2.school presentation

30
A΄ TECHNICAL SCHOOL NICOSIA - CYPRUS School year 2010-2011 “One Europe under seven heavens” Comenius Program

Upload: andri-christodoulou

Post on 23-Jun-2015

127 views

Category:

Education


0 download

DESCRIPTION

A' Technical School of Nicosia, Cyprus

TRANSCRIPT

Page 1: 2.school presentation

A΄ TECHNICAL SCHOOL NICOSIA - CYPRUS

School year 2010-2011

“One Europe under seven heavens”

Comenius Program

Page 2: 2.school presentation

A΄ TECHNICAL SCHOOL of NICOSIA

Page 3: 2.school presentation

Hephaestus the school's emblem

This 5m high statue was constructed by teachers and students out of waste metal pieces from the welding workshops.

Page 4: 2.school presentation

Mr. Evagoras AristotelousAutomobile Engineer

Headmaster of A' Technical School

Page 5: 2.school presentation

The School’s Administration

Page 6: 2.school presentation

1955-56: the first year

The A΄Technical School is located at the best area of Nicosia, opposite the Hilton hotel.It was built by the British Colonial Government at 1955-56. At the first year of operation the school had 385 students and offered 4 directions of studies:• Electrical • Mechanical • Automobile • Welding technicians

Page 7: 2.school presentation

1974-1977: the difficult years

After the Turkish invasion in 1974, many persons were displaced from the northern to the southern part of the island.As a result, during 1976-1977, the number of students was increased to the maximum of 2421.The school operated during morning, afternoon and evening hours.

Page 8: 2.school presentation

the years after

The number of students started decreasing, after the year 1977, due to the fact that more schools were built.Although more directions were offered like electrical, mechanical, civil, automobile, carpentry, plumbing, jewelry and fine arts, the number of our students continued to decrease.

Page 9: 2.school presentation

the school today

404 students (17 girls and 387 boys) follow the morning sessions during the school year 2010-2011 .

360 students follow evening sessions in different subjects.

Page 10: 2.school presentation
Page 11: 2.school presentation

In 1960, 1963, 1967, 1968 and 1969 more teaching rooms and workshops were added to the existing ones and finally the school was completed in 1971.

In the year 2006-2008 the government invested a lot of money to improve the antiseismic capability of the building.

Page 12: 2.school presentation

School Activities

Page 13: 2.school presentation

Blood donation

Page 14: 2.school presentation

Footsal

Page 15: 2.school presentation

Bicomunal meeting

Together we build

a better world

Page 16: 2.school presentation

The popular Radio DJ broadcasted live from our school on a feast against

discrimination

Together we build a better world

Page 17: 2.school presentation

Learning draughting with Autocad

Page 18: 2.school presentation

Antismoking campaign

Page 19: 2.school presentation

Graffiti and posters

Page 20: 2.school presentation

Theatre group

Page 21: 2.school presentation

Dancing group

Page 22: 2.school presentation

Charity Bazaar

Page 23: 2.school presentation

Civil engineering workshop

Page 24: 2.school presentation

Land surveying

Page 25: 2.school presentation

Building the eco house.

Page 26: 2.school presentation

Future plumbers

Page 27: 2.school presentation

Car mechanics

Page 28: 2.school presentation

Electricians at work…

Page 29: 2.school presentation

Breaktime at 9:10 am

Page 30: 2.school presentation

Leaving the school ….