30635395 synopsis of bus information system

27
SYNOPSIS ON BUS INFORMATION SYSTEM MASTER OF COMPUTER APPLICATION (SEMESTER-IV) RAKSHPAL BAHADUR MANAGEMENT INSTITUTE, BAREILLY GUIDANCE :- SUBMITTED BY MR. RAHUL KHANDELWAL JAY NARAYAN GANGWAR LECTURER AJAY GANGWAR 1

Upload: sunil-joshi

Post on 03-Oct-2015

231 views

Category:

Documents


2 download

DESCRIPTION

ok

TRANSCRIPT

SYNOPSIS

SYNOPSISON

BUS INFORMATION SYSTEM

MASTER OF COMPUTER APPLICATION

(SEMESTER-IV)

RAKSHPAL BAHADUR MANAGEMENT INSTITUTE, BAREILLY

GUIDANCE:- SUBMITTED BYMR. RAHUL KHANDELWAL JAY NARAYAN GANGWAR

LECTURER AJAY GANGWAR

RBMI BREILLY NARENDRA

KAPIL

(M.C.A IV SEM)

CONTENTS OF SYNOPSISSL. NO.TOPIC

1. TITLE OF THE PROJECT

2. INTRODUCTION & OBJECTIVES

3. PROJECT ANATOMY

4. DFDS

5. MODULER DESCRIPTION

6. TABLES7. TOOLS PLATEFORM USED

8. REQUIREMENT SPECIFICATION

9. CONCLUSION

10. FUTURE SCOPE & ENHACEMENT

11. OUTPUT OF THE PROJECT12. REFERENCES

TITLE OF THE PROJECT

INTRODUCTION &OBJECTIVES OF PROJECT

INTRODUCTION:-Bus information system is software which will be Inform about the transport facility in college and Institute. Bus information will provide the

Information about the student and manage theContents about the system.OBJECTIVEThe BUS Management System can be entered using a username and password. It is accessible either by an administrator or receptionist. Only they can add data into the database. The data can be retrieved easily.The interface is very user-friendly. The data are well protected for personal use and makes the data processing very fast and find the student in formation quicly according to class and name both.ANATOMY OF WORD PROJ ECT:- 'P' :-) Stands for planning which deals with the idea of things, which are a support for Constructive work.'R' :-) Signifies about resources. It present the function of the planning idea about area.'O' :-) Signifies the overload that is used to say the establishing expenses which occur during the time of manufacturing . Desiging and layout of the project work.'J' :-) Stands for joint work.'E' :-) Signifies the word engineering.'C' :-) Stands for construction, which is very necessary part of the work.

'T' :-) Stands for technique means the technique of Work , which is used to design a project.

DFDS

INPUTRESPONSE

MODULAR DESIGNLOGIN MODULE

This is the first and main module for all response result of this account login page.when user will enter the correct login name it will provide to right according to the given manner.TABLES

Buses

BusStopageData Type

B001DelapireVARCHAR(2)

B001SatelliteVARCHAR(2)

B001Air ForceVARCHAR(2)

B001Covil LinesVARCHAR(2)

B002DelapireVARCHAR(2)

B002SatelliteVARCHAR(2)

B002Chowki ChaurahaVARCHAR(2)

B002Prem nagarVARCHAR(2)

B002Dharm KantaVARCHAR(2)

B003KuaraapierVARCHAR(2)

B003Kutub KhanaVARCHAR(2)

B004RoadwaysVARCHAR(2)

B004Shyam GanjVARCHAR(2)

B004railway stationVARCHAR(2)

classes

Class

B.Com IVARCHAR(2)

B.Com IIVARCHAR(2)

B.Com IIIVARCHAR(2)

B.Sc Math IVARCHAR(2)

B.Sc Math IIVARCHAR(2)

B.Sc Math IIIVARCHAR(2)

BCA IVARCHAR(2)

BCA IIVARCHAR(2)

BCA IIIVARCHAR(2)

MBA IVARCHAR(2)

MBAIIVARCHAR(2)

MCA IVARCHAR(2)

MCA IIIVARCHAR(2)

MCAIIVARCHAR(2)

PGDBMVARCHAR(2)

PGDCAVARCHAR(2)

BUS TABLE CLASS TABLE

Student

StudentIDStudentNameClassStopageBus

S00001Krishna MohanMCA IIIDelapireB001

S00002KanikaMCA IIISatelliteB001

S00003AshokMCA IIIRoadwaysB004

S00004ChamanMCA IChowki ChaurahaB002

S00005DineshMBAIIKutub KhanaB003

S00006KailashBCA IDelapireB002

S00007MohitMCAIIShahadanaB004

S00008RamuBCA IPrem nagarB002

S00009ChanchalMBAIICovil LinesB001

S00010jainarayanMCAIISatelliteB002

S00011neerajMCA IIICovil LinesB001

S00012shilpiMCAIIRoadwaysB004

usersDATA TYPE

UserIDPasswordUserTypeDesignationContactVARCHAR(2)

JAYJAYAdministratorProgrammer9627030752

TOOLS PLATEFORM USEDMS-Access (AS BACK END)

Personal computer provides an excellent tool for scoring information in database can be so useful and crucial for any organizations.

In Ms-Access, we can not only create tables, queries, forms, and reports and retrieve information but also sort, manipulate and analyze that informations to spot trends or patterns in data.

We can use MS-Access in two ways:-

The first way is to design and creating table, queries, forms and reports.

The second way is to editing and manipulating of data.

So finally in short, MS-Access is the most sophisticated tool widely used for database application. Using MS-Access, we can manage all the information from a single database file.

A database is a collection of information related to the particular area or domain.

MS-Access is a RDBMS under windows. It is used to store and manipulate large amount of data , the data is stored in multiple tables & access allows us to setup relationship between the tables to facilitate data retrieval.

MS-Access is an object oriented program i.e. every thing in MS-Access is an object, MS-Access has a number of component is the table object. Tables are object that holds the data and all related objects such as queries, reports that are used to manage this data in tables.

NETBEANS 6.7.1AS FRONT ENDHARDWARE & SOFTWARE REQUIRMENT

SYSTEM REQUIREMENTS

HARDWARE SPECIFICATION:- IT IS RECOMMENDED THAT THE MINIMUM CONFIGURATION FOR THE USER

SUGGESTED CONFIGURATION OF USER

MICROPROCESSOR: PENTIUM IV (1.5GHZ)

HARD DISK: 80 GB

RAM:512 MB

DVD ROM DRIVE

SOFTWARE SPECIFICATION:-

OPERATING SYSTEM :WINODWS XP (PACK 2)

RDBMS :MS ACCESS

FRONT END :NETBEANS IDE 6.7.1

CONCLUSION

SO THERE SHOULD BE A PROPER BUS MANAGEMT SYSTEM SO THAT ALL THE ACTIVITIES PROCEDURE CAN BE CARRIED OUT EFFECTIVELY WITH OUT LOSING ITS TRANSPARENCY.A BUS MANAGEMENT SYSTEM WILL MANAGE THE ACTIVITES SUCH AS STUDENT INFORMATION ,ROUTE INFORMATION,CLASS STATUS AND OTHER DETAILS THAT WILL SAVE TIME ,PAPER AND MANPOWER.

THIS SYSTEM WILL PROVIDE BETTER PROSPECTIVE ENHANCEMENT OF ORGANIZATION REGARDING TO QUALITY AND TRANSPARENCY.FUTURE SCOPE OF THE PROJECT

SINCE THIS SYSTEM WILL PLAY A KEY ROLE IN THE ORGANIZATION ,THUS SUCCESS OVER LONG PERIOD OF TIME AND RELIANCE OF ORGANIZATION OVER THE TRANSPORT MANAGEMENT.

AT PRESENT EVERY ORGANIZATION IS USING OWN TRANSPORT FOR THEIR PROPER FUNCTIOING,SO THIS FULLFILLED MANY DREAMS WHICH COMES BE TRUE.

FURTHERMORE IF THIS PROJECT WILL BE UPLOADED ,IT CAN BE USED

TRANSPORT MANAGEMENT SYSTEM.IT CAN INCREASE THE CALIVER OF THE ORGANIZATION.OUTPUT OF THE PROJECT REPORT

FOLLOWING REPORTS WILL BE PRODUCED IN THIS PROJECT:-

ADMINISTRATOR CAN MODIFY ,

MEMBER CAN LIMITED PERMISSION TO DO THE CHANGES IN EXCULTABE TABLE.REFERENCES THINKING IN JAVA 2ND EDITION(PRENTICE-HALL) LEARNING JAVA 3RD EDITION (JONATHAN KNUDSEN& PAT)

(a)Bus Managers operational flow of data & control

Log Out

Manage Students Per Route Per Bus

Buses

View Students Per Bus

View

Students Per Route

Students

Login

Route

Users

Bus Manager

Bus Management

System

User

Context Diagram(DFD 0)

Data Store

Stopage

Classes

Bus

Route

Student

User

Admin

View Bus

Status

(b)Administrators operational flow of data & control

Logout

Update

View Route

Status

Login

PAGE 7