YOUR REF: OUR REF: DA-2012-239 21 November 2012 Hart Design Developments Pty Ltd 2/1 Tolcher St MOUNT PLEASANT QLD 4740 Dear Sir/Madam DECISION NOTICE Applicant: Hart Design Developments Pty Ltd Proposal: Material Change of Use - Multiple Dwelling Units (10) Application Number: DA-2012-239 Address: 46 Beaconsfield Road, BEACONSFIELD QLD 4740 Property Description: Lot 16 on RP712135 Please find enclosed the above Decision Notice with the relevant attachments: Decision Notice Assessment Manager’s Conditions Approved Plans Appeal Rights Notice to Commence Use Infrastructure charges are applicable on this approval. A separate Infrastructure Charge Notice accompanies this Decision Notice. If you require any further information, please contact Kathryn Goodman. This is a Mackay Regional Council Digitally Signed Document

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

YOUR REF:

OUR REF: DA-2012-239

21 November 2012 Hart Design Developments Pty Ltd 2/1 Tolcher St MOUNT PLEASANT QLD 4740 Dear Sir/Madam DECISION NOTICE Applicant: Hart Design Developments Pty Ltd Proposal: Material Change of Use - Multiple Dwelling Units (10) Application Number: DA-2012-239 Address: 46 Beaconsfield Road, BEACONSFIELD QLD 4740 Property Description: Lot 16 on RP712135 Please find enclosed the above Decision Notice with the relevant attachments: Decision Notice Assessment Manager’s Conditions Approved Plans Appeal Rights Notice to Commence Use Infrastructure charges are applicable on this approval. A separate Infrastructure Charge Notice accompanies this Decision Notice. If you require any further information, please contact Kathryn Goodman.

This is a Mackay Regional Council Digitally Signed Document

Page 2: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Decision Notice

Sustainable Planning Act

Application Number: DA-2012-239

Date of Decision: 16th November 2012

1. APPLICANT/S DETAILS

Name: Hart Design Developments Pty Ltd

Postal Address: 2/1 Tolcher St

MOUNT PLEASANT QLD 4740

2. PROPERTY DETAILS

Property Address: 46 Beaconsfield Road, BEACONSFIELD QLD 4740

Property Description: Lot 16 on RP712135

3. OWNER’S DETAILS

Hart Design Developments Pty Ltd

4. PROPOSAL

Material Change of Use - Multiple Dwelling Units (10)

5. DECISION TYPE

DEVELOPMENT DECISION Material Change of Use Development Permit

Approved in Full subject to Conditions

This is a Mackay Regional Council Digitally Signed Document

Page 3: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Decision Notice

Sustainable Planning Act

6. ASSESSMENT MANAGER’S CONDITIONS

The conditions relevant to this decision are attached to this notice. These conditions are clearly identified to indicate whether the assessment manager or a concurrence agency imposed them.

7. IDAS REFERRAL AGENCIES

It is advised that there are no Referral Agencies for this Application. 8. SUBMISSIONS

There were no properly made submissions received on this application. 9. PLANNING SCHEME

This decision is issued under the Mackay City Planning Scheme including amendments up to 19 December 2011.

10. SUPERSEDED PLANNING SCHEME

Not Applicable

11. FURTHER APPROVALS REQUIRED

Operational Works – Development Permit Operational Works Construction – Compliance Certificate Building Works – Development Permit Plumbing and Drainage Works – Compliance Permit

12. PRELIMINARY APPROVAL OVERRIDING THE PLANNING SCHEME

Not Applicable

13. RELEVANT PERIOD The standard relevant period states in Section 341 of the Sustainable Planning Act apply to each aspect of development in this approval, if not stated in the conditions of approval attached.

14. APPEALS Attached is an extract from the Sustainable Planning Act which details your appeal rights and the

appeal rights of any submitters regarding this decision. 15. ASSESSMENT MANAGER SIGNATURE

Name Leah Harris

Position Principal Planner

Signature Date

This is a Mackay Regional Council Digitally Signed Document

leahs
Typewritten Text
23-11-12
Page 4: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 1 of 10 

1. Plan of Development

The approved 10 Multiple Dwelling Unit development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval.

Drawing Number

Sheet Number

Revision Prepared by Date

1812 Cover Page

- D&M Building Co. -

1812 A-4 - D&M Building Co. 11/09/2012 1812 A-5 A D&M Building Co. 11/09/2012 1812 A-6 A D&M Building Co. 11/09/2012 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012 1812 A-11 A D&M Building Co. 11/09/2012 1812 A-12 A D&M Building Co. 11/09/2012 1812 A-13 A D&M Building Co. 11/09/2012 1812 A-14 A D&M Building Co. 11/09/2012 1812 A-15 A D&M Building Co. 11/09/2012 1812 A-16 A D&M Building Co. 11/09/2012 1812 A-17 A D&M Building Co. 11/09/2012 1812 A-18 A D&M Building Co. 11/09/2012 1812 A-19 A D&M Building Co. 11/09/2012 1812 A-20 A D&M Building Co. 11/09/2012 1812 A-21 A D&M Building Co. 11/09/2012 201257-DA-001 B Owen Consulting

Engineering & Development 14/09/2012

2. Amended Plans Required

Prior to the lodgement of Operational Works application the approved plans of development must be amended to comply with redesign of the development addressing the following matters: a) Unit 1 must address the streetscape by siting front door at the front of the unit

facing Beaconsfield Road. b) Private open space must incorporate areas with a minimum dimension of 4m x

4m to be located as follows: i) Unit 1 – Not located within the frontage of the lot. Must be rearward or

adjacent the southern boundary. ii) Units 9 and 10 – Must be located outside of the drainage easement.

c) Buildings must be located wholly outside of the rear drainage easement, including roof.

d) Car parking in accordance with Condition 33. e) Concrete bin setdown areas in accordance with Condition 26.

This is a Mackay Regional Council Digitally Signed Document

Page 5: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 2 of 10 

A reduction in the number of units, or alternatively a reduction in the number of bedrooms may be required to achieve redesign outcomes as outlined above. The amended plans must be approved in writing by Council prior to the lodgement of an application for Operational Works approval.

3. Compliance with Conditions

All conditions must be complied with prior to the occupancy of the building for the approved use, unless specified in an individual condition.

4. Maintenance of Development

Maintain the approved development (including landscaping, car parking, driveways and other external spaces) in accordance with the approved drawings and/or documents, and any relevant Council engineering or other approval required by the conditions.

5. Conflict Between Plans and Written Conditions

Where a discrepancy or conflict exists between the written conditions of the approval and the approved plans, the requirements of the written conditions will prevail.

6. Notice of Intention to Commence the Use

Prior to the commencement of the use on the site, written notice must be given to Council that the use (development and / or works) fully complies with the decision notice issued in respect of the use (please see attached notice for your completion).

7. Damage Any damage which is caused to Council’s infrastructure as a result of the proposed development must be repaired immediately.

8. Compliance with Council Standards All design and construction for the development must be in accordance with Council’s Policies, Engineering Design Guidelines, Standard drawings and standard specifications.

9. Increased Building Setback An increased building setback of 10m, to the outmost projection, for the full frontage of the site in Beaconsfield Road must be provided in order to allow for future road widening of 5m.

This is a Mackay Regional Council Digitally Signed Document

Page 6: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 3 of 10 

A 5m no build area for all structures is required on Beaconsfield Road. Landscaping is permitted within the 5m no build area. Letter boxes will be permitted on the boundary, with Council indemnified of any cost to remove/replace at the time of resumption of future road reserve widening. This must be reflected through a Community Management Statement and provided to Council as evidence of compliance at the time of submission of the Notice of Intention to Commence Use. Future purchasers are to be made aware of these requirements in the contract of sale. A notation to this effect will be placed on Council’s rates database.

10. Contribution for Footpath Works In lieu of construction of a footpath along Beaconsfield Road a contribution of $2,800.00 toward road frontage works comprising footpath works must be provided.

11. Electricity and Telecommunications Services The approved development must be provided with electricity and telecommunications infrastructure.

12. Access The 6m wide invert crossing and concrete driveway must be constructed in accordance with Council’s Standard Drawing A3-773. The invert crossing must maintain a 2m clearance from the nearby power pole.

13. Stormwater a) The drainage easement along the rear property boundary is the lawful and

practical point of discharge for all stormwater drainage.

b) All stormwater from the site (including roofwater) shall be collected within the property boundaries and discharged via an underground system to Council’s stormwater system. The stormwater discharge point is shown on Plan No. 201257-DA-001.

c) Ponding of stormwater resulting from the development must not occur on adjacent sites and stormwater formerly flowing onto the site must not be diverted onto other sites. The site shall be graded so that it is free draining.

d) A concrete lined channel must be constructed within the drainage easement along the rear boundary of the site to match neatly to the field pit at the south eastern corner and the newly constructed channel at the rear of Lot 17 RP712135. This channel must comply with Council’s Standard Drawing A3-870.

This is a Mackay Regional Council Digitally Signed Document

Page 7: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 4 of 10 

14. On-Site Detention The development will increase the impervious area of the site and hence stormwater runoff to Council streets and underground stormwater system. The developer must comply with the proposed on-site detention volume as calculated in the Site Based Stormwater Management Plan prepared by Owen Consulting dated August 2012. A notation advising of the requirement for compliance with the approved design must be placed on Council’s Rates Database.

15. Site Based Stormwater Management Plan – High Risk The proposed development triggers assessment under the State Planning Policy 4/10 Healthy Waters. The developer must comply with the proposed water quality system as designed in the Site Based Stormwater Management Plan prepared by Owen Consulting dated August 2012.

16. Direct Pumping From Reticulation System Pumping direct from Council water mains for potable or fire fighting supply is not permitted.

17. Live Connections Council’s Water and Waste Services Department is to carry out all water connection and live sewer work at the developer’s expense.

18. Sewerage a) The proposed sewerage layout must comply with the design shown on attached

annotated drawing 201257-DA-001.

b) The existing house drain must be disconnected. A Sewer Disconnection Form is to be submitted to Council’s Water and Waste Services Department with the appropriate fees for approval.

c) The existing sewer main and manhole within neighbouring Lot 15 RP712135 and the existing sewer that traverses the site must be removed.

This is a Mackay Regional Council Digitally Signed Document

Page 8: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 5 of 10 

19. Connect to Water Services The development must connect to the water service shown on attached annotated drawing 201257-DA-001.

20. Water Metering Queensland State Legislation (the ‘Standard Plumbing and Drainage Regulation 2003’, Section 8B) requires compliance with the Queensland Plumbing and Wastewater Code. In particular, the QPW Code requires that ‘The water supply to a meterable premises must be fitted with a device (water meter) to measure the amount of water supplied to the premises’. ‘Meterable premises’ means (amongst other definitions) each lot within a community title scheme, including the common property, in a water service provider’s area. The developer is responsible for the installation of sub-meters, master meters, AMR technology hardware, meter cupboards and the supply of all equipment and materials to the satisfaction of Mackay Regional Council. Individual meters (Sub-meters) must be installed to each meterable premises (ie. each lot including common property areas). A Master Meter must be installed at the common entry point into the development. Sub-meters and Master Meters must be fitted with Automatic Meter Reading (AMR) technology. AMR technology consists of a Meter Interface Unit (MIU) fitted to the meter, a Data Concentration Unit (DCU) located remote from the meters in a lockable Cupboard (termed ‘Meter Cupboard’), and the equipment necessary to provide connectivity between the MIU and DCU. The Master Meter and DCU must be located together in a ‘Meter Cupboard’ located at the front of the common entry point to the development such that accessibility from outside the development is maintained at all times.

21. Floor Level The minimum habitable floor level of the proposed development must be the higher of: 300mm above the top of kerb 300mm above the crown of the road 225mm above ground level a level which allows the connection of all sanitary fixtures to the designated

sewer connection point by means of sanitary drainage which complies with AS3500.

This is a Mackay Regional Council Digitally Signed Document

Page 9: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 6 of 10 

22. Landscape Plan Required

A detailed site and footpath landscaping plan must be prepared by a qualified Landscape Designer and must be submitted with Operational Works Approval application. The plan must show for all areas identified on the approved plan of development the following: Landscape specification of sufficient detail so that landscape works are to be

carried out; Plant schedule detailing number of plants, species, pot size and height at

planting; Details of soil and mulch types, including depths, areas of turf, garden edges and

paving finishes; The details of the irrigation system. Street planting must be provided in accordance with Council Planning Scheme Policy No.11 – Landscaping, and included with submission of landscaping plans.

23. Completion of Landscaping

All of the landscaping works shown on the approved plan must be completed before the development is occupied.

24. Visual Screen Fence

A visual screen fence between the site boundaries and adjoining properties and all open space areas, must be constructed. The screen fence must be a minimum height of 1.8 metres. Furthermore, the fence must be tapered to a height of 1.2 metres within 10 metres of the front alignment. The total cost of this fencing to be met by the Developer.

25. Waste Storage Area

The waste storage area must be provided in the location shown on the approved plan and must comply with the following: contain an impervious surface contain sufficient storage space for the storage of 240 litre refuse and recycling

bins for each unit. The location and design of the waste storage area must be located so as not to cause a nuisance to neighbouring properties in accordance with the relevant provisions of the Environmental Protection Act and Regulations.

This is a Mackay Regional Council Digitally Signed Document

Page 10: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 7 of 10 

A concrete bin setdown area within Council’s road verge with minimum dimensions of 9m x 1m must be constructed on each of the frontages of 46 and 48 Beaconsfield Road. The concrete bin setdown areas must be utilised as follows: 46 Beaconsfield Road must be utilised for general waste bins; 48 Beaconsfield Road must be utilised only for recycle bins. This must be reflected through a Community Management Statement and provided to Council as evidence of compliance at the time of submission of the Notice of Intention to Commence Use. Future purchasers are to be made aware of these requirements in the contract of sale. A notation to this effect will be placed on Council’s rates database.

26. Open Space per Unit

A minimum of 35m² of open space per unit is required to be provided, part of which shall comprise at least a 16m² private open space area with a minimum dimension of four metres. For the purpose this condition ‘private open space’ means a landscape and recreation space which is partitioned by walls, fences or the like into a court or yard which is provided within the curtilage of and immediately accessible from the living/dining room of the dwelling unit.

27. No Dual Key Units

This approval does not approve any potential multiple key dwelling units within the proposed unit configuration.

28. Service Facilities Locations Rainwater tanks (including associated piping) and clothes lines are not to protrude above the top of the fence line. The outdoor storage of any equipment or material and any service area, including rainwater tanks, and clothes lines shall be aesthetically screened so as not to be visible from Beaconsfield Road.

29. Aesthetic Screening

The outdoor storage of any equipment or material and any service area shall be aesthetically screened so as not to be visible from Beaconsfield Road.

This is a Mackay Regional Council Digitally Signed Document

Page 11: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 8 of 10 

30. No Nuisance to Adjoining Properties

All service equipment, lighting and air-conditioning units shall be located so as not to cause a nuisance to neighbouring properties.

31. Minimum Car Parking Spaces

Car parking spaces must comply with 1 space per 1 and 2 bedroom units, 1.5 spaces per 3 bedroom or more units, and 2 visitor spaces. Car parking is not permitted in the future 5m road reserve or in front of Unit 1. The car parking area must be constructed, sealed, line marked and drained for car parking spaces in accordance with the above requirements, and maintained thereafter. The car parking is to be designed in accordance with Australian Standard AS-NZS2890.1 – 2004 and AS-NZS2890.6 – 2009.

32. Protection of Landscape Areas from Car Parking

The landscaped areas adjoining the car parking area must be protected from vehicles by a 125 mm high vertical concrete kerb or similar obstruction.

33. Vehicle Manoeuvring

All car parking spaces must be designed to allow all vehicles to drive forwards both when entering and leaving the property.

34. Demolish/Remove Existing Structures

All existing buildings currently situated on the subject site must be demolished or removed from the subject site prior to the commencement of the use. A Building Approval is required for demolition and should be issued by a Private Building Certifier.

ASSESSMENT MANAGER’S ADVICE

1. Adopted Infrastructure Charges Notice

Pursuant to the Sustainable Planning Act 2009 and the State Planning Regulatory Provision (adopted charges) an Adopted Infrastructure Charges Notice relates to this Development Permit, and accompanies this notice.

This is a Mackay Regional Council Digitally Signed Document

Page 12: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 9 of 10 

Prior to making payment please contact Mackay Regional Council, Development Services, Business Support Unit to establish if any Development Incentive Policies apply to the development at the time of the payment will be made.

2. Local Laws

The approved development must also comply with Council’s current Local Laws under the Local Government Act 2009.

3. Hours of Work

It is the applicant/owner’s responsibility to ensure compliance with Section 440R of the Environmental Protection Act 1994, which prohibits any construction, building and earthworks activities likely to cause audible noise (including the entry and departure of heavy vehicles) between the hours of 6:30pm and 6:30am from Monday to Saturday and at all times on Sundays or Public Holidays.

4. Dust Control

It is the applicant/owner’s responsibility to ensure compliance with Section 319 General Environmental Duty of the Environmental Protection Act 1994, which prohibits unlawful environmental nuisance caused by dust, ash, fumes, light, odour or smoke beyond the boundaries of the property during all stages of the development including earthworks and construction.

5. Sedimentation Control

It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3C of the Environmental Protection Act 1994 to prevent soil erosion and contamination of the stormwater drainage system and waterways.

6. Noise During Construction and Noise in General

It is the applicant/owner’s responsibility to ensure compliance with Chapter 8, Part 3B of the Environmental Protection Act 1994.

7. General Safety of Public During Construction

It is the principal contractor’s responsibility to ensure compliance with Section 19 (2) Work Health and Safety Act 2011. Section 19 (2) states that a person conducting a business or undertaking must ensure that the health and safety of other persons is not put at risk from work carried out as part of the conduct of the business or undertaking.

This is a Mackay Regional Council Digitally Signed Document

Page 13: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

ASSESSMENT MANAGER CONDITIONS Application Number: DA-2012-239 Applicant’s Name: Hart Design Developments Pty Ltd

Decision Date: 16 November 2012  

Page 10 of 10 

It is the responsibility of the person in control of the workplace to ensure compliance with Section 20 (2) of the Work Health and Safety Act 2011. Sections 20 (2) states that the person in control of the workplace is obliged to ensure that the means of entering and exiting the workplace and anything arising from the workplace are without risks to the health and safety of any person.

8. Contaminated Land

It is strictly the applicant/owner’s responsibility to source information regarding contaminated land from the Department of Environment and Heritage Protection, Contaminated Land Section as Council has not conducted detailed studies and does not hold detailed information pertaining to contaminated land.

This is a Mackay Regional Council Digitally Signed Document

Page 14: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 15: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-4

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

ST

RE

ET

SC

AP

E

NORTH WESTERN PERSPECTIVE.

SOUTH EASTERN PERSPECTIVE.

NORTHERN PERSPECTIVE.

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 16: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

UP

UP

20117

100584

20117

100584

UP

UP

S

S

S

S

S

S

S

PLP

SMH

SMH

FH

WM

SV

S

S

S

S

S

S

S

S

S

S

7.93

7.88

7.99

7.62

8.02

8.00

7.92

7.93

8.09

8.34

8.44

8.10

7.77

7.68

7.90

7.87

7.68

8.07

8.56

7.84

7.80

7.94

7.69

7.74

7.72

7.62

7.52

7.62

7.72

7.76

7.67

7.57

7.67

7.84

8.17

8.11

7.99

7.98

8.37

8.46

8.16

7.82

7.868.05

7.90

7.72

7.57

7.70

7.87

7.757.89

7.71

7.73

7.84

8.26

8.11

IL - 6.50Cover Level -8.00m

8.0

16

17

RP712135

15

RP712135

84

RP732427

Brass Plaque on Concrete Plinth

150 VCP

RP712135E

mt D

Em

t C

Driveway

Sewerline

Sw

ale Drain

Picket mesh fence

pipe & mesh fence 0.9 high

(VCP = Vitrified Clay Pipe)

UP

UP

UP

UP UP

5 000

5 000

5 000

10 000

8 381

6 017

7 817

7 116

1 500

1 501

3 130

1

DRYING AREA.

DRYING AREA.

DR

YI NG

AR

EA.

DR

YI NG

AR

EA.

DRYING

AREA.

VISITORS

CARPARK.

UNIT 4

CARPARK.

UNIT 6

CARPARK.

VISITORS

CARPARK.

1800 high timber picket fence.

VISITORS

CARPARK.

DRYING

AREA.

DRYING

AREA.

DRYING

AREA.

DR

YI NG

AR

EA.

LOT 19 on RP 711247

BUILDING FOOTPRINT - 474.5m2

FLOOR AREA - 636.52sq.m

COUNTY of CARLISLE

PARISH of HOWARD

SITE AREA 1230m2

SITE COVERAGE -38.6%

1800 high timber picket fence.

1800 high timber picket fence.

1800 high timber picket fence.

1800 high timber picket fence.

1800 high timber picket fence tapered to1200 high timber picket fence within 10m of the boundary.

Picket mesh fence.

1800 high timber picket fence tapered to1200 high timber picket fence within 10m of the boundary.

VISITORS

CARPARK.

Gas bottle.

Water meters.

Letter boxes.

Water

tank

Water

tank

Water

tank

Unit 5

Un it 7

Un it 3

Un it 1

Un it 2

Un it 8

Un it 9

Un it 10

Water

tank

Water

tank

Water

tank

Water

tank

Water

tank

N

19990

100635

19990

100635

Landscape area - 85m2.

Landscape area - 9m2.

LANDSCAPING TO ARCHITECT DESIGN.

CONCRETE DRIVEWAY 686m2.

TURFED AREA.

74m2 - POS

62m2 - POS

47m2 - POS

48m2 - POS

45m2 - POS

39m2 - POS

134m2 - POS

77m2 - POS

LEGEND.

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-5

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

SIT

E P

LA

N

1:500

A

NOTES1. DESIGNED IN ACCORDANCE WITHBCA, C2 & STANDARD BUILDING BY-LAWS.2. GROUND AROUND THE PERIMETER OF THEBUILDING SHALL SLOPE 50mm IN 1000mmMIN AWAY FROM THE BUILDING.3. HABITABLE ROOMS TO HAVE A FLOORHEIGHT 300mm MIN ABOVE FINISHEDGROUND LEVEL.4. RAIN WATER DOWN PIPES TO DISCHARGEVIA 100 DIAM PVC UNDER GROUND SWLINE DRAINS TO REAR EASEMENT.5. ALL SEWERAGE DRAINAGE TO SEWERAGEAND WATER SUPPLY ACT AND AMENDMENTACT, COUNCIL DRAWING AND APPROVAL.

REAL PROPERTY DESCRIPTIONLOT 16 on RP 712135PARISH of BASSETTCOUNTY of CARLISLESITE AREA 2023m2FLOOR AREA – 1293.29m2BUILDING FOOTPRINT – 695.43m2SITE COVERAGE – 34%

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 17: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

20117

100584

100584

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

PLP

SMH

FH

WM

SV

S

S

S

S

S

S

S

S

S

S

8.02

8.09

8.34

8.44

8.10

7.44

7.58

7.68

8.07

8.00

8.12

8.56

7.84

7.80

7.94

7.69

7.74

7.72

7.62

7.52

7.62

7.72

8.17

8.11

7.99

7.98

8.37

8.46

8.16

8.26

8.11

8.0

16

17

RP712135

15

RP712135

Mountable K

& C

PSM 45481Brass Plaque on Concrete PlinthRL 7.746

RP712135

Road C

L

Change of G

radeLinem

arking

DrivewayBEAC

ON

SFIELD R

OAD

UP

UP

UP

5 000

5 000

5 000

10 000

8 381

6 017

7 817

1 500

VISITORS

CARPARK.

UNIT 4

CARPARK.

UNIT 6

CARPARK.

VISITORS

CARPARK.

VISITORS

CARPARK.

DRYING

AREA.

DRYING

AREA.

DRYING

AREA.1800 high timber picket fence.

1800 high timber picket fence.

1800 high timber picket fence tapered to1200 high timber picket fence within 10m of the boundary.

Picket mesh fence.

1800 high timber picket fence tapered to1200 high timber picket fence within 10m of the boundary.

VISITORS

CARPARK.

Gas bottle.

Water meters.

Letter boxes.

Water

tank

Water

tank

Water

tank

Unit 5

Unit 3

Unit 1

Unit 2

Water

Water

tank

100635

19990

100635

Landscape area - 85m2.

Landscape area - 9m2.

74m2 - POS

62m2 - POS

47m2 - POS

48m2 - POS

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-6

11/09/2012

1:200

ARev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

SIT

E P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 18: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

UP

UP

10058420117

100584

UP

UP

S

S

S

S

S

S

S

S

S

SMH

S

S

S

S

S

S

S

S

S

S

S

S

7.93

7.88

7.99

7.62

8.00

7.92

7.93

7.77

7.68

7.90

7.87

7.62

7.52

7.62

7.72

7.76

7.67

7.57

7.67

7.84

7.82

7.868.05

7.90

7.72

7.57

7.70

7.87

7.757.89

7.71

7.73

7.84

IL - 6.50Cover Level -8.00m

15

RP712135

84

RP732427

83

RP732427

150 VCP

Emt D

Emt C

Sw

ale Drain

Picket mesh fence

pipe & mesh fence 0.9 high

(VCP = Vitrified Clay Pipe)

UP

UP UP

7 817

7 116

1 500

1 501

3 130

1

DRYING AREA.

DRYING AREA.

DR

YING

AREA.

DR

YING

AREA.

DRYING

AREA.

UNIT 6

CARPARK.

1800 high timber picket fence.

VISITORS

CARPARK. DR

YING

AREA.

1800 high timber picket fence.

1800 high timber picket fence.

1800 high timber picket fence.

Picket mesh fence.

Unit 5

Unit 7

Unit 8

Unit 9

Unit 10

Water

tank

Water

tank

Water

tank

Water

tank

Water

tank

N

19990

100635

100635

POS

48m2 - POS

45m2 - POS

39m2 - POS

134m2 - POS

77m2 - POS

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-7

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

1:200

A

SIT

E P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 19: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

18/0

6 ox

21/1

8 S

GD

ox

12/1

8 ox

720

820

1500

Lin

en

18/0

6 ox

18/0

6 xo

18/18 oxxo

820

09/1

8ox

21/1

8 S

GD

ox

820

18/0

6 xo

12/18 ox

820

06/06xo 06/06ox

820

18/18 oxxo

2126 RAD2126 RAD

820

720 CSD

720

1500

Lin

en

720 CSD

820

820

UP UP

11 9

00

4 45

03

930

2 64

04

450

4 81

0

190

3 60

070

7 85

019

0

14 900

1 900 190 615 2 530 70 930 70 935 701 0001901 000 70 935 70 930 70 2 535 2 690

190 3 145 70 3 005 190 3 005 70 3 805

190 2 585 70 330 70 2 195 70 900 190 900 70 2 195 70 330 70 2 575 190

1902 135.2 1 009.8 70 3 005 190 3 005 70 1 010 2 605 190

190

1 60

070

1 00

070

1 21

070

6 02

019

01

290

190

Living

Dining

Kitchen

Patio

Garage

LaundryWC

Garage

Living

Dining

Kitchen

Laundry WC

Patio3.2m3 storage.

2.8m3 Storage.

2.8m3 Storage.

3.2m3 storage.

Storage Storage

LaundryKitchen

Kitchen

Living

Unit 1FFL: 8.7

Unit 2FFL: 8.7

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-9

11/09/2012

Rev:

1:100

A

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

UN

ITS

1 &

2

GR

OU

ND

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 20: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

RE

F.R

EF

.

820

12/18 ox 12/18 ox

820

2127 RAD

820/fixed

2100 Robe

2127 RAD

820/fixed

2100 Robe

820

CS

D

820

21/18 SGD ox

820

2700 Storage

820

CS

D

21/18 SGD ox

820

09/12ox

820

2700 Storage

09/12ox

12/1

8 ox

12/1

8 ox

870870 UP

2 700

6 80

01

206

10 8

00

8 400

3 400 2 200 2 800

190 3 240 190 1 790190 2 800

190 3 020 190 4 810 190

6 90

03

900

600

190

5 92

019

085

070

900

701

820

190

190

6 00

070

5707

0530

703

110

190

Living

Dining

Kitchen

Garage

Bedroom

Laun

dry/

Bat

h

Patio

Living

Dining

Kitchen

Garage

Bedroom

Laun

dry/

Bat

h

Patio

UNIT 6 CARPARK.

Storage 6.7m3.

UNIT 4 CARPARK.

Storage 6.7m3.

Storage 4.5m3.Storage 4.5m3.

Unit 5FFL: 8.4

Unit 3FFL: 8.4

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-10

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

3 &

5

GR

OU

ND

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 21: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

REF.REF.

21/15 SGD xo21/15 SGD xo 12/09 ox12/09 ox12/09 ox

18/1

2 ox

xo

18/12 oxxo820 F

18/1

2 ox

xo

12/09 xo 21/15 SGD ox

06/06 xo 06/06 ox

720

820

2/420

820

820

2/420

820

720

2127 RADF 82018/12 oxxo

2127 RAD

UPUP

4 00

1.2

6001 2007001 2006 6001 2007001 200600

600 14 000 600

3 20

03

000

3 40

01

000

900

900

1 00

019

095

070

1 00

070

7 13

019

0

190

4 95

01

460

701

720

701

950

190

3 20

03

200

3 20

01

000

900

600 5 700 2 600 5 700 600

190 4 410 2 305 190 1 465 5 250 190

190 5 250 70 1 395 190 1 39570 5 250 190

90 2 211 90 2 211 90 2 213 190 2 213 90 2 211 90 2 211 90

900

1 00

019

095

070

1 00

070

350

706

710

190

190

1 95

070

1 72

070

1 46

04

950

190

190 3 640 70 1 06070

80570

2 19070

80570

1 060 70 3 640 190

11 5

00

901

810

190

3 01

019

02

820

190

3 01

019

0

6001905 5101901 015190

1 0151905 510190

11 5

00

190

3 01

019

02

820

190

3 01

019

01

810

90

15 200

600 190 3 640 70 6 200 70 3 640 190 600

Kitchen

VerandahVerandah

Dining

Garage

Laundry

Storage 1.8m3.

Storage .9m3.Storage .9m3.

Storage 1.8m3.

Linen Linen

WC

Garage

Laundry

WC

Dining

Kitchen

Unit 7FFL: 8.3

Unit 8FFL: 8.3

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-11

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

7 &

8

GR

OU

ND

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 22: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

D/W

REF.

REF.

18/12 oxxo

18/1

2 ox

xo82

0 F

2127

RA

D21

27 R

AD

F 8

2018

/12

oxxo

820

720

820

1800 Linen

21/1

8 S

GD

xo

21/1

5 S

GD

ox

21/1

5 S

GD

xo

21/1

8 S

GD

ox

820

720

820

1800 Linen

18/12 oxxo

UPUP

UPUP

1

400

1 20

080

01

400

400

2 70

040

02

700

400

1 40

080

01

200

13 000 600

2 400 10 600 600

2 400 190 10 220 190 600

2 400 190 2 200 70 900 701 500 70 6 010 190

90 2 310 190 2 200 70 1 000 2 750 4 800 190

3 80

06

600

3 80

0

13 600

2 400 10 600 600

902

243

902

243

902

249

190

2 24

8.7

902

243

902

243

90

703

015

190

3 01

570

3 73

019

0

190

3 73

070

900

7097

570

1 00

019

01

000

7097

570

900

703

730

190

2 400 190 2 200 70 900 701 500 70 6 010 190

90 2 310 190 2 200 70 1 000 2 750 4 800 190

14 2

00

190

3 61

019

03

015

190

3 01

519

0

2 400 190 10 220 190 600

190

4 27

070

450

701

955

190

1 95

570

450

704

270

190

Dining

Verandah

Laundry

Laundry

WC

Verandah

Storage 3.6m3.

Storage 2.5m3.

Storage 3.6m3.

Storage 2.5m3.

Dining

Kitchen

Lounge

Garage

Garage

WC

Kitchen

Lounge

Unit 9FFL: 8.2

Unit 10FFL: 8.2

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-12

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

9 &

10

GR

OU

ND

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 23: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

DN

2/420

12/18xo 09/06xo 09/06xo 09/06xo 09/06xo 12/18xo

720

CS

D

2/420

12/1

8ox

06/1

8xo

12/18ox12/18xo

12/12 xo

820

820

820

8202100 Robe

2100 Robe

2100 Robe

2100 Robe

820 8201800 Robe 1800 Robe

720

CS

D

720 720

12/12 xo

06/1

8xo

06/1

8xo

13 000.1

70 3 265.1 70 930 70 2 005 190 2 005 70 930 70 3 255 70

70 2 265.1 70 930 70 930 70 935 701 000

190

1 000 70 935 70 930 70 930 70 2 255 70

10 0

40.3

703

360.

370

4 20

070

2 20

070

702

830.

353

070

530

703

600

702

270

701

720.

370

1 94

070

2 43

070

530

703

000

70

701

720.

370

3 25

01

190

703

600

70

13 000.1

3 335.1 6 340 3 325

70 3 265.1 70 2 005 70 930 190 930 70 2 005 70 3 255 70

70 3 265.1 70 3 005 190 3 005 70 3 255 70

Bedroom 1

Bedroom 2

Bedroom 3 Bedroom 3

Bedroom 1

Bedroom 2

StudyStudy

Bath WCBathWC

Linen Linen

LIVING AREA

Bath

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-13

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

1 &

2

FIR

ST

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 24: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

DN

RE

F.R

EF

.

820

21/1

8 S

GD

ox

21/1

8 S

GD

ox

720

CS

D82

0

720

2400 Robe

2/72

0

2/42

0

820

720

CS

D82

0

720

2400 Robe

620

2/72

0

09/12 xo

12/06 L12/06 L09/06 ox

2/42

0

620

21/1

8 S

GD

ox

21/1

8 S

GD

ox

09/12 xo

09/06 ox12/06 L12/06 L

Clothes lineClothes line

2 8004 4103 6904 6002 800

10 8

06

6 90

03

906

703

000

7053

070

3 25

070

750

702

850

70

703

600

706

990

70

702

600

7093

070

3 38

070

1 60

019

01 8

26

1901 800 70 3 470 70 2 800

190 53070

1 20070

930 70 2 470 70 2 800

1 500 190 5 340 70 2 800

1 000 190 4 220 190

190 930 70 3 620 70 530 190

Dining

Balcony

Patio

BedroomBath

Kitchen

LivingLiving

Kitchen

BedroomBath

Patio

Storage 1.4m3.

Storage 1m3.Storage 1m3.

Storage 1.4m3.

Line

n

Line

n

Open timber stairs.

18.8m2 - POS.18.8m2 - POS.

Unit 6 Unit 4

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-14

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

4 &

6

FIR

ST

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 25: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

DNDN

12/18 ox

2100

Rob

e

09/0

6 ox

09/0

6 ox

09/0

6 ox

09/0

6 ox

12/18 ox12/18 ox

12/18 xo

720

2100

Rob

e

720

820 720

820

2700

Lin

en

720

720 820

2700

Lin

en

820720

12 000

1 335 9 336 1 335

70 3 894 70 530190

530 70 3 900 70

70 4 494 190 4 500 70

0

9 60

61

000

7693

070

3 15

070

2 92

070

3 25

070

702

070.

670

1 00

070

2 20

0.4

1 72

970

930

702

250

70

9 60

61

000

703

250

702

920

703

150

7093

076

703

250

703

930

701

000

702

070

70

76 2 190 70 900 70530 70 2 005 190 2 005 70 53070 900 70 2 190 70

70 4 010 70 1 755190 1 755 70 4 010 70

10 6

00

709

460

701

006

704 765701 0001901 000704 76570

704 01070180

701 5051901 50570180

704 01070

10 6

00

1 00

070

3 15

070

1 42

570

1 42

570

3 25

070

WIR

Bedroom 1Bedroom 1

Study

Bedroom 2

Study

Bedroom 2

WIR

Storage 4.35m3.Storage 4.35m3.

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-15

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

7 &

8

FIR

ST

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 26: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

DNDN

DNDN

Scr

een

Scr

een

8202700 Linen

820

21/1

8 S

GD

ox

12/1

8 xo

12/1

8 ox

21/1

8 S

GD

xo

09/1

8 ox

09/0

6 xo

09/1

2 ox

09/1

2 xo

09/0

6 ox

09/1

8 xo

06/18 xo 06/09 xo 06/18 xo

8202700 Linen

8202400 Robe

720

720

1800

Rob

e

820

720

720

06/18 ox06/09 ox06/18 ox

2400 Robe

720

720

820

1800

Rob

e

720

720

0

12 190

70 3 730 70 2 790 70 3 800 70 1 490 100

70 2 730 70 930 70 2 790 70 3 800 70 1 490 100

70 2 320 70 5 310 70 3 290 70 990

70 2 320 70 4 71070

530 70 3 290 70

3 79

46

536

3 87

6

703

730

702

135

1 00

019

01 0

002

135

703

730

70

70 2 320 70 5 310 70 3 290 70 990

703

730

7093

070

2 13

519

02

135

7093

03

800

70

701

830

701

440

7032

0702

135

1 00

019

01 0

002

135

7631

470

3 34

076

70 2 320 70 4 71070

530 70 3 290 70

70 2 730 70 930 70 2 790 70 3 800 70 1 490100

14 2

00

703

130

7053

070

900

702

165

190

2 16

570

900

7053

070

3 13

070

14 2

00

703

724

703

141

190

3 14

170

3 72

470

12 190

70 3 730 70 2 790 70 3 800 70 1 490 100

Patio

Bedroom 3

Bedroom 1Bedroom 2

Ensuite

WIR

Bath

WC

Study

Study

Bedroom 3

Bedroom 1

Patio

Bedroom 2

WC

Bath

WIR

Ensuite

1:100 fall.

1:100 fall.

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-16

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

UN

ITS

9 &

10

FIR

ST

FL

OO

R P

LA

N

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 27: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

10.70

13.40

8.20

7.80

10.90

11.20

13.90

8.70

8.40

11.4010.90

13.60

8.40

8.00

11.10

10.80

13.50

8.30

7.90

11.00

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-17

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

A

1:100

EL

EV

AT

ION

PL

AN

WESTERN ELEVATION UNIT 7.

WESTERN ELEVATION UNIT 1.

Colour bond RAD.

Internal decks to comply with Hardies method 2 liquid membrane system.

200 series sponge render finish concrete masonry block wall.

Colourbond Custom orbwith anticon blanketunder.

Select colour bondfascia and gutter.

Aluminium framedsliding glassdoors.

200 series sponge render finish concrete masonry block wall.

Hardie plank with reflective foil.

Hardie plank with reflective foil.Hardie plank with reflective foil.

Masonry fire separating wallmin 60/60/60 to B.C.A. 3.7.1.

Masonry fire separating wallmin 60/60/60 to B.C.A. 3.7.1.

90 x 90 F14 hardwoodposts.

Colourbond Custom orbwith anticon blanketunder.

200 series sponge render finish concrete masonry block wall.

6mm Hardie flex with reflective foil.

WESTERN ELEVATION UNITS 3 & 4.

WESTERN ELEVATION UNITS 9 & 10.

Select front door.Aluminium framedsliding glasswindows.

90x90 F14 hardwood posts. Hardie plank with reflective foil.

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 28: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

10.80

13.50

8.30

7.90

11.00

10.90

13.60

8.40

8.00

11.10

10.70

13.40

8.20

7.80

10.90

11.20

13.90

8.70

8.40

11.40

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-18

11/09/2012

Rev:

1:100

A

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

EL

EV

AT

ION

PL

AN

EASTERN ELEVATION UNITS 9 & 10.

EASTERN ELEVATION UNITS 5 & 6.

Colourbond Custom orbwith anticon blanketunder.

200 series sponge render finish concrete masonry block wall.

Powder coat aluminiumhandrails to comply with BCA 3.9.2.

Aluminium framedsliding glasswindows.

200 series sponge render finish concrete masonry block wall.

6mm Hardie flex with reflective foil.

Hardie plank with reflective foil.

6mm Hardie flex with reflective foil.

Hardie plank with reflective foil.

200 series sponge render finish concrete masonry block wall.

90 x 90 F14 hardwoodposts.

EASTERN ELEVATION UNIT 8.

EASTERN ELEVATION UNIT 2.

Masonry fire separating wallmin 60/60/60 to B.C.A. 3.7.1.

Masonry fire separating wallmin 60/60/60 to B.C.A. 3.7.1.

90 x 90 F14 hardwoodposts.

Select colour bondfascia and gutter.

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 29: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

10.70

13.40

8.20

7.80

10.9010.80

13.50

8.30

7.90

11.00

10.90

13.60

8.40

8.00

11.10

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-19

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

1:100

A

EL

EV

AT

ION

PL

AN

NORTHERN ELEVATION UNIT 10.

NORTHERN ELEVATION UNITS 3, 4, 5 & 6.

NORTHERN ELEVATION UNITS 7 & 8.

Colourbond Custom orbwith anticon blanketunder.

200 series sponge render finish concrete masonry block wall.

Hardie plank with reflective foil.

Aluminium framedsliding glasswindows.

6mm Hardie flex with reflective foil.

90 x 90 F14 hardwoodposts.

Aluminium framedglass louverwindows.

Select colour bondfascia and gutter.

200 series sponge render finish concrete masonry block wall.

Colour bond RAD.

Colour bond RAD.

Powder coat aluminiumhandrails to comply with BCA 3.9.2.

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 30: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

11.20

13.90

8.70

8.40

11.4010.70

13.40

8.20

7.80

10.90

10.80

13.50

8.30

7.90

11.0011.20

13.90

8.70

8.40

11.40

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-20

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

1:100

A

EL

EV

AT

ION

PL

AN

NORTHERN ELEVATION UNITS 1 & 2.

SOUTHERN ELEVATION UNITS 7 & 8.

SOUTHERN ELEVATION UNIT 9.

SOUTHERN ELEVATION UNITS 1 & 2.

Colourbond Custom orbwith anticon blanketunder.

200 series sponge render finish concrete masonry block wall.

Hardie plank with reflective foil.

Colour bond RAD.

200 series sponge render finish concrete masonry block wall.

200 series sponge render finish concrete masonry block wall.90 x 90 F14 hardwood

posts.90 x 90 F14 hardwoodposts.

Hardie plank with reflective foil.

6mm Hardie flex with reflective foil.Hardie plank with reflective foil.

Colourbond Custom orbwith anticon blanketunder.

Colourbond Custom orbwith anticon blanketunder.

Select colour bondfascia and gutter.

Aluminium framedsliding glasswindows.

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 31: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Des

ignD

M&

Dra

ftin

g

10.90

13.60

8.40

8.00

11.10

SHEET:

SCALE:

Hart Design Developments.

DRAWINGS PROVIDED BY:

DESCRIPTION

25 Badila Crt.

Mackay, Queensland, 4740.

07 4942 6006 -

DATE:

BY

DATE

NO.

PROJECT DESCRIPTION:

SHEET TITLE:

Lo

t 16

Bea

con

sfie

ld R

oad

A-21

11/09/2012

Rev:

Sheet Size

A3

1812

PROPOSED

UNITS FOR:

DRAWING NUMBER:

1:100

A

EL

EV

AT

ION

PL

AN

SOUTHERN ELEVATION UNITS 3, 4, 5 & 6.

200 series sponge render finish concrete masonry block wall.

Select colour bondfascia and gutter.

Colourbond Custom orbwith anticon blanketunder.6mm Hardie flex with reflective foil. Powder coat aluminium

handrails to comply with BCA 3.9.2.

Aluminium framedsliding glasswindows.

This is a Mackay Regional Council Digitally Signed Document

kathryng
Amendment Required
kathryng
Manual DA & Date
Page 32: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

This is a Mackay Regional Council Digitally Signed Document

trinas
Text Box
SK02 - DA-2012-239
trinas
Oval
trinas
Line
trinas
Line
trinas
Callout
Line to be deleted
trinas
Callout
Existing sewer main to be removed.
trinas
Line
trinas
Rectangle
trinas
Callout
Concrete lined swale drain to be constructed in accordance with A3-870.
Page 33: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Decision Notice

Sustainable Planning Act

Sustainable Planning Act Appeals Chapter 7 Part 1 Planning and Environment Court: Division 8 – Appeals to court relating to development applications 1) An applicant for a development application may appeal to the court against any of the following - (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c), or (d) must be started within 20 business days (the applicant’s appeal period) after- (a) if a decision notice or negotiated decision notice is given-the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise-the day a decision notice was required to be given to the applicant. 462 Appeals by submitters - General (1) A submitter for a development application may appeal to the court only against- (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327 (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following- (a) the giving of a development approval; (b) any provision of the approval including- (i) a condition of, or lack of condition for, the approval; or (ii)the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter- (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii) (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter. 463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to- (a) if the prescribed concurrence agency is the chief executive (fisheries)-development that is- (i)a material change of use of premises for aquaculture; or (ii)operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment- (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2) 464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about- (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.

This is a Mackay Regional Council Digitally Signed Document

Page 34: 21 November 2012 2/1 Tolcher St MOUNT PLEASANT QLD 4740 · 1812 A-7 A D&M Building Co. 11/09/2012 1812 A-9 A D&M Building Co. 11/09/2012 1812 A-10 A D&M Building Co. 11/09/2012

Decision Notice

Sustainable Planning Act

NOTICE OF INTENTION TO COMMENCE USE

Planning Approval DA-2012-239

Date of Approval 16-Nov-2012

Approved Material Change of Use - Multiple Dwelling Units (10)

Location 46 Beaconsfield Road, BEACONSFIELD QLD 4740

Property Description

I am hereby notifying you of my intention to commence the approved use on ______________________________ (insert date). I have read the conditions of the above Decision Notice and believe that all the applicable conditions have been complied with. Applicant: Hart Design Developments Pty Ltd Address: 2/1 Tolcher St, MOUNT PLEASANT QLD 4740

_________________________________________ Signature of Applicant Date: ______________

This is a Mackay Regional Council Digitally Signed Document