Page 1: 30th Engr Bn Update

3030thth Engineer Battalion Engineer Battalion (Topographic)(Topographic)

Ongoing Support to OEF/OIFOngoing Support to OEF/OIF

Page 2: 30th Engr Bn Update

AgendaAgenda

OIF MissionOIF Mission OIF StatisticsOIF Statistics OIF Locations OIF Locations Support to CPASupport to CPA Thanks…Thanks… IssuesIssues

Page 3: 30th Engr Bn Update

MissionMission

The 30The 30thth EN BN (-) deploys to Kuwait EN BN (-) deploys to Kuwait with an LAD of 4 April 2003, conducts with an LAD of 4 April 2003, conducts RSOI with the 416RSOI with the 416thth ENCOM in theatre, ENCOM in theatre, and resumes geospatial support to the and resumes geospatial support to the CFLCC in order to support current and CFLCC in order to support current and future military operations in the Middle future military operations in the Middle East.East.

Page 4: 30th Engr Bn Update

Summary of Missions ExecutedSummary of Missions Executed

4423100th Survey

70000818100th Press

66103218100th HVMP

500032025100th TA

3264639175th HVMP

33011935175th TA

Production

Complete

Missions

(since 11 APR)

PAXElement

Page 5: 30th Engr Bn Update

E

1 100

E

2 100

E

175E

2 100

E

1 100

E

HHCI

E

100

TALILTALIL

KIRKUKKIRKUK

BIAPBIAP

AL KUTAL KUT

CPACPA

DOHADOHA

E

1 100

Page 6: 30th Engr Bn Update

Returning from CPA missionReturning from CPA mission Remainder of BN reconstituted & ready to Remainder of BN reconstituted & ready to

deploydeploy 5026/50275026/5027 OIF 2.5OIF 2.5 OIF 3OIF 3

Ongoing Geospatial OperationsOngoing Geospatial Operations

Page 7: 30th Engr Bn Update

Topographic Support Topographic Support ToTo

Coalition Provisional Coalition Provisional AuthorityAuthority

(CPA)(CPA)

Page 8: 30th Engr Bn Update

AgendaAgenda

MissionMission RequirementsRequirements Statistics Statistics Facts Facts Current OrganizationCurrent Organization Proposed OrganizationProposed Organization Future Support to CPAFuture Support to CPA

Page 9: 30th Engr Bn Update

MissionMission

The Coalition Provisional Authority provides The Coalition Provisional Authority provides continuous support to the people of Iraq to continuous support to the people of Iraq to ensure effective and complete ensure effective and complete reconstruction of the country’s critical reconstruction of the country’s critical infrastructure and stabilization of the infrastructure and stabilization of the government until such time as the Iraqi government until such time as the Iraqi people can provide for and govern people can provide for and govern themselves as a democratic nationthemselves as a democratic nation

Page 10: 30th Engr Bn Update

RequirementsRequirements

Special map products which support:Special map products which support: Route planningRoute planning Infrastructure reconstruction and planningInfrastructure reconstruction and planning Civil developmentCivil development Governmental representationGovernmental representation

Image products which support:Image products which support: Force protection planning Force protection planning Operational planningOperational planning

ScanningScanning Disaster reliefDisaster relief ReconstructionReconstruction

ReproductionReproduction Large quantity reproductionLarge quantity reproduction

Page 11: 30th Engr Bn Update

StatisticsStatistics

Statistics (as of 15 May 2004)Statistics (as of 15 May 2004)Product Type QuantityImage Maps 1,876Raster Maps 1,765Vector Maps 1,076Scans 745Reproduction 76,367

Page 12: 30th Engr Bn Update

FactsFacts All products produced were created for the CPA staff and ministries, Combined

Joint Task force-7 (CJTF-7), its subordinate units, and the United States Army Corps of Engineers (USACE)

The topographic team is playing a key role in the ongoing Mass Grave site assessment through change detection utilizing archival and current commercial satellite imagery

Provided image based products to assist in the search for weapons of mass destruction

Very little of Iraq’s map data survived combat operations and post war looting. In the effort to recover or reproduce this critical data, the Topographic Team has scanned in several hard copy maps and created vector data crucial in the rebuilding of the Iraqi infrastructure

The USACE has a Division size element flowing into Iraq and the Topographic Team will be a valuable asset fulfilling their mapping needs

Page 13: 30th Engr Bn Update

Facts (con’t)Facts (con’t) Products are also being utilized to support the following military plans and Products are also being utilized to support the following military plans and

operations:operations: Operation Desert ScorpionOperation Desert Scorpion Operation Peninsula StrikeOperation Peninsula Strike Operation Long StreetOperation Long Street Operation Iron AnvilOperation Iron Anvil Green Zone Security (CPA)Green Zone Security (CPA) Force protection plans for maneuver units throughout IraqForce protection plans for maneuver units throughout Iraq Regional CPA Headquarter security plansRegional CPA Headquarter security plans

The following are key products used to support the CPA regional The following are key products used to support the CPA regional headquarters:headquarters: Baldiyah (cities, municipalities), Hayy (neighborhoods), and Mahalah Baldiyah (cities, municipalities), Hayy (neighborhoods), and Mahalah

zones (postal zones) boundarieszones (postal zones) boundaries Province (state) Quaida (county), and Nadiya (district) zone boundariesProvince (state) Quaida (county), and Nadiya (district) zone boundaries

Government districts boundariesGovernment districts boundaries

Page 14: 30th Engr Bn Update

Facts (con’t)Facts (con’t)These products continue to be instrumental in successful accomplishments of the following critical tasks:

Reconstruction of the Iraqi oil infrastructure

Reconstruction of the Iraqi electrical infrastructure

Reconstruction of the Iraqi transportation network

Reconstruction of the Iraqi irrigation system

Reconstruction of key Iraqi government facilities infrastructure

Reconstruction of the Iraqi civil infrastructure to include schools, hospitals, police stations, fire stations, prisons and court houses

Bottom line:Bottom line: The Topographic Team is a critical asset within CPA and The Topographic Team is a critical asset within CPA and must continue supporting this organizationmust continue supporting this organization

Page 15: 30th Engr Bn Update

CurrentCurrentOverall OrganizationOverall Organization

DCOS/ HSG

PERSONNAL INTELLIGENCE RCO RSCO Logistics

Director, Administration & Logistics / Chief of Staff Amb Steve Smith

DCMA

HCA

CHAPLAIN

DS

KBR

CommunicationsFACILITIES MGT

DCIS

SJA

ComptrollerFPO

DVB

Transition Support Team

Convention Center

CID

Blackwater

OSI

3/2 CAVMRCO

SPECIAL STAFFPRINCIPAL STAFF

CPA SUPPORT

Geo-Spatial SpaceSupport Cell

HQ SUPPORT GROUP

IndicatesTransition to Principle Staff

Page 16: 30th Engr Bn Update

Current Geo-Spatial Space Current Geo-Spatial Space Support Cell OrganizationSupport Cell Organization

Chief GSSC(0-5, FA 40)

TopographicTeam (7)

Spectral Analysts(2)

Space SupportTeam (6)

Page 17: 30th Engr Bn Update

Proposed OrganizationProposed Organization

LTC, FA 40Space Plans Off

Topographic Tech(CW2/3)

Eagle Vision IITeam

CJTF7 SpaceSupport Team

Topographic TeamNCOIC (SFC)

Topographic AnalystSquad (1xNCO, 5xEM)

Lithography Squad(1xNCO, 3xEM)

Database/SystemAdministrator (1xNCO, 2xEM)

-Military ranks used, can also be civilian equivalent-Pre-assigned positions from Space and Missile Defense Command

Page 18: 30th Engr Bn Update

Future Geo-Spatial Support

-Geo-Spatial support not included in OIF-2 support-Geo-Spatial support to new CPA organization will be included in OIF-3 support-Team will be civilian contracted or military-Team will continue to support the same organizations -Team size will be approximate 10 to 15 man size element-Equipment package will be the same or civilian equivalent to

-2 DTSS-L and HVMP (ARC and ERDAS software)-Software will be ERDAS and ARC-View or equivalent -At least one 36” scanner, two 60” plotters and three 36” plotters

-Products and data will be posted on the net

Page 19: 30th Engr Bn Update

Thanks…Thanks…

ILEX / MANTECH (deployment critical)ILEX / MANTECH (deployment critical) TPIO-Terrain, DCD, FLWTPIO-Terrain, DCD, FLW DGSDGS 2929thth, 320, 320thth, 555, 555thth, 1203, 1203rdrd, & 132, & 132ndnd LTC Kuh/LTC DayLTC Kuh/LTC Day

Page 20: 30th Engr Bn Update

IssuesIssues

HVMP FieldingHVMP Fielding UA / UE Terrain Teams (pax & equip)UA / UE Terrain Teams (pax & equip) Future of 21L & 21SFuture of 21L & 21S TGD TGD Geospatial OversightGeospatial Oversight