8/9/2019 220917626 Silo Design Final for Mombasa is Niladri
1/18
3.3 CALCULATION OF STORED MATERIAL FROM STRUCTURAL POINT OF VIEW
(For proper working of high level probe a clearance of 2.00 m from top is required)
Volume above cone = !"
Volume of cone portion = 2#$"
Volume of filling concrete = !!
%eight of material = 2!$2& ' onsidering densit of material .$ from structural point of view
3.4 VERICAL LOAD CALCULATION FOR DESIGN OF FOUNDATION1.0 Dead Loads
%eight of *oof +lab including supporting ,eams = $".2- ' (2! e/tra considered for beams)
%eight of +ilo %all upto ,ottom of nverted one = !01-."$ '%eight of nverted one = "&!.1& '
%eight of Filling oncrete around nverted one = 1".$2 '
%eight of ntermediate Floors below the nverted one = "!.$0 ' (2 floors 20 kg3m2 has been considered)
%eight of +ilo %all upto 4round 5evel = 21!-.2# '
%eght of +ilo %all From 45 to 'op of Foundation = -".0# '
%eight of Foundation *aft (6et %eight) = 2$!.1& ' (circular raft considered)
%eight of Filling above Foundation upto 45 = -1.!! '
%eight of 4round Floor +lab = $2.$ ' (consider !0 thick slab)TOTAL DEAD LOAD = 11713.00 T
.0 Ma!e"#a$ Loads
7aterial above one = 2-$ '
7aterial in one portion = $2- '
7aterial in ,in below the nverted one = 22$ ' (consider -0 ' bin capacit)
5oad on 'op from bag Filter8 conveor etc. = 2! '
5oad from air +lide8 Fan8 +tair ase8 onveor8 ,ag Filter = ! '
9/ial 5oad in one = 0TOTAL MATERIAL LOAD = %%&% T
3.0 L#'e Loads
5ive 5oad on *oof +lab = 1$$." '
5ive on ntermediate Floors below nverted one = 1$.- '
TOTAL LIVE LOAD = &%(.00 T
3.% )ORI*ONTAL LOADS ON SILO STRUCTURE1.0 W#+d Loads (as per +: &"! ;art 1 < #&")
i) ,asic wind speed = $".00
ii) ;robabilit Factor = .00
iii) 'errain height +truct. +i>e factor = 0.#& (?pto 0.0 7)
iv) 'errain height +truct. +i>e factor = .02 (0.0 7 to !.0 7)
v) 'errain height +truct. +i>e factor = .0! (!.0 7 to 20.0 7)
vi) 'errain height +truct. +i>e factor = .0 (20.0 7 to 10.0 7)
vii) 'errain height +truct. +i>e factor = .! (10.0 7 to !0.0 7)
viii) 'errain height +truct. +i>e factor = .22 (!0.0 7 and above)
i/) 'opograph Factor = .00
/) @esign wind speed = $-.0- (?pto 0.0 7)
/i) @esign wind speed = $".#$ (0.0 7 to !.0 7)
/ii) @esign wind speed = $#.1! (!.0 7 to 20.0 7)
/iii) @esign wind speed = !."0 (20.0 7 to 10.0 7)
/iv) @esign wind speed = !$.0! (10.0 7 to !0.0 7)
/v) @esign wind speed = !".1$ (!0.0 7 and above)
a. %ind load upto 0.0 7 from 45. = 0.2" = 2.11 '37 (on +ilo width)
b. %ind load from 0.0 7 to !.0 7. = 0.1& = 2.1 '37 (on +ilo width)
c. %ind load from !.0 7 to 20.0 7. = 0.$- = 2.$$# '37 (on +ilo width)
d. %ind load from 20.0 7 to 10.0 7 = 0.-0 = 2.-&& '37 (on +ilo width)
e. %ind load from 10.0 7 to !0.0 7 = 0."! = 2.#1& '37 (on +ilo width)
f. %ind load from !0.07 and above = 0.#" = 1.10- '37 (on +ilo width)
S,ea" -T Mo/e+! -TM
%ind 5oad between &1.!0 7 and !0.00 7 = 0."-0-$ ' at !0.00 7 0."- &!!.2$
2 %ind 5oad between !0.00 7 and 10.00 7 = !&."!! ' at 10.00 7 -#.!- $-!&.00-
1 %ind 5oad between 10.00 7 and 20.00 7 = 2-.&"# ' at 20.00 7 #-.1#$ -$&".!!&
$ %ind 5oad between 20.00 7 and ".!- 7 = !.#"- ' at ".!- 7 202.1"0 -#"$.0!
! %ind 5oad between ".!- 7 and !.00 7 = -.&& ' at !.00 720#.2!
"!00.#2-
! %ind 5oad between !.00 7 and 0.00 7 = .!!- ' at 0.00 7 220.&0" &!"-.0"0
- %ind 5oad between 0.00 7 and 0.00 7 = 2.11$ ' at 0.00 7 2$2.$ 0.&0"
" %ind 5oad between 0.00 7 and
-
8/9/2019 220917626 Silo Design Final for Mombasa is Niladri
2/18
Mo/e+! ao! "a2! !o6 = 11011.77 TM
Mo/e+! ao! I+'!. Co+e o!. = &(74.0%1 TM
-
8/9/2019 220917626 Silo Design Final for Mombasa is Niladri
3/18
.0 Se#a/# Loads (as per +: ;art < 2002)
a F+da/e+!a$ Na!"a$ Pe"#od o2 V#"a!#o+ =0.0# / h h = Aeight of the building8 in 7
sqrt (d) d = ,ase dimension of the building at
= .-$&-12 s plinth level8 in 7
T86e o2 So#$. = Aard
i) ,asic Aori>ontal +eismic coefficient = 0.0- 'B;C DF +D5
ii) mportance Factor
= 1.7% Hard Medium Soft
iii) *esponse *eduction Factor R = 3.00 0.609 0.828 1.017
iv) @esign Aori>ontal +eismic coefficient = 0.02&$21
I!e/ )!. 2"o/ Mass Mo/e+! ao! Mo/e+! ao! Mo/e+! ao!
"a2! o!!o/ "a2! !o6 I+'!. Co+e o!
'op +lab &-.#1 1$$.-2 2-01#2$ 2$.-0! 21&."!# 20-$.#$! -20.!&!
'op +hell !$.01 !"$." !0$1-2 $2."22 "".202 "2&1.01- $"0!.$"!
,ot +hell 2.01 2$21.1# 1!0"! 1.1$ 1#.&-" 2#.#2!
nv. one 2-.&1 "#0.1& !-#0#2 !.1"" $$.2#1 2&.-
Cquip. Floor 2.01 $2-.-& -"$# 0.!&1 ".0# !.2-#
-2.- --1.-2 -!1$#1- -!.$-$ 1&!1-.#"& 1--#0.!&- 2!!"!.10$
12.- 121#.0 1$$1"#- 12.!$ 0-.0$2 #-1.$20 1"!."1-
TOTAL (011.(4 7&%74 4(&3(.1%( 471&%.340 377.100
#' Des#9+ :ase S,ea" = 4.&0&& T
3.& NET :EARING PRESSURE ON FOUNDATION
9ssumed dimension of *aft Foundation ircular of diameter = 1$ 7 'hickness = 1.00 7
9rea = #!".-"
9llowable ,earing ;ressure = $0
1.0 DL ; LL ; ML5oad = 1"121.! '
,earing ;ressure = 1&.#"1&" Oe of beam = !"" / 2000 mm
-!.&-"!12"!$
'ensile +teel='03.21 2&1$2.0-"
'his force will be resisted b hoop steel in ring beam and in part of wall adOacent to ring beam (effective height 27)
2!0$.#1!
*einf in *ing ,eaml :< 0
-
8/9/2019 220917626 Silo Design Final for Mombasa is Niladri
12/18
-
8/9/2019 220917626 Silo Design Final for Mombasa is Niladri
13/18
-
8/9/2019 220917626 Silo Design Final for Mombasa is Niladri
14/18
der compression