3. Hyper Container Crane Elevation platform 1 8 No. 2 Trolley No. 1 Trolley 1. Productivity 40% increase. (More than 60 boxes/H) 2. The container is transferred via the elevation platform between two trolleys. 3. The height of platform is automatically selected to equalize the cycle time of two trolleys.

Upload: jody-fleming

Post on 18-Dec-2015

218 views

Category:

Documents


2 download

TRANSCRIPT

3. Hyper Container Crane

Elevation platform

18

No. 2 TrolleyNo. 1 Trolley 1. Productivity

40% increase.

(More than 60 boxes/H)

2. The container is transferred via the elevation platform between two trolleys.

3. The height of platform is automatically selected to equalize the cycle time of two trolleys.

3. Hyper Container Crane

19

Without bay shifting, hatch cover operation Average of on-deck and hold operation in 1 bay

Operation productivity : 40 % UP (Theoretically)

Handling Capacity per hour Vessel Size

Hyper System Conventional System

(1 trolley) 17 rows 70.0 47.2

22 rows 65.3 45.2

3. Hyper Container Crane

20

Seismic Isolation Systemfor

Mitsubishi Quayside Crane

Seismic Isolation System