chester, Green & Wayne Townships) COUNTIES

Rates Fringes

ELECTRICIAN......................$ 33.71 24.22---------------------------------------------------------------- ELEC0573-003 11/25/2019

ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & WindsorTownships), GEAUGA (Auburn, Middlefield, Parkman & TroyTownships), MAHONING (Milton Township), PORTAGE (Charlestown,Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & WindhamTownships), and TRUMBULL (Except Liberty & Hubbard Townships)

Rates Fringes

ELECTRICIAN......................$ 34.21 19.24---------------------------------------------------------------- ELEC0575-001 05/27/2019

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield,Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal,Jackson, Liberty, Milton & Washington Townships), PICKAWAY(Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships),PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry,Seal, Camp Creek, Newton, Scioto, Sunfish, Union & MarionTownships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk,Harrison, Jackson, Richland & Swan Townships)

Rates Fringes

ELECTRICIAN......................$ 33.75 17.19---------------------------------------------------------------- ELEC0648-001 09/02/2019

BUTLER and WARREN COUNTIES (Deerfield, Hamilton, Harlan,Massie, Salem, Turtle Creek, Union & Washington Townships)

Rates Fringes

CABLE SPLICER....................$ 30.50 18.23ELECTRICIAN......................$ 30.00 19.85---------------------------------------------------------------- ELEC0673-004 05/27/2019

ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne &Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden,Huntsburg, Montville, Munson, Newbury & Thompson Townships) andLAKE COUNTIES

Page 77: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Rates Fringes

CABLE SPLICER....................$ 33.31 21.46ELECTRICIAN......................$ 33.03 21.45---------------------------------------------------------------- ELEC0683-002 05/27/2019

CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON,PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison,Monroe, Muhlenberg, Scioto, Walnut & Washington Townships), andUNION COUNTIES

Rates Fringes

CABLE SPLICER....................$ 34.50 21.20ELECTRICIAN......................$ 33.50 20.18---------------------------------------------------------------- ELEC0688-003 12/02/2019

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley &Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard,Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown &Jefferson Townships), MARION, MORROW, RICHLAND and WYANDOT(Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.00 18.86---------------------------------------------------------------- ELEC0972-002 06/01/2019

ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox,Madison, Vinton & Wilkesville Townships), and WASHINGTONCOUNITES

Rates Fringes

CABLE SPLICER....................$ 33.80 26.65ELECTRICIAN......................$ 33.55 26.65---------------------------------------------------------------- ELEC1105-001 05/28/2018

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller,Milford, Hilliar, Butler, Harrison, Pleasant & CollegeTownships), LICKING, MUSKINGUM, PERRY, and TUSCARAWAS (Auburn,York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry &Bucks Townships) COUNTIES

Page 78: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Rates Fringes

ELECTRICIAN......................$ 30.95 17.96---------------------------------------------------------------- ENGI0018-003 05/01/2019

ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA,PORTAGE, and SUMMIT COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR GROUP 1.....................$ 38.63 15.20 GROUP 2.....................$ 38.53 15.20 GROUP 3.....................$ 37.49 15.20 GROUP 4.....................$ 36.27 15.20 GROUP 5.....................$ 30.98 15.20 GROUP 6.....................$ 38.88 15.20 GROUP 7.....................$ 39.13 15.20

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump; Crane (All Types, Including Boom Truck, Cherry Picker); Crane-Compact, Track or Rubber over 4,000 lbs. capacity; Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24"" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; Wheel Excavator; and Asphalt Plant Engineer (Cleveland District Only).

GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48""; Bulldozer; Endloader; Horizontal Directional Drill (Over 50,000 ft lbs thrust); Hydro

Page 79: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Milling Machine; Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24"" wide & under); Vermeer type Concrete Saw; and Maintenance Operators (Portage and Summit Counties Only).

GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer (Portage and Summit Counties Only); Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4"" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); Welding Machines; and Railroad Tie Inserter/Remover; Articulating/straight bed end dumps if assigned (minus $4.00 per hour.

GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48"" or less); Bull Floats; Burlap & Curing Machine; Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand; Farm-type Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types); Forklift; Form Trencher; Hydro Hammer expect masonary; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader; Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.

GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonry Fork Lift; Inboard-Outboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4"" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes - Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.

GROUP 6 - Master Mechanic & Boom from 150 to 180.

GROUP 7 - Boom from 180 and over.

Page 80: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

---------------------------------------------------------------- ENGI0018-004 05/01/2019

ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN,BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON,COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD,FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON,HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES,HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN,LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE,MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING,PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS,SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VANWERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, andYANDOT COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR GROUP 1.....................$ 37.14 15.20 GROUP 2.....................$ 37.02 15.20 GROUP 3.....................$ 35.98 15.20 GROUP 4.....................$ 34.80 15.20 GROUP 5.....................$ 29.34 15.20 GROUP 6.....................$ 37.39 15.20 GROUP 7.....................$ 37.64 15.20

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump; Crane (All Types, Including Boom Truck, Cherry Picker); Crane-Compact, Track or Rubber over 4,000 lbs. capacity; Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24"" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; and Wheel Excavator.

Page 81: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48""; Bulldozer; Endloader; Hydro Milling Machine; Horizontal Directional Drill (over 50,000 ft. lbs. thrust);Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24"" wide & under); and Vermeer type Concrete Saw.

GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4"" & over discharge); Railroad Tie Inserter/Remover; Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); and Welding Machines; Artiaculating/straight bed end dumps if assigned (minus $4.00 per hour.

GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48"" or less); Bull Floats; Burlap & Curing Machine; Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand; Farm-type Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift; Form Trencher; Hydro Hammer expect masonary; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader; Self-Propelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.

GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonary Forklift; Inboard-Outboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4"" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes - Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.

GROUP 6 - Master Mechanic & Boom from 150 to 180.

Page 82: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

GROUP 7 - Boom from 180 and over.

---------------------------------------------------------------- ENGI0066-023 06/01/2017

COLUMBIANA, MAHONING & TRUMBULL COUNTIES

Rates Fringes

POWER EQUIPMENT OPERATOR ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - A & B.............$ 39.23 19.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - A & B.............$ 38.90 19.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - A & B.............$ 34.64 19.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - A & B.............$ 30.70 19.66 ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - A & B.............$ 27.30 19.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - C & D.............$ 35.96 19.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - C & D.............$ 35.66 19.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - C & D.............$ 31.76 19.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - C & D.............$ 28.14 19.66 HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - C & D.............$ 25.03 19.66 ALL OTHER WORK GROUP 1.....................$ 32.69 19.66

Page 83: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

ALL OTHER WORK GROUP 2.....................$ 32.42 19.66 ALL OTHER WORK GROUP 3.....................$ 28.87 19.66 ALL OTHER WORK GROUP 4.....................$ 25.58 19.66 ALL OTHER WORK GROUP 5.....................$ 22.75 19.66

GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached

GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug; Boring Machine Attached to Tractor; Bullclam; Bulldozer; C.M.I. Road Builder & Similar Type; Cable Placer & Layer; Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom; Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead; Crane-Rough Terrain; Crane-Side Boom; Crane-Truck; Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge; Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile; Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail; Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum; Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer; Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine; Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar); Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine; Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing; Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper; Tractor-Double Boom; Tractor with Attachments; Truck-Boom; Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)

GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar

Page 84: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer; Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork lift & Lulls; Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden); Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist

GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor; Curb Builder, self-propelled; Drill Wagon; Generator Set; Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller; Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter; Tractor; Trencher Form; Water Blaster; Steam Jenny; Syphon; Vibrator-Gasoline; & Welding Machine

GROUP 5 - Brakeperson; Fireperson; & Oiler

---------------------------------------------------------------- IRON0017-002 05/01/2019

ASHTABULA (North of Route 6, starting at the Geauga CountyLine, proceeding east to State Route 45), CUYAHOGA, ERIE(Eastern 2/3), GEAUGA, HURON (East of a line drawn from thenorth border through Monroeville & Willard), LAKE, LORAIN,MEDINA (North of Old Rte. #224), PORTAGE (West of a line fromMiddlefield to Shalersville to Deerfield), and SUMMIT (North ofOld Rte. #224, including city limits of Barberton) COUNTIES

Rates Fringes

IRONWORKER Ornamental, Reinforcing, & Structural..................$ 34.93 22.00---------------------------------------------------------------- IRON0017-010 05/01/2019

ASHTABULA (Eastern part from Lake Erie on the north to route#322 on the south to include Conneaut, Kingsville, Sheffield,

Page 85: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont,Richmond, Andover & Williamsfield Townships)

Rates Fringes

IRONWORKER Structural, including metal building erection & Reinforcing.................$ 34.93 22.00---------------------------------------------------------------- IRON0044-001 06/01/2018

ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT,CLINTON (South of a line drawn from Blanchester to Lynchburg),HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion ofcounty inside lines drawn from Marshall to Lynchburg from thenorthern county line through E. Monroe to Marshall) and WARREN(South of a line drawn from Blanchester through Morrow to thewest county line) COUNTIES

Rates Fringes

IRONWORKER, REINFORCING Beyond 30-mile radius of Hamilton County Courthouse..$ 28.67 21.20 Up to & including 30-mile radius of Hamilton County Courthouse..................$ 27.60 20.70---------------------------------------------------------------- IRON0044-002 06/01/2019

CLINTON (South of a line drawn from Blanchester to Lynchburg),HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion ofcounty inside lines drawn from Marshall to Lynchburg from thenorthern county line through E. Monroe to Marshall) & WARREN(South of a line drawn from Blanchester through Morrow to thewest county line)

Rates Fringes

IRONWORKER Fence Erector...............$ 28.00 21.20 Ornamental; Structural......$ 29.47 21.20---------------------------------------------------------------- IRON0055-003 07/01/2019

CRAWFORD (Area Between lines drawn from where Hwy #598 & #30meet through N. Liberty to the northern border & from said Hwyjunction point due west to the border), DEFIANCE (S. of a linedrawn from where Rte. #66 meets the northern line throughIndependence to the eastern county border), ERIE (Western 1/3),

Page 86: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

FULTON, HANCOCK, HARDIN (North of a line drawn from Maysvilleto a point 4 miles south of the northern line on the easternline), HENRY, HURON (West of a line drawn from the northernborder through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM(East of a line drawn from the northern border down throughMiller City to where #696 meets the southern border), SANDUSKY,SENECA, WILLIAMS (East of a line drawn from Pioneer throughStryker to the southern border), WOOD & WYANDOT (North of Rte.#30)

Rates Fringes

IRONWORKER Fence Erector...............$ 21.30 20.92 Flat Road Mesh..............$ 29.77 21.30 Tunnels & Caissons Under Pressure....................$ 29.77 21.30 All Other Work..............$ 30.38 24.40---------------------------------------------------------------- IRON0147-002 06/01/2015

ALLEN (Northern half), DEFIANCE (Northern part, excluding southof a line drawn from where Rte. #66 meets the northern linethrough Independence to the eastern county border), MERCER(Northern half), PAULDING, PUTNAM (Western part, excluding eastof a line drawn from the northern border down through MillerCity to where #696 meets the southern border), VAN WERT, andWILLIAMS (Western part, excluding east of a line drawn fromPioneer through Stryker to the southern border) COUNTIES

Rates Fringes

IRONWORKER.......................$ 25.39 20.64---------------------------------------------------------------- IRON0172-002 06/01/2019

CHAMPAIGN (Eastern one-third), CLARK (Eastern one-fourth),COSHOCTON (West of a line beginning at the northwestern countyline going through Walhonding & Tunnel Hill to the southerncounty line), CRAWFORD (South of Rte. #30), DELAWARE,FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (Excluding a line drawnfrom Roundhead to Maysville), HIGHLAND (Eastern one-fifth),HOCKING, JACKSON (Northern half), KNOX, LICKING, LOGAN (Easternone-third), MADISON, MARION, MORROW, MUSKINGUM (West of a linestarting at Adams Mill going to Adamsville & going fromAdamsville through Blue Rock to the southern border), PERRY,PICKAWAY, PIKE (Northern half), ROSS, UNION, VINTON and WYANDOT(South of Rte. #30) COUNTIES

Rates Fringes

Page 87: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

IRONWORKER.......................$ 30.00 20.70---------------------------------------------------------------- IRON0207-004 06/01/2019

ASHTABULA (Southern part starting at the Geauga County line),COLUMBIANA (E. of a line from Damascus to Highlandtown),MAHONING (N. of Old Route #224), PORTAGE (E. of a line fromMiddlefield to Shalersville to Deerfield) & TRUMBULL

Rates Fringes

IRONWORKER Layout; Sheeter.............$ 30.72 25.15 Ornamental; Reinforcing; Structural..................$ 28.06 24.70 Ornamental; Reinforcing.....$ 29.72 25.18---------------------------------------------------------------- IRON0290-002 06/01/2019

ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawnfrom east to the west county line going through Oxford,Darrtown & Woodsdale), CHAMPAIGN (Excluding east of a linedrawn from Catawla to the point where #68 intersects thenorthern county line), CLARK (Western two-thirds), CLINTON(Excluding south of a line drawn from Blanchester toLynchburg), DARKE, GREENE, HIGHLAND (Inside lines drawn fromMarshall to Lynchburg & from the northern county line throughEast Monroe to Marshall), LOGAN (West of a line drawn fromWest Liberty to where the northern county line meets thewestern county line of Hardin), MERCER (Southern half), MIAMI,MONTGOMERY, PREBLE, SHELBY & WARREN (Excluding south of a linedrawn from Blanchester through Morrow to the western countyline) COUNTIES

Rates Fringes

IRONWORKER.......................$ 29.23 33.35---------------------------------------------------------------- IRON0549-003 12/01/2018

BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM(Excluding portion west of a line starting at Adams Mill goingto Adamsville and going from Adamsville through Blue Rock tothe south border)

Rates Fringes

IRONWORKER.......................$ 33.34 20.81---------------------------------------------------------------- IRON0550-004 05/01/2019

Page 88: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

ASHLAND, CARROLL, COLUMBIANA (W. of a line from Damascus toHighlandtown), COSHOCTON (E. of a line beginning at NW Co. linegoing through Walhonding & Tunnel Hill to the South Co. line),HOLMES, HURON (S. of Old Rte. #224), MAHONING (S. of Old Rte.#224), MEDINA (S. of Old Rte. #224), PORTAGE (S. of Old Rte.#224), RICHLAND, STARK, SUMMIT (S. of Old Rte. #224, Excludingcity limits of Barberton), TUSCARAWAS, & WAYNE

Rates Fringes

Ironworkers:Structural, Ornamental and Reinforcing.......$ 28.90 19.87---------------------------------------------------------------- IRON0769-004 06/01/2019

ADAMS (Eastern Half), GALLIA, JACKSON (Southern Half), LAWRENCE& SCIOTO

Rates Fringes

IRONWORKER.......................$ 32.00 25.95---------------------------------------------------------------- IRON0787-003 12/01/2019

ATHENS, MEIGS, MORGAN, NOBLE, and WASHINGTON COUNTIES

Rates Fringes

IRONWORKER.......................$ 30.18 22.75---------------------------------------------------------------- LABO0265-008 05/01/2018

Rates Fringes

LABORER ASHTABULA, ERIE, HURON, LORAIN, LUCAS, MAHONING, MEDINA, OTTAWA, PORTAGE, SANDUSKY, STARK, SUMMIT, TRUMBULL & WOOD COUNTIES GROUP 1....................$ 31.05 10.95 GROUP 2....................$ 31.22 10.95 GROUP 3....................$ 31.55 10.95 GROUP 4....................$ 32.00 10.95 CUYAHOGA AND GEAUGA COUNTIES ONLY: SEWAGE PLANTS, WASTE PLANTS, WATER TREATMENT FACILITIES, PUMPING STATIONS, & ETHANOL PLANTS CONSTRUCTION................$ 33.66 10.95 CUYAHOGA, GEAUGA & LAKE

Page 89: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

COUNTIES GROUP 1....................$ 32.28 10.95 GROUP 2....................$ 32.45 10.95 GROUP 3....................$ 32.78 10.95 GROUP 4....................$ 33.23 10.95 REMAINING COUNTIES OF OHIO GROUP 1....................$ 30.62 10.95 GROUP 2....................$ 30.79 10.95 GROUP 3....................$ 31.12 10.95 GROUP 4....................$ 31.57 10.95

LABORER CLASSIFICATIONS

GROUP 1 - Asphalt Laborer; Carpenter Tender; Concrete Curing Applicator; Dump Man (Batch Truck); Guardrail and Fence Installer; Joint Setter; Laborer (Construction); Landscape Laborer; Mesh Handlers & Placer; Right-of-way Laborer; Riprap Laborer & Grouter; Scaffold Erector; Seal Coating; Surface Treatment or Road Mix Laborer; Sign Installer; Slurry Seal; Utility Man; Bridge Man; Handyman; Waterproofing Laborer; Flagperson; Hazardous Waste (level D); Diver Tender; Zone Person & Traffic Control

GROUP 2 - Asphalt Raker; Concrete Puddler; Kettle Man Pipeline); Machine Driven Tools (Gas, Electric, Air); Mason Tender; Brick Paver; Mortar Mixer; Power Buggy or Power Wheelbarrow; Paint Striper; Sheeting & Shoring Man; Surface Grinder Man; Plastic Fusing Machine Operator; Pug Mill Operator; & Vacuum Devices (wet or dry); Rodding Machine Operator; Diver; Screwman or Paver; Screed Person; Water Blast, Hand Held Wand; Pumps 4"" & Under (Gas, Air or Electric) & Hazardous Waste (level C); Air Track and Wagon Drill; Bottom Person; Cofferdam (below 25 ft. deep); Concrete Saw Person; Cutting with Burning Torch; Form Setter; Hand Spiker (Railroad); Pipelayer; Tunnel Laborer (without air) & Caisson; Underground Person (working in Sewer and Waterline, Cleaning, Repairing & Reconditioning); Sandblaster Nozzle Person; & Hazardous Waste (level B)

GROUP 3 - Blaster; Mucker; Powder Person; Top Lander; Wrencher (Mechanical Joints & Utility Pipeline); Yarner; Hazardous Waste (level A); Concrete Specialist; Concrete Crew in Tunnels (With Air-pressurized - $1.00 premium); Curb Setter & Cutter; Grade Checker; Utility Pipeline Tapper; Waterline; and Caulker

GROUP 4 - Miner (With Air-pressurized - $1.00 premium); & Gunite Nozzle Person

TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE

SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING.

Page 90: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

---------------------------------------------------------------- PAIN0006-002 05/01/2018

ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. of theEast-West Turnpike) & SUMMIT (N. of the East-West Turnpike)

Rates Fringes

PAINTER COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS GROUP 1....................$ 27.90 16.16 GROUP 2....................$ 28.30 16.16 GROUP 3....................$ 28.60 16.16 GROUP 4....................$ 34.16 16.16 COMMERCIAL REPAINT GROUP 1....................$ 26.40 16.16 GROUP 2....................$ 26.80 16.16 GROUP 3....................$ 27.10 16.16

PAINTER CLASSIFICATIONS - COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS

GROUP 1 - Brush; & Roller

GROUP 2 - Sandblasting & Buffing

GROUP 3 - Spray Painting; Closed Steel Above 55 feet; Bridges & Open Structural Steel; Tanks - Water Towers; Bridge Painters; Bridge Riggers; Containment Builders

GROUP 4 - Bridge Blaster

PAINTER CLASSIFICATIONS - COMMERCIAL REPAINT

GROUP 1 - Brush; & Roller

GROUP 2 - Sandblasting & Buffing

GROUP 3 - Spray Painting

---------------------------------------------------------------- PAIN0007-002 07/01/2019

FULTON, HENRY, LUCAS, OTTAWA (Excluding Allen, Bay, Bono,Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach,Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD

Rates Fringes

PAINTER NEW COMMERCIAL WORK

Page 91: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

GROUP 1....................$ 27.64 17.79 GROUP 2....................$ 27.39 17.79 GROUP 3....................$ 27.39 17.79 GROUP 4....................$ 27.39 17.79 GROUP 5....................$ 27.39 17.79 GROUP 6....................$ 27.39 17.79 GROUP 7....................$ 27.39 17.79 GROUP 8....................$ 27.39 17.79 GROUP 9....................$ 27.39 17.79

REPAINT IS 90% OF JR

PAINTER CLASSIFICATIONS

GROUP 1 - Brush; Spray & Sandblasting Pot Tender

GROUP 2 - Refineries & Refinery Tanks; Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior)

GROUP 3 - Swing Stage & Chair

GROUP 4 - Lead Abatement

GROUP 5 - All Methods of Spray

GROUP 6 - Solvent-Based Catalized Epoxy Materials of 2 or More Component Materials, to include Solvent-Based Conversion Varnish (excluding water based)

GROUP 7 - Spray Solvent Based Material; Sand & Abrasive Blasting

GROUP 8 - Towers; Tanks; Bridges; Stacks Over 30 Feet

GROUP 9 - Epoxy Spray (excluding water based)

---------------------------------------------------------------- PAIN0012-008 05/01/2019

BUTLER COUNTY

Rates Fringes

PAINTER GROUP 1.....................$ 21.95 10.20 GROUP 2.....................$ 25.30 10.20 GROUP 3.....................$ 25.80 10.20 GROUP 4.....................$ 26.05 10.20 GROUP 5.....................$ 26.30 10.20

PAINTER CLASSIFICATIONS

GROUP 1: Bridge Equipment Tender; Bridge/Containment Builder

Page 92: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

GROUP 2: Brush & Roller

GROUP 3: Spray

GROUP 4: Sandblasting; & Waterblasting

GROUP 5: Elevated Tanks; Steeplejack Work; Bridge; & Lead Abatement

---------------------------------------------------------------- PAIN0012-010 05/01/2019

BROWN, CLERMONT, CLINTON, HAMILTON & WARREN

Rates Fringes

PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING Bridge Equipment Tender and Containment Builder....$ 21.95 10.20 Bridges when highest point of clearance is 60 feet or more; & Lead Abatement Projects.........$ 26.30 10.20 Brush & Roller.............$ 25.30 10.20 Sandblasting & Hopper Tender; Water Blasting.....$ 26.05 10.20 Spray......................$ 25.80 10.20---------------------------------------------------------------- PAIN0093-001 12/01/2018

ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE andWASHINGTON COUNTIES

Rates Fringes

PAINTER Bridges; Locks; Dams; Tension Towers; & Energized Substations.......$ 34.04 18.50 Power Generating Facilities.$ 30.89 18.50---------------------------------------------------------------- PAIN0249-002 05/01/2019

CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

Page 93: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

PAINTER GROUP 1 - Brush & Roller....$ 23.67 11.50 GROUP 2 - Swing, Scaffold Bridges; Structural Steel; Open Acid Tank; High Tension Electrical Equipment; & Hot Pipes......$ 23.67 11.50 GROUP 3 - Spray; Sandblast; Steamclean; Lead Abatement..............$ 24.42 11.50 GROUP 4 - Steeplejack Work..$ 24.62 11.50 GROUP 5 - Coal Tar..........$ 25.17 11.50 GROUP 6 - Bridge Equipment Tender & or Containment Builder.....................$ 32.38 11.50 GROUP 7 - Tanks, Stacks & Towers......................$ 27.31 11.50 GROUP 8 - Bridge Blaster, Rigger......................$ 35.38 11.50---------------------------------------------------------------- PAIN0356-002 09/01/2009

KNOX, LICKING, MUSKINGUM, and PERRY

Rates Fringes

PAINTER Bridge Equipment Tenders and Containment Builders....$ 27.93 7.25 Bridges; Blasters; andRiggers..................$ 34.60 7.25 Brush and Roller............$ 20.93 7.25 Sandblasting; Steam Cleaning; Waterblasting; and Hazardous Work..........$ 25.82 7.25 Spray.......................$ 21.40 7.25 Structural Steel and Swing Stage.......................$ 25.42 7.25 Tanks; Stacks; and Towers...$ 28.63 7.25---------------------------------------------------------------- PAIN0438-002 12/01/2018

BELMONT, HARRISON and JEFFERSON COUNTIES

Rates Fringes

PAINTER Bridges, Locks, Dams, Tension Towers & Energized Substations.................$ 32.80 17.68 Power Generating Facilities.$ 29.65 17.68---------------------------------------------------------------- PAIN0476-001 06/01/2019

Page 94: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

COLUMBIANA, MAHONING, and TRUMBULL COUNITES

Rates Fringes

PAINTER GROUP 1.....................$ 25.82 16.58 GROUP 2.....................$ 32.45 16.58 GROUP 3.....................$ 26.03 16.58 GROUP 4.....................$ 26.47 16.58 GROUP 5.....................$ 26.47 16.58 GROUP 6.....................$ 26.72 16.58 GROUP 7.....................$ 27.82 16.58

PAINTER CLASSIFICATIONS:

GROUP 1: Painters, Brush & Roller

GROUP 2: Bridges

GROUP 3: Structural Steel

GROUP 4: Spray, Except Bar Joist/Deck

GROUP 5: Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 Feet; and Swingstages

GROUP 6: Tanks; Sandblasting

GROUP 7: Towers; Stacks

---------------------------------------------------------------- PAIN0555-002 06/01/2019

ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO

Rates Fringes

PAINTER GROUP 1.....................$ 31.04 16.31 GROUP 2.....................$ 32.50 16.31 GROUP 3.....................$ 33.96 16.31 GROUP 4.....................$ 36.82 16.31

PAINTER CLASSIFICATIONS

GROUP 1 - Containment Builder

GROUP 2 - Brush; Roller; Power Tools, Under 40 feet

GROUP 3 - Sand Blasting; Spray; Steam Cleaning; Pressure Washing; Epoxy & Two Component Materials; Lead Abatement; Hazardous Waste; Toxic Materials; Bulk & Storage Tanks of 25,000 Gallon Capacity or More; Elevated Tanks

Page 95: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

GROUP 4 - Stacks; Bridges

---------------------------------------------------------------- PAIN0639-001 05/01/2011

Rates Fringes

Sign Painter & Erector...........$ 20.61 3.50+a+b+c

FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day; July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1 Floating Day b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service - 20 days' paid vacation c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral

---------------------------------------------------------------- PAIN0788-002 06/01/2019

ASHLAND, CRAWFORD, ERIE, HANCOCK, HURON, MARION, MORROW, OTTAWA(Allen, Bay, Bono, Catawba Island, Clay Center, Curtice,Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, GemBeach & Genoa), RICHLAND, SANDUSKY, SENECA & WYANDOT

Rates Fringes

PAINTER Brush & Roller..............$ 24.66 14.05 Structural Steel............$ 26.26 14.05

WINTER REPAINT: Between December 1 to March 31 - 90%JR

$.50 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK:

While working swingstage, boatswain chair, needle beam and horizontal cable. While operating sprayguns, sandblasting, cobblasting and high pressure waterblasting (4000psi).

$1.00 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK:

For the application of catalized epoxy, including latex epoxy that is deemed hazardous, lead abatement, or for work or material where special precautions beyond normal work duties must be taken. For working on stacks, tanks, and

Page 96: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

towers over 40 feet in height.

---------------------------------------------------------------- PAIN0813-005 12/01/2008

GALLIA, LAWRENCE, MEIGS & VINTON

Rates Fringes

PAINTER Base Rate...................$ 24.83 10.00 Bridges, Locks, Dams & Tension Towers..............$ 27.83 10.00---------------------------------------------------------------- PAIN0841-001 06/01/2018

MEDINA, PORTAGE (South of and including Ohio Turnpike), andSUMMIT (South of and including Ohio Turnpike) COUNTIES

Rates Fringes

Painters: GROUP 1.....................$ 25.75 14.35 GROUP 2.....................$ 26.40 14.35 GROUP 3.....................$ 26.50 14.35 GROUP 4.....................$ 26.60 14.35 GROUP 5.....................$ 27.00 14.35 GROUP 6.....................$ 39.20 11.75 GROUP 7.....................$ 27.00 14.35

PAINTER CLASSIFICATIONS:

GROUP 1 - Brush, Roller & Paperhanger

GROUP 2 - Epoxy Application

GROUP 3 - Swing Scaffold, Bosum Chair, & Window Jack

GROUP 4 - Spray Gun Operator of Any & All Coatings

GROUP 5 - Sandblast, Painting of Standpipes, etc. from Scaffolds, Bridge Work and/or Open Structural Steel, Standpipes and/or Water Towers

GROUP 6 - Public & Commerce Transportation, Steel or Galvanized, Bridges, Tunnels & Related Support Items (concrete)

GROUP 7 - Synthetic Exterior, Drywall Finisher and/or Taper, Drywall Finisher and Follow-up Man Using Automatic Tools

---------------------------------------------------------------- PAIN0841-002 06/01/2018

Page 97: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE

Rates Fringes

PAINTER Bridges; Towers, Poles & Stacks; Sandblasting Steel; Structural Steel & Metalizing..................$ 22.78 13.63 Brush & Roller..............$ 21.77 13.63 Spray; Tank Interior & Exterior....................$ 22.60 13.63---------------------------------------------------------------- PAIN1020-002 04/01/2019

ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER,PAULDING, PUTNAM, SHELBY, VAN WERT, and WILLIAMS COUNTIES

Rates Fringes

PAINTER Brush & Roller..............$ 24.57 15.03 Drywall Finishing & Taping..$ 23.27 15.03 Lead Abatement..............$ 26.32 15.03 Spray, Sandblasting Pressure Cleaning, & Refinery....................$ 25.32 15.03 Swing Stage, Chair, Spiders, & Cherry Pickers...$ 24.82 15.03 Wallcoverings...............$ 22.17 15.03

All surfaces 40 ft. or over where material is applied to or labor performed on, above ground level (exterior), floor level (interior) - $.50 premium

Applying Coal Tar Products - $1.00 premium

---------------------------------------------------------------- PAIN1275-002 05/01/2019

DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS& UNION

Rates Fringes

PAINTER Bridges.....................$ 34.24 14.20 Brush; Roller...............$ 24.76 14.20 Sandblasting; Steamcleaning; Waterblasting (3500 PSI or

Page 98: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Over)& Hazardous Work.......$ 25.46 14.20 Spray.......................$ 25.26 14.20 Stacks; Tanks; & Towers.....$ 28.27 14.20 Structural Steel & Swing Stage.......................$ 25.06 14.20---------------------------------------------------------------- PLAS0109-001 05/01/2018

MEDINA, PORTAGE, STARK, and SUMMIT COUNTIES

Rates Fringes

PLASTERER........................$ 28.86 17.11---------------------------------------------------------------- PLAS0109-003 05/01/2018

CARROLL, HOLMES, TUSCARAWAS, and WAYNE COUNTIES

Rates Fringes

PLASTERER........................$ 28.21 17.11---------------------------------------------------------------- PLAS0132-002 05/01/2018

BROWN, BUTLER, CLERMONT, HAMILTON, HIGHLAND, WARREN COUNTIES

Rates Fringes

PLASTERER........................$ 28.86 17.11---------------------------------------------------------------- PLAS0404-002 05/01/2018

ASHTABULA, CUYAHOGA, GEAUGA, AND LAKE COUNTIES

Rates Fringes

PLASTERER........................$ 29.63 17.11---------------------------------------------------------------- PLAS0404-003 05/01/2018

LORAIN COUNTY

Rates Fringes

PLASTERER........................$ 28.86 17.11---------------------------------------------------------------- PLAS0526-022 05/01/2018

COLUMBIANA, MAHONING, and TRUMBULL COUNTIES

Rates Fringes

PLASTERER........................$ 28.86 17.11----------------------------------------------------------------

Page 99: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

PLAS0526-023 05/01/2018

BELMONT, HARRISON, and JEFFERSON COUNTIES

Rates Fringes

PLASTERER........................$ 28.21 17.11---------------------------------------------------------------- PLAS0886-001 05/01/2018

FULTON, HANCOCK, HENRY, LUCAS, PUTNAM, and WOOD COUNTIES

Rates Fringes

PLASTERER........................$ 29.63 17.11---------------------------------------------------------------- PLAS0886-003 05/01/2018

DEFIANCE, ERIE, HURON, OTTAWA, PAULDING, SANDUSKY, and SENECACOUNTIES

Rates Fringes

PLASTERER........................$ 28.86 17.11---------------------------------------------------------------- PLAS0886-004 05/01/2018

ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, and VAN WERT COUNTIES

Rates Fringes

PLASTERER........................$ 28.21 17.11---------------------------------------------------------------- PLUM0042-002 07/01/2018

ASHLAND, CRAWFORD, ERIE, HURON, KNOX, LORAIN, MORROW, RICHLAND& WYANDOT

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 34.20 22.07---------------------------------------------------------------- PLUM0050-002 07/01/2019

DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD

Rates Fringes

Plumber, Pipefitter,

Page 100: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Steamfitter......................$ 42.00 26.73---------------------------------------------------------------- PLUM0055-003 04/29/2019

ASHTABULA, CUYAHOGA, GEAUGA, LAKE, MEDINA (N. of Rte. #18 &Smith Road) & SUMMIT (N. of Rte. #303, including the corporatelimits of the city of Hudson)

Rates Fringes

PLUMBER..........................$ 36.55 26.74---------------------------------------------------------------- PLUM0083-001 07/01/2017

BELMONT & MONROE (North of Rte. #78)

Rates Fringes

Plumber and Steamfitter..........$ 32.16 31.51---------------------------------------------------------------- PLUM0094-002 05/01/2019

CARROLL (Northen Half), STARK, and WAYNE COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER...............$ 35.78 20.14---------------------------------------------------------------- PLUM0120-002 04/30/2018

ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN (the C.E.I. PowerHouse in Avon Lake), MEDINA (N. of Rte. #18) & SUMMIT (N. of#303)

Rates Fringes

PIPEFITTER.......................$ 37.67 22.42---------------------------------------------------------------- PLUM0162-002 01/01/2020

CHAMPAIGN, CLARK, CLINTON, DARKE, FAYETTE, GREENE, MIAMI,MONTGOMERY & PREBLE

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 31.25 25.52---------------------------------------------------------------- PLUM0168-002 06/01/2019

MEIGS, MONROE (South of Rte. #78), MORGAN (South of Rte. #78)

Page 101: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

& WASHINGTON

Rates Fringes

PLUMBER/PIPEFITTER...............$ 35.32 31.63----------------------------------------------------------------* PLUM0189-002 06/01/2019

DELAWARE, FAIRFIELD, FRANKLIN, HOCKING, LICKING, MADISON,MARION, PERRY, PICKAWAY, ROSS & UNION

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 38.45 16.98---------------------------------------------------------------- PLUM0219-002 05/31/2018

MEDINA (Rte. #18 from eastern edge of Medina Co., west toeastern corporate limits of the city of Medina, & on the countyroad from the west corporate limits of Medina running due westto and through community of Risley to the western edge ofMedina County - All territory south of this line), PORTAGE, andSUMMIT (S. of Rte. #303) COUNTIES

Rates Fringes

Plumber and Steamfitter..........$ 37.02 23.79---------------------------------------------------------------- PLUM0392-002 06/01/2019

BROWN, BUTLER, CLERMONT, HAMILTON & WARREN

Rates Fringes

PLUMBER/PIPEFITTER...............$ 32.81 21.27---------------------------------------------------------------- PLUM0396-001 06/01/2019

COLUMBIANA (Excluding Washington & Yellow Creek Townships &Liverpool Twp. - Secs. 35 & 36 - West of County Road #427),MAHONING and TRUMBULL COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER...............$ 34.00 25.46---------------------------------------------------------------- PLUM0495-002 06/01/2018

CARROLL (Rose, Monroe, Union, Lee, Orange, Perry & Loudon

Page 102: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Townships), COLUMBIANA (Washington & Yellow Creek Townships &Liverpool Township, Secs. 35 & 36, West of County Rd. #427),COSHOCTON, GUERNSEY, HARRISON, HOLMES, JEFFERSON, MORGAN (Southto State Rte. #78 & from McConnelsville west on State Rte. #37to the Perry County line), MUSKINGUM, NOBLE, and TUSCARAWASCOUNTIES

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 38.24 23.09---------------------------------------------------------------- PLUM0577-002 06/01/2019

ADAMS, ATHENS, GALLIA, HIGHLAND, JACKSON, LAWRENCE, PIKE,SCIOTO & VINTON

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 34.90 24.11---------------------------------------------------------------- PLUM0776-002 08/01/2019

ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY and VAN WERTCOUNTIES

Rates Fringes

Plumber, Pipefitter, Steamfitter......................$ 36.64 24.73---------------------------------------------------------------- TEAM0377-003 05/01/2019

STATEWIDE, EXCEPT CUYAHOGA, GEAUGA & LAKE

Rates Fringes

TRUCK DRIVER GROUP 1.....................$ 28.04 15.70 GROUP 2.....................$ 28.46 15.70

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Asphalt Distributor; Batch; 4- Wheel Service; 4-Wheel Dump; Oil Distributor & Tandem

GROUP 2 - Tractor-Trailer Combination: Fuel; Pole Trailer; Ready Mix; Semi-Tractor; & Asphalt Oil Spraybar Man When Operated From Cab; 5 Axles & Over; Belly Dump; End Dump; Articulated Dump; Heavy Duty Equipment; Low Boy; & Truck

Page 103: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Mechanic

---------------------------------------------------------------- TEAM0436-002 05/01/2019

CUYAHOGA, GEAUGA & LAKE

Rates Fringes

TRUCK DRIVER GROUP 1.....................$ 28.40 16.95 GROUP 2.....................$ 28.90 16.95

GROUP 1: Straight & Dump, Straight Fuel

GROUP 2: Semi Fuel, Semi Tractor, Euclids, Darts, Tank, Asphalt Spreaders, Low Boys, Carry-All, Tourna-Rockers, Hi-Lifts, Extra Long Trailers, Semi-Pole Trailers, Double Hook-Up Tractor Trailers including Team Track & Railroad Siding, Semi-Tractor & Tri-Axle Trailer, Tandem Tractor & Tandem Trailer, Tag Along Trailer, Expandable Trailer or Towing Requiring Road Permits, Ready-Mix (Agitator or Non-Agitator), Bulk Concrete Driver, Dry Batch Truck, Articulated End Dump

----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performingoperation to which welding is incidental.

================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leavefor Federal Contractors applies to all contracts subject to theDavis-Bacon Act for which the contract is awarded (and anysolicitation was issued) on or after January 1, 2017. If thiscontract is covered by the EO, the contractor must provideemployees with 1 hour of paid sick leave for every 30 hoursthey work, up to 56 hours of paid sick leave each year.Employees must be permitted to use paid sick leave for theirown illness, injury or other health-related needs, includingpreventive care; to assist a family member (or person who islike family to the employee) who is ill, injured, or has otherhealth-related needs, including preventive care; or for reasonsresulting from, or to assist a family member (or person who islike family to the employee) who is a victim of, domesticviolence, sexual assault, or stalking. Additional informationon contractor requirements and worker protections under the EOis available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included withinthe scope of the classifications listed may be added afteraward only as provided in the labor standards contract clauses(29CFR 5.5 (a) (1) (ii)).

Page 104: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

----------------------------------------------------------------

The body of each wage determination lists the classificationand wage rates that have been found to be prevailing for thecited type(s) of construction in the area covered by the wagedetermination. The classifications are listed in alphabeticalorder of ""identifiers"" that indicate whether the particularrate is a union rate (current union negotiated rate for local),a survey rate (weighted average rate) or a union average rate(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosedin dotted lines beginning with characters other than ""SU"" or""UAVG"" denotes that the union classification and rate wereprevailing for that classification in the survey. Example:PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier ofthe union which prevailed in the survey for thisclassification, which in this example would be Plumbers. 0198indicates the local union number or district council numberwhere applicable, i.e., Plumbers Local 0198. The next number,005 in the example, is an internal number used in processingthe wage determination. 07/01/2014 is the effective date of themost current negotiated rate, which in this example is July 1,2014.

Union prevailing wage rates are updated to reflect all ratechanges in the collective bargaining agreement (CBA) governingthis classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate thatno one rate prevailed for this classification in the survey andthe published rate is derived by computing a weighted averagerate based on all the rates reported in the survey for thatclassification. As this weighted average rate includes allrates reported in the survey, it may include both union andnon-union rates. Example: SULA2012-007 5/13/2014. SU indicatesthe rates are survey rates based on a weighted averagecalculation of rates and are not majority rates. LA indicatesthe State of Louisiana. 2012 is the year of survey on whichthese classifications and rates are based. The next number, 007in the example, is an internal number used in producing thewage determination. 5/13/2014 indicates the survey completiondate for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until anew survey is conducted.

Page 105: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicatethat no single majority rate prevailed for thoseclassifications; however, 100% of the data reported for theclassifications was union data. EXAMPLE: UAVG-OH-001008/29/2014. UAVG indicates that the rate is a weighted unionaverage rate. OH indicates the state. The next number, 0010 inthe example, is an internal number used in producing the wagedetermination. 08/29/2014 indicates the survey completion datefor the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January ofeach year, to reflect a weighted average of the currentnegotiated/CBA rate of the union locals from which the rate isbased.

----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This canbe:

* an existing published wage determination* a survey underlying a wage determination* a Wage and Hour Division letter setting forth a position on a wage determination matter* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requestsfor summaries of surveys, should be with the Wage and HourRegional Office for the area in which the survey was conductedbecause those Regional Offices have responsibility for theDavis-Bacon survey program. If the response from this initialcontact is not satisfactory, then the process described in 2.)and 3.) should be followed.

With regard to any other matter not yet ripe for the formalprocess described here, initial contact should be with theBranch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then aninterested party (those affected by the action) can requestreview and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Page 106: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

file:///C|/Users/dan.WILCO/Desktop/oh1%20(1).txt[3/27/2020 11:26:22 AM]

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210

The request should be accompanied by a full statement of theinterested party's position and by any information (wagepayment data, project description, area practice material,etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, aninterested party may appeal directly to the AdministrativeReview Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

================================================================

END OF GENERAL DECISION"

Page 107: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

Form ApprovedEquivalent to:Budget Bureau No. 44-R1093U.S. Department of Labor

Wage and Hour and PublicContracts Divisions

STATEMENT OF COMPLIANCEProject No.Date:

County

, do hereby state;I,(Title)(Name of signatory party)

that during,on the(1) That I pay or supervise the payment of the persons employed by

the payroll period commencing on the day of 20 and ending the day of 20 all persons employed on said project have been

paid in full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of said

Contractor or Subcontractor from the full weekly wages earned by any person and

that no deductions have been made either directly or indirectly from the full wages earned by any person, other than permissible deductions as

defined in Regulations, Part 3 (29 CFR Subtitle A);

FEDERAL(A)issued by the Secretary of Labor under the Copeland Act as amended (48 Stat. 948.63 Stat.108.72 Stat. 967;76 State 357; 40 USC276c)

STATE(B)or as defined in the Ohio Revised Code, Chapter 4115, and described below:

That any payrolls otherwise under this contract required to be submitted for the above period are correct ad complete; that the wage rates(2)for laborers or mechanics contained therein are not less than the applicable wage rates contained in any wage determination incorporatedinto the contract; that the classifications set forth therein for each laborer or mechanic conform with the work he performed.That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State(3)apprenticeship agency recognized by the Bureau of Apprenticeship and Training Untied States Department of Labor, or if no suchrecognized agency exists in a State, are registered with the Bureau of Apprenticeship and Training, United States Department of Labor.That:(4)(A) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS OR PROGAMS

In addition to the basic hourly wage rates paid to each laborer or mechanic listed in the above referenced payroll, payments offringe benefits as listed in the contract have been or will be made to appropriate programs for the benefit of such employees, except as noted in Section 4(c) below.

(B) WHERE FRINGE BENEFITS ARE PAID IN CASHEach laborer or mechanic listed in the above referenced payroll has been paid as indicated on the payroll, an amount not less thanthe sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as listed in the contract, exceptas noted in Section 4(c) below.

(C) EXCEPTIONS

ExplanationExceptions (Craft)

Remarks

SignatureName and Title

The willful falsification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution. See Section 1001 of Title 18 and Section 231 of Title 31 of

the United States Code.

FOR STATE & FEDERAL FUNDED PROJECTSFORM WH-248(9/00)

Dan
Typewritten Text
Dan
Typewritten Text
EXHIBIT B
Dan
Typewritten Text
Dan
Typewritten Text
END OF EXHIBIT
Dan
Typewritten Text
Dan
Typewritten Text
Dan
Typewritten Text
Williams
Dan
Typewritten Text
Dan
Typewritten Text
2020 Fiber Service Project
Dan
Typewritten Text
Dan
Typewritten Text
Page 108: 2020 FIBER INSTALLATION PROJECT - Williams County, OH
Dan
Typewritten Text
EXHIBIT C
Page 109: 2020 FIBER INSTALLATION PROJECT - Williams County, OH
Dan
Typewritten Text
END OF EXHIBIT
Page 110: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

EMPLOYEE RIGHTSUNDER THE DAVIS-BACON ACT

fOR LABORERS AND MECHANICSEMPLOYED ON fEDERAL OR fEDERALLYASSISTED CONSTRUCTION PROjECTS

THE UNITED STATES DEPARTMENT OF LABOR WAGE AND HOUR DIVISION

PREVAILING WAGES

OVERTIME

ENFORCEMENT

APPRENTICES

PROPER PAY

You must be paid not less than the wage rate listed in the Davis-Bacon Wage Decision posted with this Notice for the work you perform.

You must be paid not less than one and one-half times your basic rate of pay for all hours worked over 40 in a work week. There are few exceptions.

Contract payments can be withheld to ensure workers receive wages and overtime pay due, and liquidated damages may apply if overtime pay requirements are not met. Davis-Bacon contract clauses allow contract termination and debarment of contractors from future federal contracts for up to three years. A contractor who falsifies certified payroll records or induces wage kickbacks may be subject to civil or criminal prosecution, fines and/or imprisonment.

Apprentice rates apply only to apprentices properly registered under approved Federal or State apprenticeship programs.

If you do not receive proper pay, or require further information on the applicable wages, contact the Contracting Officer listed below:

or contact the U.S. Department of Labor’s Wage and Hour Division.

1-866-4-USWAGE (1-866-487-9243) TTY: 1-877-889-5627

WWW.WAGEHOUR.DOL.GOV U.S. Department of Labor Employment Standards Administration Wage and Hour Division

WH 1321(Revised April 2009)

For additional information:

dan
Typewritten Text
Dan Clum Prevailing Wage Coordinator Williams County Engineer's Office Bryan, Ohio 43506 419-636-2454 419-636-8687 [email protected]
dan
Typewritten Text
dan
Typewritten Text
dan
Text Box
END OF EXHIBIT
Dan
Typewritten Text
EXHIBIT D
Dan
Typewritten Text
Page 111: 2020 FIBER INSTALLATION PROJECT - Williams County, OH

LABOR STANDARDS INTERVIEWCONTRACT NUMBER EMPLOYEE INFORMATION

LAST NAME FIRST NAME MI

STREET ADDRESS

CITY STATE ZIP CODE

WORK CLASSIFICATION WAGE RATE

NAME OF PRIME CONTRACTOR

NAME OF EMPLOYER

SUPERVISOR'S NAMELAST NAME FIRST NAME MI

ACTION CHECK BELOWYES NO

Do you work over 8 hours per day?

Do you work over 40 hours per week?

Are you paid at least time and a half for overtime hours?

Are you receiving any cash payments for fringe benefits required by the posted wage determination decision?

WHAT DEDUCTIONS OTHER THAN TAXES AND SOCIAL SECURITY ARE MADE FROM YOUR PAY?

HOW MANY HOURS DID YOU WORK ON YOUR LAST WORK DAY BEFORE THIS INTERVIEW?

DATE OF LAST WORK DAY BEFORE INTERVIEW (YYMMDD)

DATE YOU BEGAN WORK ON THIS PROJECT (YYMMDD)

TOOLS YOU USE

THE ABOVE IS CORRECT TO THE BEST OF MY KNOWLEDGEEMPLOYEE'S SIGNATURE DATE (YYMMDD)

INTERVIEWERSIGNATURE TYPED OR PRINTED NAME DATE (YYMMDD)

INTERVIEWER'S COMMENTSACTION (If explanation is needed, use comments section) YES NOWORK EMPLOYEE WAS DOING WHEN INTERVIEWED

IS EMPLOYEE PROPERLY CLASSIFIED AND PAID?

ARE WAGE RATES AND POSTERS DISPLAYED?

FOR USE BY PAYROLL CHECKERIS ABOVE INFORMATION IN AGREEMENT WITH PAYROLL DATA?

YES NO

COMMENTS

CHECKERLAST NAME FIRST NAME MI JOB TITLE

DATE (YYMMDD)SIGNATURE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition not usable

STANDARD FORM 1445 (REV. 12-96) Prescribed by GSA - FAR (48 CFR) 53.222(g)