25-oct-14

17
Jun 18, 2022 S.Movchan Straw manufacturing and QC 1 na straws and assembly site status (28/09/2012) Dubna straws - stored - manufactured Assembly site: - module vacuum test results - straw installation tooling test - straw position scanner status Plans Presented by S.Mo

Upload: zia-larson

Post on 04-Jan-2016

36 views

Category:

Documents


0 download

DESCRIPTION

Dubna straws and assembly site status (28/09/2012) Dubna straws - stored - manufactured Assembly site: - module vacuum test results - straw installation tooling test - straw position scanner status Plans Presented by S.Movchan. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 1

Dubna straws and assembly site status (28/09/2012)

• Dubna straws- stored - manufactured

• Assembly site: - module vacuum test results

- straw installation tooling test - straw position scanner status• Plans

Presented by S.Movchan

Page 2: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 2

Dubna straws

Last straw serial number - #2784

For Dubna Module: 418 straws – stored 653 straws – manufacturedTotal: 1071 straws

For CERN Module: 506 straws will be delivered to CERN - end of October

Page 3: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 3

Module vacuum testat Dubna

Page 4: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 4

Set up for Module vacuum test

Pumps

Table gas leak is about 0.1 mbar/10h(V~0.8 m3, T=23 degree)

Leak L = 170 mbar*cm3/min

Table

He leak detector

Sensors r/o

Page 5: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 5

Module deformations control

6 micrometers:4 –> on side + 2 –> on top

Common view

Elastic deformations are about (60+/-20) μm

Page 6: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 6

Leak

dP=0.7 mbar dT=2964 minV=2200000 cm3

dP/dt=2.36*10-4 mbar/min

Leak ~ 520 mbar*cm3/min (video film is available)

Page 7: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 7

Dubna assembly site

Page 8: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 8

Module installed – 27 September 2012

Page 9: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 9

Straw assembly tooling

Page 10: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 10

Straw installation test

Ok!

Page 11: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 11

Straw position scanner

Page 12: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 12

Set up (based on INFN equipment)

in progress …

laser

Page 13: 25-Oct-14

Apr 20, 2023 13

3 laser positions

Top

Middle

Bottom

Bar for laser

INFN bar with optic ruler

Page 14: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 14

Main components

Step motor

laser

Horizontal bar(X-coordinate)

Ver

tical

bar

(Y-c

oord

inat

e)

Movable table

Page 15: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 15

October 2012 Installation and tuning of straw supports - 1 week Tooling for straw gluing check Laser scanner preparation

Technology verification: Step 1 (without gluing): - 1 week - installation of 14 straws (will be used 1/2 set of tooling)

- measurement position of 14 straws by laser scanner Step 2: - 1 week - gluing of 14 straws - measurement position of 14 straws

November 2012 - 4 weeksStart straw mass-gluing

December 2012 - 4 weeksContinue straw gluing

Plans

Page 16: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 16

Conclusion

Straws:Straw manufacture rate – 100 straws per week

Dubna Module: stored - 418 straws manufactured - 653 straws

Delivery 506 straws to CERN – end of October 2012

Dubna assembly site:Module vacuum test: leak L ~ 500 mbar*cm3/min

Technology verification - October 2012

Start straw mass-gluing – November 2012

Page 17: 25-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 17