Managing Change at AsureQuality Using
Configuration Packages
2
What we do
• State owned enterprise, with 1700 staff over 60 locations
• Testing we do:• Microbiology & Pathogens• Residual & Pesticides• Food contaminants & General chemistry
• The AsureQuality labs process on average 700,000 samples and 1.9 million tests per year
3
LabWare in AsureQuality
• Contract Lab Template V6• First to implement WebLims in Australasia• Multi‐site, geographically dispersed• Some numbers:
– 3000 + analyses– 2000+ contracts– 1000 + customers– 1000 + subroutines
4
Project Stage
• February 2012 ‐ Started system configuration• January 2013 ‐ Started User Acceptance testing and data validation
• March 2014 – First customer group went live (Wellington MPI)
• Now – Final roll out – Already operating in Auckland as well as Wellington with selected customer groups
5
Why do we manage change
• To understand impact of the changes to the business before it happens
• Minimize the risks• Enable beneficial changes to be made on a regular basis• Maintain validation status
– ISO 17025– GMP
6
Process outline
Issue raised Investigation Fix Regression TestingQA TestingDev Testing Pass ProductionPass
Fail
Fail
Fail
Pass
7
Process outline ‐ continued
Issue raised Investigation Fix Regression TestingQA TestingDev Testing Pass ProductionPass
Fail
Fail
Fail
Pass
LW issue log
Change Manager and configuration packages
Change Manager and configuration packages
8
A problem
• Problem: When a contract has a large number (>100) contract items, charge manager becomes significantly slower when adding more.
Fill an Issue form
9
Process to log an issue
• Fill the “Log Issue” tab based on the information from issue form
10
How an issue is assigned
• Use Search Dialog to find the issue• Drill down to the issue and use “Manage Issue” tab to adjust the properties, add notes and assign to a technician
11
Solution & Review Comment
• “Solution & Review Comment” is used to record the issue resolution progress
12
Incident & Issue Management Dashboard
• The issue will show up on the dashboard of assigned technician
13
What can we do?
• We cannot reduce the number of contract items because of business requirements
• However, using a combination of user grid and object group manager can greatly improve the user experiences
14
Using Changes Manager
• Create a Configuration Package• Use Changes Manager to find all changes
15
Adding objects into package
• Adding all necessary objects into the package and export it using change manager
16
Package installation
• Install package in target environment
17
User testing in QA system
• User testing using test script
18
Migrating to production
• Once the test script is passed, the package is ready to be migrated to production at next available scheduled update event
• Run regression testing
• Same installation process as in QA
19
Advantages of Configuration Packages and Changes Manager
• Clear ownership of issues• Traceability
– Attached supporting documents– Investigation process in the notes of the issue
• Find similar issues• Know how many issues are outstanding• Make it easier to manage a large amount of changes
– We migrate roughly 20 packages in one event every fortnight
20
Enhancement ideas
• Using Changes Manager and Configuration Packages to apply database changes (adding fields, tables etc…)
• Menu and toolbar changes currently fail to be migrated using Configuration Packages.
• Package report could use some tweaks
21
Summary
• Introduction• AQ LabWare project• AQ change management process• How we log, investigate and resolve an issue• How we test and migrate configuration packages using Changes Manager
• Advantages and enhancement ideas
22
Thank You
• Questions?