ISO PublicISO Public
2021 and 2025 Final LCR Study Results
Greater Fresno Area
Vera Hart
Senior Regional Transmission Engineer
Stakeholder Call
April 13, 2020
![Page 2: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/2.jpg)
ISO Public
Greater Fresno Area
Electrical Boundaries and LCR Sub-Areas
Slide 2
Electrical Boundaries:
● Gates – Mustang #1 230 kV line
● Gates – Mustang #2 230 kV line
● Panoche – Tranquility #1 230 kV line
● Panoche – Tranquility #2 230 kV line
● Warnerville – Wilson 230 kV line
● Melones – Wilson 230 kV line
● Panoche 230/115 kV transformer #1
● Panoche 230/115 kV transformer #2
● Smyrna – Alpaugh – Corcoran 115 kV line
● Los Banos #3 230/70 kV transformer
● Los Banos #4 230/70 kV transformer
● San Miguel – Coalinga #1 70 kV line
● Gates 230/70 kV transformer #5
Melones
Wilson
Warnerville
Gregg
Los Banos
Panoche
Gates
Henrietta
McCall
Helms
Helm
Mcmullin
Kearney
Herndon
Kngsbrg
Corcoran
Alpaugh
Gates 70 kVCoalnga
San Miguel
Overall Fresno Sub Area
![Page 3: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/3.jpg)
ISO Public
New major transmission projects
Slide 3
Project Name Expected ISD
Oro Loma 70 kV Area Reinforcement 24-Apr
Reedley 70 kV Reinforcement (Renamed to Reedley 70 kV Area
Reinforcement Projects Include Battery at Dinuba)21-May
Wilson 115 kV Area Reinforcement 23-May
Wilson-Le Grand 115 kV line reconductoring 20-Apr
Panoche – Oro Loma 115 kV Line Reconductoring 21-Apr
Northern Fresno 115 kV Area Reinforcement 21-May
Bellota-Warnerville 230kV line Reconductoring 24-Mar
Herndon-Bullard 230kV Reconductoring Project 21-Jan
Gregg-Herndon #2 230 kV Line Circuit Breaker Upgrade 21-Jan
![Page 4: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/4.jpg)
ISO Public
Power plant changes
Resource Additions:
• 1 new Solar/BESS resource (309 MW)
Resource Retirements:
• None
Slide 4
![Page 5: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/5.jpg)
ISO Public
Hanford Sub-area: Load and Resources
Slide 5
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 207 209 Market 125 125
AAEE -1 -1 Solar 25 25
Behind the meter DG -3 -3 MUNI 0 0
Net Load 203 205 QF 0 0
Transmission Losses 6 5
Pumps 0 0Total Qualifying
Capacity150 150
Load + Losses +
Pumps209 210
![Page 6: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/6.jpg)
ISO Public
Hanford Sub-Area
Requirements
Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)
First Limit P6McCall-Kingsburg
#2 115kV Line
McCall-Kingsburg #1 115kV line
and Henrietta 230/115kV TB#358 58
Slide 6
Hanford
McCall
Gates
Henrietta
Kingsburg
GWF-Hanford
Small Solar
Corcoran
Mustang
![Page 7: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/7.jpg)
ISO Public
Hanford Sub-area: Load Profiles
Slide 7
![Page 8: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/8.jpg)
ISO Public
Coalinga Sub-area: Load and Resources
Slide 8
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 92 89 Market 0 0
AAEE -1 -1 Solar 13 13
Behind the meter DG 0 0 MUNI 0 0
Net Load 91 88 QF 3 3
Transmission Losses 2 1 Mothballed 0 0
Pumps 0 0Total Qualifying
Capacity16 16
Load + Losses +
Pumps93 89
![Page 9: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/9.jpg)
ISO Public
Coalinga Sub-Area Requirements
Slide 9
Limit Category Limiting Facility Contingency 2021 LCR (MW) 2024 LCR (MW)
First Limit P6
Overload on San-
Miguel-Coalinga
70kV Line and
Voltage Instability
T-1/T-1: Gates 230/70kV TB
#5 and Schindler 115/70 kV
TB#1
57
(52 at Peak)
(41 NQC)
52
(47 at Peak)
(36 NQC)
Coalinga
Gates
Calfax
Huron
Schindler DJacalito
Schindler
Coalinga
2
Q633
SS
Plesant
Valley
Penzir Jc
To
Panoche
Coalinga 1
Tornado JCoalinga
Cogen
To Paso
Robles
Q532
Q526
![Page 10: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/10.jpg)
ISO Public
Coalinga Sub-area: Load Profiles
Slide 10
![Page 11: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/11.jpg)
ISO Public
Borden Sub-area: Load and Resources
Slide 11
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 132 136 Market, Net Seller 33 33
AAEE -1 -1 Solar 13 13
Behind the meter DG 0 0 MUNI 0 0
Net Load 131 135 QF 0 0
Transmission Losses 2 2 Mothballed 0 0
Pumps 0 0Total Qualifying
Capacity46 46
Load + Losses +
Pumps133 137
![Page 12: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/12.jpg)
ISO Public
Borden Sub-Area Requirements
Slide 12
Borden
Borden
Glass
Madera
Wishon
Coppermine
Bonita
BiolaFriant
SJ#1
SJ#2
SJ#3
Crane
Valley
To Reedley
Tivy Valley
Solar
Unit
Limit Category Limiting Facility Contingency2021 LCR
(MW)
2025 LCR
(MW)
First Limit P6Borden 230/70 kV
TB # 1
Friant - Coppermine 70 kV Line and
Borden 230/70 kV TB # 40 4
![Page 13: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/13.jpg)
ISO Public
Borden Sub-area: Load Profiles
Slide 13
![Page 14: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/14.jpg)
ISO Public
Reedley Sub-area: Load and Resources
Slide 14
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 207 212 Market 51 51
AAEE -1 -2 Solar 0 0
Behind the meter DG 0 0 MUNI 0 0
Net Load 206 211 QF 0 0
Transmission Losses 58 59
Pumps 0 0Total Qualifying
Capacity51 51Load + Losses +
Pumps264 270
![Page 15: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/15.jpg)
ISO Public
Reedley Sub-Area Requirements
Slide 15
Reedley
McCall
Sanger
Wahtoke
Parlier
Kings
River
Reedley
Dinuba
Orosi
Sand Creek
Dinuba 7MW
BESS in 2021
Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)
First Limit P6
Kings River-Sanger-
Reedley 115kV line
with Wahtoke load
online
McCall-Reedley 115kV Line & Sanger-
Reedley 115kV line 82 (31) 84 (33)
![Page 16: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/16.jpg)
ISO Public
Reedley Sub-area: Load Profiles
Slide 16
![Page 17: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/17.jpg)
ISO Public
NEW Panoche 115-70 kV Sub-area: Load and Resources
Slide 17
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 415 427 Market/Net Seller 282 282
AAEE -2 -4 Solar 89 89
Behind the meter DG -1 -1 MUNI 100 100
Net Load 412 422 QF 3 3
Transmission Losses 12 8
Pumps 0 0Total Qualifying
Capacity474 474
Load + Losses +
Pumps424 430
![Page 18: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/18.jpg)
ISO Public
Panoche 115-70 kV Sub-Area Requirements
Slide 18Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)
First Limit P6Five Points-Huron-
Gates 70kV line
Panoche 230/115kV TB #2 and Panoche
230/115kV TB #4198 164
Panoche
Oro Loma
El NidoWilson
Mendota
Dairyland
Le Grand
Chowchilla
Oakhurst
Kerckhoff 2Exchequer
Sanger
Gregg
Helms
Merced
Atwater
El Capitan
Schindler
Helm
Five Points Gates
CalfaxHuron
![Page 19: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/19.jpg)
ISO Public
Panoche Sub-area: Load Profiles
Slide 19
![Page 20: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/20.jpg)
ISO Public
NEW Wilson 115 kV Sub-area: Load and Resources
Slide 20
Load (MW) 2021 Generation (MW) 2021
Gross Load
NA – Flow
through area.
Market/ Net Seller / Battery 260
AAEE Solar 100
Behind the meter DG Wind 0
Net Load Muni 54
Transmission Losses QF 0
PumpsFuture preferred resource
and energy storage0
Load + Losses +
PumpsTotal Qualifying Capacity 414
![Page 21: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/21.jpg)
ISO Public
Wilson 115 KV Sub-Area Requirements
Slide 21
Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)
First Limit P6Wilson-Oro Loma 115 kV Line
(El Nido-Oro Loma 115 kV)
Wilson 230/115kV TB #1 and
Wilson 230/115kV TB #2
416
(2 NQC/32 Peak)
None due to the
3rd Wilson
230/115kV TB
Panoche
Oro Loma
El NidoWilson
Mendota
Dairyland
Le Grand
Chowchilla
Oakhurst
Kerckhoff 2Exchequer
Sanger
Gregg
Helms
Merced
Atwater
El Capitan
Atwater Jct
Livingston Galo Cressey
JRwood
![Page 22: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/22.jpg)
ISO Public
Herndon Sub-area: Load and Resources
Slide 22
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 1471 1523 Market 997 997
AAEE -6 -13 Solar 63 63
Behind the meter DG -3 -3 MUNI 98 98
Net Load 1462 1507 QF 1 1
Transmission Losses 24 25
Pumps 0 0Total Qualifying
Capacity1159 1159
Load + Losses +
Pumps1486 1532
![Page 23: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/23.jpg)
ISO Public
Herndon Sub-Area Requirements
Slide 23
Kings River,
Pine Flats
Helm
sGregg
McCall
Herndo
n
Panoche
Henrietta
Sanger
Haas,
Balch
Rio Bravo
Fresno
KRCD Malaga
GWF
Hanford
Kerckhof
ClovisBullar
d
Woodward Coppermine
Kingsburg
Borden
Gates
Mancheste
r
Barton
Ashlan
Limit Category Limiting Facility Contingency2021 LCR
(MW)
2025 LCR
(MW)
First limit P6Herndon-Manchester 115 kV
line
Herndon-Woodward 115 kV line and
Herndon-Barton 115 kV line334 441
![Page 24: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/24.jpg)
ISO Public
Herndon Sub-area: Load Profiles
Slide 24
![Page 25: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/25.jpg)
ISO Public
Overall Load and Resources
Slide 25
Load (MW) 2021 2025 Generation (MW) 2021 2025
Gross Load 3099 3217 Market/Net Seller 2515 2515
AAEE -12 -26 Solar 320 320
Behind the meter DG -5 -5 MUNI 212 212
Net Load 3082 3186 QF 4 4
Transmission Losses 106 93 Battery 300 300
Pumps 0 0
Load + Losses +
Pumps3189 3279
Total Qualifying
Capacity 3351 3351
![Page 26: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/26.jpg)
ISO Public
Overall Sub-Area
Requirements
Hanford
Mendota
Merced
Madera
Fresno
Haas,
Balch,
Pine Flats
Helms
Gregg
McCallHerndon
Wilson
Panoche
Gates
Los Banos
McMullin
Helm
Borden
Melones Warnerville
Henrietta
Slide 26
Mustang
Tranquility
Kingsburg
GWF-
Hanford
Corcoran
Contandida
![Page 27: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/27.jpg)
ISO Public
Overall Fresno Area : Requirements
Slide 27
Limit Category Limiting Facility Contingency2021 LCR
(MW)
2025 LCR
(MW)
First limit P6GWF-Contandida
115kV Line
Panoche-Helm 230kV
Line and Gates-McCall
230kV line
1694 1971
Study YearExisting Generation
Capacity Needed (MW)Deficiency (MW) Total MW Need
2021 1,694 72 1,766
2025 1,971 69 2,040
![Page 28: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/28.jpg)
ISO Public
Overall Sub-area: Load Profiles
Slide 28
![Page 29: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley](https://reader036.vdocument.in/reader036/viewer/2022071105/5fdeec587165f27299501e64/html5/thumbnails/29.jpg)
ISO Public
Changes Compared to Previous LCR Requirements
Slide 29
Sub-area2020 2021 2024 2025
Load LCR Load LCR Load LCR Load LCR
Hanford 226 82 209 58 231 93 210 58
Coalinga 91 35 93 57 (41) 89 33 89 52 (36)
Borden 143 19 133 0 148 19 137 4
Reedley 244 35 264 83 (31) 265 31 270 84 (33)
New Panoche 115 kV N/A N/A 424 198 N/A N/A 430 164
New Wilson 115/70 kV N/A N/AFlow-
Through416(2) N/A N/A N/A
Eliminated
due to
Project
Herndon 1569 436 1486 334 1594 465 1532 441
Overall 3287 1694 3189 1694 3337 1711 3279 1971
LCR increase mostly due to changes to the LCR criteria.