24 january 2014 larp vtf follow-up meeting p. kovach vtf 1 larp vertical test facility vertical...

18
24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach January 24, 2013

Upload: chester-green

Post on 01-Jan-2016

216 views

Category:

Documents


3 download

TRANSCRIPT

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 1

LARP Vertical Test Facility

Vertical Dewar Design,Magnet Prep And Installation

Paul KovachJanuary 24, 2013

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 2

Outline

• Design details• Assembly sequence

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 3

Design Details

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 4

Overall System Configuration

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 5

Self contained heat exchanger - copper pipe in yoke hole - connected directly to Nash pump

Vertical Dewar = 24KA vapor cooled leads, 1.9K, 1 atm vessel, 4.5K LHe “thermal shield”, insulating vacuum, instrumentation, etc.

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 6

Top of lambda plate to bottom of dewar top hat = 40 in. (min. LHe distance ~ 28 in.)

1.9K

exh

aust

(to

Nas

h)

300K

4K li

quid

- ga

s

Inner / outer Insulating vacuum

4K heat shield (existing dewar)

Vertical Dewar Details

G-10 – SST Lambda plate

Bolted – metal seal1.9K-4.5K relief

G-10 hanging support

300K

1.9K

vacuum4.5K

vacuum

vacuum4.5Kvacuum

Bottom detail

4.5K-1.9K “J-T” pre-cool heat exchanger

1.9K heat exchanger pipe

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 7

1.9k Heat Exchanger Details

1.9K

exh

aust

(Nas

h va

cuum

)

1.9K reservoir

helium pre-cool heat exchanger (from 1.9K exhaust)

Level Probe4.5k He Supply

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 8

Assembly Sequence

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 9

Cold Mass Ready For Up-Righting

Top Hat/ Lambda Plug Prep Fixture

Lifting Details

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 10

Lower Up-Righted Cold Mass into Wiring Stand

Attaching Top Hat/ Lambda Plug Assembly

Remove Lifting Ring

Install In Wiring Stand

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 11

Lower Magnet To Final Position In Wiring Stand

• Solder main leads

• Connect Hypertronics, etc.

Lower Cold Mass Assembly Onto Wiring Stand

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 12

Existing Vertical Dewar

New Vacuum Jacketed 1.9K Vessel

Install 1.9K Vessel Into Vertical Dewar On Temporary Support Rings

Install 1.9K vessel Into Vertical Dewar (1 time only)

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 13

Bolt Lambda Plug to 1.9K Vessel• Connect

vacuum line• Connect He fill

line• Install heat

exchanger, outer warm bore

Remove Temporary Support Ring And Lower cold mass, 1.9K Vessel Into DewarInstall inner warm bore

Lower Magnet Into 1.9K Vessel

Install cold mass into dewar

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 14

Extra slides

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 15

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 16

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 17

24 January 2014 LARP VTF Follow-up Meeting • P. Kovach VTF 18

Background Info

• Crane capacity: double hooks, 30T and 5T• Hook heights: 303 IN., 30t; 324 IN. APPROX, 5T• “dewar 3” = 6.1 m deep, sits 0.9 m above floor,

is 710 mm inner diameter• Plan assumes 4785 mm overall cold mass length