Frame 9E (PG 9171E) Gas Turbine Key Features
• 3 x Frame 9161E’s available. Previously operated
in utility base load plant application in Europe
• All gas turbines fully owned, removed and stored by
Wood Group Power Solutions
• Wood Group scope does not include combined
cycle or Balance of Plant (BOP) equipment but can
be supplied if requested
• One gas turbine stored in Italy, two stored in
port of Baltimore, MD USA. Typical Frame 9E Site Installation
• Removed gas turbines are available for inspection
ePG9161E Heavy Duty Gas Turbine
Specifications / Included Equipment
• Total of three (3) x GE Model PG9161E Gas Turbine Generators
• Natural Gas fuel system, liquid fuel system available through conversion
• Generator Type: GEC Alstom Model T 230-268, Air/Water cooled with brushless excitation
system. Rated voltage: 11.500V +/- 10%, 5.529A
• Frequency: 50 Hz at 95MW output
• Lubricating oil systems for gas turbine and generator
• Steam injection systems for Nox control
• Control System: GE Speedtronic Mark IV
• Exhaust system with transition piece
• Inlet house and exhaust stack not included but can be purchased for Buyer if needed
• Starting System: Electric motor + Hydraulic Torque Converter
GE Model PG9161E Heavy Duty Gas Turbine
Specifications Gas Turbine UNIT 3 UNIT 1 – T G 4 Unit 2 - TG 3
Manufacturer Nuovo Pignone (General Electric) Nuovo Pignone (General Electric) Nuovo Pignone (General Electric)
Turbine Type Frame 9 Frame 9 Frame 9
Model PG 9161 E PG 9161 E PG 9161 E
Serial Number 5742 5663 5662
Date Manufactured 1993 1991 1991
Date Plant Installed 1994 1993
Rated Power 93MW (ISO Condition 93MW (ISO Condition) 93MW (ISO Condition)
Fuel Type Natural Gas Natural Gas Natural Gas
Noise 81,2 DBA 81,2 DBA 81,2 DBA
Total Operation Hours 117,085 104,863 98,637
Times since CI/HGP 27,000 0 7,000
Time Since MOH 27,000 16,000 7,000
Compressor Rotor Changed
No. of Fired Starts 192 159 160
Nox Control Steam Injection Steam Injection Steam Injection
A.C. Generator UNIT 3 UNIT 1 – TG 4 Unit 2 - T G 3
Manufacturer GEC ALSTHOM GEC ALSTHOM GEC ALSTHOM
Model T 230-268 T 230-268 T 230-268
Serial Number 413.227 (Stator) 413113 (Rotor) 413.114 413.113
Date Manufactured 1992 1992 1992
Nameplate Power 103.000 KVA 103.000 KVA 103.000 KVA
Output Power 110.000 KVA 110.000 KVA 110.000 KVA
Rated Voltage 11.500 V ± 10% 11.500 V ± 10% 11.500 V ± 10%
Rated Current 5.529 A 5.529 A 5.529 A
Hertz 50 50 50
RPM 3000 3000 3000
Insulation Class F F F
Power Factor 0.85 2.85 1.85
Cooling Type Air/Water Air/Water Air/Water
U UNIT 3 UNIT 1 – TG 4 Unit 2 - T G 3
Motor Control Center MT Yes Yes Yes
Measurements Cewe Prometer W Telettro Meter Cewe Prometer W Telettro Meter Cewe Prometer W Telettro Meter
Generator Control Panel Yes Yes Yes
Synchronization Yes, Mav GEC Alstom Type Yes, Mav GEC Alstom Type Yes, Mav GEC Alstom Type
Voltage Regulation Brushless Excitation GEC Alstom Brushless E xcitation GEC A lstom Brushless Excitation GEC A lstom
Auxiliary Equipment Bussi UNIT 1 – TG 4 Unit 2 - TG 3
Starting System Electric Motor + Hydraulic Torque Electric Motor + Hydraulic Torque Electric Motor + Hydraulic Torque
Rated Voltage 6000 V 6500 V 6500 V
Cooing Type Water Water Water
G.T. Control S ystem Speedtronic Mark IV Speedtronic Mark IV Speedtronic Mark IV
Utilities Bussi UNIT 1 – TG 4 Unit 2 - T G 3
Voltage for Instrumentation 110 V D.C. 110 V D.C. 110 V D.C.
Voltage for Motors 400 V - 50 Hz - 3 P hase 400 V - 50 Hz - 3 Phase 400 V - 50 Hz - 3 Phase
Instrument Air 6,5 BARG 4,5 BARA 4,5 BARA
Frame 9E Design Features
Technical Details
� Single-shaft design, with can-type combustors and hot end drive
� Heavy frame industrial type simple cycle, inclusive of all
auxiliaries, driving generator
� Rugged design for operation and maintenance
� Steam injection for NOx reduction
� Gas Fuel, can be converted to liquid fuel with additional
modifications
Frame 9E Maintenance Considerations
Key Maintenance Recommendations
Boroscope / Inspection: Annual / 8000 hrs.
Hot Gas Path Inspections: Start of Contract and
Every 24,000 hrs.
Major Overhauls: Start of Contract and
Every 48,000 hrs.
Warranty: Available with WG
LTSA / O&M
Outage Planning: Developed through
integrated LTSA /
O&M Contract
Parts / Inventory: Analysis performed
and
recommendations
made by WG to
achieve maximum
availability at lowest
Long Term Service Agreements (LTSA)
Key Features
• Levelized Maintenance Fees = Predictable Costs
-Fired hour / monthly fees
-No “spike” in fees during major maintenance
-Simplified maintenance budgeting
• Outage Flexibility = More Revenue
-Routine maintenance by contracted service partner (WG)
-Ongoing record keeping and monitoring
-Extended maintenance intervals based on condition
-Parts and repair options
• Outage Planning = Lower Owner’s Risk
-Scheduled and unscheduled maintenance included
-Maintenance planning, parts sourcing by WG
-Maintenance planned around scheduled plant outages
Operations and Maintenance (O&M)
Key Features
• Experienced Staff = Lower Operating Costs
- Staff trained by OEMs and WG
- Backed by most experienced O&M team and resources in industry
- Rigorous operations and maintenance procedures
• Engineering Resources = Greater Availability and Reliability
- Hundreds of engineers supporting O&G and Power Generation
contracts worldwide
- Technology-specific maintenance modeling and scheduling programs
- Remote monitoring and diagnostics available
• Integrated O&M / LTSA = Lower Maintenance Costs
- Trend monitoring and diagnosis detects problems before they become
maintenance events
- Maintenance planning scheduled with Operations input
- O&M on all key plant equipmentLnot just gas turbine
Frame 9E Photographs
GT Shipment
Generator Shipment
GT Removal
Preserved & Stored EquipmentAux. Systems