Del Rio Hills Planned Unit Development 3-1 Draft Environmental Impact Report
December 2008 P:\Projects - WP Only\51244.00 Del Rio Hills\!DEIR\3.0 Summary.doc
3.0 SUMMARY OF IMPACTS AND MITIGATION MEASURES
INTRODUCTION
This chapter provides an overview of the Del Rio Hills Planned Unit Development (DRHPUD) project and its potential impacts. This chapter also provides a brief discussion of potentially viable development alternatives to the DRHPUD project. A detailed discussion of these alternatives can be found in Chapter 5 of this EIR. Table 3-1, at the end of this chapter, provides a summary of the environmental effects of the DRHPUD project identified in each technical issue section of Chapter 4. The table consists of the environmental impacts, the significance of the impacts prior to mitigation, the proposed mitigation measures, and the significance of the impacts after mitigation measures are implemented.
PROJECT UNDER REVIEW
The DRHPUD consists of approximately 505 acres of land located west of downtown Rio Vista, and south of SR 12. The project area is bounded to the west by Amerada Hess Road, to the south by unincorporated Solano County. The surrounding area is typified by rolling hills and agricultural activities, surrounded by rural residential uses. The DRHPUD would allow for a mix of residential neighborhoods, a SR commercial center, a proposed K-6 school, neighborhood parks, public facilities, recreation areas, and an extensive open space and trail network. The project would be developed over three phases, the first phase of which could begin as early as 2009.
POTENTIAL AREAS OF CONCERN
Comments received in response to the NOP and at the Scoping Meeting included the following:
Flood risk and drainage issues
Safety issues related to gas wells and gas pipelines
Traffic and circulation impacts along SR-12 and existing City roadways during construction and operation
Air quality impacts related to project construction and project generated vehicle operation
Hazard impacts related to former on-site agricultural production
Land use compatibility
Project and mitigation funding mechanisms
Visual quality of the proposed project
Sewer and water infrastructure
Safe and accessible pedestrian pathways to and from the project site
Soil erosion
Availability of adequate public service facilities
3.0 SUMMARY OF IMPACTS AND MITIGATION MEASURES
Del Rio Hills Planned Unit Development 3-2 Draft Environmental Impact Report
December 2008 P:\Projects - WP Only\51244.00 Del Rio Hills\!DEIR\3.0 Summary.doc
ALTERNATIVES TO THE PROPOSED PROJECT
The EIR analyzes the following alternatives to the proposed project:
No Project/ No Build Alternative: The No Project/No Build Alternative assumes that the proposed project would not be developed and agricultural development would continue to occur on the DRHPUD site. This alternative assumes the existing residence and outbuildings would remain and the rest of the site would not be altered relative to existing conditions.
No Project/ General Plan Buildout Alternative: The No Project General Plan Buildout Alternative assumes that the DRHPUD site would be developed consistent with the existing land use designations and zoning as identified in the current General Plan. The DRHPUD site would be developed using the midpoint of the allowable residential densities under this alternative.
General Plan Minimum Density Alternative: The General Plan Minimum Density Alternative assumes that the DRHPUD site would be developed consistent with the existing land use designations and zoning as identified in the current General Plan, using the lowest allowable residential and commercial densities.
Detailed descriptions and analysis of potential impacts of these alternatives are presented in Chapter 5.
SUMMARY OF IMPACTS
Table 3-1 provides a complete list of all impacts and mitigation measures for the topics evaluated in this EIR. For each impact, the table presents the significance of the impact before mitigation, applicable mitigation measures, and the level of significance of the impact after implementation of the mitigation measures.
Effects Found to be Less Than Significant
A number of project impacts identified in the EIR were found to have no impact or a less-than-significant impact, requiring no mitigation. These impacts are found in Chapter 4, Environmental Analysis, and are summarized in this Chapter in Table 3-1, Summary of Impacts and Mitigation Measures.
Significant Impacts
Pursuant to CEQA Guidelines Section 15382, a significant effect on the environment is defined as a substantially or potentially substantial adverse change in any of the physical conditions within the area affected by the project, including, land, air, water, minerals, flora, fauna, ambient noise, and objects of historic or aesthetic significant (CEQA Guidelines Section 15382). Implementation of the proposed project would result in significant impacts to some of these resources, which are fully analyzed in Chapter 4, Environmental Analysis, and are summarized in this Chapter in Table 3-1, Summary of Impacts and Mitigation Measures.
This EIR discusses mitigation measures that could be implemented by the City and/or the project applicant to reduce potential adverse impacts to a level that is considered less than significant. Such mitigation measures are noted in Chapter 4 of the EIR. A summary of these mitigation measures can be found in Table 3-1. The mitigation measures presented in this EIR form the basis of the Mitigation Monitoring Program, which is included in the Final EIR document.
3.0 SUMMARY OF IMPACTS AND MITIGATION MEASURES
Del Rio Hills Planned Unit Development 3-3 Draft Environmental Impact Report
December 2008 P:\Projects - WP Only\51244.00 Del Rio Hills\!DEIR\3.0 Summary.doc
Significant and Unavoidable Impacts
However, even with the application of feasible mitigation measures, some impacts could not be reduced to less-than-significant levels. The significant and unavoidable impacts that were identified for both project-level and cumulative impacts in Chapter 4, Environmental Analysis, and are summarized in this Chapter in Table 3-1, Summary of Impacts and Mitigation Measures.
SUMMARY TABLE
Table 3-1 (Summary of Impacts and Mitigation Measures), has been organized to correspond with the environmental issues discussed in Chapter 4. The summary table is arranged in four columns:
1. Environmental impacts (“Impact”).
2. Level of significance without mitigation (“Significance”).
3. Mitigation measures (“Mitigation Measure”).
4. The level of significance after implementation of mitigation measures (“Residual Significance”).
If an impact is determined to be significant or potentially significant, mitigation measures are identified, where appropriate and feasible. More than one mitigation measure may be required to reduce the impact to a less-than-significant level. This EIR assumes that all applicable plans, policies, and regulations would be implemented, including, but not necessarily limited to, City General Plan Policies, laws, City Ordinances, and requirements or recommendations of the City of Rio Vista. Applicable plans, policies, and regulations are identified and described in the Regulatory Setting of each issue area and within the relevant impact analysis. A description of the organization of the environmental analysis, as well as key foundational assumptions regarding the approach to the analysis, is provided in Section 4.0, Introduction to the Analysis.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-4
D
raft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.1
Ae
sth
eti
cs
an
d V
isu
al R
eso
urc
es
4.1
-1
Th
e p
rop
osed
pro
ject
co
uld
ha
ve
a
su
bsta
nti
al ad
ve
rse e
ffect
on
a s
cen
ic v
ista
o
r su
bsta
nti
ally d
eg
rad
e t
he e
xis
tin
g v
isu
al
ch
ara
cte
r o
r q
uality
of
the s
ite a
nd
its
su
rro
un
din
gs.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
-2
Th
e p
rop
os
ed
pro
jec
t c
ou
ld c
rea
te a
new
so
urc
e o
f su
bsta
nti
al o
f lig
ht
or
gla
re t
hat
wo
uld
ad
ve
rse
ly a
ffe
ct
da
y o
r n
igh
ttim
e
vie
ws in
th
e a
rea.
PS
4.1
-2
a)
All
str
eet lig
hting s
hall
be d
ow
ncast and s
hie
lded to p
revent
light spill
to s
urr
oundin
g p
ropert
ies, sky g
low
, a
nd g
lare
to the
exte
nt
fea
sib
le.
LS
b)
Low
-level outd
oor
lighting s
hall
be incorp
ora
ted into
new
hom
es p
art
icula
rly a
long t
he h
illsid
e r
idges.
c)
Reflective s
urf
aces in p
ublic
are
as s
hall
be k
ept to
a m
inim
um
usin
g n
on-r
eflective m
ate
rial w
here
ver
possib
le.
d
) L
an
dscap
ing
sha
ll b
e in
co
rpo
rate
d a
lon
g in
tern
al ro
ad
s a
nd
near
off-s
ite h
om
es to r
educe s
pill
lig
ht em
anating fro
m
ve
hic
les a
nd
bu
ildin
gs.
4.1
-3
Th
e p
rop
os
ed
pro
jec
t, in
co
nju
nc
tio
n w
ith
o
ther
pro
jects
in
th
e C
ity o
f R
io V
ista
, co
uld
h
ave a
su
bsta
nti
al ad
ve
rse e
ffect
on
a
sc
en
ic v
ista
or
su
bs
tan
tia
lly
de
gra
de
th
e
exis
tin
g v
isu
al
ch
ara
cte
r o
r q
uality
of
the
sit
e a
nd
its
su
rro
un
din
gs.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
-4
Th
e p
rop
os
ed
pro
jec
t, in
co
nju
nc
tio
n w
ith
o
ther
pro
jects
in
th
e C
ity o
f R
io V
ista
, co
uld
cre
ate
a n
ew
so
urc
e o
f su
bsta
nti
al o
f lig
ht
or
gla
re t
hat
wo
uld
ad
vers
ely
aff
ect
day o
r n
igh
ttim
e v
iew
s in
th
e a
rea.
PS
4.1
-4 Im
ple
ment M
itig
ation M
easure
4.1
-2(a
) th
rough (
d).
LS
4.2
Air
Qu
ality
4.2
-1
Imp
lem
en
tati
on
of
the p
rop
osed
pro
ject
wo
uld
resu
lt in
new
so
urc
es o
f air
em
issio
ns t
hat
co
uld
im
pair
im
ple
men
tati
on
o
f th
e A
QM
P.
LS
N
on
e r
eq
uir
ed
. N
A
4.2
-2
Co
nstr
ucti
on
acti
vit
ies a
sso
cia
ted
wit
h t
he
pro
po
sed
pro
jec
t w
ou
ld g
en
era
te
em
issio
ns o
f cri
teri
a p
ollu
tan
ts.
S
4.2
-2
a)
Prior
to a
ll phases o
f pro
ject constr
uction, th
e a
pplic
ant and
City s
hall
ensure
that constr
uction c
ontr
acts
inclu
de the
follo
win
g s
pe
cific
atio
ns:
SU
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-5
D
raft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
A
fter
revie
w a
nd a
ppro
val by th
e Y
SA
QM
D, th
e
develo
per,
if re
quired, shall
apply
appro
ved c
hem
ical
soil
sta
bili
zers
accord
ing to m
anufa
ctu
rers
specific
ations, to
all
inactive c
onstr
uction a
reas
(pre
vio
usly
gra
ded a
reas w
hic
h r
em
ain
inactive for
96
hours
).
R
educe tra
ffic
speeds o
n a
ll unpaved s
urf
aces to 1
5
mile
s p
er
hour
or
less.
C
rea
tion
of a
du
st co
ntr
ol p
lan
fo
r a
pp
rova
l b
y Y
SA
QM
D.
N
o o
pen b
urn
ing o
f vegeta
tion d
uring p
roje
ct
constr
uction.
R
eesta
blis
hm
ent of gro
und c
over
as s
oon a
s p
ossib
le
after
constr
uction.
S
uspensio
n o
f gra
din
g a
ctivitie
s w
hen w
inds e
xceed 2
5
mph.
E
nclo
se
, co
ve
r, o
r w
ate
r a
t le
ast tw
ice
da
ily a
ll so
il pile
s
and e
xposed s
urf
aces.
K
eep a
ll desig
nate
d h
aul ro
ute
s c
lean o
f any loose s
oil
or
oth
er
mate
rials
associa
ted w
ith tra
nsport
ation o
f soil
and o
ther
constr
uction r
ela
ted m
ate
rials
.
C
over
loads o
f all
haul/dum
p tru
cks s
ecure
ly.
b)
Prior
to a
ll phases o
f pro
ject constr
uction, th
e a
pplic
ant and
City s
hall
ensure
that constr
uction c
ontr
acts
inclu
de the
follo
win
g s
pe
cific
atio
ns:
C
ontr
acto
rs s
hall
pro
vid
e a
pla
n for
appro
val by t
he
YS
AQ
MD
dem
onstr
ating that th
e h
eavy-d
uty
(>
50
hors
epow
er)
off-r
oad v
ehic
les to b
e u
sed in the
constr
uction p
roje
ct, inclu
din
g o
wned, le
ased a
nd
su
bco
ntr
acto
r ve
hic
les, w
ou
ld a
ch
ieve
a p
roje
ct-
wid
e
fleet avera
ge 3
0 p
erc
ent N
Ox r
eduction a
nd 4
5 p
erc
ent
part
icula
te r
eduction c
om
pare
d to the m
ost re
ce
nt
CA
RB
fle
et avera
ge. A
ccepta
ble
options for
reducin
g
em
issio
ns m
ay inclu
de u
se o
f la
te m
odel engin
es, lo
w-
em
issio
n d
iesel pro
ducts
, altern
ative fuels
, engin
e
retr
ofit te
chnolo
gy, afte
r-tr
eatm
ent pro
ducts
, and/o
r oth
er
options a
s the
y b
ecom
e a
vaila
ble
.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-6
D
raft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
T
o the e
xte
nt
feasib
le, m
anage o
pera
tion o
f heavy-d
uty
equip
ment to
reduce e
mis
sio
ns s
uch a
s m
ain
tain
h
ea
vy-d
uty
ea
rth
mo
vin
g, sta
tio
na
ry a
nd
mo
bile
equip
ment in
optim
um
runnin
g c
onditio
ns.
M
inim
ize idlin
g tim
e to
fiv
e (
5)
min
ute
s w
hen
constr
uction e
quip
ment is
not in
use, unle
ss p
er
engin
e
manufa
ctu
rer’s s
pecific
ations o
r fo
r safe
ty r
easons m
ore
tim
e is r
equired.
U
se low
sulfur
fuel fo
r sta
tionary
constr
uction
equip
ment, if fe
asib
le.
U
tiliz
e e
xis
ting p
ow
er
sourc
es (
e.g
., p
ow
er
pole
s)
or
cle
an fuel genera
tors
rath
er
tha
n tem
pora
ry p
ow
er
genera
tors
.
U
se low
em
issio
n o
n-s
ite s
tationary
equip
ment.
C
on
tro
l vis
ible
em
issio
ns e
xce
ed
ing
40
pe
rce
nt o
pa
city
to n
o m
ore
than 3
min
ute
s in a
ny o
ne h
our,
wh
ich
inclu
des a
ll (o
n-r
oad a
nd o
ff-r
oad)
die
sel-pow
ere
d
equip
ment, in a
ccord
ance w
ith Y
SA
QM
D R
ule
2.3
.
c)
During c
onstr
uction o
f th
e p
roposed p
roje
ct, th
e p
roje
ct
co
ntr
acto
r sh
all
follo
w th
e g
uid
elin
es e
sta
blis
he
d b
y Y
SA
QM
D
Ru
les, in
clu
din
g th
e fo
llow
ing
:
C
om
ply
with Y
SA
QM
D R
ule
2.1
4, A
rchitectu
ral
Coatings, fo
r arc
hitectu
ral coatings a
nd s
olv
ents
used a
t th
e p
roposed p
roje
ct.
In
the e
vent th
at an
y o
pen b
urn
ing is r
equired, obta
in
appro
val and issuance o
f a b
urn
ing p
erm
it fro
m
YS
AQ
MD
and p
erf
orm
burn
ing in c
om
plia
nce w
ith
YS
AQ
MD
Rule
2.8
, O
pen B
urn
ing, G
enera
l.
C
utb
ack a
nd
em
uls
ifie
d a
sp
ha
lt a
pp
lica
tio
n s
ha
ll b
e
conducte
d to a
ccord
ance w
ith Y
SA
QM
D R
ule
2.2
8,
Cutb
ack a
nd E
muls
ifie
d A
sphalt P
avin
g M
ate
rials
.
4.2
-3
Op
era
tio
n o
f th
e p
rop
osed
pro
ject
co
uld
g
en
era
te e
mis
sio
ns o
f R
OG
an
d N
Ox.
S4.2
-3
Prior
to b
uild
ing p
erm
it,
the a
pplic
ant shall
imple
ment
these, or
equally
effective m
easure
s, in
consultation w
ith
the Y
SA
QM
D:
Im
pro
ve
th
e th
erm
al in
teg
rity
of
no
nre
sid
en
tial build
ings,
and r
educe the therm
al lo
ad w
ith a
uto
mate
d tim
e c
locks
or
auto
mate
d s
ensors
.
SU
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-7
D
raft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
P
rovid
e e
ffic
ient heating a
nd o
ther
applia
nces, such a
s
wa
ter
heate
rs, cookin
g e
quip
ment, r
efr
igera
tors
, fu
rnaces, and b
oile
r units.
E
lectr
ical outlets
shall
be insta
lled o
n the e
xte
rior
walls
of both
the fro
nt and b
ack o
f a r
esid
ence o
r all
com
merc
ial build
ings to p
rom
ote
the u
se o
f ele
ctr
ic
lan
dsca
pe
main
ten
an
ce
eq
uip
me
nt.
In
sta
ll a
ga
s o
utle
t in
th
e b
ackya
rd o
f re
sid
en
tial
build
ings for
use w
ith o
utd
oor
cookin
g a
pplia
nces, such
as g
as b
urn
ing b
arb
eques.
If feasib
le, in
sta
ll a g
as o
utlet w
ith c
era
mic
logs in a
ny
pro
po
se
d fire
pla
ce
s, in
clu
din
g o
utd
oo
r re
cre
ation
al
fire
pla
ces o
r pits.
In
sta
ll lo
w n
itro
ge
n o
xid
e (
NO
x)
hot
wate
r heate
rs.
(Beyond Y
SA
QM
D R
ule
Requirem
ents
)
H
VA
C u
nits s
hall
be e
quip
ped w
ith P
rem
Air (
or
oth
er
manufa
ctu
rer)
cata
lyst syste
m if availa
ble
and
econom
ically
feasib
le a
t th
e tim
e b
uild
ing p
erm
its a
re
issued. T
he P
rem
Air c
ata
lyst can c
onvert
up to 7
0
perc
ent of gro
und level ozone that passes o
ver
the
condenser
coils
into
oxygen. T
he P
rem
Air s
yste
m is
consid
ere
d feasib
le if th
e a
dditio
nal cost is
less than 1
0
perc
ent of th
e b
ase H
VA
C u
nit c
ost.
R
equire a
ll flat ro
ofs
in the n
onre
sid
ential la
nd u
se
are
as to h
ave a
wh
ite o
r silv
er
cap s
heet to
reduce
energ
y d
em
and.
If feasib
le, purc
hase b
attery
po
were
d o
r ele
ctr
ic
landscape m
ain
tenance e
quip
ment fo
r ne
w r
esid
ences.
C
onfigure
park
ing to m
inim
ize tra
ffic
inte
rfere
nce a
nd
de
lays.
In
clu
de w
ide p
ark
ing s
paces o
r vanpool only
spaces to
acco
mm
od
ate
va
np
ool ve
hic
les in
em
plo
ym
en
t a
rea
s
(e.g
., c
om
munity c
om
merc
ial, b
usin
ess-p
rofe
ssio
nal,
industr
ial) a
s d
ete
rmin
ed b
y Y
SA
QM
D.
P
rovid
e p
refe
rential park
ing for
carp
ools
and v
anpools
in
em
plo
ym
ent
are
as (
e.g
., c
om
munity c
om
merc
ial,
busin
ess-p
rofe
ssio
nal, a
nd industr
ial are
as).
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-8
D
raft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
E
quip
all
truck loadin
g a
nd u
nlo
adin
g d
ocks w
ith o
ne
11
0/2
08
vo
lt p
ow
er
ou
tle
t fo
r e
ve
ry t
wo
do
ck d
oo
rs.
Die
se
l tr
ucks s
ha
ll b
e p
rohib
ite
d fro
m id
ling
mo
re th
an
five m
inute
s a
nd s
hall
be r
equired to c
onnect to
the
110/2
08 v
olt p
ow
er
to r
un a
ny a
uxili
ary
equip
ment.
Sig
na
ge
ad
dre
ssin
g th
ese
re
quire
me
nts
sh
all
be
pro
vid
ed a
t th
e loadin
g d
ocks.
V
ehic
le a
nd b
icycle
all
day p
ark
ing lots
near
transit
sto
ps, and fre
ew
ay a
ccess p
oin
ts.
P
erm
it p
ark
& r
ide lots
in b
usin
ess v
illage a
rea.
P
rovid
e r
ide
sharin
g in
form
ation
in
a h
om
eo
wn
ers
associa
tion p
ackage.
C
ontr
ibute
to a
n a
rea tra
nsit fund to h
elp
build
, m
ain
tain
, and e
nhance tra
nsit s
erv
ices/facili
ties/
am
enitie
s.
S
ub
sid
ize
d s
cho
ol b
us s
erv
ice
.
A
subsid
y for
ad
ded tra
nsit s
erv
ices.
C
lass II and III o
n-s
treet bik
ew
ay s
yste
m.
C
lass I b
ike
wa
y s
yste
m th
at co
nn
ects
re
sid
en
tial,
com
merc
ial and p
ark
uses o
f th
e S
pecific
Pla
n.
D
esig
n s
treets
to m
axim
ize p
edestr
ian a
ccess to tra
nsit
sto
ps.
S
ite d
esig
n to m
axim
ize a
ccess to tra
nsit lin
es.
S
ite d
esig
n to a
ccom
modate
bus tra
vel.
S
ite d
esig
n to p
rovid
e lig
hte
d s
helters
at tr
ansit a
ccess
poin
ts.
P
repara
tion o
f a T
ransport
ation S
yste
m M
anagem
ent
Pla
n fo
r e
mp
loye
rs w
ith
50
or
mo
re e
mp
loye
es.
P
rovid
e s
ecu
re b
icycle
sto
rag
e a
t p
ub
lic p
ark
ing
fa
cili
ties.
O
nly
U.S
. E
PA
Ph
ase
II ce
rtifie
d w
oo
db
urn
ing
de
vic
es
should
be a
llow
ed in s
ingle
-fam
ily r
esid
ences. T
he
em
issio
n p
ote
ntial fr
om
each r
esid
ence s
hall
not exceed
7.5
gra
ms p
er
hour.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-9
D
raft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
W
oodburn
ing o
r P
elle
t applia
nces s
hall
not be p
erm
itte
d
in m
ulti-fa
mily
develo
pm
ents
. O
nly
natu
ral gas o
r pro
pane fired firepla
ce a
pplia
nces a
re p
erm
itte
d.
4.2
-4
Th
e p
rop
osed
pro
ject
wo
uld
gen
era
te
incre
ased
tra
ffic
vo
lum
es t
hat
co
uld
in
cre
ase c
on
cen
trati
on
s o
f C
O a
t lo
cal
inte
rsecti
on
s.
LS
No
ne
re
quire
d.
NA
4.2
-5
Th
e p
rop
os
ed
pro
jec
t c
ou
ld e
xp
ose
sen
sit
ive
recep
tors
in
clo
se p
roxim
ity t
o t
he
pro
ject
sit
e t
o T
AC
s.
LS
No
ne
re
quire
d.
NA
4.2
-6
De
velo
pm
en
t o
f th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h o
ther
exis
tin
g a
nd
fu
ture
d
eve
lop
me
nt
wit
hin
th
e S
VA
B c
ou
ld h
ave
a
cu
mu
lati
ve
ozo
ne im
pact.
LS
No
ne
re
quire
d.
NA
4.2
-7
Th
e p
rop
osed
pro
ject
wo
uld
gen
era
te
inc
rea
sed
tra
ffic
vo
lum
es
un
de
r c
um
ula
tive
co
nd
itio
ns t
hat
co
uld
in
cre
ase
co
ncen
trati
on
s o
f C
O a
t lo
cal
inte
rsecti
on
s.
LS
No
ne
re
quire
d.
NA
4.3
Bio
log
ical R
eso
urc
es
4.3
-1
Th
e p
rop
osed
pro
ject
wo
uld
no
t re
su
lt in
th
e lo
ss o
f sta
te a
nd
/or
fed
era
lly p
rote
cte
d
wetl
an
ds.
LS
No
ne
re
quire
d.
NA
4.3
-2
Th
e p
rop
osed
pro
ject
will n
ot
resu
lt in
th
e
loss o
f ri
pari
an
or
oth
er
sen
sit
ive h
ab
itats
.
LS
No
ne
re
quire
d.
NA
4.3
-3
Th
e p
rop
osed
pro
ject
co
uld
resu
lt in
th
e
loss o
f fo
rag
ing
hab
itat
for
Sw
ain
so
n’s
h
aw
k, w
hit
e-t
ailed
kit
e, an
d o
ther
pro
tecte
d
rap
tors
.
S
4.3
-3 T
he p
roje
ct applic
ant shall
ensure
that agricultura
l la
nd,
annual gra
ssla
nds o
r oth
er
suitable
rapto
r fo
ragin
g h
abitat are
pre
serv
ed e
ither
on s
ite, or
a c
om
bin
ation o
f on s
ite a
nd o
ff
site p
reserv
ation o
f habitat
within
Sola
no C
ounty
at a 0
.5:1
ra
tio. T
he fin
al acre
age a
mount shall
be a
ppro
ved b
y the C
ity.
Pre
serv
e a
reas m
ust be e
sta
blis
hed p
rior
to p
roje
ct
constr
uction, and m
ay o
ccur
thro
ugh e
ither:
a)
Paym
ent o
f a m
itig
ation fee to a
habitat develo
pm
ent and
managem
ent com
pany s
uch a
s the C
ente
r fo
r N
atu
ral Lands
Managem
ent, W
ildla
nds, In
c., o
r to
the C
DF
G. If an
esta
blis
hed m
itig
ation b
ank is n
ot availa
ble
in the a
rea, th
e
fees s
hall
be h
eld
in a
tru
st fu
nd, and u
sed to d
evelo
p a
m
itig
ation b
ank in S
ola
no C
ounty
thro
ugh the p
urc
hase,
monitoring, m
ain
tenance, and r
em
edia
tion o
f la
nds in S
ola
no
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
0
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
County
that support
suitable
fora
gin
g h
abitat fo
r S
wain
son’s
haw
k, and o
ther
rapto
rs. T
hese lands w
ould
becom
e
incorp
ora
ted into
the m
itig
ation b
ank, ow
ned a
nd o
pera
ted b
y
the h
abitat develo
pm
ent and m
anagem
ent com
pany, and
pro
tecte
d in p
erp
etu
ity. T
he lands m
ust be w
ithin
10 m
iles o
f th
e p
roje
ct site (
consis
tent
with C
DF
G g
uid
elin
es);
or
b)
Purc
hase o
f conserv
ation e
asem
ents
or
fee title
in S
ola
no
County
. T
his
mitig
ation s
hall
occur
within
10 m
iles o
f th
e
pro
ject site (
consis
tent w
ith
CD
FG
guid
elin
es)
or
at anoth
er
dis
tan
ce
app
rove
d b
y C
DF
G. A
lth
ou
gh
th
e p
rim
ary
fo
cu
s o
f th
ese m
itig
ation m
easure
s is o
n S
wain
son’s
haw
k,
pre
serv
ation o
f fo
ragin
g h
abita
t fo
r oth
er
pro
tecte
d b
ird
sp
ecie
s in
clu
din
g r
ed
-ta
iled
ha
wk, re
d-s
ho
uld
ere
d h
aw
k,
nort
hern
harr
ier,
ferr
ugin
ous h
aw
k, A
merican k
estr
el, g
reat
horn
ed o
wl, a
nd loggerh
ead s
hrike w
ould
be a
ccom
plis
hed
concurr
ently.
4.3
-4
Th
e p
rop
osed
pro
ject
co
uld
resu
lt in
th
e
loss o
f n
esti
ng
hab
itat
for
Sw
ain
so
n’s
h
aw
k, w
hit
e-t
ailed
kit
e, an
d o
ther
pro
tecte
d
rap
tors
.
S4.3
-4
a)
If c
onstr
uction is to o
ccur
betw
een M
arc
h 1
5 thro
ugh A
ugust
30, th
e p
roje
ct applic
ant, s
hall
reta
in a
qualif
ied b
iolo
gis
t to
conduct a p
re-c
onstr
uction b
reedin
g-s
eason s
urv
ey o
f th
e
pro
ject site w
ithin
30 d
ays o
f w
hen c
onstr
uction is p
lanned to
begin
, to
dete
rmin
e if any b
ird
s a
re n
esting o
n o
r directly
adja
cent to
the p
roje
ct site. T
he s
urv
ey r
esults s
hall
be
subm
itte
d to the C
DF
G for
their r
evie
w.
LS
b)
The p
roje
ct applic
ant, c
onsis
tent
with C
DF
G g
uid
elin
es, shall
avoid
all
bir
ds n
est sites locate
d in the p
roje
ct site d
uring the
bre
edin
g s
eason (
appro
xim
ate
ly M
arc
h 1
5 thro
ugh A
ugust
30)
wh
ile the n
est is
occupie
d w
ith a
dults a
nd/o
r young. T
his
avoid
ance c
ould
consis
t of dela
yin
g c
onstr
uction to a
void
the
nesting s
eason. A
ny o
ccupie
d n
est shall
be m
onitore
d b
y a
qualif
ied b
iolo
gis
t to
dete
rmin
e w
hen the n
est is
no longer
used. If
the c
onstr
uction c
annot be d
ela
yed, avoid
ance s
hall
inclu
de the e
sta
blis
hm
ent of a n
on-d
istu
rbance b
uffer
zone
aro
und the n
est site. T
he s
ize o
f th
e b
uffer
zo
ne w
ill b
e
dete
rmin
ed in c
onsultation w
ith t
he C
DF
G. T
he b
uffer
zone
shall
be d
elin
eate
d b
y h
ighly
vis
ible
tem
pora
ry c
onstr
uction
fencin
g.
LS =
Les
s th
an S
igni
fican
t P
S =
Pot
entia
lly S
igni
fican
t S
= S
igni
fican
t S
U =
Sig
nific
ant a
nd U
navo
idab
le
NA
= N
ot A
pplic
able
N
I = N
o Im
pact
Del
Rio
Hill
s P
lann
ed U
nit D
evel
opm
ent
3-11
D
raft
Env
ironm
enta
l Im
pact
Rep
ort
Dec
embe
r 20
08
P:\P
roje
cts
- WP
Onl
y\51
244.
00 D
el R
io H
ills\
!DE
IR\3
.0 S
umm
Tab
le.d
oc
TA
BL
E 3
-1
SU
MM
AR
Y O
F IM
PA
CT
S A
ND
MIT
IGA
TIO
N M
EA
SU
RE
S
Imp
act
Lev
el o
f S
ign
ific
ance
Pri
or
to M
itig
atio
n
Mit
igat
ion
Mea
sure
(s)
Lev
el o
f S
ign
ific
ance
Aft
er
Mit
igat
ion
4.
3-5
Th
e p
rop
ose
d p
roje
ct w
ou
ld n
ot
resu
lt in
lo
ss o
f n
esti
ng
hab
itat
fo
r tr
ico
lore
d
bla
ckb
ird
.
LS
Non
e re
quire
d.
NA
4.3-
6 T
he
pro
po
sed
pro
ject
wo
uld
no
t re
sult
in
inte
rru
pti
on
s to
wild
life
corr
ido
rs o
r lo
ss o
f w
ildlif
e n
urs
ery
site
s.
LS
Non
e re
quire
d.
NA
4.3-
7 T
he
pro
po
sed
pro
ject
wo
uld
no
t re
sult
in
imp
acts
to
sp
ecia
l sta
tus
pla
nt
spec
ies.
LS
N
one
requ
ired.
N
A
4.3-
8 T
he
pro
po
sed
pro
ject
in c
om
bin
atio
n w
ith
o
ther
cu
rren
t an
d p
rop
ose
d p
roje
cts
in t
he
vici
nit
y co
uld
res
ult
in a
reg
ion
al lo
ss o
f ri
par
ian
or
oth
er s
ensi
tive
hab
itat
s.
LS
Non
e re
quire
d.
NA
4.3-
9 T
he
pro
po
sed
pro
ject
in c
om
bin
atio
n w
ith
o
ther
cu
rren
t an
d p
rop
ose
d p
roje
cts
in t
he
vici
nit
y co
uld
res
ult
in a
reg
ion
al lo
ss o
f fo
rag
ing
hab
itat
fo
r S
wai
nso
n’s
haw
k,
wh
ite-
taile
d k
ite,
an
d o
ther
pro
tect
ed
rap
tors
.
PS
4.
3-9
Impl
emen
t Miti
gatio
n M
easu
re 4
.3-3
(a)
and
(b).
LS
4.3-
10
Th
e p
rop
ose
d p
roje
ct in
co
mb
inat
ion
wit
h
oth
er c
urr
ent
and
pro
po
sed
pro
ject
s in
th
e vi
cin
ity
cou
ld r
esu
lt in
a r
egio
nal
loss
of
nes
tin
g h
abit
at f
or
Sw
ain
son
’s h
awk,
wh
ite-
taile
d k
ite,
an
d o
ther
pro
tect
ed r
apto
rs.
LS
4.3-
10
Impl
emen
t Miti
gatio
n M
easu
re 4
.3-2
(a),
and
if n
eces
sary
(i.
e., i
f nes
ting
rapt
ors
are
pres
ent)
, Miti
gatio
n M
easu
re
4.3-
2(b)
.
LS
4.3-
11
Th
e p
rop
ose
d p
roje
ct in
co
mb
inat
ion
wit
h
oth
er c
urr
ent
and
pro
po
sed
pro
ject
s in
th
e vi
cin
ity
cou
ld r
esu
lt in
a r
egio
nal
loss
of
nes
tin
g h
abit
at f
or
tric
olo
red
bla
ckb
ird
.
LS
Non
e re
quire
d.
LS
4.3-
12
Th
e p
rop
ose
d p
roje
ct in
co
mb
inat
ion
wit
h
oth
er c
urr
ent
and
pro
po
sed
pro
ject
s in
th
e vi
cin
ity
cou
ld r
esu
lt in
a r
egio
nal
loss
of
wild
life
corr
ido
rs o
r lo
ss o
f w
ildlif
e n
urs
ery
site
s.
LS
Non
e re
quire
d.
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
2
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.4
Cu
ltu
ral R
es
ou
rces
4.4
-1
Th
e p
rop
os
ed
pro
jec
t c
ou
ld c
au
se
a
su
bsta
nti
al ad
ve
rse c
han
ge in
th
e
sig
nif
ican
ce o
f an
his
tori
cal re
so
urc
e o
r a
un
iqu
e a
rch
aeo
log
ical re
so
urc
e a
s d
efi
ned
in
§21083.2
of
the C
EQ
A s
tatu
tes a
nd
§15064.5
of
the S
tate
CE
QA
Gu
idelin
es.
PS
4.4
-1
In the e
vent th
at an
y p
rehis
toric o
r his
toric s
ubsurf
ace
arc
ha
eolo
gic
al fe
atu
res o
r d
ep
osits, in
clu
din
g loca
lly
dark
ened s
oil
(“m
idden”)
, th
at could
conceal cultura
l deposits, anim
al bone, obsid
ian, and/o
r m
ort
ar
are
dis
covere
d d
uring c
onstr
uction-r
ela
ted e
art
h-m
ovin
g
activitie
s, all
gro
und-d
istu
rbin
g a
ctivity w
ithin
50 feet of
the
reso
urc
es s
hall
be
ha
lte
d a
nd
the
City o
f R
io V
ista
C
om
munity D
evelo
pm
ent D
epart
ment shall
be n
otified b
y
the p
roje
ct applic
ant. T
he p
roje
ct applic
ant shall
reta
in a
qualif
ied a
rchaeolo
gis
t to
surv
ey a
nd e
valu
ate
the fin
d.
The C
om
munity D
evelo
pm
ent D
epart
ment shall
consult
with t
he q
ualif
ied a
rcheolo
gis
t to
assess the s
ignific
ance o
f th
e fin
d. Im
pacts
to a
ny s
ignific
ant re
sourc
es s
hall
be
mitig
ate
d to a
less-t
han-s
ignific
ant le
vel th
rough d
ata
re
covery
or
oth
er
meth
ods d
ete
rmin
ed a
dequate
by a
qualif
ied a
rchaeolo
gis
t and that are
consis
tent w
ith t
he
Secre
tary
of th
e Inte
rior's S
tandard
s for
Arc
haeolo
gic
al
Do
cu
me
nta
tio
n.
LS
4.4
-2
Th
e p
rop
os
ed
pro
jec
t c
ou
ld d
istu
rb a
ny
hu
man
rem
ain
s, in
clu
din
g t
ho
se in
terr
ed
o
uts
ide o
f fo
rmal cem
ete
ries.
PS
4.4
-2
If h
um
an r
em
ain
s a
re d
iscovere
d o
n the p
roje
ct site d
uring
any p
hase o
f constr
uction, all
gro
und-d
istu
rbin
g a
ctivity
within
50 feet of th
e r
em
ain
s s
hall
be h
alted im
media
tely
, a
nd
th
e C
ity o
f R
io V
ista
Co
mm
un
ity D
eve
lop
me
nt
Depart
ment and the C
ounty
coro
ner
shall
be n
otified
imm
edia
tely
. If
the r
em
ain
s a
re d
ete
rmin
ed b
y t
he C
ounty
coro
ner
to b
e N
ative A
merican, th
e N
ative A
merican
He
rita
ge
Co
mm
issio
n (
NA
HC
) sh
all
be
no
tifie
d w
ith
in
24 h
ours
, and the g
uid
elin
es o
f th
e N
AH
C s
hall
be a
dhere
d
to in the tre
atm
ent and d
ispositio
n o
f th
e r
em
ain
s. T
he
pro
ject applic
ant shall
als
o r
eta
in a
pro
fessio
nal
arc
ha
eolo
gis
t w
ith
Na
tive
Am
erica
n b
urial e
xp
erie
nce
to
conduct a fie
ld investigation o
f th
e s
pecific
site a
nd c
onsult
with t
he M
ost Lik
ely
Descendant, if an
y, id
entified b
y the
NA
HC
. A
s n
ecessary
, th
e a
rch
aeolo
gis
t m
ay p
rovid
e
pro
fessio
nal assis
tance to the M
ost Lik
ely
Descendant,
inclu
din
g the e
xcavation a
nd r
em
oval of th
e h
um
an
rem
ain
s. T
he
City s
ha
ll b
e r
espo
nsib
le fo
r a
pp
rova
l o
f re
com
mended m
itig
ation a
s it deem
s a
ppro
priate
, ta
kin
g
account of th
e p
rovis
ions o
f S
tate
law
, as s
et fo
rth in C
EQ
A
Gu
idelin
es S
ectio
n 1
50
64
.5(e
) a
nd
Pu
blic
Re
so
urc
es C
od
e
Section 5
097.9
8. T
he p
roje
ct applic
ant shall
imple
ment
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
3
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
appro
ved m
itig
ation m
easure
s, to
be v
erified b
y t
he C
ity o
f R
io V
ista
Com
munity D
evelo
pm
ent D
epart
ment, b
efo
re the
resum
ption o
f gro
und-d
istu
rbin
g a
ctivitie
s w
ithin
50 feet of
where
the r
em
ain
s w
ere
dis
covere
d.
4.4
-3
Th
e p
rop
osed
pro
ject
co
uld
dir
ectl
y o
r in
dir
ectl
y d
estr
oy a
un
iqu
e p
ale
on
tolo
gic
al
reso
urc
e o
r sit
e o
r a u
niq
ue g
eo
log
ic
featu
re.
PS
4
.4-3
S
ho
uld
pa
leo
nto
logic
al o
r u
niq
ue
ge
olo
gic
al re
so
urc
es b
e
dis
covere
d o
n the p
roje
ct site d
uring a
ny p
hase o
f constr
uction, all
gro
und d
istu
rbin
g a
ctivitie
s s
hall
cease
within
100 feet
of th
e s
ite o
f th
e d
iscovery
and the C
ity o
f R
io V
ista
Com
munity D
evelo
pm
ent D
epart
ment shall
be
notified im
media
tely
. T
he p
roje
ct applic
ant shall
reta
in a
qualif
ied p
ale
onto
logis
t to
pro
vid
e a
n e
valu
ation o
f th
e fin
d
and to p
rescribe m
itig
ation m
easure
s to r
educe im
pacts
to
a less-t
han-s
ignific
ant le
vel.
In c
onsid
ering a
ny s
uggeste
d
mitig
ation p
roposed b
y the c
onsultin
g p
ale
onto
logis
t, the
City o
f R
io V
ista
Co
mm
unity D
eve
lop
me
nt D
epa
rtm
en
t shall
dete
rmin
e w
heth
er
avoid
ance is n
ecessary
and
feasib
le in lig
ht of fa
cto
rs s
uch a
s the n
atu
re o
f th
e fin
d,
pro
ject desig
n, costs
, specific
pla
n p
olic
ies a
nd land u
se
assum
ptions, and o
ther
consid
era
tions. If avoid
ance is
unnecessary
or
infe
asib
le, oth
er
appro
priate
measure
s
(e.g
., d
ata
reco
very
) shall
be institu
ted. W
ork
ma
y p
roceed
on o
ther
part
s o
f th
e p
roje
ct site, as d
efined b
y the C
ity a
nd
the p
ale
onto
logis
t, w
hile
mitig
ation for
pale
onto
logic
al
resourc
es is c
arr
ied o
ut.
LS
4.4
-4
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
ve
lop
men
t in
th
e C
ity o
f R
io V
ista
, co
uld
cau
se a
su
bsta
nti
al ad
ve
rse c
han
ge
in t
he s
ign
ific
an
ce o
f an
his
tori
cal re
so
urc
e,
un
iqu
e a
rch
aeo
log
ical re
so
urc
e, o
r h
um
an
re
main
s a
s d
efi
ned
in
§21083.2
of
the C
EQ
A
sta
tute
s a
nd
§15064.5
of
the S
tate
CE
QA
G
uid
elin
es.
PS
4.4
-4
Imple
ment M
itig
ation M
easure
s 4
.4-1
and 4
.4-2
. LS
4.4
-5
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
ve
lop
men
t in
th
e C
ity o
f R
io V
ista
, co
uld
dir
ectl
y o
r in
dir
ectl
y d
estr
oy a
un
iqu
e
pale
on
tolo
gic
al re
so
urc
e o
r sit
e o
f a u
niq
ue
geo
log
ic f
eatu
re.
PS
4.4
-5
Imple
ment M
itig
ation M
easure
4.4
-3.
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
4
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.5
Geo
log
y a
nd
So
ils
4.5
-1
Th
e p
rop
os
ed
pro
jec
t c
ou
ld e
xp
ose
pe
op
le
or
str
uctu
res t
o a
dve
rse im
pacts
in
vo
lvin
g
lan
dslid
es d
ue t
o s
ub
sta
nti
al ero
sio
n.
PS
4.5
-1
Imple
ment soil
sta
bili
ty r
ecom
mendations p
rovid
ed in the
Engeo, In
c. geote
chnic
al explo
ration r
eport
during
excavation, gra
din
g, fill
activitie
s, etc
., o
n s
lopes w
ithin
the
pro
ject site. M
easure
s inclu
de, but are
not lim
ited to:
(1)
rem
oval of all
org
anic
s a
nd d
ebris fro
m fill
mate
rials
, (2
) re
moval of soft s
oils
, (3
) com
paction o
f soils
prior
to fill
pla
cem
ent, (
4)
co
mpaction o
f tr
ench b
ackfills
, (5
) lim
itin
g
final slo
pe g
radie
nts
to 2
:1 (
horizonta
l:vert
ical) o
r flatter
for
slo
pes less than 1
0 feet in
heig
ht, (
6)
limitin
g s
lope
gra
die
nts
to 3
:1 for
slo
pes e
xceedin
g 1
0 feet in
heig
ht,
(7)
use o
f perm
anent dra
inage m
easure
s to inte
rcept
surf
ace w
ate
r in
filtra
tion, (8
) re
vie
w o
f gra
din
g p
lans to
ensure
more
deta
iled r
ecom
mendations, (9
) build
ing
setb
acks fro
m s
lopes a
ccord
ing to m
inim
um
UB
C
requirem
ents
, (1
0)
constr
uction o
f re
tain
ing w
alls
, etc
. T
he
most appro
priate
and e
ffective m
easure
s s
hall
be
dete
rmin
ed b
y a
qualif
ied p
roje
ct engin
eer
and r
evie
wed
and a
ppro
ved b
y t
he C
ity P
lannin
g D
epart
ment prior
to the
issuance o
f gra
din
g p
erm
its.
LS
4.5
-2
Th
e p
rop
osed
pro
ject
is lo
cate
d o
n
ex
pan
siv
e s
oil
s, w
hic
h c
ou
ld c
rea
te
su
bsta
nti
al ri
sks t
o lif
e o
r p
rop
ert
y.
PS
4.5
-2
The p
roje
ct applic
ant shall
incorp
ora
te a
ppro
priate
re
com
mendations m
ade in the g
eote
chnic
al explo
ration
report
(E
ngeo, In
c., S
epte
mber
2003)
into
pro
ject desig
n
and g
radin
g a
nd e
xcavation p
lans to r
educe im
pacts
associa
ted w
ith d
evelo
pm
ent of th
e p
roposed p
roje
ct on
expansiv
e s
oils
. M
easure
s to r
educe the e
ffects
of
develo
pm
ent on e
xpansiv
e s
oils
inclu
de, but are
not lim
ited
to: (
1)
the u
tiliz
ation o
f post-
tensio
ned m
at fo
undations for
sin
gle
fa
mily
re
sid
en
ce
s w
ith
in th
e p
rop
ose
d p
roje
ct a
nd
(2
) specific
eart
hw
ork
com
paction a
nd (
3)
mois
ture
re
com
mendations to r
educe the d
am
agin
g e
ffects
of
expansiv
e s
oils
. T
he m
ost effective a
nd a
ppro
priate
m
easure
s, alo
ng w
ith a
ny a
dditio
nal m
easure
s that m
ay b
e
deem
ed a
ppro
priate
shall
be d
ete
rmin
ed b
y a
qualif
ied
ge
ote
ch
nic
al e
ng
ine
er.
T
he
se
me
asu
res s
hall
be
re
vie
we
d
and a
ppro
ved b
y t
he C
ity P
lannin
g D
epart
ment prior
to the
issuance o
f gra
din
g p
erm
its.
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
5
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.5
-3
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
ve
lop
men
t w
ith
in t
he C
ity o
f R
io
Vis
ta, co
uld
exp
ose p
eo
ple
or
str
uctu
res t
o
ad
vers
e im
pacts
in
vo
lvin
g t
he p
lacem
en
t o
f s
tru
ctu
res
on
ex
pa
ns
ive
so
ils
an
d
lan
dslid
es d
ue t
o s
ub
sta
nti
al ero
sio
n,
wh
ich
co
uld
cre
ate
su
bs
tan
tia
l im
pa
cts
to
life
or
pro
pert
y.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
Hazard
s a
nd
Hazard
ou
s M
ate
rials
4.6
-1
Th
e p
rop
os
ed
pro
jec
t c
ou
ld e
xp
ose
pe
op
le
to p
ote
nti
al h
ealt
h h
azard
s b
y d
em
olish
ing
b
uild
ing
s o
n t
he p
roje
ct
sit
e t
hat
co
uld
co
nta
in a
sb
esto
s a
nd
/or
lead
-based
pain
t.
PS
4.6
-1
Prior
to d
em
olit
ion o
f an
y s
tructu
res locate
d o
n the p
roje
ct
site, th
e p
roje
ct applic
ant shall
reta
in a
Cal O
SH
A c
ert
ifie
d
lead-b
ased p
ain
t and A
CB
M c
ontr
acto
r to
conduct a r
isk
assessm
ent of
all
str
uctu
res o
n-s
ite c
onstr
ucte
d p
rior
to
1978 for
the p
resence o
f A
CB
Ms a
nd/o
r le
ad-b
ased p
ain
t.
If A
CB
Ms a
nd/o
r le
ad-b
ased p
ain
t are
dete
rmin
ed to e
xis
t on s
ite, th
e c
ontr
acto
r shall
pre
pare
a s
ite-s
pecific
AC
BM
and lead h
azard
contr
ol pla
n. If
the p
lan c
alls
for
the
rem
oval of A
CB
Ms a
nd lead-b
ased p
ain
ts p
rior
to
dem
olit
ion a
ctivitie
s, A
CB
M r
em
oval m
eth
ods m
ay inclu
de,
but are
not lim
ited to: d
ry s
trip
pin
g, w
et contr
olle
d
str
ippin
g, hig
h p
ressure
wa
ter
jettin
g, and a
ir m
anagem
ent
for
hot str
ippin
g. P
ain
t re
moval m
eth
ods m
ay inclu
de, but
are
not lim
ited to
: u
se o
f a h
eat gun, to
ols
equip
ped w
ith
HE
PA
exh
au
st ca
pa
bili
ty,
we
t scra
pin
g, a
nd
che
mic
al
rem
overs
. If re
moval is
no
t deem
ed n
ecessary
prior
to
dem
olit
ion, th
e p
lan s
hall
make o
ther
recom
mendations for
the c
onta
inm
ent of an
y A
CB
Ms o
r le
ad-b
ased p
ain
t m
ate
rials
that m
ay b
e r
ele
ased into
the e
nvironm
ent during
dem
olit
ion a
ctivitie
s, as w
ell
as a
ppro
priate
dis
posal
meth
ods. T
he p
lan s
hall
als
o p
rovid
e s
pecific
instr
uctions
for
pro
vid
ing p
rote
ctive c
loth
ing a
nd g
ear
for
abate
ment
pers
onnel.
LS
Waste
s fro
m a
bate
ment and d
em
olit
ion a
ctivitie
s s
hall
be
m
anaged a
nd d
isposed o
f at a landfill(
s)
licensed to a
ccept
AC
BM
s a
nd lead-b
ased w
aste
. O
nce a
ll abate
ment
measure
s h
ave b
een im
ple
mente
d, th
e p
roje
ct applic
ant
shall
pro
vid
e w
ritten d
ocum
enta
tion to the C
ity that A
CB
M
and lead-b
ased p
ain
t te
sting a
nd a
bate
ment, if necessary
, has b
een c
om
ple
ted in a
ccord
ance w
ith a
ll fe
dera
l, s
tate
, and local la
ws a
nd r
egula
tions,
inclu
din
g: le
ad-b
ased p
ain
t
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
6
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
exposure
guid
elin
es p
rovid
ed in “
Guid
elin
es for
the
Evalu
ation a
nd C
ontr
ol of Lead B
ased P
ain
t H
azard
s in
Housin
g”
by t
he U
.S. D
epart
ment of H
ousin
g a
nd U
rban
Develo
pm
ent (H
UD
), C
onstr
uction S
afe
ty O
rder
1532.1
fr
om
Title
8 o
f th
e C
alif
orn
ia C
ode o
f R
egula
tions (
CC
R),
and the C
alif
orn
ia D
epart
ment of H
ealth S
erv
ices.
4.6
-2
Co
nstr
ucti
on
an
d/o
r o
ccu
pan
cy o
f th
e
pro
po
sed
pro
ject
co
uld
exp
ose p
eo
ple
to
so
urc
es o
f p
ote
nti
al h
ealt
h h
azard
s, su
ch
as s
oil o
r g
rou
nd
wate
r co
nta
min
ati
on
, fr
om
p
ast
uses o
n-
or
off
-sit
e.
PS
4
.6-2
a)
Prior
to issuin
g g
radin
g p
erm
its, a P
hase II E
SA
shall
be
pre
pare
d b
y t
he p
roje
ct applic
ant in
accord
ance w
ith
pro
fessio
nal sta
ndard
s, as r
ecom
mended in the P
hase I E
SA
.
Th
e P
hase
II E
SA
sh
all
furt
he
r e
va
lua
te th
e R
EC
s id
en
tifie
d
in the P
hase I E
SA
and o
ther
pote
ntial risks that m
ay h
ave
resulted in s
oil
and/o
r gro
undw
ate
r conta
min
ation a
t th
e
pro
ject site. T
he P
hase II E
SA
shall
inclu
de s
oil
sam
plin
g to
be c
onducte
d a
t each o
f th
e s
ites o
f th
e R
EC
s identified in the
Phase I E
SA
, in
clu
din
g the E
spers
on H
om
este
ad, in
the a
rea
of each o
f th
e a
bove-g
round s
tora
ge tanks, th
e s
tora
ge y
ard
on the E
spers
on H
om
este
ad, and the s
tora
ge s
ilos o
n the
Esp
ers
on
Ho
meste
ad
. T
he
Ph
ase
II E
SA
sh
all
als
o
investigate
the p
ote
ntial fo
r soil
conta
min
ation r
esultin
g fro
m
the u
se o
f pesticid
es a
nd/o
r herb
icid
es thro
ughout th
e p
roje
ct
site.
LS
A w
ork
pla
n for
and r
esults o
f th
e investigation s
hall
be
subm
itte
d b
y t
he p
roje
ct applic
ant to
the C
ity o
f R
io V
ista
P
lannin
g D
epart
ment fo
r re
vie
w a
nd a
ppro
val. T
he r
esults o
f th
e s
tud
y s
hall
identify
recom
mended m
easure
s to r
educe
pote
ntial risks, if a
ny,
to indiv
idua
ls a
nd the e
nvironm
ent th
at
could
occur
during s
ite d
evelo
pm
ent or
futu
re o
ccupancy.
R
em
edia
tion
me
asu
res r
eco
mm
en
de
d b
y t
he
Ph
ase
II E
SA
and w
ork
pla
n s
hall
be c
arr
ied o
ut to
the s
atisfa
ction the C
ity
of R
io V
ista
Pla
nnin
g D
epart
ment prior
to issuin
g g
radin
g
perm
its.
b)
In the e
vent th
at pre
vio
usly
unid
entified s
oil
or
gro
undw
ate
r conta
min
ation, U
ST
s, or
oth
er
featu
res o
r m
ate
rials
that could
pre
sent a thre
at to
hum
an h
ealth o
r th
e e
nvironm
ent are
dis
covere
d d
uring e
xcavation a
nd g
radin
g o
r constr
uction
activitie
s, all
constr
uction w
ithin
the p
roje
ct site s
hall
cease
imm
edia
tely
, an
d the a
pplic
ant shall
reta
in a
qualif
ied
pro
fessio
nal to
evalu
ate
the typ
e a
nd e
xte
nt of th
e h
azard
ous
mate
rials
conta
min
ation a
nd m
ake a
ppro
priate
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
7
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
recom
mendations, in
clu
din
g, if n
ecessary
, th
e p
repara
tion o
f a s
ite r
em
edia
tion p
lan. P
urs
uant to
Section 2
5401.0
5 (
a)(
1)
of th
e C
alif
orn
ia H
ealth a
nd S
afe
ty C
ode, th
e p
lan s
hall
inclu
de: a
pro
posal in
com
plia
nce w
ith a
pplic
ation law
, re
gula
tions, and s
tandard
s for
conducting a
site investigation
and r
em
edia
l action, a s
chedule
for
the c
om
ple
tion o
f th
e s
ite
investigation a
nd
rem
edia
l action, and a
pro
posal fo
r an
y
oth
er
rem
edia
l actions p
roposed to r
espond to the r
ele
ase o
r th
reate
ned r
ele
ase o
f hazard
ous m
ate
rials
at th
e p
ropert
y.
Work
within
the p
roje
ct site s
hall
not pro
ceed u
ntil all
ide
ntifie
d h
aza
rds a
re m
an
ag
ed
to
th
e s
atisfa
ctio
n o
f th
e C
ity
an
d th
e S
ola
no
Co
un
ty E
nviro
nm
en
tal M
an
agem
en
t D
epart
ment.
c)
In the e
vent site investigation a
nd/o
r re
media
tion a
re
required, th
e a
pplic
ant shall
ensure
pre
para
tion o
f a s
ite-
specific
health a
nd s
afe
ty p
lan t
hat m
eets
the inte
nt of O
SH
A
hazard
ous m
ate
rials
wo
rker
requir
em
ents
(C
CR
Title
8).
T
he
pla
n s
hall
be
pre
pare
d b
y a
qualif
ied p
rofe
ssio
nal prior
to the
com
mencem
ent of site-d
istu
rbin
g a
ctivitie
s a
ssocia
ted w
ith
the investigation a
nd/o
r re
media
tion. T
he p
lan s
hall
pro
vid
e
for
the identification, evalu
ation, contr
ol of safe
ty a
nd h
ealth
hazard
s, and e
merg
ency r
esponse to h
azard
ous w
aste
opera
tions. P
urs
uant to
the r
equirem
ents
of sta
te a
nd federa
l la
w,
the s
ite-s
pecific
health a
nd s
afe
ty p
lan m
ay r
equire, but
would
not be lim
ited to: the u
se o
f pers
onal pro
tective
equip
ment, o
nsite c
ontr
ols
(e.g
., c
ontinuous a
ir q
ualit
y
monitoring)
during c
onstr
uction, and o
ther
pre
cautions a
s
dete
rmin
ed to b
e n
ecessary
by t
he p
lan p
repare
r.
d)
Prior
to the issuance o
f gra
din
g p
erm
its, an investigation s
hall
confirm
the p
resence o
f fo
rmer
septic s
yste
ms a
t th
e
Espers
on H
om
este
ad. If th
e h
om
este
ad d
oes in fact conta
in
form
er
septic s
yste
ms, th
ese s
yste
ms s
hall
be
abandoned
under
perm
it fro
m, and to the s
atisfa
ction o
f, the S
ola
no
County
Environm
enta
l M
anagem
ent D
epart
ment.
e)
During s
ite p
repara
tion a
ctivitie
s s
uch a
s g
radin
g a
nd
excavation, exte
rnal corr
osio
n c
ontr
ol m
easure
s s
uch a
s, but
not lim
ited to, th
e u
se o
f pro
tective c
oating o
n p
ipe e
xte
riors
and the u
se o
f cath
odic
pro
tection s
yste
ms s
hall
be u
sed b
y
the p
roje
ct contr
acto
r to
pre
vent corr
osio
n d
am
age to e
xis
ting
pip
elin
es that m
ay b
ecom
e u
neart
hed d
uring these a
ctivitie
s.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
8
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
These a
ctivitie
s s
hall
be m
onitore
d b
y the S
ola
no C
ounty
E
nvironm
enta
l M
anagem
ent D
epart
ment.
4.6
-3
Co
nstr
ucti
on
an
d/o
r o
ccu
pan
cy o
f th
e
pro
po
sed
pro
jec
t w
ou
ld in
vo
lve
th
e r
ou
tin
e
use, sto
rag
e, an
d t
ran
sp
ort
ati
on
of
hazard
ou
s m
ate
rials
, w
hic
h c
ou
ld c
reate
a
healt
h h
aza
rd o
r p
ote
nti
al h
ealt
h h
azard
.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-4
Th
e p
rop
osed
pro
ject
co
uld
resu
lt in
p
ote
nti
ally s
ign
ific
an
t h
azard
s t
o
resid
en
ces a
nd
sch
oo
ls d
ue t
o t
he n
atu
ral
gas e
xtr
acti
on
acti
vit
ies w
ith
in t
he p
roje
ct
sit
e.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-5
Th
e p
rop
osed
pro
ject
co
uld
resu
lt in
p
ote
nti
ally s
ign
ific
an
t h
azard
s t
o
resid
en
ces a
nd
sch
oo
ls d
ue t
o t
he
pre
sen
ce o
f n
atu
ral g
as t
ran
sm
issio
n
facilit
ies w
ith
in t
he p
roje
ct
sit
e.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-6
Th
e p
rop
osed
pro
ject
is lo
cate
d w
ith
in t
wo
m
iles o
f th
e R
io V
ista
Mu
nic
ipal
Air
po
rt,
wh
ich
co
uld
resu
lt in
a s
afe
ty h
azard
.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-7
Imp
lem
en
tati
on
of
the p
rop
osed
pro
ject
co
uld
exp
ose
se
ns
itiv
e r
ec
ep
tors
to
in
cre
ased
evac
uati
on
ris
ks u
nd
er
em
erg
en
cy c
on
dit
ion
s.
PS
4
.6-7
C
ity o
f R
io V
ista
sh
all
no
t is
su
e o
ccu
pa
ncy b
uild
ing
pe
rmits
beyond the 1
,931st re
sid
ential un
it u
ntil th
e p
roje
ct
applic
ant coord
inate
s w
ith t
he C
ity F
ire C
hie
f and the
So
lan
o C
ou
nty
OE
S to
en
su
re p
roje
ct co
mplia
nce
with
th
e
appro
ved c
ounty
Em
erg
ency E
vacuation P
lan. A
ny
applic
ant re
vis
ions to the e
vacuation p
lan w
ould
be s
ubje
ct
to the r
evie
w a
nd a
ppro
val of th
e C
ity F
ire C
hie
f and
So
lan
o C
ou
nty
OE
S.
LS
4.6
-8
Co
nstr
ucti
on
an
d/o
r o
ccu
pan
cy o
f th
e
pro
po
sed
pro
ject,
in
co
mb
inati
on
wit
h o
ther
pro
jects
in
th
e C
ity o
f R
io V
ista
, co
uld
exp
ose p
eo
ple
to
so
urc
es o
f p
ote
nti
al
healt
h h
azard
s, su
ch
as a
sb
esto
s
co
nta
inin
g b
uild
ing
mate
rials
, le
ad
-based
p
ain
t, a
nd
so
il o
r g
rou
nd
wate
r co
nta
min
ati
on
, fr
om
past
uses o
n-
or
off
-sit
e.
PS
4.6
-8
Imple
ment M
itig
ation M
easure
s 4
.6-1
and 4
.6-2
. LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-1
9
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.6
-9
Co
nstr
ucti
on
an
d/o
r o
ccu
pan
cy o
f th
e
pro
po
sed
pro
ject,
in
co
mb
inati
on
wit
h t
he
de
velo
pm
en
t o
f o
the
r p
roje
cts
in
an
d
aro
un
d t
he C
ity o
f R
io V
ista
, w
ou
ld in
vo
lve
the r
ou
tin
e u
se, sto
rag
e, an
d t
ran
sp
ort
ati
on
o
f h
azard
ou
s m
ate
rials
, w
hic
h c
ou
ld c
reate
a h
ealt
h h
azard
or
po
ten
tial h
ealt
h h
azard
.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-10
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
velo
pm
en
t in
th
e C
ity, co
uld
resu
lt
in p
ote
nti
ally s
ign
ific
an
t h
azard
s r
ela
ted
to
th
e e
xtr
ac
tio
n a
nd
tra
ns
mis
sio
n o
f n
atu
ral g
as.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-11
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
pro
jects
in
th
e C
ity o
f R
io V
ista
, w
ou
ld r
esu
lt in
th
e d
evelo
pm
en
t o
f re
sid
en
tial, c
om
merc
ial, a
nd
sch
oo
l u
ses
wit
hin
tw
o m
iles o
f th
e R
io V
ista
Mu
nic
ipal
Air
po
rt, w
hic
h c
ou
ld r
esu
lt in
a s
afe
ty
hazard
fo
r p
eo
ple
resid
ing
an
d w
ork
ing
w
ith
in t
he p
rop
osed
pro
ject.
LS
N
on
e r
eq
uir
ed
. N
A
4.6
-12
Cu
mu
lati
ve d
eve
lop
men
t, in
clu
din
g t
he
pro
po
sed
pro
ject,
co
uld
aff
ect
imp
lem
en
tati
on
an
ad
op
ted
em
erg
en
cy
evacu
ati
on
pla
n.
PS
4
.6-1
2
City o
f R
io V
ista
sh
all
no
t is
su
e o
ccu
pa
ncy b
uild
ing
pe
rmits
be
yo
nd
th
e 1
,93
1st r
esid
ential unit u
ntil th
e p
roje
ct
applic
ant coord
inate
s w
ith t
he C
ity F
ire C
hie
f and the
So
lan
o C
ou
nty
OE
S to
en
su
re p
roje
ct co
mplia
nce
with
th
e
appro
ved c
ounty
Em
erg
ency E
vacuation P
lan. A
ny
applic
ant re
vis
ions to the e
vacuation p
lan w
ould
be s
ubje
ct
to the r
evie
w a
nd a
ppro
val of th
e C
ity F
ire C
hie
f and
So
lan
o C
ou
nty
OE
S.
LS
4.7
Hyd
rolo
gy a
nd
Wate
r Q
uality
4.7
-1
Th
e p
rop
osed
pro
ject
wo
uld
in
cre
ase p
eak
run
off
ra
tes
an
d v
olu
me
s w
hic
h c
ou
ld
exceed
th
e c
ap
acit
y o
f lo
cal d
rain
ag
es a
nd
re
su
lt in
on
- an
d o
ff-s
ite f
loo
din
g h
azard
s.
PS
4
.7-1
a)
Prior
to issuance o
f a g
radin
g p
erm
it, th
e a
pplic
ant shall
pre
pare
a F
inal D
rain
age M
aste
r P
lan for
all
on-
and o
ff-s
ite
dra
ina
ge
fa
cili
tie
s (
inclu
din
g w
ate
r qualit
y facili
ties -
BM
Ps)
shall
be p
repare
d a
nd s
ubm
itte
d to the C
ity o
f R
io V
ista
D
epart
ment of P
ublic
Work
s a
nd
the C
om
munity
Develo
pm
ent D
epart
ment (C
ity)
for
revie
w a
nd a
ppro
val. T
he
Fin
al D
rain
ag
e M
aste
r P
lan
sha
ll d
em
on
str
ate
th
at p
ea
k flo
ws
from
develo
ped a
reas w
ould
not exceed p
re-d
evelo
pm
ent
conditio
ns a
nd s
hall
be in c
onfo
rmance w
ith th
e r
equirem
ents
of R
io V
ista
’s G
enera
l P
lan p
olic
ies a
nd g
uid
elin
es for
desig
n
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
0
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
of dra
inage facili
ties a
nd the c
rite
ria u
sed in the S
ola
no
County
Hydro
log
y M
anual th
at
are
in e
ffect at th
e tim
e o
f su
bm
itta
l. T
he
Dra
ina
ge
Pla
ns s
ha
ll in
clu
de
at a
min
imu
m,
written te
xt addre
ssin
g e
xis
ting c
onditio
ns, th
e e
ffects
of
pro
ject im
pro
vem
ents
, all
appro
priate
calc
ula
tions, a
wate
rshed m
ap, pote
ntial in
cre
ases in d
ow
nstr
eam
flo
ws a
nd
volu
mes, pro
posed o
n-s
ite a
nd o
ff-s
ite im
pro
vem
ents
, on-s
ite
wa
ter
qualit
y fa
cili
ties, effectiveness o
f w
ate
r q
ualit
y B
MP
s,
opera
tion a
nd m
ain
tenance r
esponsib
ilities, in
spection
schedule
s, and r
eport
ing r
equirem
ents
. T
he F
inal D
rain
age
Ma
ste
r P
lan
sha
ll b
e p
repa
red
by a
Re
gis
tere
d C
ivil
Eng
ine
er
an
d s
ha
ll in
clu
de
sp
ecific
s r
eg
ard
ing
th
e tim
ing
of
imp
lem
en
tatio
n.
b)
Fundin
g a
nd im
ple
menta
tion for
the m
ain
tenance o
f re
quired
dra
inage facili
ties s
hall
be p
rovid
ed b
y a
Hom
eow
ners
A
ssocia
tion, C
om
munity S
erv
ices D
istr
ict, o
r oth
er
responsib
le e
ntity
to b
e d
ete
rmin
ed a
ppro
priate
by t
he C
ity
prior
to c
onstr
uction.
4.7
-2
Co
nstr
ucti
on
acti
vit
ies f
or
the
pro
po
sed
p
roje
ct
co
uld
resu
lt in
sed
imen
t an
d o
ther
co
nstr
ucti
on
-rela
ted
po
llu
tan
ts e
nte
rin
g
local d
rain
ag
es.
PS
4
.7-2
a)
Any p
roje
ct
with
in the D
RH
PU
D w
ith g
round d
istu
rbance
exceedin
g o
ne-a
cre
that is
subje
ct to
the S
tate
NP
DE
S
Genera
l C
onstr
uction P
erm
it s
ha
ll obta
in s
uch p
erm
it fro
m the
CV
RW
QC
B a
nd s
hall
pro
vid
e to the C
ity e
vid
ence o
f a S
tate
-is
sued N
PD
ES
Genera
l C
onstr
uction P
erm
it n
um
ber
or
filin
g
of a N
otice o
f In
tent and fees p
rior
to s
tart
of co
nstr
uction.
LS
b)
Imple
ment M
itig
ation M
easure
4.5
-1 (
slo
pe s
tabili
ty a
nd
ero
sio
n c
ontr
ol fr
om
Section 4
.5 –
Geolo
gy a
nd S
oils
).
4.7
-3
Op
era
tio
n o
f th
e p
rop
os
ed
pro
jec
t w
ou
ld
resu
lt in
urb
an
po
llu
tan
ts e
nte
rin
g lo
cal
dra
ina
ge
s, w
hic
h c
ou
ld e
xc
eed
or
vio
late
w
ate
r q
uality
sta
nd
ard
s.
PS
4
.7-3
a)
Imple
ment M
itig
ation M
easure
s 4
.7-1
(a)
and (
b).
b)
P
roje
ct-
rela
ted s
torm
wa
ter
dis
charg
es a
re s
ubje
ct to
all
applic
able
requirem
ents
of th
e N
ational P
ollu
tan
t D
ischarg
e
Elim
ination S
yste
m (
NP
DE
S)
Phase II pro
gra
m. B
MP
s s
hall
be d
esig
ned to m
itig
ate
(m
inim
ize, in
filtra
te, filter,
or
treat)
sto
rmw
ate
r ru
noff in a
ccord
ance w
ith A
ttachm
ent 4 o
f th
e
City’s
NP
DE
S M
unic
ipal S
torm
wate
r P
erm
it (
Sta
te W
ate
r R
esou
rces C
ontr
ol B
oard
NP
DE
S G
enera
l P
erm
it N
o.
CA
S000004).
A
ll B
MP
s for
wa
ter
qualit
y p
rote
ction, sourc
e
contr
ol, a
nd tre
atm
ent contr
ol shall
be d
evelo
ped in
accord
ance w
ith the C
alif
orn
ia S
torm
wate
r Q
ualit
y
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
1
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
Associa
tion S
torm
wa
ter
Best M
anagem
ent P
ractice
Handbook for
Constr
uction a
nd N
ew
Develo
pm
ent/
Redevelo
pm
ent (o
r oth
er
sim
ilar
sourc
e a
ppro
ved b
y the C
ity)
for
the a
pplic
able
type o
f develo
pm
ent and/o
r im
pro
vem
ent.
The B
MP
s s
hall
be d
esig
ned to m
itig
ate
(m
inim
ize, in
filtra
te,
filter,
or
treat)
sto
rmw
ate
r ru
noff. F
low
or
volu
me b
ased p
ost-
co
nstr
uctio
n B
MP
s s
ha
ll b
e d
esig
ne
d a
t a
min
imu
m in
accord
ance w
ith c
rite
ria b
ased in the C
AS
QA
Handbook.
Pro
vis
ions s
hall
be inclu
ded for
long-t
erm
main
tenance o
f B
MP
s. A
ll B
MP
s s
hall
reflect th
e B
est A
vaila
ble
T
echnolo
gie
s (
BA
T)
availa
ble
at th
e tim
e o
f im
ple
menta
tion
and s
hall
reflect site-s
pecific
lim
itations. T
he C
ity s
hall
make
the fin
al dete
rmin
ations a
s t
o the a
ppro
priate
ness o
f th
e
BM
Ps p
roposed for
each p
roje
ct.
4.7
-4
Th
e p
rop
os
ed
pro
jec
t c
ou
ld r
ed
uce
g
rou
nd
wate
r re
ch
arg
e a
nd
aff
ect
gro
un
dw
ate
r q
uality
.
LS
N
on
e r
eq
uir
ed
. N
A
4.7
-5
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
the b
uild
ou
t o
f th
e C
ity o
f R
io V
ista
’s
wate
rsh
ed
s, co
uld
resu
lt in
sto
rmw
ate
r p
eak f
low
s a
nd
vo
lum
es t
hat
co
uld
resu
lt in
o
n-
or
off
-sit
e f
loo
din
g.
PS
4.7
-5
Imple
ment M
itig
ation M
easure
4.7
-1(a
) and (
b).
LS
4.7
-6
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
the b
uild
ou
t o
f th
e C
ity G
en
era
l P
lan
, w
ou
ld
resu
lt in
deg
rad
ati
on
of
wate
r q
uality
fro
m
sto
rmw
ate
r ru
no
ff.
PS
4.7
-6
Imple
ment M
itig
ation M
easure
s 4
.7-2
(a)
and (
b)
and
4.7
-3(a
) and (
b).
L
S
4.7
-7
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
velo
pm
en
t in
th
e S
ola
no
Su
bb
asin
, co
uld
im
pact
gro
un
dw
ate
r re
ch
arg
e r
ate
s
an
d q
uality
.
LS
N
on
e r
eq
uir
ed
. N
A
4.8
Lan
d U
se a
nd
Ag
ricu
ltu
ral R
eso
urc
es
4.8
-1
Imp
lem
en
tati
on
of
the p
rop
osed
pro
ject,
co
uld
co
nfl
ict
wit
h t
he R
io V
ista
Gen
era
l P
lan
, R
io V
ista
Zo
nin
g O
rdin
an
ce
, S
ola
no
C
ou
nty
Gen
era
l P
lan
, o
r o
ther
ap
plicab
le
po
licie
s.
LS
N
on
e r
eq
uir
ed
. N
A
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
2
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.8
-2
De
ve
lop
men
t o
f th
e p
rop
osed
pro
ject
co
uld
cre
ate
in
co
mp
ati
ble
uses s
uch
th
at
the
pro
du
cti
vit
y o
f ad
jacen
t ag
ricu
ltu
ral la
nd
is
su
bsta
nti
ally r
ed
uced
or
that
the r
esu
ltin
g
resid
en
tial u
ses
are
ad
ve
rsely
aff
ecte
d b
y
ag
ricu
ltu
ral acti
vit
ies.
LS
N
on
e r
eq
uir
ed
. N
A
4.9
No
ise
4.9
-1
Co
nstr
ucti
on
of
the p
rop
osed
pro
ject
wo
uld
te
mp
ora
rily
in
cre
ase a
mb
ien
t n
ois
e le
ve
ls.
LS
4.9
-1 T
he p
rim
e c
ontr
acto
r shall
ensure
that th
e f
ollo
win
g m
easure
s
are
im
ple
mente
d d
uring a
ll phase
s o
f pro
ject constr
uction:
LS
a
) C
on
str
uctio
n a
ctivitie
s s
ha
ll com
ply
with
th
e R
io V
ista
M
unic
ipal C
ode, in
clu
din
g c
om
plia
nce w
ith o
pera
tional hours
fo
r constr
uction e
quip
ment of 7:0
0 a
.m. to
7:0
0 p
.m.
b)
Locate
fix
ed c
onstr
uction e
quip
ment, s
uch a
s c
om
pre
ssors
and g
enera
tors
, and c
onstr
uction s
tagin
g a
reas a
s far
as
possib
le (
with a
min
imum
dis
tance o
f 50 feet)
fro
m n
earb
y
sensitiv
e r
ecepto
rs. S
hro
ud o
r shie
ld a
ll im
pact to
ols
and
muffle
or
shie
ld a
ll in
take a
nd e
xhaust port
s o
n p
ow
er
constr
uction e
quip
ment w
ithin
50 f
eet of sensitiv
e r
ecepto
rs.
c)
Desig
nate
a d
istu
rbance c
oord
inato
r and c
onspic
uously
post
this
pers
on's
num
ber
aro
und the p
roje
ct site a
nd in a
dja
cent
public
spaces. T
his
dis
turb
ance c
oord
inato
r w
ill r
eceiv
e a
ll public
com
pla
ints
about constr
uction n
ois
e d
istu
rbances a
nd
will
be r
esponsib
le for
dete
rmin
ing the c
ause o
f th
e c
om
pla
int,
and im
ple
ment any feasib
le m
easure
s to b
e taken to a
llevia
te
the p
roble
m, in
clu
din
g, fo
r exam
ple
, use o
f te
mpora
ry n
ois
e
attenuation m
echanis
ms s
uch a
s the e
rection o
f te
mpora
ry
sound w
alls
, esta
blis
hm
ent of short
term
constr
uction
setb
acks, use o
f nois
e c
ontr
ol bla
nkets
, and the u
se o
f equip
ment m
uffle
rs, in
ord
er
to r
educe n
ois
e o
n e
xis
ting
sensitiv
e r
ecepto
rs.
4.9
-2
Co
nstr
ucti
on
of
the p
rop
osed
pro
ject
wo
uld
te
mp
ora
rily
in
cre
ase le
ve
ls o
f g
rou
nd
bo
rne
vib
rati
on
.
LS
4.9
-2
Imple
ment M
itig
ation M
easure
s 4
.9-1
(a)
thro
ugh (
c).
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
3
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.9
-3
Th
e p
rop
osed
pro
ject
wo
uld
cre
ate
tr
an
sp
ort
ati
on
no
ise t
hat
co
uld
aff
ect
exis
tin
g r
ecep
tors
.
S
4.9
-3
The p
roje
ct sponsor
shall
be r
equired to p
rovid
e n
ois
e
attenuation to S
ierr
a A
venue b
etw
een the p
roje
ct site a
nd
Dro
uin
Drive. N
ois
e a
ttenuation s
hall
be a
chie
ved w
ith t
he
imple
menta
tion o
f open g
rade a
sphalt, w
hic
h p
rovid
es
appro
xim
ate
ly a
2 to 3
dB
A d
ecre
ase in tra
ffic
nois
e level,
in o
rder
to r
educe the p
roje
ct’s c
ontr
ibution to tra
ffic
nois
e
in this
are
a.
LS
4.9
-4
Th
e p
rop
osed
pro
ject
wo
uld
cre
ate
tr
an
sp
ort
ati
on
no
ise t
hat
co
uld
aff
ect
pro
po
sed
resid
en
tial re
cep
tors
ad
jacen
t to
S
R 1
2.
PS
4
.9-4
a)
The p
roje
ct develo
per
shall
ensure
that nois
e levels
at th
e
exte
rio
r a
rea
s o
f th
e p
rop
ose
d d
eta
ch
ed
(sin
gle
fa
mily
) re
sid
en
tia
l u
nits m
ee
ts th
e C
ity’s
65
dB
A s
tan
da
rd. F
ina
l desig
n s
hould
inclu
de a
t le
ast a 4
-foot berm
and a
six
-foot
wall
or
a 2
-foot
berm
and a
n 8
-foot
wall
com
bin
ation w
here
th
e s
etb
ack to the b
erm
is a
dja
cent to
the r
oadw
ay r
ight-
of-
wa
y a
nd there
is a
t le
ast a 6
5-f
oot setb
ack to the r
esid
ential
wa
lls; or
som
e o
ther
com
bin
ation o
f berm
s,
wa
lls, and
setb
acks that ensure
the e
xte
rior
nois
e levels
at th
e c
losest
de
tach
ed
(sin
gle
-fa
mily
) re
sid
en
tia
l u
nits a
re 6
5 d
BA
or
less.
LS
b)
The p
roje
ct develo
per
shall
ensure
that in
terior
nois
e levels
at
the p
roposed d
eta
ched (
sin
gle
fam
ily)
resid
ential units m
eets
th
e C
ity’s
45 d
BA
sta
ndard
, by incorp
ora
ting s
ite d
esig
n a
nd
insula
tion featu
res to m
eet th
is s
tandard
.
c)
If e
xte
rior-
to-inte
rior
nois
e r
eduction featu
res for
resid
ential
str
uctu
res r
equires inopera
ble
or
clo
sed w
indow
s to m
eet th
e
nois
e s
tandard
, a m
echanic
al ventila
tion s
yste
m m
eeting
Uniform
Build
ing C
ode r
equirem
ents
must be p
rovid
ed.
4.9
-5
Sta
tio
nary
so
urc
es a
sso
cia
ted
wit
h t
he
pro
po
sed
pro
ject
wo
uld
in
cre
ase a
mb
ien
t n
ois
e le
vels
at
ex
isti
ng
an
d p
rop
os
ed
re
cep
tors
.
S
4.9
-5
The p
roje
ct develo
per
shall
ensure
that m
echanic
al
equip
ment in
sta
lled for
resid
ential and c
om
merc
ial
bu
ildin
gs a
nd
tru
ck lo
adin
g a
rea
s s
ha
ll b
e lo
ca
ted
as fa
r aw
ay fro
m r
esid
ential re
cepto
rs a
s feasib
le, and s
hall
inclu
de p
roper
shie
ldin
g s
uch that nois
e levels
at th
e
clo
sest re
sid
ential re
cepto
r w
ould
be b
elo
w 4
5 d
BA
Leq for
me
ch
anic
al eq
uip
me
nt a
nd
belo
w 5
0 d
BA
Leq for
truck
loa
din
g a
rea
s.
LS
4.9
-6
Th
e p
rop
osed
pro
ject
wo
uld
pla
ce
resid
en
ts a
dja
cen
t to
gas w
ell b
uff
er
are
a a
t th
e p
roje
ct
sit
e.
S
4.9
-6
The p
rim
e c
ontr
acto
r shall
ensure
that one o
r all
of th
e
follo
win
g m
easure
s a
re im
ple
mente
d for
resid
ential units
adja
cent to
a w
ell
site b
uffer
are
a a
s d
esig
nate
d o
n the
pro
posed s
ite p
lan:
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
4
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
a)
Com
ply
with the
Rio
Vis
ta M
unic
ipal C
ode b
y p
rovid
ing
exte
rior-
to-inte
rior
nois
e r
eduction featu
res for
the r
esid
ential
str
uctu
res a
dja
cent to
the 1
50 f
oot of th
e s
etb
ack a
rea for
a
well
site to a
ssure
that in
terior
nois
e levels
are
30 d
BA
or
less
within
bedro
om
s a
nd 3
5 d
BA
in o
ther
room
s.
b)
In o
rder
to c
om
ply
with the C
ity’s
Munic
ipal C
ode s
tandard
s,
the follo
win
g n
ois
e a
ttenuation m
easure
could
be
imple
mente
d: incre
ase the r
esid
ential setb
ack, re
quire the
constr
uction o
f te
mpora
ry n
ois
e b
arr
iers
such a
s s
ound w
alls
or
berm
, or
pro
vis
ion o
f la
ndscapin
g featu
res inclu
din
g thic
k
tree lin
es a
long the p
erim
ete
r of th
e w
ell
sites.
c)
If e
xte
rior-
to-inte
rior
nois
e r
eduction featu
res for
hig
h d
ensity
resid
en
tia
l str
uctu
res r
eq
uire
s ino
pe
rab
le o
r clo
se
d w
ind
ow
s
to m
eet th
e n
ois
e s
tandard
, a m
echanic
al ventila
tion s
yste
m
meeting U
niform
Build
ing C
ode r
equirem
ents
must be
pro
vid
ed.
4.9
-7
Th
e p
rop
osed
pro
ject
wo
uld
no
t exp
ose
resid
en
ts w
ith
in t
wo
miles o
f th
e R
io V
ista
A
irp
ort
to
no
ise le
ve
ls i
n e
xcess o
f th
e
sta
nd
ard
s.
LS
N
on
e r
eq
uir
ed
. N
A
4.9
-8
Co
nstr
ucti
on
of
the p
rop
osed
pro
ject
wo
uld
te
mp
ora
rily
ad
d t
o c
um
ula
tive
no
ise le
ve
ls
in t
he v
icin
ity o
f th
e p
rop
osed
pro
ject
sit
e.
LS
N
on
e r
eq
uir
ed
. N
A
4.9
-9
Incre
ases in
tra
ffic
asso
cia
ted
wit
h t
he
pro
po
sed
pro
ject
wo
uld
cre
ate
no
ise t
hat
co
uld
co
mb
ine w
ith
oth
er
road
way n
ois
e
an
d a
ffect
sen
sit
ive
recep
tors
.
S4.9
-9
Imple
ment M
itig
ation M
easure
4.9
-3.
LS
4.1
1 P
ub
lic
Se
rvic
es
4.1
1-1
T
he p
rop
osed
pro
ject
wo
uld
resu
lt in
an
in
cre
ased
dem
an
d f
or
po
lice p
rote
cti
on
serv
ices, re
qu
irin
g n
ew
or
exp
an
ded
po
lice
facilit
ies t
he c
on
str
ucti
on
of
wh
ich
co
uld
cau
se s
ign
ific
an
t en
vir
on
men
tal eff
ects
.
S4.1
1-1
P
rior
to p
roje
ct constr
uction, th
e p
roje
ct applic
ant shall
pay
the m
unic
ipal fa
cili
ties f
ee tow
ard
the d
evelo
pm
ent of
adequate
polic
e facili
ties a
s r
equired b
y S
ection 3
.36.0
20
of th
e C
ity o
f R
io V
ista
Munic
ipal C
ode. T
he p
roje
ct
applic
ant shall
als
o p
ay a
n a
dditio
nal fe
e to e
nsure
adequate
fundin
g is a
vaila
ble
to c
onstr
uct a n
ew
polic
e
facili
ty p
rior
to t
he d
evelo
pm
ent of 450 u
nits.
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
5
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.1
1-2
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
futu
re d
eve
lop
men
t in
th
e C
ity o
f R
io V
ista
, w
ou
ld r
esu
lt in
an
in
cre
ased
dem
an
d f
or
po
lic
e p
rote
cti
on
se
rvic
es
, in
clu
din
g t
he
co
nstr
ucti
on
of
new
po
lice f
acilit
ies, w
hic
h
co
uld
cau
se
sig
nif
ica
nt
en
vir
on
men
tal
eff
ects
.
S
4.1
1-2
Im
ple
ment M
itig
ation M
easure
4.1
1-1
. LS
4.1
1-3
T
he p
rop
osed
pro
ject
wo
uld
resu
lt in
an
in
cre
ased
dem
an
d f
or
fire
pro
tecti
on
an
d
em
erg
en
cy r
esp
on
se s
erv
ice
s, re
qu
irin
g
new
or
exp
an
ded
fir
e f
acilit
ies, th
e
co
ns
tru
cti
on
of
wh
ich
co
uld
ca
us
e
sig
nif
ican
t en
vir
on
men
tal eff
ects
.
S
4.1
1-3
P
rior
to p
roje
ct constr
uction, th
e p
roje
ct applic
ant shall
pay
the m
unic
ipal fa
cili
ties f
ee tow
ard
the d
evelo
pm
ent of
adequate
fire facili
ties, sta
ff, and e
quip
ment as r
equired b
y
Section 3
.36.0
20 o
f th
e C
ity o
f R
io V
ista
Munic
ipal C
ode.
The p
roje
ct applic
ant shall
als
o p
ay a
n a
dditio
nal fe
e to
ensure
adequate
fundin
g is a
vaila
ble
to c
onstr
uct a n
ew
fire
facili
ty p
rior
to o
r com
ple
tion o
f firs
t phase.
LS
4.1
1-4
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
futu
re d
eve
lop
men
t in
th
e C
ity o
f R
io V
ista
, w
ou
ld r
esu
lt in
an
in
cre
ased
dem
an
d f
or
fire
pro
tec
tio
n a
nd
em
erg
en
cy r
es
po
ns
e
serv
ices, in
clu
din
g t
he c
on
str
ucti
on
of
new
p
olice f
acilit
ies
wh
ich
co
uld
cau
se
sig
nif
ican
t en
vir
on
men
tal eff
ects
.
S
4.1
1-4
Im
ple
ment M
itig
ation M
easure
4.1
1-3
. LS
4.1
1-5
T
he p
rop
osed
pro
ject
wo
uld
gen
era
te s
olid
w
aste
th
at
co
uld
ex
ce
ed
th
e p
roje
cte
d
cap
acit
y o
f th
e lan
dfi
ll t
hat
wo
uld
serv
e t
he
pro
ject.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
1-6
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
futu
re d
eve
lop
men
t in
th
e C
ity o
f R
io V
ista
, w
ou
ld g
en
era
te s
oli
d w
as
te t
ha
t c
ou
ld
exceed
th
e p
roje
cte
d c
ap
acit
y o
f th
e lan
dfi
ll
that
wo
uld
serv
e t
he C
ity.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
1-7
T
he p
rop
osed
pro
ject
co
uld
gen
era
te
ad
dit
ion
al ele
men
tary
, m
idd
le, an
d h
igh
sch
oo
l stu
den
ts in
th
e R
ive
r D
elt
a U
nif
ied
S
ch
oo
l D
istr
ict
that
wo
uld
req
uir
e t
he
co
nstr
ucti
on
of
new
, o
r exp
an
sio
n o
f exis
tin
g s
ch
oo
l fa
cilit
ies w
ith
th
e p
ote
nti
al
to r
esu
lt in
sig
nif
ican
t en
vir
on
men
tal
eff
ects
.
PS
4.1
1-7
T
he p
roje
ct applic
ant shall
pay s
chool m
itig
ation fees to the
RD
US
D for
the c
onstr
uction o
r expansio
n o
f school
facili
ties w
hic
h w
ould
be r
equired to a
ccom
modate
stu
dents
genera
ted b
y t
he p
roposed p
roje
ct.
LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
6
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.1
1-8
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
futu
re d
eve
lop
men
t in
th
e C
ity o
f R
io V
ista
, co
uld
gen
era
te a
dd
itio
nal stu
den
ts in
th
e
Riv
er
De
lta
Un
ifie
d S
ch
oo
l D
istr
ict
that
wo
uld
req
uir
e t
he c
on
str
ucti
on
of
new
, o
r exp
an
sio
n o
f exis
tin
g s
ch
oo
l fa
cilit
ies.
PS
4.1
1-8
Im
ple
ment M
itig
ation M
easure
4.1
1-7
. LS
4.1
1-9
T
he p
rop
osed
pro
ject
co
uld
resu
lt in
th
e
need
to
co
nstr
uct
new
, o
r exp
an
ded
exis
tin
g N
eig
hb
orh
oo
d P
ark
s.
PS
4.1
1-9
P
rior
to p
roje
ct constr
uction, th
e p
roje
ct applic
ant shall
pay
in-lie
u fees a
nd the N
eig
hborh
ood P
ark
and R
ecre
ation
Fa
cili
tie
s fe
e w
hic
h w
ou
ld fu
nd
1.4
gro
ss a
cre
s o
f N
eig
hborh
ood P
ark
.
LS
OR
Prior
to fin
al desig
n r
evie
w,
the p
roje
ct applic
ant shall
inclu
de o
n the fin
al te
nta
tive m
ap a
nd larg
e lot m
ap, 1.4
gro
ss a
cre
s o
f N
eig
hborh
ood P
ark
.
4.1
1-1
0
Th
e p
rop
osed
pro
ject
co
uld
resu
lt in
th
e
need
to
co
nstr
uct
new
, o
r exp
an
d e
xis
tin
g
Co
mm
un
ity P
ark
s.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
1-1
1
Th
e p
rop
osed
pro
ject
co
uld
resu
lt in
th
e
need
to
co
nstr
uct
new
, o
r exp
an
d e
xis
tin
g
trails.
S
4.1
1-1
1 P
rior
to p
roje
ct constr
uction, th
e p
roje
ct applic
ant shall
pay
the P
ark
and R
ecre
ation F
acili
ties fee for
trails
whic
h w
ould
fu
nd e
ither
5.8
mile
s o
f tr
ails
or
17.3
gro
ss a
cre
s o
f tr
ail
corr
idor,
wh
ichever
is g
reate
r.
LS
OR
Prior
to fin
al desig
n r
evie
w,
the p
roje
ct applic
ant shall
inclu
de o
n the fin
al te
nta
tive m
ap a
nd larg
e lot m
ap, either
5.8
mile
s o
f tr
ails
or
17.3
gro
ss a
cre
s o
f tr
ail
corr
idor,
w
hic
hever
is g
reate
r.
4.1
1-1
2
Th
e p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
futu
re d
eve
lop
men
t in
th
e C
ity o
f R
io V
ista
, w
ou
ld r
esu
lt in
a s
ub
sta
nti
al p
hysic
al
dete
rio
rati
on
of
exis
tin
g a
rea p
ark
s a
nd
re
cre
ati
on
al fa
cilit
ies, o
r cre
ate
a n
eed
fo
r co
nstr
ucti
on
or
exp
an
sio
n o
f re
cre
ati
on
al
facilit
ies b
eyo
nd
wh
at
was a
nti
cip
ate
d in
th
e G
en
era
l P
lan
an
d/o
r P
ark
s M
aste
r P
lan
.
PS
4.1
1-1
2 Im
ple
ment M
itig
ation M
easure
4.1
1-9
. LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
7
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.1
2 T
ran
sp
ort
ati
on
an
d C
irc
ula
tio
n
4.1
2-1
U
nd
er
Exis
tin
g P
lus P
roje
ct
co
nd
itio
ns t
he
pro
po
sed
pro
ject
wo
uld
su
bsta
nti
ally
incre
ase t
rip
s a
lon
g e
xis
tin
g r
oad
way
seg
men
ts.
PS
4
.12
-1
a)
The C
ity, in
coord
ination w
ith S
TA
, shall
cre
ate
a r
egio
nal
fundin
g p
rogra
m that
would
esta
blis
h a
nd c
olle
ct fa
ir s
hare
contr
ibutions fro
m n
ew
develo
pm
ent pro
jects
tow
ard
s n
eeded
unfu
nded r
oad im
pro
vem
ents
alo
ng S
R 1
2 in c
onju
nction w
ith
the S
TA
SR
12 E
ast P
rioritization a
nd Im
ple
menta
tion
Str
ate
gy.
SU
b)
Upon e
sta
blis
hm
ent of th
is n
ew
regio
nal fu
ndin
g p
rogra
m, th
e
pro
ject applic
ant shall
contr
ibute
fair-s
hare
funds tow
ard
s t
he
imple
menta
tion o
f th
e follo
win
g im
pro
vem
ents
in a
ccord
ance
to the tim
ing identified in T
able
4.1
2-9
:
i.
Wid
en
th
e s
ectio
n o
f S
R 1
2 b
etw
ee
n S
R 1
13
an
d
Sum
mers
et D
rive fro
m o
ne to tw
o lanes in e
ach
dire
ction
.
ii.
W
iden the s
ection o
f S
R 1
2 b
etw
een S
R 8
4 a
nd S
R
16
0 fro
m o
ne
to
tw
o la
ne
s in
each
dire
ction
by e
ith
er
wid
enin
g the e
xis
ting b
ridge o
ver
the S
acra
mento
R
iver
or
by c
onstr
ucting a
new
bridge o
ver
the r
iver.
c)
The p
roje
ct applic
ant shall
contr
ibute
fair-s
hare
funds tow
ard
s
the r
egio
nal m
unic
ipal serv
ices fund. C
ity s
taff s
hall
ensure
th
at all
funds a
re d
irecte
d to
ward
s the follo
win
g im
pro
vem
ent:
i.
Wid
en the s
ection o
f S
R 1
2 b
etw
een S
um
mers
et
Drive a
nd C
hurc
h R
oad fro
m o
ne to tw
o lanes in
ea
ch
dire
ctio
n w
ith
a r
ais
ed
lan
dsca
ped
me
dia
n,
curb
s a
nd g
utters
, sid
ew
alk
s, bik
e lanes, and tra
nsit
pullo
uts
.
ii.
W
ide
n th
e s
ectio
n o
f S
R 1
2 b
etw
ee
n C
hu
rch
Ro
ad
and M
ain
Str
eet fr
om
one to t
wo
lanes in e
ach
direction w
ith a
rais
ed landscaped m
edia
n to lim
it
left-t
urn
in a
nd o
ut access a
nd c
urb
s a
nd g
utters
, sid
ew
alk
s, bik
e lanes, and tra
nsit p
ullo
uts
.
iii
. W
iden the s
ection o
f S
R 1
2 b
etw
een M
ain
Str
eet
and G
ard
iner
Wa
y fro
m o
ne to tw
o lanes in e
ach
direction w
ith a
rais
ed landscaped m
edia
n to lim
it
left-t
urn
in a
nd o
ut access a
nd c
urb
s a
nd g
utters
, sid
ew
alk
s, bik
e lanes, and tra
nsit p
ullo
uts
.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
8
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
iv
. W
iden the s
ection o
f S
R 1
2 b
etw
een G
ard
iner
Way
and S
R 8
4 fro
m o
ne to tw
o lanes in e
ach d
irection
with a
rais
ed landscaped m
edia
n to lim
it left-t
urn
in
and o
ut access a
nd c
urb
s a
nd g
utters
, sid
ew
alk
s,
bik
e lanes, and tra
nsit p
ullo
uts
.
d)
The C
ity s
hall
add a
fundin
g m
echanis
m to the e
xis
ting C
IP to
pro
vid
e a
cir
cula
tory
connection fro
m the p
roje
ct to
7th S
treet
or
2nd S
treet via
the p
roposed c
om
munity p
ark
stu
bbed
roadw
ay. T
he a
pplic
ant shall
be r
equired to p
ay its
fair fees
tow
ard
s t
he im
pro
vem
ents
.
4.1
2-2
U
nd
er
Exis
tin
g P
lus P
roje
ct
co
nd
itio
ns t
he
pro
po
sed
pro
ject
wo
uld
su
bsta
nti
ally
incre
ase d
ela
y a
t exis
tin
g a
nd
pro
po
sed
in
ters
ecti
on
s.
PS
4
.12
-2
a)
Imple
ment M
itig
ation M
easure
s 4
.12-1
(a)
thro
ugh (
c).
b)
Upon e
sta
blis
hm
ent of th
is n
ew
regio
nal fu
ndin
g p
rogra
m, th
e
pro
ject applic
ant shall
contr
ibute
fair-s
hare
funds tow
ard
s t
he
imple
menta
tion o
f th
e follo
win
g a
dditio
nal im
pro
vem
ents
.
The im
pro
vem
ents
should
be m
ade in a
ccord
ance w
ith t
he
tim
ing s
chedule
pro
vid
ed in T
able
4.1
2-1
1:
LS
i.
Insta
ll a tra
ffic
sig
nal, r
estr
ipe the s
outh
bound
appro
ach, and w
iden the n
ort
hbound, eastb
ound,
an
d w
estb
ou
nd
ap
pro
ach
es to
th
e S
R 1
2/S
R 1
13
in
ters
ection to p
rovid
e the follo
win
g lane
configura
tions:
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the n
ort
hbound a
ppro
ach
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the s
outh
bound a
ppro
ach
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the e
astb
ound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
fre
e
right-
turn
lane o
n the w
estb
ound a
ppro
ach
ii.
In
sta
ll a
tra
ffic
sig
na
l a
nd
wid
en
th
e n
ort
hb
ou
nd
, south
bound, eastb
ound, and w
estb
ound a
ppro
aches
to the S
R 1
2/C
hurc
h R
oad inte
rsection to p
rovid
e the
follo
win
g la
ne
co
nfig
ura
tion
s:
O
ne left-t
urn
lane, one thro
ugh lane, and a
right-
turn
lane o
n the n
ort
hbound a
ppro
ach
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-2
9
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the s
outh
bound a
ppro
ach
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
right-
turn
lane o
n the e
astb
ound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
share
d thro
ugh/r
ight-
turn
lane o
n the
westb
ound a
ppro
ach
iii
. In
sta
ll a tra
ffic
sig
nal and w
iden the n
ort
hbound,
eastb
ound, and w
estb
ound a
ppro
aches to the S
R
12/”
C”
Str
eet in
ters
ection to p
rovid
e the follo
win
g
lane c
onfigura
tions:
O
ne left-t
urn
lane a
nd a
rig
ht-
turn
lane o
n the
nort
hbound a
ppro
ach
T
wo thro
ugh lanes a
nd a
rig
ht-
turn
lane o
n the
eastb
ound a
ppro
ach
O
ne left-t
urn
lane a
nd tw
o thro
ugh lanes o
n the
westb
ound a
ppro
ach
iv
. In
sta
ll a r
ais
ed landscaped m
edia
n a
long S
R 1
2 a
nd
clo
se the left-t
urn
lane o
n the n
ort
hbound a
ppro
ach
to the S
R 1
2/D
rouin
Drive inte
rsection to r
estr
ict le
ft-
out access fro
m D
rouin
Drive. W
iden the e
astb
ound
and w
estb
ound a
ppro
aches to the S
R 1
2/D
rouin
D
rive
in
ters
ection
to
pro
vid
e th
e fo
llow
ing
la
ne
configura
tions:
O
ne thro
ugh lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the e
astb
ound a
ppro
ach
O
ne left-t
urn
lane a
nd tw
o thro
ugh lanes o
n the
westb
ound a
ppro
ach
v.
Insta
ll a s
econd thro
ugh lane o
n S
R 1
2 in b
oth
directions thro
ugh the inte
rsection o
f S
R 1
2/M
ain
S
treet-
Hill
sid
e T
err
ace.
vi.
Insta
ll a r
ais
ed landscaped m
edia
n o
n S
R 1
2 to
restr
ict le
ft o
ut a
ccess fro
m G
ard
iner
Way o
n th
e
south
bound a
ppro
ach to the S
R 1
2/G
ard
iner
Wa
y
inte
rsection a
nd insta
ll a s
econd thro
ugh lane o
n S
R
12 in b
oth
directions.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
0
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
vii.
In
sta
ll a
ra
ised
la
nd
sca
pe
d m
edia
n o
n S
R 1
2 to
re
str
ict le
ft o
ut a
ccess fro
m N
ort
h 5
th S
treet on the
nort
hbound a
nd s
outh
bound a
ppro
aches to the
SR
12
/No
rth
5th S
treet in
ters
ection a
nd insta
ll a
second thro
ugh lane o
n S
R 1
2 in b
oth
directions.
viii
. In
sta
ll a r
ais
ed landscaped m
edia
n o
n S
R 1
2 to
restr
ict le
ft o
ut a
ccess fro
m V
irgin
ia S
treet and a
second thro
ugh lane o
n S
R 1
2 in b
oth
directions
thro
ugh the inte
rsection o
f S
R 1
2/V
irgin
ia D
rive.
ix
. W
ide
n th
e e
astb
ou
nd
an
d w
estb
ou
nd
ap
pro
ach
es to
th
e S
R 1
2/S
R 8
4 inte
rsection to p
rovid
e the follo
win
g
lane c
onfigura
tions:
T
wo thro
ugh lanes a
nd a
rig
ht-
turn
lane o
n the
eastb
ound a
ppro
ach
T
wo thro
ugh lanes a
nd a
rig
ht-
turn
lane o
n the
westb
ound a
ppro
ach
x.
Wid
en the e
astb
ound a
nd n
ort
hbound a
ppro
aches to
the S
R 1
2/S
R 1
60 inte
rsection to p
rovid
e the
follo
win
g la
ne
co
nfig
ura
tion
s:
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
right-
turn
lane o
n the e
astb
ound a
ppro
ach
T
wo left-t
urn
lanes, one thro
ugh lanes, and a
right-
turn
lane o
n the n
ort
hbound a
ppro
ach
4.1
2-3
U
nd
er
Exis
tin
g P
lus P
roje
ct
co
nd
itio
ns t
he
pro
po
sed
pro
ject
co
uld
fail t
o p
rovid
e
ad
eq
uate
sp
ace f
or
tran
sit
facilit
ies.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
2-4
U
nd
er
Baselin
e P
lus P
roje
ct
co
nd
itio
ns, th
e
pro
po
sed
pro
ject
wo
uld
su
bsta
nti
ally
incre
ase t
rip
s a
lon
g e
xis
tin
g r
oad
way
seg
men
ts.
S
4.1
2-4
a)
Imple
ment M
itig
ation M
easure
s 4
.12-1
(a)
thro
ugh (
d).
b)
Upon e
sta
blis
hm
ent of th
is n
ew
regio
nal fu
ndin
g p
rogra
m, th
e
pro
ject applic
ant shall
contr
ibute
fair-s
hare
funds tow
ard
s t
he
imple
menta
tion o
f th
e follo
win
g im
pro
vem
ents
:
SU
i.
Wid
en
th
e s
ectio
n o
f S
R 1
2 b
etw
ee
n S
R 1
13
an
d
Sum
mers
et D
rive fro
m o
ne to tw
o lanes in e
ach
direction a
nd a
dd a
media
n.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
1
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
ii.
W
iden the s
ection o
f S
R 1
2 b
etw
een S
R 8
4 a
nd S
R
16
0 fro
m o
ne
to
tw
o la
ne
s in
each
dire
ction
by e
ith
er
wid
enin
g the e
xis
ting b
ridge o
ver
the S
acra
mento
R
iver
or
by c
onstr
ucting a
new
bridge o
ver
the r
iver.
iii
. W
iden the s
ection o
f M
ain
Str
eet betw
een S
R 1
2
and S
ierr
a A
venue to a
tw
o-lane a
rterial by a
ddin
g a
cente
r tw
o-w
ay left-t
urn
lane.
iv
. W
iden the s
ection o
f M
ain
Str
eet fr
om
Sie
rra A
venue
to 7
th S
treet to
a tw
o-lane a
rterial by a
ddin
g a
cente
r tw
o-w
ay le
ft-t
urn
la
ne
.
c)
The p
roje
ct applic
ant shall
contr
ibute
fair-s
hare
funds tow
ard
s
the r
egio
nal m
unic
ipal serv
ices fund. C
ity s
taff s
hall
ensure
th
at all
funds a
re d
irecte
d to
ward
s the follo
win
g im
pro
vem
ent:
i.
Wid
en the s
ection o
f S
R 1
2 b
etw
een S
um
mers
et
Drive a
nd C
hurc
h R
oad fro
m o
ne to tw
o lanes in
ea
ch
dire
ctio
n a
nd
ad
d a
ra
ise
d m
ed
ian
.
ii.
W
ide
n th
e s
ectio
n o
f S
R 1
2 b
etw
ee
n C
hu
rch
Ro
ad
and M
ain
Str
eet fr
om
one to t
wo
lanes in e
ach
dire
ction
an
d a
dd
a r
ais
ed
me
dia
n.
iii
. W
iden the s
ection o
f S
R 1
2 b
etw
een M
ain
Str
eet
and G
ard
iner
Wa
y fro
m o
ne to tw
o lanes in e
ach
dire
ction
an
d a
dd
a r
ais
ed
me
dia
n.
iv
. W
iden the s
ection o
f S
R 1
2 b
etw
een G
ard
iner
Way
and S
R 8
4 fro
m o
ne to tw
o lanes in e
ach d
irection
an
d a
dd
a r
ais
ed
me
dia
n.
4.1
2-5
U
nd
er
Baselin
e P
lus P
roje
ct
co
nd
itio
ns t
he
pro
po
sed
pro
ject
wo
uld
su
bsta
nti
ally
incre
ase t
rip
s a
lon
g e
xis
tin
g a
nd
pro
po
sed
in
ters
ecti
on
s.
S
4.1
2-5
a)
Imple
ment M
itig
ation M
easure
s 4
.12-2
(b)
and (
c).
b)
Upon e
sta
blis
hm
ent of th
is n
ew
regio
nal fu
ndin
g p
rogra
m, th
e
pro
ject applic
ant shall
contr
ibute
fair-s
hare
funds tow
ard
s t
he
imple
menta
tion o
f th
e follo
win
g a
dditio
nal im
pro
vem
ents
:
LS
i.
Insta
ll a tra
ffic
sig
nal and w
iden the n
ort
hbound,
south
bound, eastb
ound, and w
estb
ound a
ppro
aches
to the S
R 1
2/S
R 1
13 inte
rsection to p
rovid
e the
follo
win
g la
ne
co
nfig
ura
tion
s:
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the n
ort
hbound a
ppro
ach
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
2
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
T
wo left-t
urn
lanes a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the s
outh
bound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
share
d thro
ugh/r
ight-
turn
lane o
n the
eastb
ound a
ppro
ach
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
fr
ee r
ight-
turn
lane o
n the w
estb
ound a
ppro
ach
ii.
R
estr
ipe the e
astb
ound a
ppro
ach to the S
R 1
2/
Sum
mers
et D
rive inte
rsection to p
rovid
e o
ne left-t
urn
la
ne a
nd tw
o thro
ugh lanes, th
e w
estb
ound
appro
ach to p
rovid
e tw
o thro
ug
h lanes a
nd a
rig
ht-
turn
lane, and e
ither
restr
ipe the s
outh
bound
appro
ach to p
rovid
e tw
o left-t
urn
lanes a
nd a
rig
ht-
turn
lane w
ith o
verlap p
hasin
g o
r w
iden the
eastb
ound a
ppro
ach to p
rovid
e tw
o left-t
urn
lanes
and tw
o thro
ugh lanes.
iii
. W
iden the n
ort
hbound, south
bound, eastb
ound, and
westb
ound a
ppro
aches to the S
R 1
2/C
hurc
h R
oad
inte
rsection to p
rovid
e the follo
win
g lane
configura
tions:
T
wo left-t
urn
lanes, one thro
ugh lane, and a
right-
turn
lane o
n the n
ort
hbound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
right-
turn
lane o
n the s
outh
bound a
ppro
ach
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
right-
turn
lane o
n the e
astb
ound a
ppro
ach
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
right-
turn
lane o
n the w
estb
ound a
ppro
ach
iv
. W
iden the n
ort
hbound, south
bound, eastb
ound, and
we
stb
ound a
ppro
aches to the S
R 1
2/”
C”
Str
eet
inte
rsection to p
rovid
e the follo
win
g lane
configura
tions:
O
ne left-t
urn
lane, one thro
ugh lane, and a
right-
turn
lane o
n the n
ort
hbound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
right-
turn
lane o
n the s
outh
bound a
ppro
ach
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
3
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
right-
turn
lane o
n the e
astb
ound a
ppro
ach
T
wo left-t
urn
lanes, tw
o thro
ugh lanes, and a
right-
turn
lane o
n the w
estb
ound a
ppro
ach
v.
Insta
ll a tra
ffic
sig
nal and w
iden the n
ort
hbound,
south
bound, eastb
ound, and w
estb
ound a
ppro
aches
to the S
R 1
2/D
rouin
Drive inte
rsection to p
rovid
e the
follo
win
g la
ne
co
nfig
ura
tion
s:
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the n
ort
hbound a
ppro
ach
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the s
outh
bound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
share
d thro
ugh/r
ight-
turn
lane o
n the
eastb
ound a
ppro
ach
O
ne left-t
urn
lane, one thro
ugh lane, and a
share
d thro
ugh/r
ight-
turn
lane o
n the
westb
ound a
ppro
ach
vi.
Insta
ll a s
econd thro
ugh lane o
n S
R 1
2 in b
oth
directions a
nd w
iden the n
ort
hbound a
nd
south
bound a
ppro
aches to the S
R12/M
ain
Str
eet-
Hill
sid
e T
err
ace
in
ters
ection
to
pro
vid
e th
e fo
llow
ing
la
ne c
onfigura
tions:
O
ne left-t
urn
lane, one thro
ugh lane, and a
right-
turn
lane o
n the n
ort
hbound a
ppro
ach
O
ne left-t
urn
lane a
nd a
share
d thro
ugh/r
ight-
turn
lane o
n the s
outh
bound a
ppro
ach
vii.
In
sta
ll a
ra
ised
la
nd
sca
pe
d m
edia
n o
n S
R 1
2 to
re
str
ict le
ft o
ut a
ccess fro
m G
ard
iner
Way o
n th
e
south
bound a
ppro
ach to the S
R 1
2/G
ard
iner
Wa
y
inte
rsection a
nd insta
ll a s
econd thro
ugh lane o
n S
R
12 in b
oth
directions.
viii
. In
sta
ll a r
ais
ed landscaped m
edia
n o
n S
R 1
2 to
restr
ict le
ft o
ut a
ccess fro
m N
ort
h 5
th S
treet on the
nort
hbound a
nd s
outh
bound a
ppro
aches to the
SR
12
/No
rth
5th S
treet in
ters
ection a
nd insta
ll a
second thro
ugh lane o
n S
R 1
2 in b
oth
directions.
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
4
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
ix
. In
sta
ll a
ra
ised
la
nd
sca
pe
d m
edia
n o
n S
R 1
2 to
re
str
ict le
ft o
ut a
ccess fro
m V
irgin
ia S
treet and insta
ll a s
econd thro
ugh lane o
n S
R 1
2 in b
oth
directions
thro
ugh the S
R 1
2/V
irgin
a D
rive Inte
rsection.
x.
Insta
ll a s
econd thro
ugh lane o
n S
R 1
2 in b
oth
directions thro
ugh the S
R 1
2/S
R 8
4 inte
rsection.
xi.
Wid
en
th
e e
astb
ou
nd
an
d w
estb
ou
nd
ap
pro
ach
es to
th
e S
R 1
2/S
R 1
60 inte
rsection to p
rovid
e the
follo
win
g la
ne
co
nfig
ura
tion
s:
O
ne left-t
urn
lane, tw
o t
hro
ugh lanes, and a
right-
turn
lane w
ith o
verlap p
hasin
g o
n the
eastb
ound a
ppro
ach.
T
wo left-t
urn
lanes, one thro
ugh lanes, and a
right-
turn
lane o
n the n
ort
hbound a
ppro
ach.
4.1
2-6
U
nd
er
Baselin
e P
lus P
roje
ct
co
nd
itio
ns t
he
pro
po
sed
pro
ject
co
uld
fail t
o p
rovid
e
ad
eq
uate
sp
ace f
or
tran
sit
facilit
ies.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
2-7
U
nd
er
Cu
mu
lati
ve c
on
dit
ion
s t
he p
rop
osed
p
roje
ct
wo
uld
su
bsta
nti
ally c
on
trib
ute
to
th
e in
cre
ased
tra
ffic
vo
lum
es o
n e
xis
tin
g
road
way s
eg
men
ts.
S
4.1
2-7
a)
Imple
ment M
itig
ation M
easure
4.1
2-1
(a)
and (
d).
b)
Imple
ment M
itig
ation M
easure
4.1
2-4
(b)
and (
c).
SU
4.1
2-8
U
nd
er
Cu
mu
lati
ve c
on
dit
ion
s, th
e p
rop
osed
p
roje
ct
wo
uld
su
bs
tan
tia
lly i
nc
rea
se
de
lays
at
exis
tin
g a
nd
pro
po
sed
in
ters
ecti
on
s.
S
4.1
2-8
a)
Imple
ment M
itig
ation M
easure
4.1
2-1
(a)
thro
ugh (
c).
b)
Imple
ment M
itig
ation M
easure
4.1
2-2
(b)
and (
c).
LS
c)
Imple
ment M
itig
ation M
easure
4.1
2-5
(c).
4.1
2-9
U
nd
er
Cu
mu
lati
ve c
on
dit
ion
s t
he p
rop
osed
p
roje
ct
co
uld
fail t
o p
rovid
e a
deq
uate
sp
ace
for
tran
sit
facilit
ies.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
3 P
ub
lic U
tiliti
es
4.1
3-1
T
he p
rop
osed
pro
ject’
s d
em
an
d f
or
wate
r co
uld
exceed
exis
tin
g a
va
ilab
le w
ate
r su
pp
lies.
LS
N
on
e r
eq
uir
ed
. N
A
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
5
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.1
3-2
T
he in
cre
ased
wate
r d
em
an
d r
esu
ltin
g f
rom
th
e p
rop
osed
pro
ject
wo
uld
resu
lt in
th
e
co
nstr
ucti
on
of
new
or
exp
an
sio
n o
f exis
tin
g f
acilit
ies, w
hic
h c
ou
ld r
esu
lt in
ad
vers
e p
hysic
al im
pacts
to
th
e
en
vir
on
men
t.
PS
4.1
3-2
P
rior
to the issuance o
f build
ing p
erm
its, th
e p
roje
ct
applic
ant shall
pa
y “
fair s
hare
” fe
es in a
ccord
ance w
ith t
he
City o
f R
io V
ista
Wa
ter
Ma
ste
r P
lan
fe
e s
ch
edu
le, p
aya
ble
to
the C
ity o
f R
io V
ista
Depart
ment of P
ublic
Wo
rks to
contr
ibute
tow
ard
the d
evelo
pm
ent of ne
w g
rou
ndw
ate
r w
ells
an
d w
ate
r d
istr
ibu
tio
n in
frastr
uctu
res th
at
wo
uld
e
xp
an
d a
nd
im
pro
ve
th
e C
ity’s
wa
ter
su
pp
ly s
yste
m,
wh
ich
w
ould
enable
the s
yste
m to
serv
e the p
roposed p
roje
ct
thro
ugh b
uild
out.
LS
4.1
3-3
T
he p
rop
osed
pro
ject’
s d
em
an
d f
or
wate
r,
in a
dd
itio
n t
o t
he d
em
an
d f
or
wate
r re
su
ltin
g f
rom
oth
er
de
ve
lop
men
t w
ith
in t
he
Cit
y o
f R
io V
ista
, co
uld
exceed
ava
ilab
le
so
urc
es o
f w
ate
r su
pp
lies.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
3-4
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
ve
lop
men
t w
ith
in t
he C
ity o
f R
io
Vis
ta, co
uld
resu
lt in
th
e n
eed
fo
r th
e
co
nstr
ucti
on
of
new
wa
ter
infr
astr
uctu
re,
wh
ich
co
uld
cau
se
ad
ve
rse
en
vir
on
me
nta
l eff
ects
.
PS
4.1
3-4
Im
ple
ment M
itig
ation M
easure
4.1
3-2
. LS
4.1
3-5
T
he p
rop
osed
pro
ject
wo
uld
gen
era
te
ad
dit
ion
al w
aste
wate
r fl
ow
s t
hat
wo
uld
exceed
th
e C
ity’s
waste
wate
r co
llecti
on
, tr
eatm
en
t, o
r d
isp
osal cap
acit
y, w
hic
h
co
uld
vio
late
CV
RW
QC
B t
reatm
en
t re
qu
irem
en
ts. T
his
wo
uld
resu
lt in
th
e
need
fo
r exp
an
sio
n o
f exis
tin
g o
r co
nstr
ucti
on
of
new
facilit
ies o
f in
frastr
uctu
re.
PS
4
.13
-5
a)
Prior
to a
ppro
vin
g a
ny a
dditio
nal hookups to the N
ort
hw
est
Waste
wate
r T
reatm
ent P
lant beyond the 4
50 E
DU
s
pre
vio
usly
appro
ved for
the p
roje
ct, the C
ity s
hall
insure
that
Phase II im
pro
vem
ents
are
com
ple
te a
nd o
pera
tional.
b)
The p
roje
ct applic
ant shall
coord
inate
with the C
ity t
o
dete
rmin
e a
“fa
ir s
hare
” fe
e c
ontr
ibution tow
ard
the
develo
pm
ent of P
hase II of th
e N
ort
hw
est W
aste
wate
r T
reatm
ent P
lant.
LS
4.1
3-6
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
oth
er
de
ve
lop
men
t in
th
e C
ity o
f R
io V
ista
, w
ou
ld g
en
era
te a
dd
itio
nal w
aste
wate
r fl
ow
s
that
wo
uld
exceed
th
e C
ity’s
waste
wate
r co
llecti
on
, tr
eatm
en
t, o
r d
isp
osal cap
acit
y,
wh
ich
co
uld
vio
late
CV
RW
QC
B t
rea
tme
nt
req
uir
em
en
ts. T
his
wo
uld
resu
lt in
th
e
need
fo
r exp
an
sio
n o
f exis
tin
g o
r co
nstr
ucti
on
of
new
facilit
ies.
S
4.1
3-6
Im
ple
ment M
itig
ation M
easure
4.1
3-5
. LS
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
6
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
4.1
3-7
T
he p
rop
osed
pro
ject
wo
uld
re
qu
ire t
he
co
nstr
ucti
on
of
new
facilit
ies t
o p
rovid
e
ele
ctr
ical serv
ice, w
hic
h c
ou
ld r
esu
lt in
sig
nif
ican
t en
vir
on
men
tal eff
ects
.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
3-8
T
he p
rop
osed
pro
ject
wo
uld
re
qu
ire t
he
co
nstr
ucti
on
of
new
facilit
ies t
o p
rovid
e
natu
ral g
as s
erv
ice, w
hic
h c
ou
ld r
esu
lt in
sig
nif
ican
t en
vir
on
men
tal eff
ects
.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
3-9
T
he p
rop
osed
pro
ject,
in
co
mb
inati
on
wit
h
futu
re d
eve
lop
men
t in
th
e C
ity o
f R
io V
ista
, co
uld
exceed
th
e e
lectr
ical o
r n
atu
ral g
as
su
pp
ly a
nd
tra
nsm
issio
n c
ap
ab
ilit
ies.
LS
N
on
e r
eq
uir
ed
. N
A
4.1
4 G
lob
al C
lim
ate
Ch
an
ge
4.1
4-1
D
evelo
pm
en
t o
f th
e p
rop
osed
pro
ject
co
uld
p
ote
nti
ally r
esu
lt in
a c
um
ula
tively
co
nsid
era
ble
in
cre
men
tal co
ntr
ibu
tio
n t
o
the s
ign
ific
an
t cu
mu
lati
ve i
mp
act
of
glo
bal
clim
ate
ch
an
ge.
S
4.1
4-1
a)
At th
e tim
e o
f a
pplic
ation fo
r desig
n r
evie
w for
a p
roje
ct of
more
than 1
0 u
nits o
r a c
om
merc
ial develo
pm
ent of over
50,0
00 s
f, the C
ity s
hall
require the p
roje
ct applic
ant to
subm
it
an E
nerg
y C
onserv
ation P
lan. T
he p
lan s
hall
describe the
techniq
ues a
nd p
rogra
ms to b
e e
mplo
yed in the d
evelo
pm
ent
of th
e p
roje
ct to
achie
ve e
nerg
y c
onserv
ation. T
hese
pro
gra
ms s
hall
inclu
de, but shall
not be lim
ited to, either:
SU
P
art
icip
ation in the P
G&
E E
nerg
y S
tar
Perf
orm
ance
Meth
od. T
his
meth
od is a
vaila
ble
to b
uild
ers
of sin
gle
-fa
mily
hom
es th
at are
at le
ast 15 p
erc
ent m
ore
energ
y
effic
ient th
an r
equired b
y the 2
005 T
itle
24 E
nerg
y C
ode
an
d m
ee
t a
ll U
S E
PA
sp
ecific
atio
ns. P
art
icip
atin
g
build
ers
becom
e p
art
of th
e C
alif
orn
ia E
nerg
y S
tar
New
H
om
es P
rogra
m, and their h
om
es e
arn
the E
nerg
y S
tar
label. In
cre
menta
l in
centives c
an a
lso b
e e
arn
ed b
y
addin
g e
nerg
y e
ffic
ient applia
nces a
nd/o
r lig
hting to
hom
es.
OR
P
art
icip
ation in the N
ew
Sola
r H
om
es P
art
ners
hip
(N
SH
P)
Perf
orm
ance M
eth
od. T
his
meth
od is a
vaila
ble
to
build
ers
of sin
gle
-fam
ily h
om
es that are
at le
ast
15 p
erc
ent m
ore
effic
ient th
an r
equired b
y the 2
005 T
itle
24 E
nerg
y C
ode a
nd m
eet all
US
EP
A s
pecific
ations. A
second tie
r of part
icip
ation is a
vaila
ble
to s
ingle
-fam
ily
hom
es that exceed T
itle
24 b
y 3
5 p
erc
ent, d
em
onstr
ate
LS
= L
ess th
an
Sig
nific
an
t P
S =
Po
ten
tia
lly S
ignific
an
t
S =
Sig
nific
an
t S
U =
Sig
nific
an
t a
nd
Un
avoid
able
N
A =
No
t A
pp
lica
ble
N
I =
No Im
pact
Del R
io H
ills P
lann
ed U
nit D
evelo
pm
ent
3-3
7
Dra
ft E
nvironm
enta
l Im
pact
Report
Decem
ber
2008
P:\P
roje
cts
- W
P O
nly
\5124
4.0
0 D
el R
io H
ills\!
DE
IR\3
.0 S
um
mT
able
.doc
TA
BL
E 3
-1
SU
MM
AR
Y O
F I
MP
AC
TS
AN
D M
ITIG
AT
ION
ME
AS
UR
ES
Imp
act
Le
vel o
f S
ign
ific
an
ce P
rio
r to
Mit
igati
on
M
itig
ati
on
Measu
re(s
)
Le
vel o
f S
ign
ific
an
ce A
fter
Mit
igati
on
a 4
0 p
erc
ent re
duction in c
oolin
g load, and inclu
de s
ola
r genera
tion a
s a
n o
ption for
bu
ye
rs. B
oth
tie
rs r
equire
that all
applia
nces p
rovid
ed b
y the b
uild
er
must be
Energ
y S
tar
qu
alif
ied. B
uild
ers
ma
y a
lso q
ualif
y f
or
additio
nal sola
r in
centives thro
ugh the C
EC
’s N
SH
P.
b)
The C
ity a
nd th
e p
roje
ct applic
ant shall
wo
rk togeth
er
to
pu
blis
h a
nd
dis
trib
ute
an
En
erg
y R
eso
urc
e C
onse
rva
tio
n
Guid
e d
escribin
g m
easure
s indiv
iduals
can take to incre
ase
energ
y e
ffic
iency a
nd c
onserv
ation p
rior
to the o
ccupation o
f th
e first re
sid
ential unit. T
he a
pplic
ant shall
be r
esponsib
le for
fun
din
g th
e p
rep
ara
tio
n o
f th
e G
uid
e. T
he
City w
ill b
e
responsib
le for
the d
istr
ibution o
f th
e g
uid
e. T
he E
nerg
y
Resourc
e C
onserv
ation G
uid
e s
hall
be u
pdate
d e
very
5 y
ears
and d
istr
ibute
d a
t th
e p
ublic
perm
it c
ounte
r.
c)
The p
roje
ct applic
ant shall
pay for
an initia
l in
sta
llment of
Lig
ht E
mitting D
iode (
LE
D)
traffic
lig
hts
in a
ll S
pecific
Pla
n
are
a tra
ffic
lig
hts
.
d)
The p
roje
ct applic
ant shall
develo
p a
tre
e p
lanting p
rogra
m
whic
h inclu
des the p
lanting o
f tr
ees that can a
bsorb
CO
2.
e)
The p
roje
ct applic
ant shall
coord
inate
with tra
nsit o
ffic
ials
on
a r
evis
ed tra
nsit s
yste
m p
lan w
hic
h w
ould
pro
vid
e p
ublic
tr
ansit s
erv
ice w
ithin
the p
roposed s
ite, im
pro
ve p
ublic
tra
nsit
access to a
nd fro
m the p
roposed p
roje
ct, a
nd p
rovid
e r
ide
sharing p
rogra
ms.
f)
T
he C
ity s
hall
require that
energ
y e
ffic
ient lig
hting fix
ture
s,
inclu
din
g flu
ore
scent lig
ht be u
sed in r
esid
ential and
com
merc
ial str
uctu
res w
ithin
th
e p
lan a
rea.
g
) T
he
pro
ject a
pp
lica
nt sh
all
inclu
de
lig
ht co
lore
d r
oo
fin
g
mate
rials
and r
oad m
ate
rials
to a
ddre
ss “
urb
an h
eat is
land”
effect.
h)
Imple
ment all
mitig
ation m
easure
s identified in S
ection 4
.2-
Air Q
ualit
y.