2.1 contractor management
TRANSCRIPT
-
7/29/2019 2.1 Contractor Management
1/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
2.2 Process Safety Management
-
7/29/2019 2.1 Contractor Management
2/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
-
7/29/2019 2.1 Contractor Management
3/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
-
7/29/2019 2.1 Contractor Management
4/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
Design out hazards Inherently safe processes
The pursuit of designing hazards out of chemical
processes and equipment, rather than the use ofengineering or procedural controls to reduce the
frequency or mitigate the consequences of
potential hazardous events.
-
7/29/2019 2.1 Contractor Management
5/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
Spacing of operating plant e.g.
When designing new plants or modifying
existing plants, high traffic areas such as tank
car loading and unloading facilities, officebuildings and parking lots should be located
away from hazardous process areas.
Piping systems should be laid out such thatthe likelihood of them being impacted by
vehicular traffic is minimized.
-
7/29/2019 2.1 Contractor Management
6/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
Control room
By the nature of its importance in the plant
operations and up to and including shutdown incase of abnormal situation, the control room
should be as much as possible be made the
safest place within the whole plant
-
7/29/2019 2.1 Contractor Management
7/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
Temporary refuge
The accommodation module of an offshore
platform will usually form part of the temporaryrefuge (TR) for the platform. It must therefore
provide protection against blast, fire, smoke and
other associated hazards for up to an hour aftera major accidental event
-
7/29/2019 2.1 Contractor Management
8/8
NEBOSH International Technical Certificate in Oil & GasOperational Safety
Module 2.2 Process Safety Management
Change management
Written procedures to ensure following addressed:
Technical basis for proposed change
Impact of change on employee safety and health
Modifications to operating procedures
Necessary time period for change
Authorisation requirements for proposed change