3. sop for cleaning of clinker cooler discharge
TRANSCRIPT
-
8/12/2019 3. SOP for Cleaning of Clinker Cooler Discharge
1/3
DALMIA CEMENT (B) LIMITED CEMENT PLANTARIYALUR
PRODUCTION DEPARTMENT
Issue No. 01 Rev. No: 00 Effectve D!te: 01.11."010 #OP$PROD$01
Issue% B&: M.R A''ove% B&: OD (Po%ucto*)
#OP +OR CLEARIN, O+ COOLER DI#CAR,E
Scope : This SOP is applicable to Safe working for clearing the cooler discharge.
Responsibility : CCR executive.
Accountability : Section Head Pyro.
PPE:
1. Kevelar suit,
2. Safety helet,
!. Safety shoe,
". #ask.
$. %sbestos &loves.
Tools:
1. 'T pup
2. (reaker achine
!. )aer
". (o* Spanner set
$. +ing Spanner set
Hazards:
Risks associated Mitigating Measures
(urn inury -ear Kevelar suit /ire proof suit0
T!**- *ee%s:
1. /ire fighting2. ergency preparedness!. 'T pup operation". %ir blaster operation
Procedure:
1. Shut down the kiln operation.
2. 3 to be taken for cooler drive, 4P3 and clinker crusher.
!. Take &eneral and confined space work perit.
". 'se Proper PP 5 tools.
1/3
-
8/12/2019 3. SOP for Cleaning of Clinker Cooler Discharge
2/3
DALMIA CEMENT (B) LIMITED CEMENT PLANTARIYALUR
PRODUCTION DEPARTMENT
Issue No. 01 Rev. No: 00 Effectve D!te: 01.11."010 #OP$PROD$01
Issue% B&: M.R A''ove% B&: OD (Po%ucto*)
#OP +OR CLEARIN, O+ COOLER DI#CAR,E
$. 3ooler 64 fan to be operated with iniu suction.
7. %ir cannon to be switched off and the residual air to be vented out.
8. 6nlet valve to be isolated 5 cross check with pressure gauge.
9. Keep the vent valve in open condition for safer side.
:. ;o other persons should be peritted near the door area ! distance0.
1
-
8/12/2019 3. SOP for Cleaning of Clinker Cooler Discharge
3/3
DALMIA CEMENT (B) LIMITED CEMENT PLANTARIYALUR
PRODUCTION DEPARTMENT
Issue No. 01 Rev. No: 00 Effectve D!te: 01.11."010 #OP$PROD$01
Issue% B&: M.R A''ove% B&: OD (Po%ucto*)
#OP +OR CLEARIN, O+ COOLER DI#CAR,E
Job Safety Analysis Job: Clinkerdischarge jamcleaning
Date: 15 06 - 2012 Analysis by: !"!"athiresh k#mar!
$e%ie&ed by:'!Chandrasekaran!
(itle o) em*loyee doingjob: Attendant
+#*er%isor: +ection,ngineer
De*artment: rocess +ection: $. A**ro%ed by:"!/inayagam#rthi
$edrecommended ,: "e%elar s#it3 +a)ety helmet3 +a)ety shoe3 'ask 4 Asbestos lo%es!
Sequence of Basic JobSteps
Potential HazardsRecommended Safe
Job ProcedureWhat Could Go
WronCorrecti!e Action
#t on ,
.*en the ins*ection door
Check the s#ction at theins*ection door
+&itch .n the ( *#m*
$emo%ing o) the bo#lders
,7*os#re to clinker d#eto body not )#lly co%ered
8#rn inj#ry
8#rn3 8ody 9nj#ry
ater hose hit to the*erson
;ot material bo#ncing
se "e%elar s#it!
9ns*ection o) s#it &ith
checklistClose the Air line inlet %al%eto the canon!
,m*ty air canon andens#re that it is em*tied byo*ening the %ent line or )romthe *ress#re ga#ge
m distance?!
.*en the door a)ter theabo%e slo&ly!
'aintain the negati%e
*ress#re in the ins*ectiondoor area by $#nning thecooler %ent )an #ntil the jobis )inished!
Con)irm the s#ction &ithmanometer or hood dra)tindication )rom CC$
Check the tightness o) thehose joints by checklists3eriodic hose maintenanceand re*lacement!
se "e%elar s#it =@ire *roo)s#it?
Damaged s#it
;ot clinker s*ill o#t&hile o*eration o) theair canon
9nlet air line is leakingor )ailed
Cooler %ent )an maytri* and hot gasesmay *#)) o))!
ater hose *i*e gotb#rst
Clinker *iece canbo#nce and hit the*erson o%er the"e%elar s#it!
eriodic re*lacement!
Dont o*en theins*ection door #ntil aircanon is em*tied!
"ee* the %ent %al%eo*en
+to* the last )o#rcooler )ans )ors#))icient s#ction incooler
+&itch o)) the ( #m*4 $e*lace the ;ose!
'aintain the sa)edistance!
3/3