ISO Public ISO Public 2021 and 2025 Final LCR Study Results Greater Fresno Area Vera Hart Senior Regional Transmission Engineer Stakeholder Call April 13, 2020

Upload: others

Post on 28-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO PublicISO Public

2021 and 2025 Final LCR Study Results

Greater Fresno Area

Vera Hart

Senior Regional Transmission Engineer

Stakeholder Call

April 13, 2020

Page 2: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Greater Fresno Area

Electrical Boundaries and LCR Sub-Areas

Slide 2

Electrical Boundaries:

● Gates – Mustang #1 230 kV line

● Gates – Mustang #2 230 kV line

● Panoche – Tranquility #1 230 kV line

● Panoche – Tranquility #2 230 kV line

● Warnerville – Wilson 230 kV line

● Melones – Wilson 230 kV line

● Panoche 230/115 kV transformer #1

● Panoche 230/115 kV transformer #2

● Smyrna – Alpaugh – Corcoran 115 kV line

● Los Banos #3 230/70 kV transformer

● Los Banos #4 230/70 kV transformer

● San Miguel – Coalinga #1 70 kV line

● Gates 230/70 kV transformer #5

Melones

Wilson

Warnerville

Gregg

Los Banos

Panoche

Gates

Henrietta

McCall

Helms

Helm

Mcmullin

Kearney

Herndon

Kngsbrg

Corcoran

Alpaugh

Gates 70 kVCoalnga

San Miguel

Overall Fresno Sub Area

Page 3: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

New major transmission projects

Slide 3

Project Name Expected ISD

Oro Loma 70 kV Area Reinforcement 24-Apr

Reedley 70 kV Reinforcement (Renamed to Reedley 70 kV Area

Reinforcement Projects Include Battery at Dinuba)21-May

Wilson 115 kV Area Reinforcement 23-May

Wilson-Le Grand 115 kV line reconductoring 20-Apr

Panoche – Oro Loma 115 kV Line Reconductoring 21-Apr

Northern Fresno 115 kV Area Reinforcement 21-May

Bellota-Warnerville 230kV line Reconductoring 24-Mar

Herndon-Bullard 230kV Reconductoring Project 21-Jan

Gregg-Herndon #2 230 kV Line Circuit Breaker Upgrade 21-Jan

Page 4: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Power plant changes

Resource Additions:

• 1 new Solar/BESS resource (309 MW)

Resource Retirements:

• None

Slide 4

Page 5: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Hanford Sub-area: Load and Resources

Slide 5

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 207 209 Market 125 125

AAEE -1 -1 Solar 25 25

Behind the meter DG -3 -3 MUNI 0 0

Net Load 203 205 QF 0 0

Transmission Losses 6 5

Pumps 0 0Total Qualifying

Capacity150 150

Load + Losses +

Pumps209 210

Page 6: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Hanford Sub-Area

Requirements

Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)

First Limit P6McCall-Kingsburg

#2 115kV Line

McCall-Kingsburg #1 115kV line

and Henrietta 230/115kV TB#358 58

Slide 6

Hanford

McCall

Gates

Henrietta

Kingsburg

GWF-Hanford

Small Solar

Corcoran

Mustang

Page 7: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Hanford Sub-area: Load Profiles

Slide 7

Page 8: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Coalinga Sub-area: Load and Resources

Slide 8

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 92 89 Market 0 0

AAEE -1 -1 Solar 13 13

Behind the meter DG 0 0 MUNI 0 0

Net Load 91 88 QF 3 3

Transmission Losses 2 1 Mothballed 0 0

Pumps 0 0Total Qualifying

Capacity16 16

Load + Losses +

Pumps93 89

Page 9: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Coalinga Sub-Area Requirements

Slide 9

Limit Category Limiting Facility Contingency 2021 LCR (MW) 2024 LCR (MW)

First Limit P6

Overload on San-

Miguel-Coalinga

70kV Line and

Voltage Instability

T-1/T-1: Gates 230/70kV TB

#5 and Schindler 115/70 kV

TB#1

57

(52 at Peak)

(41 NQC)

52

(47 at Peak)

(36 NQC)

Coalinga

Gates

Calfax

Huron

Schindler DJacalito

Schindler

Coalinga

2

Q633

SS

Plesant

Valley

Penzir Jc

To

Panoche

Coalinga 1

Tornado JCoalinga

Cogen

To Paso

Robles

Q532

Q526

Page 10: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Coalinga Sub-area: Load Profiles

Slide 10

Page 11: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Borden Sub-area: Load and Resources

Slide 11

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 132 136 Market, Net Seller 33 33

AAEE -1 -1 Solar 13 13

Behind the meter DG 0 0 MUNI 0 0

Net Load 131 135 QF 0 0

Transmission Losses 2 2 Mothballed 0 0

Pumps 0 0Total Qualifying

Capacity46 46

Load + Losses +

Pumps133 137

Page 12: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Borden Sub-Area Requirements

Slide 12

Borden

Borden

Glass

Madera

Wishon

Coppermine

Bonita

BiolaFriant

SJ#1

SJ#2

SJ#3

Crane

Valley

To Reedley

Tivy Valley

Solar

Unit

Limit Category Limiting Facility Contingency2021 LCR

(MW)

2025 LCR

(MW)

First Limit P6Borden 230/70 kV

TB # 1

Friant - Coppermine 70 kV Line and

Borden 230/70 kV TB # 40 4

Page 13: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Borden Sub-area: Load Profiles

Slide 13

Page 14: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Reedley Sub-area: Load and Resources

Slide 14

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 207 212 Market 51 51

AAEE -1 -2 Solar 0 0

Behind the meter DG 0 0 MUNI 0 0

Net Load 206 211 QF 0 0

Transmission Losses 58 59

Pumps 0 0Total Qualifying

Capacity51 51Load + Losses +

Pumps264 270

Page 15: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Reedley Sub-Area Requirements

Slide 15

Reedley

McCall

Sanger

Wahtoke

Parlier

Kings

River

Reedley

Dinuba

Orosi

Sand Creek

Dinuba 7MW

BESS in 2021

Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)

First Limit P6

Kings River-Sanger-

Reedley 115kV line

with Wahtoke load

online

McCall-Reedley 115kV Line & Sanger-

Reedley 115kV line 82 (31) 84 (33)

Page 16: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Reedley Sub-area: Load Profiles

Slide 16

Page 17: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

NEW Panoche 115-70 kV Sub-area: Load and Resources

Slide 17

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 415 427 Market/Net Seller 282 282

AAEE -2 -4 Solar 89 89

Behind the meter DG -1 -1 MUNI 100 100

Net Load 412 422 QF 3 3

Transmission Losses 12 8

Pumps 0 0Total Qualifying

Capacity474 474

Load + Losses +

Pumps424 430

Page 18: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Panoche 115-70 kV Sub-Area Requirements

Slide 18Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)

First Limit P6Five Points-Huron-

Gates 70kV line

Panoche 230/115kV TB #2 and Panoche

230/115kV TB #4198 164

Panoche

Oro Loma

El NidoWilson

Mendota

Dairyland

Le Grand

Chowchilla

Oakhurst

Kerckhoff 2Exchequer

Sanger

Gregg

Helms

Merced

Atwater

El Capitan

Schindler

Helm

Five Points Gates

CalfaxHuron

Page 19: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Panoche Sub-area: Load Profiles

Slide 19

Page 20: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

NEW Wilson 115 kV Sub-area: Load and Resources

Slide 20

Load (MW) 2021 Generation (MW) 2021

Gross Load

NA – Flow

through area.

Market/ Net Seller / Battery 260

AAEE Solar 100

Behind the meter DG Wind 0

Net Load Muni 54

Transmission Losses QF 0

PumpsFuture preferred resource

and energy storage0

Load + Losses +

PumpsTotal Qualifying Capacity 414

Page 21: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Wilson 115 KV Sub-Area Requirements

Slide 21

Limit Category Limiting Facility Contingency 2021 LCR (MW) 2025 LCR (MW)

First Limit P6Wilson-Oro Loma 115 kV Line

(El Nido-Oro Loma 115 kV)

Wilson 230/115kV TB #1 and

Wilson 230/115kV TB #2

416

(2 NQC/32 Peak)

None due to the

3rd Wilson

230/115kV TB

Panoche

Oro Loma

El NidoWilson

Mendota

Dairyland

Le Grand

Chowchilla

Oakhurst

Kerckhoff 2Exchequer

Sanger

Gregg

Helms

Merced

Atwater

El Capitan

Atwater Jct

Livingston Galo Cressey

JRwood

Page 22: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Herndon Sub-area: Load and Resources

Slide 22

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 1471 1523 Market 997 997

AAEE -6 -13 Solar 63 63

Behind the meter DG -3 -3 MUNI 98 98

Net Load 1462 1507 QF 1 1

Transmission Losses 24 25

Pumps 0 0Total Qualifying

Capacity1159 1159

Load + Losses +

Pumps1486 1532

Page 23: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Herndon Sub-Area Requirements

Slide 23

Kings River,

Pine Flats

Helm

sGregg

McCall

Herndo

n

Panoche

Henrietta

Sanger

Haas,

Balch

Rio Bravo

Fresno

KRCD Malaga

GWF

Hanford

Kerckhof

ClovisBullar

d

Woodward Coppermine

Kingsburg

Borden

Gates

Mancheste

r

Barton

Ashlan

Limit Category Limiting Facility Contingency2021 LCR

(MW)

2025 LCR

(MW)

First limit P6Herndon-Manchester 115 kV

line

Herndon-Woodward 115 kV line and

Herndon-Barton 115 kV line334 441

Page 24: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Herndon Sub-area: Load Profiles

Slide 24

Page 25: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Overall Load and Resources

Slide 25

Load (MW) 2021 2025 Generation (MW) 2021 2025

Gross Load 3099 3217 Market/Net Seller 2515 2515

AAEE -12 -26 Solar 320 320

Behind the meter DG -5 -5 MUNI 212 212

Net Load 3082 3186 QF 4 4

Transmission Losses 106 93 Battery 300 300

Pumps 0 0

Load + Losses +

Pumps3189 3279

Total Qualifying

Capacity 3351 3351

Page 26: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Overall Sub-Area

Requirements

Hanford

Mendota

Merced

Madera

Fresno

Haas,

Balch,

Pine Flats

Helms

Gregg

McCallHerndon

Wilson

Panoche

Gates

Los Banos

McMullin

Helm

Borden

Melones Warnerville

Henrietta

Slide 26

Mustang

Tranquility

Kingsburg

GWF-

Hanford

Corcoran

Contandida

Page 27: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Overall Fresno Area : Requirements

Slide 27

Limit Category Limiting Facility Contingency2021 LCR

(MW)

2025 LCR

(MW)

First limit P6GWF-Contandida

115kV Line

Panoche-Helm 230kV

Line and Gates-McCall

230kV line

1694 1971

Study YearExisting Generation

Capacity Needed (MW)Deficiency (MW) Total MW Need

2021 1,694 72 1,766

2025 1,971 69 2,040

Page 28: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Overall Sub-area: Load Profiles

Slide 28

Page 29: 2021 and 2025 Final LCR Study Results Greater …...Borden Sub-Area Requirements Slide 12 Borden Borden Glass Madera Wishon Coppermine Bonita Biola Friant SJ#1 SJ#2 SJ#3 Crane Valley

ISO Public

Changes Compared to Previous LCR Requirements

Slide 29

Sub-area2020 2021 2024 2025

Load LCR Load LCR Load LCR Load LCR

Hanford 226 82 209 58 231 93 210 58

Coalinga 91 35 93 57 (41) 89 33 89 52 (36)

Borden 143 19 133 0 148 19 137 4

Reedley 244 35 264 83 (31) 265 31 270 84 (33)

New Panoche 115 kV N/A N/A 424 198 N/A N/A 430 164

New Wilson 115/70 kV N/A N/AFlow-

Through416(2) N/A N/A N/A

Eliminated

due to

Project

Herndon 1569 436 1486 334 1594 465 1532 441

Overall 3287 1694 3189 1694 3337 1711 3279 1971

LCR increase mostly due to changes to the LCR criteria.