3 "must haves" for planning your bathroom renovation
DESCRIPTION
Planning your next bathroom renovation project? Here are 3 diagrams that will make the whole experience a lot easier for you and your budget. From screening contractors to design ideas to bringing your bathroom design to life . . . you'll find what you need to get started. Check out the original post at http://blog.smartdraw.com/planning-your-bathroom/.TRANSCRIPT
3 “Must Haves” for Planning Your Bathroom Renovation
The Bathroom Renovation Process
This presentation is inspired by the SmartDraw Blog post entitled, “3 ‘Must Haves’ for Planning Your Bathroom Renovation.” To learn more and see the before and after photos of the renovation go to http://blog.smartdraw.com/
BathroomRenovation Process
Screen ContractorsMust Have #1: GeneralContractor Handout
Decide on a Design &Contractor
Must Have #2: Bathroom DesignBrainstorm
Bring Life to the DesignMust Have #3: Items toAdd/Remodel Checklist
Enjoy NewBathroom
Plans for guest bath remodelItems: Remove everything but the Toto toiletWalls: Remove all tile, retexture and paint wallsVent: Replace vent with quieter light/vent comboElectrical: Relocate power outlet, add additional light fixture
Notes
OriginalGuest Bathroom
Floor Plan
11' 7
"
5' 0"
11' 7
"
5' 0"
6' 0
"
1' 5"
4' 2
"Must Have #1: General Contractor Handout
General Contractor Handout should include the following: Overview of remodel ideas and expectations
Dimensions of the current floor plan
Area to take notes and enter their own measurements
SmartDraw Tip: The symbol libraries in SmartDraw contain more than 5,000 professionally designed symbols, images and clip art. With that many symbols, you can create this diagram in minutes.
OriginalGuest Bathroom
Floor Plan
Option A:Custom Built
Vanity
RemodelDuration: 4-6 Wks
Option B:Single SinkPre-built
RemodelDuration: 1.5-2 Wks
Option C:Double Sink
Pre-built
RemodelDuration: 1.5-2 Wks
Guest Bathroom Remodel Options
6' 0
"
1' 9"
4' 4
"
1' 7"
5' 1
0"
1' 7"
11' 7
"
5' 0"
11' 7
"
5' 0"
6' 0
"
1' 5"
4' 2
"
4' 2
"
4' 2
"
4' 2
"
Must Have #2: Bathroom Design Brainstorm
Bathroom Design Brainstorm should include the following: Original floor plan
Each floor plan design
Duration required for each design
SmartDraw Tip: Use the Ctrl key + D key to duplicate an object. To create the diagram (above) simply duplicate the original floor plan as needed. Then use the Design Ribbon to align and space the floor plans evening.
# Item Purchase Location Price Delivery Date
1 bathtub
2 sink faucets
2 lighting
2 mirror
1 shower head
1 tub faucet & drain
1 toilet paper holder
1 towel ring
1 towel bar
1 ventilation
1 shower curtain rod
floor tile
bath surround tile
accent tile
Double SinkPre-built
RemodelDuration: 1.5-2 Wks
6' 0
"
1' 9"
11' 7
"
5' 1"
11' 7
"
5' 1"
2' 6
"
4' 8"
4' 2
"Must Have #3: Items to Add/Remodel Checklist
Items to Add/Remodel Checklist should include: Tracking information such as vendor, price, and delivery date
Floor plan including dimensions
List of items to add or remodel
SmartDraw Tip: Use Ctrl+C to copy the design from the Bathroom Design Brainstorm (on previous diagram). Then use Ctrl+V to paste it into the Items to Add/Remodel Checklist. You can add a Table or Form to any template in SmartDraw.
About RuthJoy Bitner, M.Ed. With a M.Ed. in Human Resource Development and Organizational Behavior, RuthJoy has become a trusted advisor and educator working with mid-market to global organizations providing change management and user adoption strategy services for more than 15 years. As the Director of Learning and Organizational Development of SmartDraw Software she continues to coach and mentor professionals from non-profits to Fortune 500 companies.
An unashamed perfectionist and absolute SmartDraw addict, she discovers innovative ways to use diagrams in her day-to-day activities to increase productivity and efficiency for herself as well as her clients.
Leave a comment and subscribe to http://blog.smartdraw.com/
Email [email protected]
800-768-3729 (toll-free) or 858-225-3300 Monday – Friday 6:00 am to 5:00 pm PST
Follow SmartDraw
Learn More About SmartDraw