2exceed 2emap process mapping web tool copyright © 2012 2exceed m arch 2013 – initial test...
TRANSCRIPT
2Exce
ed
2eMAPProcess Mapping Web tool
Copyright © 2012 2ExceedMARCH 2013 – INITIAL TEST VERSION
A quick guide for getting started
2eMAP is a supporting tool for a team jointly mapping a business process
Current state: Brown paper Future state: 2eMAP
The team gathers on the same location
The team may participate from their desks around the world
Moving post-it labels around the brown paper takes up a lot of time
New tasks are easily inserted by all participants during the process, and measures are instantly recalculated
After the session the time consuming documentation is expensive
Press print or e-mail the result
Copyright © 2012 2Exceed
Easy login and access control
Access via: http://note.mediaxplore.dk/2eMAP/ (best suited browsers are Explorer and Google Crome – 100% zoom level)
Push <<Login>> Login as Project manager or User
Copyright © 2012 2Exceed
The Project Manager (PM) owns the project, invites workshop participants, and control the mapping process. Participant can only access those projects that they are assigned to
1
2 3
First, you enter the cockpit of 2eMAP
Copyright © 2012 2Exceed
Projects: PM project portfolio overview – for users, it is only the project relating to the pass code
Overview: The process mapping area
New: Entry of new posts (process tasks)
Measure: Calculate measures across a project (various options)
Log in/Log out
The PM chooses and defines projects within the ‘projects’ screen
1b Select a project by marking the activate boxand press, ´Edit´, and then press ‘Update’ - now you are ready to utilise the menu bar in top of your screen. You can also ´Copy´ a project, to use same framework or as template for standardwork.
1a Enter a new project, or…
1 2 34
12
Copyright © 2012 2Exceed
3
Project manager considerations before starting the mapping session
• Which kind of workshop is it: planning, flow mapping, brainstorm ?
• Invite participants by sending them an e-mail with 1. Web-link: http://note.mediaxplore.dk/2eMAP/2. Project name 3. Project pass code as project user (right site of view)
• Prepare instructing the team regarding the use of posts – i.e. choice of colours, levels of detail in posts including use of measures and description
Copyright © 2012 2Exceed
Overview – example of process mapping
Optional features:
Different colours
Different strings (horizontally)
Post headline
Grid position coordinates of the post
Use of symbols
Copyright © 2012 2Exceed
The sequence of
posts comprise the
mapped process
Process for working with posts in the overview
Copyright © 2012 2Exceed
All users can add, edit or delete posts in ‘unconfirmed posts’ during the workshop• double clicking and choose copy, edit
or delete within 5 sec
Only the PM can drag-and-drop into the overview area - Note! The new post will be placed next to the last placed post – on the lowest horisontal placed post and from here drag it to right position• by default it is placed in the underlying grid next
to the most recently placed post• Replace one post with another – place it on top
All users can open a post to see details by a double click (doesn’t affect other users) – and more posts can be edited by PM at the same time in same view – drag them around by left upper corner
Only the PM can relocate posts in the overview screen (posts are being attached to an underlying grid) Drag in more posts at the same time– mark them by Crl left click
All screens are updated every 5 sec. and manually by pressing the F5 bottom
!1
2
3 4
Making a post
• Make a post by pressing ‘new’ in the cockpit screen
• Define the name of the post (task) which will be the headline of the post within the overview screen
• Other fields are optional and support your way of mapping
• ‘Description’ is a free text area; we encourage to include time of start and completion
• All fields below ‘description’ are measures that are computed across the project (except for ‘initials’)
• ‘Initials’ names the person or function responsible for the task
• Volume (e.g. number of failure etc.)• Push ”insert post” to upload data and
place it in unconfirmed posts
Copyright © 2012 2Exceed
Editing a post
• Adjust the post in edit screen similar to making a new post
• Double click a post within ‘unconfirmed posts’ or ‘overview’
1
2
3
4• Subsequently choosing ‘edit’ within 5 sec.
• Press ‘update’ and confirm to upload data and place the post in ‘unconfirmed posts’
Copyright © 2012 2Exceed
Measurements – by choice
Calculating the measures
of each post across the activated project
Copyright © 2012 2Exceed
• Press ‘measure’ in the cockpit screen to
enter the module
• Choose the string (row or column)/color,
you want to measure
• Press ‘show’ to calculate and present
• E.g. show current and future state total
operation time depending on the PM’s
choice when defining the posts
1
2
3
See underlying calculations next slide
Underlying Calculations
Total flow time = Sum of all (flow time)Total operation time = Sum of all (operation time)Yield operation time = Sum of all (operation times) - Sum of all (operation time * Operation waste percentage)Waste operation time = Sum of all (operation time * Operation waste percentage)Yield cost = Sum of all (Cost) - Sum of all (Cost * Cost waste percentage)Waste cost = Sum of all (Cost * Cost waste percentage)Total volume = Sum of all volume
Expand view to Full screen by pressing icon and press F11 to have a total screen
view. Press F11 again, left arrow in browser, if you want to go back to normal overview.
Overview – other functionalities
Copyright © 2012 2Exceed
Logout
Insert row or column make post active by Crl Left click
Print (output options)
Overview/Detail to PDF file
Overview/Detail to Excel file
Overview/Detail to Visio file
Bottom of Full screen view
New post
Reduce screen view
Help (how to manage 2eMAP)
See links to Manual or video
Zoom in and out(set your browser to 100% )