To m C a m b a r e r i | C a p e C o d C o m m i s s i o n
C a p e C o d C o m m u n i t y C o l l e ge , M ay 1 8 , 2 0 1 6
O P P O R T U N I T Y F O R W A T E R S H E D S O L U T I O N S
Improving Water Quality U P D AT I N G T H E 2 0 8 P L A N
Clean Water Act
Section 208
CCC directed to update the 1978
Plan
$3 million to complete
the plan
Focus on 21st century
problems Support targeted watershed
solutions under existing plans
CAPE COD HAS A NITROGEN PROBLEM
REQUIRED NITROGEN REDUCTION
Cape-wide Nitrogen Contributions
Very Permeable Glacial Deposits Leaching Catch Basins Exceptionally Effective Areas of High Groundwater are Problematic Little Water Quality Renovation
Fertilizer
& Storm
Nitro
gen L
oad
Fertilizer
& Storm
Existing
Controllable
Load
Target
Load Target
Load
Existing
Controllable
Load
Required
Reduction P
ort
ion o
f S
eptic L
oad
Port
ion o
f
Septic L
oad
Required
Reduction
May | 18 | 2016
Stormwater
in 208 Planning
Tools
Watershed MVP 3.0
May | 18 | 2016
Appendix F Requirements for Discharges to Impaired Waters with an Approved
TMDL
May | 18 | 2016
Goal: Current N loads from MS4 Stormwater do not increase
Requires the following “Enhanced BMPs” • Public Education and Outreach annual timed messages
• Spring – use/disposal of grass clippings and fertilizer use • Summer – pet waste management • Fall – leaf litter disposal
• Stormwater Management in New Development and Redevelopment • Stormwater BMPs be optimized for N removal • Retrofit inventory + priority ranking needs to consider BMPs to reduce N discharges
• Good Housekeeping and Pollution Prevention for Permittee Owned Operations • Improved management of fertilizer use, grass cuttings, leaf litter on municipal property • Increased (2x per year) street sweeping of all municipal owned streets and parking lots
Appendix F Requirements for Discharges to Impaired Waters with an Approved TMDL
Opportunity
Gateway Marina Park
Hyannis
Bank Redevelopment
in Hyannis
DRI Review
Sea Level Rise, Coastal Resiliency and Stormwater Management
HW
May | 18 | 2016
OneCape Summit
June 23 – 24
Thursday, June 23rd • Pilot Projects • Technologies • Monitoring Dinner Session: All Cape Selectman and Councilors Meeting
Friday, June 24th • WMA Progress • Implementation
Resort and Conference Center at Hyannis 35 Scudder Ave, Hyannis
1 SOLE SOURCE AQUIFER