27/10/2008 - JW Farthing 1
Barcelona, 27th, 28th October 2008
Jonathan [email protected]
CODAS & IT Department, UKAEA Culham
Questions and Answers Session
F4E Colloquium on ITER-CODAC Plant Control Design
Handbook (PCDH) and EU Procurement of Control and
Instrumentation for ITER
27/10/2008 - JW Farthing 2
F4E PCDH Remote Review 2008
• PCDH V3 was distributed with the details of this meeting–Asking for comments / questions about PCDH and more general ITER-CODAC and I&C
–Detailed responses will be published and passed on to ITER-IO
• Layout of the document to improve clarity• Safety Systems• Human Factors• Suggestions about inclusion of other standards
• Some general comments and questions follow–To promote discussion now and in the parallel sessions
27/10/2008 - JW Farthing 3
Questions - 1
•F4E–Do the centres of excellence proposed by ITER-IO make sense?
–What is the best way to do it?–Timescales to set up?
• ITER–How will they work?
•Parallel sessions?
27/10/2008 - JW Farthing 4
Questions – 2
PCDH• There are a large number of TBD’s in PCDH V3
–What are the plans for a more complete version?
• F4E–When does the first F4E plant system require the complete PCDH – contractually or technically?
–What can F4E do to help flesh out the TBD’s?
–Parallel sessions?
27/10/2008 - JW Farthing 5
Questions – 3
Standardisation
• PCDH V3. “Final choices between competing candidate technologies are still outstanding”
– When will the selection of technologies be complete?– The first plasma is planned for 2018. Is it a mistake to select
the technologies so early?– Will it be possible to integrate new technologies?– What will be the process by which ITER-IO checks the I&C in
the plant systems – for non-conformities?
– How different will physics diagnostics be from more industrial-like plant systems? How many “special cases” will there be?
– Parallel sessions?
27/10/2008 - JW Farthing 6
Questions - 4
For Industry• Do you agree with the strategy of the PCDH and
standardisation for Plant System I&C?– How many bids will there be for non-conformities against the
prescribed technologies?
• When it has been fleshed out will you be able to use the PCDH to build I&C for the plant systems?
• What is missing altogether?
• Parallel sessions?
27/10/2008 - JW Farthing 7
Questions - 5
Obsolescence Management
• “Considering the life cycle of the Project (35 years) and the life cycle of the I&C components a specific chapter should cover the strategy to adopt in case of obsolescence. Either by storage or by successive evolutions”
– IEC 62402– Should there be a separate chapter on obsolescence?– Do we over-emphasise this problem?
• Parallel sessions?
27/10/2008 - JW Farthing 8
Questions - 6
• Plant system self-description–Referred to throughout the PCDH
–Can it work? –Is it too ambitious?–Are there similar examples already adopted in industry or elsewhere?
–Parallel sessions?
27/10/2008 - JW Farthing 9
Questions – 7
ITER-CODAC
• What are the timescales for the procurement of the high-level ITER-CODAC systems?
– Is there a procurement plan?– When will the hardware selection take place?– Commercial or Open Source software?– Parallel sessions?
• Any comments about the Plant System Host and mini-CODAC or other parts of ITER-CODAC?
• Parallel sessions?
27/10/2008 - JW Farthing 10
Questions – 8
• CODAC, Interlocks, Safety– What will be the mix between these three tiers?– How will decisions be made for each plant system?– How will interlocks between plant systems delivered by
different DA’s be handled?
– Parallel sessions?
27/10/2008 - JW Farthing 11
Questions – 9
• The PCDH references several other documents– RD1: Project Requirements, RD2: Plant Description Document,
RD5: Electrical Design Handbook, RD9: ITER Quality Assurance Program, GD1: CODAC Conceptual Design Document etc
–How to get access to these documents?–Does F4E need to make them available to all EU interested parties or will ITER give ~public access?